High temperature sintering phosphogypsum calcium slag preparation device
By designing a vortex processing path and a heat recovery system in the high-temperature sintering phosphogypsum calcium slag process, the problems of high energy consumption and uneven heating are solved, and the stability of product quality and environmentally friendly use of energy are achieved.
Patent Information
- Application Number
- CN202410510580.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-26
- Publication Date
- 2024-10-01
- Estimated Expiration
- 2044-04-26
AI Technical Summary
In the high-temperature sintering phosphogypsum calcium slag process, the existing equipment results in high energy consumption, uneven heating, easy agglomeration and equipment blockage, resulting in unstable product quality, and the waste gas is harmful to the environment and wastes energy.
A furnace frame structure including a second sintering rack and a first sintering rack is designed. The vortex hole and the bottom lining plate are used to form a uniform processing path. It is combined with a heat exchange drying mechanism and an exhaust gas driving unit. Through the spray burning mechanism and air supply The mechanism realizes uniform heating of materials and heat recovery of exhaust gas.
It effectively avoids agglomeration, improves production quality and energy utilization efficiency, reduces energy consumption and environmental impact, and ensures the stability of the product structure and the environmentally friendly use of energy.
Smart Images

Figure CN118463603B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of mining metallurgy, in particular to a device for preparing high-temperature sintered phosphogypsum calcium slag. Background Art
[0002] Phosphogypsum and calcium slag are both names of industrial production waste. Both substances are industrial waste and need to be properly disposed and treated to reduce the impact on the environment. At the same time, through technical means and resource utilization, these wastes can also be converted into reusable resources to contribute to the circular economy and clean production. The high-temperature sintering phosphogypsum calcium slag process is a process for resource utilization of waste phosphogypsum and calcium slag. Through high-temperature treatment, these wastes can be converted into new materials to achieve comprehensive resource utilization and reduce the impact on the environment.
[0003] When sintering phosphogypsum and calcium slag, rotary kilns or rotary kilns are usually used. These equipment can heat the raw materials in a high-temperature environment. However, no matter which type is used, a large amount of phosphogypsum calcium slag piles are sprayed and burned during sintering. Although they can be rotated and turned, the energy consumption is still large. At the same time, tumbling in one direction is difficult to ensure the uniformity of heating of phosphogypsum and calcium slag, and may cause agglomeration. Agglomeration will cause equipment blockage, such as in conveyor belts, sintering furnaces or other processing equipment, making it impossible to transport or process materials normally, resulting in uneven product structure or unstable quality, and it is difficult to control the particle size distribution of raw materials. At the same time, the waste gas generated is used to directly dry the raw materials to ensure that it does not contain harmful substances that are harmful to the raw materials or production equipment, which increases the problem of production quality control. At the same time, the waste gas contains a lot of heat. If it is discharged directly, it will not only affect the environment, but also waste energy.
[0004] However, these devices are used Summary of the invention
[0005] The purpose of the present invention is to provide a high-temperature sintered phosphogypsum calcium slag preparation device to solve the problems raised in the above background technology.
[0006] To achieve the above-mentioned purpose, the present invention provides the following technical scheme: it comprises a furnace frame, a second sintering frame is rotatably arranged at the bottom end of the inner wall of the furnace frame, a first sintering frame is rotatably arranged at the top end of the second sintering frame, the bottom end of the inner wall of the furnace frame is connected to a support frame, the top end of the support frame is connected to a bottom lining plate, the bottom lining plate is located directly below the second sintering frame and the first sintering frame, the bottom end of the inner wall of the furnace frame is connected to a limited mounting frame, a driving gear disc is rotatably arranged on one side of the top end of the limited mounting frame, the bottom end of the driving gear disc is connected to a circular shaft, and the bottom end of the circular shaft passes through the driving gear disc and is connected to a driven sprocket, the bottom end of the furnace frame is connected to a reducer, one side of the reducer is connected to a driving motor, one side of the inner wall of the furnace frame is connected to a partition plate, the top end of the partition plate is connected to a feeding pipe and a spraying mechanism, A feeding port is provided at the bottom end of the feeding pipe, a connecting pipe is connected to the bottom end of the inner wall of the burning mechanism, an exhaust pipe is connected to the top end of the connecting pipe, a spiral feeding guide is connected to the surface of the exhaust pipe, a heat exchange and drying mechanism is connected inside the exhaust pipe, a partition plate 2 is connected to one side of the inner wall of the grate, an exhaust gas driving unit is connected to the top end of the partition plate 2, a circulation pipe is connected to the top end of the exhaust pipe, one end of the circulation pipe passes through the exhaust gas driving unit and is connected to a water tank, a heat-conducting air pipe is connected inside the water tank, one end of the circulation pipe is connected to the heat-conducting air pipe, one end of the heat-conducting air pipe passes through the water tank and is connected to an annular gas tank, a plurality of blowing pipes are connected to one side of the inner wall of the annular gas tank, a plurality of air supply mechanisms are connected to the outer ring of the grate, and a discharge pipe is connected to one side.
