A hoisting device for glass curtain wall used in building
By using large-area lifting components and inflatable supporting units in glass curtain wall hoisting equipment to provide planar support, the problem of load concentration is solved, the stability of the glass curtain wall is improved, and the risk of fragmentation is reduced. At the same time, the space after hoisting is achieved. optimization.
Patent Information
- Application Number
- CN202410904231.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-08
- Publication Date
- 2024-10-29
- Estimated Expiration
- 2044-07-08
AI Technical Summary
In the existing building glass curtain wall hoisting equipment, the four-corner clamping and positioning method causes the load of the glass curtain wall to be concentrated during the hoisting process, which can easily cause the glass curtain wall to break.
Large-area lifting components are used, including inflatable support units and edge reinforcement units. The rolled air bags are inflated to provide surface support. Combined with the U-shaped frame and the initial positioning of electronically controlled telescopic rods, it ensures that the load of the glass curtain wall is uniform during the hoisting process. Distributed and reinforced with capacitive plate hardened coiled seal hose.
It effectively avoids load concentration, improves the stability of the glass curtain wall, prevents breakage caused by external shaking, and can be stowed away to reduce storage space after the hoisting is completed.
Smart Images

Figure CN118439490B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of hoisting, in particular to hoisting equipment for a glass curtain wall for a building. Background Art
[0002] An invention patent with application number 202111387778.9 discloses lifting equipment and methods for large-size glass curtain walls for buildings with a balancing mechanism, and specifically discloses the technical solution of "using transmission gears to control the up and down movement of the clamping movable plate to clamp the edge of the glass curtain wall. The four corners of the glass curtain wall are fixed, and the clamping stability is higher. In addition, a fixed suction cup is provided, which is adsorbed above the middle position of the glass curtain wall to further improve the clamping stability."
[0003] Although the technical solution of the application has the function of positioning and hoisting, the way of clamping and positioning the glass curtain wall at the four corners makes the supporting force load on the glass curtain wall too concentrated during the hoisting process, that is, the load on the glass curtain wall is not reasonably distributed in a planar manner. During the hoisting and loading and unloading process of the glass curtain wall, when the glass curtain wall shakes due to external factors, the load on the four corners changes suddenly, which can easily cause the glass curtain wall to break. Summary of the invention
[0004] In view of the above situation, in order to overcome the defects of the prior art, the present invention provides a hoisting device for a glass curtain wall for a building. In order to solve the technical problem that the supporting force load on the glass curtain wall during the hoisting process is too concentrated due to the way of clamping and positioning the glass curtain wall at four corners, that is, the load on the glass curtain wall fails to be reasonably distributed in a planar manner, the present invention proposes a hoisting device for a glass curtain wall for a building that can provide planar support for the glass curtain wall.
[0005] The technical solution adopted by the present invention is as follows: a hoisting device for a glass curtain wall for a building, comprising a lifting beam, a main electric-controlled telescopic rod, a positioning mainboard and a large-surface lifting assembly, wherein the main electric-controlled telescopic rod is fixedly arranged on one side of the lifting beam, the positioning mainboard is fixedly arranged on one end of the main electric-controlled telescopic rod, and the large-surface lifting assembly is arranged on the positioning mainboard.
[0006] Furthermore, the large-surface lifting assembly includes an inflatable supporting unit, an edge reinforcement unit, two U-shaped frames, two initially-positioning electrically-controlled telescopic rods and two pressure pads. The two U-shaped frames are symmetrically fixed on the front and rear sides of the positioning main board. Locking grooves are penetrated through the tops of the two U-shaped frames. The two initially-positioning electrically-controlled telescopic rods are vertically fixed in the two locking grooves respectively. The two pressure pads are fixed at the bottom of the two initially-positioning electrically-controlled telescopic rods, and the inflatable supporting unit is arranged on the positioning main board.
[0007] Furthermore, a curtain wall body is fitted inside the U-shaped frame, and the compression pad is fitted on the top of the curtain wall body.
[0008] Furthermore, the inflatable supporting unit includes two extension plates, a torsion shaft, a winding airbag, an extrusion frame, two extrusion rollers and an air pump, the two extension plates are respectively fixed on the two U-shaped frames, the torsion shaft is rotatably arranged between the two extension plates, one end of the winding airbag is wound on the torsion shaft, the extrusion frame is fixedly arranged between the two extension plates, the two extrusion rollers are both rotatably arranged on the extrusion frame, the two extrusion rollers are in a vertical linear array, the two extrusion rollers are respectively fitted on the upper and lower sides of the winding airbag, the air pump is fixedly arranged on one end of the winding airbag away from the torsion shaft, the winding airbag between the extrusion roller and the torsion shaft is in a contracted state, the winding airbag between the extrusion roller and the air pump is in an expanded state, and the winding airbag between the extrusion roller and the air pump is fitted on the bottom of the curtain wall body.
