Goaf filling treatment boundary plugging method

By arranging boundary boreholes above the goaf and injecting fly ash and slurry to form a boundary sealing entity, combined with the expansion material top connection, the problem of low filling rate in the goaf is solved, and efficient coal resource recovery and safety are achieved. mining environment.

CN118728476APending Publication Date: 2024-10-01CCTEG COAL MINING RES INST +1
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202411023892.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-29
Publication Date
2024-10-01

AI Technical Summary

Technical Problem

In the existing technology, the filling rate of the goaf is low, which results in the disadvantage of efficient mining in the later period, and the waste of leftover coal resources is serious, which can easily cause mine earthquakes and spontaneous combustion of leftover coal.

Method used

Boundary boreholes are arranged above the goaf, and fly ash and slurry are injected to form a boundary sealing solid body, and expanded materials are used to connect it to the roof to form a closed filling space and improve the filling rate and roof connection rate.

Benefits of technology

It effectively improves the filling rate and roof connection rate of the goaf, ensures safe and efficient mining in the later period, and reduces the waste of legacy coal resources and the risk of mine earthquakes.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118728476A_ABST
    Figure CN118728476A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of goaf treatment, and provides a goaf filling treatment boundary blocking method which comprises the steps that boundary drill holes are formed in the boundary of a treatment area above a goaf; coal ash and slurry are injected into the goaf boundary areas corresponding to the boundary drill holes through material injection devices arranged on the boundary drill holes, so that boundary plugging solid bodies are formed in the goaf boundary areas; and injecting an expansion material above the boundary plugging solid body through a material injection device so as to enable the boundary plugging solid body to abut against the top plate of the goaf. According to the method, the boundary drill holes are formed in the boundary of the treatment area above the goaf, the fly ash and the slurry are injected into the goaf boundary area corresponding to the boundary drill holes, so that the boundary blocking solid is formed in the goaf boundary area, and the boundary blocking solid is effectively propped against the goaf top plate through the expansion material; the boundary plugging solid body forms the boundary constraint of the goaf filling space, so that the filling space forms a closed area, and the goaf filling rate is effectively improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of goaf management, and in particular to a goaf filling management boundary blocking method. Background Art

[0002] Due to the backwardness of early mining technology and equipment, as well as the irregular management of mineral resources, a large amount of coal resources have been left behind in the goaf during the coal mining process, such as room-and-pillar mining and Wangwili mining, with a recovery rate of only about 50%. At the same time, local over-boundary mining and illegal mining in small kilns at the borders have destroyed coal seams, wasting a large amount of coal resources. In addition, the existing room-and-pillar coal mines with goafs have left behind a large number of goafs and illegal holes, which can easily cause spontaneous combustion of the remaining coal resources and large-scale collapse due to mining, which in turn causes mine tremors. Therefore, the mining of the remaining coal is very urgent.

[0003] In the existing technology, coal gangue and other aggregates are mainly used to make filling materials to fill the goaf with residual coal, restore the goaf to its integrity, and then arrange the working face for mining to recover the residual coal pillars. However, the existing filling rate of the goaf is low, which is not conducive to efficient mining in the later stage. Summary of the invention

[0004] The invention provides a method for filling and managing the boundary blocking of a goaf area, which is used to solve the defect in the prior art that the filling rate of the goaf area is low and is not conducive to efficient recovery in the later stage.

[0005] The present invention provides a method for filling and managing the boundary of a goaf area, comprising the following steps: Arrange boundary drilling holes at the boundary of the treatment area above the goaf; Injecting fly ash and slurry into the goaf boundary area corresponding to the boundary borehole through injection devices arranged at the boundary borehole, respectively, to form a boundary sealing entity in the goaf boundary area; The expansion material is injected onto the top of the boundary sealing knot entity through the injection device, so that the boundary sealing knot entity is connected to the top plate of the goaf.

