Engineering construction index system configuration method, system and equipment and storage medium
By systematically analyzing the business scenarios of engineering construction projects, determining business indicator items and semantics, configuring calculation models, and building an indicator system, the problems of subjective dependence and insufficient data analysis in the existing technology have been solved, and more accurate and scientific results have been achieved. Construction of indicator system.
Patent Information
- Application Number
- CN202410838328.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-26
- Publication Date
- 2024-10-01
AI Technical Summary
The existing engineering construction indicator system construction method relies on the subjective experience of managers and lacks in-depth analysis of business scenarios and data, resulting in inaccurate indicator settings and difficulty in truly reflecting business operating conditions.
Through systematic analysis of business scenarios, business indicator items and their semantics are determined, calculation models are configured, and an indicator system is constructed. Analysis methods are adopted from shallow to deep, from surface to interior, to ensure the scientific nature and pertinence of the indicator system.
It improves the accuracy and practicality of the indicator system, ensures that the indicators can truly reflect the business operation status, and provides scientific and reasonable evaluation and monitoring methods.
Smart Images

Figure CN118735342A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the field of engineering construction, and specifically to an engineering construction indicator system configuration method, system, equipment and storage medium. Background Art
[0002] Engineering construction projects usually involve complex business processes and multiple goals, which require detailed management and evaluation of each link. In actual operations, project managers often need to establish a set of indicator systems to quantify and monitor the operating status of each key business node. However, the existing indicator system construction methods have some shortcomings.
[0003] Traditional indicator systems usually determine key indicators based on the subjective experience and judgment of managers, lacking in-depth analysis of actual business scenarios and data. Although this highly subjective method is relatively simple to operate, it may ignore some important influencing factors, resulting in inaccurate indicator settings and difficulty in truly reflecting the business operation status. Summary of the invention
[0004] The present application provides a method, system, device and storage medium for configuring an engineering construction indicator system, so as to improve the accuracy of the configuration of the engineering construction indicator system.
[0005] In a first aspect, the present application provides a method for configuring an engineering construction indicator system, the method comprising: Acquire the business scenario of the target project, and determine the business indicator items and the business semantics corresponding to the business indicator items according to the business scenario; According to the business indicator items and the business semantics, a calculation model corresponding to the business indicator items is configured, and an indicator system is constructed based on the calculation model, the business indicator items and the business semantics.
[0006] By adopting the above technical solution, through systematic analysis of business scenarios, relevant business indicators and their business semantics are determined, and then the corresponding calculation model is configured and the indicator system is constructed. This method, which starts from the business scenario and focuses on business semantics, can effectively overcome the defects caused by subjective assumptions or insufficient data analysis in the existing technology.
[0007] Optionally, determining a business indicator item and a business semantic corresponding to the business indicator item according to the business scenario includes: Determine a business tag according to the business scenario, and determine an indicator solution theme according to the business tag; Determine the business indicator items according to the indicator scheme theme; According to the indicator scheme theme and the business indicator item, the business semantics corresponding to the business indicator item is determined.
[0008] By adopting the above technical solutions, starting from the business scenario, we gradually determined the business tags, indicator scheme themes, business indicator items, and the business semantics corresponding to the business indicator items, and built an analysis method from the shallow to the deep and from the surface to the inside. This progressive thinking can more accurately and comprehensively describe the actual business, laying a solid foundation for the subsequent configuration of the calculation model and the construction of the indicator system.
[0009] First, by determining the business tags based on the business scenarios, we can summarize the key features of the business operations and point out the direction for further analysis. On this basis, we determine the theme of the indicator plan based on the business tags, which clarifies the core objectives of the evaluation and helps to focus on the key points.
[0010] Next, business indicator items are determined based on the indicator scheme theme, and the evaluation objectives are refined into specific and actionable indicators, which enhances the feasibility. Determining business semantics based on the indicator scheme theme and business indicator items gives the indicators connotations and makes them closely aligned with business practices.
