A test method considering the effect of seepage on tunnel excavation face stability
By designing a test device for the seepage stability model of the shield tunnel excavation, the instability of the excavation surface of the shield tunnel in water-rich sand pebble formation is simulated, and the changes in surface displacement and soil pressure are recorded, which solves the problem of the ineffective study of the tunnel excavation surface in the existing technology. The stability issue has obtained the law of instability of excavation surfaces and improved the accuracy of the stability research of tunnel excavation surfaces.
Patent Information
- Application Number
- CN202410881545.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-03
- Publication Date
- 2024-11-15
- Estimated Expiration
- 2044-07-03
AI Technical Summary
The existing technology cannot effectively study and simulate the stability of the shield tunnel excavation surface under seepage conditions of the water-rich sand-pebbles formation, resulting in lack of specific research on the excavation surface instability and surface deformation laws.
A test device for the safety flow stability of shield tunnel excavation including water pressure, soil pressure and surface displacement measurement and acquisition system was designed. The saturated formation test was carried out in the model box through the simulation device to record the surface displacement during excavation. , soil pressure and osmotic pressure change, different water pressure ratios were selected for experiments to simulate the instability of the excavation surface of shield tunnel in water-rich sand-pebbles formations.
The surface deformation and soil pressure change laws caused by the instability of the excavation surface of the shield tunnel in the water-rich sand-pebbles were successfully obtained, providing an analysis of the impact on the excavation surface support pressure and the instability mode, and helping to improve tunnel excavation. Surface stability study.
Smart Images

Figure CN118425019B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of underground engineering, in particular to a test method considering the influence of seepage on the stability of tunnel excavation surface. Background Art
[0002] At present, domestic subway construction is booming, and most of them are constructed using the shield method. When using the shield method in sand and gravel formations, over-excavation often occurs due to disturbance, scattering, and collapse of the face, resulting in cavities and ground collapse, which has a serious impact on upper roads, pipelines, and buildings. This is mainly because sand and gravel is a typical mechanically unstable formation with large pores between particles and no cohesion; in the absence of water, the sand and gravel formation transmits force point to point between particles, and the formation reacts sensitively; when the cutterhead rotates and cuts, the formation can easily destroy the original relatively stable or balanced state and collapse, causing greater surrounding rock disturbance, causing the excavation surface and the tunnel wall to lose constraints and become unstable.
[0003] At present, most of the research on the effect of seepage on the stability of tunnel excavation face is focused on numerical simulation and theoretical analysis, which is unable to carry out real simulation. In addition, there is a lack of specific research on the stability of seepage in shield tunnel excavation in water-rich sandy gravel strata. Therefore, an experimental method that considers the effect of seepage on the stability of tunnel excavation face is needed. Summary of the invention
[0004] The purpose of the present invention is to provide a test method that takes into account the influence of seepage on the stability of tunnel excavation face in light of the deficiencies in the above-mentioned prior art. Based on a shield tunnel excavation seepage stability model test device, a corresponding water pressure, soil pressure and surface displacement measurement and acquisition system is designed and deployed. A progressive instability test of the excavation face under the condition that the water pressure is not zero is carried out on saturated sandy soil strata, so as to obtain the surface deformation and soil pressure change law caused by the instability of the shield tunnel excavation face in water-rich sand and gravel strata.
[0005] The purpose of the present invention is achieved by the following technical solutions:
[0006] A test method considering the effect of seepage on tunnel excavation face stability, characterized in that the method comprises:
[0007] (S1) installing a model box, applying vaseline on the inner side of the model box, and setting scale lines on the model box;
[0008] (S2) using the scale lines on the model box to fill the model box in layers, and arranging earth pressure boxes at corresponding positions inside the soil body; arranging surface displacement meters at corresponding positions on the surface of the soil body; and after the filling is completed, using a sprinkler to saturate the soil with water to achieve a test condition of a saturated stratum;
[0009] (S3) a shield machine is arranged at the rear end plate of the model box; the shield machine is arranged on a support pedestal and the tail of the shield machine is driven by a ball screw mechanism to move forward and backward; an earth pressure box and a piezometer are arranged on the cutter head of the shield machine;
[0010] (S4) simulating tunnel excavation by drilling soil in the model box with the shield machine, stopping after excavation reaches the observation section, and recording data of the surface displacement meter, the earth pressure box and the piezometer during the excavation process and after the excavation stops;
[0011] (S5) Select different water pressure ratios to conduct simulation experiments, and repeat the above steps S1 to S4 to obtain the surface deformation and soil pressure change law caused by the instability of the shield tunnel excavation face in the water-rich sand and gravel stratum.
