A drilling equipment for building infrastructure construction
By introducing robotic arms, drill shafts and drive protection components into the drilling equipment for construction infrastructure, automatic correction and torque protection of drill bits are achieved, the problems of drill hole tilt and drill bit damage are solved, and the overall service life and construction efficiency of the equipment are improved .
Patent Information
- Application Number
- CN202411107064.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-13
- Publication Date
- 2024-11-15
- Estimated Expiration
- 2044-08-13
AI Technical Summary
Existing construction drilling equipment is prone to inclination during the drilling process, and the drill bit is easily damaged when encountering hard objects, resulting in a shortened service life and high maintenance costs.
A construction drilling equipment for construction infrastructure including a robotic arm, a drill shaft, a drive protection component and a balance compensation device is designed. The automatic correction of the drill bit is achieved through the balance compensation device, and the drive protection component is used to prevent excessive torque when the drill shaft rotates. Protect drill bits and motors.
Effectively avoid drilling inclination, extend the service life of the drill bit and motor, and reduce repair and replacement costs.
Smart Images

Figure CN118622171B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of building construction drilling, in particular to a building infrastructure construction drilling device. Background Art
[0002] Construction drilling refers to the process of using a drilling machine to drill holes in the ground, walls or buildings in construction projects. Drilling is one of the important processes in construction and is often used in geological exploration, foundation engineering, building structures, equipment installation, and decoration projects; construction drilling requires the use of professional drilling machines and tools and is operated in accordance with relevant specifications and standards to ensure construction quality and safety.
[0003] At present, in the process of ground drilling, many people use a direct drilling method of a drilling machine to drill holes, and the drilling device for construction includes a motor assembly and a drill bit. Generally, a motor is used to control the rotation of the drill bit to penetrate the ground. However, in this method, firstly, the drill bit is very easy to tilt when drilling, resulting in the hole position being tilted, affecting the later construction. Moreover, when the drill bit is drilling, when encountering a harder object, the drill bit is very easy to break and damage, affecting the service life of the drill bit, resulting in a high cost for later drill bit maintenance and replacement. Therefore, a construction infrastructure construction drilling equipment is proposed to solve the above-mentioned problems. Summary of the invention
[0004] In view of the deficiencies in the prior art, the present invention provides a drilling device for building infrastructure construction, which solves the problem that in the prior art, when drilling for construction, the drilling method is too single, which causes the drill hole to be easily tilted and cannot be corrected. At the same time, the degree of wear of the drill bit is high. When dealing with some harder objects in the soil, the drill bit still drills deep, which causes the drill bit to be worn or damaged more, thereby reducing its service life.
[0005] To achieve the above-mentioned purpose, the present invention provides the following technical solutions: a drilling device for building infrastructure construction, comprising a mechanical arm; a drill shaft; a drive protection assembly, which is used to drive the rotation of the drill shaft and also can provide torque protection for the drill shaft; a drill bit assembly, which is used to perform rotational drilling on the ground; the drive protection assembly drives the drill shaft and then drives the drill bit assembly to perform rotational drilling; a connecting sleeve is connected to the drill shaft, and a balancing compensation device is provided inside the connecting sleeve, which is used to automatically calibrate the drilling angle of the drill bit assembly.
[0006] Preferably, the drill bit assembly includes a drill seat, a plurality of drill cones are rotatably connected to the bottom of the drill seat, a connecting shaft is connected to the interior of the drill seat, and blades are arranged on the surface of the connecting shaft.
[0007] Preferably, the blade is spiral-shaped, and a discharge groove is provided on the drill seat, and the top of the drill seat is connected to the connecting sleeve.
[0008] Preferably, a movable part is provided at one end of the drill shaft, and the movable part includes a ball seat, one side of the ball seat is connected to the drill shaft, a plurality of ball grooves are provided on the surface of the ball seat and the inner wall of the connecting sleeve, and a sliding ball is slidably connected inside the ball groove.
