A dual-cold-source energy-saving thermal management device for cabinets
By arranging partitions and phase-change heat pipe heat exchangers in the cabinet, combined with the refrigeration system and natural environmental circulation, the temperature control problem of outdoor communication base station cabinets in high-temperature environments is solved, achieving the dual effects of low energy consumption, cooling and cleanliness.
Patent Information
- Application Number
- CN202410781357.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-18
- Publication Date
- 2024-10-01
- Estimated Expiration
- 2044-06-18
AI Technical Summary
The temperature control equipment of existing outdoor communication base station cabinets cannot effectively control the temperature inside the cabinet, especially in high-temperature environments, and there are problems such as high power consumption, dust pollution, and equipment safety hazards.
Design a dual cold source energy-saving thermal management device, including a partition, a phase change heat pipe heat exchanger, a refrigeration compressor, an air-cooled condenser, a throttling element and a fan. It is separated into independent chambers by partitions and uses phase change heat pipes. The heat exchanger and refrigeration system achieve efficient cooling, and circulate air through fans and the natural environment to prevent dust from entering.
It achieves effective cooling with low energy consumption, keeps the inside of the cabinet clean, extends the life of the equipment, simplifies installation and maintenance, and reduces the risk of high temperature alarms.
Smart Images

Figure CN118368875B_ABST
Abstract
Description
[0001] The present invention relates to the technical field of energy-saving thermal management of outdoor cabinets, and in particular to a dual-cold-source energy-saving thermal management device for a cabinet. Background Art
[0002] At present, the temperature control equipment used for outdoor communication base station cabinets mainly includes door-mounted air conditioners using compressor refrigeration, heat exchangers using sensible heat exchangers, and natural ventilators using fans. However, these types of temperature control equipment have limitations, and they can neither meet the requirements of controlling the temperature inside the cabinet nor achieve the purpose of energy saving at the same time.
[0003] For example, the working efficiency of the heat exchanger depends on the temperature difference between the inside and outside of the cabinet. It is effective when there are not many devices in the cabinet, the total heat generation is not large, and the external natural environment temperature is low. However, when the ambient temperature is high in summer, the use of a heat exchanger cannot meet the temperature control requirements in the cabinet, resulting in high temperature alarms and even communication equipment being shut down.
[0004] For example, natural ventilation equipment is installed, mainly exhaust fans, to directly use fresh air from outside the cabinet to cool the cabinet. Although natural ventilation can play a certain cooling role, the air outside the cabinet directly enters the cabinet, causing the dust cleanliness inside the cabinet to exceed the standard, and water vapor will bring safety hazards to the operation of communication equipment. Condensation water generated when the temperature changes may even cause damage to electrical equipment.
[0005] As the power consumption and heat generation of communication equipment continue to increase due to the temperature control method of door-mounted air conditioners using compressor refrigeration, how to quickly and conveniently improve the performance of air conditioners, reduce power consumption, and extend the service life of air conditioners at a relatively low cost has become a pain point of great concern in the field of outdoor communication base stations. Summary of the invention
[0006] In order to solve the technical problems existing in the background technology, the present invention proposes a dual-cold-source energy-saving thermal management device for a cabinet.
[0007] The present invention proposes a dual-cold-source energy-saving thermal management device for a cabinet, comprising: a cabinet body, a partition, a phase-change heat pipe heat exchanger, a refrigeration compressor, an air-cooled condenser, a throttling element and an evaporator, a first fan, a second fan and a third fan;
[0008] The partition is vertically arranged in the cabinet and extends along a first horizontal direction, the partition divides the interior of the cabinet into a first chamber and a second chamber which are arranged in sequence along a second horizontal direction perpendicular to the first horizontal direction, and the first chamber and the second chamber are sealed and independent;
[0009] The cabinet body includes a first side wall and a second side wall opposite to each other in the first horizontal direction, a first air inlet is provided at a position corresponding to the first chamber on the first side wall, and the first air inlet is used to connect to the air outlet of the cabinet; a first air outlet is provided at a position corresponding to the first chamber on the second side wall, and the first air outlet is used to connect to the air inlet of the cabinet; a second air inlet is provided at a position corresponding to the first chamber on the first side wall, and the second air inlet is used to connect to the natural environment; a second air outlet is provided on a third side wall of the cabinet body in the second horizontal direction and adjacent to the second chamber, and the second air outlet is used to connect to the natural environment; a third air outlet is provided at a position corresponding to the second chamber on the second side wall, and the third air outlet is used to connect to the natural environment;
[0010] The phase-change heat pipe heat exchanger is installed in the first chamber, and one end of the phase-change heat pipe heat exchanger penetrates the partition and extends into the second chamber; the evaporator is installed in the first chamber between the phase-change heat pipe heat exchanger and the first air outlet, the refrigeration compressor, the air-cooled condenser, and the throttling element are all installed in the second chamber, the air-cooled condenser is close to the second air outlet, and the refrigeration compressor, the air-cooled condenser, the throttling element and the evaporator are connected in sequence to form a refrigerant circuit; the first fan is installed in the first air outlet, the second fan is installed in the second air outlet, and the third fan is installed in the third air outlet.
