Intelligent ventilation control method and system for aluminum-silver paste production workshop
Through real-life image data analysis, the ventilation control strategy of the aluminum silver paste production workshop is dynamically adjusted, and the ventilation equipment is coordinated to control the ventilation equipment, which solves the problem of high energy consumption of ventilation equipment in the existing technology, and achieves low energy consumption and high efficiency ventilation effect.
Patent Information
- Application Number
- CN202410495091.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-24
- Publication Date
- 2024-11-12
- Estimated Expiration
- 2044-04-24
AI Technical Summary
The existing ventilation equipment in the aluminum silver paste production workshop cannot be adaptively adjusted according to actual conditions, resulting in high energy consumption and poor ventilation effect.
By analyzing the regional separation attributes and production equipment attributes by acquiring real-life image data, dynamically adjusting ventilation control strategies, collaboratively controlling multiple ventilation devices to achieve the best ventilation effect in the workshop, and dispatching ground mobile ventilation devices when necessary to optimize ventilation intensity.
It achieves high-efficiency ventilation and dust removal effect with low energy consumption, which is more advantageous than traditional fixed ventilation strength methods.
Smart Images

Figure CN118189378B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of aluminum-silver paste production, and in particular to an intelligent ventilation control method and system for an aluminum-silver paste production workshop. Background Art
[0002] The aluminum paste production process involves the preparation of aluminum powder, ball milling and other processes, which inevitably lead to a certain concentration of harmful substances in the aluminum paste production workshop, such as floating aluminum powder, various volatile solvents, additives, etc., and in order to ensure the high quality of aluminum paste products, the aluminum paste production workshop also needs to be ventilated to reduce the concentration of floating substances. However, the existing ventilation equipment works according to a fixed exhaust intensity and cannot be adaptively adjusted according to actual conditions, resulting in generally high energy consumption of ventilation equipment. The present invention aims to improve this technical problem. Summary of the invention
[0003] In order to solve at least one of the above technical problems, the present invention specifically provides an intelligent ventilation control method, system, electronic equipment, computer storage medium and computer program product for an aluminum-silver paste production workshop.
[0004] The present invention provides an intelligent ventilation control method for an aluminum-silver paste production workshop, comprising the following steps:
[0005] Acquire real-scene image data of an aluminum-silver paste production workshop, and analyze and obtain regional separation attributes and production equipment attributes of the aluminum-silver paste production workshop based on the real-scene image data;
[0006] Determine a ventilation control strategy based on the area separation attribute and the production equipment attribute, wherein the ventilation control strategy includes a corresponding number of ventilation devices and a working mode of each ventilation device;
[0007] According to the ventilation control strategy, each of the ventilation equipment is controlled to perform coordinated ventilation and dust removal on the aluminum-silver paste production workshop in accordance with the working mode.
[0008] Furthermore, the acquisition of real-life image data of an aluminum paste production workshop includes:
[0009] Obtain a re-identification cycle corresponding to the aluminum-silver paste production workshop, and obtain real-scene image data of the aluminum-silver paste production workshop by photographing according to the re-identification cycle;
[0010] Furthermore, if the first number of ventilation devices in an aluminum-silver paste production workshop that have stopped working for more than a specified time exceeds a first number threshold, an advance coefficient is determined based on the first number and the specified time, and the re-identification period is adjusted using the advance coefficient. Based on the adjusted new re-identification period, real-life image data of the aluminum-silver paste production workshop is captured and acquired.
[0011] Further, determining the advance coefficient according to the first number and the specified duration includes:
[0012]
[0013] In the formula, γ is the advance coefficient, and γ<1; n is the first number of ventilation equipment in the aluminum-silver paste production workshop that has stopped working for more than the specified time, and N is the benchmark number of ventilation equipment in the aluminum-silver paste production workshop that has stopped working for more than the specified time, that is, the first quantity threshold; α1 is the number of types of different production equipment in the aluminum-silver paste production workshop, and α is the benchmark number of types corresponding to the number of types; β1 is the number of production lines in the aluminum-silver paste production workshop, and β is the benchmark number corresponding to the number of production lines.