[0011] Through this series of closely connected links, the solution links macro business scenarios with micro indicator projects, giving the construction process of the evaluation system a clear logical main line and strict theoretical support, thereby ensuring the scientificity and pertinence of the subsequent configuration of calculation models and construction of the indicator system.
[0012] Optionally, configuring a calculation model corresponding to the business indicator item according to the business indicator item and the business semantics includes: Determine an input parameter corresponding to the business indicator item according to the business indicator item and the business semantics; Configure a calculation formula according to the business logic corresponding to the input parameter and the business indicator item; According to the calculation formula and the business indicator item, a calculation model corresponding to the business indicator item is constructed.
[0013] By adopting the above technical solution, after determining the business indicator items and business semantics, the corresponding calculation model is configured through a series of scientific and rigorous steps to maximize the accuracy and practicality of the model.
[0014] First, the input parameters are determined according to the business indicator items and business semantics, laying the foundation for model configuration. Since the input parameters are directly derived from the actual business needs, they can truly reflect the connotation and evaluation focus of the indicators, which is conducive to the accuracy of subsequent formula calculations.
[0015] Secondly, the calculation formula is configured according to the business logic corresponding to the input parameters and business indicator items. This business logic-oriented configuration method makes the calculation formula not a simple mathematical expression, but rooted in field practice, containing professional knowledge and operational experience, thus maximizing the inherent laws and practical significance of the indicator.
[0016] Finally, the calculation model is constructed based on the calculation formula and business indicator items. Since the construction of the model is based on the formula that has been verified by both semantics and logic, the resulting calculation model must be highly consistent with the business indicators and their internal laws, and truly reflect the business operation status.
[0017] Optionally, determining an input parameter corresponding to the business indicator item according to the business indicator item and the business semantics includes: Determining an indicator factor corresponding to the business indicator according to the business indicator item and the business semantics; According to the calculation rule and judgment rule of the indicator factor, the input parameter corresponding to the business indicator item is determined.
[0018] By adopting the above technical solution, a scientific method from abstract to concrete, from concept to quantification is adopted when determining the input parameters corresponding to the business indicator items, which fully reflects the rigor and pertinence.
[0019] First, determine the indicator factors corresponding to the business indicators based on the business indicator items and business semantics. The indicator factors are a high degree of summary and abstraction of the connotation of the indicator, reflecting the most essential content and characteristics of the indicator. Extracting the indicator factors through semantic analysis can accurately grasp the core of the indicator and lay a conceptual foundation for subsequent quantitative calculations.
[0020] Secondly, according to the calculation rules and judgment rules of the indicator factors, the input parameters corresponding to the business indicator items are determined. The calculation rules and judgment rules connect the abstract indicator factors with specific data and business scenarios, and through a series of clear algorithms and conditions, the concepts are transformed into computable quantitative indicators, namely the input parameters. This process of guiding from abstract concepts to specific practices ensures the pertinence and practicality of the input parameters.
[0021] Through the close connection of the above two links, this implementation method highly integrates business semantics and field data, realizes the organic unity of qualitative and quantitative, theory and practice, and thus obtains input data that is highly close to business reality, laying a solid foundation for subsequent model calculations.
[0022] Optionally, determining the service tag according to the service scenario includes: Performing business analysis on the business scenario, determining the business process and the business objectives of each process node, and determining the business objectives of each business node based on the business process; Analyze the influencing factors based on the business objectives of each business node and determine the influencing factors of each business node; The service label is formed based on the influencing factors of each service node.
[0023] By adopting the above-mentioned technical means, a systematic analysis approach is adopted when determining business tags, which comprehensively considers the operating logic and key influencing factors of the entire business scenario, ensuring the comprehensiveness and pertinence of business tags.
[0024] First, conduct a business analysis of the business scenario to determine the business process and the business objectives of each process node. This step sorts out the internal logic and key links of the business operation, laying the foundation for subsequent analysis. On this basis, based on the business process, further determine the specific business objectives of each business node, so that the analysis process moves from macro to micro, closer to the actual business.
[0025] Next, based on the business goals of each business node, we conduct an influencing factor analysis to identify the key factors that affect the achievement of each node's goals. This step extends the analysis perspective from the internal business to the external environment, taking into account various objective conditions that affect business operations, making the analysis more comprehensive.
