A pelletizing shaft furnace waste heat utilization system
By designing the heat exchange rack and cleaning components in the pellet vertical furnace, efficient recycling and utilization of waste heat in the waste gas is achieved, and the problems of low waste heat recovery efficiency and complex structure in the prior art are solved, thereby improving the reliability and maintenance of the system Convenience.
Patent Information
- Application Number
- CN202410204731.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-02-25
- Publication Date
- 2024-11-05
- Estimated Expiration
- 2044-02-25
AI Technical Summary
The waste heat recovery efficiency in existing pellet vertical furnaces is low, and the heat exchange pipelines are prone to accumulate stains and water droplets, resulting in the waste heat being unable to be fully utilized, and the structure is complex and maintenance is difficult.
A waste heat utilization system of the pellet vertical furnace was designed to recover waste heat in the waste gas by setting up a heat exchange rack, and heat exchange was carried out using a top-down intake method. Combined with cleaning components to clean stains and water droplets, improving recycling efficiency. The system includes a waste gas chamber, a calcination chamber, a heating chamber and a waste slag chamber, a built-in heat exchange assembly and a stirring assembly, and a preheating treatment of hot air is used to use insulation pipes.
It improves the recovery rate of waste heat in the exhaust gas, ensures effective cleaning of the heat exchange rack, reduces the cost of waste heat utilization, simplifies structural design, and improves the reliability and maintenance convenience of the system.
Smart Images

Figure CN118009732B_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of waste heat recovery, and in particular to a pelletizing shaft furnace waste heat utilization system. Background Art
[0002] As an important charge structure in the steel industry, pellets often form good furnace conditions together with sintered ore to improve the efficiency and quality of steelmaking. When preparing pellets, the powder ore is added with an appropriate amount of water and a binder to form green balls with uniform viscosity and sufficient strength. After drying and preheating, they are roasted at high temperature to make the green balls agglomerate and form pellets. This process is often carried out in a pelletizing shaft furnace. During the pellet roasting process, part of the heat in the pelletizing shaft furnace is easily discharged to the outside through waste gas and waste slag, resulting in the ineffective use of this part of the heat; in order to recycle this part of the heat, heat exchange is currently often used to recover the heat, but when recovering the waste heat in the waste gas, the heat exchange pipe is fumigated by the waste gas for a long time, and its exterior is prone to accumulate stains and condensation of water droplets, which is not conducive to the heat exchange of the waste heat in the waste gas, resulting in the waste heat cannot be fully utilized. In addition, the common waste heat utilization method has a low heat utilization rate and a relatively complex structure, resulting in some shortcomings such as high cost and difficult maintenance. Summary of the invention
[0003] The present application provides a pelletizing vertical furnace waste heat utilization system, which recycles waste heat in exhaust gas by means of a heat exchange rack, and gradually exchanges heat with exhaust gas by adopting an air intake method from top to bottom, thereby improving the recovery rate of waste heat in exhaust gas. At the same time, a cleaning component is provided for cleaning stains and water droplets on the outer side of the heat exchange rack, thereby ensuring the efficiency of waste heat recovery in exhaust gas by the heat exchange rack. The recovered heat is used for preheating of pelletizing raw materials and fuel raw materials, thereby facilitating the roasting of pellets. The gas after preheating of the pelletizing raw materials and fuel raw materials flows from the waste slag chamber to the vertical furnace, and the heat in the waste slag is carried from the waste slag chamber to the vertical furnace, thereby ensuring the stability of the temperature in the vertical furnace, thereby improving the above-mentioned problems.
[0004] The present invention is specifically as follows: it includes a furnace body and a control cabinet, wherein the interior of the furnace body is provided with an exhaust gas chamber, a roasting chamber, a heating chamber and a waste slag chamber in sequence from top to bottom, a waste slag cleaning component is installed on the side of the furnace body near the waste slag chamber, a stirring component located in the roasting chamber and the heating chamber is installed inside the furnace body, and a heat exchange component located in the exhaust gas chamber is also provided inside the furnace body.
[0005] The heat exchange component includes a heat exchange box installed on the upper part of the exhaust gas cavity, an exhaust gas inlet pipe connected to its inner cavity is installed on the side of the heat exchange box, and a position-adjustable sealing component is arranged in the exhaust gas inlet pipe, a heat exchange frame is installed in the heat exchange box, and a cleaning component for cleaning stains on the outside of the heat exchange frame is arranged in the heat exchange box.
[0006] As a preferred technical solution of the present invention, the heat exchange rack includes a plurality of heat exchange tubes, which are arranged in a spiral shape, and two adjacent heat exchange tubes are connected to each other, and an air inlet pipe is installed at the air inlet of the heat exchange tube located at the top, and an air outlet pipe is installed at the air outlet of the heat exchange tube located at the bottom, and feed assemblies are arranged on the side of the furnace body near the roasting chamber and the heating chamber, and a pipe connected to the inner cavity of the feed assembly is installed at the end of the air outlet pipe.
[0007] As a preferred technical solution of the present invention, the feeding assembly includes a first installation box installed on the side of the furnace body, the first installation box is provided with an opening connected to the inner cavity of the furnace body on the side close to the furnace body, a first dragon mechanism is installed in the first installation box, and a first motor that drives the first dragon mechanism is installed on the side of the first installation box, and the first motor, a control switch corresponding to the first motor in the control cabinet, and an external power supply are connected in series to form a working circuit of the first motor.
[0008] As a preferred technical solution of the present invention, a sealing plate is rotatably installed at the opening on the side of the first installation box, a feed box is installed on the side of the first installation box near the first motor, and the feed box is connected to the inner cavity of the first installation box, a feed hopper connected to its inner cavity is installed on the upper side of the first installation box, a sealing block is slidably arranged in the feed hopper, and an elastic support assembly is installed in the feed box to support and position the sealing block.
