System and method for bidirectional splayed roof lifting of slag loading chamber

By setting up a two-way eight-shaped roof system in the mine and using inclined explosive groups to form an arc-shaped top, the problem of high destructiveness of the roof and ventilation resistance caused by one-way hole blasting has been solved, and the stability of the tunnel and construction safety have been improved.

CN118728446APending Publication Date: 2024-10-01YUXI MINING
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410894130.8
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-04
Publication Date
2024-10-01

AI Technical Summary

Technical Problem

In the existing technology, during the roof expansion construction of the slag-loading chamber in the mine tunnel, the use of one-way hole distribution and multiple rows of blasting causes the roof to be highly destructive, forming a zigzag step shape, causing the roof and side walls to loosen the surrounding rock, which easily causes roof collapse. ACCIDENT.

Method used

A two-way figure-eight roofing system is adopted. By setting up a horizontal first chamber and a relatively vertical second chamber in the mine, and setting an expansion surface at the connection point, multiple tilted explosive groups are used to form an "eight" shape. The blasting unit carries out expansion brush construction on the top of the second chamber to achieve the formation of an arc-shaped top.

Benefits of technology

It reduces the ventilation resistance of the underground tunnel, improves the stability of the tunnel roof and side rails, enhances the bearing capacity of the surrounding rock, ensures construction safety, and reduces the risk of large-scale roof falls.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118728446A_ABST
    Figure CN118728446A_ABST
Patent Text Reader

Abstract

The invention discloses a system and a method for bidirectional splayed roof lifting of a slag loading chamber, and belongs to a roof lifting method in the technical field of mine construction, and the technical scheme is that the system comprises a first chamber, and the first chamber is horizontally arranged in a mine; the second chamber is arranged in a manner of being vertically communicated with the first chamber; an expansion surface is arranged at the communication part of the first chamber and the second chamber, and the expansion surface is arranged on the first chamber; and the second chamber is provided with at least one blasting unit in the length direction, the blasting unit comprises two symmetrically arranged explosive groups, the explosive groups are obliquely arranged, and the two explosive groups form a splayed shape. The invention provides a slag loading chamber bidirectional splayed top brushing method. The stability of a roadway top plate and a side wall after blasting is improved under the condition that the requirement for designing a section contour is met, rock mass stability is kept, the bearing capacity of surrounding rock is enhanced, and the construction quality of a tunneling working face is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of mine construction, and in particular relates to a system and method for bidirectional eight-shaped roof lifting of a slag loading chamber. Background Art

[0002] With the rapid development of society, my country's demand for mineral resources has also increased dramatically. Shallow resources are increasingly being mined out, and mining is gradually transitioning to deep mines. The increase in mining scale and the improvement of mechanization level provide feasible space for the use of large chambers in underground mines. Chambers are spatial structures excavated and built underground for a special purpose in mines, and they vary in size. With the acceleration of my country's infrastructure construction process and the deepening implementation of the western development strategy, water conservancy and hydropower projects, tunnel projects and underground space structure projects are increasing. The "deep burial depth, large cross-section and complex environment" of underground chambers are new forms faced by my country's underground chamber construction field. Explosives can release huge energy at the moment of explosion, so blasting technology is widely used in water conservancy, mining, transportation and construction engineering.

[0003] During the construction of roof expansion of the slag loading chamber in the tunnel, Yuxi Mining Co., Ltd. (Dahongshan Copper Mine) adopted one-way hole arrangement and multi-row construction blasting, but the on-site experimental results were poor. The main manifestation was the formation of a large step on one side, which caused great damage to the integrity of the roof and formed a jagged step-shaped roof, which made the roof and side wall surrounding rock loose and easily caused roof collapse and slab collapse accidents. Summary of the invention

[0004] The first purpose of the present invention is to provide a bidirectional eight-shaped roof lifting system for a slag loading chamber. A first chamber is set up, and a second chamber is connected to the end of the first chamber. The top of the second chamber is expanded and brushed by the "eight" roof lifting method to obtain a relatively smooth arc-shaped top, thereby meeting the profile requirements of the cross-section of the tunnel and further reducing the ventilation resistance of the underground tunnel.

