A full-section vertical shield machine
Through the design of the full-section vertical shield machine, the problems of high cost, long construction period and safety hazards in deep foundation pit construction are solved, and the effects of low equipment cost, high construction efficiency and stable surrounding soil are achieved. It is suitable for intensive construction. Deep foundation pit construction in object area.
Patent Information
- Application Number
- CN202411088297.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-09
- Publication Date
- 2024-11-08
- Estimated Expiration
- 2044-08-09
AI Technical Summary
The existing deep foundation pit machinery construction technology has high cost, long construction period, large disturbances and potential safety hazards, especially the settlement of surrounding structures.
A full-section vertical shield machine is designed, adopting a detachable and connected casing structure, and ensuring the stability of the equipment by using hydraulic horizontal top device and conical pin shaft. It assists in sinking through the pipe section installation groove and the self-weight of the outer cylinder. Improve work efficiency and optimize cutting efficiency and equipment structure with multi-cutting powertrain and elastic support.
It reduces the cost of equipment, avoids surrounding soil collapse, improves construction efficiency and equipment stability, solves the safety hazards of deep foundation pit construction for surrounding structure settlement, and is suitable for construction in dense structure areas.
Smart Images

Figure CN118601072B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to a full-section vertical shield machine, belonging to the technical field of full-section construction equipment. Background Art
[0002] With the accelerated advancement of the country's urbanization process, the urban ground space is becoming increasingly narrow, and there is an urgent need to develop and utilize the urban underground space. At present, deep foundation pit mechanical construction is mostly hoisted cantilever tunneling machines. The cantilever tunneling machine body rotates for excavation, and the gantry crane grabs the slag out of the earth. This type of equipment is not only expensive and highly disturbing, but also has potential safety hazards of settlement of surrounding structures.
[0003] Therefore, a new solution needs to be proposed to solve this problem. Summary of the invention
[0004] The technical problem to be solved by the present invention is to provide a full-section vertical shield machine, which solves the mechanical construction technical problems of high cost, long construction period, large disturbance, potential safety hazards and settlement of surrounding structures in deep foundation pit construction in the prior art.
[0005] A full-section vertical shield machine comprises a main machine, the main machine comprises a casing and a tunneling assembly, the tunneling assembly is arranged at the bottom of the casing and is used to rotate to cut soil layers;
[0006] The host also includes:
[0007] The slag discharge pipe and the grouting pipe are both arranged inside the casing, with one end extending out of the top of the casing and the other end penetrating through the casing and connected to the bottom of the casing.
[0008] A plurality of pressure sensors are arranged at the bottom of the casing;
[0009] Among them, an outer cylinder is arranged on the outside of the casing, a pipe joint installation groove is opened on the top of the outer cylinder, and the bottom covers the outside of the excavation component and forms a pressure balance chamber with the bottom of the casing.
[0010] By adopting the above technical solution, the equipment cost is low, the construction cost is greatly reduced, and by installing the pipe joints on the pipe joint installation grooves, the present application can cleverly use the deadweight of the equipment and the pipe joints as an auxiliary driving force for sinking, driving the equipment to install the pipe joints while sinking and pushing forward, thereby greatly improving work efficiency.
[0011] The present invention is further configured as follows: the casing and the outer cylinder are detachably connected, a plurality of hydraulic cross-lift devices are arranged inside the casing, the hydraulic cross-lift devices include a hydraulic cylinder, the output end of the hydraulic cylinder is hinged with a tapered pin shaft that slides laterally on the side wall of the casing, and a steel pipe is welded inside the outer cylinder to form a pin hole for the tapered pin shaft to be inserted.
[0012] By adopting the above technical solution, when the main machine is connected to the outer cylinder, the output end of the hydraulic cylinder drives the tapered pin shaft to extend, so that the tapered pin shaft extends into the pin hole, ensuring a stable connection. When the main machine needs to be separated from the outer cylinder, the output end of the hydraulic cylinder retracts, so that the tapered pin shaft returns to the inside of the casing, thereby facilitating the lifting of the main machine. Among them, the output end of the hydraulic cylinder and the tapered pin shaft adopt an intermediate hinge connection to ensure that the output end of the hydraulic cylinder is not subjected to radial force during the construction process, thereby avoiding oil leakage and ensuring the stability of the equipment.
