Information monitoring telemetry terminal and transmission control method
By dividing the time period and adjusting the data transmission frequency based on the data collected by the telemetry terminal and the solar energy supply data, the reliability problem caused by uneven energy supply and data changes in the telemetry terminal is solved, and the accuracy of data transmission and the reliability of energy use are achieved. sex.
Patent Information
- Application Number
- CN202410349715.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-26
- Publication Date
- 2024-11-05
- Estimated Expiration
- 2044-03-26
AI Technical Summary
In telemetry terminals using solar power supply devices, due to the difference in the energy supply period and the uneven changes in telemetry data, it is difficult for the prior art to achieve accurate control of data transmission frequency, which affects the working reliability of the telemetry terminal and the reliability of data transmission analysis. sex.
By dividing the unit time into multiple divided time periods, energy supply prediction is carried out based on the historical changes in data collected by the telemetry terminal and solar energy supply data, energy supply deviation periods and reliable periods are divided, data transmission frequency is adjusted to meet energy supply needs, and ensure that Reliability of data transmission.
The accurate evaluation of the data transmission frequency of the telemetry terminal and the accurate evaluation of the energy use are achieved, which avoids the problem of excessive energy use and ensures the data transmission reliability and energy use of the telemetry terminal.
Smart Images

Figure CN118264994B_ABST
Abstract
Description
Technical Field
[0001] The present invention belongs to the technical field of data transmission, and in particular relates to an information monitoring telemetry terminal and a transmission control method. Background Art
[0002] In the meteorological, hydrological, water conservancy, underground pipeline, geological and other industries, in order to realize the transmission and processing of the collected data at the observation site, corresponding telemetry terminals are generally set up. However, due to the limitation of power supply conditions, it is inevitable that the telemetry terminal cannot be powered by the mains. Generally, solar power supply devices are used to realize the energy replenishment processing of the telemetry terminal, which makes the energy-saving control of the data transmission process of the telemetry terminal a technical problem that needs to be solved urgently.
[0003] In order to solve the above technical problems, in the existing technical solution CN202310659206.4 "An energy consumption control system suitable for hydrological and water resources telemetry terminal", the energy consumption of each sensor is reduced by reducing the acquisition frequency to achieve the ultimate energy consumption control purpose. At the same time, the display controller controls the screen off or on of the display, thereby reducing the energy consumption of the hydrological and water resources telemetry terminal. However, it is not difficult to find the following problems through analysis:
[0004] For telemetry terminals that use solar power supply devices for energy processing, not only does the energy supply of the solar power supply device have certain time period differences, but the changes in the telemetry data of the telemetry target of the telemetry terminal also have certain time period differences. Therefore, if the above factors cannot be taken into account to accurately control the data transmission frequency in different time periods, it is impossible to ensure the reliability of data transmission analysis on the basis of ensuring the working reliability of the telemetry terminal.
[0005] Based on the above technical problems, the present application provides an information monitoring telemetry terminal and a transmission control method. Summary of the invention
[0006] To achieve the purpose of the present invention, the present invention adopts the following technical solutions:
[0007] According to one aspect of the present invention, a transmission control method is provided.
[0008] A transmission control method, characterized in that it specifically includes:
[0009] S1 divides the unit time into multiple divided time periods based on the preset time period, and determines the basic data transmission frequency and energy consumption of the collected data in different divided time periods according to the historical changes of the collected data of the telemetry terminal;
[0010] S2 determines the energy supply forecast amount of different divided time periods based on the historical energy supply data of the solar energy device, and divides the time period types of the divided time periods into energy supply deviation time periods and energy supply reliable time periods based on energy usage;
[0011] S3 takes the divided time period at the current moment as the current divided time period, and determines that the basic data transmission frequency of the telemetry terminal of the current divided time period does not meet the requirements according to the energy supply deviation time period after the current divided time period within the unit time length and the time period type of the current divided time period, and then proceeds to the next step;
[0012] S4 obtains the deviation data of energy supply forecast and energy consumption for the current divided time period and different divided time periods after the current divided time period within the unit time length, and corrects the basic data transmission frequency of the telemetry terminal in combination with the energy supply deviation time period after the current divided time period to obtain a corrected data transmission frequency, and performs data transmission control of the telemetry terminal based on the corrected data transmission frequency.