[0005] The second purpose is to provide a construction method for bidirectional eight-shaped roof cantilevering of a slag loading chamber, which improves the stability of the tunnel roof and side walls after blasting, maintains the stability of the rock mass, enhances the bearing capacity of the surrounding rock itself, and improves the construction quality of the excavation working face while meeting the requirements of the designed section profile.

[0006] The object of the present invention is achieved by: A first chamber, wherein the first chamber is horizontally arranged in the mine; a second chamber, the second chamber being vertically connected to the first chamber, the second chamber being larger than the first chamber and being horizontally arranged in the mine; A connection point between the first chamber and the second chamber is provided with an expansion surface, and the expansion surface is provided on the first chamber; and, The second chamber is provided with at least one blasting unit in the length direction, and the blasting unit includes two symmetrically arranged explosive groups. The explosive groups are arranged obliquely, and the two groups of explosive groups form an "eight" shape.

[0007] Furthermore, two blasting units are symmetrically arranged in the length direction of the second chamber.

[0008] Furthermore, the distance S between the upper ends of the two groups of explosive groups is 0.5 to 1.2 m.

[0009] Furthermore, the inclination angle θ of the explosive group is 18° to 35°, and the upward inclination length L of the explosive group is 2.5 to 3.5 m.

[0010] Furthermore, the explosive group includes a plurality of explosive pipes arranged to be inclined upward, and the plurality of explosive pipes are evenly spaced and arranged in a width direction of the second chamber; the interval between two adjacent explosive pipes is 0.8 m.

[0011] Furthermore, the projection of the blasting unit on the plane is a rectangle, the length of the rectangle is 4.0 m, and the width of the rectangle is 7.0 m.

[0012] A method for bidirectional eight-shaped roof lifting of a slag chamber comprises the following steps: S1. digging a first chamber in a mine, and digging a second chamber at the end of the first chamber; S2, the second chamber is excavated toward both sides at the end of the first chamber to form a second chamber perpendicular to the first chamber; S3, expanding and brushing the top of the second chamber so that the top of the second chamber forms an arc-shaped top; S4. In S3, two blasting units are selected at the top of the second chamber, the two blasting units are arranged adjacent to each other in the length direction of the second chamber, and bidirectional construction is performed on the top of the second chamber from both sides to the middle; S5, the blasting unit is arranged in the length direction of the top of the second chamber, and explosive tube hole groups are drilled at both ends of the blasting unit in the length direction, and explosive groups are placed in the explosive tube hole groups; the explosive tube hole groups include a plurality of explosive pipes arranged upwardly inclined, and the plurality of explosive pipes are evenly spaced and arranged in the width direction of the second chamber; S6, detonating two blasting units simultaneously to form an arc-shaped top of the unit; S7. Repeat steps S4 and S5 on both sides of the unit arc-shaped top, thereby forming a complete arc-shaped top at the top of the second chamber in the length direction.

[0013] Furthermore, the height of the second chamber is 3.65m, the horizontal interval between the tops of the two explosive pipes forming an "eight"-shaped explosive group is 0.8m, the inclination angle of the explosive pipes is 27°, and the vertical distance between the top of the explosive pipes and the top of the second chamber is 1.35m.

[0014] Furthermore, the two blasting units are symmetrically arranged on the top of the second chamber.

[0015] Furthermore, the explosive pipe hole group is provided with 6 parallel explosive pipes, and millisecond detonators are placed in the explosive pipes.

[0016] The beneficial effects of the present invention are embodied in: 1. In the present invention, a horizontal first chamber is set in the mine body, and a relatively vertically connected second chamber is set at the end of the first chamber, and an expansion surface is set at the connection between the first chamber and the second chamber, so as to ensure that the connection between the two can be more stable in the mountain body; further, since the aperture of the second chamber is relatively large, when construction is carried out therein, in order to improve the ventilation and structural stability inside the second chamber, it is necessary to carry out top-lifting and expansion construction on the roof of the second chamber, and by setting a plurality of adjacent blasting units in the length direction of the inner top of the second chamber, and making the explosive group in the blasting unit inclined and forming an "eight" shape for blasting after installation, it can be achieved that the roof of the tunnel is less destructive during the excavation blasting process, and the end face of the tunnel reaches the predetermined arc-shaped top, which can reduce the ventilation resistance of the underground tunnel in the second chamber and improve the stability of the entire internal structure of the chamber.