[0009] As a preferred technical solution of the present invention, the pipeline includes a first insulation pipe, a second insulation pipe and a third insulation pipe, one end of the first insulation pipe is connected to the end of the air outlet pipe, the other end of the first insulation pipe is connected to the inner cavity of the feed box in the feed assembly close to the roasting chamber, one end of the second insulation pipe is connected to the inner cavity of the first installation box in the feed assembly close to the roasting chamber, the other end of the second insulation pipe is connected to the inner cavity of the feed box in the feed assembly close to the heating chamber, one end of the third insulation pipe is connected to the inner cavity of the first installation box in the feed assembly close to the heating chamber, and the other end of the third insulation pipe is connected to the middle part of the waste slag chamber.
[0010] As a preferred technical solution of the present invention, the waste slag cleaning assembly includes a second installation box installed on the side of the furnace body, a cleaning port is opened at one end of the second installation box close to the furnace body, a second dragon mechanism is installed in the second installation box, and a second motor that drives the second dragon mechanism to work is installed on the side of the second installation box, the end of the second dragon mechanism away from the second motor extends into the waste slag chamber through the cleaning port, a discharge port is opened at a position of the second installation box away from the cleaning port, and a movable plate for sealing the discharge port is arranged in the discharge port, and the second motor, a control switch corresponding to the second motor in the control cabinet, and an external power supply are connected in series to form a working circuit of the second motor.
[0011] As a preferred technical solution of the present invention, a first support frame located at the bottom of the roasting chamber is installed in the furnace body, and a material taking port located above the first support frame is provided on the side of the furnace body close to the first support frame, and a sealing plate for sealing it is installed in the material taking port, and a second support frame located at the bottom of the heating chamber is also installed in the furnace body, and a number of through holes are opened on the sides of the first support frame and the second support frame.
[0012] As a preferred technical solution of the present invention, the stirring assembly includes a mounting rod arranged in the furnace body, the mounting rod is rotatably connected to the middle part of the first support frame and the middle part of the second support frame, and the part of the side of the mounting rod located in the roasting chamber and the part located in the heating chamber are both installed with several stirring shafts, and a stirring motor for driving the mounting rod to rotate is installed at the bottom of the second support frame, and the stirring motor, the control switch corresponding to the stirring motor in the control cabinet, and the external power supply are connected in series to form a working circuit of the stirring motor.
[0013] As a preferred technical solution of the present invention, the exhaust gas intake pipe includes an intake pipe with only an open bottom, a connecting pipe connected to the lower part of the inner cavity of the heat exchanger box is installed on the side of the intake pipe, and the sealing assembly includes a guide rod slidably installed in the intake pipe, and a first sealing plug in contact with the inner side of the intake pipe is fixed to the bottom end of the guide rod, a scraper for cleaning stains inside the intake pipe is installed on the side of the first sealing plug, and a positioning spring is sleeved on the outer side of the guide rod, and the positioning spring is located between the first sealing plug and the intake pipe.
[0014] As a preferred technical solution of the present invention, the cleaning assembly includes a mounting frame, a cleaning ring mounted on the side of the heat exchange frame is fixed to the side of the mounting frame, the inner side of the cleaning ring is in contact with the outer side of the heat exchange tube in the heat exchange frame, a telescopic rod for driving the mounting frame to move is installed on the side of the heat exchange box, the telescopic rod, a control switch corresponding to the telescopic rod in the control cabinet, and an external power supply are connected in series to form a working circuit of the telescopic rod, and a drain pipe connected to the inner cavity of the heat exchange box is installed at the bottom of the heat exchange box, and the drain pipe extends to the outside of the furnace body at one end away from the heat exchange box.
[0015] As a preferred technical solution of the present invention, an exhaust pipe connected to its inner cavity is installed on the top of the heat exchanger box, a second sealing plug is slidably arranged in the exhaust pipe, a positioning frame for positioning the second sealing plug is arranged above the heat exchanger box, a positioning rod is fixed on the top of the heat exchanger box, and the positioning rod is slidably connected to the positioning frame, a limit spring located above the positioning frame is sleeved on the outer side of the positioning rod, a thread is opened on the upper part of the side surface of the positioning rod, and the positioning rod is threadedly connected to a positioning nut for positioning the limit spring.
[0016] The beneficial effects of the present invention are:
[0017] 1. The pelletizing vertical furnace waste heat utilization system of the example of the present invention extracts air through an external exhaust assembly and conveys the air extracted by the exhaust assembly to the air inlet pipe. When the air enters the heat exchange rack from the air inlet pipe, the exhaust gas in the heat exchange box exchanges heat with the air in the heat exchange rack, so as to recover and utilize the waste heat in the exhaust gas. In this scheme, the exhaust gas first contacts the heat exchange tube at the bottom and last contacts the heat exchange tube at the top, while the air contacts the top heat exchange tube first and last contacts the bottom heat exchange tube. This method allows the initial air to contact the exhaust gas to be discharged, thereby improving the recovery rate of the waste heat in the exhaust gas.
[0018] 2. In the pelletizing vertical furnace waste heat utilization system of the example of the present invention, the second sealing plug arranged in the exhaust pipe seals the exhaust pipe to ensure that the exhaust gas entering the heat exchange box fully exchanges heat with the heat exchange frame. The elastic sensitivity of the limit spring is adjusted by rotating the positioning nut at the end of the positioning rod, thereby realizing the adjustment of the elastic supporting force of the limit spring, which is suitable for various needs.
[0019] 3. The pelletizing vertical furnace waste heat utilization system of the present invention controls the telescopic rod to move the mounting frame through the control cabinet, and the cleaning ring fixed on the side of the mounting frame moves with the mounting frame to clean the foreign matter on the side of the heat exchange frame, so as to avoid the heat exchange frame being fumigated by exhaust gas for a long time and accumulating stains, and at the same time prevent the moisture in the exhaust gas from condensing on the side of the heat exchange frame when it is cold during the heat exchange process, affecting the heat exchange, so as to ensure that the heat exchange frame can effectively recover the waste heat in the exhaust gas.