[0013] A further technical solution is that the preset time duration is determined according to the historical changes of the collected data of the telemetry terminal, wherein the more drastic the changes of the collected data of the telemetry terminal are, the shorter the preset time duration is.
[0014] A further technical solution is that the unit time length is selected as data between one day and three days.
[0015] A further technical solution is to determine the basic data collection frequency of the divided time periods based on the change frequency evaluation amount of the collected data of the divided time periods and the change amount of the collected data, specifically including:
[0016] Determine the matching data acquisition frequency corresponding to the change frequency evaluation amount based on the change frequency evaluation amount of the collected data in the divided time periods, and determine the matching data acquisition frequency corresponding to the collected data change amount based on the collected data change amount in the divided time periods;
[0017] The basic data collection frequency for the divided time periods is determined according to the maximum value of the matching data collection frequency corresponding to the change frequency evaluation amount and the matching data collection frequency corresponding to the collection data change amount.
[0018] A further technical solution is that the method for determining the predicted energy supply amount for the divided time periods is:
[0019] The historical energy supply data of the solar energy device are used to determine the historical energy supply of the solar energy device in divided time periods on different dates, and the energy supply forecast for the divided time periods is determined based on the average value of the historical energy supply of the divided time periods on different dates.
[0020] A further technical solution is to divide the time period types of the divided time periods into energy supply deviation time periods and energy supply reliable time periods, specifically including:
[0021] When the energy consumption of the divided time period is less than the predicted energy supply amount, determining the time period type of the divided time period as a functional deviation time period;
[0022] When the energy consumption of the divided time period is not less than the predicted energy supply amount, the time period type of the divided time period is determined to be a functionally reliable time period.
[0023] A further technical solution is that the method for determining the modified data transmission frequency is:
[0024] Determine the basic correction amount of the data transmission frequency of the telemetry terminal according to the deviation data between the energy supply forecast amount and the energy consumption amount in the current divided time period;
[0025] Determine the energy supply deviation correction amount of the data transmission frequency of the telemetry terminal by using the deviation data of the energy supply prediction amount and the energy consumption in different divided time periods after the current divided time period and the number of energy supply deviation time periods;
[0026] Based on the basic correction amount of the data transmission frequency of the telemetry terminal and the energy supply deviation correction amount, the basic data transmission frequency of the telemetry terminal is corrected to obtain a corrected data transmission frequency.
[0027] On the other hand, the present application provides an information monitoring telemetry terminal, which adopts the above-mentioned transmission control method, and is characterized in that it specifically includes:
[0028] Using energy prediction module, time period type division module, frequency correction judgment module, transmission frequency correction module;
[0029] The energy consumption prediction module is responsible for dividing the unit time into multiple time periods based on the preset time period, and determining the basic data transmission frequency and energy consumption of the collected data in different time periods according to the historical changes of the collected data of the telemetry terminal;
[0030] The time period type division module is responsible for determining the energy supply forecast amount of different divided time periods through the historical energy supply data of the solar energy device, and dividing the time period type of the divided time period into energy supply deviation time period and energy supply reliable time period in combination with energy use;
[0031] The frequency correction judgment module is responsible for taking the division period at the current moment as the current division period, and determining whether the basic data transmission frequency of the telemetry terminal of the current division period meets the requirements according to the energy supply deviation period after the current division period within the unit time length and the period type of the current division period;
[0032] The transmission frequency correction module is responsible for obtaining the deviation data of the energy supply forecast and the energy consumption in the current divided time period and different divided time periods after the current divided time period within the unit time length, and correcting the basic data transmission frequency of the telemetry terminal in combination with the energy supply deviation time period after the current divided time period to obtain the corrected data transmission frequency, and performing data transmission control of the telemetry terminal based on the corrected data transmission frequency.
