Urban rail transit line interconnection intelligent dispatching training system
By designing a smart scheduling training system in the interconnection scenario of urban rail transit lines, using cloud platforms and multi-dimensional charts, the efficiency of trainees' scheduling training is solved, clear multi-dimensional scene display and real-time interaction are achieved, and scheduling skills are improved mastery and practical ability.
Patent Information
- Application Number
- CN202410944502.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-15
- Publication Date
- 2024-12-06
- Estimated Expiration
- 2044-07-15
AI Technical Summary
In the existing urban rail transit line interconnection scenarios, there are challenges in how to efficiently conduct training for students, especially the problem of low transfer efficiency in cities such as Chongqing.
Design an intelligent dispatching training system for urban rail transit lines interconnection, and realize the training effect through cloud platform, including servers and clients (training machines and student machines), and use cross-line operation plan diagram, global dispatching system diagram and global dispatching HMI diagram realizes the creation of simulated trains, the determination of scheduling modes and the injection of faults, and provides training and assessment modes.
It realizes a multi-dimensional scene that clearly and intuitively displays the interconnection of rail transit lines, ensures practical training results, reduces the complexity of the interactive interface and the misoperation rate, and improves the mastery and practical ability of scheduling skills through real-time interaction and feedback.
Smart Images

Figure CN118471046B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of traffic control system teaching, and in particular to an urban rail transit line interconnection intelligent dispatching training system. Background Art
[0002] In most existing cities, each subway line mostly operates independently, and passengers switch between different lines at transfer stations by walking; the transfer efficiency is relatively low compared to the interconnection between different lines in cities such as Chongqing. At the same time, in the scenario of interconnection between urban rail transit lines, how to efficiently conduct dispatching training for trainees based on the vocational education cloud platform has become a new technical issue. Summary of the invention
[0003] The purpose of the present invention is to disclose a smart dispatching training system for interconnection of urban rail transit lines, so as to achieve training effects based on a cloud platform.
[0004] To achieve the above-mentioned purpose, the present invention discloses an urban rail transit line interconnection intelligent dispatching training system, each networked node includes a server and a client, the client includes a trainer machine and a trainee machine, each node includes a memory, a processor, and a computer program stored in the memory and executable on the processor, and when the processor of the trainee machine executes the corresponding computer program, it cooperates with other nodes to implement the following method steps:
[0005] Step S1, the trainee machine switches to the cross-line operation plan diagram; the cross-line operation plan diagram is pre-set with all rail transit lines that can be interconnected between each other in the target city, with time indicated horizontally and rail transit lines arranged at intervals vertically, and the stations arranged vertically on any rail transit line are only composed of the starting station, the terminal station and the cross-line station;
[0006] Step S2, the trainee machine creates a simulated train handover task in the handover rail transit line of the cross-line operation plan diagram;
[0007] Step S3, the trainee machine creates an access task for the simulated train in the access rail transit line of the cross-line operation plan diagram;
[0008] Step S4, the server determines whether the pairing information in the handover task and the access task of the simulated train number meets the preset rules, if yes, go to step S5, otherwise, output the first type of error information;
[0009] Step S5, the server determines whether the running time of the simulated train conflicts with other simulated trains, if not, proceeds to step S6, otherwise, outputs a second type of error message;
[0010] Step S6: After the trainee machine switches to the global dispatching system diagram, the server displays the running route corresponding to the simulated train with a set light strip; the global dispatching system diagram is used to display the actual map of the cross-distribution of all interconnected rail transit lines in the target city.
[0011] Preferably, the processor of the trainee machine implements the following method steps when executing the computer program:
[0012] Step S7, the trainee computer switches to the global dispatch HMI diagram, which is used to display the specific dispatch items of each section and each simulated train on each line, including the status switching of the platform screen door, the displacement switching of the simulated train, and the status switching of the turnout and traffic light;
[0013] Step S8, the student machine and the server jointly determine the scheduling mode corresponding to the global scheduling HMI diagram, and execute the scheduling matters corresponding to the simulated train in the determined scheduling mode according to the operation authority of the student machine. The scheduling mode includes central control, station control and emergency station control mode.