[0006] According to a method for filling and blocking a goaf boundary provided by the present invention, the injection device comprises a pipeline component, the pipeline component has a first channel and a second channel, and the fly ash and slurry are respectively injected into the goaf boundary area corresponding to the boundary borehole through the injection device arranged at the boundary borehole, comprising: Inserting the pipeline component into the boundary borehole; Injecting fly ash into the goaf boundary area through the first channel, injecting slurry into the goaf boundary area through the second channel, and spraying the fly ash; The fly ash and the slurry undergo a hydration reaction and solidify into the boundary sealing entity.

[0007] According to a method for blocking the boundary of a goaf filling and treatment provided by the present invention, the first channel is connected to a transport tank truck, and the transport tank truck contains solid waste fly ash.

[0008] According to a method for filling and blocking the boundary of a goaf provided by the present invention, injecting fly ash into the goaf boundary area through the first channel comprises: Based on the conveying air pressure of the transport tank truck, the solid waste fly ash in the transport tank truck is blown to the mined-out boundary area through the first channel; The conveying gas pressure is adjusted to control the diffusion range of the solid waste fly ash in the goaf boundary area.

[0009] According to a method for filling and controlling the boundary blocking of a goaf provided by the present invention, the pipeline component includes a first tube body and a second tube body, the first tube body forms the first channel inside, the second tube body forms the second channel inside, and the side wall of one end of the second tube body extending into the goaf is provided with a plurality of spray holes.

[0010] According to a method for filling and controlling a goaf boundary plugging provided by the present invention, the expansion material comprises an expansion agent or a cement slurry having an expansion material, and the expansion material is injected above the boundary plugging entity through the injection device, comprising: When the boundary sealing knot entity is filled to the top plate of the goaf, the expansion material is injected above the boundary sealing knot entity through the second pipe body; The expansion material fills the space between the boundary sealing joint entity and the top plate.

[0011] According to a method for filling and blocking the boundary of a goaf provided by the present invention, the boundary drilling is arranged at the boundary of the treatment area above the goaf, comprising: Determine the filling boundary of the goaf based on the goaf and the remaining coal body; Determining a drill hole location at a boundary of the treatment area above the fill boundary; When the drilling position is drilled to a preset depth, an orifice casing is arranged at the drilling position; The drilling position is drilled through to the roof of the goaf.

[0012] According to a method for filling and blocking the boundary of a goaf provided by the present invention, the slurry is cement slurry, and the blending ratio of the cement slurry to the fly ash is 5% to 15%.

[0013] According to a method for filling and controlling a goaf area boundary plugging provided by the present invention, the diameter of the boundary drill hole is greater than 150 mm.

[0014] According to a method for sealing the boundary of a goaf filling and treatment provided by the present invention, the first tube body is interspersed in the second tube body, and the second channel is formed between the inner wall of the second tube body and the outer wall of the first tube body.

[0015] The method for sealing the boundary of a goaf filling and management provided by the present invention arranges boundary holes at the boundary of a management area above the goaf, injects fly ash and slurry into the goaf boundary area corresponding to the boundary holes, so as to form a boundary sealing entity in the goaf boundary area, and effectively connects the boundary sealing entity to the top plate of the goaf through expansion materials. In this way, the boundary sealing entity forms a boundary constraint for the filling space of the goaf, so that the filling space forms a closed area, effectively improving the filling rate and the top connection rate of the goaf, and providing a guarantee for safe and efficient mining in the later stage. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] In order to more clearly illustrate the technical solutions in the present invention or the prior art, the following briefly introduces the drawings required for use in the embodiments or the description of the prior art. Obviously, the drawings described below are some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0017] Figure 1 It is one of the flow diagrams of the method for filling and managing the boundary blocking of the goaf provided by the present invention.

[0018] Figure 2 This is the second flow chart of the method for filling and managing the boundary blocking of the goaf provided by the present invention.

[0019] Figure 3 It is a schematic diagram of the filling boundary setting of the room-and-pillar goaf area provided by the present invention.

