A basement waterproofing construction method
By setting up a built-in baffle structure and laying waterproof coils at the bottom of the basement pit structure to form a multi-layer waterproof layer, the problem of insufficient waterproofing in the prior art is solved, and a more efficient waterproofing effect is achieved.
Patent Information
- Application Number
- CN202410754624.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-12
- Publication Date
- 2025-03-04
- Estimated Expiration
- 2044-06-12
AI Technical Summary
Existing basement waterproofing methods are usually treated after seepage occurs, making it difficult to effectively prevent water seepage problems at the connection between the wall and the ground or between the wall and the ceiling.
A good protective area is formed by providing a built-in baffle structure at the bottom of the basement pit structure, laying gravels and pre-pouring cement on it. At the same time, waterproof coils are laid along the edges of the load-bearing wall and the concrete cushion layer, and a multi-layer waterproof layer is formed by bonding.
It has achieved efficient waterproofing measures during the basement construction process, and improved the waterproofing performance of the basement, especially in the event of sinking, and still has a strong waterproofing effect.
Smart Images

Figure CN118581926B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of building construction, and more specifically, to a basement waterproofing construction method. Background Art
[0002] In order to improve the utilization rate of underground space, a basement is usually set up at the bottom of the building, and the basement is usually located below the ground. Due to the existence of groundwater, waterproofing of the basement wall is a problem that must be solved during the construction of the basement to ensure the main protection of the basement storage.
[0003] The traditional construction steps for a basement are as follows: S1. Support the formwork at the bottom of the foundation pit; S2. Pour concrete in the area surrounded by the formwork, and form an outer wall after the concrete solidifies; S3. Backfill soil between the outer wall and the inner wall of the foundation pit, and compact the soil.
[0004] The current method of basement waterproofing is usually to deal with it after water seepage occurs. The essence of water seepage is that cracks appear on the basement wall that penetrate the inside and outside of the basement. Groundwater seeps into the basement through the cracks, especially for the connection between the wall and the ground or the wall and the ceiling. Because of the problem of subsidence, the water seepage problem at the connection is particularly serious.
[0005] In view of the above technical problems, it has become an urgent issue to strengthen the joints between the wall and the ground or the wall and the ceiling with effective waterproof measures. Summary of the invention
[0006] In view of the deficiencies in the prior art, the object of the present invention is to provide a basement waterproofing construction method which has good waterproofing effect and is convenient to construct.
[0007] To achieve the above object, the present invention provides the following technical solution: a basement waterproofing construction method, specifically comprising the following steps: S1, excavating the soil layer according to the design elevation and in combination with the on-site enclosure structure to form a basement pit structure, and compacting it;
[0008] S2. Measure the angle between two adjacent inner walls of the basement pit structure to see if it is 90 degrees and whether there is any inclination angle. Set a built-in baffle structure along the bottom of the basement pit structure. The built-in baffle structure is in an "L" shape. Lay stones on the area surrounded by the built-in baffle structure and pour cement in advance so that the formed area is flush with the built-in baffle structure.
[0009] S3, pouring a first concrete cushion layer on the bottom of the pit structure formed by excavation in step S1, and the first concrete cushion layer is placed above the built-in baffle structure;
[0010] S4, building a load-bearing wall along the edge of the first concrete cushion layer poured in step S3, pouring a second concrete cushion layer on the load-bearing wall, and opening an exhaust port on the second concrete cushion layer for installing an exhaust ventilation system; and a stair opening for installing stairs;
[0011] S5, fixing a plurality of inner cushions to the connection between each of the load-bearing wall and the first concrete cushion layer and the connection between the load-bearing wall and the second concrete cushion layer, wherein each of the inner cushions is configured to increase the angle of the connection between the load-bearing wall and the first concrete cushion layer and the connection between the load-bearing wall and the second concrete cushion layer;
[0012] S6. Lay waterproof membranes at the joints between each load-bearing wall and the first concrete cushion layer and at the joints between each load-bearing wall and the second concrete cushion layer, and bond the waterproof membranes to the above joints with waterproof adhesive;
[0013] S7, laying waterproof membranes of equal length on the load-bearing wall, the first concrete cushion layer and the area on the second concrete cushion layer where no waterproof membrane is bonded, and forming a first waterproof layer;
[0014] S8, taking the connection point of two adjacent waterproof membranes on the first waterproof layer as the center position, laying the waterproof membrane on the first waterproof layer, and bonding them to form a second waterproof layer;
[0015] S9. Apply tile adhesive on the second waterproof layer and then lay the tiles;
[0016] S10. Clean the wall after tiling to complete the construction.
