An emergency flood protection method to prevent dam damage due to excessive flood

By adopting a dual protection system of cement blanket and geomembrane on the dam, combined with waste tires and press-holding components, the problems of low protection efficiency and uncertain protection are solved, and the safe overflow and peak flood of the dam are achieved.

CN118653436BActive Publication Date: 2024-11-19WATER RESOURCES RES INST OF SHANDONG PROVINCE
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411139404.9
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-08-20
Publication Date
2024-11-19
Estimated Expiration
2044-08-20

AI Technical Summary

Technical Problem

When facing floods beyond the standard, existing dam protection methods have problems such as low efficiency, complex construction and uncertain protection. In particular, single-layer geomembrane is prone to be punctured by sharp objects and cannot effectively protect the dam.

Method used

Using the dual protection system of 'cement carpet + geomembrane', combined with waste tires to build flood discharge channels and overcurrent channels, forming a double protective layer, using the anti-shrinking ability of cement carpet and the flexible waterproof characteristics of geomembrane, combining press-holding components and disinfection It can be stripped to improve the protection effect.

Benefits of technology

The safe flood overflow of the dam is achieved, the peak of floods is reduced, the protection effect is improved, the problems of low construction efficiency and uncertain protection are solved, and the recycling of waste resources is achieved.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118653436B_ABST
    Figure CN118653436B_ABST
Patent Text Reader

Abstract

The present invention proposes an emergency flood protection method for preventing the damage of dams caused by super-standard floods, which relates to the technical field of dam protection; it includes: grooving on the slope surface of the back slope and burying waste tires to form a tire wall, and forming a flood discharge channel between the tire walls; laying a cement blanket in the flood discharge channel; watering and solidifying the cement blanket to form a first protective layer; breaking the original wave-breaking wall at the position corresponding to the flood discharge channel to form a flood discharge outlet, and installing a baffle at the flood discharge outlet; removing the baffle and opening the flood discharge outlet during emergency flood handling; laying a layer of geomembrane on the surface of the cement blanket to form a second protective layer; after the water level continues to rise and overflows, emergency discharge is carried out. The present invention adopts the concept of "tire wall + cement blanket + geomembrane + flexible energy dissipation strip" to form a "rigid and flexible" dual protection and anti-scour system, which can better cope with super-standard floods, realize the centralized guidance, discharge and energy dissipation of overflowing water, ensure the protection effect of the dam, and achieve safe flooding.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of dam protection, and in particular to an emergency flood protection method for preventing dams from being damaged by excessive floods. Background Art

[0002] Dam overflow rescue refers to the rescue work to prevent floods from overflowing the dams, especially earth dams and earth-rock dams. If the rescue is not timely or improper, it is very easy to cause dam breach and bring major flood losses.

[0003] The principle of dam overflow protection is "build dams when water rises, divert excess water", that is, when the water level rises, temporarily raise the dam or repair the sub-weir, or use diversion (retention, storage) areas or adjacent rivers to divert water in order to lower the water level.

[0004] When the flood level is likely to exceed the top of the dam, in order to prevent the flood from overflowing and breaking, according to the flood forecast and the actual situation of the river and reservoir, we should seize every opportunity and do our best to build a sub-weir on the top of the dam, and strive to complete it before the flood arrives. There are five common emergency protection methods: raising the dam, building an earthen sub-weir, building an earthen bag weir, using a wave-breaking wall to build a sub-weir, and laying waterproof cloth. For the first four methods of building sub-weirs, since they require sufficient materials in advance, they have the disadvantages of low efficiency and complicated handling after the flood season; for laying waterproof cloth, if the flood is expected to overflow for a short time, and it is difficult to obtain soil or there is no time to build a sub-weir, a layer of waterproof material (such as geomembrane, geocomposite) can be laid on the top of the dam and the back slope to allow the water to overflow in a short time. In comparison, this emergency protection method can protect the slope and reduce the peak value of the dam burst flood. It is a more suitable engineering emergency risk elimination measure.

[0005] At present, waterproof materials are mostly laid directly on the slope. For example, Hohai University proposed a buoyant geomembrane device to prevent overtopping and dam collapse. The authorization announcement number is CN 110761243 B, which records that "the present invention is installed under the wave-breaking wall, and automatically deploys the geomembrane to protect the dam top and downstream surface from being scoured when overtopping occurs, greatly reducing the scour damage to the dam body." The above device automatically deploys the geomembrane when overtopping occurs, but ignores the damage to the geomembrane by sharp objects such as tree roots and stones on the slope. Since there are inevitably these sharp objects on the slope, the geomembrane is easily pierced when overflow occurs due to uneven force and stress concentration. The water flows through the holes and scours the slope. In this way, no protection can be formed. Only relying on a layer of geomembrane for protection increases the uncertainty of protection. Another example is a patent application for a rapid disposal method for preventing earth-rock dams from being damaged by excessive overtopping floods, with application publication number CN 118292403 A. It also directly lays geomembranes on the flood passage, which may be easily punctured by sharp objects such as stones; secondly, it only relies on a single layer of geomembrane for protection, which may also easily lead to problems of uncertain protection; in addition, the slope retaining wall needs to be formed by supporting formwork and casting on the inclined surface. During construction, due to the inclined surface, it is not easy to support and remove the formwork, which is relatively time-consuming and labor-intensive.