[0011] Preferably, the phase-change heat pipe heat exchanger includes one or more first phase-change heat pipe heat exchange components, the first phase-change heat pipe heat exchange components include a plurality of first microchannel flat tubes arranged in sequence from top to bottom, the plurality of first microchannel flat tubes are arranged along the second horizontal direction, each first microchannel flat tube is filled with a first phase-change medium, the first phase-change medium changes from liquid to gas after absorbing heat and changes from gas to liquid after releasing heat;
[0012] Wherein, when there are multiple first phase-change heat pipe heat exchange assemblies, the multiple first phase-change heat pipe heat exchange assemblies are sequentially arranged at intervals along the first horizontal direction.
[0013] Preferably, each first microchannel flat tube is welded with a first aluminum fin.
[0014] Preferably, the first aluminum fin is a flat sheet type, a corrugated sheet type or a window sheet type.
[0015] Preferably, the plurality of first microchannel flat tubes in each first phase-change heat pipe heat exchange assembly are sequentially connected end to end to form a continuous first microchannel flat tube flow passage.
[0016] Preferably, the phase-change heat pipe heat exchanger further comprises one or more second phase-change heat pipe heat exchange components, and the one or more second phase-change heat pipe heat exchange components are arranged one by one on one side of the one or more first phase-change heat pipe heat exchange components close to the first air outlet;
[0017] The second phase-change hot air duct heat exchange component includes a plurality of second microchannel flat tubes arranged in sequence from top to bottom, each second microchannel flat tube is filled with a second phase-change medium, and the second phase-change medium changes from liquid to gas after absorbing heat and changes from gas to liquid after releasing heat;
[0018] The plurality of second microchannel flat tubes in each second phase-change hot air duct heat exchange assembly are staggered in height direction with the plurality of first microchannel flat tubes in the corresponding first phase-change heat exchange assembly.
[0019] Preferably, each second microchannel flat tube is welded with a second aluminum fin.
[0020] Preferably, the second aluminum fin is a flat sheet type, a corrugated sheet type or a window sheet type.
[0021] Preferably, the plurality of second microchannel flat tubes in each second phase-change hot air duct heat exchange assembly are sequentially connected end to end to form a continuous second microchannel flat tube flow channel.
[0022] Preferably, the second phase change medium is the same as or different from the first phase change medium.
[0023] Preferably, the air inlet direction of the air-cooled condenser is parallel to the air inlet direction of the second air outlet.
[0024] Preferably, a filter is installed in the second air inlet.
[0025] Preferably, a damper shutter is installed at one end of the third air outlet away from the interior of the cabinet.
[0026] Preferably, it also includes a controller and a temperature acquisition mechanism installed in the cabinet and used to obtain the real-time temperature in the cabinet. The temperature acquisition mechanism, the first fan, the second fan, the third fan, the refrigeration compressor, and the throttling element are electrically connected to the controller respectively.
