Blast furnace production method based on cost performance evaluation of cutting slag steel for blast furnace
Through conventional chemical analysis and cost calculation of iron oxides of cut slag steel for blast furnaces, the safety risks and high cost issues of the quality evaluation method for cut slag steel for blast furnaces were solved. Slag steel was used as raw material for blast furnace ironmaking, which achieved safety. and cost optimization.
Patent Information
- Application Number
- CN202410820508.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-24
- Publication Date
- 2024-10-01
AI Technical Summary
The existing quality evaluation methods for blast furnace cutting slag steel have safety risks and high costs, and are prone to smoke pollution during the heating and melting process.
By conducting conventional chemical analysis of iron oxides on cut slag steel for blast furnaces, calculating its ferrous oxide content and direct reduction degree, and combining the melting heat capacity of scrap steel, coke price and processing costs, the production cost of using slag steel to produce 1 ton of molten iron was calculated. , if the cost is lower than not using slag steel, use slag steel as raw material for blast furnace ironmaking to avoid the heating, melting and cooling process.
It achieves improved safety and cost savings, eliminates the risk of tumbling and splashing during the melting process, saves equipment maintenance and energy consumption, and improves production efficiency and resource utilization.
Smart Images

Figure CN118726672A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of blast furnace ironmaking, and in particular to a blast furnace production method based on cost performance evaluation of cut slag steel for blast furnace. Background Art
[0002] Cutting slag steel is a by-product of the cutting process in the manufacturing industry, mainly composed of metallic iron, iron oxides, silicon, manganese, phosphorus, sulfur and other impurity oxides.
[0003] For the quality evaluation of cutting slag steel, crushed materials, particle steel (for steelmaking), etc. for blast furnaces, some companies currently use the medium frequency furnace heating melting weighing method. Specifically: 1) Weigh 500g of sample and place it in a clay crucible (graphite crucible); 2) Place it in the medium frequency induction furnace heating facility and heat it to 1500-1600℃ (open heating), let it stand in the air to cool after melting, and add water to accelerate cooling to room temperature below 45℃ after condensation; 3) Use a hammer to break the crucible and remove the condensed slag on the discus; 4) Calculate the metal recovery rate after weighing the discus; 5) Use the metal recovery rate of a certain variety as a benchmark to evaluate the cost performance of other varieties. There are the following disadvantages: 1) The melt is prone to rolling and splashing during the heating and melting process, which poses safety risks and smoke pollution; 2) The equipment needs to be kept in good condition during use, and timely maintenance and repairs are required to avoid accidents caused by equipment failure. Summary of the invention
[0004] The purpose of the present invention includes, for example, providing a blast furnace production method based on cost-effectiveness evaluation of cut slag steel for blast furnace, which can improve the problems of high risk and high cost of quality evaluation methods for scrap steel for blast furnace.
[0005] The embodiments of the present invention can be implemented as follows:
[0006] An embodiment of the present invention provides a blast furnace production method based on cost-effectiveness evaluation of cut slag steel for blast furnaces, comprising: obtaining the ferrous oxide content of the slag steel by performing conventional chemical analysis of iron oxides on the cut slag steel for blast furnaces; performing theoretical calculation of the direct reduction degree of iron using conventional detection data based on the production performance of a stable forward cycle of the blast furnace to obtain the direct reduction degree of iron; obtaining the production cost of producing one ton of molten iron using slag steel under the same conditions based on a comprehensive calculation of the direct reduction degree of iron, the ferrous oxide content of the slag steel, the melting heat capacity of scrap steel, the price of coke, and the processing cost per ton of iron; and using slag steel as raw material for blast furnace ironmaking when the cost of producing molten iron for a blast furnace using slag steel is lower than the cost of producing molten iron for a blast furnace not using slag steel.
[0007] In addition, the blast furnace production method based on the cost performance evaluation of the cut slag steel for blast furnace provided by the embodiment of the present invention may also have the following additional technical features:
[0008] Optionally, the step of obtaining the ferrous oxide content of the slag steel by performing conventional chemical analysis on iron oxides of the blast furnace cutting slag steel includes: using 1 g of potassium fluoride and 60 ml of a hydrochloric acid solution to form a hydrochloric acid solution, dissolving the iron oxides in the blast furnace cutting slag steel, to obtain a first-stage product; using absorbent cotton to filter the first-stage product to remove carbon, to obtain a second-stage product; and titrating the second-stage product with a standard potassium dichromate titration solution.