[0017] The present invention is further configured as follows: the built-in baffle structure in step S2 is also connected to a pre-buried structure, and the installation of the pre-buried structure specifically includes the following steps: S20, digging a groove structure for accommodating the pre-buried structure on the bottom of the basement pit structure, burying the pre-buried structure in the groove structure, and connecting the pre-buried structure with the drainage pipe;
[0018] S21. Lay a steel plate layer on top of each built-in baffle structure, place the embedded structure below the steel plate layer, and lay a steel bar frame with a thickness of 10-20 cm on top of the steel plate layer, so that the steel plate layer and the steel bar frame are connected to form a casting area;
[0019] S22, pouring concrete in the pouring area formed in step S21, and completing the construction of the bottom support area after the concrete is tightened.
[0020] The present invention is further configured as follows: the built-in baffle structure includes a first covering plate and a second covering plate that are connected in sequence and are L-shaped, a drainage channel arranged on the first covering plate, and an insertion rod arranged on the first covering plate and inserted into the side wall of the basement pit structure, the second covering plate is connected to an embedded structure embedded in the groove structure, the drainage channel and the embedded structure are connected to each other, and the embedded structure is connected to a drain pipe for drainage.
[0021] The present invention is further configured as follows: an external fixing mechanism is also provided on the outside of the embedded structure, and the external fixing mechanism includes a left reinforcing member arranged along one side of the embedded structure, a right reinforcing member arranged along the other side of the embedded structure, and a sealing component respectively arranged between the left and right reinforcing members and the embedded structure.
[0022] The present invention is further configured as follows: the left reinforcement member includes a first covering member and two first reinforcement members, the first covering member has the same axial structure as the embedded structure, and the inner wall cross-section of the first covering member is a "["-shaped groove structure, and the first covering member extends to the water outlet of the embedded structure, the first reinforcement members are respectively arranged at both ends of the first covering member, each of the first reinforcement members has an arc-shaped structure, and is covered outside the water outlet of the embedded structure.
[0023] The present invention is further configured as follows: the right reinforcement member includes a second covering member and two second reinforcement members, the second covering member has the same axial structure as the embedded structure, and the inner wall cross-section of the second covering member is a "]"-shaped groove structure, and the second covering member extends to the water outlet of the embedded structure, and the second reinforcement members are respectively arranged at both ends of the second covering member, each of the second reinforcement members is an arc-shaped structure, and is covered outside the water outlet of the embedded structure.
[0024] The present invention is further configured as follows: the sealing assembly comprises an embedding groove arranged on the inner walls of the first reinforcement member and the second reinforcement member, a sealing member arranged in the embedding groove, and a spring sheet arranged between the sealing member and the embedding groove.
[0025] The present invention is further configured as follows: the sealing component mainly includes an annular extension piece arranged on the embedding groove, the annular extension piece is an annular structure, the thickness of the outer diameter side of the annular extension piece is greater than the thickness of the inner diameter side, the inner diameter side of the spring piece is upturned to form a resisting inclined surface, and after being connected with the annular extension piece, the inner edge of the annular extension piece and its outer edge are not on the same horizontal plane, when the annular extension piece is arranged on the embedding groove, its inner edge is close to the water outlet, and the sealing component also includes a fixing structure for fixing the spring piece.
[0026] The present invention is further configured as follows: the fixing structure includes a bolt for sequentially connecting the annular extension sheet and the spring sheet, and after the bolt is fixed to the flat part of the spring sheet and one side of the annular extension sheet, the other side of the annular extension sheet forms a structure to be sealed along the upwardly tilted contact slope of the spring sheet, the edge of which is slowly sealed under stress, and the structure to be sealed is in an empty state, and the empty space formed by the structure to be sealed gradually becomes thinner from the outside to the inside, and the inner edge thickness of the annular extension sheet is between 2-5mm.