[0027] In the present invention, the proposed dual-cold-source energy-saving thermal management device for a cabinet is provided with a partition in a cabinet body, and two closed independent first chambers and second chambers are opened inside the cabinet body, and the first chamber forms an internal circulation with the interior of the cabinet through the first air inlet and the first air outlet, so that dust in the natural environment will not enter the first chamber and the interior of the cabinet, and the cleanliness of the first chamber and the interior of the cabinet can be effectively maintained;
[0028] Then, the phase-change heat pipe heat exchanger provided in the first chamber and the second chamber preferentially utilizes the air in the natural environment for phase-change heat transfer when the temperature inside the first chamber is in a relatively low high temperature range (i.e., the first preset temperature range), thereby greatly reducing energy consumption and effectively saving energy;
[0029] Then, the air inside the first chamber is compressed and cooled by the refrigeration compressor, the air-cooled condenser, the throttling element and the evaporator, the second fan and the third fan when the temperature inside the first chamber is in a relatively high temperature range (i.e., the second preset temperature range and the third preset temperature range), which can effectively ensure the refrigeration effect of the air inside the first chamber, thereby achieving the purpose of cooling the cabinet;
[0030] Finally, the phase-change heat pipe heat exchanger, refrigeration compressor, air-cooled condenser, throttling element and evaporator, the first fan, the second fan and the third fan are all integrated and installed inside the cabinet, realizing the integration and modularization of dual cold source heat exchange. There is no need to install various components in the cabinet in a dispersed manner. It is easy to transport and assemble as a finished product, and it is only connected to the cabinet by pipes, which makes disassembly and maintenance convenient, greatly reducing the workload during disassembly operations. BRIEF DESCRIPTION OF THE DRAWINGS
[0031] Figure 1 It is a schematic diagram of the three-dimensional structure of a dual-cold-source energy-saving thermal management device for a cabinet in one embodiment of the present invention.
[0032] Figure 2 The figure is a schematic structural diagram of a dual-cold-source energy-saving thermal management device for a cabinet in one embodiment of the present invention. DETAILED DESCRIPTION
[0033] It should be noted that, in the absence of conflict, the embodiments of the present invention and the features in the embodiments can be combined with each other. The present invention will be described in detail below with reference to the accompanying drawings and in combination with the embodiments.
[0034] Reference Figure 1 and Figure 2 The present invention proposes a dual-cold-source energy-saving thermal management device for a cabinet, comprising: a cabinet body 1, a partition 2, a phase-change heat pipe heat exchanger 3, a refrigeration compressor 6, an air-cooled condenser 5, a throttling element 7 and an evaporator 4, a first fan 9, a second fan 11 and a third fan 10;
[0035] The partition 2 is vertically arranged in the cabinet 1 and extends along a first horizontal direction. The partition 2 divides the interior of the cabinet 1 into a first chamber and a second chamber which are arranged in sequence along a second horizontal direction perpendicular to the first horizontal direction. The first chamber and the second chamber are sealed and independent.
[0036] The cabinet body 1 includes a first side wall and a second side wall opposite to each other in a first horizontal direction, a first air inlet connected to the first chamber is provided at a position of the first side wall corresponding to the first chamber, and the first air inlet is used to connect to the air outlet of the cabinet; a first air outlet connected to the first chamber is provided at a position of the second side wall corresponding to the first chamber, and the first air outlet is used to connect to the air inlet of the cabinet; a second air inlet connected to the second chamber is provided at a position of the first side wall corresponding to the second chamber, and the second air inlet is used to connect to the natural environment, a second air outlet connected to the second chamber is provided on a third side wall of the cabinet body 1 in a second horizontal direction and adjacent to the second chamber, and the second air outlet is used to connect to the natural environment; a third air outlet connected to the second chamber is provided at a position of the second side wall corresponding to the second chamber, and the third air outlet is used to connect to the natural environment;
[0037] The phase-change heat pipe exchanger 3 is installed in the first chamber, and one end of the phase-change heat pipe exchanger 3 passes through the partition 2 and extends into the second chamber; the evaporator 4 is installed in the first chamber between the phase-change heat pipe exchanger 3 and the first air outlet, the refrigeration compressor 6, the air-cooled condenser 5, and the throttling element 7 are all installed in the second chamber, the air-cooled condenser 5 is close to the second air outlet, and the refrigeration compressor 6, the air-cooled condenser 5, the throttling element 7 and the evaporator 4 are connected in sequence to form a refrigerant circuit; the first fan 9 is installed in the first air outlet, the second fan 11 is installed in the second air outlet, and the third fan 10 is installed in the third air outlet.