[0009] Optionally, when the cost of manufacturing blast furnace molten iron using slag steel is lower than the cost of manufacturing blast furnace molten iron not using slag steel, the step of using slag steel as raw material for blast furnace ironmaking includes: the parameter of adding slag steel is 25-40kg / t of slag steel per ton of iron.
[0010] Optionally, when the manufacturing cost of blast furnace molten iron using slag steel is lower than the manufacturing cost of blast furnace molten iron not using slag steel, the step of using slag steel as raw material for blast furnace ironmaking also includes: blast furnace air supply parameters are, air volume 4900-5200m 3 / min, oxygen enrichment rate 4-6%, top pressure 215-230Kpa.
[0011] Optionally, the blast furnace air supply parameters are: air volume 4900-5000m 3 / min, oxygen enrichment rate 4-5%, top pressure 220-230Kpa.
[0012] Optionally, when the manufacturing cost of blast furnace molten iron using slag steel is lower than that of blast furnace molten iron not using slag steel, the step of using slag steel as raw material for blast furnace ironmaking further includes: furnace top distribution parameters are respectively: 8 3 7 3 6 3 5 2 , C 9 3 8 2 7 2 6 2 5 2 4 2 , material line 1.4m.
[0013] Optionally, when the cost of manufacturing blast furnace molten iron using slag steel is lower than the cost of manufacturing blast furnace molten iron not using slag steel, the step of using slag steel as raw material for blast furnace ironmaking also includes: the thermal system and slag making system are centered on the physical heat of molten iron being greater than 1500°C and sufficient and stable heat flow in the furnace, based on 0.98-1.02 times the quaternary basicity.
[0014] Optionally, when the cost of manufacturing blast furnace molten iron using slag steel is lower than the cost of manufacturing blast furnace molten iron not using slag steel, the step of using slag steel as raw material for blast furnace ironmaking also includes: when the ferrous oxide content is high and the specific gravity is high, the slag steel and lump ore are mixed in the lower loading chamber of the blast furnace.
[0015] Optionally, when the cost of manufacturing blast furnace molten iron using slag steel is lower than the cost of manufacturing blast furnace molten iron not using slag steel, the step of using slag steel as raw material for blast furnace ironmaking also includes: charging the furnace top to the middle ring belt of the furnace.
[0016] Optionally, when the cost of manufacturing blast furnace molten iron using slag steel is lower than the cost of manufacturing blast furnace molten iron not using slag steel, the step of using slag steel as raw material for blast furnace ironmaking also includes: monitoring the operation of the belt iron remover.
[0017] The beneficial effects of the blast furnace production method based on the cost performance evaluation of the cut slag steel for blast furnace according to the embodiment of the present invention include, for example:
[0018] The blast furnace production method based on the cost-effectiveness evaluation of cut slag steel for blast furnace comprises: step S1, obtaining the ferrous oxide content of the slag steel by performing conventional chemical analysis of iron oxides on the cut slag steel for blast furnace; step S2, theoretically calculating the direct reduction degree of iron by using conventional detection data based on the production performance of the stable forward cycle of the blast furnace to obtain the direct reduction degree of iron; step S3, comprehensively calculating the direct reduction degree of iron, the ferrous oxide content of the slag steel, the melting heat capacity of scrap steel, the price of coke and the processing cost per ton of iron to obtain the production cost of producing one ton of molten iron using slag steel under the same conditions; step S4, using slag steel as raw material for blast furnace ironmaking when the cost of manufacturing blast furnace molten iron using slag steel is lower than that of manufacturing blast furnace molten iron not using slag steel.
[0019] The ferrous oxide content of slag steel is obtained through conventional chemical analysis. With the help of the previous (long-term) estimated data, it is possible to achieve an evaluation effect similar to that of the heating and melting method to measure the metal iron yield. Then the production cost is calculated. The required data is easy to obtain for daily production inspection items, and the data volume is relatively reliable. Therefore, it is relatively reliable to use production data to estimate the upper limit of the price of cutting slag steel for blast furnaces. Finally, based on the comparison of production costs, it is evaluated whether to use slag steel for ironmaking. If slag steel has a high cost-effectiveness, slag steel is used as raw material for blast furnace ironmaking. Therefore, there is no need for heating, melting and cooling, eliminating the risk of scalding and fire accidents caused by rolling and splashing during the melting process; at the same time, it saves the costs of crucibles, medium-frequency induction furnaces, electricity consumption, water consumption, etc. BRIEF DESCRIPTION OF THE DRAWINGS
[0020] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings required for use in the embodiments are briefly introduced below. It should be understood that the following drawings only show certain embodiments of the present invention and therefore should not be regarded as limiting the scope. For ordinary technicians in this field, other related drawings can be obtained based on these drawings without creative work.