[0027] The present invention is further configured as follows: the inner cushion bodies each include a main body portion and a cushion body surface, and the angles formed between the cushion body surfaces of two adjacent inner cushion bodies are the same and are between 144 degrees and 162 degrees.
[0028] By adopting the above technical scheme, the beneficial effects are as follows: 1. After the basement pit structure is formed by excavation, the present invention uses a pre-set built-in baffle structure, which is in an "L" shape, and paving stones on the area surrounded by the built-in baffle structure, and pre-pour cement, so that the formed local area is flush with the built-in baffle structure. Because the built-in baffle structure is pre-arranged, a good protection area can be formed before pouring, and the laying of stones and pre-pour cement make the formed local area and the built-in baffle structure flush, with higher integrity, and the built-in baffle structure can improve the waterproof protection effect of the outer wall of the basement, greatly improving the strong waterproof performance in the event of sinking, and in order to increase the waterproof effect in the basement, a first and second waterproof layer structure are formed by bonding multiple layers of waterproof membranes, thereby greatly improving the waterproof effect of the underground type, and greatly improving the practicality;
[0029] 2. In step S2, the built-in baffle structure is also connected to the embedded structure. In order to improve the drainage performance of the overall structure, the embedded structure is used to achieve the drainage effect after the waterproofing measures are taken. Specifically, the installation of the embedded structure includes the following steps: a groove structure for placing the embedded structure is dug on the bottom of the basement pit structure, the embedded structure is buried in the groove structure, and the embedded structure is connected to the drainage pipe; a steel plate layer is laid above each built-in baffle structure, the embedded structure is placed below the steel plate layer, and a steel bar frame with a length of 10cm-20cm is laid above the steel plate layer, and the steel plate layer and the steel bar frame are connected to form a casting area; concrete is poured in the casting area formed in step S21, and after the concrete is tightened, the bottom support area is constructed. In the embodiment of the present invention, by placing the embedded structure below the steel plate layer, and laying a steel bar frame with a length of 10cm-20cm above the steel plate layer, and the steel plate layer and the steel bar frame are connected to form a casting area, a more solid support is formed under the first concrete cushion layer, thereby providing strength protection for the drainage system formed by the embedded structure and the drainage pipe part;
[0030] 3. In order to further improve the structural strength of the embedded structure, an external fixing mechanism is provided on the outer side of the embedded structure, thereby increasing the resistance of the embedded structure and further improving the stability. Furthermore, by providing the external fixing mechanism to include a left reinforcing member provided along one side of the embedded structure, a right reinforcing member provided along the other side of the embedded structure, and a sealing assembly provided between the left and right reinforcing members and the embedded structure, the structural reinforcement of the embedded structure is achieved through the left and right reinforcing members and the sealing assembly, thereby greatly improving the stability.
[0031] 4. In the present invention, the sealing component is configured to include an embedding groove provided on the inner wall of the first reinforcement member and the second reinforcement member, a sealing member provided in the embedding groove, and a spring sheet provided between the sealing member and the embedding groove. In order to improve the long-term elastic sealing effect of the sealing member, the sealing member is configured to include an annular extension sheet provided on the embedding groove. The annular extension sheet is an annular structure. The thickness of the outer diameter side of the annular extension sheet is greater than the thickness of the inner diameter side. The inner diameter side of the spring sheet is upturned to form an abutting inclined surface. When the above structure is adopted, the annular extension sheet can always be in a state where the inner edge of the annular extension sheet and its outer edge are not on the same horizontal plane under the action of the spring sheet. When the annular extension sheet is provided on the embedding groove, its inner edge is close to the water outlet. Therefore, when the first reinforcement member and the second reinforcement member for sealing are installed, the sealing effect of the annular extension sheet is improved, and the practicality is greatly improved. BRIEF DESCRIPTION OF THE DRAWINGS
[0032] Figure 1 A cross-sectional view of a basement according to an embodiment of a basement waterproofing construction method of the present invention;
[0033] Figure 2 A basement waterproofing construction method according to the present invention is provided. Figure 1 A magnified view of the structure at center;
[0034] Figure 3 The construction method flow of a basement waterproofing construction method embodiment of the present invention is as follows Figure 1 ;