[0007] Preferably, the second sintering rack includes a dispersion rack 1, one side of the dispersion rack 1 is connected to a material stripping plate, one side of the inner wall of the dispersion rack 1 is connected to an inner gear ring, one side of the driving gear disc is meshed with the inner gear ring, and the bottom end of the inner wall of the furnace rack is connected to a guide rack corresponding to the material stripping plate.
[0008] Preferably, the first sintering frame includes a second dispersion frame, the top end of the second dispersion frame is connected to a guide cone, the bottom end of the guide cone is connected to an inner liner tube, one side of the inner wall of the inner liner tube is connected to a connecting shaft frame, the bottom end of the connecting shaft frame is connected to a driving sprocket, a chain is sleeved and connected between the driving sprocket and the driven sprocket, and the output end of the reducer passes through the furnace frame and is connected to the driving sprocket.
[0009] Preferably, the spraying mechanism includes a plurality of mounting seats, the top end of the mounting seat is connected to a connecting branch pipe, one end of the connecting branch pipe is connected to the same connecting ring pipe, the end of the connecting branch pipe close to the connecting ring pipe is connected to an electric-controlled valve, the bottom end of the mounting seat is connected to a mixing nozzle corresponding to the connecting branch pipe, and the bottom end of the mounting seat is connected to an igniter.
[0010] Preferably, there are two groups of spraying mechanisms, which are distributed and arranged directly above the second sintering rack and the first sintering rack.
[0011] Preferably, the heat exchange and drying mechanism includes an air inlet pipe, one end of the air inlet pipe is connected to a heat exchange pipe, the other end of the heat exchange pipe is connected to an air box, a plurality of groups of heat dissipation pipes are connected to the outer circle of the air box, the ends of the heat dissipation pipes away from each other all pass through the connecting pipe and extend into the burning mechanism, and exhaust holes are opened on the lower side, the top end of the air inlet pipe passes through the circulation pipe and is connected to an air intake device.
[0012] Preferably, the exhaust gas driving unit includes a wind tank, an inner gear ring is rotatably arranged inside the wind tank, a side of the inner gear ring located inside the wind tank is connected with magnetic turbine blades, a lower magnetic ring and an upper magnetic plate are connected between the inner walls of the wind tank, the magnetic turbine blades are located between the lower magnetic ring and the upper magnetic plate, an inner lining plate is connected to one side of the inner wall of the wind tank, a through hole is provided on one side of the wind tank corresponding to the circulation pipe, and an exhaust gas discharge pipe is connected to the top of the wind tank.
[0013] Preferably, a transmission is connected to the top of the through hole, a DC generator is connected to one side of the transmission, a connecting shaft is connected to the output end of the transmission, the bottom end of the connecting shaft passes through the inner lining plate and is connected to a gear, and one side of the gear is meshed with the inner gear ring.
[0014] Preferably, one end of the blowing pipe passes through the annular gas tank and is connected to the exhaust gas driving unit, the end of the blowing pipe located in the annular gas tank is connected to a safety valve, and the end of the heat-conducting gas pipe close to the annular gas tank is connected to a one-way valve.
