A hovering and reassembling control device for a special-shaped steel corridor and a construction method thereof

By using the control device to adjust vertical and horizontal displacement in the hovering state of the steel corridor, the assembly accuracy and stability of the hover steel corridor during construction is solved, and the accurate docking and construction safety of the upper and lower layers are achieved. promote.

CN118639885BActive Publication Date: 2024-11-26SHANGHAI CONSTRUCTION FOURTH CONSTRUCTION GROUP CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411131914.1
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-08-19
Publication Date
2024-11-26
Estimated Expiration
2044-08-19

AI Technical Summary

Technical Problem

In the construction of super high-rise double tower or multi-tower joint building, the traditional construction process of one-time assembly and overall lifting has difficulty in controlling the accuracy of bottom assembly in hovering state and vertical deformation problems during steel rope suspension, which makes it difficult to have the lower structure Accurate assembly.

Method used

A special-shaped steel corridor hovering and reassembly control device is designed. By setting up components such as fixed seats, clamps, fixed studs, vertical adjustment parts, hydraulic cylinders and rollers on the lifting frame, the suspension steel rope is realized. Vertical displacement adjustment and horizontal position adjustment ensure the butt accuracy of the upper and lower steel corridors, and reduce the shaking of the steel rope through the guide column and hydraulic cylinder structure.

Benefits of technology

The vertical displacement and horizontal position of the hovering steel corridor are effectively controlled, ensuring the accurate docking of the lower steel corridor, reducing the shaking of the steel rope, and improving assembly accuracy and safety.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118639885B_ABST
    Figure CN118639885B_ABST
Patent Text Reader

Abstract

The present invention discloses a device for controlling the suspension and reassembly of a special-shaped steel corridor and a construction method thereof, which belongs to the technical field of building construction and comprises a lifting frame, a steel rope and a vertical adjustment part, wherein a fixed seat and a clamping block are arranged at the end of the steel rope, and the vertical adjustment part comprises a horizontal seat supported on the plane of the building platform, a vertical plate is fixed downwardly on the side end of the horizontal seat, and an adjusting stud is threadedly connected on the vertical plate; two parallel baffles are also fixedly arranged on the vertical plate, and two rollers are rotatably arranged between the two baffles; a first hydraulic cylinder is also fixedly arranged on the vertical plate, and a stop roller is arranged at the end of the first hydraulic cylinder, and the stop roller is located at a height between the two rollers, and the stop roller is blocked on the other side of the steel rope. This device adjusts the overall suspension height of the steel rope by the relative positions of the stop roller and the two rollers. During the adjustment process, the steel rope still serves as the main force-bearing structural member, thereby reducing the strength input of the force-applying device of the vertical adjustment part and avoiding damage to the added vertical adjustment part.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of building construction, and particularly relates to a suspension reassembly control device for a special-shaped steel corridor and a construction method thereof. Background Art

[0002] Steel corridor is a large-span structure made mainly of steel. It plays an important role in modern architecture and is often used to connect two or more buildings to form a coherent spatial system. This structure is widely used in various engineering projects due to its high strength, good plasticity, light texture and unique architectural style. It not only increases the functionality of the building, such as passage and viewing, but also beautifies the urban landscape and improves the overall quality of the urban space. In the construction process of super-high-rise twin-tower or multi-tower connected buildings, hydraulic overall lifting technology is usually used to implement it to achieve fast and safe construction. However, with the increasing complexity of building functions and structures, the traditional construction process of assembling once and then lifting the whole is difficult to implement. In engineering practice, in order to reduce the difficulty of assembly, it is usually adopted to assemble the steel corridor of the partial floor and then lift the whole to a certain height before assembling the bottom again.

[0003] This assembly method has the following problems: when the upper steel corridor is suspended, it is difficult to control the bottom assembly accuracy in the suspended state; the shaking of the steel corridor in the suspended state is difficult to control, and vertical deformation occurs during the steel rope suspension process, making the lower structure difficult to assemble. Summary of the invention

[0004] In view of this, the purpose of the present invention is to provide a special-shaped steel corridor suspension reassembly control device and a construction method thereof, by providing a relatively close support adjustment point for the suspended steel corridor, thereby avoiding the shaking of the steel corridor and adjusting the deformation displacement.

