An automatic detection and control system for concrete pouring, compaction and leveling

By real-time collection and intelligent adjustment of construction parameters during concrete pouring, especially the frequency, amplitude and pressure during vibration and smoothing, the problem of difficult to ensure the density and flatness of concrete in the existing technology is solved, and high Precision casting effect.

CN118641738BActive Publication Date: 2024-11-12江苏通和沥青混凝土有限公司
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411117471.0
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-08-15
Publication Date
2024-11-12
Estimated Expiration
2044-08-15

AI Technical Summary

Technical Problem

The prior art fails to effectively consider the corresponding parameter settings during vibration during concrete pouring, which makes it difficult to ensure the density and flatness after pouring, affecting the final effect.

Method used

The data acquisition module is used to collect construction parameters in real time, and the vibration frequency, amplitude and compensation control time are intelligently adjusted through the vibration control module. The smoothing control module accurately controls the trajectory and pressure of the smoothing device, and combines the data analysis module to evaluate the concrete quality and adjust the parameters. , ensure compactness and flatness.

Benefits of technology

It significantly improves the precise control of the concrete pouring process, ensures the density and flatness of each target area, and improves the construction accuracy and effect.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118641738B_ABST
    Figure CN118641738B_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of concrete automatic control, in particular to an automatic detection and control system for concrete pouring, compaction and smoothing, comprising: a data acquisition module, for collecting construction parameters of a corresponding working area during concrete pouring, and dividing the working area into a plurality of target areas, the construction parameters being compaction parameters, a working trajectory and pressure of a smoothing device; the compaction parameters being the vibration frequency, amplitude and vibration mode corresponding to the working of the vibrating device; and a compaction control module, for determining, according to set compaction parameters, the vibration frequency and compensation control time at a corresponding position when different vibration times and moving distances are used during the vibrating work, and determining the compactness of the concrete after vibration, thereby improving the quality of the concrete and the construction efficiency during construction.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of concrete automatic control, in particular to an automatic detection and control system for concrete pouring, compacting and leveling. Background Art

[0002] Automation control technology is one of the core technologies for realizing the automatic detection and control system of concrete pouring, compaction and leveling. Through PLC (Programmable Logic Controller), servo motor and other automation equipment, precise control of concrete compaction and leveling process can be achieved.

[0003] For example, Chinese patent publication No. CN110394890A discloses a method and system for controlling the quality of concrete component casting, the system includes a hopper weighing unit, a hopper opening measuring unit, a vibrating unit, a feeding method detection unit, a control unit, and a temperature measuring unit. The temperature measuring unit is used to measure the temperature of concrete and the environment, the vibrating unit is used to vibrate the component mold, the concrete hopper is used to feed the component mold, the hopper weighing unit is used to measure the weight of the concrete hopper, the hopper opening measuring unit is used to measure the degree of opening of the hopper, the feeding method detection unit is used to detect the feeding method of the hopper, and the control unit is used to collect data from the hopper weighing unit, the hopper opening measuring unit, and the feeding method detection unit, perform calculations, and control the actions of the concrete hopper and the vibrating unit.

[0004] However, the prior art does not consider the setting of corresponding parameters during vibration when controlling concrete, resulting in failure to ensure the density and flatness of the concrete after pouring, which results in poor final pouring effect. Summary of the invention

[0005] In order to solve the above technical problems, the technical solution adopted by the present invention is:

[0006] As a preferred technical solution of the present invention, an automatic detection and control system for concrete pouring, compaction and leveling includes:

[0007] The data acquisition module is used to collect the construction parameters of the corresponding working area during the concrete pouring process, and divide the working area into multiple target areas. The construction parameters are the compaction parameters, the working trajectory and pressure of the leveling device; the compaction parameters are the vibration frequency, amplitude and vibration mode corresponding to the working of the vibrating device.

[0008] The vibration control module is used to determine the vibration frequency and compensation control time at the corresponding position when using different vibration times and moving distances during vibration work according to the set vibration parameters, and determine the density of concrete after vibration.

[0009] The smoothing control module is used to control the working trajectory and pressure of the smoothing device, obtain the travel speed and angle of the smoothing device according to the working trajectory of the smoothing device, and determine the flatness of the concrete under the corresponding travel speed, angle and pressure.

[0010] The data analysis module is used to analyze the density and flatness of concrete during corresponding leveling and compaction work, evaluate the state of concrete, determine the quality score of concrete, and adjust the construction parameters of concrete based on the quality score of concrete.