[0012] In the process of layered filling, the soil mass required for each layer of filling is calculated by the relative density of the soil, and then the soil is weighed and filled into the model box, compacted with a rammer and checked with a laser level; after the filling reaches a predetermined height, the specific burial position of the soil pressure box is determined by the laser level.
[0013] The earth pressure boxes inside the soil body are respectively arranged above the position area after the shield machine stops excavating, above the boundary of the position area after the shield machine stops excavating, and above outside the position area after the shield machine stops excavating.
[0014] The surface displacement meters are respectively arranged above the position area after the shield machine stops excavating and above the boundary of the position area after the shield machine stops excavating.
[0015] The model box is a cubic box with an open top, including a bottom plate, a front plate, a rear plate, side plates on both sides and two corner connecting plates; wherein:
[0016] The two ends of the front end plate are connected to the side plates through the corner connecting plates respectively; the corner connecting plates are in a right angle shape; the ends of the corner connecting plates, the ends of the side plates and the ends of the front end plate are all connected by a rubber clamping structure;
[0017] A rubber clamping structure is also used between the two end portions of the rear end plate and the two side plates.
[0018] The rubber clamping structure comprises a rubber wall plate and a through-axis linear screw mechanism, wherein bosses are respectively provided at both ends of the rubber wall plate, and slots are respectively provided at the ends of the corner connecting plate, the ends of the side plate, the ends of the front end plate, and the ends of the rear end plate, wherein the bosses and the slots are adapted to each other in size and shape, and the clamping is achieved by clamping the bosses at both ends of the rubber wall plate into the slots at the ends of the plate body to be connected; the through-axis linear screw mechanism is pre-embedded in the ends of the side plate, the ends of the front end plate, and the ends of the rear end plate, and a through hole is provided at the center of the rubber wall plate for the screw in the through-axis linear screw mechanism to pass through, and the rubber wall plate is finely adjusted to be compressed or stretched by driving the screw forward or backward;
[0019] For the rubber clamping structure connecting the side plate and the corner connecting plate, the through-axis linear screw mechanism in the rubber clamping structure is pre-buried in the side plate and the screw front end of the through-axis linear screw mechanism is rotatably connected to the end of the corner connecting plate;
[0020] For the rubber clamping structure connecting the front end plate and the corner connecting plate, the through-axis linear screw mechanism in the rubber clamping structure is pre-buried in the front end plate and the screw front end of the through-axis linear screw mechanism is rotatably connected to the end of the corner connecting plate;
[0021] For the rubber clamping structure connecting the rear end plate and the side plate, the through-axis linear screw mechanism in the rubber clamping structure is pre-buried in the rear end plate and the front end of the screw of the through-axis linear screw mechanism is rotatably connected to the end of the side plate.
[0022] In the process of the shield machine drilling into the soil in the model box, based on the soil squeezing effect generated by the shield machine in the longitudinal direction and on both sides during excavation, each of the through-axis linear screw mechanisms is controlled to support forward to displace the front end plate in the longitudinal direction and the side plates on both sides outward, and the rubber wall panels follow and extend.
[0023] The advantages of the present invention are:
[0024] (1) The influence of water pressure on the support pressure of the excavation face and the instability mode of the stratum during the excavation process and after the excavation process is stopped can be obtained;
[0025] (2) By setting a rubber clamping structure that can generate displacement on the model box, that is, a rubber wall plate that can adapt to stretching or compression and a through-axis linear screw mechanism that can drive the rubber wall plate to deform, the actual soil layer environment can be better simulated to avoid the soil layer terminating displacement transmission at the side plates and the front plate in the narrow model box, causing the soil layer to be compressed at the wall plate position.