[0020] Figure 4 This is the third flow chart of the method for filling and controlling the boundary blocking of goaf areas provided by the present invention.

[0021] Figure 5 It is a side view of the room-and-pillar goaf filling boundary arrangement provided by the present invention.

[0022] Figure 6 It is a schematic diagram of filling expansion material to connect the top at the end of boundary plugging provided by the present invention.

[0023] Figure 7 It is a schematic diagram of the partial structure of the second tube body provided by the present invention.

[0024] Figure 8 This is the fourth flow chart of the method for filling and managing the boundary blocking of the goaf provided by the present invention.

[0025] Fig. 9This is the fifth flow chart of the method for filling and managing the boundary blocking of the goaf provided by the present invention.

[0026] Figure numerals: 1. Remaining coal body; 2. Goaf; 3. Filling boundary; 4. Boundary drilling; 41. Orifice casing; 5. Transport tank truck; 6. Ash unloading pipe; 7. Second pipe body; 71. Spray hole; 72. Grouting pump; 8. Fly ash; 9. Slurry; 10. Boundary plugging entity; 11. Expansive material; 12-Expansive material entity; 13. First pipe body. DETAILED DESCRIPTION

[0027] The following embodiments of the present invention are described in further detail in conjunction with the accompanying drawings and examples. The following examples are used to illustrate the present invention, but are not intended to limit the scope of the present invention.

[0028] In the description of the embodiments of the present invention, it should be noted that the terms "center", "longitudinal", "lateral", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside" and the like indicate positions or positional relationships based on the positions or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the embodiments of the present invention and simplifying the description, and do not indicate or imply that the devices or elements referred to must have a specific orientation, be constructed and operate in a specific orientation, and therefore cannot be understood as limitations on the embodiments of the present invention. In addition, the terms "first", "second", and "third" are used for descriptive purposes only and cannot be understood as indicating or implying relative importance.

[0029] In the description of the embodiments of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "connected" and "connection" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium. For ordinary technicians in this field, the specific meanings of the above terms in the embodiments of the present invention can be understood according to specific circumstances.

[0030] In the embodiments of the present invention, unless otherwise clearly specified and limited, the first feature being "above" or "below" the second feature may mean that the first and second features are in direct contact, or the first and second features are in indirect contact through an intermediate medium. Moreover, the first feature being "above", "above" and "above" the second feature may mean that the first feature is directly above or obliquely above the second feature, or simply means that the first feature is higher in level than the second feature. The first feature being "below", "below" and "below" the second feature may mean that the first feature is directly below or obliquely below the second feature, or simply means that the first feature is lower in level than the second feature.

[0031] In the description of this specification, the description with reference to the terms "one embodiment", "some embodiments", "example", "specific example", or "some examples" etc. means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the embodiment of the present invention. In this specification, the schematic representations of the above terms do not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described may be combined in any one or more embodiments or examples in a suitable manner. In addition, those skilled in the art may combine and combine the different embodiments or examples described in this specification and the features of the different embodiments or examples, without contradiction.

[0032] The embodiment of the present invention provides a method for filling and blocking the boundary of a goaf area, such as Figure 1 As shown, the method includes the following steps 100 to 300.

[0033] Step 100 , arranging boundary drill holes 4 at the boundary of the treatment area above the goaf 2 .

[0034] Step 200: Inject fly ash 8 and slurry 9 into the goaf boundary area corresponding to the boundary borehole 4 through injection devices arranged at the boundary borehole 4, so as to form a boundary sealing entity 10 in the goaf boundary area.

[0035] Step 300 , inject the expansion material 11 onto the top of the boundary sealing entity 10 through the injection device, so that the boundary sealing entity 10 is connected to the top plate of the goaf 2 .

