A circuit board load test fixture suitable for energy storage converter and its use method
By designing a hardware tooling solution that includes components such as communication board, touch screen, indicator light, AC/DC module, and other components, a separate load test of the AC filter board and inverter board in the energy storage converter is realized, and the existing solutions are solved The problem of being unable to test separately in the technology increases the yield of energy storage converters and reduces production costs.
Patent Information
- Application Number
- CN202411095377.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-12
- Publication Date
- 2024-12-06
- Estimated Expiration
- 2044-08-12
AI Technical Summary
The existing energy storage converter circuit board test solution cannot carry out load testing of AC filter board and inverter board separately, resulting in high failure rate and cumbersome disassembly and assembly, which increases production costs.
A hardware tooling solution including a communication board, a touch screen, an indicator light, an AC/DC module, a switching power supply, an oscilloscope, a multiple reactor and a number of cables is designed. Through the communication connection of these components, the AC filter plate can be individually matched. The inverter plate is subjected to load testing, and the oscilloscope is used to display the waveform and amplitude of the given current to achieve the test conclusion.
This solution allows trouble detection before the energy storage converter is installed, reduces the disassembly and assembly process of the whole machine, improves the yield rate and reduces production costs. It also has convenient circuit board installation/disassembly, low hardware cost, convenient debugging, low probability of false detection and Advantages of low maintenance cost.
Smart Images

Figure CN118625108B_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of energy storage converter testing, and in particular relates to a circuit board load testing tool suitable for an energy storage converter and a use method thereof. Background Art
[0002] In order to achieve the dual carbon goals (i.e. carbon peak and carbon neutrality), low-carbon green energy is being vigorously developed at this stage. As an important component of low-carbon energy, energy storage systems are widely used. Energy storage inverters are a topic that can never be avoided in energy storage systems. Due to the limited internal space of energy storage inverters, circuit boards such as AC filter boards and inverter boards are stacked.
[0003] At present, in the mainstream energy storage inverter circuit board testing scheme, the AC filter board and the inverter board are usually installed inside the energy storage inverter before a systematic test is performed. During the test, the inverter board may fail, causing the entire energy storage inverter to be disassembled to replace the inverter board. Therefore, the existing energy storage inverter circuit board testing scheme cannot perform load testing on the AC filter board and the inverter board separately, which will greatly increase the production cost during the actual installation process due to a certain failure rate of the circuit board and the cumbersome disassembly and assembly process. Summary of the invention
[0004] The purpose of the present invention is to provide a circuit board load test tool suitable for an energy storage inverter and a method of using the same, so as to solve the problem that the existing circuit board test scheme for the energy storage inverter is unable to perform load tests on the AC filter board and the inverter board separately, which will result in a significant increase in production costs during the actual installation process due to a certain failure rate of the circuit board and complicated disassembly and assembly procedures.
[0005] In order to achieve the above object, the present invention adopts the following technical solutions:
[0006] In a first aspect, a circuit board load test fixture suitable for an energy storage converter is provided, comprising a communication board, a touch screen, an indicator light, an AC / DC module, a switching power supply, an oscilloscope, a first reactor, a second reactor, a third reactor, a first cable, a second cable, a third cable, a fourth cable, a fifth cable, a sixth cable, a seventh cable, an eighth cable, a ninth cable, a tenth cable, an eleventh cable, a twelfth cable, a thirteenth cable, a fourteenth cable, a fifteenth cable, a sixteenth cable, a seventeenth cable, an eighteenth cable, a nineteenth cable, a twentieth cable, and a twenty-first cable, wherein the communication board is electrically connected to the touch screen;
[0007] One end of the first reactor is electrically connected to one end of the first cable, the other end of the first reactor is electrically connected to one end of the second cable, the other end of the first cable is used to electrically connect to the U-phase input terminal of the AC filter board to be tested of the energy storage converter, and the other end of the second cable is used to electrically connect to the U-phase output terminal of the inverter board to be tested of the energy storage converter;
[0008] One end of the second reactor is electrically connected to one end of the third cable, the other end of the second reactor is electrically connected to one end of the fourth cable, the other end of the third cable is used to electrically connect to the V-phase input terminal of the AC filter board to be tested, and the other end of the fourth cable is used to electrically connect to the V-phase output terminal of the inverter board to be tested;
[0009] One end of the third reactor is electrically connected to one end of the fifth cable, the other end of the third reactor is electrically connected to one end of the sixth cable, the other end of the fifth cable is used to electrically connect to the W-phase input terminal of the AC filter board to be tested, and the other end of the sixth cable is used to electrically connect to the W-phase output terminal of the inverter board to be tested;
[0010] One end of the seventh cable is used to electrically connect the BUS+ terminal of the AC filter board to be tested, and the other end of the seventh cable is used to electrically connect the BUS+ terminal of the inverter board to be tested;
[0011] One end of the eighth cable is used to electrically connect the BUS-terminal of the AC filter board to be tested, and the other end of the eighth cable is used to electrically connect the BUS-terminal of the inverter board to be tested;
[0012] One end of the ninth cable is used to electrically connect the BUS_M terminal of the AC filter board to be tested, and the other end of the ninth cable is used to electrically connect the BUS_M terminal of the inverter board to be tested;
[0013] One end of the tenth cable is used to electrically connect the power supply output terminal of the AC filter board to be tested, and the other end of the tenth cable is used to electrically connect the power supply input terminal of the inverter board to be tested;
[0014] One end of the eleventh cable is used to electrically connect to the control output terminal of the AC filter board to be tested, and the other end of the eleventh cable is used to electrically connect to the control input terminal of the inverter board to be tested;
[0015] One end of the twelfth cable is used to electrically connect to the communication terminal of the AC filter board to be tested, and the other end of the twelfth cable is electrically connected to the communication terminal of the communication board;
[0016] One end of the thirteenth cable is used to electrically connect to the first power supply terminal of the AC filter board to be tested, and the other end of the thirteenth cable is electrically connected to the power supply terminal of the communication board;
[0017] One end of the fourteenth cable is used to electrically connect to the second power supply terminal of the AC filter board to be tested, and the other end of the fourteenth cable is electrically connected to the power supply terminal of the touch screen;
[0018] One end of the fifteenth cable is used to electrically connect to the third power supply terminal of the AC filter board to be tested, and the other end of the fifteenth cable is electrically connected to the power supply end of the indicator light;
[0019] One end of the sixteenth cable is used to electrically connect to the positive power supply terminal of the AC filter board to be tested, and the other end of the sixteenth cable is electrically connected to the DC positive output terminal of the AC / DC module;
[0020] One end of the seventeenth cable is used to electrically connect to the negative power supply terminal of the AC filter board to be tested, and the other end of the sixteenth cable is electrically connected to the negative DC output terminal of the AC / DC module;
[0021] One end of the eighteenth cable is used to electrically connect the U-phase output terminal of the AC filter board to be tested, and the other end of the eighteenth cable is used to electrically connect the V-phase output terminal of the AC filter board to be tested;
[0022] One end of the nineteenth cable is used to electrically connect the W-phase output terminal of the AC filter board to be tested, and one end of the nineteenth cable is used to electrically connect the U-phase output terminal of the AC filter board to be tested or the V-phase output terminal of the AC filter board to be tested;
[0023] One end of the 20th cable is used to electrically connect to the positive power supply terminal of the inverter board to be tested, and the other end of the 20th cable is electrically connected to the DC positive output terminal of the switching power supply;
[0024] One end of the 21st cable is used to electrically connect to the negative power supply terminal of the inverter board to be tested, and the other end of the 21st cable is electrically connected to the negative DC output terminal of the switching power supply;
[0025] The oscilloscope has three current probes which are respectively disposed on the first cable, the third cable and the fifth cable in a one-to-one correspondence.