[0011] The beneficial effects of the present invention are as follows: the present invention collects key construction parameters in the concrete pouring process in real time through the data acquisition module, including the slump of concrete, compaction parameters, and the working trajectory and pressure of the smoothing device, thereby ensuring precise control of the construction process; the compaction control module intelligently adjusts the vibration frequency, amplitude, and compensation control time of the vibrating device according to preset compaction parameters, thereby ensuring that the concrete in each target area can reach the expected density, thereby significantly improving the construction accuracy; the smoothing control module realizes high-precision smoothing of the concrete surface by precisely controlling the working trajectory, travel speed, and pressure of the smoothing device, thereby improving the flatness of the concrete. BRIEF DESCRIPTION OF THE DRAWINGS

[0012] The present invention is further described below in conjunction with the accompanying drawings and embodiments.

[0013] Figure 1 The present invention is a system module diagram of an automatic detection and control system for concrete pouring, compaction and leveling. DETAILED DESCRIPTION

[0014] The embodiments of the present invention are described in detail below. The embodiments described below are exemplary and are only used to explain the present invention, and should not be construed as limiting the present invention. If no specific techniques or conditions are specified in the embodiments, the techniques or conditions described in the literature in the art or the product specifications are used.

[0015] See also Figure 1 , a concrete pouring vibration and leveling automatic detection and control system, comprising:

[0016] The data acquisition module is used to collect the construction parameters of the corresponding working area during the concrete pouring process, and divide the working area into multiple target areas. The construction parameters are the compaction parameters, the working trajectory and pressure of the leveling device; the compaction parameters are the vibration frequency, amplitude and vibration mode corresponding to the working of the vibrating device.

[0017] The vibration control module is used to determine the vibration frequency and compensation control time at the corresponding position when using different vibration times and moving distances during vibration work according to the set vibration parameters, and determine the density of concrete after vibration.

[0018] The smoothing control module is used to control the working trajectory and pressure of the smoothing device, obtain the travel speed and angle of the smoothing device according to the working trajectory of the smoothing device, and determine the flatness of the concrete under the corresponding travel speed, angle and pressure.

[0019] The data analysis module is used to analyze the density and flatness of concrete during corresponding leveling and compaction work, evaluate the state of concrete, determine the quality score of concrete, and adjust the construction parameters of concrete based on the quality score of concrete.

[0020] First, determine the location of concrete filling and pouring, determine the location of the vibration work at this time, and select the corresponding vibration parameters according to different locations, put the corresponding vibration device into the position to be vibrated, and work by vibration. After vibration, determine that the concrete is no longer bubbling and the surface is slurry. Determine the current density of the concrete by setting the corresponding detection device, and smooth the concrete at the same time. When smoothing, determine the elevation values ​​at multiple points on the concrete, and select the smoothing position and angle based on the elevation difference in relative position, and record the speed and pressure of smoothing at this time to determine the current smoothing effect, and identify the concrete after smoothing to determine that the concrete remains flat after smoothing; finally, determine the effect of the construction parameter setting based on the density and flatness calculated during the current work. If the corresponding parameter value is too large, or the number of jobs is large and the power output of the corresponding machine becomes larger, determine the parameters affecting the current work, and determine the main influencing construction parameters according to the weights, and adjust this construction parameter.

[0021] When pouring is completed, the poured concrete is vibrated by a vibrator. The vibrator used can be an inserted vibrator, an attached vibrator, or a flat vibrator. When the inserted vibrator is used, the vibration time, insertion depth, movement spacing, and vibration frequency need to be set. The attached vibrator is attached to the formwork, and through vibration conduction, the vibration is transmitted from the formwork to the concrete to control the vibration effect on the concrete. At this time, the vibration frequency and amplitude are mainly controlled. The flat vibrator is placed directly on the concrete surface and vibrates the concrete through vibration. At this time, it is necessary to design the area covered by the vibration and the vibration time, as well as the corresponding vibration frequency and amplitude.

[0022] Although the parameters considered for these vibrators may be different, when working, the type and size of the current working position can be identified by setting cameras and other scanning devices, and the corresponding vibration frequency and amplitude can be set to achieve sufficient vibration of the concrete.

[0023] After determining to vibrate the concrete, determine the density and surface flatness of the concrete, and evaluate the vibration work based on the parameters of the concrete after vibration.