[0009] Furthermore, the inflatable support unit also includes a C-shaped end connecting frame and a propulsion electric telescopic rod, the C-shaped end connecting frame is fixedly connected to the front and rear sides of the winding airbag, the propulsion electric telescopic rod is fixedly arranged on the positioning main board, and the propulsion electric telescopic rod is fixedly connected to the C-shaped end connecting frame.
[0010] Furthermore, the edge reinforcement unit is arranged on the extension plate, and the edge reinforcement unit includes a capacitor plate and two winding sealing hoses. The capacitor plate is fixed between the two extension plates, and the two winding sealing hoses are symmetrically fixed on the front and rear sides of the winding airbag. The two winding sealing hoses are filled with electrorheological fluid.
[0011] Furthermore, the main electric control telescopic rod, the positioning main board and the large surface lifting assembly are all provided in two groups symmetrically on the left and right.
[0012] Furthermore, a lifting ring is fixedly provided on the top of the lifting beam.
[0013] The beneficial effects achieved by the present invention using the above structure are as follows:
[0014] 1. The setting of the large-surface lifting assembly enables the lower part of the curtain wall body to be supported by the expanded coiled airbag in a planar manner, avoiding the load concentration problem caused by the four-corner clamping positioning, so that the curtain wall body is not easy to break when shaking caused by external factors.
[0015] 2. The coordinated use of the torsion shaft, the C-shaped end connection frame and the propulsion electric telescopic rod enables the winding airbag to be pulled out or folded up at will. On the basis of the pulled-out winding airbag providing planar support for the curtain wall body, the winding airbag can also be folded up to reduce the space required for storage.
[0016] 3. A winding sealing hose filled with electrorheological fluid is arranged on the side of the winding airbag, so that the winding sealing hose can be hardened under the action of the capacitor plates in the two sets of large-surface lifting components, thereby enhancing the stability of the winding airbag under the curtain wall body and providing stable support for the curtain wall body when shaking occurs. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] Figure 1 It is a three-dimensional schematic diagram of the hoisting equipment of the building glass curtain wall of the present invention.
[0018] Figure 2 The present invention is a cross-sectional schematic diagram of a hoisting device for a glass curtain wall for a building.
[0019] Figure 3 It is a three-dimensional schematic diagram of the large-surface lifting assembly of the present invention.
[0020] Figure 4 It is a three-dimensional schematic diagram of the U-shaped frame of the present invention.
[0021] Figure 5 It is a three-dimensional schematic diagram of the inflatable supporting unit of the present invention.
[0022] Figure 6 It is a cross-sectional schematic diagram of the inflatable supporting unit of the present invention.
[0023] Figure 7 It is a three-dimensional schematic diagram of the extrusion frame and the extrusion roller of the present invention.
[0024] Figure 8 It is a three-dimensional schematic diagram of the edge reinforcement unit of the present invention.
[0025] Among them, 1. lifting beam, 101. lifting ring, 2. main electric telescopic rod, 3. positioning main board, 4. large surface lifting assembly, 401. U-shaped frame, 4011. locking groove, 402. initial positioning electric telescopic rod, 403. pressing pad, 5. inflatable supporting unit, 501. extension plate, 502. torsion shaft, 503. winding airbag, 504. extrusion frame, 505. extrusion roller, 506. air pump, 507. C-shaped end connecting frame, 508. propulsion electric telescopic rod, 6. edge reinforcement unit, 601. winding sealing hose, 602. capacitor plate, 7. curtain wall body.
[0026] The accompanying drawings are used to provide further understanding of the present invention and constitute a part of the specification. They are used to explain the present invention together with the embodiments of the present invention and do not constitute a limitation of the present invention. DETAILED DESCRIPTION
[0027] The technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all the embodiments; based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of the present invention.
[0028] In the description of the present invention, it is necessary to understand that the terms "upper", "lower", "front", "back", "left", "right", "top", "bottom", "inside", "outside", etc., indicating the orientation or position relationship are based on the orientation or position relationship shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present invention.
[0029] like Figure 1 to Figure 8 As shown, a hoisting device for a glass curtain wall for a building includes a lifting beam 1, a main electric control telescopic rod 2, a positioning main board 3 and a large surface lifting component 4. The main electric control telescopic rod 2 is fixedly arranged on one side of the lifting beam 1, the positioning main board 3 is fixedly arranged on one end of the main electric control telescopic rod 2, and the large surface lifting component 4 is arranged on the positioning main board 3.