[0009] Preferably, the balance compensation device includes a support rod, one end of which is connected to a top ball, the other end of which is connected to a heavy ball sinker, the inner side of the drill seat is connected to a ring, the heavy ball sinker is located at the center of the ring, the surface of the center ball is movably connected to a ball sleeve, and the ball sleeve is fixed on the connecting sleeve.
[0010] Preferably, the bottom of the ball seat is slidably connected to a sliding shaft, one end of the sliding shaft is connected to a striker rod, the other end of the sliding shaft is connected to a compression spring, and the surface of the striker rod abuts against the surface of the top ball.
[0011] Preferably, the drive protection assembly includes a drive motor, the output end of the drive motor is connected to a drive gear, the surface of the drive gear is meshed with a transmission gear, the transmission gear is connected to a drive sleeve, and the drive sleeve is connected to the drill shaft through a protective device.
[0012] Preferably, the protection device includes an inserted shaft, one end of the inserted shaft is located in a slot opened on the drill shaft, the surface of the inserted shaft is slidably connected with a slider, the slider is arranged inside a driving sleeve, the surface of the inserted shaft is sleeved with a resistance spring, the surface of the inserted shaft is slidably connected with a synchronous sleeve, the resistance spring is located between the synchronous sleeve and the driving sleeve, the driving sleeve is connected with an extrusion block, the inserted shaft is connected with a disc, and the disc is slidably connected to the extrusion block.
[0013] Preferably, the surface of the plug shaft is provided with teeth, a pinion is meshed on the teeth, the pinion is connected to a pointer via a shaft, the surface of the shaft is rotatably connected to a torsion plate, and the torsion plate is connected to a synchronous sleeve.
[0014] Compared with the prior art, the present invention provides a drilling device for building infrastructure construction, which has the following beneficial effects:
[0015] 1. The construction drilling equipment for building infrastructure can provide a reset correction force when the drill bit is offset according to the vertical downward process of the center of gravity through the set balance compensation device, so that the drill bit is at an offset angle and the vertical gravity of the heavy ball sinker is used to compensate for the offset of the drill bit assembly. Because the drill bit will definitely vibrate in the process of drilling, and the heavy ball sinker will continuously knock and impact the drill bit assembly during the vibration process, so that it can be corrected and reset, thereby realizing automatic shock correction of the drill bit assembly when drilling and ensuring the verticality of the drill hole.
[0016] 2. The construction drilling equipment for building infrastructure can achieve torque protection when the drill shaft rotates through the protection device. Because the drill bit assembly encounters a hard object during drilling, the operator cannot see it and stop the machine in time, so he can only perform autonomous drilling. However, when the drill shaft rotates and encounters resistance from a hard object, the drive element and the drill shaft are controlled to disengage according to the size of the resistance. This can protect the drill bit while also protecting the drive element, avoiding damage to the motor and drill bit, and increasing the overall service life of the equipment. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] Figure 1 This is a schematic diagram of the overall structure of a construction infrastructure drilling device proposed by the present invention;
[0018] Figure 2 A schematic diagram of the structure of a drill bit assembly of a building infrastructure construction drilling device proposed by the present invention;
[0019] Figure 3 A schematic diagram of the drill seat structure of a building infrastructure construction drilling device proposed by the present invention;
[0020] Figure 4 A schematic diagram of the structure of a movable base of a construction infrastructure drilling device proposed by the present invention;
[0021] Figure 5 This is a structural schematic diagram of a balance compensation device for a building infrastructure construction drilling equipment proposed by the present invention;
[0022] Figure 6 This is a schematic diagram of the structure of a driving protection component of a building infrastructure construction drilling equipment proposed by the present invention;
[0023] Figure 7 A schematic diagram of a torsion plate connection structure of a construction infrastructure drilling device proposed by the present invention;
[0024] Figure 8 This is a schematic diagram of the structure of a driving sleeve of a building infrastructure construction drilling device proposed by the present invention.