[0035] Figure 4 The construction method flow of a basement waterproofing construction method embodiment of the present invention is as follows Figure 2 ;
[0036] Figure 5 The construction method flow of a basement waterproofing construction method embodiment of the present invention is as follows Figure 3 ;
[0037] Figure 6 It is a flow chart of the installation of the embedded structure of an embodiment of a basement waterproofing construction method of the present invention;
[0038] Figure 7It is a partial structural schematic diagram of left and right reinforcing components of an embodiment of a basement waterproofing construction method of the present invention;
[0039] Figure 8 It is a cross-sectional schematic diagram of a sealing component of an embodiment of a basement waterproofing construction method of the present invention;
[0040] The reference numerals in the figure are as follows: 1. built-in baffle structure; 11. embedded structure; 12. steel plate layer; 13. steel bar frame; 14. casting area; 101. first covering plate; 102. second covering plate; 103. drainage channel; 104. plug rod; 105. left reinforcing member; 106. right reinforcing member; 107. first reinforcing member; 108. second reinforcing member; 109. water outlet; 110. embedded groove; 111. annular extension piece; 112. spring piece; 2. first concrete cushion layer; 3. load-bearing wall; 4. second concrete cushion layer; 5. inner cushion body; 50. main part; 51. cushion body surface; 6. waterproof membrane; 60. first waterproof layer; 61. second waterproof layer; 7. ceramic tile. DETAILED DESCRIPTION
[0041] Reference Figures 1 to 8 An embodiment of a basement waterproofing construction method of the present invention is further described.
[0042] For ease of explanation, spatial relative terms such as "upper", "lower", "left", "right" and the like are used in the embodiments to illustrate the relationship of one element or feature shown in the figure relative to another element or feature. It should be understood that, in addition to the orientation shown in the figure, the spatial terms are intended to include different orientations of the device in use or operation. For example, if the device in the figure is inverted, the element described as being "under" other elements or features will be positioned "on" other elements or features. Therefore, the exemplary term "under" can include both upper and lower orientations. The device can be positioned in other ways (rotated 90 degrees or in other orientations), and the spatial relative descriptions used here can be interpreted accordingly.
[0043] Furthermore, relational terms such as “first” and “second” and the like are merely used to distinguish one component from another having the same name, but do not necessarily require or imply any such actual relationship or order between these components.
[0044] A basement waterproofing construction method specifically comprises the following steps: S1, excavating the soil layer according to the design elevation and in combination with the on-site enclosure structure to form a basement pit structure, and compacting it;
[0045] S2. Measure the angle between two adjacent inner walls of the basement pit structure to see if it is 90 degrees and whether there is any inclination angle. Set a built-in baffle structure 1 along the bottom of the basement pit structure. The built-in baffle structure 1 is in an "L" shape. Lay stones on the area surrounded by the built-in baffle structure 1 and pour cement in advance so that the formed local area is flush with the built-in baffle structure 1.
[0046] S3, pouring a first concrete cushion layer 2 on the bottom of the pit structure formed by digging in step S1, and the first concrete cushion layer 2 is placed above the built-in baffle structure 1;
[0047] S4, building a load-bearing wall 3 along the edge of the first concrete cushion layer 2 poured in step S3, and pouring a second concrete cushion layer 4 on the load-bearing wall 3, and opening an exhaust port on the second concrete cushion layer 4 for installing an exhaust ventilation system; and a stair opening for installing stairs;
[0048] S5, a plurality of inner cushion bodies 5 are fixed to the connection between each of the load-bearing wall 3 and the first concrete cushion layer 2 and the connection between the load-bearing wall 3 and the second concrete cushion layer 4, and each of the inner cushion bodies 5 is configured to increase the angle of the connection between the load-bearing wall 3 and the first concrete cushion layer 2 and the connection between the load-bearing wall 3 and the second concrete cushion layer 4;
[0049] S6, laying waterproof membrane 6 at the connection between each load-bearing wall 3 and the first concrete cushion layer 2 and at the connection between each load-bearing wall 3 and the second concrete cushion layer 4, and bonding the waterproof membrane 6 to the above connection by waterproof glue;
[0050] S7, laying the waterproof membrane 6 of equal length on the area where the waterproof membrane 6 is not bonded on the load-bearing wall 3, the first concrete cushion layer 2 and the second concrete cushion layer 4, and forming a first waterproof layer 60;
[0051] S8, taking the connection point of two adjacent waterproof membranes 6 on the first waterproof layer 60 as the center position, laying the waterproof membrane 6 on the first waterproof layer 60, and bonding them to form a second waterproof layer 61;
[0052] S9, applying tile adhesive on the second waterproof layer 61, and then laying tiles 7;
[0053] S10, cleaning the wall surface after tiling 7, and completing the construction.