[0006] In addition, in recent years, the technology of resource utilization of waste tires has gradually emerged and made remarkable progress. The application of waste tires in the field of water conservancy has also gradually increased. For example, waste tires are used in fields such as preventing soil erosion and revetment retaining walls, realizing the recycling of waste resources and energy conservation and environmental protection.

[0007] In summary: Although both of the above two methods adopt the idea of ​​laying waterproof cloth, they both have some disadvantages to a greater or lesser extent; therefore, how to combine the actual project situation and the reuse of waste tire resources, make overall planning, seek benefits and avoid harm, further optimize the existing disposal methods, prevent dam water damage, ensure safe drainage, and effective emergency response, so as to achieve energy conservation and environmental protection, rapid construction, and rapid and safe disposal of dangerous situations, requires further research by technical personnel in this field. Summary of the invention

[0008] In order to solve the above-mentioned technical problems, the present invention provides an emergency flood protection method for preventing water damage to dams caused by super-standard floods. The purpose is to combine the actual engineering situation and the reuse of waste tire resources, make overall planning, seek benefits and avoid harm, and optimize the existing disposal methods to better deal with super-standard floods, realize the centralized guidance, discharge and energy dissipation of overtopping water flow, ensure the protection effect of dams, achieve safe flooding, and reduce the peak value of floods.

[0009] To achieve the above purpose, this scheme provides an emergency flood protection method for preventing dams from being damaged by excessive floods, comprising the following steps:

[0010] S1: Improve the back slope in advance:

[0011] S11: Repair the backwater slope according to the design location;

[0012] S12: Grooving is performed on the back slope and a number of waste tires are buried. The tires are installed vertically and closely together to form two tire walls. The area between the two tire walls forms a flood discharge channel; the top area between adjacent tires forms a concave opening;

[0013] S13: laying a cement blanket in the flood discharge channel, and connecting the cement blanket to the top of the tire wall through fixings;

[0014] S14: watering and curing the cement blanket, so that the fixed cement blanket forms a first protective layer;

[0015] S2: Reconstruct the original wave-breaking wall in advance:

[0016] The original wave-breaking wall is broken down at the position corresponding to the flood discharge channel to form a flood discharge outlet, and a detachable baffle is installed at the flood discharge outlet to realize the opening and closing of the flood discharge outlet;

[0017] S3: Emergency flood control:

[0018] S31: When the water level reaches the warning line, the baffle is removed and the flood discharge outlet is opened; sandbags are stacked at the dam top position corresponding to the flood discharge outlet to construct a dam top flow channel; the flood discharge outlet - dam top flow channel - flood discharge channel form an emergency drainage channel;

[0019] S33: Clean the surface of the cement blanket, lay a layer of geomembrane on the surface of the cement blanket, and connect and fix the geomembrane to the top of the tire wall through fixing parts; the laid geomembrane forms a second protective layer, and the first protective layer and the second protective layer form a double protective system;

[0020] S34: After the water level continues to rise and overflows the dam, the flood flows to the dam foot through the emergency drainage channel for emergency discharge to reduce the flood peak.

[0021] Preferably, before S13, it also includes pouring concrete, and the specific process is as follows: supporting formwork on both sides of the tire, and connecting the formwork on the inner and outer sides of the tire by tension bolts; the formwork closes the cavity inside the tire; punching a hole at the top of the tire to form a pouring port, pouring concrete into the tire through the pouring port, and pre-embedding a sleeve with an internal thread at the pouring port; after the concrete reaches the designed strength, removing the formwork.

[0022] Preferably, the fixing member includes at least two groups of first threaded rods arranged at the head and tail of the top of the tire wall, the top of the cement blanket is laid on the top surface of the tire wall, and the first threaded rods penetrate the cement blanket and are threadedly connected to the sleeve; it also includes a base plate, the two ends of the base plate are detachably sleeved on the first threaded rods, and the first threaded rods are threadedly connected with lower nuts for fixing the base plate; a plurality of first bolts are threadedly connected on the base plate, and the first bolts are correspondingly arranged at the recessed openings. When the first bolts are screwed, the cement blanket is pressed and held at the recessed opening by the bottom ends of the first bolts, and the surface of the cement blanket is pressed down and fixed by the base plate and the first bolts to form a wave-like structure.