[0021] Figure 1 A flowchart of the steps of a blast furnace production method based on cost-effectiveness evaluation of cut slag steel for blast furnace provided in this embodiment;
[0022] Figure 2 This is a flowchart of step S1 in the blast furnace production method based on the cost-effectiveness evaluation of cut slag steel for blast furnace provided in this embodiment. DETAILED DESCRIPTION
[0023] In order to make the purpose, technical solutions and advantages of the embodiments of the present invention clearer, the technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Generally, the components of the embodiments of the present invention described and shown in the drawings here can be arranged and designed in various different configurations.
[0024] Therefore, the following detailed description of the embodiments of the present invention provided in the accompanying drawings is not intended to limit the scope of the invention claimed for protection, but merely represents selected embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0025] It should be noted that similar reference numerals and letters denote similar items in the following drawings, and therefore, once an item is defined in one drawing, further definition and explanation thereof is not required in subsequent drawings.
[0026] In the description of the present invention, it should be noted that if the terms "upper", "lower", "inside", "outside", etc. appear to indicate an orientation or position relationship, they are based on the orientation or position relationship shown in the accompanying drawings, or are the orientation or position relationship in which the product of the invention is usually placed when used. They are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present invention.
[0027] In addition, the terms “first”, “second”, etc., if used, are merely used to distinguish between the descriptions and should not be understood as indicating or implying relative importance.
[0028] It should be noted that, in the absence of conflict, the features in the embodiments of the present invention may be combined with each other.
[0029] Combine the following Figure 1 to Figure 2 The blast furnace production method based on the cost performance evaluation of the cut slag steel for blast furnace provided in this embodiment is described in detail.
[0030] Please refer to Figure 1 The embodiment of the present invention provides a blast furnace production method based on the cost-effectiveness evaluation of cut slag steel for blast furnace, comprising: step S1, obtaining the ferrous oxide content of the slag steel by performing conventional chemical analysis of iron oxides on the cut slag steel for blast furnace; step S2, according to the production performance of the stable forward cycle of the blast furnace, using conventional detection data to perform theoretical calculation of the direct reduction degree of iron to obtain the direct reduction degree of iron; step S3, according to the direct reduction degree of iron, the ferrous oxide content of the slag steel, the melting heat capacity of scrap steel, the coke price and the processing cost per ton of iron, the production cost of producing 1 ton of molten iron using slag steel under the same conditions is obtained by comprehensive calculation; step S4, when the cost of producing molten iron in a blast furnace using slag steel is lower than the cost of producing molten iron in a blast furnace not using slag steel, slag steel is used as raw material for blast furnace ironmaking.
[0031] In step S1, conventional chemical analysis of iron oxides, mainly ferrous oxide, etc. is performed on the blast furnace cutting slag steel. In step S3, the subsequent calculation and evaluation are carried out by borrowing the reduction degree of iron. If it is changed to the direct reduction degree of the blast furnace to participate in the measurement, it is also completed, but the measurement process is relatively cumbersome and complicated. In step S4, the production cost calculated in step S3 is compared with the blast furnace molten iron manufacturing cost (without slag steel). When it is lower than the molten iron manufacturing cost, slag steel is used as raw material. The FeO content of slag steel, the melting heat capacity of scrap steel, the price of coke, the fixed processing fee per ton of iron in the target blast furnace and the direct reduction degree of iron are comprehensively calculated to evaluate the cost performance of cutting slag steel and calculate the upper limit of the price.
[0032] The data required for steps 1-3 are easy to obtain for daily production inspection items, and the amount of data is relatively reliable. Therefore, it is relatively reliable to use production data to estimate the upper limit of the price of cutting slag steel (resource) for blast furnaces. With the help of previous (long-term) estimated data, an evaluation effect similar to that of the heating and melting method for calculating the metal iron yield can be achieved. Therefore, there is no need for heating, melting and cooling steps, eliminating the risk of scalding and fire accidents caused by rolling and splashing during the melting process, saving costs such as crucibles, medium-frequency induction furnaces, electricity consumption and water consumption.
