A comprehensive treatment method for soil and groundwater pollution in production parks
Through soil and groundwater risk scoring and treatment model selection in the production area, the problem of lack of classification, classification and applicability in the existing technology has been solved, scientific and reasonable treatment of soil and groundwater pollution in the production area has been achieved, and efficient treatment strategies have been provided. and methods.
Patent Information
- Application Number
- CN202410727230.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-06
- Publication Date
- 2024-10-01
- Estimated Expiration
- 2044-06-06
AI Technical Summary
The existing technology lacks classification and grading evaluation methods and indicator systems for soil and groundwater pollution in industrial parks, and existing treatment methods fail to fully consider the actual operating conditions of industrial parks, making it difficult to effectively comprehensively control soil and groundwater pollution.
A comprehensive treatment method for soil and groundwater pollution in industrial parks is proposed. Through risk level classification and treatment mode selection, including soil and groundwater risk scores, low, medium, high, and extremely high risk levels are divided, and corresponding treatment is selected based on the comprehensive risk level. model, using methods such as institutional control, long-term prevention and control, long-term prevention and control as the mainstay, and efficient restoration as the supplement.
A scientific and reasonable soil-groundwater pollution zoning classification and evaluation index system has been established, providing a simplified and efficient treatment method, helping decision-makers to quickly understand and manage pollution problems, obtain scientific prevention and control strategies, and improve the scientific nature and targetedness of pollution control. sex.
Smart Images

Figure CN118297410B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of groundwater pollution control, and in particular to a comprehensive control method for soil and groundwater pollution in a production park. Background Art
[0002] The groundwater system refers to a unified groundwater entity composed of a group of flow surfaces from source to sink with a unified spatiotemporal evolution process. Under the natural state, the recharge, flow and discharge conditions of groundwater are mainly controlled by the landform, geological structure, etc. For the pharmaceutical and chemical industrial park in production, the continuous generation of wastewater has a great impact on the groundwater system. For example, changes in a series of hydrogeological conditions such as groundwater storage space, hydrodynamic field, chemical field and water cycle have changed the original hydrogeological structure and the recharge, flow and discharge conditions of groundwater.
[0003] In the technical regulations on risk screening and risk classification of land plots of in-production enterprises issued by the state, a classification system for pollution of land plots of in-production enterprises is pointed out, but there is no detailed description of the comprehensive treatment methods for each level. At present, there is no classification and grading evaluation method and indicator system for the comprehensive treatment of soil and groundwater pollution in in-production parks, and the evaluation model is relatively simple. Therefore, it is necessary to combine the production situation of soil and groundwater in in-production parks to establish a classification and grading evaluation indicator system and comprehensive treatment methods for soil-groundwater pollution in in-production pharmaceutical and chemical parks.
[0004] Some patent documents have given some groundwater pollution control methods. For example, CN104671385B discloses a method for groundwater pollution control and soil remediation at a sulfate contaminated site. The main steps include: (1) setting up a separation wall between the site and the pollution source; (2) using hydraulic interception technology to control pollution; (3) pumping water - injecting water - stopping pumping and injection, reciprocating three times, and achieving the purpose of groundwater pollution control and soil remediation through water quality monitoring. However, the patent does not take into account the actual operating conditions of the industrial park, and therefore is only suitable for some conditions. Summary of the invention
[0005] In order to solve the above problems, the present invention provides a method for comprehensive treatment of soil and groundwater pollution in a production park, comprising the following steps:
[0006] S1. Risk level classification:
[0007] S1-1. Soil risk classification in production parks: Comprehensively evaluate the risk items of soil in production parks and conduct statistical scoring. Soil risk items include wastewater environmental risk T w 、Solid waste environmental risk sw, regional area A, production and operation time t, the harmful effects of pollutants on human health and whether they contain persistent pollutants, and finally the soil risk level in the production park is obtained, which is divided into four levels: low risk, medium risk, high risk and very high risk;
[0008] S1-2. Classification of groundwater risk in production parks: Comprehensively evaluate the risk items of groundwater in production parks and conduct statistical scoring. Groundwater risk items include the degree of perfection of anti-seepage measures, groundwater burial depth h, soil permeability, volatility of pollutants, annual precipitation P, number of violations by enterprises, and population R within 500m of the surrounding area. Finally, the groundwater risk level in production parks is obtained, which is divided into four levels: low risk, medium risk, high risk and extremely high risk;
[0009] S1-3. Comprehensive risk level classification: The comprehensive risk level of the production park is obtained by comprehensively evaluating the soil risk level and the groundwater risk level of the production park, which is divided into four levels: low risk, medium risk, high risk and extremely high risk;
[0010] S2. Governance model selection: select the corresponding governance model according to the comprehensive risk level of the production park;
[0011] For low-risk production parks, the governance model is institutional control.