[0030] like Figure 1 to Figure 8 As shown, the large surface lifting assembly 4 includes an inflatable supporting unit 5, an edge reinforcement unit 6, two U-shaped frames 401, two initial positioning electrically-controlled telescopic rods 402 and two pressure pads 403. The two U-shaped frames 401 are symmetrically fixed on the front and rear sides of the positioning main board 3. Locking grooves 401 are penetrated through the tops of the two U-shaped frames 401. The two initial positioning electrically-controlled telescopic rods 402 are vertically fixed in the two locking grooves 4011 respectively. The two pressure pads 403 are fixed at the bottom of the two initial positioning electrically-controlled telescopic rods 402. The inflatable supporting unit 5 is arranged on the positioning main board 3.
[0031] like Figure 1 to Figure 8 As shown, the curtain wall body 7 is fitted inside the U-shaped frame 401 , and the pressing pad 403 is fitted on the top of the curtain wall body 7 .
[0032] like Figure 1 to Figure 8As shown, the inflatable support unit 5 includes two extension plates 501, a torsion shaft 502, a winding airbag 503, an extrusion frame 504, two extrusion rollers 505 and an air pump 506. The two extension plates 501 are fixedly arranged on the two U-shaped frames 401 respectively, the torsion shaft 502 is rotatably arranged between the two extension plates 501, one end of the winding airbag 503 is wound on the torsion shaft 502, the extrusion frame 504 is fixedly arranged between the two extension plates 501, and the two extrusion rollers 505 are rotatably arranged on the extrusion frame 504. The two squeezing rollers 505 are arranged in a vertical linear array, and the two squeezing rollers 505 are respectively arranged on the upper and lower sides of the winding airbag 503. The air pump 506 is fixed on the end of the winding airbag 503 away from the torsion shaft 502. The part of the winding airbag 503 between the squeezing roller 505 and the torsion shaft 502 is in a contracted state, and the part of the winding airbag 503 between the squeezing roller 505 and the air pump 506 is in an expanded state. The part of the winding airbag 503 between the squeezing roller 505 and the air pump 506 is fitted at the bottom of the curtain wall body 7.
[0033] like Figure 1 to Figure 8 As shown, the inflatable support unit 5 also includes a C-shaped end connecting frame 507 and a propulsion electric control telescopic rod 508. The C-shaped end connecting frame 507 is fixedly connected to the front and rear sides of the winding airbag 503. The propulsion electric control telescopic rod 508 is fixedly arranged on the positioning main board 3. The propulsion electric control telescopic rod 508 is fixedly connected to the C-shaped end connecting frame 507.
[0034] like Figure 1 to Figure 8 As shown, the edge reinforcement unit 6 is arranged on the extension plate 501, and the edge reinforcement unit 6 includes a capacitor plate 602 and two winding sealing hoses 601. The capacitor plate 602 is fixed between the two extension plates 501, and the two winding sealing hoses 601 are symmetrically fixed on the front and rear sides of the winding airbag 503. The two winding sealing hoses 601 are filled with electrorheological fluid.
[0035] like Figure 1 to Figure 8 As shown, the main electric control telescopic rod 2, the positioning main board 3 and the large surface lifting assembly 4 are all provided in two groups symmetrically on the left and right.
[0036] like Figure 1 to Figure 8 As shown, a lifting ring 101 is fixedly provided on the top of the lifting beam 1.
[0037] When in use, the main electric telescopic rod 2 is extended to a suitable length so that the left and right sides of the curtain wall body 7 are in contact with the U-shaped frame 401. The initial positioning electric telescopic rod 402 is extended so that the pressing pad 403 is pressed against the top of the curtain wall body 7.
[0038] The electric telescopic rod 508 is pushed to extend, and the winding airbag 503 below the curtain wall body 7 is driven to move from the edge to the center through the U-shaped end connection frame. In this process, the torsion shaft 502 is forced to rotate, and the winding airbag 503 on the torsion shaft 502 is continuously released, and the released part of the winding airbag 503 moves to the bottom of the curtain wall body 7 through the gap between the two squeezing rollers 505. The air pump 506 inflates the winding airbag 503. Because the two squeezing rollers 505 press the winding airbag 503 from the upper and lower sides, the air blown by the air pump 506 cannot enter the part of the winding airbag 503 between the torsion shaft 502 and the squeezing roller 505. The part of the winding airbag 503 between the torsion shaft 502 and the squeezing roller 505 is still in a contracted state, while the part of the winding airbag 503 between the air pump 506 and the squeezing roller 505 is in an expanded state and fits under the curtain wall body 7. The inflated rolled airbag 503 is attached to the bottom of the curtain wall body 7, thereby providing planar support for the curtain wall body 7, avoiding the load concentration phenomenon and easy breakage of the curtain wall body 7 when hoisting.
