Urban engineering muck roadbed compaction quality control method and system
By collecting and establishing quality parameters of urban engineering muck subgrade and establishing a compaction quality control model, the problems of low detection efficiency and poor applicability in the existing technology are solved, and fast, simple and non-destructive testing of urban engineering muck subgrade is realized. Improved compaction quality and resource utilization.
Patent Information
- Application Number
- CN202411050276.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-01
- Publication Date
- 2024-10-01
AI Technical Summary
In the existing technology, the compaction quality detection method of urban engineering muck subgrade has the problems of low detection efficiency, high risk, and long time consumption. It is not suitable for fine-grained soil with poor performance, and it is difficult to achieve fast, simple and non-destructive methods. detection.
An urban engineering muck subgrade compaction quality control method is adopted, which includes obtaining parameters, establishing models, setting conditions and quality judgment. By collecting various quality parameters, a compaction quality control model is established, control standards are set, and the subgrade pressure is judged through the model. Whether the solidity meets the quality requirements is achieved to achieve fast, simple and non-destructive testing.
It improves the compaction quality of highway subgrade, realizes the green resource utilization of urban engineering muck waste, and ensures the quality of urban engineering muck roadbed. It is simple, efficient and fast.
Smart Images

Figure CN118727699A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of highway engineering, and in particular to a method and system for controlling the compaction quality of urban engineering slag roadbed. Background Art
[0002] The roadbed is the foundation of the road surface. The roadbed compaction refers to the ratio of the dry density of the soil or other road construction materials after compaction to the standard maximum dry density, expressed as a percentage. The roadbed compaction is one of the key indicators for roadbed and pavement construction quality inspection, which characterizes the density after on-site compaction. The higher the compaction, the greater the density and the better the overall performance of the material.
[0003] In the prior art, the methods for testing the compaction quality of highway subgrades include compaction (earth fill subgrade), porosity or compaction settlement difference (stone fill subgrade). The compaction should be calculated using the maximum dry density of the indoor compaction test, and the filler needs to have good uniformity. However, the compaction test requires digging holes and filling sand, testing the moisture content of the filler, which is time-consuming and labor-intensive. When the moisture content is tested by the alcohol combustion method, it is highly dangerous; when the drying method is used for testing, it takes a long time and affects the progress of subgrade construction. The porosity test should be carried out by pouring water in the excavated pit, which is more difficult and complicated, and requires an indoor specific gravity test, and the detection efficiency is extremely low. Urban engineering slag is mostly fine-grained soil with poor performance, with a wide source, complex composition, poor uniformity, and large differences in the maximum dry density of different soil fields. Obviously, urban engineering slag is not suitable for using compaction and porosity as detection indicators. Therefore, it is necessary to propose a rapid detection method and control standard for the compaction quality of urban engineering slag subgrade that matches the subgrade design indicators and meets the needs of rapid construction based on the engineering characteristics of urban engineering slag.
[0004] Therefore, it is an urgent problem for those skilled in the art to propose a method and system for controlling the compaction quality of urban engineering slag roadbed to solve the difficulties existing in the prior art. Summary of the invention
[0005] In view of this, the present invention provides a method and system for controlling the compaction quality of urban engineering slag roadbed, which is beneficial to improving the compaction quality of highway roadbed, realizing the green resource utilization of urban engineering slag waste, and ensuring the quality of urban engineering slag roadbed.
[0006] In order to achieve the above object, the present invention adopts the following technical solution:
[0007] A method for controlling the compaction quality of urban engineering slag roadbed, comprising the following steps:
[0008] S1. Obtaining parameters: collecting various quality parameters of the soil roadbed compaction;
[0009] S2. Model establishment: establishing a compaction quality control model based on the collected quality parameters;
[0010] S3. Setting conditions: Setting the control constraint conditions for the compaction quality of the muck roadbed and obtaining the control standard for the compaction quality of the roadbed;
[0011] S4. Quality judgment: By inputting the parameters of the road section to be tested into the compaction quality control model, the model results obtained are compared with the control standards of the roadbed compaction quality to judge whether the compaction degree of the muck roadbed meets the quality requirements.