[0038] When used specifically, the portion of the phase-change heat pipe heat exchanger 3 located in the first chamber is called the evaporation end of the phase-change heat pipe heat exchanger 3, and the portion of the phase-change heat pipe heat exchanger 3 located in the second chamber is called the condensation end of the phase-change heat pipe heat exchanger 3;
[0039] Among them, when the temperature in the cabinet is within the first preset temperature range, the first fan 9 and the third fan 10 are started and the second fan 11 is stopped, and the refrigeration compressor 6 and the throttling element 7 are not started; at this time, the first fan 9 sends the high-temperature hot air in the cabinet from the first air inlet to the evaporation end of the phase-change heat pipe heat exchanger 3, so that the first phase-change medium in the phase-change heat pipe heat exchanger 3 absorbs the heat in the air and undergoes a phase change, and transfers the heat to the condensation end of the phase-change heat pipe heat exchanger 3. The air in the first chamber after heat exchange enters the cabinet from the first air inlet; at the same time, the third fan 10 sends the natural wind in the natural environment from the second air inlet to the condensation end of the phase-change heat pipe heat exchanger 3 and discharges it from the third air outlet to take away the heat, and the purpose of cooling the air inside the first chamber is achieved through the phase change heat transfer of the phase-change heat pipe heat exchanger 3, thereby achieving the purpose of cooling the cabinet;
[0040] When the temperature in the cabinet is within the second preset temperature range, and the second preset temperature range is greater than the first preset temperature range, the first fan 9 and the second fan 11 are started and the third fan 10 is stopped, and the refrigeration compressor 6 and the throttling element 7 are started; at this time, the first fan 9 sends the high-temperature hot air in the cabinet from the first air inlet to the evaporator 4, so that the refrigerant in the evaporator 4 absorbs the heat in the air and undergoes a phase change, and transfers the heat to the air-cooled condenser 5, and the air in the first chamber after heat exchange enters the cabinet from the first air inlet; at the same time, the second fan 11 sends the natural wind in the natural environment from the second air inlet to the air-cooled condenser 5 and discharges it from the second air outlet to take away the heat, and the purpose of cooling the air inside the first chamber is achieved through the cooperation of the refrigeration compressor 6, the air-cooled condenser 5, the throttling element 7, the evaporator 4 and the second fan 11, thereby achieving the purpose of cooling the cabinet;
[0041] When the temperature in the cabinet is within the third preset temperature range, which is greater than the second preset temperature range, the first fan 9, the second fan 11 and the third fan 10 are all started, and the refrigeration compressor 6 and the throttling element 7 are controlled to start; at this time, the first fan 9 sends the high-temperature hot air in the cabinet from the first air inlet to the evaporation end of the phase-change heat pipe heat exchanger 3 and the evaporator 4, so that the first phase-change medium in the phase-change heat pipe heat exchanger 3 and the refrigerant in the evaporator 4 absorb the heat in the air and undergo a phase change, transferring the heat to the condensation end of the phase-change heat pipe heat exchanger 3 and the air-cooled condenser 5. The interior of the first chamber is heated by the heat exchanger. The heated air then enters the interior of the cabinet through the first air inlet; at the same time, the third fan 10 sends the natural wind in the natural environment through the second air inlet to the condensation end of the phase-change heat pipe heat exchanger 3 and discharges it through the third air outlet; at the same time, the second fan 11 sends the natural wind in the natural environment through the second air inlet to the air-cooled condenser 5 and discharges it through the second air outlet to take away the heat. The purpose of cooling the air inside the first chamber is achieved through the cooperation of the phase-change heat pipe heat exchanger 3, the refrigeration compressor 6, the air-cooled condenser 5, the throttling element 7, the evaporator 4, the second fan 11 and the third fan 10, thereby achieving the purpose of cooling the inside of the cabinet.
[0042] The present invention sets a partition 2 in a cabinet 1, and opens two closed independent first chambers and second chambers inside the cabinet 1, and the first chamber forms an internal circulation with the inside of the cabinet through the first air inlet and the first air outlet, so that dust in the natural environment will not enter the inside of the first chamber and the inside of the cabinet, and the cleanliness of the inside of the first chamber and the inside of the cabinet can be effectively maintained;
[0043] Then, the phase-change heat pipe heat exchanger 3 provided in the first chamber and the second chamber preferentially utilizes the air in the natural environment for phase-change heat transfer when the temperature inside the first chamber is in a relatively low high temperature range (i.e., the first preset temperature range), thereby greatly reducing energy consumption and effectively saving energy;
[0044] Then, the air inside the first chamber is compressed and cooled by the refrigeration compressor 6, the air-cooled condenser 5, the throttling element 7 and the evaporator 4, the second fan 11 and the third fan 10 when the temperature inside the first chamber is in a relatively high temperature range (i.e., the second preset temperature range and the third preset temperature range), which can effectively ensure the refrigeration effect of the air inside the first chamber, thereby achieving the purpose of cooling the cabinet;
[0045] Finally, the phase-change heat pipe heat exchanger 3, the refrigeration compressor 6, the air-cooled condenser 5, the throttling element 7 and the evaporator 4, the first fan 9, the second fan 11 and the third fan 10 are all integrated and installed inside the cabinet 1, realizing the integration and modularization of dual cold source heat exchange. There is no need to install each component in the cabinet in a dispersed manner, which is easy to transport and assemble as a finished product. Moreover, it is only connected to the cabinet through a pipeline, which is convenient for disassembly and maintenance, greatly reducing the workload during disassembly operations.