[0012] For medium-risk production parks, the governance model is mainly institutional control, supplemented by long-term prevention and control.
[0013] For high-risk production parks, the governance model is mainly long-term prevention and control, supplemented by efficient restoration.
[0014] For production parks with extremely high risk levels, the governance model is supplemented by long-term prevention and control and mainly based on efficient restoration.
[0015] Furthermore, in step S1-1,
[0016] Wastewater Environmental Risk w = annual wastewater discharge × wastewater type. The unit of annual wastewater discharge is 10,000 tons. If T w >3, then assign 4, if 1 < T w ≤3, then assign a value of 2.4. If T w ≤1, then assign a value of 0.8,
[0017] Solid waste environmental risk sw = annual solid waste discharge × type of solid waste. The unit of annual solid waste discharge is 10,000 tons. If T sw >8, then assign 2.5, if 3 < T sw ≤8, then assign a value of 1.5. If T sw ≤3, then assign a value of 0.5,
[0018] For the area A, if A>10 hectares, then assign a value of 5, if 2<A≤10, then assign a value of 3, if A≤2, then assign a value of 1,
[0019] For the production and operation time t, if t>10 years, the value is 6; if 3<t≤10, the value is 4; if t≤3, the value is 1.5.
[0020] For the harmful effects of pollutants on human health, if the harmful effect is level I, a value of 7.5 is assigned; if the harmful effect is level II, a value of 5 is assigned; if the harmful effect is level III, a value of 2.5 is assigned; if the harmful effect is level IV, a value of 1 is assigned.
[0021] For whether it contains persistent pollutants, if yes, it is assigned a value of 1.5, if no, it is assigned a value of 0.
[0022] Add up all the assigned values to obtain the soil risk score S1 in the production park. If S1>24, the soil risk level in the production park is extremely high risk; if 16<S1≤24, the soil risk level in the production park is high risk; if 8<S1≤16, the soil risk level in the production park is medium risk; if S1≤8, the soil risk level in the production park is low risk.
[0023] Note: Each soil risk item is scored and assigned a value, and then the sum is added to obtain a score value that can reflect the soil risk, and the soil risk is defined based on the score value.
[0024] Furthermore, in step S1-2, the degree of perfection of anti-seepage measures is assigned a value of 8 if there are no anti-seepage measures, a value of 5 if there are partial anti-seepage measures, and a value of 1.2 if there are comprehensive anti-seepage measures.
[0025] For the groundwater depth h, if h < 3m, then assign a value of 5; if 3 ≤ h < 10m, then assign a value of 3; if h ≥ 10m, then assign a value of 0.5.
[0026] For soil permeability, if the soil is gravel sand or above, the value is 3; if the soil is coarse sand, medium sand or fine sand, the value is 1.8; if the soil is silt sand or below, the value is 0.6.
[0027] For pollutant volatility, if Henry's constant H ≥ 0.1, then the value is 3; if 0.001 ≤ H < 0.1, then the value is 1.8; if H < 0.001, then the value is 0.6.
[0028] For annual precipitation P, if P ≥ 1000 mm, then assign a value of 3; if 400 mm ≤ P < 1000 mm, then assign a value of 1.8; if P < 400 mm, then assign a value of 0.6.
[0029] For the number of times the enterprise violates the law, if the number of times the enterprise violates the law is more than 3 times, it is assigned a value of 2; if the number of times the enterprise violates the law is 1 to 3 times, it is assigned a value of 1; if the number of times the enterprise violates the law is 0 times, it is assigned a value of 0.
[0030] For the population R within 500m, if R≥5000, assign a value of 6; if 1000≤R<5000, assign a value of 4; if 100≤R<1000, assign a value of 2; if R<100, assign a value of 0.
[0031] Add up all the assigned values to obtain the groundwater risk score S2 in the production park. If S2>24, the groundwater risk level in the production park is extremely high risk; if 16<S2≤24, the groundwater risk level in the production park is high risk; if 8<S2≤16, the groundwater risk level in the production park is medium risk; if S2≤8, the groundwater risk level in the production park is low risk.
[0032] Note: By assigning scores to each groundwater risk item, the sum of the scores is used to obtain a score value that can reflect the groundwater risk, and the groundwater risk is defined based on the score value.
[0033] Preferably, in step S1-3, the comprehensive risk level score S in the production park is positively correlated with the soil risk score S1 in the production park and the groundwater risk score S2 in the production park, satisfying the following formula:
[0034] ;
[0035] If the soil risk level in the production park is low risk, n1 is 0.5; if the soil risk level in the production park is medium risk or high risk, n1 is 1; if the soil risk in the production park is extremely high risk, n1 is 2; if the groundwater risk in the production park is low risk, n2 is 0.5; if the groundwater risk level in the production park is medium risk or high risk, n2 is 1; if the groundwater risk level in the production park is extremely high risk, n2 is 2.