[0012] In the above method, the optional quality parameters of the slag roadbed compaction in S1 include equipment information, filler type, rolling moisture content, compaction thickness, number of rolling passes, roller speed, compaction degree, porosity, and dynamic deformation modulus.
[0013] In the above method, optionally, the specific content of establishing the compaction quality control model based on the collected quality parameters in S2 is:
[0014] S21. Perform data cleaning on each quality parameter to obtain the cleaned quality parameter;
[0015] S22. Dividing the cleaned quality parameters into a training set and a test set;
[0016] S23. Inputting the training set into the compaction quality control model to obtain a trained compaction quality control model;
[0017] S24. The test set evaluates the trained compaction quality control model to obtain the final compaction quality control model.
[0018] In the above method, optionally, S3 sets the control constraint conditions for the compaction quality of the slag roadbed, and obtains the specific content of the control standard for the compaction quality of the roadbed: obtain the qualified rate of each test parameter as the control constraint conditions for the compaction quality of the slag roadbed, and obtain the control standard for the compaction quality of the roadbed.
[0019] The above method is optional. In S4, the model result obtained by inputting the parameters of the road section to be tested into the compaction quality control model is compared with the control standard of the roadbed compaction quality to determine whether the compaction degree of the slag roadbed meets the quality requirements. The specific content is: if the model result meets the quality requirements when compared with the control standard of the roadbed compaction quality, the compaction quality control model is output; otherwise, return to S2.
[0020] A quality control system for compaction of urban engineering slag roadbed, applying any one of the above-mentioned quality control methods for compaction of urban engineering slag roadbed, comprising: a parameter acquisition module, a model establishment module, a condition setting module, and a quality judgment module;
[0021] The parameter acquisition module is connected to the input end of the model building module and is used to collect various quality parameters in the compaction of the slag roadbed;
[0022] A model building module is connected to the input end of the condition setting module and is used to build a compaction quality control model based on the collected quality parameters;
[0023] A condition setting module is connected to the input end of the quality judgment module and is used to set the control constraint conditions of the compaction quality of the muck roadbed and obtain the control standard of the compaction quality of the roadbed;
[0024] The quality judgment module is used to compare the model results obtained by inputting the parameters of the road section to be tested into the compaction quality control model with the control standard of the roadbed compaction quality to determine whether the compaction degree of the muck roadbed meets the quality requirements.
[0025] It can be seen from the above technical solution that compared with the prior art, the present invention provides a method and system for controlling the compaction quality of urban engineering slag roadbed, which has the following beneficial effects: the present invention solves the difficult problem that urban engineering slag roadbed is not suitable for detection of compaction degree and porosity, which is beneficial to improving the compaction quality of highway roadbed, has the characteristics of simplicity, high efficiency, speed and non-destructiveness, realizes the green resource utilization of urban engineering slag waste, and ensures the quality of urban engineering slag roadbed. BRIEF DESCRIPTION OF THE DRAWINGS
[0026] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on the provided drawings without paying creative work.
[0027] Figure 1 A flow chart of a method for controlling the compaction quality of urban engineering slag roadbed provided by the present invention;
[0028] Figure 2 A structural block diagram of a quality control system for compaction of urban engineering slag roadbed provided by the present invention;
[0029] Figure 3 A schematic diagram for determining control standards for quality requirements of the compaction quality control model provided by the present invention. DETAILED DESCRIPTION
[0030] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0031] Reference Figure 1 As shown, the present invention discloses a method for controlling the compaction quality of urban engineering slag roadbed, comprising the following steps:
[0032] S1. Obtaining parameters: collecting various quality parameters of the soil roadbed compaction;
[0033] S2. Model establishment: establishing a compaction quality control model based on the collected quality parameters;
[0034] S3. Setting conditions: Setting the control constraint conditions for the compaction quality of the muck roadbed and obtaining the control standard for the compaction quality of the roadbed;
[0035] S4. Quality judgment: By inputting the parameters of the road section to be tested into the compaction quality control model, the model results obtained are compared with the control standards of the roadbed compaction quality to judge whether the compaction degree of the muck roadbed meets the quality requirements.
