Novel vacuum glass production equipment

By designing new vacuum glass production equipment, using pump sets and molecular pumps to form a vacuum, combined with lifting cylinders and heaters, the problems of inconvenient and time-consuming operation of existing equipment are solved, and production efficiency and automation are improved.

CN118724481AInactive Publication Date: 2024-10-01SHANGHAI XINDONGLI INTELLIGENT TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410764836.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-06-13
Publication Date
2024-10-01
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

The existing vacuum glass production equipment is inconvenient to operate, time-consuming, labor-intensive, and low-efficiency.

Method used

A new type of vacuum glass production equipment is designed, including a front pre-pumping box, a front transition box, a front exhaust box, a closing box, a shaping box, a brazing box, a cooling box, a glue coating box and a rear transition box. Through the pump unit It forms a vacuum with a molecular pump, and combines lifting cylinders, conveying rollers and heaters to realize automated processing and welding of glass plates.

Benefits of technology

It improves production efficiency, reduces labor intensity, realizes efficient vacuum sealing and welding of glass plates, and improves the automation of the equipment.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118724481A_ABST
    Figure CN118724481A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of vacuum glass production, and provides novel vacuum glass production equipment which comprises a front pre-pumping box, a front transition box is arranged on one side of the front pre-pumping box, a front exhaust box is arranged on one side of the front transition box, a sheet combining box is arranged on one side of the front exhaust box, and a shaping box is arranged on one side of the sheet combining box. A first brazing box is arranged on one side of the shaping box, a second brazing box is arranged on one side of the first brazing box, a third brazing box is arranged on one side of the second brazing box, a cooling box is arranged on one side of the second brazing box, and a gluing box is arranged on one side of the cooling box. Internal air is pumped out by starting the molecular pump and the pump set, then vacuum is formed in the glass plate, the first vacuum lock is opened by closing the second vacuum lock, the glass plate is pushed into the front pre-pumping box, the pump set is started by closing the first vacuum lock, then internal air is pumped out, the interior is vacuumized, and then the effect of keeping the interior vacuum is achieved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of vacuum glass production, in particular to a new type of vacuum glass production equipment. Background Art

[0002] Vacuum glass is a special glass material. Its main feature is that air is removed during the preparation process to form a vacuum layer. This glass material is usually composed of a vacuum gap between two or more glass sheets, which gives it excellent thermal insulation and heat preservation properties. The production of vacuum glass requires the use of vacuum glass production equipment.

[0003] The existing vacuum glass production equipment needs to manually put two pieces of glass together and braze them around the two pieces of glass during use. When brazing, a vacuum hole is reserved, and then air is pumped through the reserved vacuum hole to form a vacuum between the two pieces of glass. After the vacuum is pumped, the vacuum is sealed. The production method is inconvenient to operate and use, time-consuming and labor-intensive, labor-intensive, and inefficient. Summary of the invention

[0004] In view of the deficiencies in the prior art, the present invention provides a novel vacuum glass production equipment, which solves the problems of inconvenient operation and use, time-consuming and labor-intensive production method, high labor intensity and low efficiency.

[0005] To achieve the above objectives, the present invention is implemented through the following technical solutions: a new type of vacuum glass production equipment, including a front pre-evacuation box, a front transition box is arranged on one side of the front pre-evacuation box, a front exhaust box is arranged on one side of the front exhaust box, a sheet-joining box is arranged on one side of the front exhaust box, a shaping box is arranged on one side of the sheet-joining box, a first brazing box is arranged on one side of the shaping box, a second brazing box is arranged on one side of the first brazing box, a third brazing box is arranged on one side of the second brazing box, a cooling box is arranged on one side of the cooling box, a glue coating box is arranged on one side of the glue coating box, a rear transition box is arranged on one side of the rear transition box, a rear pre-evacuation box is arranged on one side of the rear transition box, the outer walls of the front pre-evacuation box and the rear pre-evacuation box are fixedly connected with a pump group, the outer walls of the front transition box are fixedly connected with a vacuum pipe and a molecular pump, the outer wall of the vacuum pipe is fixedly connected to one end of the pump group, and one end of the molecular pump is fixedly connected to the outer wall of the vacuum pipe.