[0036] Note: By scoring and assigning values to the comprehensive risk level of the production park, the soil risk score S1 and the groundwater risk score S2 in the production park are summarized to obtain a scoring formula that can reflect the comprehensive risk of the production park. The impact of soil and groundwater under different risks is considered respectively. The final score S can define the comprehensive risk of the production park.
[0037] Preferably, if S>30, the comprehensive risk level in the production park is extremely high risk; if 18<S≤30, the comprehensive risk level in the production park is high risk; if 6<S≤18, the comprehensive risk level in the production park is medium risk; if S≤6, the comprehensive risk level in the production park is low risk.
[0038] Note: The comprehensive risk level of the production park is closely related to the soil risk and groundwater risk in the production park, and the risk level is defined with high accuracy.
[0039] Furthermore, the system control in step S2 includes hidden danger investigation, regular monitoring and pollution source investigation.
[0040] Furthermore, in step S2,
[0041] When the governance mode is supplemented by long-term blocking and control, several grouting wells are arranged upstream of the production area, with each grouting well spaced 10-20m apart, and the connection line between all grouting wells covers at least 60% of the projection length of the production area in the vertical direction of groundwater flow.
[0042] When the governance mode is mainly long-term blocking and control, several grouting wells are arranged upstream of the production area. The interval between each grouting well is 8 to 14 meters, and the connecting lines between all grouting wells cover at least 75% of the projection length of the production area in the vertical direction of the groundwater flow. The grouting slurry is cement.
[0043] Note: By limiting the main and auxiliary methods of long-term prevention and control respectively, we can obtain a highly targeted long-term prevention and control method that meets the different risk levels in the production park.
[0044] Furthermore, in step S2,
[0045] When the treatment mode is supplemented by efficient remediation, the soil is first thermally desorbed. The thermal desorption heating cycle is 120-160 days, the heating temperature is 100-120°C, and the heating method is conduction heating. Then gas phase extraction is carried out. The gas phase extraction cycle is 4-8 months. The spacing between the steam injection wells for gas phase extraction is 10-14m, and the gas injection method is a pulse 12h-12h cycle.
[0046] When the treatment mode is mainly efficient restoration, the soil is first thermally desorbed with a heating cycle of 160-200 days, a heating temperature of 120-150°C, and a heating method of conduction heating. It is then gas extraction with a cycle of 6-12 months. The spacing between steam injection wells is 10-14m, and the gas injection method is a pulsed 8h-8h cycle.
[0047] Note: By limiting the main and auxiliary methods of efficient remediation respectively, we can obtain highly targeted and efficient remediation methods that meet the different risk levels of production parks, and adapt them to the long-term prevention and control methods, so as to further improve the scientific rationality of comprehensive groundwater management in production parks of different risk levels.
[0048] Compared with the prior art, the present invention has the following beneficial effects:
[0049] (1) The present invention simplifies the technical regulations for risk screening and risk grading of plots of land in production enterprises, and obtains a set of standards that meet the requirements of soil and groundwater management in production parks. It comprehensively considers and assigns values to various risk items in soil risks and groundwater risks in production parks, and scores and assigns values to the comprehensive risk levels of production parks. The soil risk score S1 and the groundwater risk score S2 in the production park are summarized and corrected to obtain a scoring formula that can reflect the comprehensive risk of the production park. In particular, the effects of soil and groundwater under different risks are considered respectively. The scientific and reasonable comprehensive risk level score S of the production park is finally obtained, which can define the comprehensive risk of the production park, establish a soil-groundwater pollution zoning, classification and grading evaluation index system and method for production pharmaceutical and chemical parks, and provide a simplified and efficient method to help decision makers understand and manage soil and groundwater pollution problems more quickly and accurately, obtain scientific prevention and control strategy guidance, and facilitate the smooth progress of subsequent pollution prevention and control work;
[0050] (2) The present invention defines the main method and auxiliary method of long-term prevention and control respectively, thereby obtaining a long-term prevention and control method with strong pertinence that meets the different risk levels of the production park; the present invention defines the main method and auxiliary method of efficient remediation respectively, thereby obtaining a highly pertinent and efficient remediation method that meets the different risk levels of the production park, and the method is adapted to the long-term prevention and control method, thereby further improving the scientific rationality of the comprehensive management of groundwater in production parks of different risk levels. BRIEF DESCRIPTION OF THE DRAWINGS
[0051] Figure 1 It is a schematic diagram of the governance mode of Experimental Example 1 of the present invention;
[0052] Figure 2 is a schematic diagram of the governance mode of Experimental Example 2 of the present invention;
[0053] Figure 3 It is a flow chart of the method of the present invention. DETAILED DESCRIPTION
[0054] In order to further illustrate the method adopted by the present invention and the effect achieved, the technical solution of the present invention will be clearly and completely described in combination with experiments below.