[0014] Preferably, the processors of the server and the trainer machine respectively execute corresponding computer programs to cooperate with the trainee machine to implement the following method steps:
[0015] Step S9, the server obtains the simulated fault injection task sent by the trainer and configured by the trainer, wherein the simulated fault injection task specifies attribute information and operating status information of at least one trainee and at least one train number for simulated fault injection;
[0016] Step S10, the server displays the running status of the simulated fault injection vehicle in the global scheduling system diagram and the global scheduling HMI diagram of the learning machine logged in by the designated student according to the parsed simulated fault injection task, and prohibits displaying the running status of the simulated fault injection vehicle in the global scheduling system diagram and the global scheduling HMI diagram displayed on the learning machine logged in by non-designated students.
[0017] Preferably, the running status information of the vehicle number used for simulated fault injection includes emergency stop.
[0018] Preferably, the login mode of the student machine includes a training mode and an assessment mode; in the training mode, the server prompts the student to operate according to preset steps and provides real-time prompts for erroneous operations tracked during the training task; in the assessment mode, the server hides the preset operating steps and records and scores the erroneous operations tracked during the training task.
[0019] The present invention has the following beneficial effects:
[0020] 1. There is a complementary and related relationship in terms of display and control authority between the cross-line operation plan diagram, the global dispatching system diagram and the global dispatching HMI diagram, which can clearly and intuitively display the actual multi-dimensional scenario of the interconnection of rail transit lines, making it easier for trainees to understand and master the practical skills of dispatching. Moreover, through the interaction between the nodes, dispatching tasks can be issued in real time, the dispatching process can be tracked and the actual results of the dispatching operation can be fed back, thus ensuring the training effect.
[0021] 2. In the cross-line operation plan, except for the starting station, terminal station and cross-line station of each rail transit line, the display of the intermediate stations of each line is omitted. While simplifying the interactive interface, it also reduces the occurrence rate of erroneous operations such as selecting the wrong station when handing in tasks and accessing tasks.
[0022] The present invention will be further described in detail below with reference to the accompanying drawings. BRIEF DESCRIPTION OF THE DRAWINGS
[0023] The drawings constituting a part of this application are used to provide a further understanding of the present invention. The exemplary embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute an improper limitation of the present invention. In the drawings:
[0024] Figure 1 It is a block diagram of the urban rail transit line interconnection intelligent dispatching training system disclosed in an embodiment of the present invention.
[0025] Figure 2 It is a schematic diagram of the training process of intelligent dispatching of urban rail transit line interconnection disclosed in an embodiment of the present invention. DETAILED DESCRIPTION
[0026] The embodiments of the present invention are described in detail below with reference to the accompanying drawings, but the present invention can be implemented in many different ways as defined and covered by the claims.
[0027] Embodiment 1
[0028] This embodiment discloses a smart dispatching training system for interconnection of urban rail transit lines. Figure 1 As shown, it includes a server and a client, and the client includes a trainer machine and a student machine. Optionally, the user can log in through a browser from a PC. When the user's login identity information is a trainer, the program and interactive interface corresponding to the trainer machine are loaded and run; when the user's login identity information is a student, the program and interactive interface corresponding to the student machine are loaded and run; or when the user is a backend development and operation and maintenance personnel, the server backend program and interactive interface are loaded and run; this is a prior art and will not be described in detail later.
[0029] In this embodiment, each node connected to the network by the trainee machine, the trainer machine and the server includes a memory, a processor and a computer program stored in the memory and executable on the processor. When the processor of the trainee machine executes the corresponding computer program, it cooperates with other nodes to implement the following Figure 2 The following method steps are shown:
[0030] Step S1, the trainee machine switches to the cross-line operation plan diagram; the cross-line operation plan diagram is pre-set with all rail transit lines that can be interconnected in the target city, with time represented horizontally and rail transit lines arranged at intervals vertically, and the stations arranged vertically on any rail transit line are composed only of the starting station, the terminal station and the cross-line station.
[0031] In this step, the order of the starting station, the cross-line station and the terminal station in the corresponding non-loop single rail transit line from top to bottom is consistent with the order of the stations in the actual line. Preferably, each station of the same rail transit line is deployed with a horizontal line parallel to the time axis. For easy distinction, the colors of the upper and lower adjacent horizontal lines can be set to be inconsistent; further, the time axis can be evenly divided by dotted lines to form a grid shape of a single rail transit line.