[0033] The beneficial effects of the present invention are:
[0034] 1. According to the historical changes of the collected data of the telemetering terminal, the basic data transmission frequency and energy consumption of the collected data in different time periods are determined, which realizes the accurate evaluation of the basic data transmission frequency of the collected data in different time periods from the perspective of the historical changes of the collected data of the telemetering terminal, ensures the reliability of the data transmission of the telemetering terminal, and also realizes the accurate evaluation of the energy consumption of the telemetering terminal, which also lays the foundation for further differentiated evaluation of data transmission frequency.
[0035] 2. The basic data transmission frequency of the telemetry terminal is corrected by combining the energy supply deviation period after the current divided time period to obtain the corrected data transmission frequency. This fully takes into account the energy supply demand after the current divided time period, avoids the technical problem of excessive energy consumption caused by the high data transmission frequency in the current time period, ensures the reliability of energy consumption of the telemetry terminal within unit time, and also lays the foundation for ensuring the reliability of data transmission of the telemetry terminal.
[0036] In order to make the above-mentioned objects, features and advantages of the present invention more obvious and easy to understand, preferred embodiments are given below and described in detail with reference to the accompanying drawings. BRIEF DESCRIPTION OF THE DRAWINGS
[0037] The above and other features and advantages of the present invention will become more apparent by describing in detail exemplary embodiments thereof with reference to the attached drawings.
[0038] Figure 1 is a flow chart of a transmission control method;
[0039] Figure 2 is a flow chart of a method for determining a basic data transmission frequency of collected data divided into time periods;
[0040] Figure 3 is a flow chart of a method for modifying determination of a data transmission frequency. DETAILED DESCRIPTION
[0041] In order to enable those skilled in the art to better understand the technical solutions in this specification, the technical solutions in the embodiments of this specification will be clearly and completely described below in conjunction with the drawings in the embodiments of this specification. Obviously, the described embodiments are only part of the embodiments of this specification, not all of the embodiments. Based on the embodiments of this specification, all other embodiments obtained by ordinary technicians in this field without creative work should fall within the scope of protection of this specification.
[0042] Example 1
[0043] To solve the above problems, according to one aspect of the present invention, Figure 1 As shown, a transmission control method is provided, which is characterized by specifically comprising:
[0044] S1 divides the unit time into multiple divided time periods based on the preset time period, and determines the basic data transmission frequency and energy consumption of the collected data in different divided time periods according to the historical changes of the collected data of the telemetry terminal;
[0045] Furthermore, the preset time duration is determined according to the historical changes of the collected data of the telemetry terminal, wherein the more drastic the changes of the collected data of the telemetry terminal are, the shorter the preset time duration is.
[0046] Specifically, the unit time length is selected as data between one day and three days.
[0047] In one possible embodiment, Figure 2 As shown, the method for determining the basic data transmission frequency of the collected data divided into time periods is:
[0048] Determine the number of changes in the collected data of the divided time periods on different dates based on the historical changes in the collected data of the telemetry terminal, and determine the amount of change in the collected data of the divided time periods based on the change amplitudes of the collected data with different change times;
[0049] Determine the interval lengths of different historical change times of the divided time periods on different dates based on the historical change situation of the collected data of the telemetry terminal, and determine the change frequency evaluation amount of the collected data of the divided time periods based on the historical change times with an interval length less than a preset time length threshold;
[0050] The basic data collection frequency of the divided time periods is determined based on the change frequency evaluation amount of the collected data of the divided time periods and the collected data change amount.
[0051] Further, determining the basic data collection frequency of the divided time periods based on the change frequency evaluation amount of the collected data of the divided time periods and the collected data change amount specifically includes:
[0052] Determine the matching data acquisition frequency corresponding to the change frequency evaluation amount based on the change frequency evaluation amount of the collected data in the divided time periods, and determine the matching data acquisition frequency corresponding to the collected data change amount based on the collected data change amount in the divided time periods;
[0053] The basic data collection frequency for the divided time periods is determined according to the maximum value of the matching data collection frequency corresponding to the change frequency evaluation amount and the matching data collection frequency corresponding to the collection data change amount.