[0023] Preferably, the fixing device also includes a lower clamping plate and an upper clamping plate which are sequentially mounted on the first threaded rod from bottom to top, and the lower clamping plate is arranged above the lower nut; a clamping space for clamping the geomembrane is formed between the lower clamping plate and the upper clamping plate; an upper nut is provided above the clamping plate, and the upper nut is threadedly connected to the first threaded rod, for pressing and fixing the lower clamping plate and the upper clamping plate.

[0024] Preferably, S33 also includes installing a plurality of pressing components for pressing and fixing the geomembrane; wherein the pressing component includes a pressing bracket and a second threaded rod, the second threaded rod is threadedly connected to a sleeve on the top of a portion of the tire, the pressing bracket includes a U-shaped main structure, both sides of the main structure are fixedly connected with ear plates, the ear plates are provided with through holes, the top end of the second threaded rod freely passes through the through holes, the second threaded rod is threadedly connected with a fastening nut for achieving a fixed connection between the pressing bracket and the second threaded rod; a plurality of second bolts are threadedly connected to the pressing bracket for achieving the pressing of the geomembrane.

[0025] Preferably, it also includes an energy dissipation strip used in conjunction with the pressing assembly, and a plurality of the energy dissipation strips are installed between adjacent pressing assemblies at intervals. The energy dissipation strip is made of a flexible tire strip, and the energy dissipation strip includes an arc-shaped portion and a connecting portion connected to both sides of the arc-shaped portion. The pressing bracket is provided with a groove, and the connecting portion can be inserted into the groove and connected to the second threaded rod.

[0026] Preferably, adjacent tires are interlocked into one by bolting.

[0027] Preferably, a profile is fixedly installed at the flood discharge outlet, and two sides of the baffle are detachably inserted into slots of the profile; the profile is threadedly connected with a top screw for fixing the baffle.

[0028] Preferably, the baffle is an acrylic plate.

[0029] Preferably, an anchor rod is fixedly connected to the bottom of the tire, and the anchor rod is inserted into the backwater slope.

[0030] The above technical solution has the following advantages or beneficial effects:

[0031] 1. The present invention adopts a dual protection system of "cement blanket + geomembrane" to construct a "rigid and flexible" anti-scour system; before watering the cement blanket, it can be rolled up like a cloth, which is very convenient for storage, transportation and laying. After watering and fixing, the cement blanket forms a durable concrete layer that is waterproof, fireproof and not easy to crack. As the "rigid" part, the geomembrane forms a flexible waterproof, and as the "flexible" part, the two are used in combination to have a very good protection effect. Moreover, the geomembrane is laid on the surface of the cement blanket, rather than directly on the back slope. This also solves the problems of easy puncture and uncertain protection of laying a single-layer geomembrane in the prior art.

[0032] 2. The present invention introduces waste tires and adopts a construction process of first installing the waste tires and then pouring concrete based on the tires, which can effectively solve the problem in the prior art that it is not easy to set up formwork on the inclined surface, which is time-consuming and labor-intensive; after the tires are buried, the tires are used as the skeleton for pouring concrete, and the formwork pulled on both sides of the tires can form a pouring cavity inside the tires, forming relatively independent mold cavities, which is convenient for workers to construct, effectively improves construction efficiency, and realizes the recycling of waste resources.

[0033] 3. Use waste tires to form tire walls and construct flood discharge channels, which provide convenient conditions for the installation of cement blankets. At the same time, the pre-buried sleeves on the top of the tires are used as installation nodes to facilitate the installation of subsequent fixings, providing an installation foundation for the fixation of cement blankets and geomembranes. The recessed openings constructed by adjacent tires can form a wave-like fixation on the top of the cement blanket. This method has excellent anti-scouring ability, is not easy to shift, and is reliably fixed.

[0034] 4. The present invention also provides a holding component, which holds the surface of the geomembrane, and the holding component is also used in conjunction with the tire wall, which is convenient for installation and achieves the holding and fixation of the geomembrane surface, thereby improving the anti-scouring, tensile and tearing capabilities of the geomembrane.

[0035] 5. The present invention introduces an energy dissipation strip, which is made of a flexible tire strip and installed between adjacent holding components. It can play a good role in diversion and energy dissipation, and has the advantages of easy installation, low cost and waste utilization. BRIEF DESCRIPTION OF THE DRAWINGS

[0036] The accompanying drawings are used to provide further understanding of the present invention and constitute a part of the specification. They are used to explain the present invention together with the embodiments of the present invention and do not constitute a limitation of the present invention.