[0033] Reference Figure 2 In this embodiment, step S1, obtaining the ferrous oxide content of the slag steel by performing conventional chemical analysis of iron oxides on the blast furnace cutting slag steel, comprises: step S11, using 1 g of potassium fluoride and 60 ml of hydrochloric acid solution to form a hydrochloric acid solution, dissolving the iron oxides in the blast furnace cutting slag steel to obtain a first-stage product; step S12, filtering the first-stage product with absorbent cotton to remove carbon to obtain a second-stage product; step S13, titrating the second-stage product with a potassium dichromate standard titration solution.
[0034] During the determination of samples with high carbon content or insoluble substances, the presence of insoluble substances affects the sensitivity of the color change of the titration endpoint, causing measurement deviation. Optimization and improvement are made to address the difficulty of judging the titration endpoint during the determination of ferrous oxide due to the presence of insoluble substances in the sample.
[0035] By increasing the dosage of potassium fluoride and hydrochloric acid solution to 1g and 60ml respectively, the iron oxide is fully dissolved, and then the use of absorbent cotton is increased to remove carbon, and then potassium dichromate standard titration solution is titrated to greatly improve the sensitivity of the color change at the titration end point, improve the test accuracy, and obtain the ferrous oxide content.
[0036] In this embodiment, step S4, when the cost of manufacturing blast furnace molten iron using slag steel is lower than the cost of manufacturing blast furnace molten iron not using slag steel, slag steel is used as raw material for blast furnace ironmaking, and also includes: when the ferrous oxide content is high and the specific gravity is high, the slag steel and lump ore are mixed under the blast furnace trough to prepare for distribution to the middle ring belt, thereby improving the stability of the center and edge airflows.
[0037] In this embodiment, step S4, when the cost of manufacturing molten iron in a blast furnace using slag steel is lower than the cost of manufacturing molten iron in a blast furnace not using slag steel, slag steel is used as raw material for blast furnace ironmaking, and further includes: charging the furnace top to the middle ring belt of the furnace. The stability of the center and edge airflow is improved to promote the stable, low-consumption and high-efficiency operation of the blast furnace.
[0038] During the use of the blast furnace, slag steel and lump ore are mixed and loaded under the blast furnace trough in view of the characteristics of high ferrous oxide content and high specific gravity of the materials. When loading the furnace top, the materials are distributed to the middle ring belt of the furnace to improve the stability of the airflow distribution.
[0039] In this embodiment, step S4, when the cost of manufacturing blast furnace molten iron using slag steel is lower than the cost of manufacturing blast furnace molten iron not using slag steel, blast furnace ironmaking is carried out using slag steel as raw material, including: the parameter of adding slag steel is 25-40kg / t of slag steel per ton of iron.
[0040] After using 25kg / t iron of slag steel, the blast furnace fuel ratio dropped by 5kg / t iron, which promoted the carbon reduction of the blast furnace and the efficient and comprehensive utilization of secondary resource steel materials. Among them, the current slag steel usage of No. 9 blast furnace has reached 40kg / t iron.
[0041] In this embodiment, step S4, when the cost of blast furnace molten iron using slag steel is lower than the cost of blast furnace molten iron not using slag steel, blast furnace ironmaking is performed using slag steel as raw material, and further includes: blast furnace air supply parameters are: air volume 4900-5200m 3 / min, oxygen enrichment rate 4-6%, top pressure 215-230Kpa.
[0042] Optimize the distribution of coal gas flow to improve coal gas utilization, achieve long-term stable and smooth operation of blast furnace conditions, low consumption and high efficiency production. Optimize the blast furnace air supply system and gradually move towards a green, low-carbon and high-efficiency production model with consumption reduction and production increase as the core.
[0043] In this embodiment, the blast furnace air supply parameters are: air volume 4900-5000m 3 / min, oxygen enrichment rate 4-5%, top pressure 220-230Kpa. Specifically, the blast furnace air supply parameters are: air volume 4900m 3 / min, oxygen enrichment rate 4.2%, top pressure 227Kpa.
[0044] In this embodiment, step S4, when the cost of manufacturing blast furnace molten iron using slag steel is lower than the cost of manufacturing blast furnace molten iron not using slag steel, blast furnace ironmaking using slag steel as raw material also includes: furnace top distribution parameters are respectively: 8 3 7 3 6 3 5 2 , C 9 3 8 2 7 2 6 2 5 2 4 2 , material line 1.4m.
[0045] In this way, the airflow distribution can be optimized by taking into account both the center and the loose edge to improve gas utilization, thereby achieving stable and smooth operation of the blast furnace over a longer period of time, as well as low consumption and efficient production.