[0054] In another possible embodiment, the method for determining the basic data transmission frequency of the collected data divided into time periods is:
[0055] Determine the number of changes in the collected data of the divided time periods on different dates through the historical changes in the collected data of the telemetry terminal, and judge whether the number of dates on which the number of changes in the collected data does not meet the requirement meets the requirement, if so, proceed to the next step, if not, determine the basic data transmission frequency of the collected data of the divided time periods based on the preset data transmission frequency;
[0056] Determine the amount of change of the collected data in the divided time period by the number of changes of the collected data in the divided time period on different dates and the amplitude of the change of the collected data with different numbers of changes, and judge whether the amount of change of the collected data in the divided time period meets the requirements. If so, proceed to the next step; if not, determine the basic data transmission frequency of the collected data in the divided time period based on the preset data transmission frequency;
[0057] Determine the interval lengths of different historical change times of the divided time periods on different dates through the historical change situation of the collected data of the telemetry terminal, and determine the change frequency evaluation amount of the collected data of the divided time periods in combination with the historical change times with an interval length less than a preset time length threshold, and judge whether the change frequency evaluation amount of the divided time periods meets the requirements, if so, proceed to the next step, if not, determine the basic data transmission frequency of the collected data of the divided time periods based on the preset data transmission frequency;
[0058] The basic data collection frequency of the divided time periods is determined based on the change frequency evaluation amount of the collected data of the divided time periods and the collected data change amount.
[0059] In another possible embodiment, the method for determining the basic data transmission frequency of the collected data divided into time periods is:
[0060] Determine the number of changes of the collected data of the divided time periods on different dates through the historical changes of the collected data of the telemetry terminal, and determine the change assessment amount of the collected data of the divided time periods on different dates in combination with the change amplitude of the collected data of different change times, and judge whether the number of dates whose change assessment amount does not meet the requirement meets the requirement, if so, proceed to the next step, if not, determine the basic data transmission frequency of the collected data of the divided time periods based on the preset data transmission frequency;
[0061] Determine the number of historical changes with an interval duration less than a preset duration threshold according to the historical changes of the collected data of the telemetry terminal, and judge whether the number of dates with an interval duration less than the preset duration threshold and the number of historical changes that do not meet the requirement meets the requirement, if so, proceed to the next step, if not, determine the basic data transmission frequency of the collected data of the divided time periods based on the preset data transmission frequency;
[0062] Determine the amount of change of the collected data in the divided time periods by the number of changes of the collected data in the divided time periods on different dates and the amplitude of changes of the collected data at different numbers of changes;
[0063] Determine the interval lengths of different historical change times of the divided time periods on different dates based on the historical change situation of the collected data of the telemetry terminal, and determine the change frequency evaluation amount of the collected data of the divided time periods based on the historical change times with an interval length less than a preset time length threshold;
[0064] The basic data collection frequency of the divided time periods is determined based on the change frequency evaluation amount of the collected data of the divided time periods and the collected data change amount.
[0065] S2 determines the energy supply forecast amount of different divided time periods based on the historical energy supply data of the solar energy device, and divides the time period types of the divided time periods into energy supply deviation time periods and energy supply reliable time periods based on energy usage;
[0066] Specifically, the method for determining the energy supply forecast amount for the divided time periods is:
[0067] The historical energy supply data of the solar energy device are used to determine the historical energy supply of the solar energy device in divided time periods on different dates, and the energy supply forecast for the divided time periods is determined based on the average value of the historical energy supply of the divided time periods on different dates.
[0068] It should be noted that the time period types of the divided time periods are divided into energy supply deviation time periods and energy supply reliable time periods, specifically including:
[0069] When the energy consumption of the divided time period is less than the predicted energy supply amount, determining the time period type of the divided time period as a functional deviation time period;
[0070] When the energy consumption of the divided time period is not less than the predicted energy supply amount, the time period type of the divided time period is determined to be a functionally reliable time period.
