IGCC combined cycle power generation steam-water cycle on-line monitoring system and method

By designing an online monitoring system and recycling steam condensate in the IGCC combined cycle power generation system, the problems of difficult and poor monitoring of the steam and water system are solved, efficient and accurate water quality monitoring and system stability are achieved, and the power generation effect is improved.

CN118728503APending Publication Date: 2024-10-01HUANENG TIANJIN COAL GASIFICATION POWER CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202310315564.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2023-03-28
Publication Date
2024-10-01

AI Technical Summary

Technical Problem

The complexity of the steam-water system in the IGCC combined cycle power generation model makes monitoring difficult, ineffective, time-consuming and labor-intensive, making it impossible to accurately control the overall water quality and affecting the power generation effect.

Method used

An online monitoring system for the steam-water cycle of IGCC combined cycle power generation is designed, including a condenser, a low-pressure steam drum, a medium-pressure steam drum, a waste heat boiler and a steam turbine connected in sequence. It is equipped with multiple online instruments and can effectively recycle and utilize the medium pressure. Steam, sub-medium pressure steam and steam condensate, optimize the steam and water sampling system to ensure the reliability and accuracy of online instruments.

Benefits of technology

It achieves efficient and accurate detection of problems in the soda and water system, improves the monitoring accuracy, timeliness and reliability of the water system, ensures the water quality stability of the soda and water system, and thereby improves the effect of IGCC combined cycle power generation.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118728503A_ABST
    Figure CN118728503A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of IGCC coal chemical industry, and discloses an IGCC combined cycle power generation steam-water circulation on-line monitoring system and method.The system comprises a condenser, a low-pressure steam drum, a medium-pressure steam drum, a waste heat boiler and a steam turbine which are sequentially communicated, and the steam turbine is communicated with the condenser; the low-pressure steam pocket is further communicated with a high-pressure steam pocket and a gasification furnace, the high-pressure steam pocket is communicated with the waste heat boiler, and the gasification furnace is communicated with the medium-pressure steam pocket and the low-pressure steam pocket. The system further comprises a plurality of online instruments configured in important links, and the water quality change condition can be efficiently and accurately monitored according to the numerical value change of the online instruments; and the position of a fault point can be accurately deduced by combining the relationship between data changes of different instruments, so that the measurement is accurate, and the fault is quickly and accurately judged.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of IGCC coal chemical industry, and in particular to an online monitoring system and method for an IGCC combined cycle power generation steam-water cycle. Background Art

[0002] Compared with the traditional coal-fired and gas-fired power generation modes, the water system of the IGCC combined cycle power generation mode is more complicated. It not only includes the conventional power island steam-water system, but also includes the gasification island, purification island, and air separation island steam-water systems. Among them, the steam-water system has low utilization and cannot effectively recycle the steam-water. The complex steam-water system will inevitably have the following new problems: the overall water quality of the steam-water system is prone to deterioration, the number of steam-water quality failure points increases, or the steam-water quality changes greatly. The IGCC steam-water systems are closely related, and any change in the water quality at any key point will affect the overall water quality. Due to the complexity and relative independence of the steam-water system, it is difficult to find the water quality failure point. In the process of monitoring the steam-water system, a lot of manpower and material resources are required, which is inefficient and ineffective. Summary of the invention

[0003] The technical problems to be solved by the present invention are:

[0004] At present, due to the complexity of the system itself, it is difficult to find water quality fault points during monitoring, which means that the monitoring is difficult, the monitoring effect is poor, and it is time-consuming and labor-intensive. It is impossible to accurately control the overall water quality, which in turn affects the IGCC combined cycle power generation effect.

[0005] The technical solution adopted by the present invention is:

[0006] The present invention provides an online monitoring system for steam-water cycle of IGCC combined cycle power generation, comprising a condenser, a low-pressure steam drum, a medium-pressure steam drum, a waste heat boiler and a steam turbine connected in sequence, wherein the steam turbine is connected to the condenser; the low-pressure steam drum is also connected to a high-pressure steam drum and a gasifier respectively, the high-pressure steam drum is connected to the waste heat boiler, and the gasifier is connected to the medium-pressure steam drum and the low-pressure steam drum respectively; and also comprises a plurality of online instruments.