[0026] Based on the above invention content, a hardware tooling solution is provided that can perform load testing on an AC filter board and an inverter board separately, that is, it includes a communication board, a touch screen, an indicator light, an AC / DC module, a switching power supply, an oscilloscope, multiple reactors and multiple cables. Through their communication connection relationship, after using all cables to electrically connect the AC filter board to be tested and the inverter board to be tested, it can respond to the operation of the tester to control the given current of the inverter board to be tested through the AC filter board to be tested, and use the oscilloscope to display the waveform and amplitude of the given current so as to manually obtain the load test conclusion. In this way, the tester can achieve the purpose of performing load testing on the AC filter board and the inverter board separately, which is beneficial to find a faulty inverter board or AC filter board before the energy storage inverter is installed, reduce the subsequent whole machine disassembly and assembly process, and thus improve the yield of the energy storage inverter, and reduce the production cost, which is convenient for practical application and promotion.
[0027] In a possible design, it also includes a mains power interface, a second double-pole double-throw switch, a slow-start resistor and a transformer, wherein the mains power interface, the second double-pole double-throw switch, the transformer and the AC / DC module are electrically connected in sequence, and the two ends of the slow-start resistor are electrically connected to the two ends of the live wire switch branch of the second double-pole double-throw switch in a one-to-one correspondence.
[0028] In a possible design, it also includes a mains power interface and a third double-pole double-throw switch, wherein the mains power interface, the third double-pole double-throw switch and the switching power supply are electrically connected in sequence.
[0029] In a possible design, a first double-pole double-throw switch is also included, wherein the first double-pole double-throw switch is connected in series between the mains interface and the second double-pole double-throw switch or the third double-pole double-throw switch.
[0030] In a possible design, a fourth double-pole double-throw switch and a third resistor are also included, wherein two ends of the first switch branch of the fourth double-pole double-throw switch are electrically connected to one end of the third resistor and the DC positive output terminal of the AC / DC module in a one-to-one correspondence, and two ends of the second switch branch of the fourth double-pole double-throw switch are electrically connected to the other end of the third resistor and the DC negative output terminal of the AC / DC module in a one-to-one correspondence.
[0031] In a possible design, a fifth double-pole double-throw switch and a second resistor are also included, wherein the two ends of the first switch branch of the fifth double-pole double-throw switch are electrically connected to one end of the second resistor and the DC positive output terminal of the switching power supply respectively and one-to-one, and the two ends of the second switch branch of the fifth double-pole double-throw switch are electrically connected to the other end of the second resistor and the DC negative output terminal of the switching power supply respectively and one-to-one.
[0032] In a possible design, the cabinet is further included in which the communication board, the touch screen, the AC / DC module, the switching power supply and the oscilloscope are built-in, wherein the display surface of the touch screen and the display surface of the oscilloscope are respectively embedded in the upper area of the main viewing surface of the cabinet, and the indicator light is arranged on the top of the cabinet.
[0033] In a possible design, two ear plates are extended one by one on the left and right sides of the cabinet, wherein one of the two ear plates is used to detachably support the inverter board to be tested, and the other ear plate of the two ear plates is used to detachably support the AC filter board to be tested.
[0034] In one possible design, an alligator clip is used at the end to be connected of each of the first cable, the second cable, the third cable, the fourth cable, the fifth cable, the sixth cable, the seventh cable, the eighth cable, the ninth cable, the tenth cable, the eleventh cable, the twelfth cable, the thirteenth cable, the fourteenth cable, the fifteenth cable, the sixteenth cable, the seventeenth cable, the eighteenth cable, the nineteenth cable, the twentieth cable and the twenty-first cable, wherein the end to be connected refers to one end of the cable used to electrically connect the AC filter board to be tested or the inverter board to be tested.
[0035] In a possible design, a fuse is connected in series to the AC live wire input terminal of the AC / DC module and / or the DC positive output terminal of the switching power supply.