[0055] Embodiment 1: A method for comprehensive treatment of soil and groundwater pollution in a production park, comprising the following steps:
[0056] S1. Risk level classification:
[0057] S1-1. Soil risk classification in production parks: Comprehensively evaluate the risk items of soil in production parks and conduct statistical scoring. Soil risk items include wastewater environmental risk T w 、Solid waste environmental risk sw, regional area A, production and operation time t, the harmful effects of pollutants on human health and whether they contain persistent pollutants, and finally the soil risk level in the production park is obtained, which is divided into four levels: low risk, medium risk, high risk and very high risk;
[0058] Wastewater Environmental Risk w = annual wastewater discharge × wastewater type. The unit of annual wastewater discharge is 10,000 tons. If T w >3, then assign 4, if 1 < T w ≤3, then assign a value of 2.4. If T w ≤1, then assign a value of 0.8,
[0059] Solid waste environmental risk sw = annual solid waste discharge × type of solid waste. The unit of annual solid waste discharge is 10,000 tons. If T sw >8, then assign 2.5, if 3 < T sw ≤8, then assign a value of 1.5. If T sw ≤3, then assign a value of 0.5,
[0060] For the area A, if A>10 hectares, then assign a value of 5, if 2<A≤10, then assign a value of 3, if A≤2, then assign a value of 1,
[0061] For the production and operation time t, if t>10 years, the value is 6; if 3<t≤10, the value is 4; if t≤3, the value is 1.5.
[0062] For the harmful effects of pollutants on human health, if the harmful effect is level I, a value of 7.5 is assigned; if the harmful effect is level II, a value of 5 is assigned; if the harmful effect is level III, a value of 2.5 is assigned; if the harmful effect is level IV, a value of 1 is assigned.
[0063] For whether it contains persistent pollutants, if yes, it is assigned a value of 1.5, if no, it is assigned a value of 0.
[0064] All assigned values are added together to obtain the soil risk score S1 in the production park. If S1>24, the soil risk level in the production park is extremely high risk; if 16<S1≤24, the soil risk level in the production park is high risk; if 8<S1≤16, the soil risk level in the production park is medium risk; if S1≤8, the soil risk level in the production park is low risk;
[0065] S1-2. Classification of groundwater risk in production parks: Comprehensively evaluate the risk items of groundwater in production parks and conduct statistical scoring. Groundwater risk items include the degree of perfection of anti-seepage measures, groundwater burial depth h, soil permeability, volatility of pollutants, annual precipitation P, number of violations by enterprises, and population R within 500m of the surrounding area. Finally, the groundwater risk level in production parks is obtained, which is divided into four levels: low risk, medium risk, high risk and extremely high risk;
[0066] For the degree of perfection of anti-seepage measures, if there are no anti-seepage measures, a value of 8 is assigned; if there are partial anti-seepage measures, a value of 5 is assigned; if there are comprehensive anti-seepage measures, a value of 1.2 is assigned.
[0067] For the groundwater depth h, if h < 3m, then assign a value of 5; if 3 ≤ h < 10m, then assign a value of 3; if h ≥ 10m, then assign a value of 0.5.
[0068] For soil permeability, if the soil is gravel sand or above, the value is 3; if the soil is coarse sand, medium sand or fine sand, the value is 1.8; if the soil is silt sand or below, the value is 0.6.
[0069] For pollutant volatility, if Henry's constant H ≥ 0.1, then the value is 3; if 0.001 ≤ H < 0.1, then the value is 1.8; if H < 0.001, then the value is 0.6.
[0070] For annual precipitation P, if P ≥ 1000 mm, then assign a value of 3; if 400 mm ≤ P < 1000 mm, then assign a value of 1.8; if P < 400 mm, then assign a value of 0.6.
[0071] For the number of times the enterprise violates the law, if the number of times the enterprise violates the law is more than 3 times, it is assigned a value of 2; if the number of times the enterprise violates the law is 1 to 3 times, it is assigned a value of 1; if the number of times the enterprise violates the law is 0 times, it is assigned a value of 0.
[0072] For the population R within 500m, if R≥5000, assign a value of 6; if 1000≤R<5000, assign a value of 4; if 100≤R<1000, assign a value of 2; if R<100, assign a value of 0.