[0025] In the figure: 1. mechanical arm; 2. drill shaft; 201. ball groove; 202. ball seat; 203. sliding ball; 204. center ball; 205. heavy ball sinker; 206. ring; 207. top ball; 208. support rod; 209. striker; 210. sliding shaft; 211. extrusion spring; 212. ball sleeve; 3. connecting sleeve; 4. drill bit assembly; 401. drill seat; 402. drill cone; 403. connecting shaft; 404. blade; 405. discharge chute; 5. drive protection assembly; 501. drive motor; 502. drive gear; 503. transmission gear; 504. drive sleeve; 505. slot; 506. plug shaft; 507. slider; 508. extrusion block; 509. resistance spring; 510. synchronous sleeve; 511. torque plate; 512. pointer; 513. pinion. DETAILED DESCRIPTION
[0026] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0027] See also Figure 1-Figure 8 A drilling device for building infrastructure construction includes a mechanical arm 1; a drill shaft 2; a driving protection component 5, which is used to drive the rotation of the drill shaft 2 and also can provide torque protection for the drill shaft 2; a drill bit component 4, which is used to perform rotational drilling on the ground; the driving protection component 5 drives the drill shaft 2 and then drives the drill bit component 4 to perform rotational drilling; a connecting sleeve 3 is connected to the drill shaft 2, and a balancing compensation device is arranged inside the connecting sleeve 3, which is used to automatically calibrate the drilling angle of the drill bit component 4.
[0028] In this embodiment, please refer to Figure 2-Figure 3 The drill assembly 4 includes a drill seat 401, and a plurality of drill cones 402 are rotatably connected at the bottom of the drill seat 401. A connecting shaft 403 is connected inside the drill seat 401, and a blade 404 is arranged on the surface of the connecting shaft 403. The blade 404 is spiral, and a discharge groove 405 is provided on the drill seat 401. The top of the drill seat 401 is connected to the connecting sleeve 3. When the connecting sleeve 3 rotates, the drill seat 401 will be synchronously driven to rotate, and then the drill cone 402 at the bottom and the spiral blade 404 on the internal connecting shaft 403 will be driven to rotate, so as to realize the process of drilling. After that, the soil produced by the drilling will be squeezed to the position of the discharge groove 405 as the spiral blade 404 rotates and discharged to the top of the drill seat 401. When the drilling is completed in the later stage, the soil will be taken out as the drill assembly 4 is lifted.
[0029] For further information, see Figure 4A movable part is provided at one end of the drill shaft 2, and the movable part includes a ball seat 202, one side of the ball seat 202 is connected to the drill shaft 2, and a plurality of ball grooves 201 are provided on the surface of the ball seat 202 and the inner wall of the connecting sleeve 3, and a sliding ball 203 is slidably connected inside the ball groove 201. The connection between the ball seat 202 and the sliding ball 203 can be understood as a "universal joint" structure, which is mainly used to control the soft connection between the drill assembly 4 and the drill shaft 2, so as to avoid the connection between the drill assembly 4 and the drill shaft 2 being easily stressed and cracked when rigidly connected, resulting in a broken shaft.
[0030] For further information, see Figure 5 The balance compensation device includes a support rod 208, one end of the support rod 208 is connected to a top ball 207, the other end of the support rod 208 is connected to a heavy ball sinker 205, the inner side of the drill seat 401 is connected to a ring 206, the heavy ball sinker 205 is located at the center of the ring 206, and the surface of the center ball 204 is movably connected to a ball sleeve 212, which is fixed on the connecting sleeve 3. When the drill bit assembly 4 tilts to a certain degree during drilling, the connecting sleeve 3 will rotate toward the tilted direction, and then drive the drill seat 401 and the connecting sleeve 3 to deviate in direction, and the deviation of the connecting sleeve 3 will deviate with the heavy ball sinker 205, but the heavy ball sinker 205 is similar to a lead sinker, relying on its own gravity to move vertically downward, so the heavy ball sinker 205 will be automatically subject to gravity to provide correction and reset force.