[0014] Further, the determining of the ventilation control strategy according to the area separation attribute and the production equipment attribute includes:
[0015] Calculate the area size of the corresponding separation area according to the area separation attribute, and determine a first strategy index according to the area size; wherein the first strategy index and the area size are set to have a positive correlation;
[0016] Predicting operation items of production equipment in the corresponding separated area according to the production equipment attributes, and determining a second strategy index according to the operation items;
[0017] Determine a target ventilation strategy according to the first strategy index, the second strategy index and a baseline ventilation control strategy;
[0018] The reference ventilation control strategy includes a second number of ventilation devices and a first working mode of each of the ventilation devices, and the target ventilation strategy includes a third number of ventilation devices and a second working mode of each of the ventilation devices.
[0019] Further, the determining of the target ventilation strategy according to the first strategy index, the second strategy index and the benchmark ventilation control strategy includes:
[0020] Multiplying the first strategy index, the second strategy index and the second quantity to obtain the third quantity, and selecting a corresponding quantity of the ventilation devices from the corresponding separated areas according to the third quantity;
[0021] The ventilation and filtration volume of the third number of ventilation devices when all are turned on is calculated according to the rated working parameters of the ventilation devices in the corresponding separated areas, and the output volume of the material to be filtered is predicted according to the operation items of the production equipment in the corresponding areas;
[0022] If the ventilation and filtration amount is higher than the output amount of the object to be filtered and reaches a second quantity threshold, the working mode of the third number of the ventilation devices is set to the first working mode, that is, a first target ventilation strategy is generated; otherwise, the fourth number of ground mobile ventilation devices is dispatched, the third number of the ventilation devices are set to the first working mode, and the working mode of the fourth number of the ground mobile ventilation devices is set to the second working mode;
[0023] The fourth quantity is determined according to the difference between the ventilation filtration volume and the output volume of the object to be filtered, and the first working mode is different from the second working mode.
[0024] Further, the fourth number of the ground mobile ventilation devices are set to work in the second working mode, including:
[0025] The fourth number of the mobile ground ventilation devices are controlled to be radially positioned with the working equipment in the corresponding separated area as the center, and the ventilation intensity of the mobile ground ventilation devices is lower as they are farther away from the working equipment.
[0026] The present invention also provides an intelligent ventilation control system for an aluminum-silver paste production workshop, comprising a shooting module, a processing module, a storage module and a ventilation device; the processing module is connected to the shooting module, the ventilation device and the storage module;
[0027] The shooting module is used to obtain real-scene image data of the aluminum-silver paste production workshop and transmit it to the processing module;
[0028] The storage module is used to store executable computer program code;
[0029] The processing module is used to execute the method as described in any of the preceding items by calling the executable computer program code in the storage module to generate a scheduling instruction;
[0030] The ventilation equipment is used to switch the working state according to the scheduling instruction.
[0031] The present invention also provides an electronic device, comprising: a memory storing executable program code; a processor coupled to the memory; the processor calls the executable program code stored in the memory to execute the method as described in any of the preceding items.
[0032] The present invention also provides a computer storage medium, on which a computer program is stored. When the computer program is executed by a processor, any of the above methods is executed.
[0033] The present invention also provides a computer program product, which includes a computer program. When the computer program is executed by a processor, any of the above methods is executed.
[0034] The beneficial effects of the present invention are:
[0035] Based on an in-depth analysis of the area separation properties and production equipment properties in the aluminum-silver paste production workshop, the present invention quickly determines the optimal ventilation control strategy to control multiple ventilation equipment to collaboratively achieve workshop ventilation. Compared with the traditional method of using a fixed ventilation intensity, the solution of the present invention has a higher low energy consumption advantage and better ventilation and dust removal effects. BRIEF DESCRIPTION OF THE DRAWINGS
[0036] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings required for use in the embodiments are briefly introduced below. It should be understood that the following drawings only show certain embodiments of the present invention and therefore should not be regarded as limiting the scope. For ordinary technicians in this field, other related drawings can be obtained based on these drawings without creative work.
[0037] Figure 1 It is a flow chart of an intelligent ventilation control method for an aluminum-silver paste production workshop disclosed in an embodiment of the present invention;
[0038] Figure 2 It is a structural schematic diagram of an intelligent ventilation control system for an aluminum-silver paste production workshop disclosed in an embodiment of the present invention. DETAILED DESCRIPTION
[0039] The following is a description of exemplary embodiments of the present disclosure in conjunction with the accompanying drawings, including various details of the embodiments of the present disclosure to facilitate understanding, which should be considered as merely exemplary. Therefore, it should be recognized by those of ordinary skill in the art that various changes and modifications may be made to the embodiments described herein without departing from the scope and spirit of the present disclosure. Similarly, for the sake of clarity and conciseness, descriptions of well-known functions and structures are omitted in the following description.