[0013] The present invention is further configured as follows: the excavation assembly includes a small cutter disc arranged at the bottom center of the casing and a plurality of large cutter discs arranged around the small cutter disc, and a small cutter disc power assembly and a plurality of large cutter disc power assemblies for respectively driving the small cutter disc and the plurality of large cutter discs to rotate are also arranged inside the casing.
[0014] By adopting the above technical solution, each cutter disc can be driven and speed-regulated separately, avoiding the disadvantage of multiple cutter discs being difficult to control when started at the same time. The rotation speed of each cutter disc can be adjusted according to the on-site working conditions to improve cutting efficiency and reduce energy consumption. The small cutter disc is set at the center of the equipment and plays a vertical guiding role during the excavation process.
[0015] The present invention is further configured as follows: the small blade disc power assembly and the large blade disc power assembly are respectively installed inside the casing via mounting seat 1 and mounting seat 2, wherein the mounting seat 1 is detachably connected to the inside of the casing.
[0016] By adopting the above technical solution, the disassembly and assembly of the left shell and the right shell are facilitated, thus saving the assembly time of the shell.
[0017] The present invention is further configured as follows: a plurality of scrapers are arranged on the large blade disc and the small blade disc, and a pointed knife is provided at the center, wherein the small blade disc is a spoke-shaped blade disc, half of the large blade disc is spoke-shaped, and the other half is disc-shaped, and the length of the spoke-shaped part of the large blade disc is greater than the radius length of the disc-shaped part.
[0018] By adopting the above technical solution, the large cutter disc is set to a half-strip and half-disc structure, and its arm span is long and short, and it can completely enter the projection surface of the casing by rotation, thereby ensuring the cutting area and cutting efficiency of the construction section and facilitating the lifting and withdrawal of the main machine.
[0019] The present invention is further configured as follows: a plurality of elastic support members are arranged on a surface of the large blade disc facing the housing.
[0020] By adopting the above technical scheme, the axial force of the cutter disc is effectively improved through the elastic force of the elastic support member, thereby increasing the service life of the cutter disc. The elastic support member can also be used for stirring the soil and the improver in the pressure balance chamber to facilitate slag extraction.
[0021] The present invention is further configured as follows: the casing is detachably connected by a left outer shell and a right outer shell through a plurality of bolts.
[0022] By adopting the above technical solution, the casing can be disassembled and assembled, which is convenient for transportation of the casing.
[0023] The present invention is further configured as follows: the bottom of the outer cylinder is provided with a plurality of sinking knife edges with V-shaped cross sections.
[0024] By adopting the above technical solution, when the equipment is excavating downward, the soil in the blind area can be squeezed to the large cutter head, which is convenient for the cutting of the large cutter head and makes the cutting more complete.
[0025] The present invention is further configured as follows: a plurality of U-shaped thixotropic mud pipes are passed through the upper portion of the outer cylinder.
[0026] By adopting the above technical solution, the thixotropic mud pipe can be communicated with the inside of the pipe section, so that the thixotropic mud can be injected into the pipe wall from the inside of the pipe section.
[0027] The beneficial effects of the present invention are:
[0028] 1. The sinking and excavation of the full-section vertical shield machine ensures the stability of the soil around the deep foundation pit, avoids the settlement of the structures adjacent to the deep foundation pit, and successfully solves the technical problem of no disturbance to the surrounding structures during the deep foundation pit construction.
[0029] 2. It reduces the equipment cost, optimizes the equipment structure, improves the mechanical properties, improves the construction efficiency, and is more conducive to deep foundation pit construction.
[0030] 3. The deadweight of the equipment and the upper pipe section of the outer cylinder is used as the auxiliary driving force for sinking, omitting the support shoe mechanism of the same type of equipment and improving the stability of the equipment. BRIEF DESCRIPTION OF THE DRAWINGS
[0031] Figure 1 It is a structural schematic diagram of the present invention;
[0032] Figure 2 A bottom view of the present invention;
[0033] Figure 3 It is a half-section diagram of the present invention;
[0034] Figure 4 for Figure 3 A schematic diagram of the enlarged structure at A in the middle;
[0035] Figure 5 A partial cross-sectional view of a large blade disc and a large blade disc power assembly in the present invention;
[0036] Figure 6 It is a partial cross-sectional view of the small cutter disc and the small cutter disc power assembly in the present invention;
[0037] Figure 7 It is a schematic diagram of the structure of the outer cylinder in the present invention;
[0038] Figure 8 The structure of the housing in the present invention is shown in FIG. Figure 1 ;
[0039] Fig. 9 It is a structural schematic diagram of the slag discharge pipeline in the present invention;
[0040] Fig.10 It is a structural schematic diagram of the grouting pipeline in the present invention;
[0041] Fig.11 The structure of the housing in the present invention is shown in FIG. Figure 2 .