[0036] Furthermore, the quality parameters of the soil roadbed compaction in S1 include equipment information, filler type, rolling moisture content, compaction thickness, rolling times, roller speed, compaction degree (soil-filled roadbed), porosity (stone-filled or soil-rock roadbed), and dynamic deformation modulus.
[0037] Furthermore, the specific contents of establishing the compaction quality control model based on the collected quality parameters in S2 are as follows:
[0038] S21. Perform data cleaning on each quality parameter to obtain the cleaned quality parameter;
[0039] S22. Dividing the cleaned quality parameters into a training set and a test set;
[0040] S23. Inputting the training set into the compaction quality control model to obtain a trained compaction quality control model;
[0041] S24. The test set evaluates the trained compaction quality control model to obtain the final compaction quality control model.
[0042] Specifically, data cleaning is performed on various quality parameters, specifically: determining whether the distance between two adjacent measurement points is within the threshold and whether it is within the roadbed construction range. If so, it is valid data, otherwise it is cleaned; determining whether there is duplicate data, and if so, it is cleared.
[0043] Furthermore, in S3, the control constraint conditions for the compaction quality of the slag roadbed are set, and the specific content of the control standard for the compaction quality of the roadbed is obtained: the qualified rate of each test parameter is obtained as the control constraint conditions for the compaction quality of the slag roadbed, and the control standard for the compaction quality of the roadbed is obtained.
[0044] Specifically, the number of items submitted for inspection and the number of qualified items of the project test parameters in the project-level quality evaluation index system should be obtained item by item from the highway engineering inspection data in accordance with the "Highway Geotechnical Test Code" (JTG 3430-2020) T 0131-2019, and the qualified rate of each quality parameter should be obtained.
[0045] Furthermore, in S4, the model results obtained by inputting the parameters of the road section to be tested into the compaction quality control model are compared with the control standards of the roadbed compaction quality to judge whether the compaction degree of the slag roadbed meets the quality requirements. The specific content is: if the model results meet the quality requirements compared with the control standards of the roadbed compaction quality, the compaction quality control model is output, otherwise it returns to S2.
[0046] Specifically, the control standard of the quality requirements of the compaction quality control model is as shown in the following formula:
[0047] [E vd ]=a+b×[k]
[0048] Where, [k] is the control standard for roadbed compaction quality; [E vd ] is the control standard of the compaction quality control model results; a and b are regression parameters.
[0049] In a specific embodiment, the specific operation steps are as follows: the control standard of the quality requirements shall be determined by a correlation verification test. The correlation verification shall select representative urban engineering slag, and the length of the test section shall not be less than 200m. During the test, the roadbed is divided into five rolling areas along the longitudinal direction, and rolling tests of five rolling conditions of strong vibration 2 times, strong vibration 4 times, strong vibration 6 times, strong vibration 8 times and strong vibration 10 times are carried out respectively.
[0050] 1) The loose thickness of urban engineering waste soil in the test section is controlled by inserting poles, hanging lines and drawing gray grids. The loose thickness should not exceed 30 cm, and the moisture content should be adjusted to wopt (optimum moisture content) ± 2%.
[0051] 2) After the test section is finely leveled, it is divided into five rolling areas of equal length. The starting and ending lines, lane markings, etc. of the five rolling areas are marked by inserting poles, hanging lines, spreading ash, etc.
[0052] 3) Select a vibratory roller with a deadweight of 22t or more, use the overlapping rolling method, roll at a rolling speed of 1.5 to 4.0km / h, and roll according to five rolling conditions until the entire rolling surface is rolled. Before entering the starting line of the rolling area, the vibratory roller should reach a normal vibration state.