[0040] like Figure 1 As shown, an embodiment of the present invention provides an intelligent ventilation control method for an aluminum paste production workshop, comprising the following steps:
[0041] Acquire real-scene image data of an aluminum-silver paste production workshop, and analyze and obtain regional separation attributes and production equipment attributes of the aluminum-silver paste production workshop based on the real-scene image data;
[0042] Determine a ventilation control strategy based on the area separation attribute and the production equipment attribute, wherein the ventilation control strategy includes a corresponding number of ventilation devices and a working mode of each ventilation device;
[0043] According to the ventilation control strategy, each of the ventilation equipment is controlled to perform coordinated ventilation and dust removal on the aluminum-silver paste production workshop in accordance with the working mode.
[0044] In this embodiment, the real-life image data of the aluminum paste production workshop is first captured, and the regional separation attributes and production equipment attributes of the production workshop are obtained through image recognition processing and analysis. The regional separation attributes refer to the division method of each functional area in the production workshop, including the size of the area, the separation method between areas (with partition boards, without partition boards), etc. The production equipment attributes mainly refer to the specific work content applicable to the equipment (such as aluminum powder preparation, ball milling) and the current working status. Based on the above-mentioned regional separation attributes, production equipment attributes and predetermined rules, the most suitable ventilation control strategy can be obtained. Based on the ventilation control strategy, the corresponding number of ventilation equipment can be controlled to perform ventilation operations in a specific working mode, so that the air cleanliness in the aluminum paste production workshop meets the specified requirements.
[0045] Based on an in-depth analysis of the area separation properties and production equipment properties in the aluminum-silver paste production workshop, the present invention quickly determines the optimal ventilation control strategy to control multiple ventilation equipment to collaboratively achieve workshop ventilation. Compared with the traditional method of using a fixed ventilation intensity, the solution of the present invention has a higher low energy consumption advantage and better ventilation and dust removal effects.
[0046] Furthermore, the acquisition of real-life image data of an aluminum paste production workshop includes:
[0047] Obtain a re-identification cycle corresponding to the aluminum-silver paste production workshop, and obtain real-scene image data of the aluminum-silver paste production workshop by photographing according to the re-identification cycle;
[0048] Furthermore, if the first number of ventilation devices in an aluminum-silver paste production workshop that have stopped working for more than a specified time exceeds a first number threshold, an advance coefficient is determined based on the first number and the specified time, and the re-identification period is adjusted using the advance coefficient. Based on the adjusted new re-identification period, real-life image data of the aluminum-silver paste production workshop is captured and acquired.
[0049] In this embodiment, a re-identification cycle is pre-specified, and when the corresponding re-identification node is reached, the camera is automatically controlled to re-acquire the real-life image data of the aluminum paste production workshop, and the regional separation attributes and production equipment attributes of the aluminum paste production workshop are updated in the above manner, thereby updating the ventilation control strategy. At the same time, the aluminum paste production workshop may undergo workshop renovations and equipment maintenance, which may cause changes in the working status of each device in the workshop, the regional division method, the separation status between regions, and the replacement of old and new equipment. If the fixed re-identification cycle is still followed, it may cause a lag in the acquisition of real-life image data, resulting in the old ventilation control strategy being unable to meet the needs of the workshop after the change.
[0050] In this regard, the present invention reversely infers the existence of the above situation based on the first number of ventilation devices that have stopped working for more than a specified time in the aluminum paste production workshop (the first number is greater than the first number threshold). If it exists, the advance coefficient can be calculated based on the first number and the specified time, and the fixed, large-span re-identification cycle can be shortened using the advance coefficient. Therefore, by acquiring the real-life image data of the workshop in advance at a new and closer time node, the occurrence node of the above situation can be matched with a higher probability, thereby effectively reducing the probability that the old ventilation control strategy cannot meet the needs of the workshop after the change.