[0015] Preferably, the air supply mechanism includes an air intake hood, which is hinged with a one-way air plate on one side of the furnace frame, an extrusion spring is connected to one side of the inner wall of the air intake hood, a sealing plate is connected to one end of the extrusion spring, and one side of the sealing plate is against the inner wall of the air intake hood.
[0016] Compared with the prior art, the present invention has the following beneficial effects:
[0017] 1. The present invention forms a vortex processing path through the cooperation of the vortex holes at the top of the second sintering rack and the first sintering rack with the bottom lining plate, which can evenly disperse the materials during processing, ensure the spraying effect of the spraying mechanism, effectively avoid the occurrence of agglomeration, improve production quality, ensure the stability of the production structure, and facilitate later transportation and use;
[0018] 2. The present invention also exchanges heat for the waste gas through a heat exchange and drying mechanism, dries and heats the unprocessed materials, and avoids the influence of harmful substances in the waste gas on the quality of the materials, improves the production quality, reduces energy consumption, alleviates the problem of production quality control, and further improves the production quality;
[0019] 3. The present invention compresses and collects the collision exhaust gas, and then discharges it at high pressure to drive the magnetic turbine blades to rotate, thereby converting mechanical energy into electrical energy for energy recovery and utilization, saving energy and protecting the environment, while reducing energy consumption. BRIEF DESCRIPTION OF THE DRAWINGS
[0020] Figure 1 This is a schematic diagram of the overall structure of the device for preparing high-temperature sintered phosphogypsum calcium slag of the present invention;
[0021] Figure 2 It is a schematic diagram of the front cross-section structure of the high-temperature sintering phosphogypsum calcium slag preparation device of the present invention;
[0022] Figure 3 It is a schematic diagram of the side cross-section structure of the high-temperature sintered phosphogypsum calcium slag preparation device of the present invention;
[0023] Figure 4 for Figure 2 The enlarged structural diagram of part B in the middle;
[0024] Figure 5 for Figure 3 The enlarged structural diagram of part A in the middle;
[0025] Figure 6 This is a schematic diagram of the internal structure of the device for preparing high-temperature sintered phosphogypsum calcium slag of the present invention;
[0026] Figure 7 It is a schematic cross-sectional structure diagram of a device for preparing high-temperature sintered phosphogypsum calcium slag according to the present invention;
[0027] Figure 8 It is a partial structural schematic diagram of a device for preparing high-temperature sintered phosphogypsum calcium slag according to the present invention;
[0028] Fig. 9 It is a schematic diagram of the connection structure of the partition plate 1, the feed pipe and the connecting pipe of the high-temperature sintering phosphogypsum calcium slag preparation device of the present invention;
[0029] Fig.10 It is a structural schematic diagram of the spraying mechanism in the high-temperature sintering phosphogypsum calcium slag preparation device of the present invention;
[0030] Fig.11 It is a schematic structural diagram of the gas supply mechanism in the high-temperature sintering phosphogypsum calcium slag preparation device of the present invention;
[0031] Fig.12It is a schematic structural diagram of the exhaust gas driving unit in the high-temperature sintering phosphogypsum calcium slag preparation device of the present invention;
[0032] Fig.13 It is a schematic structural diagram of the second sintering frame in the high-temperature sintering phosphogypsum calcium slag preparation device of the present invention;
[0033] Fig.14 It is a structural schematic diagram of the heat exchange and drying mechanism in the high-temperature sintering phosphogypsum calcium slag preparation device of the present invention.