[0036] It can be understood that, in the corresponding treatment area above the goaf 2, the boundary of the treatment area corresponding to the boundary of the goaf 2 is determined, and a plurality of boundary boreholes 4 are arranged along the boundary line at the boundary of the treatment area. By arranging an injection device at the boundary borehole 4, fly ash 8 and slurry 9 are respectively injected into the goaf boundary area corresponding to the boundary borehole 4 through the injection device to form a boundary plugging entity 10 in the goaf boundary area, and the expansion material 11 is injected above the boundary plugging entity 10 through the injection device to connect the boundary plugging entity 10. Thus, the filling space of the goaf 2 forms a closed area.

[0037] It should be noted that in the related art, the goaf 2 is a borderless filling area. If the borderless goaf 2 is directly filled, the filling rate is low, which is not conducive to efficient mining in the later stage. Therefore, the present invention sets the boundary of the goaf 2 through the boundary plugging entity 10 to ensure that the filling body of the goaf 2 can have a high filling rate and top connection rate within the boundary constraint range, thereby providing guarantee for safe and efficient mining in the later stage.

[0038] The method for sealing the boundary of a goaf filling and management provided by the present invention arranges a boundary drill hole 4 at the boundary of the management area above the goaf 2, injects fly ash 8 and slurry 9 into the goaf boundary area corresponding to the boundary drill hole 4, so as to form a boundary sealing entity 10 in the goaf boundary area, and realizes that the boundary sealing entity 10 is effectively connected to the top plate of the goaf 2 through the expansion material 11. In this way, the boundary sealing entity 10 forms a boundary constraint for the filling space of the goaf 2, so that the filling space forms a closed area, effectively improving the filling rate and the top connection rate of the goaf 2, and providing a guarantee for safe and efficient mining in the later stage.

[0039] In an optional embodiment of the present invention, Figure 2 As shown, step 100 specifically includes the following steps 110 to 130: Step 110 : Based on the goaf 2 and the remaining coal body 1 , determine the filling boundary 3 of the goaf 2 .

[0040] It can be understood that the distribution of the goaf 2 and the remaining coal body 1 is detected to determine the area of ​​the goaf 2 that needs to be filled, and the boundary of the filling area is the filling boundary 3.

[0041] In this embodiment, Figure 3 As shown, the goaf 2 has a plurality of residual coal pillars, and the filling area of ​​the goaf 2 is circular, so the filling boundary 3 is circular. In other embodiments, the filling boundary 3 can also be in other shapes such as ellipse, polygon, etc.

[0042] Step 120 , determine the drilling position at the boundary of the treatment area above the filling boundary 3 .

[0043] It can be understood that in the treatment area above the goaf 2, the boundary of the treatment area corresponding to the filling boundary 3 is determined, and multiple drilling positions are arranged along the boundary line of the treatment area boundary. It should be noted here that the boundary line is a component line of the treatment area boundary, such as, the filling boundary 3 is circular, the treatment area boundary is a corresponding circle, the boundary line is the circle, and multiple drilling positions are arranged in a circular shape along the boundary line at the treatment area boundary; such as, the filling boundary 3 is a quadrilateral, the treatment area boundary is a corresponding quadrilateral, the boundary line is the quadrilateral, and multiple drilling positions are arranged in a quadrilateral shape along the boundary line at the treatment area boundary.

[0044] Step 130: Drill each drilling position.

[0045] It is understandable that the drilling position is drilled until the top plate of the goaf 2 is drilled through, so that a plurality of boundary boreholes 4 are arranged along the boundary line at the boundary of the treatment area. For example, the diameter of the boundary borehole 4 is generally greater than 150 mm.

[0046] Further, such as Figure 4As shown, step 130 may specifically include the following steps 131 and 132 .

[0047] Step 131 , when the drilling position is drilled to a preset depth, a borehole casing 41 is set at the drilling position.

[0048] Step 132, drilling the hole through to the roof of goaf 2.

[0049] It is understandable that the diameter of the boundary borehole 4 is generally greater than 150 mm, and when the drilling position is drilled to a certain preset depth, a borehole casing 41 is set at the drilling position, so as to prevent the defect of shallow collapse of the surface soil in the treatment area during the drilling process. It should be noted here that the preset depth can be reasonably designed according to the actual drilling situation.