[0026] Finally, based on the influencing factors of each business node, business labels are formed. Since these influencing factors are directly derived from the node target analysis and comprehensively reflect the internal and external influences, the formed business labels must be able to highly summarize and characterize the key features of the business scenario.
[0027] Optionally, performing an influencing factor analysis based on the business objectives of each business node to determine the influencing factors of each business node includes: Analyze the influencing factors based on the business objectives of each business node and determine the potential influencing factors of each business node; According to the potential influencing factors of each business node, corresponding survey data is obtained based on the potential influencing factors of each business node, and the correlation between the potential influencing factors and each business node is determined based on the corresponding survey data obtained based on the potential influencing factors of each business node; According to the relevance of each service node, the potential influencing factors with a relevance greater than a preset relevance threshold are used as influencing factors of each service node.
[0028] By adopting the above technical solution, when determining the influencing factors of each business node, a scientific process from subjective judgment to objective data, from preliminary analysis to quantitative screening is adopted, which effectively avoids the one-sidedness and arbitrariness caused by subjective assumptions and missing data.
[0029] First, we analyze the influencing factors based on the business objectives of each business node and determine the potential influencing factors of each business node. This step relies on the experience and judgment of professionals to preliminarily identify the key factors that may affect the realization of business objectives from a theoretical and practical perspective, laying the direction for subsequent analysis.
[0030] Secondly, according to the potential influencing factors of each business node, the corresponding survey data is obtained, and the correlation between the potential influencing factors and each business node is determined based on the survey data. Through field surveys, real and reliable data is obtained, the potential influencing factors proposed in the subjective analysis are quantitatively verified, and the correlation is calculated, thereby effectively correcting the possible deviations in subjective judgment.
[0031] Finally, based on the correlation of each business node, potential influencing factors with a correlation greater than a preset threshold are determined as influencing factors of the business node. This step screens the correlation by setting a threshold, scientifically identifies the real core influencing factors, and avoids possible noise interference.
[0032] Optionally, acquiring corresponding survey data based on the potential influencing factors of each service node to determine the correlation between the potential influencing factors and each service node includes: Based on the potential influencing factors of each business node, corresponding survey data is obtained for statistical analysis to obtain statistical data; Based on the statistical data, a correlation calculation is performed on the correlation between the potential influencing factor and each service node to obtain the correlation between the potential influencing factor and each service node.
[0033] By adopting the above technical solution, when determining the correlation between potential influencing factors and each business node, the effective transformation from empirical data to quantitative correlation is achieved through statistical analysis and correlation calculation of the survey data, providing a reliable basis for the scientific identification of influencing factors.
[0034] First, based on the potential influencing factors of each business node, the corresponding survey data is obtained for statistical analysis to obtain statistical data. Survey data is usually massive and original, and it is difficult to directly reflect the intrinsic connection between the influencing factors and business nodes. Therefore, it is necessary to perform statistical analysis on the data to extract representative summary indicators and distribution patterns to reveal the essential information hidden behind the data.
[0035] Secondly, based on statistical data, the correlation between potential influencing factors and each business node is calculated to obtain the correlation. Correlation calculation is a mature mathematical statistics method that can quantitatively evaluate the degree of correlation between two variables based on statistical data. Applying it between influencing factors and business nodes can objectively and accurately measure the strength of the correlation between them, effectively avoiding the arbitrariness of subjective judgment.
[0036] Through the close integration of the above two links, this implementation method converts the original survey data into quantitative correlation indicators, achieving a leap from qualitative to quantitative, from description to measurement, and providing objective and reliable data support for the identification of influencing factors.
[0037] In a second aspect of the present application, a method system for configuring an engineering construction indicator system is provided, comprising: A business indicator determination module is used to obtain the business scenario of the target project and determine the business indicator items and the business semantics corresponding to the business indicator items according to the business scenario; The indicator system construction module is used to configure the calculation model corresponding to the business indicator item according to the business indicator item and the business semantics, and to construct the indicator system based on the calculation model, the business indicator item and the business semantics.