[0007] Preferably, the gasifier is also connected to a synthesis gas heater, and the synthesis gas heater is connected to the low-pressure steam drum.

[0008] Preferably, it also includes a flash tank and an iron remover connected in sequence, wherein the iron remover is connected to the discharge pipe of the low-pressure steam drum; the feed end of the flash tank is connected to multiple liquid inlet pipes; further, the multiple liquid inlet pipes include a vaporization island steam condensate pipe, an air separation island steam condensate pipe and a purification island steam condensate pipe.

[0009] Preferably, the multiple online instruments include an online conductivity meter for desalted water, an online conductivity meter for condensed water, a condensed water sodium meter, an online conductivity meter for low-pressure saturated steam, an online conductivity meter for medium-pressure saturated steam, an online conductivity meter for high-pressure saturated steam, an online conductivity meter for low-pressure superheated steam, an online conductivity meter for medium-pressure superheated steam, an online conductivity meter for high-pressure superheated steam, an online conductivity meter for main medium-pressure steam of vaporizer, an online conductivity meter for secondary medium-pressure steam of vaporizer, an online conductivity meter for synthesis gas heating, an online conductivity meter for steam condensate of air separation island, an online conductivity meter for steam condensate of gasification island, an online conductivity meter for steam condensate of purification island and an online conductivity meter for iron removal outlet pipeline.

[0010] The present invention also provides an online monitoring method for steam-water cycle of IGCC combined cycle power generation, comprising the following steps:

[0011] S1 adds desalted water to the condenser, and then pumps it to the low-pressure drum with the condensate pump; the desalted water in the low-pressure drum is pumped to the medium-pressure drum through the medium-pressure feed water pump, to the high-pressure drum through the high-pressure feed water pump, and to the gasifier through the gasification feed water pump;

[0012] The desalted water in the S2 low-pressure drum, medium-pressure drum and high-pressure drum is passed into the waste heat boiler for heating and then sent to the steam turbine to do work and then discharged to the condenser;

[0013] The desalted water in the S3 gasifier is transported to the waste heat boiler through the following multiple paths for heating and then sent to the steam turbine to perform work before being discharged to the condenser;

[0014] S4 air separation island steam condensate, gasification island steam condensate and purification island steam condensate are sent to the low-pressure drum after treatment;

[0015] S5 monitors through online instruments and observes the changes in the values ​​of online instruments.

[0016] Preferably, in step S3, the desalted water in the gasifier is transported to the waste heat boiler through the following multiple paths: (1) a part of the medium-pressure steam in the gasifier is passed into the medium-pressure drum; (2) another part of the medium-pressure steam in the gasifier is used to be passed into the synthesis gas to adjust the calorific value, passed into the synthesis gas heater for heating, and then passed into the low-pressure drum; (3) the sub-medium-pressure steam in the gasifier is passed into the low-pressure drum.

[0017] Preferably, in step S4, the steam condensate from the air separation island, the steam condensate from the gasification island and the steam condensate from the purification island are first passed into a flash tank, then sent to a deironing device for treatment, and then sent to a low-pressure steam drum.