[0020] 4. In the pelletizing vertical furnace waste heat utilization system of the example of the present invention, the air is heated by heat exchange and then enters the first insulation pipe through the air outlet pipe, and the hot air enters the feed box in the feeding assembly close to the roasting chamber through the first insulation pipe, and enters the first installation box through the feed box to preheat the pellets, then the hot air enters the feed box in the feeding assembly close to the heating chamber through the second insulation pipe, and enters the first installation box through the feed box to preheat the fuel, and finally enters the waste slag chamber through the third insulation pipe. After preheating the pellets and fuel, the temperature of the air decreases, and the air entering the waste slag chamber is heated by the waste heat in the waste slag chamber for fuel combustion, and then the above cycle is repeated. In this process, the waste heat in the waste gas and waste slag can be effectively utilized. BRIEF DESCRIPTION OF THE DRAWINGS
[0021] In order to more clearly illustrate the technical solutions of the embodiments of the present application, the drawings required for use in the embodiments will be briefly introduced below. It should be understood that the following drawings only show certain embodiments of the present application and therefore should not be regarded as limiting the scope. For ordinary technicians in this field, other related drawings can be obtained based on these drawings without paying creative work.
[0022] Figure 1A schematic diagram of the structure of the pelletizing shaft furnace waste heat utilization system provided in this application;
[0023] Figure 2 for Figure 1 A schematic diagram of the structure of the middle exhaust gas chamber;
[0024] Figure 3 for Figure 2 A schematic diagram of the enlarged structure at A in the middle;
[0025] Figure 4 for Figure 2 A schematic diagram of the enlarged structure at B in the middle;
[0026] Figure 5 for Figure 1 Schematic diagram of the structure of the middle heat exchange frame;
[0027] Figure 6 for Figure 5 Schematic diagram of the enlarged structure at C in the middle;
[0028] Figure 7 for Figure 5 A schematic diagram of the front view structure of
[0029] Figure 8 for Figure 1 Schematic diagram of the structure of the middle roasting chamber and the heating chamber;
[0030] Fig. 9 for Figure 8 A schematic diagram of the front view structure of
[0031] Fig.10 for Fig. 9 Schematic diagram of the enlarged structure at D in the middle;
[0032] Fig.11 for Figure 1 Schematic diagram of the structure of the middle waste chamber.
[0033] Icons: 1 furnace body, 2 control cabinet, 3 roasting chamber, 31 first support frame, 32 material taking port, 33 sealing plate, 4 heating chamber, 41 second support frame, 42 stirring motor, 43 mounting rod, 44 stirring shaft, 5 exhaust chamber, 51 heat exchange box, 52 heat exchange frame, 53 air inlet pipe, 54 air outlet pipe, 55 mounting frame, 56 cleaning ring, 57 telescopic rod, 6 air inlet pipe, 61 connecting pipe, 62 guide rod, 63 positioning spring, 64 first sealing plug, 65 scraper, 7 exhaust Tube, 71 second sealing plug, 72 positioning frame, 73 positioning rod, 74 limit spring, 75 positioning nut, 8 first installation box, 81 first dragon mechanism, 82 first motor, 83 feed box, 84 feed hopper, 85 sealing block, 86 elastic support assembly, 87 blocking plate, 9 second installation box, 91 second dragon mechanism, 92 second motor, 93 moving plate, 10 waste residue chamber, 11 first insulation tube, 12 second insulation tube, 13 third insulation tube, 14 sewage pipe. DETAILED DESCRIPTION
[0034] In order to make the purpose, technical solution and advantages of the embodiments of the present application clearer, the technical solution in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are part of the embodiments of the present application, rather than all the embodiments. The components of the embodiments of the present application described and shown in the drawings here can be arranged and designed in various different configurations.
[0035] Therefore, the following detailed description of the embodiments of the present application provided in the accompanying drawings is not intended to limit the scope of the present application for which protection is sought, but merely represents selected embodiments of the present application. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in the field without creative work are within the scope of protection of the present application.
[0036] It should be noted that, in the absence of conflict, the embodiments and features in the embodiments of the present application may be combined with each other.
[0037] It should be noted that similar reference numerals and letters denote similar items in the following drawings, and therefore, once an item is defined in one drawing, further definition and explanation thereof is not required in subsequent drawings.
[0038] In the description of the embodiments of the present application, it should be noted that the indicated orientation or positional relationship is based on the orientation or positional relationship shown in the accompanying drawings, or the orientation or positional relationship in which the product of the application is usually placed when in use, or the orientation or positional relationship commonly understood by those skilled in the art, or the orientation or positional relationship in which the product of the application is usually placed when in use, which is only for the convenience of describing the present application and simplifying the description, and does not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present application. In addition, the terms "first", "second", "third", etc. are only used to distinguish the description and cannot be understood as indicating or implying relative importance.
[0039] In the description of the embodiments of the present application, it is also necessary to explain that, unless otherwise clearly specified and limited, the terms "set", "install", and "connect" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a direct connection or an indirect connection through an intermediate medium. For ordinary technicians in this field, the specific meanings of the above terms in this application can be understood according to specific circumstances.
[0040] See also Figure 1-11 The present application provides a waste heat utilization system of a pelletizing vertical furnace, including a furnace body 1 and a control cabinet 2. A waste gas chamber 5, a roasting chamber 3, a heating chamber 4 and a waste slag chamber 10 are sequentially arranged inside the furnace body 1 from top to bottom. The waste gas chamber 5 is used for collecting and discharging waste gas, the roasting chamber 3 is used for high-temperature roasting treatment of pellets, the heating chamber 4 is used for full combustion of solid fuel, and the solid fuel is preferably coal. The waste slag chamber 10 is used for collecting and treating waste slag. A waste slag cleaning component is installed at a position near the waste slag chamber 10 on the side of the furnace body 1. A stirring component located in the roasting chamber 3 and the heating chamber 4 is installed inside the furnace body 1. The stirring component is used to stir the pellets and the fuel to ensure the quality of roasting the pellets. A heat exchange component located in the waste gas chamber 5 is also arranged inside the furnace body 1, and the waste heat in the waste gas is recovered and utilized by the arranged heat exchange component.