[0050] It should be noted that the axial length of the orifice sleeve 41 can be equal to the preset depth. After drilling the preset depth at the drilling position, the orifice sleeve 41 corresponding to the preset depth is set at the entire hole position. Of course, the preset depth can also be greater than the axial length of the orifice sleeve 41. After drilling the preset depth at the drilling position, the orifice sleeve 41 is set at the upper part of the hole position, and the upper end of the orifice sleeve 41 is flush with the upper end of the empty position.

[0051] In one embodiment of the present invention, Figure 5 and Figure 6 As shown, the injection device includes a pipeline component, and the pipeline component has a first channel and a second channel.

[0052] It can be understood that after the boundary drilling hole 4 is arranged at the boundary of the treatment area, the pipeline components are passed through the boundary drilling hole 4, the fly ash 8 is injected into the mined-out boundary area through the first channel, and the slurry 9 is injected into the mined-out boundary area through the second channel, and the fly ash 8 and the slurry 9 react and condense in the mined-out boundary area.

[0053] It should be noted that fly ash 8 and slurry 9 enter the goaf 2 through two channels respectively for boundary sealing. Fly ash 8 and slurry 9 are isolated from each other in the pipeline components and will not meet each other, thereby avoiding the problem of fly ash 8 and slurry 9 condensing and hanging on the wall to cause hole blockage.

[0054] Optionally, the first channel is connected to a transport tank truck 5 , and the transport tank truck 5 contains solid waste fly ash.

[0055] It is understandable that the fly ash of the present embodiment can be solid waste fly ash, which is a waste material of power plants and has no cost. Compared with other commonly used materials such as rice stone and aeolian sand that need to be purchased, it can effectively reduce the cost. In addition, the existing rice stone high-quality aggregate requires equipment such as aggregate crusher and paste mixer, which has a complex process and high investment cost. In the present embodiment, the fly ash 8 is injected into the goaf boundary area through the first channel, and the slurry 9 is injected into the goaf boundary area through the second channel. The fly ash 8 and the slurry 9 react and condense in the goaf boundary area, which has the characteristics of less equipment investment, low material cost and simple process.

[0056] In one embodiment of the present invention, the pipeline component includes a first tube body 13 and a second tube body 7. A first channel is formed inside the first tube body 13, and a second channel is formed inside the second tube body 7. The side wall of one end of the second tube body 7 extending into the goaf 2 is provided with multiple spray holes 71.

[0057] It is understandable that if Figure 7 As shown, the pipe opening at one end of the second pipe body 7 entering the boundary bore 4 is provided with a plurality of spray holes 71 to form a flower pipe structure, which is beneficial to the spraying area of ​​the slurry 9 and further improves the coagulation uniformity between the fly ash 8 and the slurry 9 .

[0058] Furthermore, the first tube body 13 is interspersed in the second tube body 7 , a cover plate is provided between the upper end of the first tube body 13 and the upper end of the second tube body 7 , and a second channel is formed between the inner wall of the second tube body 7 and the outer wall of the first tube body 13 .

[0059] It can be understood that the first tube body 13 is interspersed with the second tube body 7, and a connecting piece is provided between the first tube body 13 and the second tube body 7, and the connecting piece is formed with a notch for the slurry 9 to pass through. For example, the connecting piece is a connecting rod connected between the first tube body 13 and the second tube body 7, and the notch is formed between the connecting rods. The first tube body 13, the second tube body 7 and the connecting rod can be an integrally formed part.

[0060] In other embodiments, the inner wall of the second tube body 7 has a positioning groove along the axial direction, and the outer wall of the first tube body 13 has a protrusion, and the end of the protrusion away from the first tube body 13 is clamped in the positioning groove. The positioning grooves can be multiple and evenly distributed in the axial direction, and the number of the protrusions is equal to the number of the positioning grooves, and the positions correspond one to one. Furthermore, the lower end of the inner wall of the second tube body 7 has a limiting portion for limiting the position of the protrusion, so as to limit the assembly position of the first tube body 13 in the second tube body 7 along the axial direction.