[0037] Figure 1 It is a structural cross-sectional diagram of a wave-breaking wall and a dam body in the prior art.

[0038] Figure 2 It is a schematic diagram of the structure constructed by the method of the present invention in Example 1.

[0039] Figure 3 yes Figure 2 Schematic diagram of the overall structure of the flood discharge structure located on the back slope.

[0040] Figure 4 It is a schematic diagram of the structure after the tire is buried in the backwater slope and the formwork is erected.

[0041] Figure 5 yes Figure 4 Schematic diagram of the structure after the middle tire is buried in the back slope and the formwork is erected.

[0042] Figure 6 yes Figure 3 Side view of the middle flood discharge structure.

[0043] Figure 7 yes Figure 6 Schematic diagram of the enlarged structure of region B in the middle.

[0044] Figure 8 yes Figure 7 Side view of the structure after the ecological blanket and geomembrane are installed.

[0045] Fig. 9 It is a schematic diagram of the structure constructed by the method of the present invention in Example 2.

[0046] Fig.10 yes Fig. 9 Side view of the middle flood discharge structure.

[0047] Fig.11 yes Fig. 9 Structural cross-section view of the medium-pressure support bracket.

[0048] Fig.12 It is a three-dimensional diagram of the flood discharge structure with energy dissipation strips in the third embodiment.

[0049] Fig.13 This is a structural perspective view of the energy dissipation strip and the holding bracket from another angle.

[0050] Fig.14 yes Fig.13 Structural stereogram of the medium pressure support bracket.

[0051] Description of reference numerals:

[0052] 1. dam body; 2. dam top; 3. back slope; 4. dam foot; 5. original wave-breaking wall; 6. baffle; 7. sandbag; 8. tire; 801. recessed mouth; 81. formwork; 82. tension bolt rod; 83. tension nut; 84. sleeve; 85. concrete; 9. cement blanket; 10. geomembrane; 11. first threaded rod; 1101. second threaded rod; 111. lower nut; 112. upper nut; 12. upper clamping plate; 13. lower clamping plate; 14. base plate; 15. first bolt; 16. holding bracket; 161. second bolt; 1601. through hole; 1602. groove; 17. energy dissipation strip; 171. connecting part; 172. arc-shaped part. DETAILED DESCRIPTION

[0053] In order to make the objects, features and advantages of the present invention more obvious and easy to understand, the technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the embodiments described below are only part of the embodiments of the present invention, rather than all the embodiments.

[0054] It should be noted that, in the description of the present invention, terms such as "up", "down", "left", "right", "inside" and "outside" indicating directions or positional relationships are based on the directions or positional relationships shown in the drawings. This is merely for the convenience of description and does not indicate or imply that the device or element must have a specific orientation, be constructed and operated in a specific orientation. Therefore, it should not be understood as a limitation on the present invention.

[0055] Embodiment 1:

[0056] like Figure 1 As shown, the dam body 1 in the prior art comprises a dam crest 2, a water-facing slope, a water-receiving slope 3 and a dam foot 4; a wave-breaking wall is provided at the dam crest 2 near the water-facing slope, and the wave-breaking wall is generally a continuously constructed concrete structure. In view of the problems existing in the prior art, this embodiment proposes an emergency flood protection method to prevent the dam from being damaged by water due to super-standard floods, as shown in the attached drawings. Figure 2 - Figure 8 , the method mainly comprises the following steps:

[0057] Part I:

[0058] S1: Advance modification of back slope 3:

[0059] S11: Repair the back slope 3 according to the designed position; refer to the original drawings and other materials as well as the actual survey to determine the best location for flood discharge, select the address, repair the slope, remove sharp objects such as tree roots and stones, level the potholes, and remove the protruding areas to ensure that the base surface of the repaired area is flat, so as to provide convenient conditions for the subsequent installation of the cement blanket 9 and the geomembrane 10.

[0060] S12: Grooving and burying a number of waste tires 8 on the slope of the backwater slope 3. The tires 8 are installed vertically and closely together to form two tire walls. The area between the two tire walls forms a flood discharge channel; the top area between adjacent tires 8 forms a recessed opening 801; select waste tires 8 of appropriate diameter, transport the tires 8 to the construction site, mark the slope of the backwater slope 3, locate the installation position of the tires 8, and then manually or mechanically groove to form a groove for installing the tires 8, and then bury the tires 8 in the groove. It should be noted that the tires 8 are installed from the dam foot 4 to the dam top 2.