[0054] After the basement pit structure is formed by excavation, the present invention uses a pre-set built-in baffle structure 1, which is in an "L" shape, and paving stones on the area surrounded by the built-in baffle structure 1, and pre-pour cement, so that the formed local area is flush with the built-in baffle structure 1. Because the built-in baffle structure 1 is pre-arranged, a good protection area can be formed before pouring, and the laying of stones and pre-pour cement make the formed local area and the built-in baffle structure 1 flush, with higher integrity, and the built-in baffle structure 1 can improve the waterproof protection effect of the outer wall of the basement, greatly improving the strong waterproof performance in the event of sinking, and in order to increase the waterproof effect in the basement, a first and second waterproof layer structure is formed by bonding multiple layers of waterproof membrane 6, thereby greatly improving the waterproof effect of the underground type, and the practicality is greatly improved;
[0055] The present invention is further configured that the built-in baffle structure 1 in step S2 is also connected to the embedded structure 11, and the specific installation of the embedded structure 11 includes the following steps: S20, digging a groove structure for accommodating the embedded structure 11 on the bottom of the basement pit structure, burying the embedded structure 11 in the groove structure, and connecting the embedded structure 11 with the drainage pipe;
[0056] S21, laying a steel plate layer 12 on top of each built-in baffle structure 1, placing the embedded structure 11 below the steel plate layer 12, and laying a steel frame 13 with a thickness of 10 cm to 20 cm on top of the steel plate layer 12, the steel plate layer 12 and the steel frame 13 are connected to form a casting area 14;
[0057] S22, pouring concrete in the pouring area 14 formed in step S21, and completing the construction of the bottom support area after the concrete is tightened.
[0058] In step S2, the built-in baffle structure 1 is also connected to the embedded structure 11. In order to improve the drainage performance of the overall structure, the embedded structure 11 is used to achieve drainage effect after waterproofing measures. The installation of the embedded structure 11 includes the following steps: digging a groove structure for accommodating the embedded structure 11 at the bottom of the basement pit structure, burying the embedded structure 11 in the groove structure, and connecting the embedded structure 11 with the drainage pipe; laying a steel plate layer 12 above each built-in baffle structure 1, and placing the embedded structure 114 below the steel plate layer 12, and laying a steel frame 13 between 10cm and 20cm above the steel plate layer 12. The steel plate layer 12 and the steel bar frame 13 are connected to form a pouring area 14; concrete is poured in the pouring area 14 formed in step S21, and after the concrete is tightened, the bottom support area construction is completed. In the embodiment of the present invention, by placing the steel plate layer 12 below the embedded structure 11, and laying a steel bar frame 13 with a thickness of 10cm-20cm above the steel plate layer 12, the steel plate layer 12 and the steel bar frame 13 are connected to form a pouring area 14, so that a more solid support is formed below the first concrete cushion layer 2, thereby providing strength protection for the drainage system formed by the embedded structure 114 and the drainage pipe part;
[0059] The present invention is further configured such that the built-in baffle structure 1 includes a first cladding plate 101 and a second cladding plate 102 which are connected in sequence and are L-shaped, a drainage channel 103 arranged on the first cladding plate 101, and an insertion rod 104 arranged on the first cladding plate 101 and inserted into the side wall of the basement pit structure, the second cladding plate 102 is connected to an embedded structure 11 embedded in the groove structure, the drainage channel 103 and the embedded structure 11 are connected to each other, and the embedded structure 11 is connected to a drain pipe for drainage.
[0060] In order to further improve the structural strength of the embedded structure 11, an external fixing mechanism is provided on the outer side of the embedded structure 11, thereby increasing the resistance of the embedded structure 11, and further improving the stability. In addition, by providing the external fixing mechanism to include a left reinforcing member 105 provided along one side of the embedded structure 11, a right reinforcing member 106 provided along the other side of the embedded structure 11, and a sealing assembly provided between the left and right reinforcing members 106 and the embedded structure 11, respectively, the structural reinforcement of the embedded structure 11 is achieved through the left and right reinforcing members 106 and the sealing assembly, and the stability is greatly improved.
