A ground construction method for structural floor with gaps and gap blocking structure

By adopting the ground construction method of structural floor slabs with gaps in high-rise buildings, and using embedded panels, connecting beams, steel beams and other components to cantilever anchor and install the gap sealing structure, the problem of insufficient load-bearing capacity of fireproof sealing at the gaps in the curtain wall is solved and achieved Quality stability and fire prevention effect of ground construction.

CN118148326BActive Publication Date: 2024-10-29BEIJING FOURTH CONSTR & ENG +1
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202410394974.6
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-04-02
Publication Date
2024-10-29
Estimated Expiration
2044-04-02

AI Technical Summary

Technical Problem

In high-rise buildings, the gap between the curtain wall and the main body of the building structure is insufficient in fireproof sealing and load-bearing capacity, leading to the problem of cracking of the ground finish layer.

Method used

Adopt the ground construction method with gaps in the structural floor, and install the gap sealing structure through cantilever anchoring and anchoring through components such as embedded boards, connecting beams, steel beams, bottom edge sealing strips, and top buckle plates to ensure the strength and stability of the gap sealing. properties, and set flexible edge strips during ground construction to absorb deformation.

Benefits of technology

It effectively improves the load-bearing capacity of the gap sealing structure, prevents cracking of the ground completion layer, ensures the quality of ground construction, enhances the overall connection strength and stability, and prevents concrete materials from flowing into the gap and affecting the building space.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118148326B_ABST
    Figure CN118148326B_ABST
Patent Text Reader

Abstract

The present invention discloses a ground construction method with a structural floor with a gap, comprising the following steps: step one, structural floor construction; step two, curtain wall construction: a gap is left between the curtain wall and the structural floor; step three, gap fire blocking; step four, cantilever anchoring of the gap blocking structure; step five, ground construction: with the structural floor and the gap blocking structure as the bearing basis, multiple construction layers are laid in sequence from bottom to top. A gap blocking structure used in a ground construction method comprises a blocking plate, a plurality of steel beams, a bottom edge blocking strip and a top buckle plate, a blocking plate is cantilevered on the side of the structural floor, the blocking plate is covered and arranged above the gap, and is pressed and fixed above the blocking plate by a plurality of steel beams, and the steel beams and the structural floor are anchored and connected by a plurality of anchor bolts. The method and the gap blocking structure effectively prevent the quality problem of cracking of the ground finished layer due to insufficient bearing capacity of the gap blocking structure.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of ground construction, and in particular to a ground construction method for a structural floor with gaps and a gap sealing structure. Background Art

[0002] In order to pursue the beauty of appearance and fire safety, high-rise buildings now often use unitized glass curtain walls as the main external structure of the building. Generally, there is no sill wall. The gap between the curtain wall and the main structure of the building, that is, the interlayer gap, is about 300mm wide. The fire can easily spread to the entire building along the interlayer gap. Considering that the ground needs to be constructed on the structural floor, the height from the structural floor to the ground finished layer is about 400mm, and the weight is about 900kg / ㎡. If the bearing capacity of the plugging is insufficient, quality problems such as cracking of the ground finished layer will occur. Therefore, the bearing capacity of the fireproof plugging at the interlayer gap is particularly important.

[0003] For curtain wall structures with raised floors, the blocking is usually located in the area above the floor below the raised floor. At present, the common blocking methods are mainly the following: one is to use brick walls for blocking, which has complicated construction procedures and is difficult to operate; one is to use fireproof glass for blocking, which is expensive, has high costs, and has poor bearing capacity; another is to use metal plates for blocking, whose structural settings are difficult to operate, and unreasonable structural settings will directly affect the bearing capacity; there is also a method of using fireproof cotton to fill the gaps in the floor slabs, or using organic blocking materials for surface protection. Although the fireproof effect is significant, there is still a problem of poor bearing capacity. Summary of the invention

[0004] The purpose of the present invention is to provide a ground construction method for a structural floor with gaps and a gap sealing structure, which solves the problem of cracking of the ground finished layer due to insufficient bearing capacity of the sealing structure.