[0038] In a third aspect of the present application, a computer storage medium is provided, wherein the computer storage medium stores a plurality of instructions, and the instructions are suitable for being loaded by a processor and executing the above method steps.
[0039] In the fourth aspect of the present application, an electronic device is provided, including a processor, a memory, a user interface and a network interface, the memory is used to store instructions, the user interface and the network interface are used to communicate with other devices, and the processor is used to execute the instructions stored in the memory so that the electronic device executes the above method.
[0040] In summary, one or more technical solutions provided in the embodiments of the present application have at least the following technical effects or advantages: 1. This application determines the relevant business indicators and their business semantics through systematic analysis of business scenarios, and then configures the corresponding calculation model and builds an indicator system. This method, which starts from business scenarios and focuses on business semantics, can effectively overcome the defects caused by subjective assumptions or insufficient data analysis in the prior art.
[0041] 2. Starting from the business scenario, this application gradually determines the business labels, indicator scheme themes, business indicator items, and business semantics corresponding to the business indicator items, and constructs an analysis method from shallow to deep and from the surface to the inside. This progressive thinking can more accurately and comprehensively portray the actual business, and lay a solid foundation for the subsequent configuration of the calculation model and the construction of the indicator system. First, by determining the business labels according to the business scenario, the key characteristics of the business operation can be summarized, which points out the direction for further analysis. On this basis, the indicator scheme theme is determined according to the business label, which clarifies the core objectives of the evaluation and helps to focus on the key points. Next, the business indicator items are determined according to the indicator scheme theme, and the evaluation objectives are refined into specific and operational indicators, which enhances the executability. The determination of business semantics according to the indicator scheme theme and the business indicator items gives the indicators connotations, making them closely aligned with business practices. Through this series of closely connected links, the scheme links the macro business scenario with the micro indicator items, so that the construction process of the evaluation system has a clear logical main line and strict theoretical support, thereby ensuring the scientificity and pertinence of the subsequent configuration of the calculation model and the construction of the indicator system.
[0042] 3. After determining the business indicator items and business semantics, this application configures the corresponding calculation model through a series of scientific and rigorous steps to maximize the accuracy and practicality of the model. First, the input parameters are determined according to the business indicator items and business semantics, laying the foundation for model configuration. Since the input parameters are directly derived from the actual business needs, they can truly reflect the connotation and evaluation focus of the indicators, which is conducive to the accuracy of subsequent formula calculations. Secondly, the calculation formula is configured according to the business logic corresponding to the input parameters and business indicator items. This business logic-oriented configuration method makes the calculation formula not a simple mathematical expression, but is rooted in on-site practice, contains professional knowledge and operational experience, thereby maximizing the inherent laws and practical significance of the indicators. Finally, a calculation model is constructed based on the calculation formula and business indicator items. Since the construction of the model is based on a formula that has been verified by both semantics and logic, the resulting calculation model must be highly consistent with the business indicators and their inherent laws, and truly reflect the business operation status. BRIEF DESCRIPTION OF THE DRAWINGS
[0043] Figure 1 A flowchart of a method for configuring an engineering construction indicator system provided in an embodiment of the present application; Figure 2 An architectural diagram of an engineering construction indicator system configuration system provided in an embodiment of the present application; Figure 3 A schematic diagram of the structure of an electronic device provided in this application. DETAILED DESCRIPTION
[0044] In order to enable technicians in this field to better understand the technical solutions in this specification, the technical solutions in the embodiments of this specification will be clearly and completely described below in conjunction with the drawings in the embodiments of this specification. Obviously, the described embodiments are only part of the embodiments of this application, not all of the embodiments.
[0045] In the description of the embodiments of the present application, words such as "for example" or "for example" are used to indicate examples, illustrations or explanations. Any embodiment or design described as "for example" or "for example" in the embodiments of the present application should not be interpreted as being more preferred or more advantageous than other embodiments or designs. Specifically, the use of words such as "for example" or "for example" is intended to present related concepts in a specific way.