[0046] In this embodiment, the air inlet direction of the air-cooled condenser 5 is parallel to the air inlet direction of the second air outlet, so as to improve the condensation effect of the air-cooled condenser 5 .
[0047] In this embodiment, a drying filter 8 is further included, and the drying filter 8 is connected between the air-cooled condenser 5 and the throttling element 7 .
[0048] In this embodiment, it also includes a controller 13 and a temperature acquisition mechanism installed in the cabinet and used to obtain the real-time temperature in the cabinet. The temperature acquisition mechanism, the first fan 9, the second fan 11, the third fan 10, the refrigeration compressor 6, and the throttling element 7 are electrically connected to the controller 13 respectively.
[0049] Specifically, the controller 13 is installed on the cabinet 1 .
[0050] During specific use, the control module is used to control the coordinated actions of the first fan 9, the second fan 11, the third fan 10, the refrigeration compressor 6 and the throttling element 7 according to the real-time temperature in the cabinet to complete the cooling of the cabinet.
[0051] When the temperature in the cabinet is within a first preset temperature range, the controller 13 controls the first fan 9 and the third fan 10 to start and the second fan 11 to stop, and controls the refrigeration compressor 6 and the throttling element 7 to close;
[0052] When the temperature in the cabinet is within the second preset temperature range, the controller 13 controls the first fan 9 and the second fan 11 to start and the third fan 10 to stop, and controls the refrigeration compressor 6 and the throttling element 7 to start;
[0053] When the temperature in the cabinet is within the third preset temperature range, the controller 13 controls the first fan 9, the second fan 11 and the third fan 10 to start, and controls the refrigeration compressor 6 and the throttling element 7 to start.
[0054] In this embodiment, a filter screen 14 is installed in the second air inlet to prevent dust from entering the second chamber.
[0055] In this embodiment, a damper shutter 12 is installed at one end of the third air outlet away from the interior of the cabinet 1 .
[0056] During specific use, when the second fan 11 is in a stopped state and the third fan 10 is started, the air in the natural environment enters the second chamber through the second air inlet, and passes through the phase change heat pipe heat exchanger 3 to the third air outlet, the damper shutter 12 is automatically blown up, and the air passes freely, and the air in the natural environment cools the condensing end of the phase change heat pipe heat exchanger 3; when the third fan 10 is stopped, the damper shutter 12 is automatically closed due to gravity, and the air in the natural environment will not enter the second chamber through the second air inlet to cool the condensing end of the phase change heat pipe heat exchanger 3, which is very useful especially when the natural environment is in high temperature meteorological conditions, and can effectively prevent the heat in the air in the natural environment from being conducted to the condensing end of the phase change heat pipe heat exchanger 3, so as to prevent the phase change heat pipe heat exchanger 3 from transferring heat to the first chamber, thereby effectively preventing heat from being brought into the cabinet by the air passing through the first chamber.
[0057] In order to effectively improve the heat exchange effect of the phase-change heat pipe heat exchanger 3, in this embodiment, the phase-change heat pipe heat exchanger 3 includes one or more first phase-change heat pipe heat exchange components, and the first phase-change heat pipe heat exchange components include a plurality of first microchannel flat tubes arranged in sequence from top to bottom, and the plurality of first microchannel flat tubes are arranged along the second horizontal direction. Each first microchannel flat tube is filled with a first phase-change medium, and the first phase-change medium changes from liquid to gas after absorbing heat and changes from gas to liquid after releasing heat;
[0058] Wherein, when there are multiple first phase-change heat pipe heat exchange assemblies, the multiple first phase-change heat pipe heat exchange assemblies are sequentially arranged at intervals along the first horizontal direction.
[0059] In a further embodiment, a plurality of first microchannel flat tubes in each first phase change heat pipe heat exchange assembly are sequentially connected end to end to form a continuous first microchannel flat tube flow channel to further improve the heat exchange effect of the first phase change heat pipe heat exchange assembly.