[0005] To achieve the above object, the present invention adopts the following technical solutions:

[0006] A ground construction method for a structural floor with gaps comprises the following steps:

[0007] Step 1: structural floor construction, pre-embedded plates are set on the sides of the structural floor;

[0008] Step 2: curtain wall construction: a gap is left between the curtain wall and the structural floor;

[0009] Step 3: Fireproof sealing of gaps: Install connecting beams on the embedded plates, use the connecting beams as a fixed foundation, and seal the gaps with fireproof rock wool;

[0010] Step 4: Cantilever anchoring of the gap blocking structure: first, cover the blocking plate above the gap and fix it on the side of the structural floor, press and fix multiple steel beams above the blocking plate, fix one end of the steel beam to the side of the structural floor, fix the bottom edge blocking strip at the bottom of one side of the steel beam, and fix the top buckle plate at the top of the steel beam;

[0011] Step 5: Ground construction: Using the structural floor and gap sealing structure as the bearing foundation, lay multiple construction layers from bottom to top.

[0012] Preferably, the floor comprises a plurality of construction layers, which are, from bottom to top, a lightweight aggregate concrete cushion layer, a DS dry-mixed mortar waterproof leveling layer, a polyurethane coating waterproof layer, an extruded polystyrene board insulation layer, a vacuum aluminum-plated polyester film insulation layer, a fine stone concrete layer, a quick-strengthening leveling layer, an anti-crack suppression mold, an anti-crack fiber layer and a terrazzo floor, and the terrazzo floor is trimmed with magnesium-aluminum alloy trimming strips on all sides.

[0013] Preferably, a gap is provided between the terrazzo floor and the curtain wall, and a flexible edge strip is provided at the gap to absorb deformation of the terrazzo floor.

[0014] A gap sealing structure used in the ground construction method comprises a sealing plate, multiple steel beams, a bottom edge sealing strip and a top snap-fit ​​plate. The sealing plate is cantilevered on the side of the structural floor slab, the sealing plate is arranged to cover the gap, and is pressed and fixed above the sealing plate by multiple steel beams. The multiple steel beams are arranged at even intervals, and the steel beams and the structural floor slab are anchored and connected by multiple anchor bolts; a bottom edge sealing strip is fitted on the bottom of one side of the multiple steel beams, the top snap-fit ​​plate is installed above the multiple steel beams and the side plates of the bottom edge sealing strips are tightly buckled in the top snap-fit ​​plate, the bottom edge sealing strip, the top snap-fit ​​plate and the top surface of the structural floor slab form a closed cavity.

[0015] Preferably, the top snap-fit ​​plate is L-shaped and includes a long plate and a short plate. The long plate is connected to the top surface of the steel beam, a short plate is integrally arranged on one side of the long plate, the short plate is fitted with the side surface of the steel beam, and a blocking cavity adapted to the curtain wall is arranged on the other side of the long plate.

[0016] Preferably, the bottom edge sealing strip is made of L-shaped angle steel, the back of the side plate is closely attached to the side of the steel beam, and the bottom plate is anchored on the structural floor.

[0017] Preferably, the top snap-fit ​​plate is made of a 5 mm thick patterned steel plate, on which a steel mesh is integrated.

[0018] Preferably, the sealing plate is a 1.0 mm galvanized iron plate.

[0019] Preferably, the blocking plate, the steel beam and the top buckle plate are not in contact with the curtain wall and a gap is retained.

[0020] Preferably, the steel beam is made of galvanized I-beam, and the length of the steel beam is at least twice the width of the gap.

[0021] In the present invention, the gap sealing structure is cantilevered and anchored on one side of the structural floor and seals the gap, and the ground is laid above the structural floor and the gap sealing structure as the bearing basis. The gap sealing structure has high strength and small deformation, which effectively prevents the quality problem of cracking of the ground finish layer due to insufficient bearing capacity of the gap sealing structure.

[0022] The sealing plate in the gap sealing structure is installed on one side of the structural floor through multiple steel beams cantilevered and anchored, which not only can seal the gap, but also the multiple steel beams serve as the keel of the entire gap sealing structure, thereby increasing the overall connection strength and stability.

[0023] A top snap-in plate is fastened above multiple steel beams and sealed with a bottom sealing strip, so that the top snap-in plate, the bottom sealing strip and the structural floor form a closed cavity to prevent concrete and other fluid building materials from flowing into the gap during the construction of the ground construction layer and affecting the building space of the next floor.

[0024] The top snap-on plate is made of patterned steel plate and is L-shaped as a whole, so it is relatively strong. It is supported by multiple steel beams as keels, so it has a strong load-bearing capacity.

[0025] A steel mesh is integrated above the top buckle plate to increase the adhesion between the ground and the gap sealing structure.

[0026] There is no contact between the gap sealing structure and the curtain wall, and a gap is retained. There is also a gap between the ground finish layer and the curtain wall to meet the needs of deformation of the curtain wall after vibration.