[0031] Also, see Figure 5 The bottom of the ball seat 202 is slidably connected with a sliding shaft 210, one end of the sliding shaft 210 is connected with a striker 209, and the other end of the sliding shaft 210 is connected with an extrusion spring 211, and the surface of the striker 209 abuts against the surface of the top ball 207. Considering that the vibration force generated by the drill assembly 4 itself is small, the striker 209 is provided. When the drill shaft 2 keeps rotating, the striker 209 will be driven to rotate. If the drill assembly 4 deviates, the top ball 207 connected to it through the support rod 208 will deviate in the opposite direction. The entire deviating center is based on the central ball 204 as the moving point. Therefore, when the striker 209 rotates, it will contact the deviated top ball 207, and then extrudes it in the opposite direction, and adjusts the support rod 208 to make it in a vertical state.
[0032] In addition, see Figure 6-Figure 8The driving protection assembly 5 includes a driving motor 501, the output end of the driving motor 501 is connected to a driving gear 502, the surface of the driving gear 502 is meshed with a transmission gear 503, the transmission gear 503 is connected to a driving sleeve 504, the driving sleeve 504 is connected to the drill shaft 2 through a protection device, and the driving sleeve 504 is rotatably connected to the mechanical arm 1. By controlling the rotation of the driving motor 501, after the driving motor 501 rotates, the driving sleeve 504 is driven to rotate through the meshing of the gears, and the driving sleeve 504 will drive multiple plug-in shafts 506 to rotate, and the plug-in shafts 506 are inserted into the card slots 505 opened on the drill shaft 2, so they are in a card-engaged state at this time, so that the rotary drilling of the drill assembly 4 is indirectly controlled by linkage.
[0033] It is worth noting that see Figure 6-Figure 8 The protective device includes an insert shaft 506, one end of which is located in a slot 505 opened on the drill shaft 2, a slider 507 is slidably connected to the surface of the insert shaft 506, and the slider 507 is arranged inside the drive sleeve 504. A resistance spring 509 is sleeved on the surface of the insert shaft 506, and a synchronous sleeve 510 is slidably connected to the surface of the insert shaft 506. The resistance spring 509 is located between the synchronous sleeve 510 and the drive sleeve 504, an extrusion block 508 is connected to the drive sleeve 504, and a disc is connected to the insert shaft 506, and the disc is slidably connected to the extrusion block 508. When the bottom of the drill assembly 4 contacts a harder object, or encounters a greater resistance to rotation, when the drive sleeve 504 is difficult to drive the drill shaft 2 to rotate through the plug shaft 506, the drive sleeve 504 will continue to rotate a short distance, so that the extrusion block 508 contacts and squeezes the disc on the plug shaft 506, and then uses the sliding of the arc surface to push the plug shaft 506 to slide outward to squeeze the resistance spring 509, so that the plug shaft 506 will be separated from the slot 505 on the drill shaft 2, and the power will be separated. Therefore, the rotational torque is converted into a lateral movement force as a whole. When the torque value reaches a certain maximum value, the protection will be triggered to prevent the continuous rotation of the drill shaft 2 from causing damage to the drill assembly 4 and the high-load operation of the motor from being damaged.
[0034] It is worth mentioning that please refer to Figure 6-Figure 7 The surface of the plug shaft 506 is provided with teeth, and a pinion 513 is meshed on the teeth. The pinion 513 is connected to a pointer 512 through a shaft. The surface of the shaft is rotatably connected to a torsion plate 511, and the torsion plate 511 is connected to the synchronous sleeve 510. By providing the torsion plate 511, when the plug shaft 506 is subjected to resistance and moves laterally, the pinion 513 will be driven to rotate, and the rotation of the pinion 513 will drive the rotation of the pointer 512, thereby causing the pointer 512 to rotate on the torsion plate 511. At this time, the operator can directly check the torque applied to the drill shaft 2, which is convenient for the operator to stop the machine in time and protect the equipment.