[0032] In this embodiment, for the corresponding loop line, the station where the actual train operation and maintenance is located is usually regarded as both the starting station and the terminal station (but not necessarily a cross-line station); to facilitate the subsequent steps (such as creating handover and access tasks, etc.), when arranging the stations in a clockwise or counterclockwise direction, it is preferred to deploy the station that integrates the starting point and the terminal in the middle position.
[0033] Furthermore, in order to distinguish different rail transit lines, each grid within the same rail transit line can be filled with color, while the intervals between different rail transit lines can be left blank. This will make it easier for the college to quickly and accurately find the required rail transit lines for related scheduling.
[0034] Step S2: the trainee machine creates a simulated train handover task in the handover rail transit line of the cross-line operation plan.
[0035] Usually, changing tracks relies on the switch mechanism of the turnout, and this process is achieved by controlling the railway turnouts so that the train can switch to different tracks. To this end, in the handover task of this step, it is necessary to set the train attributes and arrange the work station for performing the turnout switch. In the specific implementation method, the student machine can reflect the specific handover task by drawing lines in the handover rail transit line. For example: Line 10 starting from Wangjiazhuang needs to cross the line at the North Square of Chongqing North Station to the Min'an Avenue direction of Line 4; then the specific line drawing operation corresponding to the handover task can be:
[0036] A1. On Line 10, create a marked line A with starting and ending directions, with the starting point being Wangjiazhuang and the end point being the North Square of Chongqing North Railway Station.
[0037] A2. Enter the train number and the train number attribute information set according to the coding rule in the marking line A. Optionally, the train number attribute information includes but is not limited to the distribution of the start and stop time of each station, and the running speed distribution curve between adjacent stations.
[0038] A3. Adjust the position information of the starting point and the end point of the marking line A on the time axis, so that the North Square of Chongqing North Station can make coordinated dispatching of the turnouts for the train entering the station within the time range corresponding to the starting point and the end point. It is worth noting that the time point of the marking line A is not the departure time of Wangjiazhuang, but should be regarded as the time for the start-up preparation of the turnouts for entering the cross-line station.
[0039] Step S3: The trainee machine creates an access task for the simulated train in the access rail transit line of the cross-line operation plan diagram.
[0040] Similarly, based on the above example, the trainee machine can draw a line on Line 4 to reflect the specific access task, and the specific line drawing operation corresponding to the access task can be:
[0041] B1. On Line 4, create line B with starting and ending directions, with the starting point being the North Square of Chongqing North Railway Station and the end point being Min'an Avenue.
[0042] B2. Enter the train number and the train number attribute information set according to the coding rule in the marking line B. If the input train number information is the train number entered in A2 above, the train number attribute information set in A2 will be automatically imported.
[0043] B3. Adjust the position information of the starting point and the end point of the marking line B on the time axis so that the North Square of Chongqing North Railway Station can carry out coordinated dispatching of the turnouts for the train leaving the station within the time range corresponding to the starting point and the end point.
[0044] In the access task, if there are other cross-line stations on the rail transit line after the train crosses the line, if there is a subsequent cross-line operation in the scheduling plan, the end point of the drawn line in this access task will be pointed to the next cross-line station, and so on, a new handover task will be created at the next cross-line station; if there is no subsequent cross-line operation, the end point of the drawn line can be directly pointed to the terminal station of the line after this cross-line.
[0045] Step S4, the server determines whether the pairing information in the handover task and the access task of the simulated train meets the preset rules. If yes, go to step S5, otherwise, output the first type of error information.
[0046] In this step, it is mainly determined whether the train number handed over and connected meets the coding rules and is paired successfully, and whether the time distribution of handover and connection is handled within a reasonable range. Preferably, this embodiment can calculate the reasonable position range of the starting point and end point of the above-mentioned marking A and marking B on the time axis based on the actual position of the turnout, the response time required to complete a complete state switch, the start and stop time of each station in the attribute information of the train number, and the running speed between adjacent stations; thereby, the accuracy and sensitivity of time control of trainees in the simulated train number handover and connection tasks can be achieved.
[0047] Step S5, the server determines whether the running time of the simulated train conflicts with other simulated trains. If there is no conflict, go to step S6, otherwise, output the second type of error information.