[0036] In a second aspect, there is also provided a method for using the circuit board load test fixture as described in the first aspect or any possible design of the first aspect, comprising:
[0037] Use all cables in the circuit board load test fixture to electrically connect the AC filter board to be tested and the inverter board to be tested;
[0038] Powering on the AC filter board to be tested, the inverter board to be tested, and the oscilloscope in the circuit board load test fixture;
[0039] After waiting for the indicator light and the touch screen in the circuit board load test fixture to light up, click the start button on the touch screen to start the load test task of the AC filter board to be tested and the inverter board to be tested: control the inverter board to be tested to output a given current through the AC filter board to be tested, and display the current waveform and amplitude of the given current on the oscilloscope, so as to manually check whether the displayed content is consistent with the target content of the given current, and then obtain the load test conclusion of the AC filter board to be tested and the inverter board to be tested;
[0040] After obtaining the load test conclusions for the AC filter board to be tested and the inverter board to be tested, clicking an end button on the touch screen to end the load test task;
[0041] After waiting for the current amplitude displayed on the oscilloscope to return to zero, the AC filter board to be tested and the inverter board to be tested are powered off.
[0042] In a possible design, when the circuit board load test fixture further includes a fourth double-pole double-throw switch and a third resistor, after the AC filter board to be tested and the inverter board to be tested are powered off, the method further includes:
[0043] closing the fourth double-pole double-throw switch;
[0044] After the switch is closed, when waiting for a first preset time, disconnecting the fourth double-pole double-throw switch;
[0045] And / or, when the circuit board load test fixture further includes a fifth double-pole double-throw switch and a second resistor, after powering off the AC filter board to be tested and the inverter board to be tested, the method further includes:
[0046] closing the fifth double-pole double-throw switch;
[0047] After the switch is closed, the fifth double-pole double-throw switch is opened after waiting for a second preset time.
[0048] Beneficial effects of the above scheme:
[0049] (1) The present invention creatively provides a hardware tooling solution that can perform load testing on an AC filter board and an inverter board separately, that is, it includes a communication board, a touch screen, an indicator light, an AC / DC module, a switching power supply, an oscilloscope, multiple reactors and multiple cables. Through their communication connection relationship, after all cables are used to electrically connect the AC filter board to be tested and the inverter board to be tested, the given current of the inverter board to be tested can be controlled by the AC filter board to be tested in response to the operation of the tester, and the waveform and amplitude of the given current can be displayed using an oscilloscope so as to manually obtain the load test conclusion. In this way, the tester can achieve the purpose of performing load testing on the AC filter board and the inverter board separately, which is conducive to finding a faulty inverter board or AC filter board before the energy storage inverter is installed, reducing the subsequent whole machine disassembly and assembly process, thereby improving the yield rate of the energy storage inverter and reducing the production cost;
[0050] (2) The entire tooling solution also has the advantages of easy installation / disassembly of circuit boards, low hardware cost, easy debugging, low probability of false detection and low maintenance cost, which is convenient for practical application and promotion. BRIEF DESCRIPTION OF THE DRAWINGS
[0051] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0052] Figure 1 A schematic diagram of the application circuit structure of a circuit board load test fixture suitable for an energy storage converter provided in an embodiment of the present application.
[0053] Figure 2 A schematic diagram of the connection relationship between multiple switches, AC / DC modules and switching power supplies in a circuit board load test fixture provided in an embodiment of the present application.
[0054] Figure 3 A schematic diagram of the vertical structure of a cabinet in a circuit board load test fixture provided in an embodiment of the present application.
[0055] Figure 4 A schematic diagram of the top view of the cabinet in the circuit board load test fixture provided in an embodiment of the present application.
[0056] In the above drawings: L1-first cable; L2-second cable; L3-third cable; L4-fourth cable; L5-fifth cable; L6-sixth cable; L7-seventh cable; L8-eighth cable; L9-ninth cable; L10-tenth cable; L11-eleventh cable; L12-twelfth cable; L13-thirteenth cable; L14-fourteenth cable; L15-fifteenth cable; L16-sixteenth cable; L17-seventeenth cable; L18-eighteenth cable; L19-nineteenth cable; L20-twentieth cable; L21-twenty-first cable; 201-display surface of touch screen; 3-indicator light; 601-display surface of oscilloscope; 700-ear plate; 800-AC filter board to be tested; 900-inverter board to be tested. DETAILED DESCRIPTION
[0057] In order to more clearly illustrate the technical solutions in the embodiments of the present invention or the prior art, the present invention will be briefly introduced below in combination with the drawings and the description of the embodiments or the prior art. Obviously, the following description of the structures of the drawings is only some embodiments of the present invention. For ordinary technicians in this field, other embodiments can be obtained based on these embodiments without creative work. It should be noted that the description of these embodiments is used to help understand the present invention, but does not constitute a limitation of the present invention.
[0058] It should be understood that although the terms first and second, etc. may be used herein to describe various objects, these objects should not be limited by these terms. These terms are only used to distinguish one object from another object. For example, a first object can be referred to as a second object, and similarly, a second object can be referred to as a first object without departing from the scope of the exemplary embodiments of the present invention.
[0059] It should be understood that the term "and / or" that may appear in this document is merely a description of the association relationship between associated objects, indicating that there may be three relationships. For example, A and / or B can indicate three situations: A exists alone, B exists alone, or A and B exist at the same time. For another example, A, B and / or C can indicate the existence of any one of A, B and C or any combination of them. The term " / and" that may appear in this document describes another type of association object relationship, indicating that there may be two relationships. For example, A / and B can indicate two situations: A exists alone or A and B exist at the same time. In addition, the character " / " that may appear in this document generally indicates that the previous and next associated objects are in an "or" relationship.
[0060] Example
[0061] like Figure 1 to Figure 4 As shown, the circuit board load test fixture provided in this embodiment and suitable for the energy storage converter includes but is not limited to a communication board, a touch screen, an indicator light, an AC / DC module (i.e., a module for converting alternating current to direct current), a switching power supply, an oscilloscope, a first inductor, a second inductor, a third inductor, a first cable, a second cable, a third cable, a fourth cable, a fifth cable, a sixth cable, a seventh cable, an eighth cable, a ninth cable, a tenth cable, an eleventh cable, a twelfth cable, a thirteenth cable, a fourteenth cable, a fifteenth cable, a sixteenth cable, a seventeenth cable, an eighteenth cable, a nineteenth cable, a twentieth cable, and a twenty-first cable, etc., wherein the communication board is electrically connected to the touch screen.