[0051] Further, determining the advance coefficient according to the first number and the specified duration includes:
[0052]
[0053] In the formula, γ is the advance coefficient, and γ<1; n is the first number of ventilation equipment in the aluminum-silver paste production workshop that has stopped working for more than the specified time, and N is the benchmark number of ventilation equipment in the aluminum-silver paste production workshop that has stopped working for more than the specified time, that is, the first quantity threshold; α1 is the number of types of different production equipment in the aluminum-silver paste production workshop, and α is the benchmark number of types corresponding to the number of types; β1 is the number of production lines in the aluminum-silver paste production workshop, and β is the benchmark number corresponding to the number of production lines.
[0054] In this embodiment, in the above formula, It represents the number of ventilation devices that have stopped working for more than the specified time. The more ventilation devices that have stopped working for the timeout, the larger the advance coefficient γ is, that is, the smaller the re-identification cycle is adjusted, and the earlier the update and acquisition of the real-scene image data is started; conversely, the smaller the advance coefficient γ is, the smaller the re-identification cycle is adjusted, and the lower the degree of advance entry into the update and acquisition of the real-scene image data is.
[0055] In addition, the present invention also adds two coefficients, namely and It represents the number of different types of production equipment in the aluminum paste production workshop. The greater the number of types of production equipment, the greater the probability of starting a smaller number of ventilation equipment. Correspondingly, the more ventilation equipment does not need to be started, that is, the more ventilation equipment does not work when it times out (the greater the probability of more equipment being idle, shut down or switched to standby mode, the more ventilation equipment does not need to be started). This coefficient can be By reducing it, a smaller advance coefficient γ is obtained. It represents the number of production lines in the aluminum paste production workshop. The more production lines there are, the greater the probability of starting a smaller number of ventilation equipment. Correspondingly, the more ventilation equipment does not need to be started or timed out (the greater the probability of more production lines being idle, shut down or switched to standby mode, the more ventilation equipment does not need to be started). This coefficient can be By adjusting it down, a smaller advance coefficient γ is obtained. Therefore, by using the above two coefficients, it is fully considered that when the number of types of production equipment in the workshop and the number of production lines are greater, the number of ventilation equipment that does not work overtime under normal circumstances will also increase. Based on this, the advance coefficient is appropriately adjusted down, which also reduces the sensitivity of the advance coefficient, thereby reducing the probability of misjudgment of the above situation.
[0056] It should be noted that due to the dynamic startup mode of controlling ventilation equipment, some ventilation equipment in the aluminum paste production workshop will be in an unactivated state under normal circumstances. Therefore, the above-mentioned quantity threshold N is obtained by statistically analyzing the common values of ventilation equipment stopping working for more than a specified time in aluminum paste production workshops under normal circumstances.
[0057] Further, the determining of the ventilation control strategy according to the area separation attribute and the production equipment attribute includes:
[0058] Calculate the area size of the corresponding separation area according to the area separation attribute, and determine a first strategy index according to the area size; wherein the first strategy index and the area size are set to have a positive correlation;
[0059] Predicting operation items of production equipment in the corresponding separated area according to the production equipment attributes, and determining a second strategy index according to the operation items;
[0060] Determine a target ventilation strategy according to the first strategy index, the second strategy index and a baseline ventilation control strategy;
[0061] The reference ventilation control strategy includes a second number of ventilation devices and a first working mode of each of the ventilation devices, and the target ventilation strategy includes a third number of ventilation devices and a second working mode of each of the ventilation devices.
[0062] In this embodiment, a reference ventilation control strategy is pre-set, which includes a second number of ventilation equipment and a first working mode of each of the ventilation equipment. The reference ventilation control strategy is generally applicable to all separated areas in the workshop. At the same time, the size of each area in the aluminum paste production workshop will affect the determination of the ventilation control strategy. Generally speaking, the larger the divided area, the more ventilation equipment is required, and the working mode of the ventilation equipment may need to be adjusted when necessary. In addition, the different operating items of the production equipment in each area of the aluminum paste production workshop will also affect the determination of the ventilation control strategy. For example, the operating equipment in area 1 is an aluminum powder preparation machine, the operating equipment in area 2 is a ball mill film making machine, and the operating equipment in area 3 is an aluminum paste filling machine. Obviously, compared with area 3, the aluminum powder preparation machine in area 1 will diffuse more aluminum powder particles, and the ball mill film making machine in area 2 will volatilize more solvents or additives. Accordingly, it is necessary to dispatch more ventilation equipment in areas 1 and 2 for ventilation and dust removal. According to the above correspondence, the first strategy index and the second strategy index can be determined respectively, and the number and working mode of ventilation equipment in the baseline ventilation control strategy can be adjusted accordingly to obtain a target ventilation control strategy that is more suitable for the characteristics of each separated area.