[0042] In the figure: 1. main engine; 11. housing; 111. left housing; 112. right housing; 113. rib plate; 114. top cover; 115. wear plate; 12. excavation assembly; 121. small cutter head; 122. large cutter head; 123. scraper; 124. sharp angle knife; 125. elastic support; 1251. flange; 13. slag discharge pipe; 131. slag discharge inlet; 132. slag discharge outlet; 14. grouting pipe; 141. grouting inlet; 142. grouting nozzle; 15. pressure sensor; 16. lifting lug; 17. small knife Disc power assembly; 171, mounting seat one; 18, large cutter disc power assembly; 181, motor; 182, planetary reducer; 183, intermediate reduction mechanism; 184, mounting seat two; 19, junction box; 2, outer cylinder; 21, pipe segment mounting groove; 22, outer skirt plate; 221, shovel teeth; 23, cross plate; 24, reinforcing rib plate; 25, steel pipe; 251, pin hole; 26, thixotropic mud pipe; 27, sinking blade; 3, pressure balance chamber; 4, hydraulic cross-top device; 41, mounting seat; 42, hydraulic cylinder; 43, tapered pin shaft. DETAILED DESCRIPTION
[0043] In order to make the technical means, creative features, objectives and effects of the present invention easier to understand, the present invention is further described below with reference to specific illustrations.
[0044] like Figure 1 and Figure 3 As shown, a full-section vertical shield machine includes a main machine 1, the main machine 1 includes a casing 11 and a tunneling assembly 12, the tunneling assembly 12 is arranged at the bottom of the casing 11, and is used to rotate to cut soil layers;
[0045] Host 1 also includes:
[0046] A plurality of slag discharge pipes 13 and grouting pipes 14 are arranged inside the casing 11 and one end of the slag discharge pipes 13 extends out from the top of the casing 11 and the other end of the slag discharge pipes 13 and communicates with the bottom of the casing 11.
[0047] A plurality of pressure sensors 15 are disposed at the bottom of the housing 11;
[0048] A plurality of lifting ears 16 are provided on the top peripheral side of the housing 11 for lifting the host 1 separately or as a whole.
[0049] Among them, an outer cylinder 2 is arranged on the outside of the casing 11, a pipe joint installation groove 21 is opened on the top of the outer cylinder 2, and the bottom covers the outside of the excavation component 12 and forms a pressure balance chamber 3 connected with the slag discharge pipe 13 and the grouting pipe 14 between the bottom and the casing 11.
[0050] The full-section vertical shield machine provided by the present application has a simple structure, which makes the equipment cost low and greatly reduces the construction cost. By installing the pipe segments on the pipe segment installation grooves 21, the present application can cleverly use the deadweight of the equipment and the pipe segments as an auxiliary driving force for sinking, driving the equipment to sink and advance while installing the pipe segments, greatly improving work efficiency.
[0051] In addition, by sinking the excavation component 12 in the equipment to excavate and discharge slag, the cross-section of the deep foundation pit is formed at one time, which effectively avoids safety hazards in the construction process. Specifically, after the bottom end of the outer cylinder 2 is embedded in the soil layer, the pressure balance chamber 3 between the bottom of the outer cylinder 2 casing 11 will enter a sealed state, and the pressure in the pressure balance chamber 3 is adjusted by adjusting the unloading pressure of the slag discharge pipe 13 and the adding pressure of the grouting pipe 14 to ensure that the pressure in the pressure balance chamber 3 is always greater than or equal to the soil extrusion stress at the same depth, thereby effectively avoiding the collapse of the surrounding soil, and then ensuring the stability of the soil around the deep foundation pit, avoiding the settlement of the buildings adjacent to the deep foundation pit, so that the full-section vertical shield equipment provided by the present application can be used in construction areas with dense structures around, effectively overcoming the technical bottleneck of mechanical construction in deep foundation pits with structures around or in narrow urban areas.
[0052] like Figure 8 As shown, the casing 11 is composed of a left outer shell 111, a right outer shell 112 and a top cover 114 which are detachably connected by a plurality of bolts to form a complete and internally sealed casing 11, thereby facilitating the disassembly, assembly and transportation of the casing 11. In addition, a plurality of ribs 113 are welded inside the casing 11 to improve the overall structural strength and rigidity of the casing 11.