[0026] (3) The rubber clip structure used between the plates of the model box can achieve waterproof effect. BRIEF DESCRIPTION OF THE DRAWINGS
[0027] Figure 1 It is a plan view of the model box and the shield machine test mechanism in the present invention;
[0028] Figure 2 It is a split schematic diagram of the rubber wall panel, the corner connecting plate and the side plate in the present invention;
[0029] Figure 3 For the present invention Figure 1 An enlarged schematic diagram of the local A in FIG.
[0030] Figure 4 It is a schematic diagram of the screw in the through-shaft linear screw mechanism of the present invention pushing the corner connecting plate to extend the rubber wall plate;
[0031] Figure 5 The figure is a layout diagram of the surface displacement meter under the top view of the model box of the present invention;
[0032] Figure 6 for Figure 5 Schematic diagram of AA in the middle;
[0033] Figure 7 for Figure 5 Schematic diagram of the middle BB;
[0034] Figure 8 for Figure 5 Schematic diagram of CC;
[0035] Fig. 9 for Figure 5 Schematic diagram of DD in China;
[0036] Fig.10 The figure is a layout diagram of the earth pressure box and the piezometer on the cutterhead of the shield machine in the present invention. DETAILED DESCRIPTION
[0037] The features of the present invention and other related features are further described in detail below through embodiments in conjunction with the accompanying drawings to facilitate understanding by those skilled in the art:
[0038] like Figure 1-10 As shown, the reference numerals in the figure are: shield machine test mechanism 1, shield machine 11, ball screw mechanism 12, support pedestal 13; model box 2, side plate 21, front end plate 22, rear end plate 23, corner connecting plate 24, rubber wall plate 25, through-axis linear screw mechanism 26, through hole 27; piezometer 3, soil pressure box 4.
[0039] Example: Figure 1-10 As shown, this embodiment relates to a test method considering the effect of seepage on tunnel excavation face stability, the method mainly includes:
[0040] (S1) Clean the model box 2 and apply vaseline on the inside of the model box 2 to eliminate the friction between the box and the soil. Draw positioning lines every 10 cm on the outside of the box to ensure accurate filling.
[0041] The length, width and height of the model box 2 are 2000 mm×2000 mm×1500 mm respectively. The model box 2 is a cubic box with an open top, including a bottom plate, a front plate 22, a rear plate 23, side plates 21 on both sides and two corner connecting plates 24. The bottom plate is laid flat on the ground, the two ends of the front plate 22 are connected to the side plates 21 on both sides through the corner connecting plates 24, and the two ends of the rear plate 23 are connected to the side plates 21 on both sides, together forming the circumferential vertical panel of the model box 2.
[0042] The corner connecting plate 24 is in a right-angle shape, and one end of the corner connecting plate 24 is clamped to the end of the side plate 21 via a rubber clamping structure, and the other end of the corner connecting plate 24 is clamped to the end of the front end plate 22 via a rubber clamping structure; in addition, the two ends of the rear end plate 23 are also clamped to the ends of the side plates 21 on both sides via a rubber clamping structure.
[0043] like Figure 2 , 3 4, each rubber clamping structure adopts the same structure. In this embodiment, the rubber clamping structure between the corner connecting plate 24 and the side plate 21 is used as an example for explanation. The rubber clamping structure includes a rubber wall plate 25 and a through-axis linear screw mechanism 26. The two ends of the rubber wall plate 25 are respectively provided with bosses and the middle position has the same thickness as the side plate 21. The ends of the corner connecting plate 24 and the ends of the side plate 21 are respectively provided with card grooves. The shapes and sizes of the bosses and the card grooves correspond to each other. When assembling, by The bosses of 25 are correspondingly assembled in the slots of the two end plates to form a snap-fit relationship; the through-axis linear screw mechanism 26 is pre-buried and fixed in the front end cavity of the side plate 21, and a through hole 27 is provided in the center of the rubber wall plate 25 for the screw in the through-axis linear screw mechanism 26 to pass through. The front end of the screw in the through-axis linear screw mechanism 26 is fixedly connected to the end surface of the corner connecting plate 24 (but the screw can be rotated), and the rubber section in the middle of the rubber wall plate 25 is finely adjusted to be compressed or stretched by driving the screw forward or backward. Specifically, by driving the through-axis linear screw mechanism 26 in the two sets of rubber snap-fit structures here, the longitudinal displacement of the front end plate 22 can be achieved.