[0005] In order to achieve the above object, the present invention provides the following technical solutions:

[0006] A device for controlling and suspending a special-shaped steel corridor, comprising a lifting frame fixed on the top of buildings on both sides, wherein the lifting frame extends downwardly a steel rope for suspending the steel corridor, wherein the end of the steel rope is fixedly connected to a fixed seat, wherein clamping blocks are provided on both sides of the fixed seat for horizontal sliding and clamping on both sides of the horizontally extended end of the steel corridor, wherein a plurality of fixing studs are fixed on both sides of the fixed seat, wherein the fixing studs pass through the clamping blocks and are threadedly connected with locking nuts; and a vertical adjustment part is also included, wherein the vertical adjustment part comprises a support seat, wherein the support seat comprises a horizontal seat supported on the plane of a building platform adjacent to the suspended steel corridor, A vertical plate is fixed downward on the side end of the horizontal seat, and an adjusting stud is threaded on the vertical plate. A stop block is provided at the end of the adjusting stud, and the stop block is supported on the outside of the building platform; two parallel baffles are also fixed on the vertical plate, and two rollers are rotatably provided between the two baffles, and the two rollers are arranged vertically. The steel rope passes through between the two baffles, and one side of the steel rope is blocked by the two rollers at the same time. A first hydraulic cylinder is also fixed on the vertical plate, and a blocking roller is provided at the end of the first hydraulic cylinder. The blocking roller is located at a height between the two rollers, and the blocking roller is blocked on the other side of the steel rope.

[0007] Furthermore, a horizontally arranged second hydraulic cylinder is fixed on the side of the fixed seat facing the building platform, a supporting head is arranged at the end of the second hydraulic cylinder, and a supporting wheel is rotatably arranged on the supporting head.

[0008] Furthermore, it also includes a lifting base and a number of guide columns fixed under the suspended steel corridor, the guide columns are vertically arranged, the lifting base is slidably arranged on the guide columns, and a third hydraulic cylinder is provided on the bottom side of the lifting base; a number of supporting columns are fixed on the lifting base, and the supporting columns include a number of bottom columns spliced ​​in sequence and a telescopic column spliced ​​at the top of the upper bottom column, and the top of the telescopic column is supported at the intersection of the bottom end of the steel corridor to be spliced.

[0009] Furthermore, a horizontal slide groove is provided on the baffle plate, and two ends of the retaining roller are respectively slidably arranged in the slide groove.

[0010] Furthermore, a latch is fixedly provided at the bottom end of the baffle, and a pin hole is opened at the top end of the fixed seat. When the vertical adjustment part rotates around the vertical steel rope to a state where the building platform is not blocked, the latch is inserted into the pin hole.

[0011] A construction method for suspended and reassembled special-shaped steel corridors, the steps of which are as follows:

[0012] S1. Two lifting frames are fixedly installed on the top of the buildings on both sides of the steel corridor, and the lifting frames extend steel ropes downward;

[0013] S2. Fix the ends of the steel ropes to the four endpoints of the upper steel corridor respectively. The specific fixing method is: clamp the clamping blocks at the protruding ends of the ends of the steel corridors, and fix the ends of the steel ropes to the steel corridors by tightening the nuts;

[0014] S3, the lifting frame reels the steel rope at the same time, so that the upper steel corridor is suspended in the air, rotates the vertical adjustment part on the steel rope, moves the support seat up and down, so that the horizontal seat of the support seat is blocked on the building platform near the suspended steel beam, rotates the adjustment stud, so that the block is blocked on the side of the building platform, and keeps the steel rope in a vertical state;

[0015] S4. Assemble the lower steel corridor below the suspended steel corridor, and adjust the number of bottom columns and the length of telescopic columns so that the lower steel corridor is placed flat below the upper steel corridor;

[0016] S5. Lock the length of the steel rope. According to the force change of the hanging point and the position deformation of the upper steel corridor, adjust the first hydraulic cylinder to push the stop roller to shorten the hanging height of the steel rope. Adjust the four second hydraulic cylinders to horizontally displace the upper steel corridor so that the upper steel corridor structure is balanced and aligned with the lower steel corridor.

[0017] S6. Overall lift the lower steel corridor to connect the upper and lower steel corridors.