[0046] In the description of the embodiments of the present application, the meaning of the term "multiple" refers to two or more. For example, multiple systems refer to two or more systems, and multiple screen terminals refer to two or more screen terminals. In addition, the terms "first" and "second" are used for descriptive purposes only and cannot be understood as indicating or implying relative importance or implicitly indicating the indicated technical features. Thus, the features defined as "first" and "second" may explicitly or implicitly include one or more of the features. The terms "include", "comprise", "have" and their variations all mean "including but not limited to", unless otherwise specifically emphasized.
[0047] In order to facilitate understanding of the method and system provided by the embodiments of the present application, before introducing the embodiments of the present application, the background of the embodiments of the present application is first introduced.
[0048] Engineering construction projects usually involve complex business processes and multiple goals, which require detailed management and evaluation of each link. In order to quantify and monitor the operating status of each key business node, project managers need to establish a scientific and reasonable indicator system. However, the existing indicator system construction method has some outstanding shortcomings.
[0049] Traditional indicator systems are mostly based on the subjective experience and judgment of managers, lacking in-depth analysis and mining of actual business scenarios and data. Although this highly subjective method is relatively simple to operate, it is likely to overlook some important influencing factors, resulting in inaccurate indicator settings and difficulty in truly reflecting the actual status of business operations.
[0050] On the other hand, although there are some methods that attempt to determine indicators through data analysis, these analyses are often limited to isolated single nodes or certain specific factors, lacking systematic consideration of the entire business scenario. Since the inherent logic of the business process and the mutual influence between nodes are ignored, the indicators obtained may be fragmented, making it difficult to form a complete and internally consistent evaluation system, and unable to fully reflect the actual situation of the entire business operation.
[0051] In addition, the existing technology also has the shortcomings of single analysis ideas and methods and lack of theoretical support when conducting data analysis, which affects the scientificity and accuracy of the analysis results to a certain extent.
[0052] After the background introduction of the above content, those skilled in the art can understand the problems existing in the prior art. The technical solutions in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments.
[0053] Based on the above background technology, please refer to Figure 1 , Figure 1 A flow chart of a method for configuring an engineering construction indicator system provided in an embodiment of the present application. The system can be implemented by a computer program or can be run as an independent tool application. Specifically, in an embodiment of the present application, the method can be applied on a server, but can also be applied on electronic devices such as servers. A method for configuring an engineering construction indicator system includes the following steps: S101, obtaining a business scenario of a target project, and determining business indicator items and business semantics corresponding to the business indicator items according to the business scenario; Specifically, for engineering construction projects, we first need to obtain the business scenarios of the target projects. Business scenarios refer to the various business activities, business processes, and related operating environments and constraints involved in the implementation of the project, which are the basis for a comprehensive understanding and evaluation of the project's operating status. Through in-depth understanding and analysis of business scenarios, we can reveal the inherent laws and characteristics of project operations, thereby laying a solid foundation for the construction of the subsequent indicator system.
[0054] On the basis of obtaining the business scenario, it is necessary to determine the business indicator items and the business semantics corresponding to the business indicator items according to the business scenario. The purpose of this step is to extract key indicators that can reflect the project operation status from the business scenario and clarify the specific business connotation represented by each indicator.
[0055] Specifically, we first need to determine the business tags based on the business scenarios, that is, to describe the key features of the business operation in a general way, and to point out the direction for further analysis. On this basis, we determine the theme of the indicator plan based on the business tags, that is, to clarify the core objectives of the evaluation, which is conducive to the focus of subsequent work.
[0056] Next, business indicator items are determined based on the indicator scheme theme, and the evaluation objectives are refined into specific and actionable indicators to enhance executability. Determining business semantics based on the indicator scheme theme and business indicator items gives the indicators connotations and makes them closely aligned with business practices.
[0057] Through this series of closely connected links, the macro business scenarios are linked with the micro indicator items, giving the construction process of the evaluation system a clear logical main line and strict theoretical support, thereby ensuring the scientificity and pertinence of the subsequent configuration of the calculation model and the construction of the indicator system.