[0027] A flexible trim is set in the gap between the ground finish layer and the curtain wall, which can not only seal the gap but also absorb its own deformation. BRIEF DESCRIPTION OF THE DRAWINGS

[0028] Figure 1 It is a schematic diagram of the overall structure of the present invention;

[0029] Figure 2 It is a structural schematic diagram of another viewing angle of the present invention;

[0030] In the figure: 1. structural floor; 2. curtain wall; 3. gap sealing structure; 4. ground; 5. flexible edge strip; 6. fireproof rock wool; 7. connecting beam; 10. embedded plate; 30. sealing plate; 31. steel beam; 32. bottom edge sealing strip; 33. top buckle plate; 34. anchor bolt; 330. long plate; 331. short plate; 332. sealing cavity. DETAILED DESCRIPTION

[0031] The present invention will be further described below in conjunction with the accompanying drawings:

[0032] like Figure 1 and Figure 2 A ground construction method for a structural floor with gaps is shown, comprising the following steps:

[0033] Step 1: constructing the structural floor 1, and pre-embedding the embedded plate 10 on the side of the structural floor 1;

[0034] Step 2: Construction of curtain wall 2: A gap is left between curtain wall 2 and structural floor 1;

[0035] Step 3: Fireproof sealing of the gap: Install the connecting beam 7 on the embedded plate 10 by welding, use the connecting beam 7 as a fixed foundation, and seal the fireproof rock wool 6 in the gap;

[0036] Step 4: The gap sealing structure 3 is cantilevered and anchored. First, the sealing plate 30 is covered and set above the gap, and fixed to the side of the structural floor 1 by fasteners. A plurality of steel beams 31 are pressed and fixed above the sealing plate 30. One end of the steel beam 31 is fixed to the side of the structural floor 1 by fasteners. A bottom sealing strip 32 is fixed to the bottom of one side of the steel beam 31 by fasteners. A top buckle plate 33 is fixed to the top of the steel beam 31 by fasteners.

[0037] Step 5, construction of ground 4: with the structural floor 1 and the gap blocking structure 3 as the bearing foundation, multiple construction layers are laid from bottom to top. Ground 4 includes multiple construction layers, from bottom to top, light aggregate concrete cushion layer, DS dry mortar waterproof leveling layer, polyurethane coating waterproof layer, extruded polystyrene board insulation layer, vacuum aluminum-plated polyester film insulation layer, fine stone concrete layer, quick-strengthening leveling layer, anti-crack inhibition mold, anti-crack fiber layer and gold millstone floor. The gold millstone floor is trimmed with magnesium-aluminum alloy trimming strips on all sides. There is a gap between the gold millstone floor and the curtain wall 2, and a flexible trimming strip 5 is set at the gap to absorb the deformation of the gold millstone floor.

[0038] A gap sealing structure used in a ground construction method includes a sealing plate 30, multiple steel beams 31, a bottom edge sealing strip 32 and a top snap-on plate 33. The sealing plate 30 is cantilevered on the side of the structural floor 1. The sealing plate 30 is a 1 mm galvanized iron plate. The sealing plate 30 is covered above the gap and is pressed and fixed above the sealing plate 30 by multiple steel beams 31. The multiple steel beams 31 are evenly spaced, and the steel beams 31 are anchored to the structural floor 1 by multiple anchor bolts 34.

[0039] A bottom edge blocking strip 32 is installed at the bottom of one side of the multiple steel beams 31. The bottom edge blocking strip 32 is made of L-shaped angle steel. The back of the side plate is tightly attached to the side of the steel beam 31, and the bottom plate is anchored on the structural floor 1. The top buckle plate 33 is installed above the multiple steel beams 31 and the side plate of the bottom edge blocking strip 32 is tightly buckled in the top buckle plate 33. The bottom edge blocking strip 32, the top buckle plate 33 and the top surface of the structural floor 1 form a closed cavity.

[0040] The top buckle plate 33 is L-shaped and includes a long plate 330 and a short plate 331. The long plate 330 is connected to the top surface of the steel beam 31. The short plate 331 is integrally arranged on one side of the long plate 330. The short plate 331 fits the side of the steel beam 31. A blocking cavity 332 adapted to the curtain wall 2 is arranged on the other side of the long plate 330. The top buckle plate 33 is made of a 5 mm thick patterned steel plate, on which a steel wire mesh is integrally arranged.

[0041] The blocking plate 30, the steel beam 31 and the top buckle plate 33 are not in contact with the curtain wall 2, and a gap is reserved. The steel beam 31 is made of galvanized I-beam, and the length of the steel beam 31 is at least twice the width of the gap.