[0018] The beneficial effects of the present invention are:

[0019] The present invention is used for adjusting the vertical displacement of the suspended steel corridor, wherein the vertical adjustment part is fixed to the outer end of the building adjacent to the suspended steel corridor through the support seat of the vertical adjustment part, the height of the vertical adjustment part is fixed through the horizontal seat, and the horizontal position of the vertical adjustment part is adjusted by rotating the adjustment stud, wherein two rollers and a stop roller inside the vertical adjustment part are respectively blocked on both sides of the suspended steel rope, and after the upper steel corridor is suspended, the lower steel corridor can be docked upward, and during the docking process, the first hydraulic cylinder inside the vertical adjustment part works to push the steel rope between the two rollers, and under the support of the vertical plate, the steel rope is recessed between the two rollers, so that the height of the suspended point of the small steel corridor is lifted, and by adjusting the height of each suspension point, the vertical displacement of each key splicing point caused by factors such as steel rope deformation and uneven loading at the beginning and during the whole assembly process of the bottom is ensured, and the correct docking of the two-layer steel corridor is ensured. This device adjusts the displacement of the steel corridor by adding a vertical adjustment part instead of directly winding the steel rope during suspension and docking. Compared with direct steel rope winding, the shaking steel rope segments of the steel corridor are reduced by moving the vertical adjustment part along the steel rope and fixing the vertical adjustment part on the edge of the building near the steel corridor. This structure can avoid the shaking of the steel corridor during the docking process caused by the excessively long steel rope suspension. When adjusting the vertical displacement, this device adjusts the overall suspension height of the steel rope by the relative positions of the stop roller and the two rollers. During the adjustment process, the steel rope still serves as the main load-bearing structural member, reducing the strength input of the force-applying device of the vertical adjustment part and avoiding damage to the added vertical adjustment part.

[0020] Other advantages, objectives and features of the present invention will be described in the following description and will be apparent to those skilled in the art to some extent, or those skilled in the art may be taught from the practice of the present invention. The objectives and other advantages of the present invention may be realized and obtained through the following description. BRIEF DESCRIPTION OF THE DRAWINGS

[0021] In order to make the purpose, technical solution and beneficial effects of the present invention clearer, the present invention provides the following drawings for illustration:

[0022] Figure 1 This is a schematic diagram of the overall operation of the control device according to an embodiment of the present invention;

[0023] Figure 2 It is a detailed schematic diagram of the vertical adjustment part of an embodiment of the present invention;

[0024] Figure 3 This is a schematic diagram of the support of the vertical adjustment part according to an embodiment of the present invention;

[0025] Figure 4 This is a schematic diagram of the vertical adjustment part rotating and retracting according to an embodiment of the present invention;

[0026] Figure 5 This is a schematic diagram of the support column structure according to an embodiment of the present invention;

[0027] Figure 6 This is a front view of the working state of the control device according to an embodiment of the present invention;

[0028] The markings in the attached drawings are as follows: 1. lifting frame; 2. steel rope; 3. fixed seat; 31. clamping block; 32. fixing stud; 33. nut; 34. second hydraulic cylinder; 35. supporting head; 36. supporting wheel; 37. pin hole; 4. vertical adjustment part; 41. supporting seat; 411. horizontal seat; 412. vertical plate; 413. adjusting stud; 414. block; 42. baffle; 421. slide groove; 422. latch; 43. roller; 44. first hydraulic cylinder; 45. stop roller; 5. lifting base; 51. third hydraulic cylinder; 6. guide column; 7. supporting column; 71. bottom column; 72. telescopic column; 8. upper steel corridor; 9. lower steel corridor. DETAILED DESCRIPTION

[0029] like Figure 1 to Figure 6 As shown, the present invention discloses a special-shaped steel corridor suspension and assembly control device, which is used for suspending and assembling the steel corridor between two adjacent buildings, such as Figure 1 As shown, it includes a lifting frame 1 fixed on the top of the buildings on both sides, two lifting frames 1 are fixed on each side of the building, and the lifting frame 1 extends downwardly from the steel rope 2 for suspending the steel corridor. The lifting frame 1 is provided with a winding device for retracting and releasing the steel rope 2, as shown in FIG. Figure 2As shown, the end of the steel rope 2 is fixedly connected to a fixed seat 3, and the two sides of the fixed seat 3 are respectively provided with clamping blocks 31 that are clamped on both sides of the horizontally extended ends of the steel corridor for transverse sliding, wherein the clamping blocks 31 are provided with a bottom surface supporting the bottom end of the extended end and a side surface blocking the outer end of the extended end, and a plurality of fixing studs 32 are fixed on both sides of the fixed seat 3, and the fixing studs 32 pass through the clamping blocks 31 and are threadedly connected with locking nuts 33, and the extended end of the steel corridor can be fixed to the lower end of the fixed seat 3 by tightening the locking nuts 33; refer to Figure 2 and Figure 3 As shown, it also includes a vertical adjustment part 4, which includes a support seat 41, and the support seat 41 includes a horizontal seat 411 supported on the plane of the building platform adjacent to the suspended steel corridor, and a vertical plate 412 is fixed downward on the side end of the horizontal seat 411, and an adjusting stud 413 is threadedly connected to the vertical plate 412, and a stop block 414 is provided at the end of the adjusting stud 413, and the stop block 414 is supported on the outside of the building platform; two parallel baffles 42 are also fixed on the vertical plate 412, and two rollers 43 are rotatably provided between the two baffles 42, and the two rollers 43 are vertically arranged, and the steel rope 2 passes through between the two baffles 42, and one side of the steel rope 2 is blocked by the two rollers 43 at the same time, and a first hydraulic cylinder 44 is also fixed on the vertical plate 412, and a blocking roller 45 is provided at the end of the first hydraulic cylinder 44, and the blocking roller 45 is located at a height between the two rollers 43, and the blocking roller 45 is blocked on the other side of the steel rope 2.