[0062] One end of the first reactor is electrically connected to one end of the first cable, and the other end of the first reactor is electrically connected to one end of the second cable. The other end of the first cable is used to electrically connect to the U-phase input terminal J7 of the AC filter board to be tested of the energy storage converter, and the other end of the second cable is used to electrically connect to the U-phase output terminal J20 of the inverter board to be tested of the energy storage converter; one end of the second reactor is electrically connected to one end of the third cable, and the other end of the second reactor is electrically connected to one end of the fourth cable. The other end of the third cable is used to electrically connect to the V-phase input terminal J6 of the AC filter board to be tested, and the other end of the fourth cable is used to electrically connect to the V-phase output terminal J21 of the inverter board to be tested; one end of the third reactor is electrically connected to one end of the fifth cable, and the other end of the third reactor is electrically connected to one end of the sixth cable. The other end of the fifth cable is used to electrically connect to the W-phase input terminal J8 of the AC filter board to be tested, and the other end of the sixth cable is used to electrically connect to the W-phase output terminal J22 of the inverter board to be tested. The first cable, the second cable, the third cable, the fourth cable, the fifth cable and the sixth cable are used to enable the output current of the inverter board to be tested to reach and be input into the AC filter board to be tested during the test process, and the first reactor, the second reactor and the third reactor ( Figure 1 The three phases of the three-phase AC power are represented by a reactor in the figure) and are used to filter the transmission current to ensure the AC waveform display effect of the oscilloscope. In addition, the aforementioned U phase, V phase and W phase respectively represent the three phases of the three-phase AC power; the aforementioned AC filter board is used to filter the input three-phase AC power so that the waveform can be sent to the power grid or other electrical equipment after the burr phenomenon is eliminated.
[0063] One end of the seventh cable is used to electrically connect the BUS+ terminal J88 of the AC filter board to be tested, and the other end of the seventh cable is used to electrically connect the BUS+ terminal J13 of the inverter board to be tested; one end of the eighth cable is used to electrically connect the BUS- terminal J89 of the AC filter board to be tested, and the other end of the eighth cable is used to electrically connect the BUS- terminal J12 of the inverter board to be tested; one end of the ninth cable is used to electrically connect the BUS_M terminal J87 of the AC filter board to be tested, and the other end of the ninth cable is used to electrically connect the BUS_M terminal J15 of the inverter board to be tested; one end of the tenth cable is used to electrically connect the power supply output terminal J14 of the AC filter board to be tested, and the other end of the tenth cable is used to electrically connect the power supply input terminal J19 of the inverter board to be tested; one end of the eleventh cable is used to electrically connect the control output terminal J17 of the AC filter board to be tested, and the other end of the eleventh cable is used to electrically connect the control input terminal J23 of the inverter board to be tested. The aforementioned seventh cable, eighth cable, ninth cable, tenth cable and eleventh cable are used to establish other load relationships between the AC filter board to be tested and the inverter board to be tested, so as to carry out the circuit board load test normally. The aforementioned BUS+ terminal, BUS- terminal and BUS_M terminal are respectively the regular terminals of the existing inverter board and AC filter board, which are used to balance the voltage difference between the upper and lower capacitors on the inverter board (because the waveform output by the energy storage converter is a sine wave, which has both positive and negative half cycles. If there is a voltage difference between the upper and lower capacitors, the output waveform will also be biased upward or downward, that is, it will pass through 0 point but not at 0 point). The aforementioned power supply output terminal and power supply input terminal are respectively the regular terminals of the existing inverter board and AC filter board, which are used to realize the purpose of powering the inverter board by the AC filter board. The aforementioned control output terminal and control input terminal are respectively the regular terminals of the existing inverter board and AC filter board, which are used to realize the purpose of sending control signals from the AC filter board to the inverter board.
[0064] One end of the twelfth cable is used to electrically connect to the communication terminal J18 of the AC filter board to be tested, and the other end of the twelfth cable is electrically connected to the communication terminal of the communication board. The twelfth cable is used to ensure that the touch screen can communicate with the control circuit part on the AC filter board to be tested through the communication board during the test, so as to achieve the purpose of controlling the output current of the inverter board to be tested through the touch screen and completing the load test task.
[0065] One end of the thirteenth cable is used to electrically connect to the first power supply terminal J27 of the AC filter board to be tested, and the other end of the thirteenth cable is electrically connected to the power supply end of the communication board; one end of the fourteenth cable is used to electrically connect to the second power supply terminal J25 of the AC filter board to be tested, and the other end of the fourteenth cable is electrically connected to the power supply end of the touch screen; one end of the fifteenth cable is used to electrically connect to the third power supply terminal J24 of the AC filter board to be tested, and the other end of the fifteenth cable is electrically connected to the power supply end of the indicator light. The aforementioned thirteenth cable, fourteenth cable and fifteenth cable are used to realize the purpose of respectively supplying power to the communication board, the touch screen and the indicator light through the DC / DC circuit unit (i.e., a circuit unit for realizing DC boost / step-down) on the AC filter board to be tested, wherein the indicator light is used to light up to indicate that all control circuits are working normally.
[0066] One end of the sixteenth cable is used to electrically connect the positive power supply terminal J35 of the AC filter board to be tested, and the other end of the sixteenth cable is electrically connected to the DC positive output terminal of the AC / DC module; one end of the seventeenth cable is used to electrically connect the negative power supply terminal J36 of the AC filter board to be tested, and the other end of the sixteenth cable is electrically connected to the DC negative output terminal of the AC / DC module. The sixteenth cable and the seventeenth cable are used to realize the purpose of supplying power to the AC filter board to be tested through the AC / DC module, so as to carry out the circuit board load test normally, wherein the AC / DC module is used to convert AC power (e.g., 220V AC power) into the required DC power (e.g., 900V DC power) of the AC filter board to be tested.