[0061] In addition, in order to improve the firmness of the tire 8, an anchor rod is fixedly connected to the bottom of the tire 8, and the anchor rod is inserted into the backwater slope 3. In this way, the stability of the tire 8 after installation can be further improved. When installing the anchor rod, the bottom end of the anchor rod is conical and the whole is T-shaped. The anchor rod is hit with a hammer, and the bottom end of the anchor rod passes through the tire 8 and is inserted into the slope. Adjacent tires 8 can also be bolted together to be more stable.

[0062] S13: laying a cement blanket 9 in the flood discharge channel, and the cement blanket 9 is connected to the top of the tire wall through a fixing piece; after the cement blanket 9 is laid, the cross section is U-shaped; the structural form of the fixing piece will be further introduced later.

[0063] S14: Watering and curing the cement blanket 9, the fixed cement blanket 9 forms the first protective layer; about the cement blanket 9, it should be mentioned here that the scientific name of the cement blanket 9 is concrete 85 canvas, which is a soft cloth impregnated with cement. It will undergo hydration reaction when it comes into contact with water and harden into a very thin waterproof and fireproof durable concrete 85 layer. The concrete 85 canvas adopts a three-dimensional fiber composite structure woven from polyethylene and polypropylene filaments, and contains a specially formulated dry concrete 85 mixture, which has the properties of heat preservation, rapid coagulation and hardening, flame retardancy, waterproofness, windproofness, folding resistance, corrosion resistance and the like.

[0064] Part II:

[0065] The above describes the transformation of the back slope 3. Next, the transformation of the original wave-breaking wall 5 is introduced. The main points are as follows:

[0066] S2: Reconstruct the original wave-breaking wall 5 in advance:

[0067] The original wave-breaking wall 5 is broken at the position corresponding to the flood discharge channel to form a flood discharge outlet, and a detachable baffle 6 is installed at the flood discharge outlet to realize the opening and closing of the flood discharge outlet; in this embodiment, a profile is fixedly installed at the flood discharge outlet, and the profile is an aluminum alloy profile, and its cross-sectional shape is an I-shaped structure, with a vertical slot, and both sides of the baffle 6 are detachably inserted into the slot of the profile; the side of the profile is also threaded with a top screw for fixing the baffle 6. During installation, both sides of the baffle 6 are inserted into the slot, and then the top screw is tightened to realize the positioning and fixing of the baffle 6.

[0068] In this embodiment, the baffle 6 can be an acrylic plate, which is also called a plexiglass plate. It is a plastic plate made of polymethyl methacrylate and is favored for its high transparency, high strength and good weather resistance. It is light in texture, tougher than ordinary glass and not easy to break. The transparency of the acrylic plate can reach 92%, which is far higher than ordinary glass; the use of acrylic plates can also facilitate pedestrians to view the scenery.

[0069] Part III:

[0070] The above introduces some structures built in advance. When carrying out emergency flood disposal, the main process is as follows:

[0071] S3: Emergency flood control:

[0072] S31: When the water level reaches the warning line, the baffle 6 is removed and the flood discharge outlet is opened; sandbags 7 are stacked at the dam top 2 position corresponding to the flood discharge outlet to construct a flow channel at the dam top 2; the flood discharge outlet-dam top 2 flow channel-flood discharge channel forms an emergency drainage channel; it should be noted that sandbags 7 are also stacked on one side of the original wave-breaking wall 5 on both sides of the flood discharge outlet to reinforce the original wave-breaking wall 5.

[0073] S33: cleaning the surface of the cement blanket 9. Since the cement blanket 9 may have impurities such as dead branches on its surface after hardening, which may affect the laying of the geomembrane 10, workers are required to clean it first to ensure that the surface of the cement blanket 9 is an excellent paving base surface; then a layer of geomembrane 10 is laid on the surface of the cement blanket 9, and the geomembrane 10 is connected and fixed to the top of the tire wall through a fixing piece; the laid geomembrane 10 forms a second protective layer, and the first protective layer and the second protective layer form a double protective system;

[0074] S34: After the water level continues to rise and overflows the dam, the flood flows to the dam foot 4 through the emergency drainage channel to achieve emergency discharge to reduce the flood peak.

[0075] Concept and principle of the invention:

[0076] The present invention adopts a dual protection system of "cement blanket 9 + geomembrane 10" to construct a "rigid and flexible" anti-scour system; before watering the cement blanket 9, it can be rolled up like a cloth, which is very convenient for storage, transportation and laying. After watering and fixing, the cement blanket 9 forms a layer of durable concrete 85 that is waterproof, fireproof and not easy to crack. As the "rigid" part, the geomembrane 10 forms a flexible waterproof, and as the "flexible" part, the two are used in combination to have a very good protection effect. Moreover, the geomembrane 10 is laid on the surface of the cement blanket 9, rather than directly on the back slope 3. This also solves the problems of easy puncture and uncertain protection of laying a single-layer geomembrane 10 in the prior art.