[0046] Optimization of furnace top charging system: The furnace top charging method always focuses on the operation concept of center airflow and taking into account the edge. The reduction of smelting strength reduces the total pressure difference of the blast furnace, creating conditions for further widening and optimizing charging, improving airflow distribution and gas utilization.
[0047] In this embodiment, step S4, when the cost of manufacturing blast furnace molten iron using slag steel is lower than that of manufacturing blast furnace molten iron not using slag steel, the step of using slag steel as raw material for blast furnace ironmaking also includes: the thermal system slag making system is based on 0.98-1.02 times of quaternary basicity, with the physical heat of molten iron greater than 1500°C and sufficient and stable heat flow in the furnace as the center. Promote the long-term stable and smooth operation of the blast furnace condition, low-consumption and high-efficiency production.
[0048] In this embodiment, step S4, when the cost of blast furnace iron water produced by using slag steel is lower than that of blast furnace iron water produced by not using slag steel, slag steel is used as raw material for blast furnace ironmaking, and further includes: monitoring the operation of the belt iron remover. Increasing the operation monitoring of the belt iron remover so as to handle abnormalities in a timely manner and avoid damaging the belt.
[0049] According to a blast furnace production method based on the cost-effectiveness evaluation of cut slag steel for blast furnaces provided in this embodiment, the working principle of the blast furnace production method based on the cost-effectiveness evaluation of cut slag steel for blast furnaces is: the cost-effectiveness of slag steel is determined based on optimized experiments, and when the cost-effectiveness of using slag steel is higher than the cost of direct ironmaking in a blast furnace, slag steel is used as raw material, and then the optimized blast furnace process is adopted for production.
[0050] The operation method of the distribution matrix angle of the blast furnace using cut steel slag: the iron content of cut steel slag is as high as 75% or more. According to the physical properties and metallurgical properties of the cut steel slag, the appropriate amount of cut steel slag is determined. Scientifically adjust the distribution matrix in the blast furnace. The distribution matrix angle includes two directions: the number of circles and the angle. By adjusting the distribution matrix, the distribution of cut steel slag in the blast furnace is optimized. Reasonable distribution can improve the utilization efficiency of cut steel slag and reduce the adverse effects on blast furnace operation. Establish a blast furnace airflow model. According to the usage of cut steel slag and the distribution in the furnace, establish a blast furnace airflow model. The model should include parameters such as airflow edge, center index and gas utilization rate. The model can analyze the impact of cut steel slag on the blast furnace airflow and further optimize the use of cut steel slag. According to the blast furnace airflow model, adjust the blast furnace operating parameters such as furnace temperature, pressure, air volume, etc. to establish the optimal reduction reaction. This helps to increase the output of the blast furnace and reduce energy consumption.
[0051] The blast furnace production method based on the cost performance evaluation of the blast furnace cutting slag steel provided in this embodiment has at least the following advantages:
[0052] The ferrous oxide content of slag steel is obtained through conventional chemical analysis. With the help of the previous (long-term) estimated data, it is possible to achieve an evaluation effect similar to that of the heating and melting method to measure the metal iron yield. Then the production cost is calculated. The required data is easy to obtain for daily production inspection items, and the data volume is relatively reliable. Therefore, it is relatively reliable to use production data to estimate the upper limit of the price of cutting slag steel for blast furnaces. Finally, based on the comparison of production costs, it is evaluated whether to use slag steel for ironmaking. If slag steel has a high cost-effectiveness, slag steel is used as raw material for blast furnace ironmaking. Therefore, there is no need for heating, melting and cooling, eliminating the risk of scalding and fire accidents caused by rolling and splashing during the melting process; at the same time, it saves the costs of crucibles, medium-frequency induction furnaces, electricity consumption, water consumption, etc.
[0053] In addition, after using 25kg / t iron of slag steel, the blast furnace fuel ratio dropped by 5kg / t iron, which promoted the carbon reduction of the blast furnace and the efficient and comprehensive utilization of secondary resource steel materials.
[0054] The above is only a specific embodiment of the present invention, but the protection scope of the present invention is not limited thereto. Any changes or substitutions that can be easily thought of by a person skilled in the art within the technical scope disclosed by the present invention should be included in the protection scope of the present invention. Therefore, the protection scope of the present invention should be based on the protection scope of the claims.