[0041] The heat exchange component includes a heat exchange box 51 installed on the upper part of the inner cavity of the exhaust gas chamber 5, an exhaust gas inlet pipe connected to the inner cavity of the heat exchange box 51 is installed on the side of the heat exchange box 51, and a sealing component with adjustable position is arranged in the exhaust gas inlet pipe, a heat exchange frame 52 is installed in the heat exchange box 51, and a cleaning component for cleaning stains on the outer side of the heat exchange frame 52 is arranged in the heat exchange box 51, and the cleaning component is used to clean foreign objects on the side of the heat exchange frame 52 to prevent the heat exchange frame 52 from being fumigated by exhaust gas for a long time and accumulating stains, and at the same time prevent the moisture in the exhaust gas from condensing on the side of the heat exchange frame 52 when it is cold during the heat exchange process, affecting the heat exchange.
[0042] The heat exchange rack 52 includes a plurality of heat exchange tubes, which are arranged in a spiral shape to increase the contact area between the heat exchange tubes and the exhaust gas, thereby ensuring that the heat exchange tubes effectively recycle the waste heat in the exhaust gas, and two adjacent heat exchange tubes are connected to each other. An air inlet pipe 53 is installed at the air inlet of the uppermost heat exchange tube, and an air outlet pipe 54 is installed at the air outlet of the lowermost heat exchange tube. Feed assemblies are provided on the side of the furnace body 1 near the roasting chamber 3 and the heating chamber 4, and a pipe connected to the inner cavity of the feed assembly is installed at the end of the air outlet pipe 54.
[0043] The feeding assembly includes a first installation box 8 installed on the side of the furnace body 1. The first installation box 8 is provided with an opening connected to the inner cavity of the furnace body 1 on the side close to the furnace body 1. A first dragon mechanism 81 is installed in the first installation box 8. A first motor 82 that drives the first dragon mechanism 81 is installed on the side of the first installation box 8. The first motor 82, a control switch corresponding to the first motor 82 in the control cabinet 2, and an external power supply are connected in series to form a working circuit of the first motor 82. The control cabinet 2 controls the first motor 82 to work and drives the first dragon mechanism 81 to rotate to transport the pellet raw materials or fuel raw materials.
[0044] A sealing plate 87 is rotatably installed at the opening on the side of the first installation box 8, a feed box 83 is installed on the side of the first installation box 8 near the first motor 82, and the feed box 83 is connected to the inner cavity of the first installation box 8, a feed hopper 84 connected to its inner cavity is installed on the upper side of the first installation box 8, a sealing block 85 is slidably arranged in the feed hopper 84, preferably, the top of the sealing block 85 is an inclined surface, and an elastic support component 86 for supporting and positioning the sealing block 85 is installed in the feed box 83, and the elastic support component 86 includes but is not limited to a shock absorber and an elastic rod.
[0045] When the pellet raw material or fuel raw material is transported by the feeding assembly, it is placed in the feed hopper 84. The pellet raw material or fuel raw material entering the feed hopper 84 applies pressure to the sealing block 85, so that the sealing block 85 compresses the elastic support assembly 86 and moves down from the feed hopper 84 to the feed box 83. Then, it enters the first installation box 8 through the feed box 83 and is transported to the furnace body 1 by the first dragon mechanism 81. At the same time, the pellet raw material or fuel raw material can also be temporarily stored in the first installation box 8 to facilitate hot air preheating treatment. When there is no pellet raw material or fuel raw material passing through the feed hopper 84, the sealing block 85 is supported by the elastic support assembly 86 and moves to the feed hopper 84 to seal the feed hopper 84. When the first dragon mechanism 81 does not transport the pellet raw material or fuel raw material, the sealing plate 87 seals the opening of the first installation box 8 to prevent hot air leakage.
[0046] The pipeline includes a first insulation pipe 11, a second insulation pipe 12 and a third insulation pipe 13. One end of the first insulation pipe 11 is connected to the end of the air outlet pipe 54, and the other end of the first insulation pipe 11 is connected to the inner cavity of the feed box 83 in the feed assembly near the roasting chamber 3. One end of the second insulation pipe 12 is connected to the inner cavity of the first installation box 8 in the feed assembly near the roasting chamber 3. The other end of the second insulation pipe 12 is connected to the inner cavity of the feed box 83 in the feed assembly near the heating chamber 4. One end of the third insulation pipe 13 is connected to the inner cavity of the first installation box 8 in the feed assembly near the heating chamber 4, and the other end of the third insulation pipe 13 is connected to the middle part of the inner cavity of the waste slag chamber 10.
[0047] After being heated by heat exchange, the air enters the first insulation pipe 11 through the air outlet pipe 54, and the hot air enters the feed box 83 in the feeding assembly near the roasting chamber 3 through the first insulation pipe 11, and enters the first installation box 8 through the feed box 83 to preheat the pellets. Then, the hot air enters the feed box 83 in the feeding assembly near the heating chamber 4 through the second insulation pipe 12, and enters the first installation box 8 through the feed box 83 to preheat the fuel, and finally enters the waste slag chamber 10 through the third insulation pipe 13. After preheating the pellets and fuel, the temperature of the air decreases, and the air entering the waste slag chamber 10 is heated by the residual heat in the waste slag chamber 10 for fuel combustion, and then the above cycle is repeated. In this process, the residual heat in the exhaust gas and waste slag can be effectively utilized.
