Heat recovery boiler and dry quenching boiler combined water supply system and operation method
By setting up a condensate water pump and a dry quenching deoxygenated water pump in the steam turbine power generation unit, and using the condenser hot well to provide water supply, the problem of independent water supply systems for the heat recovery boiler and dry quenching boiler is solved, and the station building and equipment are saved. The compact water supply system ensures the safe and stable operation of the system.
Patent Information
- Application Number
- CN202411011494.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-26
- Publication Date
- 2024-10-01
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
In the existing technology, the water supply systems of the heat recovery boiler and the dry quenching boiler are set up independently, which leads to the addition of additional stations, increased civil construction investment and land occupation, and the equipment is complex, making it difficult to realize a compact, safe and reliable joint water supply system.
Design a heat recovery boiler combined with dry quenching boiler water supply system. By setting up a condensation water pump and a dry quenching deoxygenating water pump in the steam turbine power generation unit, and using the condenser hot well to provide condensate water, the heat recovery boiler and dry quenching coke are realized. The combined feed water supply of the boiler reduces the need for an independent water supply station, and the feed water flow and temperature are controlled through regulating valves to ensure stable operation of the system.
It achieves safe and stable operation of the combined water supply system, saves station building and equipment area, reduces operating costs, simplifies the structure of the water supply system, and improves the compactness and safety of the system.
Smart Images

Figure CN118729241A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of coke oven waste heat utilization, and in particular to a heat recovery boiler combined with dry coke quenching boiler water supply system and an operation method thereof. Background Art
[0002] The flue gas temperature of the heat recovery coke oven can reach 1200℃~1300℃. The flue gas of the heat recovery coke oven is sent to the heat recovery boiler through the high-temperature flue gas pipeline for heat exchange, heating the boiler feed water to make it change phase and heat up to become superheated steam, and then sent to the steam turbine power station for power generation; on the other hand, the red coke produced by the heat recovery coke oven needs to be sent to the dry quenching furnace for cooling by the inert circulating gas (mainly nitrogen). After the inert circulating gas heat exchange, the temperature rises to about 960℃, enters the dry quenching boiler for heat exchange, heats the boiler feed water to make it change phase and heat up to become superheated steam, and then sent to the steam turbine power station for power generation.
[0003] From the above description, it can be seen that both the heat recovery boiler and the dry coke quenching boiler need to be supplied with boiler feed water through the boiler feed water pump; in addition, due to the process requirements of the boiler to produce superheated steam, it is necessary to supplement the superheater and reheater of the heat recovery boiler and the dry coke quenching boiler with cooling water. However, due to the different feed water parameters of the heat recovery boiler and the dry coke quenching boiler, the usual practice in the prior art is that the heat recovery waste heat boiler is equipped with medium-pressure deaerators and boiler feed water pumps and other water supply system equipment in the steam turbine power station, while the dry coke quenching boiler needs to be equipped with a separate dry coke quenching boiler feed water pump station, which is equipped with desalted water tanks, low-pressure deaerators, deaerator feed water pumps and boiler feed water pumps and other water supply system equipment. This will add an additional station building dedicated to the dry coke quenching boiler water supply, which increases the civil engineering investment and land occupation. Considering that the water supply sources of the heat recovery boiler and the dry coke quenching boiler are the same (both are condensed water from the steam turbine power station and external desalted water supply), it is necessary to find a centralized, compact, station-saving, safe and reliable combined water supply system. Summary of the invention
[0004] The object of the present invention is to provide a heat recovery boiler combined with a dry coke quenching boiler water supply system and an operation method, which improves the safe and stable operation of the combined water supply system while reducing the station building settings.