[0044] like Figure 1-4As shown, for the rubber clamping structure located between the front end plate 22 and the corner connecting plate 24, a through-axis linear screw mechanism 26 is pre-buried in the front end plate 22 and the front end of the screw of the through-axis linear screw mechanism 26 is fixedly connected to the end of the corner connecting plate 24 and can rotate relatively.
[0045] For the rubber clamping structure between the rear end plate 23 and the side plate 21 , the through-axis linear screw mechanism 26 is embedded in the rear end plate 23 and the front end of the screw of the through-axis linear screw mechanism 26 is fixedly connected to the rear end of the side plate 21 and can rotate relatively.
[0046] Specifically, when the through-shaft linear screw mechanisms 26 in the front end plate 22 and the rear end plate 23 are driven simultaneously, lateral displacement of the side plates 21 on both sides can be achieved.
[0047] (S2) Fill the model box 2 in layers using the scale lines on the model box 2, and arrange soil pressure boxes at corresponding positions inside the soil; arrange surface displacement meters at corresponding positions on the surface of the soil; and after the filling is completed, use a sprinkler to saturate the soil with water to achieve the test condition of saturated strata.
[0048] Calculate the mass of soil sample required for 10 cm of backfill. Weigh the soil and fill it into the model box 2, and use a rammer to compact it and use a laser level to check the effect. After the filling reaches the predetermined height, use a laser level to determine the specific buried position of the monitoring instrument and lay out the piezometer and soil pressure box. At the same time, after the backfill is completed, use a sprinkler to saturate the soil to achieve the test condition of the saturated stratum. After the backfill and monitoring instrument layout are completed, set up the instrument positioning frame and install the surface displacement meter.
[0049] Arrangement of surface settlement measurement points. Arrange 25 settlement measurement points on the surface of the formation model, use surface displacement meter to measure surface settlement; use static strain collector to connect surface displacement meter to obtain monitoring data; osmometer collector is connected to osmometer.
[0050] The arrangement scheme of soil pressure in the stratum with a burial depth ratio of 2. 34 soil pressure boxes are arranged in the stratum model, including 20 vertical soil pressures and 14 horizontal soil pressures. Static strain collectors are used to connect the soil pressure boxes to obtain the change law of the soil instability area.
[0051] The earth pressure boxes inside the soil body are respectively arranged above the position area after the shield machine 11 stops excavating, above the boundary of the position area after the shield machine 11 stops excavating, and above outside the position area after the shield machine 11 stops excavating.
[0052] (S3) A shield machine test mechanism 1 is arranged at the rear end plate 23 of the model box 2; the shield machine test mechanism 1 includes a shield machine 11, a ball screw mechanism 12 and a support pedestal 13. The shield machine 11 is arranged on the support pedestal 13, and the tail of the shield machine 11 is connected to the ball screw mechanism 12 and driven to move forward and backward. The cutterhead of the shield machine 11 is arranged with an earth pressure box 4 and a piezometer 3.
[0053] (S4) The shield machine 11 drills the soil in the model box 2 to simulate tunnel excavation, and stops after excavation reaches the observation section. The observation section is a vertical section and is located at the center of the model box 2. The data of the surface displacement meter, the earth pressure box and the piezometer during the excavation process and after the excavation stops are recorded respectively.