[0048] The waste slag cleaning assembly includes a second installation box 9 installed on the side of the furnace body 1, a cleaning port is opened at one end of the second installation box 9 close to the furnace body 1, a second dragon mechanism 91 is installed in the second installation box 9, and a second motor 92 that drives the second dragon mechanism 91 to work is installed on the side of the second installation box 9, the end of the second dragon mechanism 91 away from the second motor 92 extends into the waste slag chamber 10 through the cleaning port, a discharge port is opened at a position of the second installation box 9 away from the cleaning port, and a movable plate 93 for sealing it is arranged in the discharge port, the second motor 92, the control switch corresponding to the second motor 92 in the control cabinet 2, and the external power supply are connected in series to form a working circuit of the second motor 92, the second motor 92 is controlled by the control cabinet 2 to drive the second dragon mechanism 91 to rotate to process the waste slag accumulated in the waste slag chamber 10, and optionally, a heat exchange tube is wound around the outside of the second installation box 9, and the waste heat in the waste slag is further recovered and utilized through the arranged heat exchange tube.
[0049] A first support frame 31 located at the bottom of the roasting chamber 3 is installed in the furnace body 1, and a material taking port 32 located above the first support frame 31 is provided on the side of the furnace body 1 near the first support frame 31, and a sealing plate 33 is installed in the material taking port 32 to seal it. A second support frame 41 located at the bottom of the heating chamber 4 is also installed in the furnace body 1, and a plurality of through holes are opened on the sides of the first support frame 31 and the second support frame 41.
[0050] The pellet raw material is transported into the roasting chamber 3 by a feeding assembly arranged at the roasting chamber 3, and the first support frame 31 arranged at the bottom of the inner cavity of the roasting chamber 3 supports the pellets entering the roasting chamber 3, so that the pellets are laid flat on the upper side of the first support frame 31. Then, the fuel raw material is transported into the heating chamber 4 by a feeding assembly arranged at the heating chamber 4, and the first support frame 31 arranged at the bottom of the inner cavity of the heating chamber 4 supports the fuel raw material entering the heating chamber 4, and the fuel raw material is ignited to roast the pellet raw material. During the roasting process, the generated exhaust gas moves upward along the furnace body 1 and accumulates in the exhaust gas chamber 5, and the generated waste slag falls into the waste slag chamber 10 through the through hole on the side of the second support frame 41 and accumulates there.
[0051] The stirring assembly includes a mounting rod 43 arranged in the furnace body 1, and the mounting rod 43 is rotatably connected to the middle part of the first support frame 31 and the middle part of the second support frame 41, and the side parts of the mounting rod 43 located in the roasting chamber 3 and the heating chamber 4 are both installed with a plurality of stirring shafts 44. A stirring motor 42 for driving the mounting rod 43 to rotate is installed at the bottom of the second support frame 41. The stirring motor 42, the control switch corresponding to the stirring motor 42 in the control cabinet 2, and the external power supply are connected in series to form a working circuit of the stirring motor 42. The control cabinet 2 controls the stirring motor 42 to drive the mounting rod 43 to rotate. The stirring shaft 44 installed on the side of the mounting rod 43 stirs the pellets in the roasting chamber 3 and the fuel in the heating chamber 4, so as to facilitate the roasting process of the pellets.
[0052] The exhaust gas intake pipe includes an intake pipe 6 with only the bottom being open, a connecting pipe 61 connected to the lower part of the inner cavity of the heat exchange box 51 is installed on the side of the intake pipe 6, and the sealing assembly includes a guide rod 62 slidably installed in the intake pipe 6, and a first sealing plug 64 in contact with the inner side of the intake pipe 6 is fixed to the bottom end of the guide rod 62, a scraper 65 for cleaning stains inside the intake pipe 6 is installed on the side of the first sealing plug 64, and a positioning spring 63 is sleeved on the outer side of the guide rod 62, and the positioning spring 63 is located between the first sealing plug 64 and the intake pipe 6.
[0053] As the exhaust gas accumulates in the exhaust gas chamber 5, the thrust on the first sealing plug 64 in the intake pipe 6 increases. When the exhaust gas thrust is greater than the elastic supporting force of the positioning spring 63, the exhaust gas pushes the first sealing plug 64 upward and compresses the positioning spring 63. When the first sealing plug 64 moves to above the connecting pipe 61, the exhaust gas in the intake pipe 6 enters the heat exchange box 51 through the connecting pipe 61; when the exhaust gas thrust is less than the elastic supporting force of the positioning spring 63, the compressed positioning spring 63 gradually recovers its deformation and pushes the first sealing plug 64 to move and reset. During this process, the scraper 65 arranged on the side of the first sealing plug 64 cleans the stains accumulated on the inner side of the intake pipe 6 to ensure the effective use of the intake pipe 6. The end of the intake pipe 6 is sealed by the first sealing plug 64, so that the exhaust gas accumulates in the exhaust gas chamber 5. During this process, the air pressure increases, and additional heat is released during the air compression process to increase the exhaust gas temperature.
[0054] The cleaning assembly includes a mounting frame 55, a cleaning ring 56 is fixed on the side of the mounting frame 55 and sleeved on the side of the heat exchange frame 52, the inner side of the cleaning ring 56 contacts the outer side of the heat exchange tube in the heat exchange frame 52, and a telescopic rod 57 is installed on the side of the heat exchange box 51 to drive the mounting frame 55 to move. The telescopic rod 57 includes but is not limited to an electric telescopic rod or a hydraulic telescopic rod. The telescopic rod 57, the control switch corresponding to the telescopic rod 57 in the control cabinet 2, and the external power supply are connected in series to form a working circuit of the telescopic rod 57. The telescopic rod 57 is controlled by the control cabinet 2 to drive the mounting frame 55 to move, and the cleaning ring fixed on the side of the mounting frame 55 is connected to the mounting frame 55. 56 moves with the mounting frame 55 to clean the foreign objects on the side of the heat exchange frame 52, so as to prevent the heat exchange frame 52 from being fumigated by the exhaust gas for a long time and accumulating stains, and at the same time prevent the moisture in the exhaust gas from condensing on the side of the heat exchange frame 52 when it is cold during the heat exchange process, affecting the heat exchange, so as to ensure that the heat exchange frame 52 can effectively recover the waste heat in the exhaust gas. A drain pipe 14 connected to the inner cavity of the heat exchange box 51 is installed at the bottom of the heat exchange box 51, and the end of the drain pipe 14 away from the heat exchange box 51 extends to the outside of the furnace body 1. The stains and water droplets cleaned by the cleaning ring 56 can be discharged to the outside through the drain pipe 14, and a valve for controlling the switch is installed on the drain pipe 14.