[0077] As a feasible embodiment, before S13, it also includes pouring concrete 85, and the specific process is as follows: formwork 81 is set up on both sides of the tire 8, and the formwork 81 located on the inner and outer sides of the tire 8 are connected by tension bolts; the tension bolts include tension bolt rods 82, and the formwork 81 has a mounting hole. The tension bolt rods 82 pass through the mounting hole and are screwed with tension nuts 83. The cavity inside the tire 8 is closed by relying on the formwork 81 to serve as a mold cavity for pouring; a hole is punched at the top of the tire 8 to form a pouring port, and concrete 85 is poured into the tire 8 through the pouring port. After the concrete 85 is poured to a suitable height, a sleeve 84 with an internal thread is pre-embedded at the pouring port; after the concrete 85 reaches the designed strength, the formwork 81 is removed, and the excess tension bolt rods 82 exposed outside are cut off with a cutting machine. In this way, a composite wall composed of the tire 8 and concrete 85 is formed.

[0078] The fixing member is mentioned above. In this embodiment, the fixing member can adopt the following structural form:

[0079] The fixing part includes at least two groups of first threaded rods 11 arranged at the head and tail of the top of the tire wall. The number of the first threaded rods 11 is determined according to the length of the backwater slope 3, and can be two or more groups; the top of the cement blanket 9 is laid on the top surface of the tire wall, and the bottom end of the first threaded rod 11 penetrates the cement blanket 9 and is threadedly connected with the sleeve 84; it also includes a base plate 14, which is a long strip, and holes are opened at both ends of the base plate 14. The two ends of the base plate 14 are detachably mounted on the first threaded rod 11, and the first threaded rod 11 passes through the holes; the threads on the first threaded rod 11 A lower nut 111 is connected to fix the base plate 14; a plurality of first bolts 15 are threadedly connected to the base plate 14, and the first bolts 15 are arranged along the length direction of the base plate 14. The first bolts 15 are arranged correspondingly at the recessed opening 801. When the first bolts 15 are screwed, the cement blanket 9 is pressed at the recessed opening 801 by the bottom end of the first bolts 15, forming a concave fixation; at the same time, the top of part of the cement blanket 9 is pressed and fixed by the base plate 14; in this way, the surface of the cement blanket 9 is pressed down and fixed by the base plate 14 and the first bolts 15, forming a wave-like structure. This partial structure can complete the positioning and fixation of the cement blanket 9.

[0080] As mentioned above, the geomembrane 10 is also fixed by a fixing member, and for this purpose, the fixing member also includes the following structure:

[0081] The lower clamping plate 13 and the upper clamping plate 12 are sequentially sleeved on the first threaded rod 11 from bottom to top, and both the lower clamping plate 13 and the upper clamping plate 12 are in the shape of long strips; the lower clamping plate 13 is arranged above the lower nut 111; a clamping space for clamping the geomembrane 10 is formed between the lower clamping plate 13 and the upper clamping plate 12, and the edge of the geomembrane 10 is clamped and fixed in the clamping space; an upper nut 112 is provided above the clamping plate, and the upper nut 112 is threadedly connected to the first threaded rod 11, and is used to press and fix the lower clamping plate 13 and the upper clamping plate 12, thereby effectively fixing the geomembrane 10.

[0082] Application results:

[0083] Firstly, the present invention introduces waste tires 8, and adopts a construction process of first installing the waste tires 8 and then pouring concrete 85 based on the tires 8, which can effectively solve the problem in the prior art that it is not easy to set up the template 81 on the inclined surface, which is time-consuming and labor-intensive; after the tires 8 are buried, the tires 8 are used as the skeleton for pouring concrete 85, and the templates 81 pulled on both sides of the tires 8 are cooperated to form a pouring cavity inside the tires 8, forming relatively independent mold cavities, which is convenient for workers to construct, effectively improves construction efficiency, and realizes the recycling of waste resources.

[0084] Secondly, waste tires 8 are used to form tire walls and construct flood discharge channels, which provide convenient conditions for the installation of cement blanket 9. At the same time, the pre-buried sleeve 84 on the top of the tire 8 is used as an installation node to facilitate the installation of subsequent fixings, providing an installation foundation for the fixation of the cement blanket 9 and the geomembrane 10. In addition, the recessed openings 801 constructed by adjacent tires 8 can form a wave-like fixation on the top of the cement blanket 9. This method has excellent anti-scouring ability, is not easy to shift, and is reliably fixed.