[0073] All assigned values are added together to obtain the groundwater risk score S2 in the production park. If S2>24, the groundwater risk level in the production park is extremely high risk; if 16<S2≤24, the groundwater risk level in the production park is high risk; if 8<S2≤16, the groundwater risk level in the production park is medium risk; if S2≤8, the groundwater risk level in the production park is low risk;
[0074] S1-3. Comprehensive risk level classification: The comprehensive risk level of the production park is obtained by comprehensively evaluating the soil risk level and the groundwater risk level of the production park, which is divided into four levels: low risk, medium risk, high risk and extremely high risk;
[0075] The comprehensive risk level score S in the production area is positively correlated with the soil risk score S1 and the groundwater risk score S2 in the production area, satisfying the following formula:
[0076] ;
[0077] If the soil risk level in the production park is low risk, n1 is 0.5; if the soil risk level in the production park is medium risk or high risk, n1 is 1; if the soil risk in the production park is extremely high risk, n1 is 2; if the groundwater risk in the production park is low risk, n2 is 0.5; if the groundwater risk level in the production park is medium risk or high risk, n2 is 1; if the groundwater risk level in the production park is extremely high risk, n2 is 2;
[0078] If S>30, the comprehensive risk level in the production park is extremely high risk; if 18<S≤30, the comprehensive risk level in the production park is high risk; if 6<S≤18, the comprehensive risk level in the production park is medium risk; if S≤6, the comprehensive risk level in the production park is low risk;
[0079] S2. Governance model selection: select the corresponding governance model according to the comprehensive risk level of the production park;
[0080] For low-risk production parks, the governance model is institutional control, which includes hidden danger inspection, regular monitoring and pollution source inspection.
[0081] For medium-risk production parks, the governance model is mainly institutional control, supplemented by long-term prevention and control.
[0082] For high-risk production parks, the governance model is mainly long-term prevention and control, supplemented by efficient restoration.
[0083] For production parks with extremely high risk levels, the governance model is to use long-term prevention and control as a supplement and efficient restoration as a main approach;
[0084] When the governance mode is supplemented by long-term blocking and control, several grouting wells are arranged upstream of the production area, with each grouting well spaced 15m apart, and the connecting line between all grouting wells covers 65% of the projection length of the production area in the vertical direction of groundwater flow.
[0085] When the governance mode is mainly long-term blocking and control, several grouting wells are arranged upstream of the production area, with each grouting well spaced 10m apart, and the connecting line between all grouting wells covers 80% of the projection length of the production area in the vertical direction of the groundwater flow, and the grouting slurry is cement;
[0086] When the treatment mode is supplemented by efficient remediation, the soil is first thermally desorbed. The thermal desorption heating cycle is 150 days, the heating temperature is 110°C, and the heating method is conduction heating. Then gas phase extraction is carried out. The gas phase extraction cycle is 6 months. The spacing between the steam injection wells for gas phase extraction is 12m, and the gas injection method is a pulse 12h-12h cycle.
[0087] When the treatment mode is mainly efficient remediation, the soil is first thermally desorbed with a heating cycle of 170 days and a heating temperature of 130°C. The heating method is conduction heating, followed by gas phase extraction with a cycle of 8 months. The spacing between steam injection wells is 12m, and the gas injection method is a pulsed 8h-8h cycle.
[0088] Embodiment 2: This embodiment differs from Embodiment 1 in that:
[0089] In step S2:
[0090] When the governance mode is supplemented by long-term blocking and control, several grouting wells are arranged upstream of the production area, with each grouting well spaced 10m apart, and the connecting line between all grouting wells covers 60% of the projection length of the production area in the vertical direction of groundwater flow.
[0091] When the governance mode is mainly long-term blocking and control, several grouting wells are arranged upstream of the production area, with each grouting well spaced 8m apart, and the connecting line between all grouting wells covers 75% of the projection length of the production area in the vertical direction of the groundwater flow, and the grouting slurry is cement;
[0092] When the treatment mode is supplemented by efficient remediation, the soil is first thermally desorbed. The thermal desorption heating cycle is 120 days, the heating temperature is 100°C, and the heating method is conduction heating. Then gas phase extraction is carried out. The gas phase extraction cycle is 4 months. The spacing between the steam injection wells for gas phase extraction is 10m, and the gas injection method is a pulse 12h-12h cycle.
[0093] When the treatment mode is mainly efficient restoration, the soil is first thermally desorbed with a heating cycle of 160 days at a heating temperature of 120°C and a heating method of conduction heating, followed by gas phase extraction with a cycle of 6 months. The spacing between steam injection wells is 10m and the gas injection method is a pulsed 8h-8h cycle.
[0094] Embodiment 3: This embodiment differs from Embodiment 1 in that:
[0095] In step S2:
[0096] When the governance mode is supplemented by long-term blocking and control, several grouting wells are arranged upstream of the production area, with each grouting well spaced 20m apart, and the connecting line between all grouting wells covers at least 60% of the projection length of the production area in the vertical direction of the groundwater flow.