[0054] In the process of controlling the shield machine 11 to simulate tunnel excavation in the soil layer of the model box 2, it is inevitable that a soil squeezing effect will be produced on the longitudinal front end and both sides of the shield machine 11, that is, the position close to the shield machine 11 is affected by the soil squeezing and the displacement is the largest. As the distance increases, the soil is affected by the soil squeezing less and the displacement will also be weakened. However, since the size of the model box 2 is generally small, the soil is usually blocked at the inner wall surface of the plate body of the model box 2 by the soil squeezing, resulting in the accumulation of soil layer compression at the inner wall surface, which makes it impossible to truly simulate the displacement and compression of the soil layer during the excavation process of the shield machine 11. In order to solve this problem, it is necessary to provide a stable supporting force to the rubber clamping structure between the plates of the model box 2 so that the rubber wall plate 25 thereon can be slowly extended to simulate the force transmission and displacement transmission of the excavated layer, and the extension of the rubber wall plate 25 will still keep the inner wall surface of the model box 2 smooth.
[0055] Specifically, each through-axis linear screw mechanism 26 is controlled to support forward so that the front end plate 22 is displaced longitudinally and the side plates 21 on both sides are displaced outwardly, and the rubber wall plate 25 is slowly extended accordingly. The specific extension size of the rubber wall plate 25 can be determined based on experience or test parameters, and the extension value of the rubber wall plate 25 is controlled to be 1-10 mm during the entire excavation process of the shield machine 11.
[0056] In this embodiment, based on the displacement data, the law that the stratum displacement decreases with the increase of distance is sorted out, and then the values of the lateral displacement compensation required for the side plates 21 on both sides are derived according to the distance between the side plates 21 and the shield machine 11, that is, the required extension values of the rubber wall plates 25 at both ends of the rear plate 23, and the required extension values of the rubber wall plates 25 at both ends of the front plate 22. According to the advancement distance of the shield machine 11 in the model box 2, the through-axis linear screw mechanism 26 at both ends of the rear plate 23 is first controlled to slowly support and extend the rubber wall plates 25 at both ends of the rear plate 23. When the shield machine 11 is advanced in the model box 2 to the front plate 22, the through-axis linear screw mechanism 26 at both ends of the front plate 22 is further controlled to slowly support and extend the rubber wall plates 25 at both ends of the front plate 22.
[0057] In addition, the required longitudinal movement compensation value of the front end plate 22 , ie, the required extension value of the rubber wall plate 25 at the front ends of the side plates 21 on both sides, is derived according to the distance between the front end plate 22 and the front end of the shield machine 11 .
[0058] (S5) Select different water pressure ratios to conduct simulation experiments, and repeat the above steps S1 to S4 to obtain the surface deformation and soil pressure change law caused by the instability of the shield tunnel excavation face in the water-rich sand and gravel stratum.
[0059] Among them, a series of model tests with different excavation face water pressure ratios (1.0, 0.5 and 0.0) were carried out based on the indoor test device to obtain the surface deformation and soil pressure change laws caused by the instability of the shield tunnel excavation face in water-rich sand and gravel strata.
[0060] The beneficial technical effect of this embodiment is that the influence of water pressure on the excavation face support pressure and the stratum instability mode can be obtained.
[0061] Although the above embodiments have described in detail the concepts and embodiments of the present invention with reference to the accompanying drawings, ordinary technicians in this field can recognize that various improvements and changes can still be made to the present invention without departing from the scope of the claims, so they are not described one by one here.