[0018] The beneficial effects of the present invention are as follows:

[0019] The present invention effectively recycles the medium-pressure steam, sub-medium-pressure steam generated by the gasifier and the steam condensate generated by the air separation island, the gasification island and the purification island, and effectively distributes and configures the online instruments, accurately analyzes the water quality of each environment, and optimizes the steam-water sampling system to ensure the reliability and accuracy of the online instruments. At the same time, combined with the measurement data of the online instruments, the causes of the problems in the steam-water system are efficiently and accurately discovered, forming a complete and efficient monitoring system, thereby improving the monitoring accuracy, timeliness and reliability of the IGCC water system. BRIEF DESCRIPTION OF THE DRAWINGS

[0020] Figure 1 It is a structural schematic diagram of the online monitoring system for the steam-water cycle of the IGCC combined cycle power generation in Example 1;

[0021] Figure 2 It is a schematic flow diagram of the steam-water cycle of the IGCC combined cycle power generation in Example 1;

[0022] Figure 3 This is a schematic diagram of the fault analysis of the online monitoring system for the steam-water cycle of the IGCC combined cycle power generation in Example 1.

[0023] Figure identification: 1- condenser, 11- condensate pump, 2- low-pressure steam drum, 21- medium-pressure feed water pump, 22- high-pressure feed water pump, 23- gasification feed water pump, 3- medium-pressure steam drum, 4- waste heat boiler, 5- steam turbine, 6- high-pressure steam drum, 7- gasifier, 71- synthesis gas heater, 8- flash tank, 81- gasification island steam condensate pipe, 82- air separation island steam condensate pipe, 83- purification island steam condensate pipe, 9- iron remover. DETAILED DESCRIPTION

[0024] In order to make the purpose, technical scheme and advantages of the embodiments of the present invention clearer, the technical scheme in the embodiments of the present invention will be described clearly and completely below. If the specific conditions are not specified in the embodiments, they are carried out according to conventional conditions or conditions recommended by the manufacturer. If the manufacturer of the reagents or instruments used is not specified, they are all conventional products that can be purchased commercially.

[0025] Example 1

[0026] like Figures 1 to 3 As shown, this embodiment provides an online monitoring system for the steam-water cycle of an IGCC combined cycle power generation, comprising a condenser 1, a low-pressure steam drum 2, a medium-pressure steam drum 3, a waste heat boiler 4 and a steam turbine 5 connected in sequence, the steam turbine 5 being connected to the condenser 1; the low-pressure steam drum 2 is also connected to a high-pressure steam drum 6 and a gasifier 7, respectively, the high-pressure steam drum 6 is connected to the waste heat boiler 4, the gasifier 7 is connected to the medium-pressure steam drum 3 and the low-pressure steam drum 2, respectively; the gasifier 7 is also connected to a synthesis gas heater 71, the synthesis gas heater 71 is connected to the low-pressure steam drum 2; and also includes a plurality of online instruments.

[0027] In this embodiment, the condenser 1 and the low-pressure steam drum 2 are transported by the condensate pump 11, the low-pressure steam drum 2 and the medium-pressure steam drum 3 are transported by the medium-pressure feed water pump 21, the low-pressure steam drum 2 and the high-pressure steam drum 6 are transported by the high-pressure feed water pump 22, and the low-pressure steam drum 2 and the gasifier 7 are transported by the gasification feed water pump 23.

[0028] In this embodiment, it also includes a flash tank 8 and an iron remover 9 which are connected in sequence. The iron remover 9 is connected to the discharge pipe of the low-pressure steam drum 2; the feed end of the flash tank 8 is connected to multiple liquid inlet pipes, and the multiple liquid inlet pipes include a gasification island steam condensate pipe 81, an air separation island steam condensate pipe 82 and a purification island steam condensate pipe 83.

[0029] In this embodiment, multiple online instruments include an online conductivity meter CC1 for desalted water, an online conductivity meter CC2 for condensed water, a condensed water sodium meter CC3, an online conductivity meter CC4 for low-pressure saturated steam, an online conductivity meter CC5 for medium-pressure saturated steam, an online conductivity meter CC6 for high-pressure saturated steam, an online conductivity meter CC7 for low-pressure superheated steam, an online conductivity meter CC8 for medium-pressure superheated steam, an online conductivity meter CC9 for high-pressure superheated steam, an online conductivity meter CC10 for main medium-pressure steam of vaporizer, an online conductivity meter CC11 for secondary medium-pressure steam of vaporizer, an online conductivity meter CC12 for synthesis gas heating, an online conductivity meter CC13 for steam condensate of air separation island, an online conductivity meter CC14 for steam condensate of gasification island, an online conductivity meter CC15 for steam condensate of purification island, and an online conductivity meter CC16 for iron removal outlet pipeline.