[0060] In a further embodiment, a first aluminum fin is welded on each first microchannel flat tube to increase the heat dissipation area in contact with air, thereby accelerating heat dissipation.
[0061] The first aluminum fin is a flat fin type, a corrugated fin type or a window fin type to enhance the disturbance of air when it flows through, so as to further improve the heat exchange efficiency.
[0062] In order to further improve the heat exchange effect of the phase-change heat pipe heat exchanger 3, in a further embodiment, the phase-change heat pipe heat exchanger 3 further includes one or more second phase-change heat pipe heat exchange components, and the one or more second phase-change heat pipe heat exchange components are arranged one by one on one side of the one or more first phase-change heat pipe heat exchange components close to the first air outlet;
[0063] The second phase-change hot air duct heat exchange component includes a plurality of second microchannel flat tubes arranged in sequence from top to bottom, each second microchannel flat tube is filled with a second phase-change medium, and the second phase-change medium changes from liquid to gas after absorbing heat and changes from gas to liquid after releasing heat;
[0064] The plurality of second microchannel flat tubes in each second phase-change hot air duct heat exchange assembly are staggered in height direction with the plurality of first microchannel flat tubes in the corresponding first phase-change heat exchange assembly.
[0065] In a further specific embodiment, multiple second microchannel flat tubes in each second phase change heat pipe heat exchange assembly are connected end to end in sequence to form a continuous second microchannel flat tube flow channel to further improve the heat exchange effect of the second phase change heat pipe heat exchange assembly.
[0066] In a further specific embodiment, a second aluminum fin is welded on each second microchannel flat tube to increase the heat dissipation area in contact with air, thereby accelerating heat dissipation.
[0067] The second aluminum fin is a flat fin type, a corrugated fin type or a window fin type to enhance the disturbance of air when it flows through, so as to further improve the heat exchange efficiency.
[0068] In one specific embodiment, the second phase change medium is the same as the first phase change medium.
[0069] Specifically, the second phase change medium and the first phase change medium are both R-134a refrigerant or R410a refrigerant.
[0070] Of course, in other specific embodiments, the first phase change medium and the second phase change medium may also be other more environmentally friendly refrigerant types.
[0071] In another specific embodiment, the second phase change medium is different from the first phase change medium to effectively ensure the phase change heating effect.
[0072] Specifically, the first phase change medium is R134a refrigerant, and the second phase change medium is R410a refrigerant.
[0073] The above description is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes according to the technical scheme and inventive concept of the present invention within the technical scope disclosed by the present invention, which should be covered by the protection scope of the present invention.
Claims
1. A dual-cold-source energy-saving thermal management device for a cabinet, characterized in that: include: Cabinet (1), A partition (2) extending along a first horizontal direction is provided in the cabinet (1), and the partition (2) divides the interior of the cabinet (1) into a first chamber and a second chamber arranged in sequence along a second horizontal direction perpendicular to the first horizontal direction, and the first chamber and the second chamber are sealed and independent; The cabinet (1) comprises a first side wall and a second side wall opposite to each other in a first horizontal direction, the first side wall is provided with a first air inlet connected to the first chamber and a second air inlet connected to the second chamber, the second side wall is provided with a first air outlet connected to the first chamber and a third air outlet connected to the second chamber, and the cabinet (1) is provided with a second air outlet on a third side wall in a second horizontal direction and adjacent to the second chamber; A phase-change heat pipe heat exchanger (3) and an evaporator (4) located between the phase-change heat pipe heat exchanger (3) and the first air outlet are installed in the first chamber, and one end of the phase-change heat pipe heat exchanger (3) penetrates the partition (2) and extends into the second chamber; a refrigeration compressor (6), an air-cooled condenser (5) near the second air outlet, and a throttling element (7) are installed in the second chamber, and the refrigeration compressor (6), the air-cooled condenser (5), the throttling element (7) and the evaporator (4) are connected in sequence to form a refrigerant circuit; a first fan (9) is installed in the first air outlet, and a first fan (9) is installed in the second air outlet. A second fan (11) is installed, and a third fan (10) is installed in the third air outlet; the first fan (9) is used to send the high-temperature hot air in the cabinet from the first air inlet to the evaporation end of the phase-change heat pipe heat exchanger (3) and enter the cabinet through the first air inlet; the second fan (11) is used to send the natural wind in the natural environment from the second air inlet to the