[0034] In the figure: 1. furnace frame; 2. second sintering frame; 201. dispersion frame 1; 202. material shifting plate; 203. inner gear ring; 3. first sintering frame; 31. dispersion frame 2; 32. guide cone; 34. inner lining pipe; 35. connecting shaft frame; 36. driving sprocket; 4. support frame; 5. bottom lining plate; 6. limit mounting frame; 7. driving gear plate; 8. driven sprocket; 9. reducer; 10. driving motor; 11. partition 1; 12. spraying mechanism; 121. mounting seat; 122. connecting branch pipe; 123. connecting ring pipe; 124. electric control valve; 125. mixing nozzle; 126. igniter; 112. feeding pipe; 13. connecting pipe; 14. exhaust pipe; 15. spiral feeding guide plate; 16. heat exchange drying mechanism; 1 61. Intake pipe; 162. Heat exchange pipe; 163. Air box; 164. Heat dissipation pipe; 17. Partition 2; 18. Exhaust drive unit; 181. Wind tank; 182. Inner gear ring; 183. Magnetic turbine blade; 184. Lower magnetic ring; 185. Upper magnetic plate; 186. Inner lining plate; 187. Through hole; 188. Exhaust discharge pipe; 19. Circulation pipe; 20. Water tank; 21. Heat transfer air pipe; 22. Annular air tank; 23. Blowing pipe; 24. Coupling shaft; 25. Gear; 26. Transmission; 27. DC generator; 28. Air supply mechanism; 281. Intake hood; 282. One-way wind plate; 283. Extrusion spring; 284. Sealing plate; 29. Guide frame; 1110. Chain; 1105. Discharge pipe. DETAILED DESCRIPTION
[0035] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0036] See also Figure 1-14The present invention provides a technical solution: comprising a furnace frame 1, a second sintering frame 2 is rotatably arranged at the bottom end of the inner wall of the furnace frame 1, a first sintering frame 3 is rotatably arranged at the top end of the second sintering frame 2, a support frame 4 is connected to the bottom end of the inner wall of the furnace frame 1, a bottom lining plate 5 is connected to the top end of the support frame 4, the bottom lining plate 5 is located directly below the second sintering frame 2 and the first sintering frame 3, wherein the second sintering frame 2 and the first sintering frame 3 are arranged in a terraced manner, and vortex holes are opened at the top ends, which cooperate with the bottom lining plate 5 at the bottom to form a conveying path, and a limited position installation is connected to the bottom end of the inner wall of the furnace frame 1 The limiting mounting frame 6 is located inside the second sintering frame 2 and is rotatably connected to the second sintering frame 2. A driving toothed disc 7 is rotatably arranged on one side of the top of the limiting mounting frame 6. A round shaft is connected to the bottom end of the driving toothed disc 7, and the bottom end of the round shaft passes through the driving toothed disc 7 and is connected to a driven sprocket 8. A reducer 9 is connected to the bottom end of the furnace frame 1, and a driving motor 10 is connected to one side of the reducer 9. A partition 11 is connected to one side of the inner wall of the furnace frame 1. A feeding pipe 112 and a spraying mechanism 12 are connected to the top of the partition 11. A lower end of the feeding pipe 112 is provided with a lower end. The material inlet, the bottom end of the inner wall of the spraying mechanism 12 is connected to a connecting pipe 13, the top of the connecting pipe 13 is connected to an exhaust pipe 14, the surface of the exhaust pipe 14 is connected to a spiral material guide plate 15, the inside of the exhaust pipe 14 is connected to a heat exchange drying mechanism 16, and one side of the inner wall of the furnace frame 1 is connected to a partition 2 17, the shapes of the partition 1 11 and the partition 2 17 are consistent with the second sintering rack 2 and the first sintering rack 3, the top of the partition 2 17 is connected to an exhaust gas driving unit 18, the top of the exhaust pipe 14 is connected to a circulation pipe 19, one end of the circulation pipe 19 penetrates The exhaust gas drive unit 18 is passed through and connected with a water tank 20, a heat-conducting air pipe 21 is connected inside the water tank 20, one end of the circulation pipe 19 is connected and communicated with the heat-conducting air pipe 21, one end of the heat-conducting air pipe 21 passes through the water tank 20, and is connected with an annular gas tank 22, one side of the inner wall of the annular gas tank 22 is connected with a plurality of blowing pipes 23, wherein the annular gas tank 22 is connected and arranged above the partition 17, the water tank 20 is connected and arranged above the annular gas tank 22, the outer ring of the furnace frame 1 is connected with a plurality of gas replenishing mechanisms 28, and one side is connected with a discharge pipe 1105;
[0037] The second sintering rack 2 includes a dispersion rack 201, which receives the materials scattered from 3 and then performs dispersed heating. A material stripping plate 202 is connected to one side of the dispersion rack 201 to collect and concentrate the materials scattered from 201 for easy discharge. An inner gear ring 203 is connected to one side of the inner wall of the dispersion rack 201, and one side of the driving gear disc 7 is engaged with the inner gear ring 203. A guide frame 29 is connected to the bottom end of the inner wall of the furnace frame 1 corresponding to the material stripping plate 202 to place material accumulation.