[0005] To achieve the above object, the present invention is implemented through the following technical solutions:
[0006] A heat recovery boiler combined with a dry coke quenching boiler feed water system, comprising a heat recovery boiler medium-pressure deaerator, a dry coke quenching boiler low-pressure deaerator, a condensate pump, a dry coke quenching deaerator pump, a heat recovery boiler feed water pump, and a dry coke quenching boiler feed water pump, wherein the water inlet of the condensate pump and the water inlet of the dry coke quenching deaerator pump are respectively connected to the condenser hot well through pipelines, the water outlet of the dry coke quenching deaerator pump is connected to the water inlet of a dry quenching furnace heat pipe heat exchanger through a pipeline, the water outlet of the condensate pump is connected to the water inlet of the heat recovery boiler medium-pressure deaerator through a pipeline, the water outlet of the heat recovery boiler medium-pressure deaerator is connected to the water inlet of the heat recovery boiler feed water pump through a pipeline, and the water outlet of the heat recovery boiler feed water pump is respectively connected to the heat recovery boiler reheater desuperheater and the heat recovery boiler economizer through pipelines;
[0007] The water outlet of the dry quenching furnace heat pipe exchanger is connected to the water inlet of the dry quenching boiler low-pressure deaerator through a pipeline, the water outlet of the dry quenching boiler low-pressure deaerator is connected to the water inlet of the dry quenching boiler feed water pump through a pipeline, and the discharge outlet of the dry quenching boiler feed water pump is connected to the dry quenching boiler economizer through a pipeline.
[0008] It includes at least one heat recovery boiler unit, at least one steam turbine power generation unit, a dry coke quenching boiler unit, and a dry coke quenching furnace heat pipe heat exchanger. Each steam turbine power generation unit is provided with a condenser hot well, each heat recovery boiler unit is provided with a heat recovery boiler reheater desuperheater, a heat recovery boiler superheater desuperheater, and a heat recovery boiler economizer. Each dry coke quenching boiler unit is provided with a dry coke quenching boiler economizer and a dry coke quenching boiler superheater desuperheater. The discharge outlet of the dry coke quenching boiler feed pump is connected to the dry coke quenching boiler superheater desuperheater through a pipeline.
[0009] A regulating valve 1 is arranged between the discharge port of the dry coke quenching boiler feed water pump and the dry coke quenching boiler superheater desuperheater.
[0010] A regulating valve 2 is arranged between the discharge outlet of the dry quenching boiler feed water pump and the dry quenching boiler economizer, a regulating valve 3 is arranged between the water outlet of the heat recovery boiler feed water pump and the corresponding heat recovery boiler economizer, a regulating valve 4 is arranged between the water outlet of the heat recovery boiler feed water pump and the corresponding heat recovery boiler superheater desuperheater, and a regulating valve 5 is arranged between the water outlet of the heat recovery boiler feed water pump and the corresponding heat recovery boiler reheater desuperheater.
[0011] The condensate pump and the CDQ deoxygenation pump are arranged in the corresponding steam turbine power generation unit.
[0012] There are at least two condensate pumps, at least two CDQ deaerator pumps, at least two heat recovery boiler feed pumps, and at least two CDQ boiler feed pumps, and all are connected in parallel.
[0013] Specifically include:
[0014] S1. The exhaust steam of the steam turbine generator unit is condensed in the condenser to form condensate, which enters the condenser hot well. The condensate is led to the condensate pump and the dry quenching deoxygenation feed water pump respectively;
[0015] S2, the condensate pump sends the condensate to the medium-pressure deaerator of the heat recovery boiler for deoxidation, the outlet water of the medium-pressure deaerator of the heat recovery boiler is pressurized by the heat recovery boiler feed water pump, and sent to each heat recovery boiler unit respectively, and respectively connected to the heat recovery boiler economizer through the regulating valve three, the heat recovery boiler superheater desuperheater through the regulating valve four, and the heat recovery boiler reheater desuperheater through the regulating valve five;