[0085] Embodiment 2:

[0086] like Fig. 9 - Fig.11As shown, based on the first embodiment, considering that the geomembrane 10 is only fixed by the edge, it is subjected to great tearing and scouring strength during flood discharge, which may damage the geomembrane 10. Therefore, S33 also includes installing a plurality of pressing components for pressing and fixing the geomembrane 10; wherein the pressing components include a pressing support 16 and a second threaded rod 1101, and the second threaded rod 1101 is threadedly connected to the sleeve 84 at the top of a portion of the tire 8. When in use, a hole is drilled at the installation position corresponding to the second threaded rod 1101 until the corresponding hole is leaked out. The sleeve 84 is then connected to the sleeve 84 through the drilled hole at the bottom end of the second threaded rod 1101; the pressing bracket 16 includes a U-shaped main structure, and the two sides of the main structure are fixedly connected with ear plates, and the ear plates are provided with through holes 1601. The top of the second threaded rod 1101 freely passes through the through holes 1601, and the second threaded rod 1101 is threadedly connected with a fastening nut for achieving a fixed connection between the pressing and the second threaded rod 1101; the pressing bracket 16 is threadedly connected with a plurality of second bolts 161 for achieving the pressing of the geomembrane 10. In this way, the plurality of pressing brackets 16 can well press and fix the geomembrane 10, and the anti-scouring ability is better.

[0087] Application results: By setting up a pressing component, the pressing component presses the membrane surface of the geomembrane 10, and the pressing component is also used in conjunction with the tire wall, which is convenient for installation and realizes the pressing and fixing of the membrane surface of the geomembrane 10, thereby improving the anti-scouring, tensile and tearing capabilities of the geomembrane 10.

[0088] Embodiment three:

[0089] refer to Fig.12 - Fig.14 On the basis of the second embodiment, it also includes an energy dissipation strip 17 used in conjunction with the pressing assembly. A plurality of energy dissipation strips 17 are installed between adjacent pressing assemblies. The energy dissipation strips 17 are made of flexible tire strips. The energy dissipation strips 17 include an arc portion 172 and a connecting portion 171 connected to both sides of the arc portion 172. The arc portion 172 and the connecting portion 171 are cut and formed, and then connected as a whole by gluing, bolting, or sewing. The pressing bracket 16 is provided with a groove 1602, and the connecting portion 171 can be inserted into the groove 1602 and connected to the second threaded rod 1101. In this embodiment, the connecting portion 171 has a light hole, and the bottom end of the second threaded rod 1101 can pass through the light hole, so that the energy dissipation strip 17 is not easy to fall off under the scouring of water flow.

[0090] The present invention introduces an energy dissipation strip 17, which is made of a flexible tire strip and installed between adjacent holding components. It can play a good role in diversion and energy dissipation, and has the advantages of easy installation, low cost, and waste recycling. The energy dissipation strip 17 is used to dissipate energy and reduce the water flow rate, which can not only protect the geomembrane 10, but also reduce the scouring of the dam foot 4. The energy dissipation strip 17 is made of a flexible tire strip, and its flexibility and certain elasticity are used to achieve good energy dissipation and energy absorption effects.

[0091] Although the above describes the specific implementation mode of the invention in conjunction with the drawings, it is not intended to limit the scope of protection of the invention. Based on the technical solution of the present invention, various modifications or variations that can be made by those skilled in the art without creative work are still within the scope of protection of the present invention.