[0038] The first sintering rack 3 includes a dispersion rack 31, and a guide cone 32 is connected to the top of the dispersion rack 31. The guide cone 32 is located just below the discharge pipe 112 to guide the falling materials. The bottom of the guide cone 32 is connected to an inner liner tube 34. A connecting shaft frame 35 is connected to one side of the inner wall of the inner liner tube 34. A driving sprocket 36 is connected to the bottom of the connecting shaft frame 35. A chain 1110 is sleeved and connected between the driving sprocket 36 and the driven sprocket 8. The output end of the reducer 9 passes through the furnace frame 1 and is connected to the driving sprocket 36. The driving sprocket 36 is driven to rotate by the reducer 9, and the driven sprocket 8 is driven to rotate by the transmission of the chain 1110, so that the driving gear disc 7 is used to shift the inner gear ring 203, thereby driving the second sintering rack 2 and the first sintering rack 3 to rotate.
[0039] The spraying mechanism 12 includes a plurality of mounting seats 121, each of which is connected to a connecting branch pipe 122 at the top end thereof, and a connecting ring pipe 123 is connected to one end of the connecting branch pipe 122, and an external air inlet pipe is connected to one side of the connecting ring pipe 123, and a mixture of oxygen and fuel gas enters the air. An electric-controlled valve 124 is connected to one end of the connecting branch pipe 122 close to the connecting ring pipe 123, and the number of mixing nozzles 125 used can be controlled as needed. A mixing nozzle 125 is connected to the corresponding connecting branch pipe 122 at the bottom end of the mounting seat 121, and an igniter 126 is connected to the bottom end of the mounting seat 121. The spraying mechanism 12 has two groups, which are distributed directly above the second sintering rack 2 and the first sintering rack 3 to facilitate heating of the material.
[0040] The heat exchange and drying mechanism 16 includes an air inlet pipe 161, one end of which is connected to a heat exchange pipe 162, and the other end of the heat exchange pipe 162 is connected to an air box 163. The heat exchange pipe 162 and the air box 163 are both located inside 14. When the exhaust gas in the exhaust pipe 14 is discharged, the heat will heat the air in the heat exchange pipe 162. A plurality of heat dissipation pipes 164 are connected to the outer circle of the air box 163. The ends of the heat dissipation pipes 164 that are away from each other all pass through the connecting pipe 13 and extend into the discharge pipe 112, and exhaust holes are opened on the lower side. The heated high-temperature gas will enter the discharge pipe 112 to preheat and dry the material in the discharge pipe 112. The top of the air inlet pipe 161 passes through the circulation pipe 19 and is connected to an air intake device, wherein the air intake device can be an air pump or a fan, which is not described in detail because it is an existing mature technology.
[0041] The exhaust gas drive unit 18 includes a wind tank 181, wherein the wind tank 181 is arranged in an annular shape, the exhaust pipe 14 and the feed pipe 112 are located inside the wind tank 181, an inner gear ring 182 is rotatably arranged inside the wind tank 181, and a magnetic turbine blade 183 is connected to one side of the inner gear ring 182 located inside the wind tank 181, and a lower magnetic ring 184 and an upper magnetic plate 185 are connected between the inner walls of the wind tank 181, and the magnetic turbine blade 183 is located between the lower magnetic ring 184 and the upper magnetic plate 185. 5, the magnetic turbine blade 183 is composed of a turbine frame and blades, wherein magnet blocks are provided on both sides of the turbine frame, and the sides close to the lower magnetic ring 184 and the upper magnetic plate 185 are arranged with the same polarity, and the stability of the magnetic turbine blade 183 is ensured by the principle of like charges repelling each other, an inner lining plate 186 is connected to one side of the inner wall of the wind tank 181, a through hole 187 is provided on one side of the wind tank 181 corresponding to the circulation pipe 19, and an exhaust gas discharge pipe 188 is connected to the top of the wind tank 181.