[0006] Preferably, the vacuum pipe and the outer wall of the molecular pump are fixedly connected to the outer walls of the front exhaust box, the assembly box, the shaping box, the first brazing box, the second brazing box, the third brazing box, the cooling box, the glue coating box and the rear transition box, the upper surface of the front pre-vacuum box is provided with a cover plate, the outer wall of the front pre-vacuum box is provided with a first vacuum lock, and the interior of the front pre-vacuum box is provided with a second vacuum lock.

[0007] Preferably, the interior of the pre-extraction box is provided with a conveying roller, the outer walls of the plurality of conveying rollers are fixedly connected with synchronous wheels, and the outer walls of the plurality of synchronous wheels are provided with a synchronous belt.

[0008] Preferably, a second vacuum lock is fixedly connected to the interior of the front transition box, an upper heater is fixedly connected to the interior of the front transition box, a lower heater is fixedly connected to the interior of the front transition box, and the upper surface of the front transition box is arranged on the lower surface of the cover plate.

[0009] Preferably, a cover plate is provided on the upper surface of the front exhaust box, a conveying roller is provided inside the front exhaust box, the inside of the front exhaust box is fixedly connected to the outer wall of the upper heater, and the inside of the front exhaust box is fixedly connected to the outer wall of the lower heater.

[0010] Preferably, the interior of the combining box is rotatably connected to a conveying roller, the interior of the combining box is provided with a lifting mechanism, the interior of the combining box is provided with a lifting cylinder, the output end of the lifting cylinder is fixedly connected to the lifting mechanism, the interior of the shaping box is provided with a positioning push block, the interior of the shaping box is fixedly provided with a lifting cylinder, the output end of the lifting cylinder is fixedly connected to the positioning push block, and the interiors of the combining box and the shaping box are both fixedly connected to the inner wall of the upper heater.

[0011] Preferably, the upper surfaces of the first brazing box, the second brazing box and the third brazing box are provided with cover plates, the interiors of the first brazing box and the second brazing box are fixedly connected to the outer wall of the upper heater, the interiors of the first brazing box and the second brazing box are fixedly connected to the outer wall of the lower heater, the interior of the second brazing box is slidably connected to a connecting frame, the interior of the front transition box is fixedly connected to a lifting cylinder, the output end of the lifting cylinder is fixedly connected to the lower surface of the connecting frame, the outer wall of the connecting frame is fixedly connected to an electromagnetic heater, one end of the electromagnetic heater is fixedly connected to a solder input pipe, and the interior of the connecting frame is provided with a lateral regulator.

[0012] Preferably, a cover plate is provided on the upper surface of the cooling box, the cover plate is rotatably connected to the interior of the cooling box, a lifting cylinder is fixedly connected to the interior of the cooling box, the output ends of the plurality of lifting cylinders are respectively fixedly connected to an upper cooling plate and a lower cooling plate, the outer walls of the upper cooling plate and the lower cooling plate are both slidably connected to the interior of the cooling box, and an upper roller is provided inside the cooling box.

[0013] Preferably, the outer wall of the glue coating box is provided with a glue supply mechanism, one end of the glue supply mechanism is respectively fixedly connected with the longitudinal glue coating structure and the lateral glue coating mechanism, the outer walls of the longitudinal glue coating structure and the lateral glue coating mechanism are arranged inside the glue coating box, the interior of the glue coating box is rotatably connected with a conveying roller, the interior of the glue coating box is rotatably connected with an upper roller, the interior of the glue coating box is provided with a second vacuum lock, and the upper surface of the glue coating box is provided with a cover plate.