[0030] This embodiment also provides an online monitoring method for the steam-water cycle of an IGCC combined cycle power generation system, comprising the following steps:

[0031] (1) Water supply on the water side: Desalted water is added to the condenser and then to the low-pressure drum through the condensate pump; the desalted water in the low-pressure drum is respectively sent to the medium-pressure drum through the medium-pressure feed water pump, sent to the high-pressure drum through the high-pressure feed water pump, and sent to the gasifier drum through the gasification feed water pump.

[0032] (2) Steam side work: The desalted water in the low-pressure drum is heated by the waste heat boiler to become low-pressure steam, and the low-pressure steam is discharged to the condenser after the steam turbine performs work; the desalted water in the medium-pressure drum is heated by the waste heat boiler to become medium-pressure steam, and the medium-pressure steam is discharged to the condenser after the steam turbine performs work: the desalted water in the high-pressure drum is heated by the waste heat boiler to become high-pressure steam, and the high-pressure steam is discharged to the condenser after passing through a series of finally discharged condensers.

[0033] (3) Recovery of medium-pressure steam from the gasifier: The desalted water from the gasifier is heated to medium-pressure steam, which is then sent to the medium-pressure steam drum and then heated by the waste heat boiler and sent to the steam turbine for power cycle.

[0034] (4) Steam recovery from syngas heater: A portion of the medium-pressure steam generated by the gasifier is added to the syngas to adjust the calorific value, and the other portion is sent to the syngas heater for heating and then sent to the low-pressure drum system. This portion of steam is recovered and sent to the steam turbine to perform work.

[0035] (5) Recovery of sub-intermediate pressure steam from the gasifier: The sub-intermediate pressure steam generated in the gasifier is sent to the low-pressure steam drum and is also recovered to be used to do work in the low-pressure system turbine.

[0036] (6) Condensate Steam Recovery: The steam condensate from the air separation island, the steam condensate from the gasification island, and the steam condensate from the purification island are sent to the low-pressure steam drum after being processed by the flash tank and the iron remover. They are recovered together and used to do work in the low-pressure system turbine.

[0037] (7) Monitor through online instruments and observe the changes in the numerical values ​​of online instruments.

[0038] In this embodiment, when the desalted water is passed into the condenser, it is monitored by the desalted water online conductivity meter CC1, and when the desalted water in the condenser is passed into the low-pressure steam drum through the condensate pump, it is monitored by the condensate online conductivity meter CC2 and the condensate sodium meter CC3.

[0039] In this embodiment, the low-pressure saturated steam generated in the low-pressure drum is monitored by the low-pressure saturated steam online conductivity meter CC4, the low-pressure supersteam generated by the low-pressure saturated steam after being heated by the waste heat boiler is monitored by the low-pressure superheated steam online conductivity meter CC7, and after the low-pressure superheated steam enters the steam turbine, the steam and water are discharged to the condenser to achieve circulation. The medium-pressure saturated steam generated in the medium-pressure drum is monitored by the medium-pressure saturated steam online conductivity meter CC5, the medium-pressure superheated steam generated by the medium-pressure saturated steam after being heated by the waste heat boiler is monitored by the medium-pressure superheated steam online conductivity meter CC8, and after the medium-pressure superheated steam enters the steam turbine, the steam and water are discharged to the condenser to achieve circulation. The high-pressure saturated steam generated in the high-pressure drum is monitored by the high-pressure saturated steam online conductivity meter CC6, and the high-pressure superheated steam generated by the high-pressure saturated steam after being heated by the waste heat boiler is monitored by the high-pressure superheated steam online conductivity meter CC9, and after the high-pressure superheated steam enters the steam turbine, the steam and water are discharged to the medium-pressure system and finally to the condenser to achieve circulation.