[0053] like Figure 7 As shown, the outer cylinder 2 is assembled from the left and right cylinders, and the outer dimensions are adapted to the construction section requirements. The left and right cylinders are welded by the outer skirt plate 22, the inner transverse plate 23 and the reinforcing rib plate 24, which ensures the structural strength. In addition, a number of steel pipes 25 are welded on the inner wall of the outer cylinder 2 facing the main machine 1 to form pin holes 251;
[0054] A plurality of bolt holes (not marked in the figure) are arranged at the top of the outer cylinder 2 at the position of the pipe segment installation groove 21, so as to facilitate the installation and connection between the outer cylinder 2 and the first pipe segment;
[0055] The outer cylinder 2 cooperates with the outer wall and bottom surface of the casing 11 and is provided with a plurality of rubber strips (not marked in the figure), thereby ensuring the sealing performance between the outer cylinder 2 and the casing 11;
[0056] A plurality of shovel teeth 221 staggered in height are welded to the bottom of the outer skirt plate 22, and the four corners thereof are all higher than the ground to facilitate embedding into the soil, thereby preventing the deflection of the equipment during the excavation process, so that the outer cylinder 2 can sink and jack more stably;
[0057] A plurality of U-shaped thixotropic mud pipes 26 are passed through the upper portion of the outer cylinder 2. The thixotropic mud pipes 26 can be communicated with the interior of the pipe section so that the thixotropic mud can be injected into the pipe wall from the inner side of the pipe section.
[0058] like Figure 3 , Figure 4 and Figure 5 As shown, the casing 11 and the outer cylinder 2 are detachably connected via a plurality of hydraulic cross-lift devices 4. The hydraulic cross-lift devices 4 include a hydraulic cylinder 42 mounted on the inner bottom wall of the casing 11 via a mounting seat 41. In the present embodiment, the hydraulic cylinder 42 is a double-acting hydraulic cylinder 42. The output end of the hydraulic cylinder 42 is hinged with a tapered pin shaft 43 which slides laterally on the side wall of the casing 11. The tapered pin shaft 43 is used to fit into a pin hole 251 formed by the steel pipe 25 inside the outer cylinder 2. The pin hole 251 is machined after welding to ensure the matching accuracy with the tapered pin shaft 43.
[0059] When the main machine 1 is connected to the outer cylinder 2, the output end of the hydraulic cylinder 42 drives the tapered pin 43 to extend, so that the tapered pin 43 extends into the pin hole 251 to ensure a stable connection. When the main machine 1 and the outer cylinder 2 need to be separated, the output end of the hydraulic cylinder 42 retracts, so that the tapered pin 43 returns to the inside of the casing 11, thereby facilitating the lifting of the main machine 1. The output end of the hydraulic cylinder 42 and the tapered pin 43 are connected by an intermediate hinge to ensure that the output end of the hydraulic cylinder 42 is not subjected to radial force during construction, thereby avoiding oil leakage and ensuring the stability of the equipment.
[0060] Specifically, when the pipe segment is installed, that is, when the construction is completed, the connection between the main unit 1 and the outer cylinder 2 can be released, and the main unit 1 can be lifted out of the well as a whole through the lifting lug 16, and the outer cylinder 2 can be left at the bottom of the well, thereby facilitating the reuse of the main unit 1 and reducing the construction cost. In addition, the outer cylinder 2 at the bottom of the well can also be cut and removed by electric welding, so that it can be reused after subsequent welding of the outer cylinder 2, thereby further reducing the construction cost.
[0061] like Figure 2 , 3As shown in Figures 5 and 6, the tunneling assembly 12 includes a small cutter disc 121 arranged at the bottom center of the casing 11 and a plurality of large cutter discs 122 arranged around the small cutter disc 121. The small cutter disc 121 and the plurality of large cutter discs 122 are arranged in a staggered manner. A small cutter disc power assembly 17 and a plurality of large cutter disc power assemblies 18 for driving the small cutter disc 121 and the plurality of large cutter discs 122 to rotate respectively are also arranged inside the casing 11.
[0062] Among them, several scrapers 123 are arranged on the large blade disc 122 and the small blade disc 121, and a pointed knife 124 is set at the center. Several elastic support members 125 are detachably connected to the side of the large blade disc 122 facing the casing 11. In this embodiment, the elastic support member 125 can be one or a combination of a compression spring and a rubber seat.