[0053] 4) After rolling, at least two sections should be selected from the five rolling areas, and at least six test points should be selected from each section. Each test point should first be tested for dynamic deformation modulus, and then for compaction degree K.
[0054] 5) After the compaction degree K test of each test point is completed, sampling should be carried out in accordance with the provisions of the compaction test of the "Highway Geotechnical Test Code" (JTG 3430-2020) T 0131-2019 to obtain the maximum dry density of the engineering waste soil at each test point, which will be used as the calculation basis for the compaction degree of the measuring point to accurately obtain the compaction degree of the measuring point.
[0055] 6) According to the dynamic deformation modulus Evd and compaction degree K measured on site, establish the correlation between the dynamic deformation modulus Evd and compaction degree K, and the correlation coefficient should be no less than 0.80. The correlation coefficient should be calculated as follows:
[0056]
[0057] Where r is the correlation between the dynamic deformation modulus Evd and the compaction degree K; x i is the sample value of compaction degree K, y i is the sample value of dynamic deformation modulus Evd, i=1,2,……,n, represents the number of samples; For x i The average value of for y i The average value of
[0058]
[0059] 7) The correlation between the dynamic deformation modulus Evd and the compaction degree K measured on site should be determined using the following linear regression model.
[0060] y=a+bx
[0061] Among them, x is the compaction index; y is the dynamic deformation modulus index; a and b are regression parameters.
[0062] 8) The control standard of dynamic deformation modulus should adopt the linear regression model and regression parameters determined in 6) and be determined according to the control standard of compaction degree K. Figure 3 The following is a schematic diagram of the control standards for the quality requirements of the compaction quality control model, as shown in the following formula:
[0063] [E vd ]=a+b×[k]
[0064] Where, [k] is the control standard for roadbed compaction quality; [E vd ] is the control standard for the compaction quality control model results.
[0065] 9) The compaction quality of urban engineering slag roadbed should be tested and evaluated in sections of 1 to 3 km in length. Randomly select test sections, with no less than 1 section per 200 m and no less than 6 test points per section. Test the dynamic deformation modulus E of each test point separately. vdi , calculate the representative value E of the dynamic deformation modulus of the model result of the evaluation unit according to the following formula: vdp :
[0066]
[0067] in, is the average value of the dynamic deformation modulus of the model results at each measuring point in the evaluation section; t a It is the coefficient in the distribution table that varies with the number of measuring points and the guarantee rate (or confidence level a). The adopted guarantee rate is 95% for expressways and first-class highways and 90% for other highways. S is the standard deviation of the detection value. n is the number of detection points.
[0068] The evaluation principle is: when E vdp ≥[E vd ], and E vdi All greater than or equal to [E vd ] is 95%, the compaction quality of the road section is assessed to be qualified.
[0069] and Figure 1 Corresponding to the method described above, the embodiment of the present invention also provides a quality control system for compaction of urban engineering slag roadbed, which is used to Figure 1 The specific implementation of the method is shown in the following diagram: Figure 2 As shown, it specifically includes: parameter acquisition module, model building module, condition setting module, and quality judgment module;
[0070] The parameter acquisition module is connected to the input end of the model building module and is used to collect various quality parameters in the compaction of the slag roadbed;
[0071] A model building module is connected to the input end of the condition setting module and is used to build a compaction quality control model based on the collected quality parameters;
[0072] A condition setting module is connected to the input end of the quality judgment module and is used to set the control constraint conditions of the compaction quality of the muck roadbed and obtain the control standard of the compaction quality of the roadbed;
[0073] The quality judgment module is used to compare the model results obtained by inputting the parameters of the road section to be tested into the compaction quality control model with the control standard of the roadbed compaction quality to determine whether the compaction degree of the muck roadbed meets the quality requirements.