[0030] This device is used to adjust the vertical displacement of the suspended steel corridor. The vertical adjustment part 4 is fixed to the outer end of the building adjacent to the suspended steel corridor through the support seat 41 of the vertical adjustment part 4, the height of the vertical adjustment part 4 is fixed through the horizontal seat 411, and the horizontal position of the vertical adjustment part 4 is adjusted by rotating the adjustment stud 413. The two rollers 43 and the stop roller 45 inside the vertical adjustment part 4 are respectively placed on both sides of the suspended steel rope 2. After the upper steel corridor 8 is suspended, the lower steel corridor 8 can be moved. The corridor 9 is docked upward. During the docking process, the first hydraulic cylinder 44 inside the vertical adjustment part 4 works to push the steel rope 2 between the two rollers 43. Under the support of the vertical plate 412, the steel rope 2 is recessed between the two rollers 43, thereby raising the height of the suspension point of the small steel corridor. By adjusting the height of each suspension point, the vertical displacement of each key splicing point caused by the deformation of the steel rope 2 and uneven loading at the beginning and during the whole assembly process of the bottom is ensured, thereby ensuring the correct docking of the two-layer steel corridor. This device adjusts the displacement of the steel corridor by adding a vertical adjusting part 4 instead of directly winding up the steel rope 2 during suspension and docking. Compared with direct winding of the steel rope 2, the shaking steel rope 2 segments of the steel corridor are reduced by moving the vertical adjusting part 4 along the steel rope 2 and fixing the vertical adjusting part 4 on the edge of the building near the steel corridor. This structure can avoid the shaking of the steel corridor during docking caused by the excessive suspension of the steel rope 2. When adjusting the vertical displacement, this device adjusts the overall suspension height of the steel rope 2 by the relative positions of the stop roller 45 and the two rollers 43. During the adjustment process, the steel rope 2 still serves as the main force-bearing structural member, reducing the strength input of the force-applying device of the vertical adjusting part 4 and avoiding damage to the added vertical adjusting part 4.

[0031] In a further solution, Figure 2 and Figure 3 As shown, a horizontally arranged second hydraulic cylinder 34 is fixed on the side of the fixed seat 3 facing the building platform, and a supporting head 35 is arranged at the end of the second hydraulic cylinder 34, and a supporting wheel 36 is rotatably arranged on the supporting head 35.

[0032] In this solution, through the provision of multiple second hydraulic cylinders 34, the lateral position of the suspended steel corridor can be blocked and the horizontal displacement can be determined, further avoiding the shaking of the steel corridor during the docking process. The horizontal position of the steel corridor is adjusted by the force applied by each second hydraulic cylinder 34 to prevent horizontal deformation of the suspended structure during the assembly process, ensure accurate docking, and reduce the difficulty of docking.

[0033] In a further solution, Figure 1 , Figure 5 and Figure 6As shown, it also includes a lifting base 5 and a plurality of guide columns 6 fixed under the suspended steel corridor, the guide columns 6 are vertically arranged, the lifting base 5 is slidably arranged on the guide columns 6, and a third hydraulic cylinder 51 is provided on the bottom side of the lifting base 5; a plurality of support columns 7 are fixed on the lifting base 5, and the support columns 7 include a plurality of bottom columns 71 spliced ​​in sequence and a telescopic column 72 spliced ​​at the top of the upper bottom column 71, and the top of the telescopic column 72 is supported at the intersection of the bottom end of the steel corridor to be spliced.