[0016] S3, the CDQ deaerator feed water pump sends the condensate in the condenser hot well to the CDQ furnace heat pipe heat exchanger for heat exchange, and the return water is sent to the CDQ boiler low-pressure deaerator for deaeration. The outlet water of the CDQ boiler low-pressure deaerator is pressurized by the CDQ boiler feed water pump and sent to the CDQ boiler unit, and is connected to the CDQ boiler economizer through regulating valve 1 and the CDQ boiler superheater desuperheater through regulating valve 2 respectively;
[0017] S4. For each steam turbine power generation unit, the parallel-connected condensate pump and parallel-connected dry coke quenching deaerator pump are in one-in-one-standby mode; the parallel-connected dry coke quenching boiler feed water pump is in one-in-one-standby mode; the parallel-connected heat recovery boiler feed water pump is in two-in-one-standby mode. Compared with the prior art,
[0018] The beneficial effects of the present invention are:
[0019] 1. The condensate of each steam turbine generating unit is led to two groups of pumps, namely the condensate pump and the CDQ deaerator pump, which supply the medium-pressure deaerator of the heat recovery boiler and the low-pressure deaerator of the CDQ boiler respectively, and then supply the feed water of the heat recovery boiler and the CDQ boiler. There is no need to set up a separate station for the CDQ boiler feed water, which saves the station building area and civil engineering investment, simplifies the water supply system, reduces the operating cost, has a simple structure and is easy to implement;
[0020] 2. The condensate pump and CDQ deaerator pump are installed in the corresponding steam turbine power generation unit, so that the heat recovery boiler and the CDQ boiler can be supplied with water from the same water source, which reduces the installation of equipment such as desalting water tanks and related pipelines, saves equipment space, reduces the resistance of steam-water medium transportation, and realizes compact layout and safe operation of the water supply system;
[0021] 3. The heat recovery boiler feed water regulating valve and the CDQ boiler feed water regulating valve ensure the stability of the boiler drum liquid level by adjusting the boiler feed water flow rate, so that the boiler system can operate normally; the heat recovery boiler superheater desuperheating water regulating valve and the CDQ boiler superheater desuperheating water regulating valve control the superheater outlet steam temperature by adjusting the desuperheating water flow rate; the heat recovery reheater desuperheating water regulating valve controls the reheater outlet steam temperature by adjusting the desuperheating water flow rate, thereby improving the safe and stable operation of the combined water supply system;
[0022] 4. Two desalted water make-up pipelines are set up to send water to the condenser hot well, ensuring that there is one make-up pipeline to replenish water to the condenser hot well to ensure water supply safety. BRIEF DESCRIPTION OF THE DRAWINGS
[0023] Figure 1 It is a structural diagram of the combined water supply system of the heat recovery coke oven waste heat boiler and the dry quenching coke boiler power generation process.
[0024] In the figure: 1- heat recovery boiler economizer 2- heat recovery boiler reheater desuperheater 3- heat recovery boiler superheater desuperheater 4- dry coke quenching boiler economizer 5- dry coke quenching boiler superheater desuperheater 6- steam turbine generator set condenser and its hot well 7- condensate pump 8- dry coke quenching deaerator pump 9- heat recovery boiler medium pressure deaerator 10- heat recovery boiler feed water pump 11- dry coke quenching boiler low pressure deaerator 12- dry coke quenching boiler feed water pump 13- heat recovery boiler Boiler main feed water pipeline 14-heat recovery boiler feed water tap water pipeline 15-heat recovery boiler feed water regulating valve 16-heat recovery boiler superheater desuperheating water regulating valve 17-heat recovery boiler reheater desuperheating water regulating valve 18-CDQ deoxygenation feed water pipeline 19-CDQ deoxygenation return water pipeline 20-CDQ boiler main feed water pipeline 21-CDQ boiler feed water regulating valve 22-CDQ boiler superheater desuperheating water regulating valve 23-demineralized water replenishment pipeline. DETAILED DESCRIPTION
[0025] The present invention is described in detail below in conjunction with the accompanying drawings, but it should be noted that the implementation of the present invention is not limited to the following embodiments.
[0026] The following examples are implemented on the premise of the technical solution of the present invention, and provide detailed implementation methods and specific operation processes, but the protection scope of the present invention is not limited to the following examples. The methods used in the following examples are conventional methods unless otherwise specified.