[0061] The present invention is further configured such that an external fixing mechanism is also provided on the outside of the embedded structure 11, and the external fixing mechanism includes a left reinforcing member 105 arranged along one side of the embedded structure 11, a right reinforcing member 106 arranged along the other side of the embedded structure 11, and a sealing component respectively arranged between the left and right reinforcing members 106 and the embedded structure 11.
[0062] The present invention is further configured such that the left reinforcement member 105 includes a first covering member and two first reinforcement members 107, the first covering member has the same axial structure as the embedded structure 11, and the inner wall cross-section of the first covering member is a "["-shaped groove structure, and the first covering member extends to the water outlet 109 of the embedded structure 11, and the first reinforcement members 107 are respectively arranged at both ends of the first covering member, and each of the first reinforcement members 107 has an arc-shaped structure and is covered outside the water outlet 109 of the embedded structure 11.
[0063] The present invention is further configured such that the right reinforcing member 106 includes a second covering member and two second reinforcing members 108, the second covering member has the same axial structure as the embedded structure 11, and the inner wall cross-section of the second covering member is a "]"-shaped groove structure, and the second covering member extends to the water outlet 109 of the embedded structure 11, and the second reinforcing members 108 are respectively arranged at both ends of the second covering member, and each of the second reinforcing members 108 has an arc-shaped structure and is covered outside the water outlet 109 of the embedded structure 11.
[0064] The present invention is further configured such that the sealing assembly includes a groove 110 disposed on the inner walls of the first reinforcement member 107 and the second reinforcement member 108 , a sealing member disposed in the groove 110 , and a spring piece 112 disposed between the sealing member and the groove 110 .
[0065] The present invention is further configured such that the sealing component mainly includes an annular extension piece 111 arranged on the embedding groove 110, and the annular extension piece 111 is an annular structure. The thickness of the outer diameter side of the annular extension piece 111 is greater than the thickness of the inner diameter side. The inner diameter side of the spring piece 112 is upturned to form a resisting inclined surface. After being connected with the annular extension piece 111, the inner edge of the annular extension piece 111 and its outer edge are not on the same horizontal plane. When the annular extension piece 111 is arranged on the embedding groove 110, its inner edge is close to the water outlet 109. The sealing component also includes a fixing structure for fixing the spring piece 112.
[0066] In the present invention, the sealing assembly is configured to include a groove 110 disposed on the inner wall of the first reinforcement member 107 and the second reinforcement member 108, a sealing member disposed in the groove 110, and a spring 112 disposed between the sealing member and the groove 110. In order to improve the sealing member's ability to have a long-term elastic sealing effect, the sealing member is configured to include an annular extension piece 111 disposed on the groove 110. The annular extension piece 111 is an annular structure. The thickness of one side of the outer diameter of the annular extension piece 111 is greater than the thickness of one side of the inner diameter. The thickness of the side, the inner diameter side of the spring piece 112 is warped to form an abutting inclined surface. When the above structure is adopted, the annular extension piece 111 can always be in a state where the inner edge of the annular extension piece 111 and its outer edge are not on the same horizontal plane under the action of the spring piece 112. When the annular extension piece 111 is arranged on the embedding groove 110, its inner edge is close to the water outlet 109. Therefore, when the first sealing reinforcement piece 107 and the second sealing reinforcement piece 108 are installed, the sealing effect of the annular extension piece 111 is improved, and the practicality is greatly improved.
[0067] The present invention is further configured such that the fixing structure includes a bolt for sequentially connecting the annular extension piece 111 and the spring sheet 112. After the bolt is fixed to the flat part of the spring sheet 112 and one side of the annular extension piece 111, a structure to be sealed whose edge is slowly sealed under stress is formed on the other side of the annular extension piece 111 along the upwardly tilted contact slope of the spring sheet 112. The structure to be sealed is in an empty state, and the empty space formed by the structure to be sealed gradually becomes thinner from the outside to the inside. The inner edge thickness of the annular extension piece 111 is between 2-5 mm.