[0067] One end of the eighteenth cable is used to electrically connect the U-phase output terminal J113 of the AC filter board to be tested, and the other end of the eighteenth cable is used to electrically connect the V-phase output terminal J112 of the AC filter board to be tested; one end of the nineteenth cable is used to electrically connect the W-phase output terminal J114 of the AC filter board to be tested, and one end of the nineteenth cable is used to electrically connect the U-phase output terminal J113 of the AC filter board to be tested or the V-phase output terminal J112 of the AC filter board to be tested. The seventeenth cable, the eighteenth cable and the nineteenth cable are used to achieve the purpose of short-circuiting the output side of the AC filter board to be tested, so as to carry out the circuit board load test normally. In addition, the aforementioned U-phase output terminal, V-phase output terminal and W-phase output terminal can be used as the output side terminal of the energy storage inverter (that is, the battery in the energy storage cabinet is discharged and transmitted to the power grid through the energy storage inverter), and can also be used as the input side terminal (that is, the power grid charges the battery in the energy storage cabinet through the energy storage inverter).
[0068] One end of the 20th cable is used to electrically connect the positive power supply terminal J5 of the inverter board to be tested, and the other end of the 20th cable is electrically connected to the DC positive output terminal of the switching power supply; one end of the 21st cable is used to electrically connect the negative power supply terminal J4 of the inverter board to be tested, and the other end of the 21st cable is electrically connected to the DC negative output terminal of the switching power supply. The 20th cable and the 21st cable are used to realize the purpose of supplying power to the inverter board to be tested through the switching power supply so as to perform the circuit board load test normally, wherein the switching power supply is used to convert AC power (e.g., 220V AC power) into the required DC power (e.g., 48V DC power) of the inverter board to be tested.
[0069] The oscilloscope has three current probes which are respectively disposed on the first cable, the third cable and the fifth cable in a one-to-one correspondence.
[0070] The working principle of the above-mentioned circuit board load test fixture is specifically but not limited to the following: when the circuit board load test is performed on the AC filter board to be tested and the inverter board to be tested, all the cables in the circuit board load test fixture are first used to electrically connect the AC filter board to be tested and the inverter board to be tested, so that the output side of the AC filter board to be tested is short-circuited, and the control circuit part of the AC filter board to be tested can control the actual output current of the inverter board to be tested (that is, the control circuit part on the AC filter board to be tested can control the inverter board to be tested, and the filter circuit part on the AC filter board to be tested can filter the output current of the inverter board to be tested). The output current of the inverter board to be tested is controlled by the operation button on the display surface of the touch screen to issue a command to the AC filter board to be tested, so as to achieve the purpose of controlling the inverter board to be tested by the AC filter board to be tested and making it emit current; when there is current, the current waveform and amplitude will be displayed on the oscilloscope, and then by analyzing the displayed waveform, it can be judged whether the circuit board is qualified. In addition, the aforementioned AC filter board to be tested and the inverter board to be tested need to be installed on the test tooling at the same time to ensure the normal operation of the tooling. Specifically, an inverter board that has been tested and found no problems and an untested AC filter board can be installed for testing, so as to test the AC filter board alone for any fault problem; or an AC filter board that has been tested and found no problems and an untested inverter board can be installed, so as to test the inverter board alone for any fault problem; or an untested inverter board and an untested AC filter board can be installed for testing, so as to test the combination of the inverter board and the AC filter board alone for any fault problem.
[0071] The method of using the aforementioned circuit board load test fixture specifically but not limited to includes the following steps S1 to S5.
[0072] S1. Use all cables in the circuit board load test fixture to electrically connect the AC filter board to be tested and the inverter board to be tested.
[0073] S2. Power on the AC filter board to be tested, the inverter board to be tested, and the oscilloscope in the circuit board load test fixture.
[0074] S3. After waiting for the indicator light and touch screen in the circuit board load test tooling to light up, click the start button on the touch screen to start the load test task of the AC filter board to be tested and the inverter board to be tested: control the inverter board to be tested to output a given current through the AC filter board to be tested, and display the current waveform and amplitude of the given current on the oscilloscope, so as to manually check whether the displayed content is consistent with the target content of the given current, and then obtain the load test conclusion of the AC filter board to be tested and the inverter board to be tested.
[0075] In step S3, the specific software technical means for controlling the inverter board to be tested to output a given current through the AC filter board to be tested can be obtained by referring to the conventional modification of the existing energy storage inverter circuit board test scheme, and will not be repeated here. The given current is an AC current, and its target content is specifically the current amplitude, which can be confirmed by clicking on the touch screen (for example, clicking the "20A" button on the touch screen to determine that the target current amplitude is 20A; clicking the "40A" button on the touch screen to determine that the target current amplitude is 40A; clicking the "60A" button on the touch screen to determine that the target current amplitude is 60A; etc.). In addition, if the manual verification shows that the displayed content is consistent with the target content of the given current, the load test conclusion may be that there is no problem with the test of the AC filter board to be tested and / or the inverter board to be tested, otherwise it is not.
[0076] S4. After obtaining the load test conclusions for the AC filter board to be tested and the inverter board to be tested, click an end button on the touch screen to end the load test task.
[0077] S5. After waiting for the current amplitude displayed on the oscilloscope to return to zero, power off the AC filter board to be tested and the inverter board to be tested.
[0078] Therefore, based on the detailed description of the aforementioned circuit board load test fixture and its use method, a hardware fixture solution is provided that can perform load testing on an AC filter board and an inverter board separately, that is, it includes a communication board, a touch screen, an indicator light, an AC / DC module, a switching power supply, an oscilloscope, multiple reactors and multiple cables. Through their communication connection relationship, after using all cables to electrically connect the AC filter board to be tested and the inverter board to be tested, it can respond to the operation of the tester to control the given current of the inverter board to be tested through the AC filter board to be tested, and use the oscilloscope to display the waveform and amplitude of the given current so as to manually obtain the load test conclusion. In this way, the tester can achieve the purpose of performing load testing on the AC filter board and the inverter board separately, which is beneficial to find a faulty inverter board or AC filter board before the energy storage inverter is installed, reduce the subsequent whole machine disassembly and assembly process, and thus improve the yield rate of the energy storage inverter, reduce the production cost, and facilitate practical application and promotion.