[0017] 2. In the present invention, since in the prior art, the blasting of the chamber roof is carried out by one-way hole arrangement and multiple rows of blasting, the chamber roof on site has the problem of poor experimental effect, which is mainly manifested in the formation of a large step on one side of the chamber roof, forming a sawtooth step-shaped roof, which makes the roof and side wall surrounding rock loose and easy to cause roof collapse and slab collapse accidents; while the original one-way hole arrangement and two blastings are changed to two-way hole arrangement and one blasting at the top of the chamber, so that the inner top of the chamber is smoother and can form a predetermined arc-shaped top, thereby enhancing the stability of the tunnel roof and side walls, ensuring construction safety during construction, and at the same time solving the problems of grooves, steps and triangular sliding surfaces caused by one-way hole arrangement construction, reducing the risk of large-scale roof collapse.

[0018] 3. In the present invention, two blasting units are symmetrically arranged in the length direction of the second chamber. The two blasting units are detonated simultaneously, and then blasting construction is carried out from two points on the top of the second chamber to the middle, thereby improving the blasting effect and making the top plate smoother after blasting, avoiding the occurrence of jagged plate structure, thereby meeting the stability and effect of the expansion construction on the top of the second chamber.

[0019] 4. In the present invention, by setting the floor area of ​​the blasting unit to a rectangle with a length of 4.0m and a width of 7.0m, an arc-shaped top channel of appropriate size is formed for the blasting expansion brush above the top of the second chamber with a height of 3.65m. The arc-shaped top channel thus adapted enhances the ventilation effect and overall stability of the entire second chamber.

[0020] 5. In the present invention, two blasting units are provided, and the two "eight"-shaped blasting units are symmetrically arranged and detonated on the top of the second chamber, thereby changing the two-time detonation of the one-way hole arrangement in the prior art to one-time detonation. The mutual force of the two symmetrically arranged "eight"-shaped blasting units during the explosion process makes the blasting construction of the expanded brush area on the top of the second chamber more thorough and stable, and a relatively stable and flat arc-shaped top can be obtained by one detonation. BRIEF DESCRIPTION OF THE DRAWINGS

[0021] In order to more clearly illustrate the specific embodiments of the present invention or the technical solutions in the prior art, the following is a brief introduction to the drawings required for the specific embodiments or the description of the prior art. In all the drawings, similar elements or parts are generally identified by similar reference numerals. In the drawings, the elements or parts are not necessarily drawn according to the actual scale.

[0022] Figure 1 A schematic top view of a blasting unit of the present invention on the top of the second chamber; Figure 2 It is a schematic cross-sectional view II of a blasting unit on the top of the second chamber of the present invention; Figure 3 It is a schematic top view of two symmetrical blasting units of the present invention on the top of the second chamber; Figure 4 It is a schematic diagram of the BB section after two symmetrical blasting units of the present invention are blasted on the top of the second chamber; Figure 5 It is a top view schematic diagram of one-way hole arrangement in the prior art; Figure 6 This is the cross-sectional intention of the prior art unidirectional hole arrangement II; Figure 7 This is a schematic diagram of hole arrangement for one-way construction in the prior art; Figure 8 It is a schematic diagram of the AA section of the one-way construction hole arrangement in the prior art.

[0023] In the attached drawings, 1-first chamber, 2-second chamber, 3-expansion surface, 4-blasting unit, 5-explosive group, 6-explosive pipeline. DETAILED DESCRIPTION

[0024] The following embodiments of the technical solution of the present invention are described in detail in conjunction with the accompanying drawings. The following embodiments are only used to more clearly illustrate the technical solution of the present invention, and are therefore only used as examples, and cannot be used to limit the protection scope of the present invention.

[0025] It should be noted that, unless otherwise specified, the technical terms or scientific terms used in this application should have the common meanings understood by those skilled in the art to which the present invention belongs.