[0040] In this embodiment, the desalted water in the low-pressure drum is sent to the gasifier through the gasification feed water pump. A part of the medium-pressure steam generated by the gasifier is sent to the medium-pressure drum and monitored by the online conductivity meter CC10 of the main medium-pressure steam of the gasifier. The steam circulates to the condenser along with the medium-pressure steam system. Another part of the medium-pressure steam generated in the gasifier is used for synthesis gas heating and synthesis gas calorific value adjustment. This part of synthesis gas heating passes through the synthesis gas heat exchanger to generate condensate, which is recovered to the low-pressure steam system and monitored by the online conductivity meter CC12 for synthesis gas heating. The steam condensate is circulated to the condenser along with the low-pressure steam system; the sub-medium-pressure steam generated by gasification is sent to the low-pressure saturated steam system and monitored by the online conductivity meter CC11 of the sub-medium-pressure steam of the gasifier. The steam is also circulated to the condenser along with the low-pressure steam system.

[0041] In this embodiment, the low-pressure steam condensate of the air separation island is monitored by the online conductivity meter CC13 of the air separation island steam condensate, the low-pressure steam condensate of the gasification island is monitored by the online conductivity meter CC14 of the gasification island steam condensate, and the low-pressure steam condensate of the purification island is monitored by the online conductivity meter CC15 of the purification island steam condensate. The three condensates enter the flash tank for separation and filtration, and are monitored by the online conductivity meter CC16 of the iron removal outlet pipeline after passing through the iron remover. The qualified water quality is sent to the low-pressure saturated steam system and circulated to the condenser with the low-pressure steam system.

[0042] In this embodiment, the data obtained by observation and recording are summarized and sorted. Different data changes represent different problems, as follows:

[0043] Case 1: The condensate conductivity CC9 and the condensate sodium table Na16 rise at the same time, indicating that the condenser has a leak. The condensate conductivity CC9 rises and the condensate sodium table Na16 does not change. Referring to the desalted water conductivity CC, it can be known that there is a problem with the desalted water or other impurities such as sulfur ions have penetrated into the water quality.

[0044] Case 2: The values ​​of low-pressure saturated steam conductivity CC10 and condensate recovery related conductivity (online conductivity table CC13-CC16) increased significantly, and the overall water quality deteriorated. It can be seen that there is a problem with the condensate recovery water quality.

[0045] Case 3: The values ​​of low-pressure saturated steam conductivity CC10 and gasification furnace medium-pressure steam conductivity CC6 both increased significantly, and the overall water quality deteriorated. It can be seen that there is a leak in the medium-pressure heat exchange system of the gasification furnace.

[0046] Case 4: The values ​​of low-pressure saturated steam conductivity CC10 and synthesis gas heating conductivity CC7 both increase significantly, and the overall water quality deteriorates. It can be seen that there is a problem with the water quality of the low-pressure steam recovered by the synthesis gas heating system.

[0047] Case 5: The values ​​of medium-pressure saturated steam conductivity CC11 and gasifier main medium-pressure steam conductivity CC5 increased significantly, and the overall water quality deteriorated. It can be seen that there is a leak in the medium-pressure steam system of the gasifier.

[0048] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. For those skilled in the art, the present invention may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.

Claims

1. An online monitoring system for steam-water cycle of IGCC combined cycle power generation, characterized in that: It comprises a condenser (1), a low-pressure steam drum (2), a medium-pressure steam drum (3), a waste heat boiler (4) and a steam turbine (5) which are connected in sequence, wherein the steam turbine (5) is connected to the condenser (1); The low-pressure steam drum (2) is also connected to a high-pressure steam drum (6) and a gasifier (7), respectively; the high-pressure steam drum (6) is connected to the waste heat boiler (4), and the gasifier (7) is connected to the medium-pressure steam drum (3) and the low-pressure steam drum (2), respectively; Also included are multiple online instruments.