[0048] In this step, the judgment of whether there is a conflict is mainly based on the safety considerations between trains; including but not limited to: judging whether the safety distance between different simulated trains meets the requirements, and whether there is a time and space intersection in the use of supporting resources such as traffic lights and switches. The conflict judgment in this step is used to simulate the actual scheduling scenario, and its logic is consistent with the actual scheduling logic of the real scenario. It is a prior art and will not be elaborated on.
[0049] Step S6: After the trainee machine switches to the global dispatching system diagram, the server displays the running route corresponding to the simulated train with a set light strip; the global dispatching system diagram is used to display the actual map of the cross-distribution of all interconnected rail transit lines in the target city.
[0050] Usually, the global dispatch system diagram can be used by the dispatch center to uniformly supervise the operation position, status, etc. of each simulated train, for example: different types of model trains are also distinguished based on different colors; the corresponding types include at least ordinary trains that do not operate across the line and express trains that operate across the line. In this step, the role of the global dispatch system diagram is mainly to mark and connect the various sections of the cross-line operation of any simulated train with a unified color. Preferably, in order to simplify the system, the system defaults to displaying the running routes corresponding to the simulated trains created by the students themselves who log in to each student machine: when the student clicks on other simulated trains (usually created by other students or coaches), the running routes corresponding to other simulated trains are switched to display; thereby, through the switching method, on the one hand, the flexibility of the system is improved, and on the other hand, the resource conflicts caused by the simultaneous display of the running routes corresponding to two or more simulated trains are avoided.
[0051] Preferably, the processor of the trainee machine of this embodiment implements the following method steps when executing the computer program:
[0052] Step S7, the trainee machine switches to the global scheduling HMI (Human Machine Interface) diagram, which is used to display the specific scheduling matters of each section and each simulated train on each line. The scheduling matters include the status switching of the platform shield door, the displacement switching of the simulated train, and the status switching of the turnout and traffic lights.
[0053] Step S8, the student machine and the server jointly determine the scheduling mode corresponding to the global scheduling HMI diagram, and execute the scheduling matters corresponding to the simulated train in the determined scheduling mode according to the operation authority of the student machine. The scheduling mode includes central control, station control and emergency station control mode.
[0054] Among them, the modes of central control, station control and emergency station control are consistent with the actual operating rail transit lines and will not be elaborated on.
[0055] Furthermore, the processors of the server and the trainer machine of this embodiment respectively execute corresponding computer programs to cooperate with the trainee machine to implement the following method steps:
[0056] Step S9, the server obtains the simulated fault injection task sent by the trainer and configured by the trainer, wherein the simulated fault injection task specifies attribute information and operating status information of at least one trainee and at least one vehicle number for simulated fault injection.
[0057] In this step, optionally, the running status information of the train number used for simulated fault injection mainly refers to the specific event corresponding to the simulated fault, for example, including but not limited to emergency stop, etc. The attribute information of the train number used for simulated fault injection includes but is not limited to: train number code, selection method of the line segment where the fault occurs (such as fixed method, random method, etc.), and trigger mechanism for hiding and appearing the train number, etc., so as to reflect the suddenness of the fault, thereby achieving the effect of training or assessing the trainee's ability to cope with faults.
[0058] Step S10, the server displays the running status of the simulated fault injection vehicle in the global scheduling system diagram and the global scheduling HMI diagram of the learning machine logged in by the designated student according to the parsed simulated fault injection task, and prohibits displaying the running status of the simulated fault injection vehicle in the global scheduling system diagram and the global scheduling HMI diagram displayed on the learning machine logged in by non-designated students.
[0059] In this way, this step can avoid the interference of faults injected into specific objects on other students, thereby improving the flexibility, intelligence and multi-task parallel processing capabilities of the system.
[0060] Preferably, the login mode of the trainee machine includes a training mode and an assessment mode; in the training mode, the server prompts the trainee to operate according to the preset steps and gives real-time prompts for the erroneous operations tracked during the training task; in the assessment mode, the server hides the preset operation steps and records and scores the erroneous operations tracked during the training task. Its specific implementation is the prior art, and the specific reference can be made to the Chinese patent with the authorization announcement number CN114419948B, which will not be described in detail.