[0068] In the embodiment of the present invention, the connection method of the traditional sealing ring is changed by the cooperation between the spring sheet and the annular extension sheet. Instead, an elastic support is formed by the spring sheet, and a sealing structure is formed by slowly sealing the edge under a force state on the contact slope of the spring sheet, and the sealing component in the two-way groove cooperates and contacts to form a sealing method. This allows the sealing structure to avoid forming a sealing method under an extrusion state in a harsh environment, reduces the aging rate, and increases the service life.
[0069] The present invention is further configured such that the inner cushion bodies 5 include a main body 50 and a cushion surface 51, and the angles formed between the cushion surfaces 51 of two adjacent inner cushion bodies 5 are the same and are between 144 degrees and 162 degrees. Through the configuration of the structure of the inner cushion bodies 5, the inner cushion bodies 5 can form an effect of increasing the gradual angle between each wall, ensuring that the waterproof membrane 6 can fit the wall more perfectly, thereby improving the overall waterproofness and greatly enhancing the practicality.
[0070] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Common changes and substitutions made by those skilled in the art within the scope of the technical solution of the present invention should be included in the protection scope of the present invention.
Claims
1. A basement waterproofing construction method, characterized in that: Specifically, the steps include: S1, excavating the soil layer according to the design elevation and combining with the on-site enclosure structure to form a basement pit structure, and compacting it; S2. Measure the angle between two adjacent inner walls of the basement pit structure to see if it is 90 degrees and whether there is any inclination angle. Set a built-in baffle structure (1) along the bottom of the basement pit structure. The built-in baffle structure (1) is in an "L" shape. Lay stones in the area surrounded by the built-in baffle structure (1) and pour cement in advance so that the formed area is flush with the top surface of the horizontal part of the built-in baffle structure (1). In the step S2, the built-in baffle structure (1) is also connected to the embedded structure (11), and the installation of the embedded structure (11) specifically includes the following steps: S20, digging a groove structure for accommodating the embedded structure (11) on the bottom of the basement pit structure, burying the embedded structure (11) in the groove structure, and connecting the embedded structure (11) with the drainage pipe; S21, laying a steel plate layer (12) above the transverse portion of each built-in baffle structure (1) and above the area where gravel is laid, placing the embedded structure (11) below the transverse portion of the built-in baffle structure (1), and laying a steel frame (13) with a thickness of 10 cm to 20 cm above the steel plate layer (12), and connecting the steel plate layer (12) and the steel frame (13) to form a casting area (14); S22, pouring concrete in the pouring area (14) formed in step S21, and completing the construction of the bottom support area after the concrete is tightened; S3, pouring a first concrete cushion layer (2) on the bottom of the pit structure formed by excavation in step S1, the first concrete cushion layer (2) being placed above the lateral part of the built-in baffle structure (1) and the area paved with gravel; S4, building a load-bearing wall (3) along the edge of the first concrete cushion layer (2) poured in step S3, pouring a second concrete cushion layer (4) on the load-bearing wall (3), and opening an exhaust port on the second concrete cushion layer (4) for installing an exhaust ventilation system; and a stair opening for installing a staircase; S5. A plurality of inner cushion bodies (5) are fixed to the connection between each of the load-bearing walls (3) and the first concrete cushion layer (2) and the connection between the load-bearing wall (3) and the second concrete cushion layer (4), wherein each of the inner cushion bodies (5) is configured to increase the angle of the connection between the load-bearing wall (3) and the first concrete cushion layer (2) and the connection between the load-bearing wall (3) and the second concrete cushion layer (4); S6, laying waterproofing coiled materials (6) at the connection points between each load-bearing wall (3) and the first concrete cushion layer (2) and at the connection points between each load-bearing wall (3) and the second concrete cushion layer (4), and bonding the waterproofing coiled materials (6) to the above-mentioned connection points by using waterproof glue; S7, laying a waterproofing roll (6) of equal length on the load-bearing wall (3), the first concrete cushion layer (2) and the second concrete cushion layer (4) in the area where the waterproofing roll (6) is not bonded, and forming a first waterproof layer (60); S8, taking the connection point of two adjacent waterproof rolls (6) on the first waterproof layer (60) as the center position, laying the waterproof roll (6) on the first waterproof layer (60), and bonding them to form a second waterproof layer (61); S9, applying tile adhesive on the second waterproof layer (61), and then laying tiles (7); S10, cleaning the wall after tiling (7), completing the construction, The built-in baffle structure (1) comprises a first cladding plate (101) and a second cladding plate (102) which are connected in sequence and are arranged vertically in an L-shape, a drainage channel (103) arranged on the first cladding plate (101), and a plug rod (104) arranged on the first cladding plate (101) and inserted into the side wall of the basement pit structure, the second cladding plate (102) is connected to a pre-buried structure (11) pre-buried in the groove structure, the drainage channel (103) and the pre-buried structure (11) are connected to each other, and the pre-buried structure (11) is connected to a drainage pipe for drainage.