[0014] Preferably, the interiors of the rear transition box and the rear pre-vacuum box are both connected with conveying rollers, the interiors of the rear transition box and the rear pre-vacuum box are provided with upper rollers, the upper surfaces of the rear transition box and the rear pre-vacuum box are provided with cover plates, the interior of the rear pre-vacuum box is provided with a second vacuum lock, and the outer wall of the rear pre-vacuum box is provided with a first vacuum lock.

[0015] Working principle: When it is necessary to use this new type of vacuum glass production equipment, first insert the glass plate from one end of the front pre-extraction box into the interior, and use the motor to drive the conveying roller to rotate, drive the synchronous wheel to rotate, so that the synchronous belt runs, and at the same time drives multiple conveying rollers and synchronous wheels to rotate, and then the glass plate is conveyed by the rotation of the conveying roller, and the front pre-extraction box is closed by the first vacuum lock, and the air inside the front pre-extraction box is extracted by starting the pump group, and then the glass plate is conveyed to the front transition box by opening the second vacuum lock, and the upper heater and the lower heater are started to heat the incoming glass plate, and then the glass plate is allowed to enter by the rotation of the conveying roller. The glass sheets are put into the front exhaust box, and then the upper heater and the lower heater inside the front exhaust box are used to continuously heat the glass sheets, so that the temperature of the workpiece is continuously increased, and then the glass sheets are put into the combining box through the conveying rollers, and the lifting mechanism is pushed to move by the lifting cylinder, and the two glass sheets are overlapped up and down, and the glass sheets are put into the shaping box through the rotation of the conveying rollers, and the positioning push blocks are pushed to move by the lifting cylinders to align them horizontally and vertically, and then continuously heated by the upper heaters inside the combining box and the shaping box, and then the glass sheets are put into the first brazing box through the rotation of the conveying rollers, and then the glass sheets are limited by sliding the upper rollers in the first brazing box, and then the glass sheets are moved. The glass plate is moved into the second brazing box, and the connecting frame is moved by the output end of the lifting cylinder, and then the horizontal regulator is moved between the connecting frames to achieve the effect of up and down and horizontal adjustment. The brazing material is allowed to enter the electromagnetic heater through the brazing material input pipe for heating, and then the brazing material is liquid filled and welded, and enters through the upper heater and the lower heater inside the first brazing box and the second brazing box. The glass plate is moved into the third brazing box through the rotation of the conveying roller and the upper roller, and then moves to the inside of the cooling box, and the upper cooling plate and the lower cooling plate are driven to move by the output end of the lifting cylinder, so that the upper cooling plate and the lower cooling plate are close to the glass plate, and then the glass plate is cooled, and then The glass plate is put into the glue coating box by the rotation of the conveying roller and the upper roller, glue is supplied to the longitudinal glue coating structure and the lateral glue coating mechanism by the glue supply mechanism, longitudinal glue is applied to the glass plate by the longitudinal glue coating structure, and then longitudinal glue is applied to the glass plate by the lateral glue coating mechanism. The vacuum is maintained in the glue coating box by starting the pump group and the molecular pump through the closing of the second vacuum lock, the glass plate is put into the rear transition box by the rotation of the conveying roller and the upper roller, and the glass plate is put into the rear pre-evacuation box by opening the second vacuum lock, and the glass plate is taken out by opening the first vacuum lock on one side of the rear pre-evacuation box, and air is extracted by the molecular pump to enter the vacuum pipe to keep the inside vacuum.

[0016] The present invention provides a new type of vacuum glass production equipment. It has the following beneficial effects:

[0017] 1. The present invention starts the molecular pump and the pump group to extract the internal air, thereby forming a vacuum inside, closes the second vacuum lock and opens the first vacuum lock to push the glass plate into the front pre-evacuation box, closes the first vacuum lock and starts the pump group to extract the internal air to form a vacuum inside, then enters the front transition box by opening the second vacuum lock and closes the second vacuum lock, opens the second vacuum lock on the rear pre-evacuation box to allow the glass plate to enter the rear pre-evacuation box, closes the second vacuum lock and opens the first vacuum lock, and then takes the glass plate out, thereby achieving the effect of maintaining the internal vacuum.