[0027] [Example 1]
[0028] See Figure 1The heat recovery boiler combined with the dry quenching boiler feed water system comprises a heat recovery boiler unit, a steam turbine power generation unit, a dry quenching boiler unit, a dry quenching furnace heat pipe heat exchanger, a heat recovery boiler medium-pressure deaerator 9, a dry quenching boiler low-pressure deaerator 11, a condensate pump 7, a dry quenching deaerator pump 8, a heat recovery boiler feed water pump 10, and a dry quenching boiler feed water pump 12. The condensate pump 7 and the dry quenching deaerator pump 8 are arranged in the corresponding steam turbine power generation unit. There are four heat recovery boiler units and two steam turbine power generation units. Each steam turbine power generation unit is provided with a condenser hot well 6. Two feed water pipelines are arranged for the desalted water make-up pipeline, which are sent to the condenser hot well 6. Each heat recovery boiler unit is provided with a heat recovery boiler reheater desuperheater 2, a heat recovery boiler superheater desuperheater, and a heat recovery boiler. Boiler economizer 1, each dry coke quenching boiler unit is provided with a dry coke quenching boiler economizer 4, a dry coke quenching boiler superheater desuperheater 5, the water inlet of the condensate pump 7 and the water inlet of the dry coke quenching deoxygenation water pump 8 are respectively connected to the condenser hot well 6 through pipelines, the discharge port of the dry coke quenching deoxygenation water pump 8 is connected to the water inlet of the dry quenching furnace heat pipe heat exchanger through the dry coke quenching deoxygenation water feed pipeline 18, the discharge port of the condensate pump 7 is connected to the water inlet of the heat recovery boiler medium-pressure deaerator 9 through a pipeline, the water outlet of the heat recovery boiler medium-pressure deaerator 9 is connected to the water inlet of the heat recovery boiler feed water pump 10 through a pipeline, the water outlet of the heat recovery boiler feed water pump 10 is connected to the heat recovery boiler reheater desuperheater 2 through the heat recovery boiler feed water tap water pipeline 14, the water outlet of the heat recovery boiler feed water pump 10 It is connected to the heat recovery boiler economizer 1 through the heat recovery boiler main feed water pipeline 13; the water outlet of the dry quenching furnace heat pipe heat exchanger is connected to the water inlet of the dry quenching boiler low-pressure deaerator 11 through the dry quenching deoxidation return water pipeline 19, the water outlet of the dry quenching boiler low-pressure deaerator 11 is connected to the water inlet of the dry quenching boiler feed water pump 12 through a pipeline, and the drain outlet of the dry quenching boiler feed water pump 12 is connected to the dry quenching boiler unit through the dry quenching boiler main feed water pipeline, that is, it is respectively connected to the dry quenching boiler economizer 4 and the dry quenching boiler superheater desuperheater 5; a dry quenching boiler superheater desuperheating water regulating valve 22 is arranged between the drain outlet of the dry quenching boiler feed water pump 12 and the dry quenching boiler superheater desuperheater 5; the number of water pumps of the condensate pump 7 is at least two, and the water pump of the dry quenching deoxidation water pump 8 is at least two. The number is at least two, the number of water pumps of the heat recovery boiler feed water pump 10 is at least two, the number of water pumps of the dry quenching boiler feed water pump 12 is at least two, and all of them are connected in parallel; a dry quenching boiler feed water regulating valve 21 is arranged between the discharge port of the dry quenching boiler feed water pump 12 and the dry quenching boiler economizer 4, a heat recovery boiler feed water regulating valve 15 is arranged between the water outlet of the heat recovery boiler feed water pump 10 and the corresponding heat recovery boiler economizer 1, a heat recovery boiler superheater cooling water regulating valve 16 is arranged between the water outlet of the heat recovery boiler feed water pump 10 and the corresponding heat recovery boiler superheater desuperheater 3, and a heat recovery boiler reheater cooling water regulating valve 17 is arranged between the water outlet of the heat recovery boiler feed water pump 10 and the corresponding heat recovery boiler reheater desuperheater 2.