[0071] S3 takes the divided time period at the current moment as the current divided time period, and determines that the basic data transmission frequency of the telemetry terminal of the current divided time period does not meet the requirements according to the energy supply deviation time period after the current divided time period within the unit time length and the time period type of the current divided time period, and then proceeds to the next step;
[0072] Further, it is determined that the basic data transmission frequency of the telemetry terminal in the current divided time period does not meet the requirements, specifically including:
[0073] Determine whether the time period type of the current divided time period is an energy supply deviation time period, if so, determine that the basic data transmission frequency of the telemetry terminal of the current divided time period does not meet the requirements, if not, proceed to the next step;
[0074] The deviation between the energy supply forecast and the energy consumption in different time periods is taken as the energy supply deviation, and the total amount of energy supply deviation after the current divided time period is determined according to the energy supply deviation of different time periods after the current divided time period within the unit time length;
[0075] The comprehensive energy supply deviation is determined by the number of energy supply deviation periods after the current divided time period within a unit time length and the deviation between the energy supply forecast and the energy consumption in different energy supply deviation periods. Based on the comprehensive energy supply deviation and the total amount of energy supply deviation after the current divided time period, it is determined whether the basic data transmission frequency of the telemetry terminal in the current divided time period meets the requirements.
[0076] In another possible embodiment, determining that the basic data transmission frequency of the telemetry terminal in the current divided time period does not meet the requirement specifically includes:
[0077] Determine whether the time period type of the current divided time period is an energy supply deviation time period, if so, determine that the basic data transmission frequency of the telemetry terminal of the current divided time period does not meet the requirements, if not, proceed to the next step;
[0078] The deviation between the energy supply forecast and the energy consumption in different time periods is taken as the energy supply deviation. The total amount of energy supply deviation after the current divided time period is determined according to the energy supply deviation of different time periods after the current divided time period within the unit time length. It is judged whether the total amount of energy supply deviation after the current divided time period meets the requirements. If not, it is determined that the basic data transmission frequency of the telemetry terminal in the current divided time period does not meet the requirements. If so, proceed to the next step.
[0079] Obtain the number of energy supply deviation periods after the current divided period within the unit time length, and determine whether the number of energy supply deviation periods after the current divided period meets the requirements. If not, determine that the basic data transmission frequency of the telemetry terminal in the current divided period does not meet the requirements. If so, proceed to the next step;
[0080] The comprehensive energy supply deviation is determined by the number of energy supply deviation periods after the current divided period and the deviation between the energy supply forecast and the energy consumption in different energy supply deviation periods, and it is judged whether the comprehensive energy supply deviation meets the requirements. If not, it is determined that the basic data transmission frequency of the telemetry terminal in the current divided period does not meet the requirements. If so, proceed to the next step;
[0081] According to the comprehensive energy supply deviation and the total energy supply deviation after the current divided time period, it is determined whether the basic data transmission frequency of the telemetry terminal in the current divided time period meets the requirements.
[0082] In another possible embodiment, determining that the basic data transmission frequency of the telemetry terminal in the current divided time period does not meet the requirement specifically includes:
[0083] Determine whether the time period type of the current divided time period is an energy supply deviation time period, if so, determine that the basic data transmission frequency of the telemetry terminal of the current divided time period does not meet the requirements, if not, proceed to the next step;
[0084] Determine the maximum duration of the energy supply deviation period based on the distribution of the energy supply deviation period after the current divided period within the unit time length, and judge whether the maximum duration of the energy supply deviation period meets the requirements. If not, determine that the basic data transmission frequency of the telemetry terminal of the current divided period does not meet the requirements. If so, proceed to the next step;
[0085] Determine the continuous energy supply deviation period according to the distribution of the energy supply deviation period after the current divided period within the unit time length, and judge whether the cumulative duration of the continuous energy supply deviation period meets the requirements. If not, determine that the basic data transmission frequency of the telemetry terminal in the current divided period does not meet the requirements. If so, proceed to the next step;
[0086] The comprehensive energy supply deviation is determined by the number of energy supply deviation periods after the current divided period and the deviation between the energy supply forecast and the energy consumption in different energy supply deviation periods, and it is judged whether the comprehensive energy supply deviation meets the requirements. If not, it is determined that the basic data transmission frequency of the telemetry terminal in the current divided period does not meet the requirements. If so, proceed to the next step;
[0087] According to the comprehensive energy supply deviation and the total energy supply deviation after the current divided time period, it is determined whether the basic data transmission frequency of the telemetry terminal in the current divided time period meets the requirements.