[0055] An exhaust pipe 7 connected to the inner cavity of the heat exchange box 51 is installed on the top of the heat exchange box 51, and a second sealing plug 71 is slidably installed in the exhaust pipe 7. A positioning frame 72 for positioning the second sealing plug 71 is arranged above the heat exchange box 51. A positioning rod 73 is fixed on the top of the heat exchange box 51, and the positioning rod 73 is slidably connected to the positioning frame 72. A limit spring 74 located above the positioning frame 72 is sleeved on the outer side of the positioning rod 73. A thread is provided on the upper side of the positioning rod 73, and the positioning rod 73 is threadedly connected to a positioning nut 75 for positioning the limit spring 74.
[0056] The second sealing plug 71 arranged in the exhaust pipe 7 plays a sealing role on the exhaust pipe 7 to ensure that the exhaust gas entering the heat exchange box 51 is fully heat exchanged with the heat exchange frame 52. As the exhaust gas in the heat exchange box 51 gradually accumulates, the thrust applied to the second sealing plug 71 gradually increases. When the thrust applied to the second sealing plug 71 is greater than the elastic supporting force of the limit spring 74, the second sealing plug 71 squeezes the limit spring 74 through the positioning frame 72 and gradually moves upward until it moves out of the exhaust pipe 7, and the exhaust gas from the heat exchange box 51 is discharged through the exhaust pipe 7. Once the gas in the heat exchange box 51 is discharged, its internal pressure decreases, and the thrust applied to the second sealing plug 71 is less than the elastic supporting force of the limit spring 74. The second sealing plug 71 enters the exhaust pipe 7 to seal the exhaust pipe 7 again, ensuring that the exhaust gas is fully heat exchanged with the heat exchange frame 52. In this process, the elastic sensitivity of the limit spring 74 is adjusted by rotating the positioning nut 75 at the end of the positioning rod 73, thereby realizing the adjustment of the elastic supporting force of the limit spring 74, which is suitable for various needs.
[0057] The control cabinet 2, stirring motor 42, telescopic rod 57, first motor 82, second motor 92, etc. used in the present invention are all commonly used electronic components in the prior art, and their working methods and circuit structures are all well-known technologies. The way in which the stirring motor 42, telescopic rod 57, first motor 82, second motor 92 and other electronic components are controlled by the control cabinet 2 is a commonly used technical solution by personnel in this field, and will not be elaborated here.
[0058] When using:
[0059] The pellet raw material is conveyed into the roasting chamber 3 by a feeding assembly arranged at the roasting chamber 3, and the first support frame 31 arranged at the bottom of the inner cavity of the roasting chamber 3 supports the pellets entering the roasting chamber 3, so that the pellets are laid flat on the upper side of the first support frame 31. Then, the fuel raw material is conveyed into the heating chamber 4 by a feeding assembly arranged at the heating chamber 4, and the first support frame 31 arranged at the bottom of the inner cavity of the heating chamber 4 supports the fuel raw material entering the heating chamber 4, and the fuel raw material is ignited to roast the pellet raw material. During the roasting process, the generated waste gas moves upward along the furnace body 1 and accumulates in the waste gas chamber 5, and the generated waste slag falls into the waste slag chamber 10 through the through hole on the side of the second support frame 41 and accumulates there.
[0060] As the exhaust gas accumulates in the exhaust gas chamber 5, the thrust on the first sealing plug 64 in the intake pipe 6 increases. When the exhaust gas thrust is greater than the elastic supporting force of the positioning spring 63, the exhaust gas pushes the first sealing plug 64 upward and compresses the positioning spring 63. When the first sealing plug 64 moves to the top of the connecting pipe 61, the exhaust gas in the intake pipe 6 enters the heat exchange box 51 through the connecting pipe 61; when the exhaust gas thrust is less than the elastic supporting force of the positioning spring 63, the compressed positioning spring 63 gradually recovers its deformation and pushes the first sealing plug 64 to move and reset. In this process, the scraper 65 arranged on the side of the first sealing plug 64 cleans the dirt accumulated on the inner side of the intake pipe 6 to ensure the effective use of the intake pipe 6. The end of the intake pipe 6 is sealed by the first sealing plug 64, so that the exhaust gas accumulates in the exhaust gas chamber 5. In this process, the air pressure increases, and additional heat is released during the air compression process to increase the exhaust gas temperature.
[0061] Air is extracted through an external exhaust assembly and transported to the air inlet pipe 53. When the air enters the heat exchange rack 52 from the air inlet pipe 53, the exhaust gas in the heat exchange box 51 exchanges heat with the air in the heat exchange rack 52, so as to recover the waste heat in the exhaust gas. In this scheme, the exhaust gas first contacts the heat exchange tube at the bottom and last contacts the heat exchange tube at the top, while the air contacts the top heat exchange tube first and last contacts the bottom heat exchange tube. This method allows the initial air to contact the exhaust gas to be discharged, thereby improving the recovery rate of waste heat in the exhaust gas.
[0062] The second sealing plug 71 arranged in the exhaust pipe 7 plays a sealing role on the exhaust pipe 7 to ensure that the exhaust gas entering the heat exchange box 51 is fully heat exchanged with the heat exchange frame 52. As the exhaust gas in the heat exchange box 51 gradually accumulates, the thrust applied to the second sealing plug 71 gradually increases. When the thrust applied to the second sealing plug 71 is greater than the elastic supporting force of the limit spring 74, the second sealing plug 71 squeezes the limit spring 74 through the positioning frame 72 and gradually moves upward until it moves out of the exhaust pipe 7, and the exhaust gas from the heat exchange box 51 is discharged through the exhaust pipe 7. Once the gas in the heat exchange box 51 is discharged, its internal pressure decreases, and the thrust applied to the second sealing plug 71 is less than the elastic supporting force of the limit spring 74. The second sealing plug 71 enters the exhaust pipe 7 to seal the exhaust pipe 7 again, ensuring that the exhaust gas is fully heat exchanged with the heat exchange frame 52. In this process, the elastic sensitivity of the limit spring 74 is adjusted by rotating the positioning nut 75 at the end of the positioning rod 73, so as to adjust the elastic supporting force of the limit spring 74, which is suitable for various needs.