Claims
1. A test method considering the effect of seepage on tunnel excavation face stability, characterized in that The method comprises: (S1) installing a model box, applying vaseline on the inner side of the model box, and setting scale lines on the model box; The model box is a cubic box with an open top, including a bottom plate, a front plate, a rear plate, side plates on both sides and two corner connecting plates; wherein: The two ends of the front end plate are connected to the side plates through the corner connecting plates respectively; the corner connecting plates are in a right angle shape; the ends of the corner connecting plates, the ends of the side plates and the ends of the front end plate are all connected by a rubber clamping structure; A rubber clamping structure is also used between the two ends of the rear end plate and the two side plates; The rubber clamping structure includes a rubber wall plate and a through-shaft linear screw mechanism; the through-shaft linear screw mechanism is pre-buried in the end of the side plate, the end of the front plate, and the end of the rear plate; a through hole is provided in the center of the rubber wall plate for the screw in the through-shaft linear screw mechanism to pass through, and the rubber wall plate is finely adjusted to be compressed or stretched by driving the screw forward or backward; (S2) using the scale lines on the model box to fill the model box in layers, and arranging earth pressure boxes at corresponding positions inside the soil body; arranging surface displacement meters at corresponding positions on the surface of the soil body; and after the filling is completed, using a sprinkler to saturate the soil with water to achieve a test condition of a saturated stratum; (S3) a shield machine is arranged at the rear end plate of the model box; the shield machine is arranged on a support pedestal and the tail of the shield machine is driven by a ball screw mechanism to move forward and backward; an earth pressure box and a piezometer are arranged on the cutter head of the shield machine; (S4) simulating tunnel excavation by drilling soil in the model box with the shield machine, stopping after excavation reaches the observation section, and recording data of the surface displacement meter, the earth pressure box and the piezometer during the excavation process and after the excavation stops; (S5) Select different water pressure ratios to conduct simulation experiments, and repeat the above steps S1 to S4 to obtain the surface deformation and soil pressure change law caused by the instability of the shield tunnel excavation face in the water-rich sand and gravel stratum.
2. A test method for considering the effect of seepage on tunnel excavation face stability as claimed in claim 1, characterized in that In the process of layered filling, the soil mass required for each layer of filling is calculated by the relative density of the soil, and then the soil is weighed and filled into the model box, compacted with a rammer and checked with a laser level; after the filling reaches a predetermined height, the specific burial position of the soil pressure box is determined by the laser level.
3. A test method for considering the effect of seepage on tunnel excavation face stability as claimed in claim 1, characterized in that The earth pressure boxes inside the soil body are respectively arranged above the position area after the shield machine stops excavating, above the boundary of the position area after the shield machine stops excavating, and above outside the position area after the shield machine stops excavating.
4. A test method for considering the effect of seepage on tunnel excavation face stability as claimed in claim 1, characterized in that The surface displacement meters are respectively arranged above the position area after the shield machine stops excavating and above the boundary of the position area after the shield machine stops excavating.
5. A test method for considering the effect of seepage on tunnel excavation face stability as claimed in claim 1, characterized in that Bosses are respectively provided at both ends of the rubber wall plate, and slots are respectively provided at the ends of the corner connecting plate, the ends of the side plate, the ends of the front plate, and the ends of the rear plate. The bosses and the slots are adapted to each other in size and shape, and the bosses at both ends of the rubber wall plate are clamped into the slots at the ends of the plate body to be connected to achieve clamping; For the rubber clamping structure connecting the side plate and the corner connecting plate, the through-axis linear screw mechanism in the rubber clamping structure is pre-buried in the side plate and the screw front end of the through-axis linear screw mechanism is rotatably connected to the end of the corner connecting plate; For the rubber clamping structure connecting the front end plate and the corner connecting plate, the through-axis linear screw mechanism in the rubber clamping structure is pre-buried in the front end plate and the screw front end of the through-axis linear screw mechanism is rotatably connected to the end of the corner connecting plate; For the rubber clamping structure connecting the rear end plate and the side plate, the through-axis linear screw mechanism in the rubber clamping structure is pre-buried in the rear end plate and the front end of the screw of the through-axis linear screw mechanism is rotatably connected to the end of the side plate.
6. A test method for considering the effect of seepage on tunnel excavation face stability as claimed in claim 5, characterized in that In the process of the shield machine drilling into the soil in the model box, based on the soil squeezing effect generated by the shield machine in the longitudinal direction and on both sides during excavation, each of the through-axis linear screw mechanisms is controlled to support forward to displace the front end plate in the longitudinal direction and the side plates on both sides outward, and the rubber wall panels follow and extend.