[0097] When the governance mode is mainly long-term blocking and control, several grouting wells are arranged upstream of the production area, with each grouting well spaced 14m apart, and the connecting line between all grouting wells covers at least 75% of the vertical projection length of the production area in the direction of groundwater flow, and the grouting slurry is cement;
[0098] When the treatment mode is supplemented by efficient remediation, the soil is first thermally desorbed. The thermal desorption heating cycle is 160 days, the heating temperature is 120°C, and the heating method is conduction heating. Then gas phase extraction is carried out. The gas phase extraction cycle is 8 months. The spacing between the steam injection wells for gas phase extraction is 14m, and the gas injection method is a pulse 12h-12h cycle.
[0099] When the treatment mode is mainly efficient remediation, the soil is first thermally desorbed with a heating cycle of 200 days at a heating temperature of 150°C and a heating method of conduction heating. It is then subjected to gas phase extraction with a cycle of 12 months. The spacing between steam injection wells is 14m and the gas injection method is a pulsed 8h-8h cycle.
[0100] Experimental Example 1: The description of this experimental example is based on the scheme described in Example 1, and is intended to illustrate the practical application effect of the present invention.
[0101] A pharmaceutical chemical industry park in production was selected for field investigation and assessment. First, the risk items of soil in the production park were assessed. The annual wastewater discharge of the production park was 14,000 tons, and there were three types of wastewater. w >3, then assign a value of 4, the annual solid waste discharge is 25,000 tons, there are 4 types of solid waste, T sw >8, then the value is 2.5, the area A is 13 hectares, then the value is 5, the production and operation time t is 7 years, then the value is 4, the pollutant has a level II harmful effect on human health, and the persistent pollutants are assigned a value of 1.5. All the values are added together to get the soil risk score S1=22 in the production park, and the soil risk level in the production park is high risk;
[0102] Then the risk item of groundwater in the production park was evaluated. The production park had no anti-seepage measures, so it was assigned a value of 8. The groundwater depth h was 4.7m, so it was assigned a value of 3. The soil permeability was gravel sand, so it was assigned a value of 3. The Henry constant of pollutant volatility H=0.13 was assigned a value of 3. The annual precipitation P was 2400mm, so it was assigned a value of 3. The number of corporate violations was 2 times, so it was assigned a value of 1. The population within 500m was R=7317, so it was assigned a value of 6. All the assigned values were added together to get the groundwater risk score S2=27 in the production park. The groundwater risk level in the production park is extremely high risk.
[0103] Therefore, n1=1, n2=2, the comprehensive risk level score in the production park , the comprehensive risk level of the production park is extremely high. It can be seen that although the soil risk of the production park is not defined as extremely high, it is still defined as extremely high risk after comprehensive consideration. Therefore, the governance model of the production park is to choose long-term control as auxiliary and efficient restoration as main;
[0104] like Figure 1As shown, after the treatment was carried out according to the method of long-term barrier control as the auxiliary and efficient remediation as the main in Example 1, the reduction rate of pollutants such as tetrachloroethylene, trichloroethylene, dichloroethane, and benzene series in the production park was more than 95%, and the pollutant reduction rate continued to increase during the subsequent 3 months of continuous monitoring. Therefore, it is explained that the comprehensive treatment method of the present invention has a good targeted treatment effect on soil and groundwater pollution in the production park.
[0105] Experimental Example 2: The description of this experimental example is based on the scheme described in Example 1, and is intended to illustrate the practical application effect of the present invention.
[0106] A pharmaceutical chemical industry park in production was selected for field investigation and assessment. First, the risk items of soil in the production park were assessed. The annual wastewater discharge of the production park was 6,000 tons, and there were two types of wastewater. 1<T w ≤3, then assign a value of 2.4, the annual solid waste discharge is 5,000 tons, there are 3 types of solid waste, T sw ≤3, then assign a value of 0.5; the area A is 5.8 hectares, then assign a value of 3; the production and operation time t is 2 years, then assign a value of 1.5; the pollutant has a level II harmful effect on human health, then assign a value of 5; the content of persistent pollutants is assigned a value of 1.5. Adding up all the assigned values, the soil risk score in the production park is S1=13.9, and the soil risk level in the production park is medium risk;
[0107] Then the risk item of groundwater in the production park is evaluated. The production park has certain anti-seepage measures, so it is assigned a value of 5. The groundwater depth h is 3.6m, so it is assigned a value of 3. The soil permeability is fine sand, so it is assigned a value of 1.8. The Henry constant of pollutant volatility H=0.015, so it is assigned a value of 1.8. The annual precipitation P is 800mm, so it is assigned a value of 1.8. The number of corporate violations is 0, so it is assigned a value of 0. The population within 500m is R=925, so it is assigned a value of 2. All the assigned values are added together to get the groundwater risk score S2=15.4 in the production park. The groundwater risk level in the production park is medium risk.