[0034] By setting up the guide column 6 and the lifting base 5 structure, the lower steel corridor 9 can be spliced ​​directly on the lifting base 5. The lifting base 5 is pushed by the third hydraulic cylinder 51 and moves vertically along the guide column 6, so that the lower steel corridor 9 installed on the lifting base 5 can move up and down directly in parallel and be spliced ​​with the upper steel corridor 8; through a plurality of sections of bottom columns 71 and telescopic columns 72 spliced ​​end to end, a plurality of support columns 7 with adjustable lengths can be respectively supported on the bottom ends of the special-shaped steel corridors, so that the lower steel corridor 9 can maintain a translational splicing state. This structure improves installation efficiency and saves splicing time.

[0035] In a further solution, Figure 2 As shown, a horizontal slide groove 421 is opened on the baffle plate 42, and both ends of the blocking roller 45 are respectively slidably arranged in the slide groove 421. By setting the slide groove 421 structure, the slide groove 421 provides a sliding guide for the blocking roller 45 to ensure that the blocking roller 45 will not deflect when supporting the steel rope 2.

[0036] In a further solution, Figure 3 and Figure 4 As shown, a latch 422 is fixedly disposed at the bottom end of the baffle 42, and a pin hole 37 is opened at the top end of the fixed seat 3. When the vertical adjustment portion 4 rotates around the vertical steel rope 2 to a state where the building platform is not blocked, the latch 422 is inserted into the pin hole 37.

[0037] By setting up this structure, when the steel rope 2 is wound and the steel corridor is moved, the vertical adjustment part is rotated so that the supporting part of the vertical adjustment part is rotated to the direction of the steel corridor, thereby preventing part of the structure of the vertical adjustment part from being blocked by the side buildings and preventing the vertical adjustment part from shaking.

[0038] The present invention also discloses a construction method for suspending and reassembling a special-shaped steel corridor, and the steps are as follows:

[0039] S1. Two lifting frames 1 are fixedly installed on the tops of the buildings on both sides of the steel corridor, and the lifting frames 1 extend steel ropes 2 downward;

[0040] S2, respectively fix the ends of the steel rope 2 to the four end points of the upper steel corridor 8, and the specific fixing method is: clamp the clamp block 31 at the protruding end of the end point of the steel corridor, and fix the end of the steel rope 2 to the steel corridor by tightening the nut 33;

[0041] S3, the lifting frame 1 winds up the steel rope 2 at the same time, so that the upper steel corridor 8 is suspended in the air, the vertical adjustment part 4 on the steel rope 2 is rotated, the support seat 41 is moved up and down, so that the horizontal seat 411 of the support seat 41 is blocked on the building platform near the suspended steel beam, and the adjustment stud 413 is rotated so that the block 414 is blocked on the side of the building platform, and the steel rope 2 is kept in a vertical state;

[0042] S4, assembling the lower steel corridor 9 below the suspended steel corridor, and adjusting the number of bottom columns 71 and the length of telescopic columns 72 so that the lower steel corridor 9 is placed flat below the upper steel corridor 8;

[0043] S5, lock the length of the steel rope 2, according to the force change of the hanging point and the position deformation of the upper steel corridor 8, adjust the first hydraulic cylinder 44 to push the blocking roller 45 to shorten the hanging height of the steel rope 2, and adjust the four second hydraulic cylinders 34 to horizontally displace the upper steel corridor 8, so that the upper steel corridor 8 is structurally balanced and aligned with the lower steel corridor 9;

[0044] S6. The lower steel corridor 9 is lifted as a whole to connect the upper and lower steel corridors 9.

[0045] Finally, it should be noted that the above preferred embodiments are only used to illustrate the technical solutions of the present invention rather than to limit it. Although the present invention has been described in detail through the above preferred embodiments, those skilled in the art should understand that various changes can be made in form and details without departing from the scope defined by the claims of the present invention.