[0035] Working principle: first, the entire mechanical arm 1 is installed on the construction machinery, and the movement of the construction machinery is used to drive the movement and drilling of the entire drilling equipment. When it moves to the desired drilling position, the verticality of the mechanical arm 1 is controlled, and then the rotation of the driving motor 501 is controlled. After the driving motor 501 rotates, the driving sleeve 504 is driven to rotate through the meshing of the gears. The driving sleeve 504 will drive multiple plug-in shafts 506 to rotate, and the plug-in shafts 506 are inserted into the slots 505 opened on the drill shaft 2, so they are in a clamping state at this time. When the drill shaft 2 rotates, it can drive the ball seat 202 connected at the bottom to rotate, and when the ball seat 202 rotates, it drives the connecting sleeve 3 to rotate through the sliding ball 203. The connection method of the ball seat 202 and the sliding ball 203 can be understood as a "universal joint" structure, which mainly controls the soft connection between the drill assembly 4 and the drill shaft 2 to avoid the connection between the drill assembly 4 and the drill shaft 2 being easily stressed and cracked during rigid connection, resulting in a broken shaft. Afterwards, when the connecting sleeve 3 rotates, the drill seat 401 will be driven to rotate synchronously, and then the drill cone 402 at the bottom and the spiral blade 404 on the internal connecting shaft 403 will be driven to rotate, so as to realize the drilling process. Afterwards, the soil produced by the drilling will be squeezed to the position of the discharge trough 405 as the spiral blade 404 rotates and discharged to the top of the drill seat 401. When the drilling is completed at the later stage, the soil will be brought out as the drill bit assembly 4 is lifted. When the drill assembly 4 is tilted at a certain angle during drilling, the connecting sleeve 3 will rotate in the tilted direction, and then drive the drill seat 401 and the connecting sleeve 3 to deviate in direction, and the deviation of the connecting sleeve 3 will deviate with the heavy ball sinker 205, but the heavy ball sinker 205 is similar to a lead sinker, relying on its own gravity to move vertically downward, so the heavy ball sinker 205 will be automatically provided with a correction and reset force by gravity, and as the drill assembly 4 rotates, it will generate a certain vibration, so the heavy ball sinker 205 will continuously reset and shock the ring 206, so that it can continuously perform automatic angle correction, and finally correct the drill assembly 4 to a vertical position, at which time the drill assembly 4 will be in a horizontal position relative to the heavy ball sinker 205. At the same time, considering that the vibration force generated by the drill assembly 4 itself is small, a striker 209 is provided. When it keeps rotating, it will drive the impact rod 209 to rotate. If the drill bit assembly 4 is offset, the top ball 207 connected to it through the support rod 208 will be offset in the opposite direction. The entire offset center is based on the central ball 204 as the movement point. Therefore, when the impact rod 209 rotates at this time, it will contact the offset top ball 207, and then squeeze it in the opposite direction, and adjust the support rod 208 to make it in a vertical state. After contact, the extrusion force of the top ball 207 will drive the sliding shaft 210 to slide inside the ball seat 202, and then squeeze the extrusion spring 211. Therefore, at this time, the ball seat 202 will contact and squeeze the offset top ball 207 every time it rotates one circle, and adjust it. Finally, the adjustment force is transmitted to the drill seat 401 through the support rod 208, the heavy ball sinker 205, and the ring 206 to achieve correction compensation.When the bottom of the drill assembly 4 contacts a harder object or is subjected to a greater resistance to rotation, the rotational force on the drive sleeve 504 remains unchanged. When it is difficult for the drive sleeve 504 to drive the drill shaft 2 to rotate through the plug shaft 506, the drive sleeve 504 will continue to rotate a short distance, so that the extrusion block 508 contacts and squeezes the disc on the plug shaft 506, and then uses the sliding of the arc surface to push the plug shaft 506 to slide outward to squeeze the resistance spring 509, so that the plug shaft 506 will be out of the groove 505 on the drill shaft 2, thereby realizing power disengagement. At this time, the continued rotation of the drive sleeve 504 will be in a state of giving way to the drill shaft 2 and will no longer continue to push the rotation of the drill shaft 2. Therefore, the drill assembly 4 will also stop rotating, and the continued rotation of the drive motor 501 will not be affected, which can implement resistance protection for the drill assembly 4 and load protection for the motor, thereby avoiding damage to the drill assembly 4 and the motor, thereby improving the overall service life of the equipment. At the same time, a torque plate 511 is provided. When the insertion shaft 506 moves sideways due to resistance, the small gear 513 will be driven to rotate. The rotation of the small gear 513 will drive the rotation of the pointer 512, thereby causing the pointer 512 to rotate on the torque plate 511. The operator can directly check the torque applied to the drill shaft 2 at this time, so that the operator can stop the machine in time to protect the equipment.