[0039] After the wound airbag 503 provides good support for the curtain wall body 7, the capacitor plates 602 in the two groups of large-surface lifting components 4 are energized to form an electric field, so that the wound sealing hose 601 filled with electrorheological fluid on the side of the wound airbag 503 is hardened, so that the wound airbag 503 can obtain a stable edge limiting effect, and when the curtain wall body 7 shakes due to external factors, the wound airbag 503 with stable edge limiting can provide good support for the curtain wall body 7.
[0040] After the curtain wall body 7 is well supported, the lifting ring 101 is lifted by a lifting device to realize the lifting of the curtain wall body 7 .
[0041] The above are only preferred specific implementation modes of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes according to the technical solutions and inventive concepts of the present invention within the technical scope disclosed by the present invention, which should be covered by the protection scope of the present invention.
Claims
1. A hoisting device for a glass curtain wall for a building, characterized in that: It comprises a lifting beam (1), a main electric control telescopic rod (2), a positioning main board (3) and a large surface lifting component (4), wherein the main electric control telescopic rod (2) is fixedly arranged on one side of the lifting beam (1), the positioning main board (3) is fixedly arranged on one end of the main electric control telescopic rod (2), and the large surface lifting component (4) is arranged on the positioning main board (3); The large surface lifting assembly (4) comprises an inflatable support unit (5), an edge reinforcement unit (6), two U-shaped frames (401), two initially positioned electrically controlled telescopic rods (402) and two pressing pads (403), the two U-shaped frames (401) being symmetrically fixed on the front and rear sides of the positioning main board (3), the tops of the two U-shaped frames (401) being penetrated by locking grooves (4011), the two initially positioned electrically controlled telescopic rods (402) being vertically fixed in the two locking grooves (4011), the two pressing pads (403) being fixed on the bottoms of the two initially positioned electrically controlled telescopic rods (402), and the inflatable support unit (5) being arranged on the positioning main board (3); The U-shaped frame (401) is fitted with a curtain wall body (7), and the pressing pad (403) is fitted on the top of the curtain wall body (7); The inflatable support unit (5) comprises two extension plates (501), a torsion shaft (502), a winding airbag (503), an extrusion frame (504), two extrusion rollers (505) and an air pump (506); the two extension plates (501) are respectively fixed on two U-shaped frames (401); the torsion shaft (502) is rotatably disposed between the two extension plates (501); one end of the winding airbag (503) is wound on the torsion shaft (502); the extrusion frame (504) is fixed between the two extension plates (501); and the two extrusion rollers (505) are both rotatably disposed on the extrusion frame (504). The two squeezing rollers (505) are arranged in a vertical linear array. The two squeezing rollers (505) are respectively arranged on the upper and lower sides of the winding airbag (503). The air pump (506) is fixedly arranged on one end of the winding airbag (503) away from the torsion shaft (502). The portion of the winding airbag (503) between the squeezing roller (505) and the torsion shaft (502) is in a contracted state, and the portion of the winding airbag (503) between the squeezing roller (505) and the air pump (506) is in an expanded state. The portion of the winding airbag (503) between the squeezing roller (505) and the air pump (506) is arranged in a fit to the bottom of the curtain wall body (7).
2. The hoisting equipment for a glass curtain wall for a building according to claim 1, characterized in that: The inflatable support unit (5) further comprises a C-shaped end connection frame (507) and a propulsion electric telescopic rod (508), wherein the C-shaped end connection frame (507) is fixedly connected to the front and rear sides of the rolled airbag (503), and the propulsion electric telescopic rod (508) is fixedly arranged on the positioning main board (3), and the propulsion electric telescopic rod (508) is fixedly connected to the C-shaped end connection frame (507).
3. The hoisting equipment for a glass curtain wall for a building according to claim 2, characterized in that: The edge reinforcement unit (6) is arranged on the extension plate (501), and comprises a capacitor plate (602) and two winding sealing hoses (601); the capacitor plate (602) is fixedly arranged between the two extension plates (501); the two winding sealing hoses (601) are symmetrically fixedly arranged on the front and rear sides of the winding airbag (503); and the two winding sealing hoses (601) are filled with electrorheological fluid.
4. The hoisting equipment for a glass curtain wall for a building according to claim 3 is characterized in that: The main electric control telescopic rod (2), the positioning main board (3) and the large surface lifting assembly (4) are all provided in two groups symmetrically on the left and right.
5. The hoisting equipment for a glass curtain wall for a building according to claim 4, characterized in that: A lifting ring (101) is fixedly provided on the top of the lifting beam (1).
Citation Information
Patent Citations
Integral hoisting equipment for building curtain wall glasses and working mode thereof
CN109052136A
Hoisting equipment with balance mechanism for large-size glass curtain wall for building and hoisting method
CN114030973A
Lifting frame for curtain wall glass construction
CN214828350U
Surface coating equipment for existing window glass
JP3068588U