[0061] Optional, such as Figure 8 As shown, step 200 specifically includes the following steps 210 to 230.

[0062] Step 210 , insert the pipeline component into the boundary borehole 4 .

[0063] Step 220 , inject the fly ash 8 into the goaf boundary area through the first channel, inject the slurry 9 into the goaf boundary area through the second channel, and spray the fly ash 8 .

[0064] In step 230 , the fly ash 8 and the slurry 9 undergo a hydration reaction and solidify into a boundary sealing entity 10 .

[0065] It can be understood that the pipeline components are passed through the boundary drill hole 4, the fly ash 8 is injected into the mined-out boundary area through the first channel, and at the same time the slurry 9 is injected into the mined-out boundary area through the second channel, the slurry 9 is sprayed on the fly ash 8, and the sprayed slurry 9 and the fly ash 8 are superimposed and mixed layer by layer, and after hydration reaction, they solidify into a boundary sealing entity 10 with a certain strength.

[0066] Optionally, the slurry 9 uses cement slurry, and the cement slurry reacts with fly ash 8 to form a cementing material. The blending ratio of cement slurry and fly ash 8 is determined according to the specific situation. In this embodiment, the slurry 9 uses cement slurry, and the blending ratio of cement slurry and fly ash 8 is 5%~15%, which can effectively improve the strength of the boundary sealing entity 10.

[0067] In an optional embodiment of the present invention, in step 220, the fly ash 8 is injected into the goaf boundary area through the first channel, which specifically includes the following contents: Based on the conveying air pressure of the transport tank truck 5, the solid waste fly ash in the transport tank truck 5 is blown to the mined boundary area through the first channel; the conveying air pressure is adjusted to control the diffusion range of the solid waste fly ash in the mined boundary area.

[0068] It can be understood that after the boundary drilling hole 4 is arranged at the boundary of the treatment area, the pipeline components are passed through the boundary drilling hole 4, and the transport tank truck 5 is used to transport the solid waste fly ash of the thermal power plant. The transport tank truck 5 is connected to the upper end of the first pipe body 13 through the unloading pipe, and the conveying air pressure of the transport tank truck 5 is used to blow the solid waste fly ash in the transport tank truck 5 through the first channel to the mined boundary area.

[0069] It should be noted that the fly ash 8 is solid and has poor free flowability. It will not spread too far and form no boundary. The fly ash 8 is transported by air pressure in a tank truck, and the diffusion distance of the fly ash 8 is controlled by adjusting the transport air pressure (i.e., the unloading air pressure) of the transport tank truck 5. At the same time, the sprayed cement slurry is mixed with the fly ash 8 layer by layer, and after reaction, it solidifies into a boundary blocking entity 10 with a certain strength.

[0070] In an optional embodiment of the present invention, Fig. 9 As shown, step 300 specifically includes the following steps 310 and 320.

[0071] Step 310 , when the boundary sealing entity 10 is filled to the top of the goaf 2 , the expansion material 11 is injected above the boundary sealing entity 10 through the second pipe body 7 .

[0072] Step 320: the expansion material 11 fills the space between the boundary sealing entity 10 and the top plate.

[0073] For example, the expansion material 11 includes an expansion agent or a cement slurry having an expansion material, and the boundary sealing entity 10 is filled to the top plate of the goaf 2, that is, the fly ash 8 completely fills the boundary area of ​​the goaf, such as Figure 6 As shown, the expansive material, or cement slurry containing a small amount of expansive material, is then pressurized and injected into the top of the boundary sealing entity 10 through the second pipe body 7, and the expansive material 11 fills the space between the boundary sealing entity 10 and the top plate to form an expansive material 11 entity, which can make the top plate of the goaf 2 where there is collapse in the boundary part also be filled with material to connect the top, so that the filling space of the goaf 2 forms a closed area, which is beneficial to the improvement of the filling rate and the top connection rate of the goaf 2.