[0088] S4 obtains the deviation data of energy supply forecast and energy consumption for the current divided time period and different divided time periods after the current divided time period within the unit time length, and corrects the basic data transmission frequency of the telemetry terminal in combination with the energy supply deviation time period after the current divided time period to obtain a corrected data transmission frequency, and performs data transmission control of the telemetry terminal based on the corrected data transmission frequency.
[0089] In one possible embodiment, Figure 3 As shown, the method for determining the modified data transmission frequency is:
[0090] Determine the basic correction amount of the data transmission frequency of the telemetry terminal according to the deviation data between the energy supply forecast amount and the energy consumption amount in the current divided time period;
[0091] Determine the energy supply deviation correction amount of the data transmission frequency of the telemetry terminal by using the deviation data of the energy supply prediction amount and the energy consumption in different divided time periods after the current divided time period and the number of energy supply deviation time periods;
[0092] Based on the basic correction amount of the data transmission frequency of the telemetry terminal and the energy supply deviation correction amount, the basic data transmission frequency of the telemetry terminal is corrected to obtain a corrected data transmission frequency.
[0093] In another possible embodiment, the method for determining the modified data transmission frequency is:
[0094] According to the deviation data of the energy supply forecast amount and the energy consumption amount in the current divided time period, it is judged whether the deviation amount of the energy supply forecast amount and the energy consumption amount in the current divided time period meets the requirements. If so, the next step is entered. If not, the basic data transmission frequency of the telemetry terminal is corrected based on the preset correction amount to obtain a corrected data transmission frequency;
[0095] Determine the total deviation between the energy supply forecast and the energy consumption after the current divided period by using the deviation data between the energy supply forecast and the energy consumption of different divided periods after the current divided period, and judge whether the total deviation between the energy supply forecast and the energy consumption after the current divided period meets the requirements. If so, proceed to the next step. If not, correct the basic data transmission frequency of the telemetry terminal based on the preset correction amount to obtain the corrected data transmission frequency.
[0096] Determine the energy supply deviation correction amount of the data transmission frequency of the telemetering terminal by using the deviation data of the energy supply forecast amount and the energy consumption of different divided time periods after the current divided time period and the number of energy supply deviation time periods, and judge whether the energy supply deviation correction amount of the data transmission frequency of the telemetering terminal meets the requirements, if so, proceed to the next step, if not, correct the basic data transmission frequency of the telemetering terminal based on the preset correction amount to obtain the corrected data transmission frequency;
[0097] The basic correction amount of the data transmission frequency of the telemetry terminal is determined according to the deviation data between the energy supply forecast amount and the energy consumption in the current divided time period, and the basic data transmission frequency of the telemetry terminal is corrected based on the basic correction amount of the data transmission frequency of the telemetry terminal and the energy supply deviation correction amount to obtain a corrected data transmission frequency.
[0098] Example 2
[0099] On the other hand, the present application provides an information monitoring telemetry terminal, which adopts the above-mentioned transmission control method, and is characterized in that it specifically includes:
[0100] Using energy prediction module, time period type division module, frequency correction judgment module, transmission frequency correction module;
[0101] The energy consumption prediction module is responsible for dividing the unit time into multiple time periods based on the preset time period, and determining the basic data transmission frequency and energy consumption of the collected data in different time periods according to the historical changes of the collected data of the telemetry terminal;
[0102] The time period type division module is responsible for determining the energy supply forecast amount of different divided time periods through the historical energy supply data of the solar energy device, and dividing the time period type of the divided time period into energy supply deviation time period and energy supply reliable time period in combination with energy use;
[0103] The frequency correction judgment module is responsible for taking the division period at the current moment as the current division period, and determining whether the basic data transmission frequency of the telemetry terminal of the current division period meets the requirements according to the energy supply deviation period after the current division period within the unit time length and the period type of the current division period;
[0104] The transmission frequency correction module is responsible for obtaining the deviation data of the energy supply forecast and the energy consumption in the current divided time period and different divided time periods after the current divided time period within the unit time length, and correcting the basic data transmission frequency of the telemetry terminal in combination with the energy supply deviation time period after the current divided time period to obtain the corrected data transmission frequency, and performing data transmission control of the telemetry terminal based on the corrected data transmission frequency.