[0079] Preferably, it also includes a mains interface, a second double-pole double-throw switch K2, a slow-start resistor R1 and a transformer BK1, wherein the mains interface, the second double-pole double-throw switch K2, the transformer BK1 and the AC / DC module are electrically connected in sequence, and the two ends of the slow-start resistor R1 are electrically connected to the two ends of the live switch branch of the second double-pole double-throw switch K2 in a one-to-one correspondence. Figure 2 As shown, the mains interface is used to connect to the mains, such as an external 220V AC. The second double-pole double-throw switch K2 is used to facilitate the power-on and power-off operations of the AC filter board to be tested, which can be implemented by, but not limited to, existing air switch products. The transformer BK1 is used to achieve the purpose of boosting or reducing the voltage of the AC power so as to match the power supply voltage requirement of the AC filter board to be tested, which can be implemented by existing transformer products. In addition, the AC / DC module can be implemented by an existing rectifier circuit.
[0080] Preferably, it also includes a mains interface and a third double-pole double-throw switch K3, wherein the mains interface, the third double-pole double-throw switch K3 and the switch power supply are electrically connected in sequence. Figure 2 As shown, the third double-pole double-throw switch K3 is used to facilitate the power-on and power-off operations of the inverter board to be tested, which can be implemented by, but not limited to, existing air switch products. In addition, the switching power supply can be implemented by an existing switching power supply circuit.
[0081] Further preferably, a first double-pole double-throw switch K1 is further included, wherein the first double-pole double-throw switch K1 is connected in series between the mains interface and the second double-pole double-throw switch K2 or the third double-pole double-throw switch K3. Figure 2As shown, the first double-pole double-throw switch K1 is used together with the second double-pole double-throw switch K2 and the third double-pole double-throw switch K3 to realize the total power-on and total power-off operation of all electrical components outside the oscilloscope, which can be realized by using, but not limited to, existing air switch products. In addition, the power-on operation of the AC filter board to be tested and the inverter board to be tested is specifically, but not limited to, closing the first double-pole double-throw switch K1, the second double-pole double-throw switch K2 and the third double-pole double-throw switch K3 in sequence (due to the presence of the slow-start resistor R1, it can be ensured that the AC filter board to be tested and the inverter board to be tested can be powered on at the same time), and the power-off operation of the AC filter board to be tested and the inverter board to be tested is specifically, but not limited to, disconnecting the first double-pole double-throw switch K1, the second double-pole double-throw switch K2 and the third double-pole double-throw switch K3 in sequence.
[0082] Preferably, a fourth double-pole double-throw switch K4 and a third resistor R3 are further included, wherein two ends of the first switch branch of the fourth double-pole double-throw switch K4 are respectively and electrically connected to one end of the third resistor R3 and the DC positive output terminal of the AC / DC module in a one-to-one correspondence, and two ends of the second switch branch of the fourth double-pole double-throw switch K4 are respectively and electrically connected to the other end of the third resistor R3 and the DC negative output terminal of the AC / DC module in a one-to-one correspondence. Figure 2 As shown, the fourth double-pole double-throw switch K4 is used to close after the AC filter board to be tested is powered off, so as to discharge the AC filter board to be tested through the third resistor R3 (i.e., to discharge the electricity stored in the capacitor on the circuit board), to ensure the subsequent installation and use, which can be implemented but not limited to the use of existing air switch products. In detail, after the AC filter board to be tested and the inverter board to be tested are powered off, the use method also includes but is not limited to: closing the fourth double-pole double-throw switch K4; after the switch is closed and the first preset time (for example, 30 seconds) is waited, the fourth double-pole double-throw switch K4 is disconnected.
[0083] Preferably, a fifth double-pole double-throw switch K5 and a second resistor R2 are further included, wherein two ends of the first switch branch of the fifth double-pole double-throw switch K5 are respectively and electrically connected to one end of the second resistor R2 and the DC positive output terminal of the switching power supply in a one-to-one correspondence, and two ends of the second switch branch of the fifth double-pole double-throw switch K5 are respectively and electrically connected to the other end of the second resistor R2 and the DC negative output terminal of the switching power supply in a one-to-one correspondence. Figure 2As shown, the fifth double-pole double-throw switch K5 is used to close after the inverter board to be tested is powered off, so as to discharge the inverter board to be tested through the second resistor R2 (i.e., to discharge the electricity stored in the capacitor on the circuit board) to ensure the subsequent installation and use, which can be implemented but not limited to the use of existing air switch products. In detail, after the AC filter board to be tested and the inverter board to be tested are powered off, the use method also includes but is not limited to: closing the fifth double-pole double-throw switch K5; after the switch is closed and the second preset time (for example, 30 seconds) is waited, the fifth double-pole double-throw switch K5 is disconnected.
[0084] Preferably, it also includes a cabinet having the communication board, the touch screen, the AC / DC module, the switching power supply and the oscilloscope built in, wherein the display surface 201 of the touch screen and the display surface 601 of the oscilloscope are respectively embedded in the upper area of the main viewing surface of the cabinet, and the indicator light 3 is arranged on the top of the cabinet. Figure 3 As shown in the figure, the cabinet structure design can facilitate test personnel to perform test operations and evaluations. Figure 3 As shown, the first double-pole double-throw switch K1, the second double-pole double-throw switch K2, the third double-pole double-throw switch K3, the fourth double-pole double-throw switch K4 and the fifth double-pole double-throw switch K5 are also embedded in the lower area of the main viewing surface of the cabinet, so as to further facilitate the tester to perform switch closing and opening operations. In addition, universal wheels can be installed at the bottom of the cabinet to move the entire test tool at any time.
[0085] Further preferably, two ear plates 700 are respectively extended on the left and right sides of the cabinet in a one-to-one correspondence, wherein one ear plate of the two ear plates 700 is used to detachably carry the inverter board to be tested, and the other ear plate of the two ear plates is used to detachably carry the AC filter board to be tested. Figure 3-4 As shown, through the specific design of the ear plate 700, the AC filter board to be tested and the inverter board to be tested can be easily installed / disassembled, thereby improving the efficiency of the circuit board load test.