[0042] The above embodiments are only some illustrations of the concept and implementation of the present invention, and are not intended to limit the same. Under the concept of the present invention, technical solutions that have not been substantially changed are still within the scope of protection.

Claims

1. A ground construction method for a structural floor with gaps, characterized in that: The following steps are involved: Step 1: constructing the structural floor slab (1), embedding an embedded plate (10) on the side of the structural floor slab (1); Step 2: curtain wall (2) construction: a gap is left between the curtain wall (2) and the structural floor (1); Step 3, fireproof sealing of the gap: installing a connecting beam (7) on the embedded plate (10), using the connecting beam (7) as a fixed foundation, and sealing the fireproof rock wool (6) in the gap; Step 4: The gap sealing structure (3) is cantilevered and anchored. First, a sealing plate (30) is covered and set above the gap and fixed to the side of the structural floor (1). A plurality of steel beams (31) are pressed and fixed above the sealing plate (30). One end of the steel beam (31) is fixed to the side of the structural floor (1). A bottom sealing strip (32) is fixedly installed at the bottom of one side of the steel beam (31). A top buckle plate (33) is fixedly installed at the top of the steel beam (31). Step 5: Ground (4) construction: using the structural floor (1) and the gap blocking structure (3) as the bearing foundation, laying multiple construction layers in sequence from bottom to top; The gap blocking structure (3) comprises a blocking plate (30), a plurality of steel beams (31), a bottom edge blocking strip (32) and a top buckle plate (33). The blocking plate (30) is cantilevered on the side of the structural floor (1). The blocking plate (30) is arranged to cover the top of the gap and is pressed and fixed by a plurality of steel beams (31) above the blocking plate (30). The plurality of steel beams (31) are arranged at even intervals. The steel beams (31) and the structural floor (1) are anchored and connected by a plurality of anchor bolts (34). A bottom edge blocking strip (32) is fitted and installed at the bottom of one side of the plurality of steel beams (31). The top buckle plate (33) is installed above the plurality of steel beams (31) and the side plates of the bottom edge blocking strip (32) are buckled in the top buckle plate (33). The bottom edge blocking strip (32), the top buckle plate (33) and the top surface of the structural floor (1) form a closed cavity. The top buckle plate (33) is made of a 5 mm thick patterned steel plate, and a steel mesh is integrated on the patterned steel plate; The top buckle plate (33) is L-shaped and comprises a long plate (330) and a short plate (331); the long plate (330) is connected to the top surface of the steel beam (31); a short plate (331) is integrally provided on one side of the long plate (330); the short plate (331) is fitted to the side surface of the steel beam (31); and a blocking cavity (332) adapted to the curtain wall (2) is provided on the other side of the long plate (330).

2. The ground construction method of a structural floor with gaps according to claim 1, characterized in that: The floor (4) comprises a plurality of construction layers, which are, from bottom to top, a lightweight aggregate concrete cushion layer, a DS dry-mixed mortar waterproof leveling layer, a polyurethane coating waterproof layer, an extruded polystyrene board insulation layer, a vacuum aluminum-plated polyester film insulation layer, a fine stone concrete layer, a quick-strengthening leveling layer, an anti-crack suppression mold, an anti-crack fiber layer and a terrazzo floor, and the terrazzo floor is edged with magnesium-aluminum alloy edge strips on all sides.

3. The ground construction method of a structural floor with gaps according to claim 2, characterized in that: A gap is provided between the terrazzo floor and the curtain wall (2), and a flexible edge strip (5) is provided at the gap to absorb deformation of the terrazzo floor.

4. The ground construction method of a structural floor with gaps according to claim 1, characterized in that: The bottom edge blocking strip (32) is made of an L-shaped angle steel, the back of the side plate is closely attached to the side of the steel beam (31), and the bottom plate is anchored on the structural floor (1).

5. The ground construction method of a structural floor with gaps according to claim 1, characterized in that: The blocking plate (30) is a 1 mm thick galvanized iron plate.

6. The ground construction method of a structural floor with gaps according to claim 1, characterized in that: The blocking plate (30), the steel beam (31) and the top buckling plate (33) are not in contact with the curtain wall (2), and a gap is retained.

7. The ground construction method of a structural floor with gaps according to claim 6, characterized in that: The steel beam (31) is made of galvanized I-beam, and the length of the steel beam (31) is at least twice the width of the gap.

Citation Information

Patent Citations

  • Curtain wall and building floor closing-in structure and construction method thereof

    CN109577526A

  • Fire prevention structure among curtain floors

    CN202969617U