[0063] The control cabinet 2 controls the telescopic rod 57 to drive the mounting frame 55 to move, and the cleaning ring 56 fixed on the side of the mounting frame 55 moves with the mounting frame 55 to clean the foreign matter on the side of the heat exchange frame 52, so as to prevent the heat exchange frame 52 from being fumigated by exhaust gas for a long time and accumulating stains, and at the same time prevent the moisture in the exhaust gas from condensing on the side of the heat exchange frame 52 when it is cold during the heat exchange process, so as to ensure that the heat exchange frame 52 can effectively recover the waste heat in the exhaust gas;
[0064] After the air is heated by heat exchange, it enters the first insulation pipe 11 through the air outlet pipe 54, and the hot air enters the feed box 83 in the feeding assembly near the roasting chamber 3 through the first insulation pipe 11, and enters the first installation box 8 through the feed box 83 to preheat the pellets, and then the hot air enters the feed box 83 in the feeding assembly near the heating chamber 4 through the second insulation pipe 12, and enters the first installation box 8 through the feed box 83 to preheat the fuel, and finally enters the waste slag chamber 10 through the third insulation pipe 13. After the air preheats the pellets and fuel, its temperature decreases, and the air entering the waste slag chamber 10 is heated by the residual heat in the waste slag chamber 10 for fuel combustion, and then the above cycle is repeated. In this process, the residual heat in the waste gas and waste slag can be effectively utilized;
[0065] When the pellet raw material or fuel raw material is transported by the feeding assembly, it is placed in the feed hopper 84. The pellet raw material or fuel raw material entering the feed hopper 84 applies pressure to the sealing block 85, so that the sealing block 85 compresses the elastic support assembly 86 and moves downward from the feed hopper 84 to the feed box 83, and then enters the first installation box 8 through the feed box 83 and is transported to the furnace body 1 by the first dragon mechanism 81. At the same time, the pellet raw material or fuel raw material can also be temporarily stored in the first installation box 8 to facilitate hot air preheating. When there is no pellet raw material or fuel raw material passing through the feed hopper 84, the sealing block 85 is supported by the elastic support assembly 86 and moves to the feed hopper 84 to seal the feed hopper 84. When the first dragon mechanism 81 does not transport the pellet raw material or fuel raw material, the blocking plate 87 seals the opening of the first installation box 8 to prevent hot air leakage;
[0066] The control cabinet 2 controls the stirring motor 42 to drive the mounting rod 43 to rotate, and the stirring shaft 44 installed on the side of the mounting rod 43 stirs the pellets in the roasting chamber 3 and the fuel in the heating chamber 4 to facilitate the roasting of the pellets; the processed pellets can be taken out of the roasting chamber 3 through the material taking port 32;
[0067] The second motor 92 is controlled by the control cabinet 2 to drive the second dragon mechanism 91 to rotate to process the waste slag accumulated in the waste slag chamber 10, and optionally, a heat exchange tube is wrapped around the outside of the second installation box 9 to further recycle the waste heat in the waste slag through the set heat exchange tube.
[0068] The undisclosed parts in the present invention are all prior art, and their specific structures, materials and working principles will not be described in detail.
[0069] The above are only preferred embodiments of the present application and are not intended to limit the present application. For those skilled in the art, the present application may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present application shall be included in the protection scope of the present application.
Claims
1. A pelletizing shaft furnace waste heat utilization system, characterized in that: include: A furnace body (1) and a control cabinet (2), wherein the furnace body (1) is provided with an exhaust gas chamber (5), a roasting chamber (3), a heating chamber (4) and a waste slag chamber (10) in order from top to bottom, a waste slag cleaning component is installed on the side of the furnace body (1) near the waste slag chamber (10), a stirring component is installed in the roasting chamber (3) and the heating chamber (4), and a heat exchange component is also provided in the furnace body (1) and located in the exhaust gas chamber (5); The heat exchange component comprises a heat exchange box (51) installed at the upper part of the inner cavity of the exhaust gas cavity (5); an exhaust gas intake pipe communicating with the inner cavity of the exhaust gas cavity is installed on the side of the heat exchange box (51); a position-adjustable sealing component is arranged in the exhaust gas intake pipe; a heat exchange frame (52) is installed in the heat exchange box (51); and a cleaning component for cleaning dirt on the outer side of the heat exchange frame (52) is arranged in the heat exchange box (51); The exhaust gas intake pipe comprises an intake pipe (6) with only the bottom portion being open, a connecting pipe (61) being mounted on the side of the intake pipe (6) and communicating with the lower portion of the inner cavity of the heat exchange box (51), the sealing assembly comprising a guide rod (62) being slidably mounted in the intake pipe (6), a first sealing plug (64) being fixed at the bottom end of the guide rod (62) and contacting the inner side of the intake pipe (6), a scraper (65) being mounted on the side of the first sealing plug (64) for cleaning dirt inside the intake pipe (6), a positioning spring (63) being sleeved on the outer side of the guide rod (62), the positioning spring (63) being located between the first sealing plug (64) and the intake pipe (6); The cleaning assembly comprises a mounting frame (55), a cleaning ring (56) sleeved on a side of a heat exchange frame (52) is fixed on a side of the mounting frame (55), the inner side of the cleaning ring (56) contacts the outer side of a heat exchange tube in the heat exchange frame (52), and a telescopic rod (57) for driving the mounting frame (55) to move is mounted on a side of the heat exchange box (51), the telescopic rod (57), a control switch in the control cabinet (2) corresponding to the telescopic rod (57), and an external power supply are connected in series to form a working circuit of the telescopic rod (57).