[0063] Further, the determining of the target ventilation strategy according to the first strategy index, the second strategy index and the benchmark ventilation control strategy includes:
[0064] Multiplying the first strategy index, the second strategy index and the second quantity to obtain the third quantity, and selecting a corresponding quantity of the ventilation devices from the corresponding separated areas according to the third quantity;
[0065] The ventilation and filtration volume of the third number of ventilation devices when all are turned on is calculated according to the rated working parameters of the ventilation devices in the corresponding separated areas, and the output volume of the material to be filtered is predicted according to the operation items of the production equipment in the corresponding areas;
[0066] If the ventilation and filtration amount is higher than the output amount of the object to be filtered and reaches a second quantity threshold, the working mode of the third number of the ventilation devices is set to the first working mode, that is, a first target ventilation strategy is generated; otherwise, the fourth number of ground mobile ventilation devices is dispatched, the third number of the ventilation devices are set to the first working mode, and the working mode of the fourth number of the ground mobile ventilation devices is set to the second working mode;
[0067] The fourth quantity is determined according to the difference between the ventilation filtration volume and the output volume of the object to be filtered, and the first working mode is different from the second working mode.
[0068] In this embodiment, the target ventilation equipment is generally configured at the top of the production workshop. First, the first strategy index and the second strategy index obtained above are multiplied by the second quantity to obtain the third quantity of ventilation equipment required after correction; then, the ventilation and filtration amount that can be provided by the third quantity of ventilation equipment when all are turned on is calculated according to the rated working parameters of the ventilation equipment, and the relationship between it and the output amount of the filtered material produced by the operating equipment in the area is judged, that is, whether these ventilation equipment can discharge the output filtered material in time. If it can, the ventilation equipment located at the top can enter the ventilation and dust removal operation; if not, it is necessary to increase the number of ventilation equipment, such as controlling more ventilation equipment located at the top configured in the area to enter the work, but it is possible that all the ventilation equipment in the area is not enough to undertake the ventilation and dust removal work. At this time, a certain number of mobile ventilation equipment located on the ground can be further dispatched to assist.
[0069] It should be noted that the output of the material to be filtered that the production equipment can produce when implementing a specific operation project can be calculated through a preset prediction model. The prediction model can be trained using the historical operation data of the specific production equipment, and taking into account the operation projects and the amount of raw materials input at this stage of the production equipment, and the specific operating parameters set (such as the type and amount of solvent, the grinding rate and temperature of the ball mill, etc.), it can realize the prediction of the output of the material to be filtered in this period.
[0070] Further, the fourth number of the ground mobile ventilation devices are set to work in the second working mode, including:
[0071] The fourth number of the mobile ground ventilation devices are controlled to be radially positioned with the working equipment in the corresponding separated area as the center, and the ventilation intensity of the mobile ground ventilation devices is lower as they are farther away from the working equipment.
[0072] In this embodiment, the aforementioned first working mode can be that the ventilation equipment located at the top performs ventilation operations according to the rated power, while the second working mode is quite different from the first working mode. Specifically, the ground mobile ventilation equipment can have the ability to walk on its own. After receiving the dispatch signal, it can go to the surroundings of the operating equipment in the corresponding separated area by itself, and stand radially around the operating equipment, and the ventilation intensity gradually decreases from the inside to the outside. Therefore, the above-mentioned second working mode of the present invention can realize that the ground mobile ventilation equipment located in the center can discharge most of the output to be filtered in time, while the ground mobile ventilation equipment located on the periphery gradually discharges the remaining to be filtered with a smaller ventilation intensity. Through such a hierarchical layout, energy saving is achieved, and it is also beneficial to reduce the noise level in the aluminum silver paste production workshop.
[0073] like Figure 2As shown, the present invention also provides an intelligent ventilation control system for an aluminum-silver paste production workshop, comprising a shooting module, a processing module, a storage module and a ventilation device; the processing module is connected to the shooting module, the ventilation device and the storage module;
[0074] The shooting module is used to obtain real-scene image data of the aluminum-silver paste production workshop and transmit it to the processing module;
[0075] The storage module is used to store executable computer program code;
[0076] The processing module is used to execute the method described in the embodiment by calling the executable computer program code in the storage module to generate a scheduling instruction;
[0077] The ventilation equipment is used to switch the working state according to the scheduling instruction.