[0074] In this specification, each embodiment is described in a progressive manner, and each embodiment focuses on the differences from other embodiments. The same or similar parts between the embodiments can be referred to each other. For the device disclosed in the embodiment, since it corresponds to the method disclosed in the embodiment, the description is relatively simple, and the relevant parts can be referred to the method part.
[0075] The above description of the disclosed embodiments enables one skilled in the art to implement or use the present invention. Various modifications to these embodiments will be apparent to one skilled in the art, and the general principles defined herein may be implemented in other embodiments without departing from the spirit or scope of the present invention. Therefore, the present invention will not be limited to the embodiments shown herein, but rather to the widest scope consistent with the principles and novel features disclosed herein.
Claims
1. A method for controlling the compaction quality of urban engineering slag roadbed, characterized in that: The following steps are involved: S1. Obtaining parameters: collecting various quality parameters of the soil roadbed compaction; S2. Model establishment: establishing a compaction quality control model based on the collected quality parameters; S3. Setting conditions: Setting the control constraint conditions for the compaction quality of the muck roadbed and obtaining the control standard for the compaction quality of the roadbed; S4. Quality judgment: By inputting the parameters of the road section to be tested into the compaction quality control model, the model results obtained are compared with the control standards of the roadbed compaction quality to judge whether the compaction degree of the muck roadbed meets the quality requirements.
2. A method for controlling compaction quality of urban engineering slag roadbed according to claim 1, characterized in that: The quality parameters of soil roadbed compaction in S1 include equipment information, filler type, rolling moisture content, compaction thickness, number of rolling passes, roller speed, compaction degree, porosity, and dynamic deformation modulus.
3. A method for controlling compaction quality of urban engineering slag roadbed according to claim 1, characterized in that: The specific contents of establishing the compaction quality control model based on the collected quality parameters in S2 are: S21. Perform data cleaning on each quality parameter to obtain the cleaned quality parameter; S22. Dividing the cleaned quality parameters into a training set and a test set; S23. Inputting the training set into the compaction quality control model to obtain a trained compaction quality control model; S24. The test set evaluates the trained compaction quality control model to obtain the final compaction quality control model.
4. A method for controlling compaction quality of urban engineering slag roadbed according to claim 1, characterized in that: In S3, the control constraint conditions for the compaction quality of the muck roadbed are set, and the specific contents of the control standard for the compaction quality of the roadbed are obtained: the qualified rate of each test parameter is obtained as the control constraint conditions for the compaction quality of the muck roadbed, and the control standard for the compaction quality of the roadbed is obtained.
5. The method for controlling compaction quality of urban engineering slag roadbed according to claim 1, characterized in that: In S4, the model result obtained by inputting the parameters of the road section to be tested into the compaction quality control model is compared with the control standard of the roadbed compaction quality to judge whether the compaction degree of the slag roadbed meets the quality requirements. The specific content is: if the model result meets the quality requirements compared with the control standard of the roadbed compaction quality, the compaction quality control model is output, otherwise it returns to S2.
6. A quality control system for compaction of urban engineering slag roadbed, characterized in that: A method for controlling the compaction quality of urban engineering slag roadbed according to any one of claims 1 to 5, comprising: a parameter acquisition module, a model establishment module, a condition setting module, and a quality judgment module; The parameter acquisition module is connected to the input end of the model building module and is used to collect various quality parameters in the compaction of the slag roadbed; A model building module is connected to the input end of the condition setting module and is used to build a compaction quality control model based on the collected quality parameters; A condition setting module is connected to the input end of the quality judgment module and is used to set the control constraint conditions of the compaction quality of the muck roadbed and obtain the control standard of the compaction quality of the roadbed; The quality judgment module is used to compare the model results obtained by inputting the parameters of the road section to be tested into the compaction quality control model with the control standard of the roadbed compaction quality to determine whether the compaction degree of the muck roadbed meets the quality requirements.
Citation Information
Cited By
Roadbed compaction quality control method based on fly ash-clayey sand mixture
CN121961357A