[0029] The combined water supply operation method of the heat recovery coke oven waste heat boiler supporting the dry quenching coke boiler power generation process is realized based on the PLC / DCS system, specifically including:
[0030] The exhaust steam of S1, 1# and 2# steam turbine power generation units is condensed in the condenser to form condensate which enters the condenser hot well 6. The condensate is led to the condensate pump 7 and the dry coke quenching deoxygenation feed water pump respectively;
[0031] S2, the condensate pump 7 sends the condensate to the heat recovery boiler medium-pressure deaerator 9 for deoxidation, the outlet water of the heat recovery boiler medium-pressure deaerator 9 is pressurized by the heat recovery boiler feed water pump 10, and is respectively sent to each heat recovery boiler unit, and is respectively connected to the heat recovery boiler economizer 1 through the heat recovery boiler feed water regulating valve 15, the heat recovery boiler superheater desuperheater through the heat recovery boiler superheater desuperheater regulating valve 16, and the heat recovery boiler reheater desuperheater 2 through the heat recovery boiler reheater desuperheater regulating valve 17;
[0032] S3, the CDQ deaeration water feed pump sends the condensate in the condenser hot well 6 to the CDQ furnace heat pipe heat exchanger for heat exchange, and the return water is sent to the CDQ boiler low-pressure deaerator 11 for deaeration. The outlet water of the CDQ boiler low-pressure deaerator 11 is pressurized by the CDQ boiler feed water pump 12 and sent to the CDQ boiler unit, and is respectively connected to the CDQ boiler economizer 4 through the CDQ boiler superheater desuperheater 5 through the CDQ boiler feed water regulating valve 22;
[0033] S4, the parallel-connected condensate pump 7, the parallel-connected CDQ deoxygenation pump 8, the parallel-connected heat recovery boiler feed water pump 10, and the parallel-connected CDQ boiler feed water pump 12 all work in a 1-in-1-standby mode.
[0034] In the present invention, the condensate of each steam turbine generating unit is led to two groups of pumps, namely, the condensate pump and the dry quenching deoxygenation water pump, which respectively supply the medium-pressure deaerator of the heat recovery boiler and the low-pressure deaerator of the dry quenching boiler, and then supply the heat recovery boiler feed water and the dry quenching boiler feed water. There is no need to independently set up a station house for the dry quenching boiler to make up water, which saves the station house area and civil engineering investment, simplifies the water supply system, reduces the operating cost, has a simple structure, and is easy to implement; the condensate pump and the dry quenching deoxygenation water pump are arranged in the corresponding steam turbine generating unit, so that the heat recovery boiler and the dry quenching boiler are supplied with water from the same water source, which reduces the equipment such as the desalting water tank and the related pipeline settings, saves the equipment area, and reduces the resistance to the transportation of the steam-water medium. , realizing compact layout and safe operation of the water supply system; the heat recovery boiler feed water regulating valve and the dry coke quenching boiler feed water regulating valve ensure the stability of the liquid level of the boiler drum by adjusting the boiler feed water flow, so that the boiler system can operate normally; the heat recovery boiler superheater desuperheating water regulating valve and the dry coke quenching boiler superheater desuperheating water regulating valve control the superheater outlet steam temperature by adjusting the desuperheating water flow; the heat recovery reheater desuperheating water regulating valve controls the reheater outlet steam temperature by adjusting the desuperheating water flow, thereby improving the safe and stable operation of the combined water supply system; two desalted water make-up pipelines are set to send them to the condenser hot well, ensuring that there is a make-up water pipeline to make up water for the condenser hot well, ensuring water supply safety.
Claims
1. A heat recovery boiler combined with dry quenching boiler water supply system, It is characterized in that It includes a medium-pressure deaerator of a heat recovery boiler, a low-pressure deaerator of a dry coke quenching boiler, a condensate pump, a dry coke quenching deaerator pump, a heat recovery boiler feed pump, and a dry coke quenching boiler feed pump. The water inlet of the condensate pump and the water inlet of the dry coke quenching deaerator pump are respectively connected to the condenser hot well through pipelines, the water outlet of the dry coke quenching deaerator pump is connected to the water inlet of the dry quenching furnace heat pipe heat exchanger through a pipeline, the water outlet of the condensate pump is connected to the water inlet of the medium-pressure deaerator of the heat recovery boiler through a pipeline, the water outlet of the medium-pressure deaerator of the heat recovery boiler is connected to the water inlet of the heat recovery boiler feed pump through a pipeline, and the water outlet of the heat recovery boiler feed pump is respectively connected to the heat recovery boiler reheater desuperheater and the heat recovery boiler economizer through pipelines; The water outlet of the dry quenching furnace heat pipe exchanger is connected to the water inlet of the dry quenching boiler low-pressure deaerator through a pipeline, the water outlet of the dry quenching boiler low-pressure deaerator is connected to the water inlet of the dry quenching boiler feed water pump through a pipeline, and the discharge outlet of the dry quenching boiler feed water pump is connected to the dry quenching boiler economizer through a pipeline.