[0086] Preferably, alligator clips are used at the connecting end of each of the first cable, the second cable, the third cable, the fourth cable, the fifth cable, the sixth cable, the seventh cable, the eighth cable, the ninth cable, the tenth cable, the eleventh cable, the twelfth cable, the thirteenth cable, the fourteenth cable, the fifteenth cable, the sixteenth cable, the seventeenth cable, the eighteenth cable, the nineteenth cable, the twentieth cable and the twenty-first cable, wherein the connecting end refers to one end of the cable used to electrically connect the AC filter board to be tested or the inverter board to be tested. Through the specific design of the alligator clips, it is convenient to connect and disconnect the AC filter board to be tested and the inverter board to be tested, thereby improving the efficiency of the circuit board load test.
[0087] Preferably, a fuse is connected in series to the AC / DC module's live input terminal and / or the DC positive output terminal of the switching power supply. Figure 2 As shown, through the fuse (i.e. Figure 2 The specific design of FU1 and FU2 in the test fixture can timely achieve the corresponding power-off protection purpose and improve the safety of the test fixture.
[0088] In summary, the circuit board load test fixture and the use method thereof provided in this embodiment have the following technical effects:
[0089] (1) This embodiment provides a hardware tooling solution that can perform load testing on an AC filter board and an inverter board separately, that is, it includes a communication board, a touch screen, an indicator light, an AC / DC module, a switching power supply, an oscilloscope, multiple reactors and multiple cables. Through their communication connection relationship, after all cables are used to electrically connect the AC filter board to be tested and the inverter board to be tested, the given current of the inverter board to be tested can be controlled by the AC filter board to be tested in response to the operation of the tester, and the waveform and amplitude of the given current can be displayed using the oscilloscope so as to manually obtain the load test conclusion. In this way, the tester can achieve the purpose of performing load testing on the AC filter board and the inverter board separately, which is conducive to finding a faulty inverter board or AC filter board before the energy storage inverter is installed, reducing the subsequent whole machine disassembly and assembly process, thereby improving the yield of the energy storage inverter and reducing the production cost;
[0090] (2) The entire tooling solution also has the advantages of easy installation / disassembly of circuit boards, low hardware cost, easy debugging, low probability of false detection and low maintenance cost, which is convenient for practical application and promotion.
[0091] Finally, it should be noted that the above description is only a preferred embodiment of the present invention and is not intended to limit the protection scope of the present invention. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.
Claims
1. A circuit board load test fixture suitable for energy storage converter, characterized in that: The invention comprises a communication board, a touch screen, an indicator light, an AC / DC module, a switching power supply, an oscilloscope, a first reactor, a second reactor, a third reactor, a first cable, a second cable, a third cable, a fourth cable, a fifth cable, a sixth cable, a seventh cable, an eighth cable, a ninth cable, a tenth cable, an eleventh cable, a twelfth cable, a thirteenth cable, a fourteenth cable, a fifteenth cable, a sixteenth cable, a seventeenth cable, an eighteenth cable, a nineteenth cable, a twentieth cable and a twenty-first cable, wherein the communication board is electrically connected to the touch screen; One end of the first reactor is electrically connected to one end of the first cable, the other end of the first reactor is electrically connected to one end of the second cable, the other end of the first cable is used to electrically connect to the U-phase input terminal (J7) of the AC filter board to be tested of the energy storage converter, and the other end of the second cable is used to electrically connect to the U-phase output terminal (J20) of the inverter board to be tested of the energy storage converter; One end of the second reactor is electrically connected to one end of the third cable, the other end of the second reactor is electrically connected to one end of the fourth cable, the other end of the third cable is used to electrically connect to the V-phase input terminal (J6) of the AC filter board to be tested, and the other end of the fourth cable is used to electrically connect to the V-phase output terminal (J21) of the inverter board to be tested; One end of the third reactor is electrically connected to one end of the fifth cable, the other end of the third reactor is electrically connected to one end of the sixth cable, the other end of the fifth cable is used to electrically connect to the W-phase input terminal (J8) of the AC filter board to be tested, and the other end of the sixth cable is used to electrically connect to the W-phase output terminal (J22) of the inverter board to be tested; One end of the seventh cable is used to electrically connect the BUS+ terminal (J88) of the AC filter board to be tested, and the other end of the seventh cable is used to electrically connect the BUS+ terminal (J13) of the inverter board to be tested; One end of the eighth cable is used to electrically connect the BUS-terminal (J89) of the AC filter board to be tested, and the other end of the eighth cable is used to electrically connect the BUS-terminal (J12) of the inverter board to be tested; One end of the ninth cable is used to electrically connect the BUS_M terminal (J87) of the AC filter board to be tested, and the other end of the ninth cable is used to electrically connect the BUS_M terminal (J15) of the inverter board to be tested; One end of the tenth cable is used to electrically connect the power supply output terminal (J14) of the AC filter board to be tested, and the other end of the tenth cable is used to electrically connect the power supply input terminal (J19) of the inverter board to be tested; One end of the eleventh cable is used to electrically connect to the control output terminal (J17) of the AC filter board to be tested, and the other end of the eleventh cable is used to electrically connect to the control input terminal (J23) of the inverter board to be tested; One end of the twelfth cable is used to electrically connect to the communication terminal (J18) of the AC filter board to be tested, and the other end of the twelfth cable is electrically connected to the communication terminal of the communication board; One end of the thirteenth cable is used to electrically connect to the first power supply terminal (J27) of the AC filter board to be tested, and the other end of the thirteenth cable is electrically connected to the power supply terminal of the communication board; One end of the fourteenth cable is used to electrically connect to the second power supply terminal (J25) of the AC filter board to be tested, and the other end of the fourteenth cable is electrically connected to the power supply terminal of the touch screen; One end of the fifteenth cable is used to electrically connect to the third power supply terminal (J24) of the AC filter board to be tested, and the other end of the fifteenth cable is electrically connected to the power supply end of the indicator light; One end of the sixteenth cable is used to electrically connect to the positive power supply terminal (J35) of the AC filter board to be tested, and the other end of the sixteenth cable is electrically connected to the DC positive output terminal of the AC / DC module; One end of the seventeenth cable is used to electrically connect to the negative power supply terminal (J36) of the AC filter board to be tested, and the other end of the sixteenth cable is electrically connected to the negative DC output terminal of the AC / DC module; One end of the eighteenth cable is used to electrically connect the U-phase output terminal (J113) of the AC filter board to be tested, and the other end of the eighteenth cable is used to electrically connect the V-phase output terminal (J112) of the AC filter board to be tested; One end of the nineteenth cable is used to electrically connect the W-phase output terminal (J114) of the AC filter board to be tested, and one end of the nineteenth cable is used to electrically connect the U-phase output terminal (J113) of the AC filter board to be tested or the V-phase output terminal (J112) of the AC filter board to be tested; One end of the 20th cable is used to electrically connect to the positive power supply terminal (J5) of the inverter board to be tested, and the other end of the 20th cable is electrically connected to the DC positive output terminal of the switching power supply; One end of the twenty-first cable is used to electrically connect to the negative power supply terminal (J4) of the inverter board to be tested, and the other end of the twenty-first cable is electrically connected to the negative DC output terminal of the switching power supply; The oscilloscope has three current probes which are respectively disposed on the first cable, the third cable and the fifth cable in a one-to-one correspondence.