[0105] Through the above embodiments, the present invention achieves the following beneficial effects:
[0106] 1. According to the historical changes of the collected data of the telemetering terminal, the basic data transmission frequency and energy consumption of the collected data in different time periods are determined, which realizes the accurate evaluation of the basic data transmission frequency of the collected data in different time periods from the perspective of the historical changes of the collected data of the telemetering terminal, ensures the reliability of the data transmission of the telemetering terminal, and also realizes the accurate evaluation of the energy consumption of the telemetering terminal, which also lays the foundation for further differentiated evaluation of data transmission frequency.
[0107] 2. The basic data transmission frequency of the telemetry terminal is corrected by combining the energy supply deviation period after the current divided time period to obtain the corrected data transmission frequency. This fully takes into account the energy supply demand after the current divided time period, avoids the technical problem of excessive energy consumption caused by the high data transmission frequency in the current time period, ensures the reliability of energy consumption of the telemetry terminal within unit time, and also lays the foundation for ensuring the reliability of data transmission of the telemetry terminal.
[0108] Each embodiment in this specification is described in a progressive manner, and the same or similar parts between the embodiments can be referred to each other, and each embodiment focuses on the differences from other embodiments. In particular, for the device, equipment, and non-volatile computer storage medium embodiments, since they are basically similar to the method embodiments, the description is relatively simple, and the relevant parts can be referred to the partial description of the method embodiment.
[0109] The above is a description of a specific embodiment of the specification. Other embodiments are within the scope of the appended claims. In some cases, the actions or steps recorded in the claims can be performed in an order different from that in the embodiments and still achieve the desired results. In addition, the processes depicted in the drawings do not necessarily require the specific order or continuous order shown to achieve the desired results. In some embodiments, multitasking and parallel processing are also possible or may be advantageous.
[0110] The above description is only one or more embodiments of this specification and is not intended to limit this specification. For those skilled in the art, one or more embodiments of this specification may have various changes and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of one or more embodiments of this specification shall be included in the scope of the claims of this specification.
Claims
1. A transmission control method, It is characterized in that Specifically include: Divide the unit time into multiple time periods based on the preset time period, and determine the basic data transmission frequency and energy consumption of the collected data in different time periods according to the historical changes of the collected data of the telemetry terminal; Determine the energy supply forecast amount of different divided time periods through the historical energy supply data of the solar energy device, and divide the time period types of the divided time periods into energy supply deviation time periods and energy supply reliable time periods in combination with energy usage; The current time segment is taken as the current time segment, and when it is determined that the basic data transmission frequency of the telemetry terminal of the current time segment does not meet the requirements according to the energy supply deviation time segment after the current time segment within the unit time and the time segment type of the current time segment, the next step is entered; Obtain the deviation data of energy supply forecast and energy consumption for the current divided time period and different divided time periods after the current divided time period within the unit time length, and correct the basic data transmission frequency of the telemetry terminal in combination with the energy supply deviation time period after the current divided time period to obtain a corrected data transmission frequency, and perform data transmission control of the telemetry terminal based on the corrected data transmission frequency.
2. The transmission control method according to claim 1, It is characterized in that The preset time length is determined according to the historical changes of the collected data of the telemetry terminal, wherein the more drastic the changes of the collected data of the telemetry terminal are, the shorter the preset time length is.
3. The transmission control method according to claim 1, It is characterized in that The unit time length is selected as data between one day and three days.