Claims
1. A blast furnace production method based on cost performance evaluation of cut slag steel for blast furnace, characterized in that: include: The ferrous oxide content of slag steel is obtained by conducting conventional chemical analysis of iron oxides on blast furnace cut slag steel; Based on the actual production performance of the blast furnace in a stable forward cycle, the direct reduction degree of iron is theoretically calculated using conventional test data to obtain the direct reduction degree of iron; The production cost of producing 1 ton of molten iron using slag steel under the same conditions is calculated based on the direct reduction degree of the iron, the ferrous oxide content of the slag steel, the melting heat capacity of scrap steel, the price of coke, and the processing cost per ton of iron; When the cost of producing blast furnace iron water using slag steel is lower than that of producing blast furnace iron water not using slag steel, slag steel is used as raw material for blast furnace ironmaking.
2. The blast furnace production method based on cost performance evaluation of cut slag steel for blast furnace according to claim 1, characterized in that: The step of obtaining the ferrous oxide content of the slag steel by performing conventional chemical analysis of iron oxides on the cut slag steel for blast furnace comprises: 1 g of potassium fluoride and 60 ml of hydrochloric acid solution are used to form a hydrochloric acid solution to dissolve the iron oxides in the blast furnace cutting slag steel to obtain the first stage product; The first-stage product is filtered using absorbent cotton to remove carbon, thereby obtaining a second-stage product; The second stage product is titrated with potassium dichromate standard titration solution.
3. The blast furnace production method based on cost performance evaluation of cut slag steel for blast furnace according to claim 1, characterized in that: When the cost of manufacturing blast furnace molten iron using slag steel is lower than that of manufacturing blast furnace molten iron not using slag steel, the step of using slag steel as raw material for blast furnace ironmaking includes: the parameter of adding slag steel is 25-40kg / t of slag steel per ton of iron.
4. The blast furnace production method based on cost performance evaluation of cut slag steel for blast furnace according to claim 3, characterized in that: In the case where the manufacturing cost of blast furnace molten iron using slag steel is lower than the manufacturing cost of blast furnace molten iron not using slag steel, the step of using slag steel as raw material for blast furnace ironmaking also includes: the blast furnace air supply parameter is, the air volume is 4900-5200m 3 / min, oxygen enrichment rate 4-6%, top pressure 215-230Kpa.
5. The blast furnace production method based on cost performance evaluation of cut slag steel for blast furnace according to claim 4, characterized in that: The blast furnace air supply parameters are: air volume 4900-5000m 3 / min, oxygen enrichment rate 4-5%, top pressure 220-230Kpa.
6. The blast furnace production method based on cost performance evaluation of cut slag steel for blast furnace according to claim 3, characterized in that: In the case where the manufacturing cost of blast furnace molten iron using slag steel is lower than the manufacturing cost of blast furnace molten iron not using slag steel, the step of using slag steel as raw material for blast furnace ironmaking also includes: furnace top distribution parameters are respectively: 8 3 7 3 6 3 5 2. C 9 3 8 2 7 2 6 2 5 2 4 2. Material line 1.4m.
7. The blast furnace production method based on cost performance evaluation of cut slag steel for blast furnace according to claim 3, characterized in that: When the cost of manufacturing blast furnace molten iron using slag steel is lower than that of blast furnace molten iron not using slag steel, the step of using slag steel as raw material for blast furnace ironmaking also includes: the thermal system and slag making system are centered on the physical heat of molten iron being greater than 1500°C and sufficient and stable heat flow in the furnace, based on 0.98-1.02 times the quaternary basicity.
8. The blast furnace production method based on cost performance evaluation of cut slag steel for blast furnace according to any one of claims 1 to 7, characterized in that: When the cost of manufacturing blast furnace molten iron using slag steel is lower than that of manufacturing blast furnace molten iron not using slag steel, the step of using slag steel as raw material for blast furnace ironmaking also includes: when the ferrous oxide content is high and the specific gravity is high, the slag steel and lump ore are mixed in the lower trough of the blast furnace.
9. The blast furnace production method based on cost performance evaluation of cut slag steel for blast furnace according to claim 8, characterized in that: When the cost of manufacturing blast furnace molten iron using slag steel is lower than that of manufacturing blast furnace molten iron not using slag steel, the step of using slag steel as raw material for blast furnace ironmaking also includes: charging the furnace top to the middle ring belt of the furnace.
10. The blast furnace production method based on cost performance evaluation of cut slag steel for blast furnace according to any one of claims 1 to 7, characterized in that: When the cost of producing blast furnace molten iron using slag steel is lower than that of producing blast furnace molten iron not using slag steel, the step of using slag steel as raw material for blast furnace ironmaking further includes: monitoring the operation of the belt iron remover.