2. The circuit board load test fixture as claimed in claim 1, characterized in that: The invention also comprises a mains interface, a second double-pole double-throw switch (K2), a slow-start resistor (R1) and a transformer (BK1), wherein the mains interface, the second double-pole double-throw switch (K2), the transformer (BK1) and the AC / DC module are electrically connected in sequence, and two ends of the slow-start resistor (R1) are electrically connected to two ends of a live switch branch of the second double-pole double-throw switch (K2) in a one-to-one correspondence.
3. The circuit board load test fixture as claimed in claim 1, characterized in that: It also includes a mains power interface and a third double-pole double-throw switch (K3), wherein the mains power interface, the third double-pole double-throw switch (K3) and the switch power supply are electrically connected in sequence.
4. The circuit board load test fixture as claimed in claim 2 or 3, characterized in that: It also includes a first double-pole double-throw switch (K1), wherein the first double-pole double-throw switch (K1) is connected in series between the mains interface and the second double-pole double-throw switch (K2) or the third double-pole double-throw switch (K3).
5. The circuit board load test fixture as claimed in claim 1, characterized in that: It also includes a fourth double-pole double-throw switch (K4) and a third resistor (R3), wherein two ends of a first switch branch of the fourth double-pole double-throw switch (K4) are electrically connected to one end of the third resistor (R3) and a DC positive output terminal of the AC / DC module in a one-to-one correspondence, and two ends of a second switch branch of the fourth double-pole double-throw switch (K4) are electrically connected to the other end of the third resistor (R3) and a DC negative output terminal of the AC / DC module in a one-to-one correspondence.
6. The circuit board load test fixture as claimed in claim 1, characterized in that: It also includes a fifth double-pole double-throw switch (K5) and a second resistor (R2), wherein two ends of a first switch branch of the fifth double-pole double-throw switch (K5) are electrically connected to one end of the second resistor (R2) and a DC positive output terminal of the switching power supply in a one-to-one correspondence, and two ends of a second switch branch of the fifth double-pole double-throw switch (K5) are electrically connected to the other end of the second resistor (R2) and a DC negative output terminal of the switching power supply in a one-to-one correspondence.
7. The circuit board load test fixture as claimed in claim 1, characterized in that: It also includes a cabinet in which the communication board, the touch screen, the AC / DC module, the switching power supply and the oscilloscope are built-in, wherein the display surface of the touch screen and the display surface of the oscilloscope are respectively embedded in the upper area of the main viewing surface of the cabinet, and the indicator light is arranged on the top of the cabinet.
8. The circuit board load test fixture as claimed in claim 7, characterized in that: The cabinet body has two ear plates extending outwardly on the left and right sides respectively, wherein one of the two ear plates is used to detachably support the inverter board to be tested, and the other ear plate of the two ear plates is used to detachably support the AC filter board to be tested.
9. A method for using the circuit board load test fixture as claimed in any one of claims 1 to 8, characterized in that: include: Use all cables in the circuit board load test fixture to electrically connect the AC filter board to be tested and the inverter board to be tested; Powering on the AC filter board to be tested, the inverter board to be tested, and the oscilloscope in the circuit board load test fixture; After waiting for the indicator light and the touch screen in the circuit board load test fixture to light up, click the start button on the touch screen to start the load test task of the AC filter board to be tested and the inverter board to be tested: control the inverter board to be tested to output a given current through the AC filter board to be tested, and display the current waveform and amplitude of the given current on the oscilloscope, so as to manually check whether the displayed content is consistent with the target content of the given current, and then obtain the load test conclusion of the AC filter board to be tested and the inverter board to be tested; After obtaining the load test conclusions for the AC filter board to be tested and the inverter board to be tested, clicking an end button on the touch screen to end the load test task; After waiting for the current amplitude displayed on the oscilloscope to return to zero, the AC filter board to be tested and the inverter board to be tested are powered off.
10. The method of use according to claim 9, characterized in that: When the circuit board load test fixture further includes a fourth double-pole double-throw switch (K4) and a third resistor (R3), after powering off the AC filter board to be tested and the inverter board to be tested, the method further includes: Closing the fourth double-pole double-throw switch (K4); After the switch is closed, when waiting for a first preset time, disconnecting the fourth double-pole double-throw switch (K4); And / or, when the circuit board load test fixture further includes a fifth double-pole double-throw switch (K5) and a second resistor (R2), after powering off the AC filter board to be tested and the inverter board to be tested, the method further includes: Closing the fifth double-pole double-throw switch (K5); After the switch is closed, the fifth double-pole double-throw switch (K5) is opened after waiting for a second preset time.