[0024] The evaluation methods at this time include using an ultrasonic instrument and a dynamic elastic modulus meter to determine the density of the concrete; and using a laser pavement roughness meter to determine the flatness of the concrete surface.

[0025] The ultrasonic instrument transmits ultrasonic waves into the concrete and receives ultrasonic signals reflected from the concrete. The speed and attenuation of ultrasonic waves in the concrete can indirectly reflect the density of the concrete. For high-density concrete, ultrasonic waves propagate faster and attenuate less; conversely, they propagate slower and attenuate more. The propagation speed of ultrasonic waves in the concrete is calculated as V=L / t. Then, based on the relationship curve between the speed V and the density of concrete, the relationship curve is determined according to the algorithm built into the instrument to determine whether the location is dense.

[0026] The dynamic elastic modulus meter uses the stress-strain relationship curve or empirical formula to calculate the dynamic elastic modulus of concrete based on the measured stress and strain data; the larger the dynamic elastic modulus, the higher the density of the concrete; the calculation method here is determined according to the built-in calculation method of the corresponding equipment.

[0027] The laser road surface flatness meter emits a laser beam to the concrete surface through a laser transmitter and receives the reflected laser signal. According to the reflection angle and position change of the laser beam on the concrete surface, the elevation change of the concrete surface can be calculated to evaluate the flatness. By measuring the elevation difference of each point on the concrete surface within a certain length, the flatness index within the length range is calculated. The elevation difference is determined by calculating the difference in height measured at the highest point on the concrete and other positions to determine the elevation difference at the current concrete laying position. When the difference at each measuring point is relatively small, it means that the road surface is flat.

[0028] The processing method of the data acquisition module also includes dividing the acquired construction parameters into multiple data sets according to the type of the corresponding working area during work, and marking the construction parameters of the data sets.

[0029] This is used to determine the construction parameters required for each structure when the work location is different facilities such as beams, ground, columns, etc. At the same time, it is necessary to determine the corresponding adjustment values ​​of the relevant construction parameters in each work data set under different circumstances to determine the corresponding weights of the construction parameters during adjustment.

[0030] By obtaining the position of the compaction parameters collected in the working area, the working area is divided into multiple target areas, the boundary of each target area is determined, the overlap between the vibrating radius of the vibrating device and the target area during vibration is compared, and the vibration time and number of vibrations for each target area are recorded.

[0031] At this time, the working area is divided into multiple target areas in order to determine the position of each vibration during vibration, so that it can be known which areas have been vibrated and which areas have not been vibrated. At the same time, the boundaries corresponding to these areas can be identified, thereby improving the accuracy of the corresponding concrete density measurement after the vibration is completed.

[0032] The degree of overlap between the vibrating radius of the vibrating device and the target area is expressed as:

[0033] The vibrating area of ​​the vibrating device is determined by the vibrating radius of the vibrating device, and the vibrating area of ​​the vibrating device is compared with the area of ​​the currently divided target area to determine the overlap between the vibrating area of ​​the vibrating device and the area of ​​the target area. If the overlap between the vibrating area of ​​the vibrating device and the area of ​​the target area is less than the preset overlap, it means that the target working area is too large, and the target area is re-divided until the overlap corresponding to each target area is less than the preset overlap; if the construction parameters collected in the target area are missing, they are filled based on the average value of the corresponding construction parameters in the target area; at the same time, the overlap of the target area is less than 1.

[0034] The vibrable area is obtained by taking the vibrating device as the center of the circle and the vibrable radius as the radius of the circle to obtain the circular area corresponding to the vibrating device, that is, the vibrable area.

[0035] After the target area is divided, the processing methods for the compaction control module include:

[0036] The number of vibrations and the vibration time of each target area during vibration are obtained; and the compensation control time of each vibration is determined according to the number of vibrations and the vibration time of each target area.

[0037] The vibration frequency and amplitude during vibration are obtained according to the compensation control time of each vibration. If the density of concrete is less than the expected value within the compensation control time of each vibration, the vibration frequency and amplitude are adjusted.

[0038] The methods for obtaining the compensation control time of each vibration include:

[0039] The relative distance of each vibration and the moving speed of the vibration are obtained to determine the average time to complete each vibration; the time to end the vibration compensation is determined according to the preset compensation control time, the number of vibrations and the average time to complete each vibration; the change in concrete density within the preset compensation control time is determined, and the preset compensation control time is adjusted according to the change in concrete density, and the adjusted preset compensation control time is used as the compensation control time for each vibration.