4. The transmission control method according to claim 1, It is characterized in that The method for determining the basic data transmission frequency of the collected data divided into time periods is: Determine the number of changes in the collected data of the divided time periods on different dates based on the historical changes in the collected data of the telemetry terminal, and determine the amount of change in the collected data of the divided time periods based on the change amplitudes of the collected data with different change times; Determine the interval lengths of different historical change times of the divided time periods on different dates based on the historical change situation of the collected data of the telemetry terminal, and determine the change frequency evaluation amount of the collected data of the divided time periods based on the historical change times with an interval length less than a preset time length threshold; The basic data collection frequency of the divided time periods is determined based on the change frequency evaluation amount of the collected data of the divided time periods and the collected data change amount.
5. The transmission control method according to claim 4, It is characterized in that Determining the basic data collection frequency of the divided time periods based on the change frequency evaluation amount of the collected data of the divided time periods and the collected data change amount specifically includes: Determine the matching data acquisition frequency corresponding to the change frequency evaluation amount based on the change frequency evaluation amount of the collected data in the divided time periods, and determine the matching data acquisition frequency corresponding to the collected data change amount based on the collected data change amount in the divided time periods; The basic data collection frequency for the divided time periods is determined according to the maximum value of the matching data collection frequency corresponding to the change frequency evaluation amount and the matching data collection frequency corresponding to the collection data change amount.
6. The transmission control method according to claim 1, It is characterized in that The method for determining the energy supply forecast amount for the divided time periods is: The historical energy supply data of the solar energy device are used to determine the historical energy supply of the solar energy device in divided time periods on different dates, and the energy supply forecast for the divided time periods is determined based on the average value of the historical energy supply of the divided time periods on different dates.
7. The transmission control method according to claim 6, It is characterized in that The time period types of the divided time periods are divided into energy supply deviation time periods and energy supply reliable time periods, specifically including: When the energy consumption of the divided time period is less than the predicted energy supply amount, determining the time period type of the divided time period as a functional deviation time period; When the energy consumption of the divided time period is not less than the predicted energy supply amount, the time period type of the divided time period is determined to be a functionally reliable time period.
8. The transmission control method according to claim 1, It is characterized in that The method for determining the modified data transmission frequency is: Determine the basic correction amount of the data transmission frequency of the telemetry terminal according to the deviation data between the energy supply forecast amount and the energy consumption amount in the current divided time period; Determine the energy supply deviation correction amount of the data transmission frequency of the telemetry terminal by using the deviation data of the energy supply prediction amount and the energy consumption in different divided time periods after the current divided time period and the number of energy supply deviation time periods; Based on the basic correction amount of the data transmission frequency of the telemetry terminal and the energy supply deviation correction amount, the basic data transmission frequency of the telemetry terminal is corrected to obtain a corrected data transmission frequency.
9. An information monitoring telemetry terminal, using a transmission control method according to any one of claims 1 to 8, It is characterized in that Specifically include: Using energy prediction module, time period type division module, frequency correction judgment module, transmission frequency correction module; The energy consumption prediction module is responsible for dividing the unit time into multiple time periods based on the preset time period, and determining the basic data transmission frequency and energy consumption of the collected data in different time periods according to the historical changes of the collected data of the telemetry terminal; The time period type division module is responsible for determining the energy supply forecast amount of different divided time periods through the historical energy supply data of the solar energy device, and dividing the time period type of the divided time period into energy supply deviation time period and energy supply reliable time period in combination with energy use; The frequency correction judgment module is responsible for taking the division period at the current moment as the current division period, and determining whether the basic data transmission frequency of the telemetry terminal of the current division period meets the requirements according to the energy supply deviation period after the current division period within the unit time length and the period type of the current division period; The transmission frequency correction module is responsible for obtaining the deviation data of the energy supply forecast and the energy consumption in the current divided time period and different divided time periods after the current divided time period within the unit time length, and correcting the basic data transmission frequency of the telemetry terminal in combination with the energy supply deviation time period after the current divided time period to obtain the corrected data transmission frequency, and performing data transmission control of the telemetry terminal based on the corrected data transmission frequency.
Citation Information
Cited By
Multifunctional telemetering and remote control terminal and method based on Internet of Things communication
CN119967552A
A multi-functional telemetry and remote control terminal and method based on internet of things communication
CN119967552B