[0036] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions, the elements defined by the sentence "comprise a ..." do not exclude the existence of other identical elements in the process, method, article or device including the elements.
Claims
1. A drilling device for building infrastructure construction, characterized in that: include Robotic arm (1); Drill shaft (2); A drive protection component (5) is used to drive the rotation of the drill shaft (2) and to provide torque protection for the drill shaft (2); A drill bit assembly (4) for rotary drilling of the ground; The driving protection component (5) drives the drill shaft (2) and thereby drives the drill bit component (4) to perform rotational drilling; The drill shaft (2) is connected to a connecting sleeve (3), and a balancing compensation device is provided inside the connecting sleeve (3) for automatically calibrating the drilling angle of the drill bit assembly (4); The drill bit assembly (4) comprises a drill seat (401), a plurality of drill cones (402) are rotatably connected to the bottom of the drill seat (401), a connecting shaft (403) is connected inside the drill seat (401), and blades (404) are arranged on the surface of the connecting shaft (403); A movable part is provided at one end of the drill shaft (2), the movable part comprising a ball seat (202), one side of the ball seat (202) is connected to the drill shaft (2), a plurality of ball grooves (201) are provided on the surface of the ball seat (202) and the inner wall of the connecting sleeve (3), and a sliding ball (203) is slidably connected inside the ball groove (201); The balance compensation device comprises a support rod (208), one end of the support rod (208) is connected to a top ball (207), the other end of the support rod (208) is connected to a heavy ball sinker (205), the middle of the support rod (208) is connected to a center ball (204), the inner side of the drill seat (401) is connected to a circular ring (206), the heavy ball sinker (205) is located at the center of the circular ring (206), and the surface of the center ball (204) is movably connected to a ball sleeve (212), and the ball sleeve (212) is fixed on the connecting sleeve (3).
2. A construction and infrastructure drilling device according to claim 1, characterized in that: The blade (404) is spiral-shaped, and a discharge groove (405) is provided on the drill seat (401). The top of the drill seat (401) is connected to the connecting sleeve (3).
3. A construction drilling equipment according to claim 1, characterized in that: The bottom of the ball seat (202) is slidably connected to a sliding shaft (210), one end of the sliding shaft (210) is connected to a striking rod (209), the other end of the sliding shaft (210) is connected to a pressing spring (211), and the surface of the striking rod (209) abuts against the surface of the top ball (207).
4. A construction drilling device for building infrastructure according to claim 3, characterized in that: The driving protection assembly (5) comprises a driving motor (501), the output end of the driving motor (501) is connected to a driving gear (502), the surface of the driving gear (502) is meshed with a transmission gear (503), the transmission gear (503) is connected to a driving sleeve (504), the driving sleeve (504) is connected to the drill shaft (2) via a protection device, and the driving sleeve (504) is rotatably connected to the mechanical arm (1).
5. A construction and infrastructure drilling device according to claim 4, characterized in that: The protection device comprises an insert shaft (506), one end of the insert shaft (506) is located in a slot (505) provided on the drill shaft (2), a sliding block (507) is slidably connected to the surface of the insert shaft (506), the sliding block (507) is arranged inside the driving sleeve (504), a resistance spring (509) is sleeved on the surface of the insert shaft (506), a synchronous sleeve (510) is slidably connected to the surface of the insert shaft (506), the resistance spring (509) is located between the synchronous sleeve (510) and the driving sleeve (504), an extrusion block (508) is connected to the driving sleeve (504), and a disc is connected to the insert shaft (506), and the disc is slidably connected to the extrusion block (508).
6. A construction and infrastructure drilling device according to claim 5, characterized in that: The surface of the plug shaft (506) is provided with teeth, a pinion (513) is meshed on the teeth, the pinion (513) is connected to a pointer (512) via a shaft, the surface of the shaft is rotatably connected to a torsion plate (511), and the torsion plate (511) is connected to a synchronous sleeve (510).