[0018] 2. The present invention drives the lifting mechanism to move by the lifting cylinder, and the two glass plates are overlapped up and down. The glass plates are placed into the shaping box by the rotation of the conveying roller. The positioning push block is pushed by the lifting cylinder to move so as to be aligned horizontally and vertically, and the glass plates are placed into the first brazing box. The brazing material is placed into the electromagnetic heater through the brazing material input pipe for heating, and then the brazing material is filled in liquid form for welding. The glass plates are placed into the gluing box by the rotation of the conveying roller and the upper roller, and the glue supply mechanism is used to supply glue to the longitudinal gluing structure and the lateral gluing mechanism. The longitudinal gluing structure is used to apply glue to the glass plates, and then the lateral gluing mechanism is used to apply glue to the glass plates laterally and longitudinally, thereby reducing labor intensity and improving efficiency. BRIEF DESCRIPTION OF THE DRAWINGS

[0019] Figure 1 A perspective view of the present invention;

[0020] Figure 2 It is a schematic diagram of the front pre-extraction box of the present invention;

[0021] Figure 3 It is a schematic diagram of the transition before the present invention;

[0022] Figure 4 It is a schematic diagram of the front exhaust box of the present invention;

[0023] Figure 5 It is a schematic diagram of the sheet-combining box of the present invention;

[0024] Figure 6 It is a cross-sectional view of a shaping box of the present invention;

[0025] Figure 7 It is a schematic diagram of a first brazing box of the present invention;

[0026] Figure 8 A cross-sectional view of a second brazing box of the present invention;

[0027] Fig. 9 for Figure 8 Enlarged view of point A in the middle;

[0028] Fig.10 for Figure 8 Enlarged view of point B in the middle;

[0029] Fig.11 It is a schematic diagram of the connecting frame of the present invention;

[0030] Fig.12 It is a schematic diagram of a cooling box of the present invention;

[0031] Fig.13 A cross-sectional view of a cooling box of the present invention;

[0032] Fig.14 This is a schematic diagram of the glue coating box of the present invention:

[0033] Fig.15 It is a schematic diagram of the rear transition box of the present invention;

[0034] Fig.16 It is a schematic diagram of the rear pre-pumping box of the present invention.

[0035] Among them, 1. front pre-evacuation box; 2. front transition box; 3. front exhaust box; 4. assembly box; 5. shaping box; 6. first brazing box; 7. second brazing box; 8. third brazing box; 9. cooling box; 10. glue coating box; 11. rear transition box; 12. rear pre-evacuation box; 13. first vacuum lock; 14. second vacuum lock; 15. pump group; 16. conveying roller; 17. synchronous wheel; 18. synchronous belt; 19. cover plate; 20. vacuum pipeline; 21. molecular pump; 22. upper heater; 23. positioning push block; 24. lower heater; 25. upper roller; 26. electromagnetic heater; 27. lifting cylinder; 28. lateral regulator; 29. ​​solder input pipe; 30. upper cooling plate; 31. lower cooling plate; 32. longitudinal glue coating structure; 33. lateral glue coating mechanism; 34. glue supply mechanism; 35. lifting mechanism; 36. connecting frame. DETAILED DESCRIPTION

[0036] The following will be combined with the drawings in the specification of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0037] Example:

[0038] Please see attached Figure 1 - Attachment Fig.16The embodiment of the present invention provides a novel vacuum glass production equipment, including a front pre-evacuation box 1, a front transition box 2 is arranged on one side of the front pre-evacuation box 1, a front exhaust box 3 is arranged on one side of the front exhaust box 3, a sheet-joining box 4 is arranged on one side of the sheet-joining box 4, a shaping box 5 is arranged on one side of the shaping box 5, a first brazing box 6 is arranged on one side of the first brazing box 6, a second brazing box 7 is arranged on one side of the second brazing box 7, a third brazing box 8 is arranged on one side of the shaping box 5, a cooling box 9 is arranged on one side of the cooling box 9, a glue coating box 10 is arranged on one side of the glue coating box 10, a rear transition box 11 is arranged on one side of the rear transition box 11, and a rear pre-evacuation box 12 is arranged on one side of the front pre-evacuation box 1 and the rear pre-evacuation box 1. The outer wall of the extraction box 12 is fixedly connected with a pump group 15, and the outer wall of the front transition box 2 is fixedly connected with a vacuum pipe 20 and a molecular pump 21. The outer wall of the vacuum pipe 20 is fixedly connected to one end of the pump group 15, and one end of the molecular pump 21 is fixedly connected to the outer wall of the vacuum pipe 20; the outer walls of the vacuum pipe 20 and the molecular pump 21 are fixedly connected to the outer walls of the front exhaust box 3, the sheet assembly box 4, the shaping box 5, the first brazing box 6, the second brazing box 7, the third brazing box 8, the cooling box 9, the glue coating box 10 and the rear transition box 11, the upper surface of the front pre-extraction box 1 is provided with a cover plate 19, the outer wall of the front pre-extraction box 1 is provided with a first vacuum lock 13, and the interior of the front pre-extraction box 1 is provided with a second vacuum lock 14;

[0039] Specifically, by closing the second vacuum lock 14 and opening the first vacuum lock 13, the glass plate enters the front pre-evacuation box 1, and by closing the first vacuum lock 13, the pump group 15 is started to pump out the internal air to make the interior vacuum, and then the second vacuum lock 14 is opened to enter the front transition box 2 and close the second vacuum lock 14, and by opening the second vacuum lock 14 on the rear pre-evacuation box 12, the glass plate enters the rear pre-evacuation box 12, and then the second vacuum lock 14 is closed and the first vacuum lock 13 is opened, and the internal air is pumped out by starting the molecular pump 21 and the pump group 15, so that a vacuum is formed inside.

[0040] The interior of the pre-extraction box 1 is connected with a conveying roller 16, and the outer walls of the plurality of conveying rollers 16 are fixedly connected with synchronous wheels 17, and the outer walls of the plurality of synchronous wheels 17 are provided with synchronous belts 18;

[0041] Specifically, a glass sheet is inserted into the interior from one end of the front pre-evacuation box 1, and the conveying roller 16 is driven by a motor to rotate, which drives the synchronous wheel 17 to rotate, thereby causing the synchronous belt 18 to run, and at the same time drives multiple conveying rollers 16 and the synchronous wheel 17 to rotate, and then the glass sheet is transported by the rotation of the conveying roller 16, and the front pre-evacuation box 1 is closed by the first vacuum lock 13, and the air inside the front pre-evacuation box 1 is extracted by starting the pump group 15, and then the glass sheet is transported to the front transition box 2 by opening the second vacuum lock 14.

[0042] The interior of the front transition box 2 is fixedly connected with a second vacuum lock 14, the interior of the front transition box 2 is fixedly connected with an upper heater 22, the interior of the front transition box 2 is fixedly connected with a lower heater 24, and the upper surface of the front transition box 2 is arranged on the lower surface of the cover plate 19;

[0043] Specifically, the upper heater 22 and the lower heater 24 are started to heat the incoming glass sheet, and then the glass sheet is allowed to enter the front exhaust box 3 by the rotation of the conveying roller 16 .

[0044] The upper surface of the front exhaust box 3 is provided with a cover plate 19, the interior of the front exhaust box 3 is provided with a conveying roller 16, the interior of the front exhaust box 3 is fixedly connected to the outer wall of the upper heater 22, and the interior of the front exhaust box 3 is fixedly connected to the outer wall of the lower heater 24;

[0045] Specifically, the glass plate is continuously heated by the upper heater 22 and the lower heater 24 inside the front exhaust box 3 , so that the temperature of the workpiece is continuously increased, and then the glass plate is transported into the sheet combining box 4 by the conveying rollers 16 .