Claims

1. A device for controlling the suspension and assembly of a special-shaped steel corridor, characterized in that: The invention comprises a lifting frame (1) fixed on the top of the buildings on both sides, the lifting frame (1) extends downwardly to suspend a steel rope (2) of the steel corridor, the end of the steel rope (2) is fixedly connected to a fixed seat (3), the two sides of the fixed seat (3) are respectively provided with clamping blocks (31) that are clamped on both sides of the horizontally extended end of the steel corridor, and the two sides of the fixed seat (3) are respectively provided with a plurality of fixing studs (32) that pass through the clamping blocks (31) and are threadedly connected to locking nuts (33); and also comprises a vertical adjustment part (4), the vertical adjustment part (4) comprises a support seat (41), the support seat (41) comprises a horizontal seat (411) supported on the plane of the building platform adjacent to the suspended steel corridor, the side end of the horizontal seat (411) is fixed downwardly with a vertical plate (412), and the vertical plate ( The vertical plate (412) is threadedly connected with an adjusting stud (413), and a stopper (414) is provided at the end of the adjusting stud (413), and the stopper (414) is supported on the outer side of the building platform; the vertical plate (412) is also fixedly provided with two parallel baffles (42), and two rollers (43) are rotatably provided between the two baffles (42), and the two rollers (43) are arranged vertically, and the steel rope (2) passes through the two baffles (42), and one side of the steel rope (2) is blocked by the two rollers (43) at the same time; the vertical plate (412) is also fixedly provided with a first hydraulic cylinder (44), and a stopper roller (45) is provided at the end of the first hydraulic cylinder (44), and the stopper roller (45) is located at a height between the two rollers (43), and the stopper roller (45) is blocked on the other side of the steel rope (2).

2. The device for controlling the suspension and reassembly of a special-shaped steel corridor according to claim 1 is characterized in that: A second hydraulic cylinder (34) arranged horizontally is fixed on the side of the fixed seat (3) facing the building platform, a support head (35) is arranged at the end of the second hydraulic cylinder (34), and a support wheel (36) is rotatably arranged on the support head (35).

3. The device for controlling the suspension and reassembly of a special-shaped steel corridor according to claim 2 is characterized in that: It also includes a lifting base (5) and a plurality of guide columns (6) fixed under the suspended steel corridor, wherein the guide columns (6) are vertically arranged, the lifting base (5) is slidably arranged on the guide columns (6), and a third hydraulic cylinder (51) is arranged on the bottom side of the lifting base (5); a plurality of support columns (7) are fixed on the lifting base (5), and the support columns (7) include a plurality of bottom columns (71) spliced ​​in sequence and a telescopic column (72) spliced ​​at the top of the upper bottom column (71), and the top of the telescopic column (72) is supported at the intersection of the bottom end of the steel corridor to be spliced.

4. The device for controlling the suspension and reassembly of a special-shaped steel corridor according to claim 3 is characterized in that: The baffle plate (42) is provided with a horizontal slide groove (421), and the two ends of the blocking roller (45) are respectively slidably arranged in the slide groove (421).

5. The device for controlling the suspension and reassembly of a special-shaped steel corridor according to claim 4 is characterized in that: A latch (422) is fixedly provided at the bottom end of the baffle (42), a pin hole (37) is provided at the top end of the fixed seat (3), and when the vertical adjustment portion (4) rotates around the vertical steel rope (2) to a state where the building platform is not blocked, the latch (422) is inserted into the pin hole (37).

6. A construction method for suspended reassembly of a special-shaped steel corridor, using a suspended reassembly control device for a special-shaped steel corridor as claimed in claim 5, wherein the steps are as follows: S1. Two lifting frames (1) are respectively fixedly installed on the tops of the buildings on both sides of the steel corridor, and the lifting frames (1) extend steel ropes (2) downward; S2, respectively fixing the ends of the steel rope (2) to the four end points of the upper steel corridor (8), and the specific fixing method is: clamping the clamping block (31) at the protruding end of the end point of the steel corridor, and fixing the end of the steel rope (2) to the steel corridor by tightening the nut (33); S3, the lifting frame (1) simultaneously reels the steel rope (2) to suspend the upper steel corridor (8), rotates the vertical adjustment part (4) on the steel rope (2), moves the support seat (41) up and down, places the horizontal seat (411) of the support seat (41) on the building platform near the suspended steel beam, rotates the adjustment stud (413), places the block (414) on the side of the building platform, and keeps the steel rope (2) in a vertical state; S4, assembling the lower steel corridor (9) below the suspended steel corridor, and adjusting the number of bottom columns (71) and the length of telescopic columns (72) so that the lower steel corridor (9) is placed flat below the upper steel corridor (8); S5, locking the length of the steel rope (2), according to the force change of the suspension point and the position deformation of the upper steel corridor (8), by adjusting the first hydraulic cylinder (44) to push the blocking roller (45), so that the suspension height of the steel rope (2) is shortened, and by adjusting the four second hydraulic cylinders (34), the upper steel corridor (8) is horizontally displaced, so that the structure of the upper steel corridor (8) is balanced and aligned with the lower steel corridor (9); S6. The lower steel corridor (9) is lifted as a whole, so that the upper and lower steel corridors (9) are butted against each other.