[0026] Reference Figure 1-Figure 4 , a two-way eight-shaped lifting system for a slag chamber, comprising: A first chamber 1, wherein the first chamber 1 is horizontally arranged in the mine; A second chamber 2, wherein the second chamber 2 is vertically connected to the first chamber 1, the second chamber 2 is larger than the first chamber 1 and is horizontally arranged in the mine; An expansion surface 3 is provided at the connection point between the first chamber 1 and the second chamber 2, and the expansion surface 3 is provided on the first chamber 1; and, The second chamber 2 is provided with at least one blasting unit 4 in the length direction. The blasting unit 4 includes two symmetrically arranged explosive groups 5. The explosive groups 5 are inclinedly arranged, and the two groups of explosive groups 5 form an "eight" shape.

[0027] By setting a horizontal first chamber 1 in the mine body, and setting a relatively vertically connected second chamber 2 at the end of the first chamber 1, and setting an expansion surface 3 at the connection between the first chamber 1 and the second chamber 2, it is ensured that the connection between the two can be more stable in the mountain; further, since the aperture of the second chamber 2 is relatively large, when construction is carried out therein, in order to improve the ventilation and structural stability inside the second chamber 2, it is necessary to carry out top-lifting and expansion construction on the roof of the second chamber 2, by setting a plurality of adjacent blasting units 4 in the length direction of the inner top of the second chamber 2, and making the explosive group 5 in the blasting unit 4 inclined and formed in an "eight" shape for blasting after installation, it can be achieved that the roof of the tunnel is less destructive during the excavation blasting process, and the end face of the tunnel reaches the predetermined arc-shaped top, which can reduce the ventilation resistance of the underground tunnel in the second chamber 2 and improve the stability of the entire internal structure of the chamber.

[0028] Preferably, two blasting units 4 are symmetrically arranged in the length direction of the second chamber 2.

[0029] In the prior art, the blasting of the chamber roof is carried out by one-way hole arrangement and multiple rows of blasting. The experimental effect of the chamber roof on site is poor, which is mainly manifested in the formation of a large step on one side of the chamber roof, forming a sawtooth step-shaped roof, which makes the roof and side wall surrounding rock loose and easily causes roof collapse and slab collapse accidents. However, the original one-way hole arrangement and two blastings are changed to two-way hole arrangement and one blasting at the top of the chamber, so that the inner top of the chamber is smoother and can form a predetermined arc-shaped top, thereby enhancing the stability of the tunnel roof and side walls, ensuring construction safety during construction, and solving the problems of grooves, steps and triangular sliding surfaces caused by one-way hole arrangement construction, reducing the risk of large-scale roof collapse.

[0030] Therefore, two blasting units 4 are symmetrically arranged in the length direction of the second chamber 2. The two blasting units 4 are detonated simultaneously, and then the blasting construction is carried out from two points on the top of the second chamber 2 to the middle, thereby improving the blasting effect and making the top plate smoother after blasting, avoiding the occurrence of jagged plate structure, thereby meeting the stability and effect of the expansion construction on the top of the second chamber 2.

[0031] Preferably, the distance S between the upper ends of the two groups of explosive groups 5 is 0.5-1.2 m.

[0032] Preferably, the inclination angle θ of the explosive group 5 is 18° to 35°, and the upward inclination length L of the explosive group 5 is 2.5 to 3.5 m.

[0033] Preferably, the explosive group 5 comprises a plurality of explosive pipes 6 arranged upwardly inclined, and the plurality of explosive pipes 6 are evenly spaced and arranged in a width direction of the second chamber 2; the interval between two adjacent explosive pipes 6 is 0.8 m.

[0034] Preferably, the projection of the blasting unit 4 on the plane is a rectangle, the length of the rectangle is 4.0 m, and the width of the rectangle is 7.0 m.

[0035] Since two blasting units 4 are provided, and the two "eight"-shaped blasting units 4 are symmetrically arranged and detonated on the top of the second chamber 2, the two detonations of the one-way hole arrangement in the prior art are changed to one detonation. The mutual force of the two symmetrically arranged "eight"-shaped blasting units 4 during the explosion process makes the blasting construction of the expanded brush area on the top of the second chamber 2 more thorough and stable, and a relatively stable and flat arc-shaped top can be obtained by one detonation.