[0046] The interior of the sheet-closing box 4 is rotatably connected with the conveying roller 16, the interior of the sheet-closing box 4 is provided with a lifting mechanism 35, the interior of the sheet-closing box 4 is provided with a lifting cylinder 27, the output end of the lifting cylinder 27 is fixedly connected with the lifting mechanism 35, the interior of the shaping box 5 is provided with a positioning push block 23, the interior of the shaping box 5 is fixed with the lifting cylinder 27, the output end of the lifting cylinder 27 is fixedly connected to the positioning push block 23, and the interiors of the sheet-closing box 4 and the shaping box 5 are both fixedly connected to the inner wall of the upper heater 22;

[0047] Specifically, the lifting mechanism 35 is pushed by the lifting cylinder 27 to move, and the two glass plates are overlapped up and down. The glass plates are put into the shaping box 5 by the rotation of the conveying roller 16, and the positioning push block 23 is pushed by the lifting cylinder 27 to move so as to align the glass plates horizontally and vertically, and then the glass plates are continuously heated by the upper heater 22 inside the combining box 4 and the shaping box 5.

[0048] The upper surfaces of the first brazing box 6, the second brazing box 7 and the third brazing box 8 are provided with a cover plate 19, the interiors of the first brazing box 6 and the second brazing box 7 are fixedly connected to the outer wall of the upper heater 22, the interiors of the first brazing box 6 and the second brazing box 7 are fixedly connected to the outer wall of the lower heater 24, the interior of the second brazing box 7 is slidably connected with a connecting frame 36, the interior of the front transition box 2 is fixedly connected with a lifting cylinder 27, the output end of the lifting cylinder 27 is fixedly connected to the lower surface of the connecting frame 36, the outer wall of the connecting frame 36 is fixedly connected with an electromagnetic heater 26, one end of the electromagnetic heater 26 is fixedly connected with a solder input pipe 29, and the interior of the connecting frame 36 is provided with a transverse regulator 28;

[0049] Specifically, the glass plate enters the first brazing box 6 by the rotation of the conveying roller 16, and then the upper roller 25 slides in the first brazing box 6 to limit the glass plate, and then enters the second brazing box 7 through the movement of the glass plate, and the connecting frame 36 is driven to move by the output end of the lifting cylinder 27, and then the lateral regulator 28 moves between the connecting frames 36 to achieve the effect of up and down and lateral adjustment, and the brazing material enters the electromagnetic heater 26 through the brazing material input pipe 29 for heating, and then the brazing material is liquid-filled and welded, and enters through the upper heater 22 and the lower heater 24 inside the first brazing box 6 and the second brazing box 7, and the glass plate is moved into the third brazing box 8 by the rotation of the conveying roller 16 and the upper roller 25.

[0050] A cover plate 19 is provided on the upper surface of the cooling box 9, the cover plate 19 is rotatably connected inside the cooling box 9, a lifting cylinder 27 is fixedly connected inside the cooling box 9, and the output ends of the plurality of lifting cylinders 27 are respectively fixedly connected with an upper cooling plate 30 and a lower cooling plate 31, and the outer walls of the upper cooling plate 30 and the lower cooling plate 31 are both slidably connected inside the cooling box 9, and an upper roller 25 is provided inside the cooling box 9;

[0051] Specifically, the upper cooling plate 30 and the lower cooling plate 31 are driven to move by the output end of the lifting cylinder 27, so that the upper cooling plate 30 and the lower cooling plate 31 are close to the glass plate, thereby cooling the glass plate, and then the glass plate is entered into the glue coating box 10 through the rotation of the conveying roller 16 and the upper roller 25.