[0078] An embodiment of the present invention further discloses an electronic device, comprising: a memory storing executable program code; a processor coupled to the memory; the processor calls the executable program code stored in the memory to execute the method described in the above embodiment.
[0079] The embodiment of the present invention further discloses a computer storage medium, on which a computer program is stored. When the computer program is executed by a processor, the method described in the above embodiment is executed.
[0080] The present invention further provides a computer program product, which includes a computer program. When the computer program is executed by a processor, the method described in the above embodiment is executed.
[0081] Various embodiments of the systems and techniques described above herein can be implemented in digital electronic circuit systems, integrated circuit systems, field programmable gate arrays (FPGAs), application specific integrated circuits (ASICs), application specific standard products (ASSPs), systems on chips (SOCs), complex programmable logic devices (CPLDs), computer hardware, firmware, software, and / or combinations thereof. These various embodiments may include: being implemented in one or more computer programs, which may be executed and / or interpreted on a programmable system including at least one programmable processor, which may be a dedicated or general programmable processor, which may receive data and instructions from a storage system, at least one input device, and at least one output device, and transmit data and instructions to the storage system, the at least one input device, and the at least one output device.
[0082] The program code for implementing the method of the present disclosure may be written in any combination of one or more programming languages. These program codes may be provided to a processor or controller of a general-purpose computer, a special-purpose computer, or other programmable load balancing device, so that when the program code is executed by the processor or controller, the functions / operations specified in the flow chart and / or block diagram are implemented. The program code may be executed entirely on the machine, partially on the machine, partially on the machine and partially on a remote machine as a stand-alone software package, or entirely on a remote machine or server.
[0083] In the context of the present disclosure, a machine-readable medium may be a tangible medium that may contain or store a program for use by or in conjunction with an instruction execution system, device, or equipment. A machine-readable medium may be a machine-readable signal medium or a machine-readable storage medium. A machine-readable medium may include, but is not limited to, an electronic, magnetic, optical, electromagnetic, infrared, or semiconductor system, device, or equipment, or any suitable combination of the foregoing. A more specific example of a machine-readable storage medium may include an electrical connection based on one or more lines, a portable computer disk, a hard disk, a random access memory (RAM), a read-only memory (ROM), an erasable programmable read-only memory (EPROM or flash memory), an optical fiber, a portable compact disk read-only memory (CD-ROM), an optical storage device, a magnetic storage device, or any suitable combination of the foregoing.
[0084] The systems and techniques described herein may be implemented in a computing system that includes back-end components (e.g., as a data server), or a computing system that includes middleware components (e.g., an application server), or a computing system that includes front-end components (e.g., a user computer with a graphical user interface or a web browser through which a user can interact with implementations of the systems and techniques described herein), or a computing system that includes any combination of such back-end components, middleware components, or front-end components. The components of the system may be interconnected by any form or medium of digital data communication (e.g., a communication network). Examples of communication networks include: a local area network (LAN), a wide area network (WAN), and the Internet.
[0085] It should be understood that the various forms of processes shown above can be used to reorder, add or delete steps. For example, the steps recorded in this disclosure can be executed in parallel, sequentially or in different orders, as long as the desired results of the technical solutions disclosed in this disclosure can be achieved, and this document does not limit this.
[0086] The above specific implementations do not constitute a limitation on the protection scope of the present disclosure. It should be understood by those skilled in the art that various modifications, combinations, sub-combinations and substitutions can be made according to design requirements and other factors. Any modification, equivalent substitution and improvement made within the spirit and principle of the present disclosure shall be included in the protection scope of the present disclosure.