[0042] A transmission 26 is connected to the top of the through hole 187, a DC generator 27 is connected to one side of the transmission 26, a connecting shaft 24 is connected to the output end of the transmission 26, the bottom end of the connecting shaft 24 passes through the inner lining plate 186, and is connected to a gear 25, one side of the gear 25 is meshed with the inner gear ring 182, and when 182 rotates, the connecting shaft 24 is driven to rotate through the meshing with the gear 25, thereby transmitting kinetic energy to the transmission 26, increasing the speed, and driving the DC generator 27 to generate electricity. By connecting an inverter, the electric energy can be recovered. Since it is a prior art, it is not described in detail in the specification.
[0043] One end of the blowing pipe 23 passes through the annular gas tank 22 and is connected to the exhaust gas drive unit 18. One end of the blowing pipe 23 located in the annular gas tank 22 is connected to a safety valve, and one end of the heat conducting gas pipe 21 close to the annular gas tank 22 is connected to a one-way valve, thereby forming a compression effect in the annular gas tank 22 and increasing the air pressure. The blowing pipes 23 are all arranged obliquely to ensure that the direction of the blown gas can well push the magnetic turbine blades 183.
[0044] The air supply mechanism 28 includes an air intake hood 281. The air intake hood 281 is located on one side of the furnace frame 1 and is hinged with a one-way air plate 282, which can ensure that the one-way air plate 282 can only rotate inwards and cannot rotate outwards, thereby ensuring that gas can only enter from the outside and cannot be discharged from the inside. An extrusion spring 283 is connected to one side of the inner wall of the air intake hood 281, and a sealing plate 284 is connected to one end of the extrusion spring 283. One side of the sealing plate 284 is abutted against the inner wall of the air intake hood 281. When the air pressure in the working environment is insufficient, air can naturally be taken in through the air intake hood 281. Under normal conditions, the one-way air plate 282 and the sealing plate 284 will block the air intake hood 281 to ensure the sealing during production and processing.
[0045] Working principle: When the invention is used, the material to be processed is put into the discharge pipe 112, which can be used in conjunction with a lifter or an intermittent feeder. The material slides down along the spiral discharge guide plate 15 to the discharge port at the bottom. When it is put into the furnace frame 1, the material is dispersed to the dispersion frame 2 31 through the guide cone 32. The drive motor 10 is started, and the second sintering frame 2 and the first sintering frame 3 are driven to rotate through the reducer 9. The material dropped on the first sintering frame 3 is slowly dispersed into the vortex hole as it rotates, and is blocked by the bottom lining plate 5, and is driven to disperse to the second sintering frame 2 as it rotates, and is started. The spraying mechanism 12 heats the materials on the second sintering rack 2 and the first sintering rack 3, thereby performing high-temperature sintering. As the materials rotate, they are brought out by the vortex hole at the top of the second sintering rack 2, and fall into the furnace rack 1 through the guide rack 29. At the same time, the material-pickup plate 202 can gather and concentrate the scattered materials, and discharge them when passing through the discharge pipe 1105. After the exhaust gas is generated by combustion, because the exhaust gas is a high-temperature expanding gas and the discharge port is blocked by materials, most of the exhaust gas will be discharged through the exhaust pipe 14. The air intake device is used to inject external clean gas into the heat exchange pipe 162. When the exhaust gas is discharged from the exhaust pipe 14, the heat will heat the heat exchanger. The gas in the tube 162 is then discharged into the feed tube 112 through the heat dissipation pipe 164, thereby drying and heating the material in the feed tube 112. Since part of the exhaust gas will still enter the feed tube 112 from the feed port, it will drive the gas discharged from the heat dissipation pipe 164 to collide with it, causing the gas discharged from the heat dissipation pipe 164 to diffuse horizontally and then move upward, while suppressing the exhaust gas to a certain extent, reducing the amount of exhaust gas entering the feed tube 