[0061] In summary, the urban rail transit line interconnection intelligent dispatching training system disclosed in the present invention has the following beneficial effects:
[0062] 1. There is a complementary and related relationship in terms of display and control authority between the cross-line operation plan diagram, the global dispatching system diagram and the global dispatching HMI diagram, which can clearly and intuitively display the actual multi-dimensional scenario of the interconnection of rail transit lines, making it easier for trainees to understand and master the practical skills of dispatching. Moreover, through the interaction between the nodes, dispatching tasks can be issued in real time, the dispatching process can be tracked and the actual results of the dispatching operation can be fed back, thus ensuring the training effect.
[0063] 2. In the cross-line operation plan, except for the starting station, terminal station and cross-line station of each rail transit line, the display of the intermediate stations of each line is omitted. While simplifying the interactive interface, it also reduces the occurrence rate of erroneous operations such as selecting the wrong station when handing in tasks and accessing tasks.
[0064] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. For those skilled in the art, the present invention may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.
Claims
1. An urban rail transit line interconnection intelligent dispatching training system, each networked node includes a server and a client, the client includes a trainer machine and a trainee machine, each node includes a memory, a processor, and a computer program stored in the memory and executable on the processor, characterized in that: When the processor of the student machine executes the corresponding computer program, it cooperates with other nodes to implement the following method steps: Step S1, the trainee machine switches to the cross-line operation plan diagram; the cross-line operation plan diagram is pre-set with all rail transit lines that can be interconnected between each other in the target city, with time indicated horizontally and rail transit lines arranged at intervals vertically, and the stations arranged vertically on any rail transit line are only composed of the starting station, the terminal station and the cross-line station; Step S2, the trainee machine creates a simulated train handover task in the handover rail transit line of the cross-line operation plan diagram; Step S3, the trainee machine creates an access task for the simulated train in the access rail transit line of the cross-line operation plan diagram; Step S4, the server determines whether the pairing information in the handover task and the access task of the simulated train number meets the preset rules, if yes, go to step S5, otherwise, output the first type of error information; Step S5, the server determines whether the running time of the simulated train conflicts with other simulated trains, if not, proceeds to step S6, otherwise, outputs a second type of error message; Step S6, after the student machine switches to the global dispatching system diagram, the server displays the running route corresponding to the simulated train number with a set light strip; the global dispatching system diagram is used to display the actual map of the cross-distribution of all interconnected rail transit lines in the target city, and when any student clicks on the simulated train number of other students, the running route corresponding to the other simulated train number is switched to display; Step S9, the server obtains the simulated fault injection task sent by the trainer and configured by the trainer, wherein the simulated fault injection task specifies attribute information and operating status information of at least one trainee and at least one train number for simulated fault injection; Step S10, the server displays the running status of the simulated fault injection train in the global scheduling system diagram and the global scheduling HMI diagram of the learning machine logged in by the designated student according to the parsed simulated fault injection task, and prohibits the running status of the simulated fault injection train from being displayed in the global scheduling system diagram and the global scheduling HMI diagram displayed by the learning machine logged in by the non-designated student; Among them, the operating status information of the train number used for simulated fault injection includes emergency stop, and the attribute information of the train number used for simulated fault injection includes: train number code, selection method of the line segment where the fault occurs, and trigger mechanism for hiding and appearing of the train number; the selection method of the line segment where the fault occurs includes a fixed method and a random method.
2. The system according to claim 1, characterized in that When the processor of the trainee machine executes the computer program, the following method steps are implemented: Step S7, the trainee computer switches to the global dispatch HMI diagram, which is used to display the specific dispatch items of each section and each simulated train on each line, including the status switching of the platform screen door, the displacement switching of the simulated train, and the status switching of the turnout and traffic light; Step S8, the student machine and the server jointly determine the scheduling mode corresponding to the global scheduling HMI diagram, and execute the scheduling matters corresponding to the simulated train in the determined scheduling mode according to the operation authority of the student machine. The scheduling mode includes central control, station control and emergency station control mode.
3. The system according to claim 1, characterized in that The login modes of the trainee machine include training mode and assessment mode; in the training mode, the server prompts the trainee to operate according to the preset steps and gives real-time prompts for the erroneous operations tracked during the training task; In the assessment mode, the server hides the preset operation steps and records and scores the erroneous operations tracked during the training task.