[0063] like Figure 5 As shown, the elastic support member 125 is installed on the large blade disc 122 through a flange 1251 and a plurality of countersunk bolts, so that when the elastic support member 125 is worn, each elastic support member 125 can be removed and replaced individually without replacing the entire large blade disc 122, thereby effectively reducing the cost of replacement and maintenance.
[0064] In this embodiment, if Figure 2 As shown, the small blade disc 121 is a spoke-shaped blade disc, half of the large blade disc 122 is spoke-shaped and the other half is disc-shaped, and the length of the spoke-shaped portion of the large blade disc 122 is greater than the radius length of the disc-shaped portion. In addition, when several large blade discs 122 rotate until their spoke-shaped middle portions are toward the rotation center of the small blade disc 121, both the large blade disc 122 and the small blade disc 121 fall within the projection surface range of the casing 11 in the vertical direction.
[0065] By setting the large blade disc 122 as a half-strip and half-disc structure, its arm span is long and short, and it can completely enter the projection surface of the casing 11 by rotation, thereby ensuring the cutting area and cutting efficiency of the construction section, and facilitating the lifting and withdrawal of the main machine 1. In addition, an elastic support member 125 is added to the back of the large blade disc 122. The elastic force of the elastic support member 125 effectively improves the axial force of the large blade disc 122 and increases the service life of the large blade disc 122. The elastic support member 125 can also be used for stirring the soil and the improver in the pressure balance chamber 3 to facilitate slag extraction.
[0066] The staggered arrangement of the large and small cutter discs 121 effectively avoids interference between the large cutter disc 122 and the small cutter disc 121, reduces the blind area of cutting, and the small cutter disc 121 is arranged at the center of the equipment, which plays a vertical guiding role during the sinking and excavation process of the equipment.
[0067] like Figure 5 and Figure 6As shown, the large blade disc power assembly 18 is composed of six sets of motors 181, planetary reducers 182 and intermediate reduction mechanisms 183. The motor 181 drives the planetary reducers 182 and the intermediate reduction mechanisms 183 to rotate to drive the large blade disc 122 to rotate;
[0068] The blade disc power assembly 17 is composed of three sets of motors 181, a planetary reducer 182 and an intermediate reduction mechanism 183. The motor 181 drives the planetary reducer 182 and the intermediate reduction mechanism 183 to rotate, thereby driving the blade disc 121 to rotate.
[0069] Among them, each cutter disc is driven and speed-regulated separately to avoid the disadvantage of multiple cutter discs being difficult to control when started at the same time. The speed of each cutter disc can be adjusted according to on-site working conditions to improve cutting efficiency and reduce energy consumption.
[0070] like Figure 8 As shown, a junction box 19 is also provided inside the casing 11 for electrically connecting to the large blade disc power assembly 18 and the small blade disc power assembly 17 to realize the operation of driving and regulating the speed of each blade disc separately.
[0071] like Fig.11 As shown, a plurality of wear-resistant disks 115 are arranged at the bottom of the casing 11 corresponding to the position of the large blade disc 122. The wear-resistant disk 115 has high hardness and wear resistance, so that the top of the elastic support member 125 can abut against the surface of the wear-resistant disk 115, thereby avoiding direct abutment against the casing 11, thereby effectively avoiding the wear of the casing 11, so that only the wear-resistant disk 115 needs to be replaced during maintenance, effectively saving maintenance costs and maintenance time.
[0072] like Figure 7 As shown, a plurality of V-shaped sinking cutting edges 27 are provided at the bottom of the outer cylinder 2, which are used to squeeze the soil in the blind area to the large cutter head 122 when the equipment sinks downward for excavation, so as to facilitate the cutting of the large cutter head and make the cutting more complete.
[0073] like Figure 8 As shown, the small blade disc power assembly 17 and several large blade disc power assemblies 18 are respectively installed inside the casing 11 through a mounting seat 171 and several mounting seats 2 184, wherein the mounting seat 2 184 is welded to the inside of the casing, namely, the left outer casing 111 and the right outer casing 112, and the mounting seat 171 is detachably connected to the inside of the casing 11. In this embodiment, the detachable connection is achieved by bolt connection, thereby facilitating the disassembly and assembly of the left outer casing 111 and the right outer casing 112, saving the assembly time of the casing 11.