112. The exhaust gas inside the exhaust pipe 14 enters the heat-conducting air pipe 21 in the water tank 20 through the circulation pipe 19, and the heat is dissipated again through the heat-conducting air pipe 21, and the water The water in the box 20 is heated and then blown into the annular gas tank 22. Due to the setting of the one-way valve at one end of the heat-conducting gas pipe 21, the gas can only enter the annular gas tank 22. As the gas continues to enter, high pressure is formed in the annular gas tank 22, and the high-pressure gas is discharged through the safety valve and blown into the wind tank 181 by the blowing pipe 23, while pushing the magnetic turbine blades 183 to rotate. When the magnetic turbine blades 183 rotate, the inner gear ring 182 is driven to rotate, thereby driving the gear 25 to rotate, and the kinetic energy is transmitted to the transmission 26 through the connecting shaft 24, and then the DC generator 27 is driven, thereby converting the kinetic energy into electrical energy for recycling.
[0046] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device.
[0047] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A high-temperature sintering phosphogypsum calcium slag preparation device, comprising a furnace frame (1), characterized in that: A second sintering rack (2) is rotatably provided at the bottom end of the inner wall of the furnace frame (1), a first sintering rack (3) is rotatably provided at the top end of the second sintering rack (2), a support rack (4) is connected to the bottom end of the inner wall of the furnace frame (1), a bottom lining plate (5) is connected to the top end of the support rack (4), the bottom lining plate (5) is located directly below the second sintering rack (2) and the first sintering rack (3), a limit mounting rack (6) is connected to the bottom end of the inner wall of the furnace frame (1), a driving gear disc (7) is rotatably provided at one side of the top end of the limit mounting rack (6), A circular shaft is connected to the bottom end of the driving gear disc (7), and the bottom end of the circular shaft passes through the driving gear disc (7) and is connected to a driven sprocket (8); a reducer (9) is connected to the bottom end of the furnace frame (1), and a driving motor (10) is connected to one side of the reducer (9); a partition plate (11) is connected to one side of the inner wall of the furnace frame (1); a feed pipe (112) and a spraying mechanism (12) are connected to the top end of the partition plate (11); a feed port is provided at the bottom end of the feed pipe (112); and a feed port is provided inside the spraying mechanism (12). A connecting pipe (13) is connected to the bottom end of the wall, an exhaust pipe (14) is connected to the top end of the connecting pipe (13), a spiral material feeding guide plate (15) is connected to the surface of the exhaust pipe (14), a heat exchange drying mechanism (16) is connected to the inside of the exhaust pipe (14), a partition plate 2 (17) is connected to one side of the inner wall of the furnace frame (1), an exhaust gas driving unit (18) is connected to the top end of the partition plate 2 (17), a circulation pipe (19) is connected to the top end of the exhaust pipe (14), and one end of the circulation pipe (19) is connected to the inner wall of the furnace frame (1). The exhaust gas drive unit (18) is passed through and connected to a water tank (20), a heat-conducting air pipe (21) is connected to the inside of the water tank (20), one end of the circulation pipe (19) is connected to the heat-conducting air pipe (21), one end of the heat-conducting air pipe (21) passes through the water tank (20) and is connected to an annular gas tank (22), one side of the inner wall of the annular gas tank (22) is connected to multiple groups of blowing pipes (23), the outer ring of the furnace frame (1) is connected to multiple groups of air supply mechanisms (28), and one side is connected to a discharge pipe (1105); The second sintering rack (2) comprises a dispersion rack (201), one side of the dispersion rack (201) is connected to a material shifting plate (202), one side of the inner wall of the dispersion rack (201) is connected to an inner gear ring (203), one side of the driving gear disc (7) is meshed with the inner gear ring (203), and the bottom end of the inner wall of the furnace rack (1) is connected to a guide rack (29) corresponding to the material shifting plate (202); The first sintering frame (3) comprises a dispersion frame 2 (31), the top end