[0036] A method for bidirectional eight-shaped roof lifting of a slag chamber comprises the following steps: S1. digging a first chamber in a mine, and digging a second chamber at the end of the first chamber; S2, the second chamber is excavated toward both sides at the end of the first chamber to form a second chamber perpendicular to the first chamber; S3, expanding and brushing the top of the second chamber so that the top of the second chamber forms an arc-shaped top; S4. In S3, two blasting units are selected at the top of the second chamber, the two blasting units are arranged adjacent to each other in the length direction of the second chamber, and bidirectional construction is performed on the top of the second chamber from both sides to the middle; S5, the blasting unit is arranged in the length direction of the top of the second chamber, and explosive tube hole groups are drilled at both ends of the blasting unit in the length direction, and explosive groups are placed in the explosive tube hole groups; the explosive tube hole groups include a plurality of explosive pipes arranged upwardly inclined, and the plurality of explosive pipes are evenly spaced and arranged in the width direction of the second chamber; S6, detonating two blasting units simultaneously to form an arc-shaped top of the unit; S7. Repeat steps S4 and S5 on both sides of the unit arc-shaped top, thereby forming a complete arc-shaped top at the top of the second chamber in the length direction.

[0037] Preferably, the height of the second chamber is 3.65m, the horizontal interval between the tops of the two explosive pipes forming an "eight"-shaped explosive group is 0.8m, the inclination angle of the explosive pipes is 27°, and the vertical distance between the top of the explosive pipes and the top of the second chamber is 1.35m.

[0038] Preferably, the two blasting units are symmetrically arranged on the top of the second chamber.

[0039] Preferably, the explosive pipe hole group is provided with 6 parallel explosive pipes, and millisecond detonators are placed in the explosive pipes.

[0040] Example 1 A method for bidirectional eight-shaped roof lifting of a slag chamber comprises the following steps: S1. According to the construction drawings, a hole is drilled above the mine, and a horizontal chamber is excavated below the vacant space by a tunnel boring machine, thereby forming a first chamber in the mine, the first chamber is 3.2m high and 3.0m wide, and a second chamber is excavated horizontally from the end of the first chamber to both sides, the second chamber is 3.65m high and 4m wide; S2, using a tunnel boring machine to dig toward both sides at the end of the first chamber to form a second chamber perpendicular to the first chamber; digging under measurement by a level meter to ensure the levelness of the first chamber and the second chamber; S3, expanding and brushing the top of the second chamber so that the top of the second chamber forms an arc-shaped top; S4. In S3, a line is drawn on the top of the second chamber to draw a rectangular area, so that the rectangular area is a blasting point distribution area, and two blasting units are selected. The two blasting units are adjacently arranged in the length direction of the second chamber, and the top of the second chamber is constructed in two directions from both sides to the middle; S5, the blasting unit is arranged in the length direction of the top of the second chamber, and explosive tube hole groups are drilled at both ends of the blasting unit in the length direction, and points are selected on the straight line on the width of the rectangular area drawn in the top of the second chamber by the drilling machine to drill holes, and the holes drilled are used as upwardly inclined tube holes, and multiple points selected on the straight line on the width are arranged at equal intervals on the straight line, thereby forming Figure 2 The first and second rows of explosive pipes are arranged so that the multiple explosive pipes are evenly spaced in the width direction of the second chamber, and the spacing is 0.8m. Six explosive pipes are arranged in the first and second rows respectively, so that the spacing between two adjacent explosive pipes in the same row is 0.8m, and explosives are placed in the upwardly inclined pipe holes; the explosive pipe hole group forms multiple upwardly inclined explosive pipes, and the inclination angle of the explosive pipes is 27°, so that the corresponding explosive pipes on the width of the rectangular area form an "eight" structure, and the tops of the corresponding explosive pipes on the straight line on the width of the two rectangular areas are spaced 0.8m apart, and the two rectangular areas are symmetrically arranged to form the first row, the second row, the second row and the first row distributed in sequence in the length direction of the first chamber; S6, simultaneously detonating the explosive pipes in the two blasting units to form an arc-shaped top of the unit; S7. After one blast, the rocks falling from the top blast are collected and output from the first chamber. At the same time, a rectangular area is again drawn on the outer edge of the second chamber where the blast has been completed, and steps S4 and S5 are repeated on both sides of the unit arc-shaped top, thereby forming a complete arc-shaped top on the top of the second chamber in the length direction.