[0074] In a specific embodiment of the present invention, the method for filling and blocking the boundary of a goaf area includes the following steps S10 to S110.

[0075] Step S10: Based on the goaf 2 and the remaining coal body 1, the filling boundary 3 of the goaf 2 is determined.

[0076] Step S20, determining the drilling position at the boundary of the treatment area above the filling boundary 3.

[0077] It can be understood that, in the treatment area above the goaf 2, the boundary of the treatment area corresponding to the filling boundary 3 is determined, and a plurality of drilling positions are arranged along the boundary line of the treatment area boundary.

[0078] Step S30: When the drilling position reaches a preset depth, a hole casing 41 is set at the drilling position.

[0079] It is understandable that the diameter of the boundary borehole 4 is generally greater than 150 mm. In order to treat the defects of shallow collapse of the surface soil in the area, a certain preset depth is drilled at the drilling position, and a hole casing 41 is set at the drilling position according to the actual situation.

[0080] Step S40 , drilling the drilling position through to the roof of the goaf 2 to form a plurality of boundary boreholes 4 at the boundary of the treatment area above the goaf 2 .

[0081] Step S50 , inserting the pipeline component into the boundary drilling hole 4 .

[0082] It is understandable that after the drilling is completed at the drilling position, the pipeline component is passed through the boundary borehole 4. Specifically, the pipeline component includes a first pipe body 13 and a second pipe body 7, a first channel is formed inside the first pipe body 13, and a second channel is formed inside the second pipe body 7. The first pipe body 13 and the second pipe body 7 are both arranged in the boundary borehole 4, the inner diameter of the second pipe body 7 is about 30 mm, and a plurality of spray holes 71 are opened on the side wall of one end of the second pipe body 7 extending into the goaf 2, and a grouting pump 72 is connected to the end of the second pipe body 7 located on the ground.

[0083] Step S60: transport fly ash, a solid waste from a thermal power plant, using a transport tank truck 5 , wherein a discharge pipe of the transport tank truck 5 is connected to the upper end of the first pipe body 13 .

[0084] Step S70 , injecting fly ash 8 into the mined-out boundary area through the first channel, injecting slurry 9 into the mined-out boundary area through the second channel, and spraying the fly ash 8 .

[0085] In step S80, the fly ash 8 and the slurry 9 undergo a hydration reaction and solidify into a boundary sealing entity 10.

[0086] It can be understood that based on the conveying air pressure of the transport tank truck 5, the solid waste fly ash in the transport tank truck 5 is blown to the mined-out boundary area through the first channel of the first tube body 13, and at the same time, the slurry 9 is injected into the mined-out boundary area through the second channel of the second tube body 7. The slurry 9 sprays the fly ash 8, and the sprayed slurry 9 and the fly ash 8 are superimposed and mixed layer by layer, and after hydration reaction, they solidify into a boundary sealing entity 10 with a certain strength.

[0087] It should be noted that the fly ash 8 is solid and has poor free flowability. It will not spread too far and form no boundary. The diffusion distance of the fly ash 8 can be controlled by adjusting the conveying air pressure (i.e., the unloading air pressure) of the transport tanker 5. At the same time, the sprayed cement slurry and the fly ash 8 are superimposed and mixed layer by layer, and after reaction, they solidify into a boundary blocking entity 10 with a certain strength.

[0088] Step S90 , when the boundary sealing knot entity 10 is filled to the top plate of the goaf 2 , the expansion material 11 is injected above the boundary sealing knot entity 10 through the second pipe body 7 .

[0089] Step S110, the expansion material 11 fills the space between the boundary sealing entity 10 and the top plate.

[0090] It can be understood that finally, high-pressure injection of cement slurry (containing a small amount of expansion material) through the second pipe body 7 can connect the roof of the boundary caving area and ensure the effect of boundary blocking.