of the dispersion frame 2 (31) is connected to a guide cone (32), the bottom end of the guide cone (32) is connected to an inner lining tube (34), one side of the inner wall of the inner lining tube (34) is connected to a connecting shaft frame (35), the bottom end of the connecting shaft frame (35) is connected to a driving sprocket (36), a chain (1110) is sleeved and connected between the driving sprocket (36) and the driven sprocket (8), and the output end of the reducer (9) passes through the furnace frame (1) and is connected to the driving sprocket (36); The spraying mechanism (12) comprises a plurality of mounting seats (121), the top end of each mounting seat (121) being connected to a connecting branch pipe (122), one end of each connecting branch pipe (122) being connected to a same connecting ring pipe (123), one end of each connecting branch pipe (122) close to the connecting ring pipe (123) being connected to an electric control valve (124), the bottom end of each mounting seat (121) being connected to a mixing nozzle (125) corresponding to the connecting branch pipe (122), and the bottom end of each mounting seat (121) being connected to an igniter (126); The heat exchange drying mechanism (16) comprises an air intake pipe (161), one end of the air intake pipe (161) is connected to a heat exchange pipe (162), the other end of the heat exchange pipe (162) is connected to an air box (163), the outer ring of the air box (163) is connected to a plurality of heat dissipation pipes (164), the ends of the heat dissipation pipes (164) that are away from each other all penetrate the connecting pipe (13) and extend into the spraying mechanism (12), and exhaust holes are formed on the lower sides of the heat dissipation pipes (164), and the top end of the air intake pipe (161) penetrates the circulation pipe (19) and is connected to an air intake device; The exhaust gas drive unit (18) comprises a wind tank (181), an inner gear ring (182) is rotatably provided inside the wind tank (181), a magnetic turbine blade (183) is connected to one side of the inner gear ring (182) located inside the wind tank (181), a lower magnetic ring (184) and an upper magnetic plate (185) are connected between the inner walls of the wind tank (181), the magnetic turbine blade (183) is located between the lower magnetic ring (184) and the upper magnetic plate (185), an inner lining plate (186) is connected to one side of the inner wall of the wind tank (181), a through hole (187) is provided on one side of the wind tank (181) corresponding to the circulation pipe (19), and an exhaust gas discharge pipe (188) is connected to the top of the wind tank (181).
2. The high temperature sintered phosphogypsum calcium slag preparation device according to claim 1, characterized in that: The spraying mechanism (12) has two groups, which are arranged directly above the second sintering rack (2) and the first sintering rack (3).
3. The high temperature sintered phosphogypsum calcium slag preparation device according to claim 1, characterized in that: A transmission (26) is connected to the top of the through hole (187), a DC generator (27) is connected to one side of the transmission (26), a connecting shaft (24) is connected to the output end of the transmission (26), the bottom end of the connecting shaft (24) passes through the inner lining plate (186) and is connected to a gear (25), and one side of the gear (25) is meshed with the inner gear ring (182).
4. The high temperature sintered phosphogypsum calcium slag preparation device according to claim 1, characterized in that: One end of the blowing pipe (23) passes through the annular gas tank (22) and is connected to the exhaust gas drive unit (18); one end of the blowing pipe (23) located inside the annular gas tank (22) is connected to a safety valve; and one end of the heat-conducting gas pipe (21) close to the annular gas tank (22) is connected to a one-way valve.
5. The high temperature sintered phosphogypsum calcium slag preparation device according to claim 1, characterized in that: The air supply mechanism (28) comprises an air intake hood (281), the air intake hood (281) being located on one side of the furnace frame (1) and being hingedly connected with a one-way air plate (282), a compression spring (283) being connected to one side of the inner wall of the air intake hood (281), a sealing plate (284) being connected to one end of the compression spring (283), and one side of the sealing plate (284) being in contact with the inner wall of the air intake hood (281).