Claims
1. An intelligent ventilation control method for an aluminum paste production workshop, characterized in that: The steps include: Acquire real-life image data of an aluminum paste production workshop, and analyze the real-life image data to obtain the regional separation attributes and production equipment attributes of the aluminum paste production workshop; the regional separation attributes refer to the division method of each functional area in the production workshop, including the size of the area and the separation method between areas, and the production equipment attributes refer to the specific work content applicable to the equipment and the current working status; Determine a ventilation control strategy based on the area separation attribute and the production equipment attribute, wherein the ventilation control strategy includes a corresponding number of ventilation devices and a working mode of each ventilation device; According to the ventilation control strategy, each of the ventilation devices is controlled to perform coordinated ventilation and dust removal on the aluminum-silver paste production workshop in accordance with the working mode; The real-life image data of the aluminum paste production workshop is obtained, including: Obtain a re-identification cycle corresponding to the aluminum-silver paste production workshop, and obtain real-scene image data of the aluminum-silver paste production workshop by photographing according to the re-identification cycle; And, if a first number of ventilation devices in the aluminum paste production workshop that have stopped working for more than a specified time exceeds a first number threshold, an advance coefficient is determined according to the first number and the specified time, and the re-identification period is adjusted using the advance coefficient. According to the adjusted new re-identification period, real-life image data of the aluminum paste production workshop is captured and acquired; The determining the advance coefficient according to the first number and the specified duration includes: ; In the formula, is the advance coefficient, and ; The first number of ventilation equipment in the aluminum paste production workshop that stopped working for more than the specified time. The first quantity threshold is the benchmark number of ventilation equipment in the aluminum paste production workshop that has stopped working for more than a specified period of time; is the number of different types of production equipment in the aluminum paste production workshop, is the number of reference categories corresponding to the number of categories; is the number of production lines in the aluminum paste production workshop, is a reference quantity corresponding to the quantity of the production lines; The determining of the ventilation control strategy according to the area separation attribute and the production equipment attribute includes: Calculate the area size of the corresponding separation area according to the area separation attribute, and determine a first strategy index according to the area size; wherein the first strategy index and the area size are set to have a positive correlation; Predicting operation items of production equipment in the corresponding separated area according to the production equipment attributes, and determining a second strategy index according to the operation items; Determine a target ventilation strategy according to the first strategy index, the second strategy index and a baseline ventilation control strategy; The reference ventilation control strategy includes a second number of ventilation devices and a first working mode of each of the ventilation devices, and the target ventilation strategy includes a third number of ventilation devices and a second working mode of each of the ventilation devices; Determining the target ventilation strategy according to the first strategy index, the second strategy index and the benchmark ventilation control strategy includes: Multiplying the first strategy index, the second strategy index and the second quantity to obtain the third quantity, and selecting a corresponding quantity of the ventilation devices from the corresponding separated areas according to the third quantity; The ventilation and filtration volume of the third number of ventilation devices when all are turned on is calculated according to the rated working parameters of the ventilation devices in the corresponding separated areas, and the output volume of the material to be filtered is predicted according to the operation items of the production equipment in the corresponding areas; If the ventilation and filtration amount is higher than the output amount of the object to be filtered and reaches a second quantity threshold, the working mode of the third number of the ventilation devices is set to the first working mode, that is, a first target ventilation strategy is generated; otherwise, the fourth number of ground mobile ventilation devices is dispatched, the third number of the ventilation devices are set to the first working mode, and the working mode of the fourth number of the ground mobile ventilation devices is set to the second working mode; The fourth quantity is determined according to the difference between the ventilation filtration volume and the output volume of the object to be filtered, and the first working mode is different from the second working mode.
2. The intelligent ventilation control method for an aluminum paste production workshop according to claim 1, characterized in that: The fourth number of the ground mobile ventilation devices is set to work in a second working mode, including: The fourth number of the mobile ground ventilation devices are controlled to be radially positioned with the working equipment in the corresponding separated area as the center, and the ventilation intensity of the mobile ground ventilation devices is lower as they are farther away from the working equipment.
3. An intelligent ventilation control system for an aluminum paste production workshop, comprising a shooting module, a processing module, a storage module and a ventilation device; the processing module is connected to the shooting module, the ventilation device and the storage module; The shooting module is used to obtain real-scene image data of the aluminum-silver paste production workshop and transmit it to the processing module; The storage module is used to store executable computer program code; Features: The processing module is used to execute the method according to any one of claims 1 to 2 by calling the executable computer program code in the storage module to generate a scheduling instruction; The ventilation equipment is used to switch the working state according to the scheduling instruction.
4. An electronic device, comprising: A memory storing executable program code; A processor coupled to the memory; characterized in that: the processor calls the executable program code stored in the memory to execute the method according to any one of claims 1-2.
5. A computer storage medium having a computer program stored thereon, characterized in that: When the computer program is executed by a processor, the method according to any one of claims 1 to 2 is executed.
6. A computer program product, comprising a computer program, characterized in that: When the computer program is executed by a processor, the method according to any one of claims 1 to 2 is performed.