Claims

1. An emergency flood protection method for preventing dams from being damaged by excessive floods, characterized in that: The steps include: S1: Advance modification of the backwater slope (3): S11: Repair the backwater slope (3) according to the designed position; S12: Grooving is performed on the slope surface of the backwater slope (3) and a plurality of waste tires (8) are buried. The tires (8) are installed vertically and closely together to form two tire walls. The area between the two tire walls forms a flood discharge channel. The top area between adjacent tires (8) forms a concave opening (801); Before S13, the method further includes pouring concrete (85), and the specific process is as follows: supporting templates (81) on both sides of the tire (8), and connecting the templates (81) located on the inner and outer sides of the tire (8) by tension bolts; the templates (81) seal the cavity inside the tire (8); drilling a hole at the top of the tire (8) to form a pouring port, and pouring concrete (85) into the tire (8) through the pouring port, while pre-embedding a sleeve (84) with an internal thread at the pouring port; after the concrete (85) reaches the designed strength, removing the template (81); S13: laying a cement blanket (9) in the flood discharge channel, wherein the cement blanket (9) is connected to the top of the tire wall via a fixing member; The fixing member comprises at least two groups of first threaded rods (11) arranged at the head and tail of the top of the tire wall, the top of the cement blanket (9) is laid on the top surface of the tire wall, the first threaded rods (11) penetrate the cement blanket (9) and are threadedly connected to the sleeve (84); it also comprises a base plate (14), the two ends of the base plate (14) are detachably sleeved on the first threaded rods (11), the first threaded rods (11) are threadedly connected with lower nuts (111) for fixing the base plate (14); a plurality of first bolts (15) are threadedly connected to the base plate (14), the first bolts (15) are correspondingly arranged at the recessed openings (801), and the first bolts (15) are screwed, so that the cement blanket (9) is pressed and held at the recessed openings (801) by the bottom ends of the first bolts (15), and the surface of the cement blanket (9) is pressed down and fixed by the base plate (14) and the first bolts (15), forming a wavy structure; S14: watering and curing the cement blanket (9), so that the fixed cement blanket (9) forms a first protective layer; S2: Reconstruct the original wave-breaking wall (5) in advance: The original wave-breaking wall (5) is broken down at a position corresponding to the flood discharge channel to form a flood discharge outlet, and a detachable baffle (6) is installed at the flood discharge outlet to realize the opening and closing of the flood discharge outlet; S3: Emergency flood control: S31: When the water level reaches the warning line, the baffle (6) is removed and the flood discharge outlet is opened; sandbags (7) are stacked at the dam crest (2) position corresponding to the flood discharge outlet to construct a dam crest (2) flow passage; the flood discharge outlet - dam crest (2) flow passage - flood discharge passage form an emergency drainage passage; S33: cleaning the surface of the cement blanket (9), laying a layer of geomembrane (10) on the surface of the cement blanket (9), and connecting and fixing the geomembrane (10) to the top of the tire wall via a fixing piece; the laid geomembrane (10) forms a second protective layer, and the first protective layer and the second protective layer form a double protective system; S34: After the water level continues to rise and overflows the dam, the flood flows to the dam foot (4) through the emergency drainage channel for emergency discharge to reduce the flood peak.

2. The method for emergency flood protection against dam damage caused by excessive flood according to claim 1, characterized in that: The fixing member further comprises a lower clamping plate (13) and an upper clamping plate (12) which are sequentially sleeved on the first threaded rod (11) from bottom to top, wherein the lower clamping plate (13) is arranged above the lower nut (111); a clamping space for clamping the geomembrane (10) is formed between the lower clamping plate (13) and the upper clamping plate (12); an upper nut (112) is arranged above the clamping plate, and the upper nut (112) is threadedly connected to the first threaded rod (11) for pressing and fixing the lower clamping plate (13) and the upper clamping plate (12).

3. The method for emergency flood protection against dam damage caused by excessive flood according to claim 1, characterized in that: S33 also includes installing a plurality of pressing components for pressing and fixing the geomembrane (10); wherein the pressing components include a pressing support (16) and a second threaded rod, the second threaded rod being threadedly connected to a sleeve (84) at the top of a portion of the tire (8), the pressing support (16) including a U-shaped main structure, the two sides of the main structure being fixedly connected with ear plates, the ear plates being provided with through holes (1601), the top end of the second threaded rod freely passing through the through holes (1601), the second threaded rod being threadedly connected with a fastening nut for achieving fixed connection between the pressing support (16) and the second threaded rod; and the pressing support (16) being threadedly connected with a plurality of second bolts (161) for achieving pressing of the geomembrane (10).

4. The method for emergency flood protection against dam damage caused by super-standard flood according to claim 3, characterized in that: It also includes an energy dissipation strip (17) used in conjunction with the pressing assembly. A plurality of the energy dissipation strips (17) are installed between adjacent pressing assemblies at intervals. The energy dissipation strip (17) is made of a flexible tire (8) strip. The energy dissipation strip (17) includes an arc-shaped portion (172) and a connecting portion (171) connected to both sides of the arc-shaped portion (172). The pressing bracket (16) is provided with a groove (1602). The connecting portion (171) can be inserted into the groove (1602) and connected to the second threaded rod.

5. The method for emergency flood protection against dam damage caused by excessive flood according to claim 1, characterized in that: Adjacent tires (8) are interlocked into one by bolting.

6. The method for emergency flood protection against dam damage caused by excessive flood according to claim 1, characterized in that: A profile is fixedly installed at the flood discharge outlet, and two sides of the baffle (6) are detachably inserted into slots of the profile; the profile is threadedly connected with a top screw for fixing the baffle (6).

7. The method for emergency flood protection against dam damage caused by excessive flood according to claim 1, characterized in that: The baffle (6) is an acrylic plate.

8. The method for emergency flood protection against dam damage caused by excessive flood according to claim 1, characterized in that: An anchor rod is fixedly connected to the bottom of the tire (8), and the anchor rod is inserted into the backwater slope (3).