[0040] The change in density of concrete is based on setting a pair of measuring points at the position of each target area of ​​concrete. For each measuring point, an ultrasonic instrument or an elastic modulus meter is used to calculate the concrete density value at each measuring point. The density of concrete is compared with the preset density to determine the change in density of each target area.

[0041] The end time of vibration compensation is expressed as:

[0042] ;

[0043] in, is the time when vibration compensation ends. is the number of vibrations, indicating the number of times each target area needs to be vibrated. is the vibration time, which indicates the duration of each vibration. is the average time, which indicates the average time required for the vibrator to move a relative distance during each vibration. It is the preset compensation control time, which means the extra time preset during the vibration process to compensate for certain factors (such as concrete fluidity, vibration efficiency, etc.).

[0044] At this time, each vibrated area needs to be vibrated multiple times according to the size of the target area. The vibration compensation end time calculated at this time is to determine how much vibration compensation time is required for the currently selected target area.

[0045] The changes in the above concrete density are mainly manifested as follows:

[0046] Determine the change in concrete density within the preset compensation control time. If the change in concrete density does not reach the expected density, or the density is too high, resulting in stress concentration inside the concrete, then adjust the preset compensation control time based on the density of the concrete.

[0047] According to the change of concrete density, the preset compensation control time is adjusted as follows:

[0048] ;

[0049] in, is the adjusted preset compensation control time, indicating the compensation control time adjusted according to the change of concrete density; is the adjustment coefficient, which is a constant used to adjust the preset compensation control time according to the change of concrete density; is the preset compensation control time; It is the change in concrete density, which means the change in concrete density within the preset compensation control time.

[0050] Because vibration frequency and amplitude are the key factors affecting the vibration effect.

[0051] It is necessary to automatically adjust the vibration frequency and amplitude according to the real-time collected concrete status data (such as consistency, fluidity, etc.) to achieve the best vibration effect.

[0052] At this time, the vibration frequency and amplitude need to be adjusted according to the state of the concrete. The vibration frequency and amplitude during vibration can be determined by:

[0053] The vibration frequency and amplitude are usually preset based on the type of concrete, aggregate size, temperature, humidity, etc. For example, fine aggregate concrete may require a higher frequency and a smaller amplitude, while coarse aggregate concrete may require a lower frequency and a larger amplitude to avoid segregation of aggregates.

[0054] Then the formula for the vibration frequency can be expressed as:

[0055] ;

[0056] in, is the vibration frequency, is the adjustment factor, which is determined by the material of the concrete. is the elastic modulus of concrete, is the density of concrete, Represents the area of ​​the effective length of the concrete section.

[0057] The effective length is the length of the vibrator in contact with the concrete.

[0058] The amplitude is obtained based on the average value of historical data.

[0059] If the concrete does not reach the expected density after using the currently acquired vibration frequency and amplitude within the compensation control time, then the concrete status data is acquired, and the vibration frequency and amplitude are dynamically adjusted based on the concrete status data; the concrete status data includes: concrete type, aggregate size, ambient temperature, humidity, vibration frequency and amplitude

[0060] The vibration frequency and amplitude can be adjusted by:

[0061] Acquire concrete state data corresponding to the vibration frequency and amplitude in the historical data, use the concrete state data, vibration frequency and amplitude as input vectors, and use the density of concrete as output vectors;

[0062] The input vector and the output vector are input into the neural network, the mean square error of the neural network output is determined, and the vibration frequency and amplitude are adjusted according to the mean square error of the neural network output.

[0063] The output layer calculation formula of the neural network is expressed as:

[0064] ;

[0065] in, It is the output of the model, used to predict the density of concrete. The output vector can contain multiple elements, each element corresponds to an output variable; is the input vector, a vector containing all input features, such as concrete type, aggregate size, ambient temperature, humidity, vibration frequency and amplitude; is the connection weight from the input layer to the first hidden layer, is the connection weight from the first hidden layer to the second hidden layer, is the activation function (such as ReLU, tanh or sigmoid); is the bias vector from the input layer to the first hidden layer, is the bias vector from the first hidden layer to the second hidden layer, is the activation function of the output layer.

[0066] At this time, the adjustment values ​​of the vibration frequency and amplitude are determined based on the concrete state data, vibration frequency and amplitude, under the premise of outputting the predicted concrete density and strength.