[0108] Therefore, n1=1, n2=1, the comprehensive risk level score in the production park , the comprehensive risk level of the production park is medium risk. It can be seen that the soil and groundwater risks of the production park are both defined as medium risk. After comprehensive consideration, the production park is defined as medium risk. Therefore, the governance model of the production park is mainly based on institutional control and supplemented by long-term prevention and control;
[0109] like Figure 2As shown, after treatment according to the method of institutional control as the main and long-term barrier control as the auxiliary in Example 2, the reduction rate of pollutants such as tetrachloroethylene, trichloroethylene, dichloroethane, and benzene series in the production park was more than 78%, and the pollutant reduction rate continued to rise during the subsequent 3 months of continuous monitoring. Since the pollutant content in the area is itself low, although the reduction rate after treatment is not as high as that in Experimental Example 1, it also meets the national standard requirements. Therefore, it is illustrated that the comprehensive treatment method of the present invention has a good targeted treatment effect on soil and groundwater pollution in the production park.
Claims
1. A comprehensive method for controlling soil and groundwater pollution in production parks. It is characterized in that The following steps are involved: S1. Risk level classification: S1-1. Soil risk classification in production parks: Comprehensively evaluate the risk items of soil in production parks and conduct statistical scoring. Soil risk items include wastewater environmental risk T w 、Solid waste environmental risk sw , regional area A, production and operation time t, the harmful effects of pollutants on human health and whether they contain persistent pollutants, and finally the soil risk level in the production park is obtained, which is divided into four levels: low risk, medium risk, high risk and very high risk; S1-2. Classification of groundwater risk in production parks: Comprehensively evaluate the risk items of groundwater in production parks and conduct statistical scoring. Groundwater risk items include the degree of perfection of anti-seepage measures, groundwater burial depth h, soil permeability, volatility of pollutants, annual precipitation P, number of violations by enterprises, and population R within 500m of the surrounding area. Finally, the groundwater risk level in production parks is obtained, which is divided into four levels: low risk, medium risk, high risk and extremely high risk; S1-3. Comprehensive risk level classification: The comprehensive risk level of the production park is obtained by comprehensively evaluating the soil risk level and the groundwater risk level of the production park, which is divided into four levels: low risk, medium risk, high risk and extremely high risk; S2. Governance model selection: select the corresponding governance model according to the comprehensive risk level of the production park; For low-risk production parks, the governance model is institutional control. For medium-risk production parks, the governance model is mainly institutional control, supplemented by long-term prevention and control. For high-risk production parks, the governance model is mainly long-term prevention and control, supplemented by efficient restoration. For production parks with extremely high risk levels, the governance model is to use long-term prevention and control as a supplement and efficient restoration as a main approach; When the governance mode is supplemented by long-term blocking and control, several grouting wells are arranged upstream of the production area, with each grouting well spaced 10-20m apart, and the connection line between all grouting wells covers at least 60% of the projection length of the production area in the vertical direction of groundwater flow. When the governance mode is mainly long-term blocking and control, several grouting wells are arranged upstream of the production area, with each grouting well spaced 8 to 14 meters apart, and the connecting line between all grouting wells covers at least 75% of the projection length of the production area in the vertical direction of the groundwater flow, and the grouting slurry is cement; When the treatment mode is supplemented by efficient remediation, the soil is first thermally desorbed. The thermal desorption heating cycle is 120-160 days, the heating temperature is 100-120°C, and the heating method is conduction heating. Then gas phase extraction is carried out. The gas phase extraction cycle is 4-8 months. The spacing between the steam injection wells for gas phase extraction is 10-14m, and the gas injection method is a pulse 12h-12h cycle. When the treatment mode is mainly efficient restoration, the soil is first thermally desorbed with a heating cycle of 160-200 days, a heating temperature of 120-150°C, and a heating method of conduction heating. It is then gas extraction with a cycle of 6-12 months. The spacing between steam injection wells is 10-14m, and the gas injection method is a pulsed 8h-8h cycle.
2. A method for comprehensive treatment of soil and groundwater pollution in a production park as claimed in claim 1, It is characterized in that In the step S1-1, Wastewater Environmental Risk w = annual wastewater discharge × wastewater type. The unit of annual wastewater discharge is 10,000 tons. If T w >3, then assign 4, if 1 < T w ≤3, then assign a value of 2.
4. If T w ≤1, then assign a value of 0.8, Solid waste environmental risk sw = annual solid waste discharge × type of solid waste. The unit of annual solid waste discharge is 10,000 tons. If T sw >8, then assign 2.5, if 3 < T sw ≤8, then assign a value of 1.