2. A heat recovery boiler combined with dry coke quenching boiler feed water system according to claim 1, comprising at least one heat recovery boiler unit, at least one steam turbine power generation unit, a dry coke quenching boiler unit, and a dry coke quenching furnace heat pipe heat exchanger, each steam turbine power generation unit is provided with a condenser hot well, each heat recovery boiler unit is provided with a heat recovery boiler reheater desuperheater, a heat recovery boiler superheater desuperheater, and a heat recovery boiler economizer, each dry coke quenching boiler unit is provided with a dry coke quenching boiler economizer and a dry coke quenching boiler superheater desuperheater, It is characterized in that The drain outlet of the dry coke quenching boiler feed water pump is connected to the dry coke quenching boiler superheater desuperheater through a pipeline.
3. A heat recovery boiler combined with dry quenching boiler water supply system according to claim 2, It is characterized in that A regulating valve 1 is arranged between the drain outlet of the dry coke quenching boiler feed water pump and the dry coke quenching boiler superheater desuperheater.
4. A heat recovery boiler combined with dry quenching boiler water supply system according to claim 1, It is characterized in that A regulating valve 2 is arranged between the drain outlet of the dry quenching boiler feed water pump and the dry quenching boiler economizer, a regulating valve 3 is arranged between the water outlet of the heat recovery boiler feed water pump and the corresponding heat recovery boiler economizer, a regulating valve 4 is arranged between the water outlet of the heat recovery boiler feed water pump and the corresponding heat recovery boiler superheater desuperheater, and a regulating valve 5 is arranged between the water outlet of the heat recovery boiler feed water pump and the corresponding heat recovery boiler reheater desuperheater.
5. A heat recovery boiler combined with dry quenching boiler water supply system according to claim 1, It is characterized in that The condensate pump and the CDQ deoxygenation pump are arranged in the corresponding steam turbine power generation unit.
6. A heat recovery boiler combined with dry quenching boiler water supply system according to claim 1, It is characterized in that There are at least two condensate pumps, at least two CDQ deaerator pumps, at least two heat recovery boiler feed pumps, and at least two CDQ boiler feed pumps, and all are connected in parallel.
7. The system according to claims 1-6 is used for the feed water operation method of the heat recovery boiler combined with the dry coke quenching boiler, It is characterized in that Specifically include: S1. The exhaust steam of the steam turbine generator unit is condensed in the condenser to form condensate, which enters the condenser hot well. The condensate is led to the condensate pump and the dry quenching deoxygenation feed water pump respectively; S2, the condensate pump sends the condensate to the medium-pressure deaerator of the heat recovery boiler for deoxidation, the outlet water of the medium-pressure deaerator of the heat recovery boiler is pressurized by the heat recovery boiler feed water pump, and sent to each heat recovery boiler unit respectively, and respectively connected to the heat recovery boiler economizer through the regulating valve three, the heat recovery boiler superheater desuperheater through the regulating valve four, and the heat recovery boiler reheater desuperheater through the regulating valve five; S3, the CDQ deaerator feed water pump sends the condensate in the condenser hot well to the CDQ furnace heat pipe heat exchanger for heat exchange, and the return water is sent to the CDQ boiler low-pressure deaerator for deaeration. The outlet water of the CDQ boiler low-pressure deaerator is pressurized by the CDQ boiler feed water pump and sent to the CDQ boiler unit, and is connected to the CDQ boiler economizer through regulating valve 1 and the CDQ boiler superheater desuperheater through regulating valve 2 respectively; S4. For each steam turbine power generation unit, the parallel-connected condensate pumps and parallel-connected CDQ deaerator pumps are in one-in-one-standby mode; the parallel-connected CDQ boiler feed pumps are in one-in-one-standby mode; the parallel-connected heat recovery boiler feed pumps are in two-in-one-standby mode.
Citation Information
Patent Citations
Dry coke quenching reheating power generation system
CN110206605A
Coking system waste heat recovery and comprehensive utilization power generation system and method
CN112539408A
Coke oven raw gas reforming furnace boiler and dry quenching boiler combined deoxygenization water supply system
CN118168395A
Dry coke quenching boiler feed water device
CN207661753U
Coke dry quenching reheating power generation device
CN209569040U