[0052] The outer wall of the glue coating box 10 is provided with a glue supply mechanism 34, one end of which is respectively fixedly connected to the longitudinal glue coating structure 32 and the lateral glue coating mechanism 33, the outer walls of the longitudinal glue coating structure 32 and the lateral glue coating mechanism 33 are arranged inside the glue coating box 10, the inside of the glue coating box 10 is rotatably connected to the conveying roller 16, the inside of the glue coating box 10 is rotatably connected to the upper roller 25, the inside of the glue coating box 10 is provided with a second vacuum lock 14, and the upper surface of the glue coating box 10 is provided with a cover plate 19;

[0053] Specifically, the glue supply mechanism 34 supplies glue to the longitudinal glue coating structure 32 and the lateral glue coating mechanism 33 , the longitudinal glue coating structure 32 coats the glass plate with glue longitudinally, and the lateral glue coating mechanism 33 coats the glass plate with glue laterally and longitudinally.

[0054] The rear transition box 11 and the rear pre-extraction box 12 are both provided with a conveying roller 16, the rear transition box 11 and the rear pre-extraction box 12 are provided with an upper roller 25, the upper surfaces of the rear transition box 11 and the rear pre-extraction box 12 are provided with a cover plate 19, the rear pre-extraction box 12 is provided with a second vacuum lock 14, and the outer wall of the rear pre-extraction box 12 is provided with a first vacuum lock 13;

[0055] Specifically, the second vacuum lock 14 is closed and the pump group 15 and the molecular pump 21 are started to keep the glue coating box 10 in vacuum, and the glass plate is allowed to enter the rear transition box 11 by the rotation of the conveying roller 16 and the upper roller 25. The second vacuum lock 14 is then opened to allow the glass plate to enter the rear pre-evacuation box 12, and the glass plate is taken out by opening the first vacuum lock 13 on one side of the rear pre-evacuation box 12. The high degree of automation greatly improves the production efficiency and reduces the production cost.

[0056] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A novel vacuum glass production equipment, comprising a front pre-evacuation box (1), characterized in that: A front transition box (2) is provided on one side of the front pre-extraction box (1), a front exhaust box (3) is provided on one side of the front exhaust box (3), a sheet-forming box (4) is provided on one side of the sheet-forming box (4), a first brazing box (6) is provided on one side of the shaping box (5), a second brazing box (7) is provided on one side of the first brazing box (6), a third brazing box (8) is provided on one side of the second brazing box (7), a cooling box (9) is provided on one side of the cooling box (9), and a cooling box (9) is provided on one side of the cooling box (9). A glue coating box (10) is arranged on one side of the glue coating box (10), a rear transition box (11) is arranged on one side of the rear transition box (11), a rear pre-pumping box (12) is arranged on one side of the rear transition box (11), the outer walls of the front pre-pumping box (1) and the rear pre-pumping box (12) are fixedly connected to a pump group (15), the outer walls of the front transition box (2) are fixedly connected to a vacuum pipe (20) and a molecular pump (21), the outer wall of the vacuum pipe (20) is fixedly connected to one end of the pump group (15), and one end of the molecular pump (21) is fixedly connected to the outer wall of the vacuum pipe (20).

2. A new vacuum glass production equipment according to claim 1, characterized in that: The vacuum pipe (20) and the outer wall of the molecular pump (21) are fixedly connected to the outer walls of the front exhaust box (3), the assembly box (4), the shaping box (5), the first brazing box (6), the second brazing box (7), the third brazing box (8), the cooling box (9), the glue coating box (10) and the rear transition box (11); the upper surface of the front pre-evacuation box (1) is provided with a cover plate (19); the outer wall of the front pre-evacuation box (1) is provided with a first vacuum lock (13); and the interior of the front pre-evacuation box (1) is provided with a second vacuum lock (14).

3. A new vacuum glass production equipment according to claim 1, characterized in that: The interior of the data pre-extraction box (1) is connected to a conveying roller (16), the outer walls of the plurality of conveying rollers (16) are fixedly connected to synchronous wheels (17), and the outer walls of the plurality of synchronous wheels (17) are provided with synchronous belts (18).

4. A new vacuum glass production equipment according to claim 1, characterized in that: The interior of the front transition box (2) is fixedly connected to a second vacuum lock (14), the interior of the front transition box (2) is fixedly connected to an upper heater (22), the interior of the front transition box (2) is fixedly connected to a lower heater (24), and the upper surface of the front transition box (2) is arranged on the lower surface of the cover plate (19).