2. The online monitoring system for the steam-water cycle of the IGCC combined cycle power generation according to claim 1 is characterized in that: The gasifier (7) is also connected to a synthesis gas heater (71), and the synthesis gas heater (71) is connected to the low-pressure steam drum (2).

3. The online monitoring system for the steam-water cycle of the IGCC combined cycle power generation according to claim 1 is characterized in that: It also includes a flash tank (8) and an iron remover (9) which are connected in sequence, and the iron remover (9) is connected to the discharge pipe of the low-pressure drum (2); The feed end of the flash tank (8) is connected to a plurality of liquid inlet pipes.

4. The online monitoring system for the steam-water cycle of the IGCC combined cycle power generation according to claim 1 is characterized in that: The multiple liquid inlet pipes include a vaporization island steam condensate pipe (81), an air separation island steam condensate pipe (82) and a purification island steam condensate pipe (83).

5. The online monitoring system for steam-water cycle of IGCC combined cycle power generation according to claim 4 is characterized in that: The multiple online instruments include an online conductivity meter CC1 for desalted water, an online conductivity meter CC2 for condensed water, a condensed water sodium meter CC3, an online conductivity meter CC4 for low-pressure saturated steam, an online conductivity meter CC5 for medium-pressure saturated steam, an online conductivity meter CC6 for high-pressure saturated steam, an online conductivity meter CC7 for low-pressure superheated steam, an online conductivity meter CC8 for medium-pressure superheated steam, an online conductivity meter CC9 for high-pressure superheated steam, an online conductivity meter CC10 for main medium-pressure steam of vaporizer, an online conductivity meter CC11 for secondary medium-pressure steam of vaporizer, an online conductivity meter CC12 for synthesis gas heating, an online conductivity meter CC13 for steam condensate of air separation island, an online conductivity meter CC14 for steam condensate of gasification island, an online conductivity meter CC15 for steam condensate of purification island, and an online conductivity meter CC16 for iron removal outlet pipeline.

6. An online monitoring method for steam-water cycle of IGCC combined cycle power generation according to any one of claims 1 to 5, characterized in that: The steps include: S1 adds desalted water to the condenser, and then pumps it to the low-pressure drum with the condensate pump; the desalted water in the low-pressure drum is pumped to the medium-pressure drum through the medium-pressure feed water pump, to the high-pressure drum through the high-pressure feed water pump, and to the gasifier through the gasification feed water pump; The desalted water in the S2 low-pressure drum, medium-pressure drum and high-pressure drum is passed into the waste heat boiler for heating and then sent to the steam turbine to do work and then discharged to the condenser; The desalted water in the S3 gasifier is transported to the waste heat boiler through the following multiple paths for heating and then sent to the steam turbine to perform work before being discharged to the condenser; S4 air separation island steam condensate, gasification island steam condensate and purification island steam condensate are sent to the low-pressure drum after treatment; S5 monitors through online instruments, observes and records the changes in the values ​​of online instruments.

7. The method for online monitoring of the steam-water cycle of the IGCC combined cycle power generation according to claim 6, characterized in that: In step S3, the desalted water in the gasifier is transported to the waste heat boiler through the following multiple paths: (1) A portion of the medium-pressure steam in the gasifier is introduced into the medium-pressure steam drum; (2) The medium-pressure steam in another part of the gasifier is used to be introduced into the synthesis gas to adjust the calorific value, introduced into the synthesis gas heater for heating, and then introduced into the low-pressure steam drum; (3) The sub-medium pressure steam in the gasifier is introduced into the low-pressure steam drum.

8. The method for online monitoring of the steam-water cycle of IGCC combined cycle power generation according to claim 6, characterized in that: In step S4, the steam condensate from the air separation island, the steam condensate from the gasification island and the steam condensate from the purification island are firstly passed into a flash tank, then sent to a deironing device for treatment, and then sent to a low-pressure steam drum.