[0041] After the blasting is completed, observe the flatness of the blasting surface and measure its flatness.

[0042] Example 2 A method for bidirectional eight-shaped roof lifting of a slag chamber comprises the following steps: S1. According to the construction drawings, a hole is drilled above the mine, and a horizontal chamber is excavated below the vacant space by a tunnel boring machine, thereby forming a first chamber in the mine, the first chamber is 3.0m high and 2.8m wide, and a second chamber is excavated horizontally from the end of the first chamber to both sides, the second chamber is 3.45m high and 3.8m wide; S2, using a tunnel boring machine to dig toward both sides at the end of the first chamber to form a second chamber perpendicular to the first chamber; digging under measurement by a level meter to ensure the levelness of the first chamber and the second chamber; S3, expanding and brushing the top of the second chamber so that the top of the second chamber forms an arc-shaped top; S4. In S3, a line is drawn on the top of the second chamber to draw a rectangular area, so that the rectangular area is a blasting point distribution area, and two blasting units are selected. The two blasting units are adjacently arranged in the length direction of the second chamber, and the top of the second chamber is constructed in two directions from both sides to the middle; S5, the blasting unit is arranged in the length direction of the top of the second chamber, and explosive tube hole groups are drilled at both ends of the blasting unit in the length direction, and points are selected on the straight line on the width of the rectangular area drawn in the top of the second chamber by the drilling machine to drill holes, and the holes drilled are used as upwardly inclined tube holes, and multiple points selected on the straight line on the width are arranged at equal intervals on the straight line, thereby forming Figure 2 The first and second rows of explosive pipes are arranged so that the multiple explosive pipes are evenly spaced and arranged in the width direction of the second chamber, and the spacing distance is 0.8m. Six explosive pipes are arranged in the first and second rows respectively, so that the spacing between two adjacent explosive pipes in the same row is 0.7m, and explosives are placed in the upwardly inclined pipe holes; thereby, the explosive pipe hole group forms multiple upwardly inclined explosive pipes, and the inclination angle of the explosive pipes is 30°, so that the corresponding explosive pipes on the width of the rectangular area form an "eight" structure, and the tops of the corresponding explosive pipes on the straight line on the width of the two rectangular areas are arranged at a spacing of 0.7m, and the two rectangular areas are symmetrically arranged to form the first row, the second row, the second row and the first row distributed in sequence in the length direction of the first chamber; S6, simultaneously detonating the explosive pipes in the two blasting units to form an arc-shaped top of the unit; S7. After one blast, the rocks falling from the top blast are collected and output from the first chamber. At the same time, a rectangular area is again drawn on the outer edge of the second chamber where the blast has been completed, and steps S4 and S5 are repeated on both sides of the unit arc-shaped top, thereby forming a complete arc-shaped top on the top of the second chamber in the length direction.

[0043] After the blasting is completed, observe the flatness of the blasting surface and measure its flatness.

[0044] Through the above-mentioned embodiments, the damage to the roof of the second chamber is relatively small during the excavation blasting process, the profile requirements of the cross section of the second chamber are met, and the ventilation resistance of the underground tunnel is further reduced; the stability of the roof and side walls of the second chamber is enhanced, ensuring the construction safety during construction, and at the same time solving the problems of grooves, ridges and triangular sliding surfaces caused by one-way hole layout construction, reducing the risk of large-scale roof collapse.

[0045] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit it. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or replace some or all of the technical features therein by equivalents. These modifications or replacements do not make the essence of the corresponding technical solutions deviate from the scope of the technical solutions of the embodiments of the present invention, and they should all be included in the scope of the claims and specification of the present invention.