[0074] like Fig. 9 and Fig.10As shown, the grouting pipe 14 and the slag discharge pipe 13 are both provided with flexible connection joints, three-way joints, manually controlled switch valves, throttle valves, and pressure control devices. During construction, the grouting pressure, flow rate, and slag discharge pressure and displacement can be adjusted according to the on-site working conditions.
[0075] The grouting pipe 14 is a two-inlet and four-outlet type, that is, it includes two grouting inlets 141 located above the housing 11 and four grouting nozzles 142 evenly located at the bottom of the housing 11, and four pressure sensors 15 are provided and are respectively arranged near the four grouting nozzles 142, so as to monitor the pressure in the pressure balance chamber 3 in real time;
[0076] The slag discharge pipeline 13 is in the form of four channels and two channels, namely, four slag discharge inlets 131 evenly arranged at the bottom of the casing 11 and two slag discharge outlets 132 located above the casing 11 , and a blockage alarm device is also arranged in the slag discharge inlet 131 .
[0077] The above shows and describes the basic principles, main features and advantages of the present invention. It should be understood by those skilled in the art that the present invention is not limited to the above embodiments. Without departing from the spirit and scope of the present invention, the present invention may have various changes and improvements, which fall within the scope of the present invention. The scope of the present invention is defined by the attached claims and their equivalents.
Claims
1. A full-section vertical shield machine, characterized in that: The machine comprises a main machine (1), wherein the main machine (1) comprises a casing (11) and a digging assembly (12), wherein the digging assembly (12) is arranged at the bottom of the casing (11) and is used to rotate to cut soil layers; The host (1) further comprises: The slag discharge pipe (13) and the grouting pipe (14) are both arranged inside the casing (11) and have one end extending out of the top of the casing (11) and the other end penetrating the casing (11) and communicating with the bottom of the casing (11). A plurality of pressure sensors (15) are arranged at the bottom of the housing (11); An outer cylinder (2) is arranged outside the casing (11), a pipe joint installation groove (21) is provided on the top of the outer cylinder (2), and a bottom covers the outside of the excavation assembly (12) and forms a pressure balance chamber (3) with the bottom of the casing (11); The excavation assembly (12) comprises a small cutter disc (121) arranged at the bottom center of the housing (11) and a plurality of large cutter discs (122) arranged around the small cutter disc (121); a small cutter disc power assembly (17) and a plurality of large cutter disc power assemblies (18) for driving the small cutter disc (121) and the plurality of large cutter discs (122) to rotate are also arranged inside the housing (11); A plurality of scrapers (123) are arranged on the large blade disc (122) and the small blade disc (121), and a sharp-angled knife (124) is provided at the center of each blade disc, wherein the small blade disc (121) is a spoke-shaped blade disc, half of the large blade disc (122) is spoke-shaped and the other half is disc-shaped, and the length of the spoke-shaped portion of the large blade disc (122) is greater than the radius length of the disc-shaped portion.
2. A full-section vertical shield machine according to claim 1, characterized in that: The casing (11) and the outer cylinder (2) are detachably connected.
3. A full-section vertical shield machine according to claim 2, characterized in that: A plurality of hydraulic lateral jacking devices (4) are arranged inside the casing (11), and the hydraulic lateral jacking devices (4) include a hydraulic cylinder (42), an output end of the hydraulic cylinder (42) being hingedly connected to a tapered pin shaft (43) that slides laterally on a side wall of the casing (11), and a steel pipe (25) is welded inside the outer cylinder (2) to form a pin hole (251) for the tapered pin shaft (43) to be inserted into.
4. A full-section vertical shield machine according to claim 1, characterized in that: The small blade disc power assembly (17) and the large blade disc power assembly (18) are respectively mounted inside the casing (11) via a first mounting seat (171) and a second mounting seat (184), wherein the first mounting seat (171) is detachably connected to the inside of the casing (11).
5. A full-section vertical shield machine according to claim 1, characterized in that: A plurality of elastic support members (125) are provided on a surface of the large blade disc (122) facing the housing (11).
6. A full-section vertical shield machine according to claim 1, characterized in that: The casing (11) is composed of a left outer shell (111) and a right outer shell (112) which are detachably connected via a plurality of bolts.
7. A full-section vertical shield machine according to claim 1, characterized in that: The bottom of the outer cylinder (2) is provided with a plurality of sunken cutting edges (27) with a V-shaped cross section.
8. A full-section vertical shield machine according to claim 1, characterized in that: A plurality of U-shaped thixotropic mud pipes (26) penetrate the upper portion of the outer cylinder (2).