[0067] Then the mean square error of the neural network output is ;

[0068] ;

[0069] in, is the actual output of the ith sample, is the predicted output of the i-th sample; is the total number of samples.

[0070] When the mean square error at this time is less than the preset error, the corresponding vibration frequency and amplitude are selected as the currently adjusted vibration frequency and amplitude. Otherwise, the current error is back-propagated and the corresponding weights and biases in each output layer and hidden layer are calculated to determine the influence weights and biases of different input vectors on the current mean square error. The weights and biases are gradually updated until the calculated mean square error reaches a stable state. The vibration frequency and amplitude calculated in the stable state are used as the adjusted vibration frequency and amplitude.

[0071] At this time, for the weights set for the vibration frequency and amplitude, the weighted input value of the current mean square error is calculated and iterated continuously until the input value reaches the expected value and the loss rate of the mean square error directly calculated is less than the threshold set for the loss rate.

[0072] The travel speed and pressure of the smoothing equipment generally need to be controlled: its travel speed and pressure are important factors affecting the smoothing effect.

[0073] It is necessary to automatically adjust the travel speed and pressure of the smoothing equipment according to the real-time collected concrete surface status data (such as flatness, humidity, etc.) to obtain the best smoothing effect.

[0074] The processing methods for the leveling control module include:

[0075] The flatness error after smoothing and the rate of change of the flatness error are obtained under the working trajectory of the smoothing device, and the adjustment amount of the travel speed, pressure and angle is determined based on the flatness error and the rate of change of the flatness error.

[0076] The flatness error is obtained by calculating the difference between the concrete flatness after smoothing and the preset concrete flatness. The flatness error change rate represents the change value of the flatness error. Through the obtained flatness error and the flatness error change rate, the travel speed, pressure and angle suitable for the current smoothing can be found from the database. At the same time, the current actual input can be compared with the data in the database to adjust the travel speed, pressure and angle used.

[0077] The adjustment of travel speed, pressure and angle is expressed as:

[0078] ;

[0079] in, is the adjustment amount, which indicates the adjustment amount of the travel speed, pressure and angle of the trowel equipment; is the error signal, which is the difference between the target flatness and the actual flatness; Proportional gain, which determines the direct effect of the error signal on the control output; is the integral gain, which determines the effect of the integral of the error signal on the control output; is the differential gain, which determines the effect of the error signal rate of change on the control output; that is, is the proportional term, which makes the control output change proportionally to the error signal, thereby quickly reducing the error; is the integral term, which is used to eliminate the static error of the system, that is, when the system reaches the desired state, the error signal is zero; It is the differential term. The function of the differential term is to predict the changing trend of the error signal and adjust the control output in advance to reduce the overshoot and oscillation of the system.

[0080] When adjusting the angle, pressure, and travel speed when leveling the concrete, it is also necessary to determine in advance the elevation of the concrete at the corresponding position after vibration, that is, to determine the flatness of the concrete.

[0081] The specific implementation method includes determining each point in the target area, calculating the elevation value of each point in the target area, and obtaining the actual flatness of the target area according to the root mean square deviation of the elevation value of each point in the target area.

[0082] The data analysis module also includes extracting features related to the density and flatness based on the acquired density and flatness of the concrete, and determining the quality score of the concrete.

[0083] Normalize the density and flatness to determine the quality score of the concrete:

[0084] ;

[0085] in, is the quality score of concrete, is the average density of concrete. is the average value of the flatness of the concrete. is the weight of the density of concrete, is the weight of the flatness of the concrete.

[0086] Based on the current quality score, determine whether the concrete quality reaches the target value. If it does not reach the target value, determine the size of the concrete density and flatness values; if the density value is less than the flatness value, adjust it according to the compaction control module; if the density value is greater than the flatness value, adjust it according to the smoothing control module until the current quality score reaches the target value.

[0087] Although the embodiments of the present invention have been shown and described above, it is to be understood that the above embodiments are exemplary and are not to be construed as limitations on the present invention. A person skilled in the art may make changes, modifications, substitutions and variations to the above embodiments within the scope of the present invention and they are still covered by the protection scope of the present invention.