Claims

1. A two-way eight-shaped lifting system for the slag chamber. Features: include, A first chamber (1), wherein the first chamber (1) is arranged horizontally in the mine; a second chamber (2), the second chamber (2) being arranged in vertical communication with the first chamber (1), the second chamber (2) being larger than the first chamber (1) and being arranged horizontally in the mine; An expansion surface (3) is provided at a connection point between the first chamber (1) and the second chamber (2), and the expansion surface (3) is provided on the first chamber (1); and, The second chamber (2) is provided with at least one blasting unit (4) in the length direction, the blasting unit (4) comprising two symmetrically arranged explosive groups (5), the explosive groups (5) being arranged at an angle, the two groups of explosive groups (5) forming an "eight" shape.

2. The system for bidirectional eight-shaped lifting of the slag chamber as claimed in claim 1, Features: Two blasting units (4) are symmetrically arranged in the length direction of the second chamber (2).

3. The system for bidirectional eight-shaped lifting of the slag chamber as claimed in claim 2, Features: The distance S between the upper ends of the two groups of explosive groups (5) is 0.5 to 1.2 m.

4. The system for bidirectional eight-shaped lifting of the slag chamber as claimed in claim 3, Features: The inclination angle θ of the explosive group (5) is 18° to 35°, and the upward inclination length L of the explosive group (5) is 2.5 to 3.5 m.

5. The system for bidirectional eight-shaped lifting of the slag chamber as claimed in claim 4, Features: The explosive group (5) comprises a plurality of explosive pipes (6) arranged upwardly slantingly, wherein the plurality of explosive pipes (6) are evenly spaced and arranged at intervals in the width direction of the second chamber (2); the interval between two adjacent explosive pipes (6) is 0.8 m.

6. The system for bidirectional eight-shaped lifting of the slag chamber as claimed in claim 1, Features: The projection of the blasting unit (4) on a plane is a rectangle, the length of the rectangle is 4.0 m, and the width of the rectangle is 7.0 m.

7. A method for bidirectional eight-shaped top lifting of slag chamber, It is characterized in that The system according to any one of claims 1 to 6 further comprises the following steps: S1. digging a first chamber in a mine, and digging a second chamber at the end of the first chamber; S2, the second chamber is excavated toward both sides at the end of the first chamber to form a second chamber perpendicular to the first chamber; S3, expanding and brushing the top of the second chamber so that the top of the second chamber forms an arc-shaped top; S4. In S3, two blasting units are selected at the top of the second chamber, the two blasting units are arranged adjacent to each other in the length direction of the second chamber, and bidirectional construction is performed on the top of the second chamber from both sides to the middle; S5, the blasting unit is arranged in the length direction of the top of the second chamber, and explosive tube hole groups are drilled at both ends of the blasting unit in the length direction, and explosive groups are placed in the explosive tube hole groups; the explosive tube hole groups include a plurality of explosive pipes arranged upwardly inclined, and the plurality of explosive pipes are evenly spaced and arranged in the width direction of the second chamber; S6, detonating two blasting units simultaneously to form an arc-shaped top of the unit; S7. Repeat steps S4 and S5 on both sides of the unit arc-shaped top, thereby forming a complete arc-shaped top at the top of the second chamber in the length direction.

8. The method for bidirectional eight-shaped roof lifting of a slag loading chamber as claimed in claim 7, It is characterized in that The height of the second chamber is 3.65m, the horizontal interval between the tops of the two explosive pipes forming an "eight"-shaped explosive group is 0.8m, the inclination angle of the explosive pipes is 27°, and the vertical distance between the top of the explosive pipes and the top of the second chamber is 1.35m.

9. The method for bidirectional eight-shaped roof lifting of a slag loading chamber as claimed in claim 7, It is characterized in that The two blasting units are symmetrically arranged on the top of the second chamber.

10. The method for bidirectional eight-shaped top lifting of a slag loading chamber as claimed in claim 7, It is characterized in that The explosive pipe hole group is provided with 6 parallel explosive pipes, and millisecond detonators are placed in the explosive pipes.