air-cooled condenser (5) and discharge it from the second air outlet; the third fan (10) is used to send the natural wind in the natural environment from the second air inlet to the condensation end of the phase-change heat pipe heat exchanger (3) and discharge it from the third air outlet; It also includes a controller (13) and a temperature acquisition mechanism installed in the cabinet and used to acquire the real-time temperature in the cabinet. The temperature acquisition mechanism, the first fan (9), the second fan (11), the third fan (10), the refrigeration compressor (6), and the throttling element (7) are electrically connected to the controller (13) respectively; the control module is used to control the first fan (9), the second fan (11), the third fan (10), the refrigeration compressor (6), and the throttling element (7) to coordinate actions according to the real-time temperature in the cabinet to complete the cooling of the cabinet; When the temperature in the cabinet is within a first preset temperature range, the controller (13) controls the first fan (9) and the third fan (10) to start and the second fan (11) to stop, and controls the refrigeration compressor (6) and the throttling element (7) to close; When the temperature in the cabinet is within a second preset temperature range, the controller (13) controls the first fan (9) and the second fan (11) to start and the third fan (10) to stop, and controls the refrigeration compressor (6) and the throttling element (7) to start; wherein the second preset temperature range is greater than the first preset temperature range; When the temperature in the cabinet is within a third preset temperature range, the controller (13) controls the first fan (9), the second fan (11) and the third fan (10) to start, and controls the refrigeration compressor (6) and the throttling element (7) to start; wherein the third preset temperature range is greater than the second preset temperature range.
2. The dual-cold-source energy-saving thermal management device for a cabinet according to claim 1, characterized in that: The phase-change heat pipe heat exchanger (3) comprises one or more first phase-change heat pipe heat exchange components, the first phase-change heat pipe heat exchange components comprising a plurality of first microchannel flat tubes arranged in sequence from top to bottom, the plurality of first microchannel flat tubes are arranged along the second horizontal direction, each first microchannel flat tube is filled with a first phase-change medium, the first phase-change medium changes from liquid to gas after absorbing heat and changes from gas to liquid after releasing heat; Wherein, when there are multiple first phase-change heat pipe heat exchange assemblies, the multiple first phase-change heat pipe heat exchange assemblies are sequentially arranged at intervals along the first horizontal direction.
3. The dual-cold-source energy-saving thermal management device for a cabinet according to claim 2, characterized in that: The plurality of first microchannel flat tubes in each first phase-change heat pipe heat exchange assembly are sequentially connected end to end to form a continuous first microchannel flat tube flow passage.
4. The dual cold source energy-saving thermal management device for a cabinet according to claim 2 or 3, characterized in that: The phase-change heat pipe heat exchanger (3) further comprises one or more second phase-change heat pipe heat exchange components, wherein the one or more second phase-change heat pipe heat exchange components are arranged one by one on a side of the one or more first phase-change heat pipe heat exchange components close to the first air outlet; The second phase-change hot air duct heat exchange component includes a plurality of second microchannel flat tubes arranged in sequence from top to bottom, each second microchannel flat tube is filled with a second phase-change medium, and the second phase-change medium changes from liquid to gas after absorbing heat and changes from gas to liquid after releasing heat; The plurality of second microchannel flat tubes in each second phase-change hot air duct heat exchange assembly are staggered in height direction with the plurality of first microchannel flat tubes in the corresponding first phase-change heat exchange assembly.
5. The dual-cold-source energy-saving thermal management device for a cabinet according to claim 4, characterized in that: The plurality of second microchannel flat tubes in each second phase-change hot air duct heat exchange assembly are sequentially connected end to end to form a continuous second microchannel flat tube flow path.
6. The dual-cold-source energy-saving thermal management device for a cabinet according to claim 4, characterized in that: The second phase change medium is the same as or different from the first phase change medium.
7. The dual-cold-source energy-saving thermal management device for a cabinet according to claim 1, characterized in that: The air inlet direction of the air-cooled condenser (5) is parallel to the air inlet direction of the second air outlet.
8. The dual-cold-source energy-saving thermal management device for a cabinet according to claim 1, characterized in that: A filter screen (14) is installed in the second air inlet.
9. The dual-cold-source energy-saving thermal management device for a cabinet according to claim 1, characterized in that: An air door shutter (12) is installed at one end of the third air outlet away from the interior of the cabinet (1).