Claims

1. An automatic detection and control system for concrete pouring, compaction and leveling, characterized in that: include: The data acquisition module is used to collect the construction parameters of the corresponding working area during the concrete pouring process, and divide the working area into multiple target areas. The construction parameters are the compaction parameters, the working trajectory and pressure of the leveling device; the compaction parameters are the vibration frequency, amplitude and vibration mode corresponding to the working of the vibrating device; The vibration control module is used to determine the vibration frequency and compensation control time at the corresponding position when using different vibration times and moving distances during vibration work according to the set vibration parameters, and determine the density of the concrete after vibration; A smoothing control module is used to control the working trajectory and pressure of the smoothing device, obtain the travel speed and angle of the smoothing device according to the working trajectory of the smoothing device, and determine the flatness of the concrete under the corresponding travel speed, angle and pressure; A data analysis module is used to analyze the density and flatness of concrete during corresponding leveling and compaction work, evaluate the state of concrete, determine the quality score of concrete, and adjust the construction parameters of concrete based on the quality score of concrete; The processing methods of the compaction control module include: When vibrating, the number of vibrations and the vibration time of each target area are obtained; according to the number of vibrations and the vibration time of each target area, the compensation control time of each vibration is determined; According to the compensation control time of each vibration, the vibration frequency and amplitude during vibration are obtained. If the density of concrete is less than the expected value within the compensation control time of each vibration, the vibration frequency and amplitude are adjusted; The methods for obtaining the compensation control time of each vibration include: The relative distance of each vibration and the moving speed of the vibration are obtained to determine the average time for each vibration to be completed; the time for the vibration compensation to be completed is determined according to the preset compensation control time, the number of vibrations and the average time for each vibration to be completed; the change in the density of the concrete within the preset compensation control time is determined, and the preset compensation control time is adjusted according to the change in the density of the concrete, and the adjusted preset compensation control time is used as the compensation control time for each vibration; The vibration frequency and amplitude may be adjusted in the following manner: Acquire concrete state data corresponding to the vibration frequency and amplitude in the historical data, use the concrete state data, vibration frequency and amplitude as input vectors, and use the density of concrete as output vectors; Inputting the input vector and the output vector into the neural network, determining the mean square error of the neural network output, and adjusting the vibration frequency and amplitude according to the mean square error of the neural network output; The processing methods of the leveling control module include: Obtaining the flatness error and the flatness error change rate after smoothing under the working track of the smoothing device, and determining the adjustment amount of the travel speed, pressure and angle based on the flatness error and the flatness error change rate; The adjustment of travel speed, pressure and angle is expressed as: ; in, is the adjustment amount, which indicates the travel speed, pressure, and angle of the trowel equipment; is the error signal; Proportional gain; is the integral gain; is the differential gain.

2. The automatic detection and control system for concrete pouring, compaction and leveling according to claim 1 is characterized in that: The working area is divided into multiple target areas, the boundary of each target area is determined, the overlap between the vibrating radius of the vibrating device and the target area is compared, and the vibration time and number of vibrations of each target area are recorded.

3. The automatic detection and control system for concrete pouring, compaction and leveling according to claim 2 is characterized in that: The degree of overlap between the vibrating radius of the vibrating device and the target area is expressed as: The vibrating area of ​​the vibrating device is determined by the vibrating radius of the vibrating device, and the vibrating area of ​​the vibrating device is compared with the area of ​​the currently divided target area to determine the overlap between the vibrating area of ​​the vibrating device and the area of ​​the target area. If the overlap between the vibrating area of ​​the vibrating device and the area of ​​the target area is less than the preset overlap, the target area is re-divided until the overlap corresponding to each target area is less than the preset overlap.

4. The automatic detection and control system for concrete pouring, compaction and leveling according to claim 1 is characterized in that: The end time of vibration compensation is expressed as: ; in, is the time when vibration compensation ends. is the number of vibrations, It's time to vibrate. is the average time, It is the preset compensation control time.

5. The automatic detection and control system for concrete pouring, compaction and leveling according to claim 1 is characterized in that: Adjust the preset compensation control time as: ; in, is the adjusted preset compensation control time; is the adjustment factor; is the preset compensation control time; is the change in concrete density.

6. The automatic detection and control system for concrete pouring, compaction and leveling according to claim 1 is characterized in that: The data analysis module also includes, based on the acquired density and flatness of the concrete, extracting features related to the density and flatness to determine the quality score of the concrete; Normalize the density and flatness to determine the quality score of the concrete: ; in, is the quality score of concrete, is the average density of concrete. is the average value of the flatness of the concrete. is the weight of the density of concrete, is the weight of the flatness of the concrete.