[0058] Based on the above embodiment, as an optional embodiment, determining the business indicator item and the business semantics corresponding to the business indicator item according to the business scenario includes: S201, determining a business tag according to the business scenario, and determining an indicator solution theme according to the business tag; Specifically, after obtaining the business scenario of the target project, it is necessary to conduct an in-depth analysis of the business scenario, extract business tags that can summarize the project operation characteristics, and determine the core theme of the indicator plan on this basis. This step aims to clarify the direction and focus of the evaluation and lay the foundation for the setting of subsequent indicator items.
[0059] Specifically, we first need to conduct a comprehensive business analysis of the business scenario, identify the process logic of business operation and the goals of each link, and have a comprehensive grasp of the internal laws of the entire business scenario. On this basis, we need to conduct an influencing factor analysis for each business node, find out the key factors that affect the realization of node goals, and thus reveal the key characteristics of business operation.
[0060] Next, by integrating and summarizing the influencing factors of each node, we can summarize the core features that reflect the entire business scenario, thus forming a series of highly summarized business tags. Business tags can highly condense the essential characteristics of project operation and are the basic starting point for building an indicator system.
[0061] After determining the business tag, you need to further establish the theme of the indicator solution. The theme of the indicator solution is a summary description of the evaluation goal, clarifying the core content and ideas of the evaluation. Each theme is derived from the in-depth understanding and connotation of the business tag and is closely related to the business scenario.
[0062] For example, for a certain construction project, business labels such as "schedule control", "quality assurance" and "cost control" are extracted from the business scenario, and the corresponding indicator program themes may be "project plan execution evaluation", "engineering construction quality evaluation" and "project investment control evaluation".
[0063] Based on the above embodiment, as an optional embodiment, determining the service tag according to the service scenario includes: S501, performing business analysis on the business scenario, determining the business process and the business objectives of each process node, and determining the business objectives of each business node based on the business process; Specifically, when building a business evaluation system, you need to first conduct an in-depth analysis of the business scenario, sort out the business process and the goals of each node, and lay the foundation for the subsequent determination of business tags. The focus of this step is to clarify the business logic, clarify the objects and focus of the evaluation, and ensure the pertinence and effectiveness of the evaluation activities.
[0064] Specifically, we first need to comprehensively sort out the complete business processes involved in the business scenarios. The business process reflects the basic path of project implementation and is the overall framework of the evaluation. We should combine the project characteristics and operational practices to draw out the detailed flow relationship of each link to ensure the completeness and accuracy of the flowchart.
[0065] Secondly, it is necessary to conduct an in-depth analysis of the specific content of each process node to clarify the specific business goals to be achieved at the current node. Business goals are the core basis for indicator design and effect evaluation. It is necessary to fully identify the goals of each node and clarify its purpose, implementation path and evaluation criteria to prepare for determining the corresponding evaluation focus.
[0066] On this basis, it is necessary to sort out the internal logical relationship between the goals of each node. Business operation is a complete system that is closely linked. The goals of upstream and downstream nodes are closely related. The analysis of business processes helps to identify this correlation and ensure the systematic and comprehensive evaluation.
[0067] Taking the machine tool production workshop as an example, we first need to sort out the complete production business process including raw material procurement, machining, assembly, inspection and packaging; secondly, analyze each node, such as the goal of the procurement link is to ensure the quality of raw materials and timely delivery, and the machining link requires precise process and maximum efficiency; finally, analyze the relationship between the goals, such as procurement efficiency affects the subsequent production progress, and process accuracy directly determines product quality.
[0068] Through this implementation step, we have a thorough understanding of the business scenario, clarified the specific objects and key points of the evaluation, and laid a solid foundation for the subsequent indicator system design. Scientific and comprehensive business analysis not only ensures the depth and breadth of the understanding of the scenario, but more importantly, establishes a systematic approach to the evaluation work, so that it is based on objective practice and closely matches business needs, fundamentally improving the pertinence and practical value of the evaluation conclusions.