5. If T sw ≤3, then assign a value of 0.5, For the area A, if A>10 hectares, then assign a value of 5, if 2<A≤10, then assign a value of 3, if A≤2, then assign a value of 1, For the production and operation time t, if t>10 years, the value is 6; if 3<t≤10, the value is 4; if t≤3, the value is 1.
5. For the harmful effects of pollutants on human health, if the harmful effect is level I, a value of 7.5 is assigned; if the harmful effect is level II, a value of 5 is assigned; if the harmful effect is level III, a value of 2.5 is assigned; if the harmful effect is level IV, a value of 1 is assigned. For whether it contains persistent pollutants, if yes, it is assigned a value of 1.5, if no, it is assigned a value of 0. Add all the assigned values to get the soil risk score S in the production park 1 , if S 1 >24, the soil risk level in the production area is extremely high risk. If 16 < S 1 ≤24, the soil risk level in the production area is high risk. 1 ≤16, the soil risk level in the production area is medium risk. 1 If ≤8, the soil risk level in the production area is low risk.
3. A method for comprehensive treatment of soil and groundwater pollution in a production park as claimed in claim 2, It is characterized in that In the step S1-2, For the degree of perfection of anti-seepage measures, if there are no anti-seepage measures, a value of 8 is assigned; if there are partial anti-seepage measures, a value of 5 is assigned; if there are comprehensive anti-seepage measures, a value of 1.2 is assigned. For the groundwater depth h, if h < 3m, then assign a value of 5; if 3 ≤ h < 10m, then assign a value of 3; if h ≥ 10m, then assign a value of 0.
5. For soil permeability, if the soil is gravel sand or above, the value is 3; if the soil is coarse sand, medium sand or fine sand, the value is 1.8; if the soil is silt sand or below, the value is 0.
6. For pollutant volatility, if Henry's constant H ≥ 0.1, then the value is 3; if 0.001 ≤ H < 0.1, then the value is 1.8; if H < 0.001, then the value is 0.
6. For annual precipitation P, if P ≥ 1000 mm, then assign a value of 3; if 400 mm ≤ P < 1000 mm, then assign a value of 1.8; if P < 400 mm, then assign a value of 0.
6. For the number of times the enterprise violates the law, if the number of times the enterprise violates the law is more than 3 times, it is assigned a value of 2; if the number of times the enterprise violates the law is 1 to 3 times, it is assigned a value of 1; if the number of times the enterprise violates the law is 0 times, it is assigned a value of 0. For the population R within 500m, if R≥5000, assign a value of 6; if 1000≤R<5000, assign a value of 4; if 100≤R<1000, assign a value of 2; if R<100, assign a value of 0. Add up all the assigned values to get the groundwater risk score S in the production park 2 , if S 2 >24, the groundwater risk level in the production park is extremely high risk. If 16 < S 2 ≤24, the groundwater risk level in the production park is high risk. If 8<S 2 ≤16, the groundwater risk level in the production park is medium risk. 2 If ≤8, the groundwater risk level in the production park is low risk.
4. A method for comprehensive treatment of soil and groundwater pollution in a production park as claimed in claim 3, It is characterized in that In step S1-3, the comprehensive risk level score S in the production area and the soil risk score S in the production area 1 and the groundwater risk score S in the production park 2 Positively correlated, satisfying the following formula: ; If the soil risk level in the production area is low risk, then n 1 Take 0.
5. If the soil risk level in the production area is medium or high risk, then n 1 Take 1, if the soil risk in the production area is extremely high, then n 1 Take 2. If the groundwater risk in the production area is low, then n 2 Take 0.
5. If the groundwater risk level in the production park is medium or high risk, then n 2 Take 1. If the groundwater risk level in the production park is extremely high, then n 2 Take 2.
5. A method for comprehensive treatment of soil and groundwater pollution in a production park as claimed in claim 4, It is characterized in that If S>30, the comprehensive risk level in the production park is extremely high risk; if 18<S≤30, the comprehensive risk level in the production park is high risk; if 6<S≤18, the comprehensive risk level in the production park is medium risk; if S≤6, the comprehensive risk level in the production park is low risk.
6. A method for comprehensive treatment of soil and groundwater pollution in a production park as claimed in claim 1, It is characterized in that The system control in step S2 includes hidden danger investigation, regular monitoring and pollution source investigation.
Citation Information
Patent Citations
A method for groundwater pollution control and soil remediation of sulfate-contaminated sites
CN104671385B
Method for identifying high-risk pollutants in regional soil environment
CN111353720A
Risk-based site key industry high-risk organic pollutant screening method
CN113657748A
Soil heavy metal ecological health risk evaluation method
CN113919569A
Industrial park soil and groundwater pollution monitoring, evaluating and early warning method
CN115660419A
Cited By
An industrial park soil-groundwater pollution prevention and control method
CN123140635A