2. The pelletizing shaft furnace waste heat utilization system according to claim 1, characterized in that: The heat exchange rack (52) comprises a plurality of heat exchange tubes, the heat exchange tubes being arranged in a spiral shape, and two adjacent heat exchange tubes being connected to each other, and an air inlet pipe (53) being installed at the air inlet of the heat exchange tube located at the top, and an air outlet pipe (54) being installed at the air outlet of the heat exchange tube located at the bottom, and a feed assembly being arranged at a position close to the roasting chamber (3) and a position close to the heating chamber (4) on the side of the furnace body (1), and a pipe being installed at the end of the air outlet pipe (54) and being connected to the inner cavity of the feed assembly.
3. The pelletizing shaft furnace waste heat utilization system according to claim 2, characterized in that: The feed assembly comprises a first installation box (8) installed on the side of the furnace body (1); an opening communicating with the inner cavity of the furnace body (1) is provided on a side of the first installation box (8) close to the furnace body (1); a first dragon mechanism (81) is installed in the first installation box (8); a first motor (82) for driving the first dragon mechanism (81) is installed on the side of the first installation box (8); the first motor (82), a control switch corresponding to the first motor (82) in the control cabinet (2), and an external power supply are connected in series to form a working circuit of the first motor (82).
4. The pelletizing shaft furnace waste heat utilization system according to claim 3, characterized in that: A sealing plate (87) is rotatably mounted at the opening of the side of the first installation box (8), a feed box (83) is mounted on the side of the first installation box (8) near the first motor (82), and the feed box (83) is connected to the inner cavity of the first installation box (8), a feed hopper (84) connected to the inner cavity of the first installation box (8) is mounted on the upper side of the first installation box (8), a sealing block (85) is slidably mounted in the feed hopper (84), and an elastic support assembly (86) is mounted in the feed box (83) for supporting and positioning the sealing block (85).
5. The pelletizing shaft furnace waste heat utilization system according to claim 4, characterized in that: The pipeline comprises a first insulation pipe (11), a second insulation pipe (12) and a third insulation pipe (13); one end of the first insulation pipe (11) is connected to the end of the air outlet pipe (54); the other end of the first insulation pipe (11) is connected to the inner cavity of a feed box (83) in a feed assembly close to the roasting chamber (3); one end of the second insulation pipe (12) is connected to the inner cavity of a first installation box (8) in a feed assembly close to the roasting chamber (3); the other end of the second insulation pipe (12) is connected to the inner cavity of a feed box (83) in a feed assembly close to the heating chamber (4); one end of the third insulation pipe (13) is connected to the inner cavity of the first installation box (8) in the feed assembly close to the heating chamber (4); and the other end of the third insulation pipe (13) is connected to the middle of the inner cavity of the waste slag chamber (10).
6. The pelletizing shaft furnace waste heat utilization system according to claim 1, characterized in that: The waste residue cleaning assembly comprises a second installation box (9) installed on the side of the furnace body (1); a cleaning port is provided at one end of the second installation box (9) close to the furnace body (1); a second dragon mechanism (91) is installed in the second installation box (9); and a second motor (92) for driving the second dragon mechanism (91) is installed on the side of the second installation box (9); an end of the second dragon mechanism (91) away from the second motor (92) extends into the waste residue chamber (10) through the cleaning port; a discharge port is provided at a position of the second installation box (9) away from the cleaning port, and a movable plate (93) for sealing the discharge port is provided in the discharge port; the second motor (92), a control switch corresponding to the second motor (92) in the control cabinet (2), and an external power supply are connected in series to form a working circuit of the second motor (92).
7. The pelletizing shaft furnace waste heat utilization system according to claim 1, characterized in that: A first support frame (31) located at the bottom of the inner cavity of the roasting chamber (3) is installed in the furnace body (1), and a material taking port (32) located above the first support frame (31) is provided on the side of the furnace body (1) near the first support frame (31), and a sealing plate (33) is installed in the material taking port (32) to seal it. A second support frame (41) located at the bottom of the inner cavity of the heating chamber (4) is also installed in the furnace body (1), and a plurality of through holes are provided on the sides of the first support frame (31) and the second support frame (41).
8. The pelletizing shaft furnace waste heat utilization system according to claim 7, characterized in that: The stirring assembly comprises a mounting rod (43) arranged in the furnace body (1), the mounting rod (43) being rotatably connected to the middle part of the first support frame (31) and the middle part of the second support frame (41), and a plurality of stirring shafts (44) are installed on the side of the mounting rod (43) located in the roasting chamber (3) and the side of the mounting rod (43) located in the heating chamber (4), and a stirring motor (42) for driving the mounting rod (43) to rotate is installed at the bottom of the second support frame (41), and the stirring motor (42), a control switch corresponding to the stirring motor (42) in the control cabinet (2), and an external power supply are connected in series to form a working circuit of the stirring motor (42).
9. The pelletizing shaft furnace waste heat utilization system according to claim 1, characterized in that: A sewage pipe (14) communicating with the inner cavity of the heat exchange box (51) is installed at the bottom of the heat exchange box (51), and one end of the sewage pipe (14) away from the heat exchange box (51) extends to the outside of the furnace body (1).
10. The pelletizing shaft furnace waste heat utilization system according to claim 1, characterized in that: An exhaust pipe (7) communicating with the inner cavity of the heat exchange box (51) is installed on the top of the heat exchange box (51), a second sealing plug (71) is slidably arranged in the exhaust pipe (7), a positioning frame (72) for positioning the second sealing plug (71) is arranged above the heat exchange box (51), a positioning rod (73) is fixed on the top of the heat exchange box (51), and the positioning rod (73) is slidably connected to the positioning frame (72), a limit spring (74) located above the positioning frame (72) is sleeved on the outer side of the positioning rod (73), a thread is provided on the upper part of the side surface of the positioning rod (73), and the positioning rod (73) is connected to a positioning nut (75) for positioning the limit spring (74) through a thread.