[0091] It should be noted that fly ash 8 and slurry 9 can be injected into the corresponding goaf boundary area through a boundary borehole 4 to achieve the sealing of a boundary borehole 4; of course, multiple boundary boreholes 4 can also be sealed at the same time, which has the characteristics of non-interference, low cost and simple process.

[0092] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit it. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or make equivalent replacements for some of the technical features therein. However, these modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present invention.

Claims

1. A method for filling and blocking the boundary of a goaf area, characterized in that: include: Arrange boundary drilling holes at the boundary of the treatment area above the goaf; Injecting fly ash and slurry into the goaf boundary area corresponding to the boundary borehole through injection devices arranged at the boundary borehole, respectively, to form a boundary sealing entity in the goaf boundary area; The expansion material is injected onto the top of the boundary sealing knot entity through the injection device, so that the boundary sealing knot entity is connected to the top plate of the goaf.

2. The method for filling and blocking the boundary of a goaf according to claim 1 is characterized in that: The injection device comprises a pipeline component, the pipeline component has a first channel and a second channel, and the fly ash and slurry are respectively injected into the goaf boundary area corresponding to the boundary borehole through the injection device arranged at the boundary borehole, comprising: Inserting the pipeline component into the boundary borehole; Injecting fly ash into the goaf boundary area through the first channel, injecting slurry into the goaf boundary area through the second channel, and spraying the fly ash; The fly ash and the slurry undergo a hydration reaction and solidify into the boundary sealing entity.

3. The method for filling and blocking the boundary of a goaf according to claim 2 is characterized in that: The first channel is connected to a transport tank truck, and the transport tank truck contains solid waste fly ash.

4. The method for filling and blocking the boundary of a goaf according to claim 3 is characterized in that: The step of injecting fly ash into the goaf boundary area through the first channel comprises: Based on the conveying air pressure of the transport tank truck, the solid waste fly ash in the transport tank truck is blown to the mined-out boundary area through the first channel; The conveying gas pressure is adjusted to control the diffusion range of the solid waste fly ash in the goaf boundary area.

5. The method for filling and blocking the boundary of a goaf according to any one of claims 2 to 4, characterized in that: The pipeline component includes a first tube body and a second tube body. The first tube body forms the first channel inside, the second tube body forms the second channel inside, and a plurality of spray holes are formed on the side wall of one end of the second tube body extending into the goaf.

6. The method for filling and blocking the boundary of a goaf according to claim 5 is characterized in that: The expansion material includes an expansion agent or cement slurry having an expansion material, and the step of injecting the expansion material onto the top of the boundary sealing entity through the injection device includes: When the boundary sealing knot entity is filled to the top plate of the goaf, the expansion material is injected above the boundary sealing knot entity through the second pipe body; The expansion material fills the space between the boundary sealing joint entity and the top plate.

7. The method for filling and blocking the boundary of a goaf according to any one of claims 1 to 4, characterized in that: The arrangement of boundary drilling holes at the boundary of the treatment area above the goaf includes: Determine the filling boundary of the goaf based on the goaf and the remaining coal body; Determining a drill hole location at a boundary of the treatment area above the fill boundary; When the drilling position reaches a preset depth, a borehole casing is arranged at the drilling position; The drilling position is drilled through to the roof of the goaf.

8. The method for filling and blocking the boundary of a goaf according to claim 7 is characterized in that: The slurry is cement slurry, and the blending ratio of the cement slurry to the fly ash is 5% to 15%.

9. The method for filling and blocking the boundary of a goaf according to any one of claims 1 to 4, characterized in that: The diameter of the boundary drilled hole is greater than 150 mm.

10. The method for filling and blocking the boundary of a goaf according to claim 6, characterized in that: The first tube body is disposed in the second tube body at intervals, and the second channel is formed between the inner wall of the second tube body and the outer wall of the first tube body.