5. The novel vacuum glass production equipment according to claim 1 is characterized in that: The upper surface of the front exhaust box (3) is provided with a cover plate (19), the interior of the front exhaust box (3) is provided with a conveying roller (16), the interior of the front exhaust box (3) is fixedly connected to the outer wall of the upper heater (22), and the interior of the front exhaust box (3) is fixedly connected to the outer wall of the lower heater (24).

6. The novel vacuum glass production equipment according to claim 1 is characterized in that: The interior of the sheet-closing box (4) is rotatably connected to a conveying roller (16); the interior of the sheet-closing box (4) is provided with a lifting mechanism (35); the interior of the sheet-closing box (4) is provided with a lifting cylinder (27); the output end of the lifting cylinder (27) is fixedly connected to the lifting mechanism (35); the interior of the shaping box (5) is provided with a positioning push block (23); the interior of the shaping box (5) is fixedly provided with a lifting cylinder (27); the output end of the lifting cylinder (27) is fixedly connected to the positioning push block (23); the interiors of the sheet-closing box (4) and the shaping box (5) are both fixedly connected to the inner wall of the upper heater (22).

7. The novel vacuum glass production equipment according to claim 1 is characterized in that: The upper surfaces of the first brazing box (6), the second brazing box (7) and the third brazing box (8) are provided with a cover plate (19); the interiors of the first brazing box (6) and the second brazing box (7) are fixedly connected to the outer wall of the upper heater (22); the interiors of the first brazing box (6) and the second brazing box (7) are fixedly connected to the outer wall of the lower heater (24); the interior of the second brazing box (7) is slidably connected to a connecting frame (36); the interior of the front transition box (2) is fixedly connected to a lifting cylinder (27); the output end of the lifting cylinder (27) is fixedly connected to the lower surface of the connecting frame (36); the outer wall of the connecting frame (36) is fixedly connected to an electromagnetic heater (26); one end of the electromagnetic heater (26) is fixedly connected to a brazing material input pipe (29); and the interior of the connecting frame (36) is provided with a transverse regulator (28).

8. The novel vacuum glass production equipment according to claim 1 is characterized in that: A cover plate (19) is provided on the upper surface of the cooling box (9), the cover plate (19) is rotatably connected inside the cooling box (9), a lifting cylinder (27) is fixedly connected inside the cooling box (9), the output ends of the plurality of lifting cylinders (27) are respectively fixedly connected to an upper cooling plate (30) and a lower cooling plate (31), the outer walls of the upper cooling plate (30) and the lower cooling plate (31) are both slidably connected to the inside of the cooling box (9), and an upper roller (25) is provided inside the cooling box (9).

9. The novel vacuum glass production equipment according to claim 1, characterized in that: The outer wall of the glue coating box (10) is provided with a glue supply mechanism (34), one end of which is fixedly connected to a longitudinal glue coating structure (32) and a lateral glue coating mechanism (33), respectively; the outer walls of the longitudinal glue coating structure (32) and the lateral glue coating mechanism (33) are arranged inside the glue coating box (10); the interior of the glue coating box (10) is rotatably connected to a conveying roller (16); the interior of the glue coating box (10) is rotatably connected to an upper roller (25); the interior of the glue coating box (10) is provided with a second vacuum lock (14); and the upper surface of the glue coating box (10) is provided with a cover plate (19).

10. The novel vacuum glass production equipment according to claim 1, characterized in that: The rear transition box (11) and the rear pre-extraction box (12) are both provided with conveying rollers (16) connected thereto, the rear transition box (11) and the rear pre-extraction box (12) are provided with upper rollers (25), the upper surfaces of the rear transition box (11) and the rear pre-extraction box (12) are provided with cover plates (19), the interior of the rear pre-extraction box (12) is provided with a second vacuum lock (14), and the outer wall of the rear pre-extraction box (12) is provided with a first vacuum lock (13).