2. A basement waterproofing construction method according to claim 1, characterized in that: An external fixing mechanism is also provided on the outside of the embedded structure (11), the external fixing mechanism comprising a left reinforcing member (105) arranged along one side of the embedded structure (11), a right reinforcing member (106) arranged along the other side of the embedded structure (11), and sealing components respectively arranged between the left and right reinforcing members (106) and the embedded structure (11).
3. A basement waterproofing construction method according to claim 2, characterized in that: The left reinforcing member (105) comprises a first covering member and two first reinforcing members (107); the first covering member and the embedded structure (11) have the same axial structure; the inner wall cross-section of the first covering member is a "["-shaped groove structure; the first covering member extends to the water outlet (109) of the embedded structure (11); the first reinforcing members (107) are respectively arranged at both ends of the first covering member; each of the first reinforcing members (107) is in an arc-shaped structure and is enclosed outside the water outlet (109) of the embedded structure (11).
4. A basement waterproofing construction method according to claim 3, characterized in that: The right reinforcing member (106) comprises a second covering member and two second reinforcing members (108); the second covering member and the embedded structure (11) have the same axial structure; the inner wall cross-section of the second covering member is a "]"-shaped groove structure; the second covering member extends to the water outlet (109) of the embedded structure (11); the second reinforcing members (108) are respectively arranged at both ends of the second covering member; each of the second reinforcing members (108) is in an arc-shaped structure and is enclosed outside the water outlet (109) of the embedded structure (11).
5. A basement waterproofing construction method according to claim 4, characterized in that: The sealing assembly comprises an embedding groove (110) arranged on the inner walls of the first reinforcing member (107) and the second reinforcing member (108), a sealing member arranged in the embedding groove (110), and a spring sheet (112) arranged between the sealing member and the embedding groove (110).
6. A basement waterproofing construction method according to claim 5, characterized in that: The sealing member mainly comprises an annular extension piece (111) arranged on the embedding groove (110); the annular extension piece (111) is an annular structure; the thickness of the outer diameter side of the annular extension piece (111) is greater than the thickness of the inner diameter side; the inner diameter side of the elastic piece (112) is warped upward to form a resisting inclined surface; after being connected to the annular extension piece (111), the inner edge of the annular extension piece (111) and its outer edge are not on the same horizontal plane; when the annular extension piece (111) is arranged on the embedding groove (110), its inner edge is close to the water outlet (109); the sealing member also comprises a fixing structure for fixing the elastic piece (112).
7. A basement waterproofing construction method according to claim 6, characterized in that: The fixing structure comprises a bolt for sequentially connecting the annular extension piece (111) and the spring sheet (112); after the bolt fixes the flat part of the spring sheet (112) and one side of the annular extension piece (111), the other side of the annular extension piece (111) forms a structure to be sealed whose edge is slowly sealed under a stress state along the upwardly tilted contact slope of the spring sheet (112); the structure to be sealed is in an empty state, and the empty space formed by the structure to be sealed gradually becomes thinner from the outside to the inside; the inner edge thickness of the annular extension piece (111) is between 2 and 5 mm.
8. A basement waterproofing construction method according to claim 1, characterized in that: Each inner cushion body (5) comprises a main body portion (50) and a cushion body surface (51), and the included angle formed between the cushion body surfaces (51) of two adjacent inner cushion bodies (5) is the same and is between 144 degrees and 162 degrees.
Citation Information
Patent Citations
Basement waterproof and drainage combined construction method
CN111691467A
Basement outer wall anti-seepage device and construction method
CN117188527A