[0069] S502, analyzing influencing factors based on the business objectives of each business node to determine the influencing factors of each business node; Specifically, after clarifying the goals of each business node, it is necessary to further analyze the influencing factors based on these goals and determine the influencing factors of each node. The influencing factors directly determine the degree of achievement of business goals and are the basis for building an evaluation system. Only by fully identifying all key influencing factors can a comprehensive evaluation of business operations be conducted.
[0070] Specifically, we first need to sort out various factors that may affect the target content of each business node, integrate business knowledge and practical experience, and sort out various factors that may affect the target. These factors may come from internal factors, such as personnel quality, equipment status, etc.; they may also come from external factors, such as market environment, policies and regulations, etc. Comprehensive consideration should be given to ensure the integrity of the factors.
[0071] Secondly, it is necessary to conduct an in-depth analysis of the influencing factors that have been initially sorted out, eliminate those minor factors that have a small impact or can be ignored, and retain the key factors that have a decisive effect on the goal. There may be a large number of influencing factors at each business node, but not all factors are equally important. They should be identified and summarized in combination with business practices.
[0072] On this basis, it is also necessary to analyze the connotation and mechanism of action of key influencing factors, clarify the specific correlation logic between each factor and business goals, and prepare for the subsequent labeling and quantitative calculation.
[0073] Taking the machining process as an example, we can preliminarily identify the factors that affect the goal of "process precision and maximum efficiency", including: employee operating skills, equipment accuracy, tooling and molds, temperature and humidity, etc. After further analysis, employee operating skills and equipment accuracy are the decisive factors, while the influence of temperature and humidity factors can be effectively controlled within a certain range. Therefore, the key factors can be identified as employee operating skills and equipment accuracy. For these two factors, it is also necessary to clarify their inherent logical relationship with the goal, that is, the higher the level of operating skills and the higher the equipment accuracy, the higher the process accuracy and the greater the production efficiency. Based on the above embodiment, as an optional embodiment, the influencing factor analysis based on the service objectives of each service node to determine the influencing factors of each service node includes: S601, analyzing influencing factors based on the business objectives of each business node to determine potential influencing factors of each business node; Specifically, when conducting an influencing factor analysis, you need to first identify all potential influencing factors based on the goals of each business node. Potential influencing factors refer to various factors that may affect the realization of business goals, including direct and indirect factors. Only by comprehensively sorting out all potential factors can you have a panoramic understanding of the business process and lay the foundation for the development of a scientific evaluation system.
[0074] Specifically, we first need to deeply understand the goal connotation of each business node and clarify the specific purpose and expected effect it hopes to achieve. Business goals are usually abstract and general, and they need to be analyzed to clarify the path to achieve the goals and the impact mechanism.
[0075] Secondly, it is necessary to combine business knowledge and practical experience to comprehensively analyze various factors that may affect the achievement of goals from both internal and external levels. Internal factors usually include production factors such as personnel, equipment, technology, and funds; external factors include external conditions such as market environment, policies and regulations, and upstream and downstream conditions. All potential influencing factors should be sorted out without omission.
[0076] On this basis, it is necessary to classify and analyze the potential factors that have been initially sorted out, and clarify the association logic between each factor and the business goal. It is necessary to distinguish between direct and indirect influencing factors, and analyze the influencing path and mechanism of each factor, so as to prepare for the subsequent identification of key influencing factors.
[0077] Taking the goal of "precise process and maximized efficiency" in the machining process as an example, we first need to clarify that "precise process" means that the processed parts meet the process requirements, and "maximum efficiency" means the maximum capacity utilization rate. Then from an internal perspective, employee operating skills, equipment accuracy, etc. are direct influencing factors; from an external perspective, raw material quality, temperature and humidity, etc. are indirect influencing factors. Through analysis, it can be clearly seen that the higher the level of operating skills and the higher the equipment accuracy, the higher the qualified rate of processed parts and the greater the production efficiency.
[0078] S602, according to the potential influencing factors of each service node, obtaining corresponding survey data based on the potential influencing factors of each service node, and determining the correlation between the potential influencing factors and each service node based on the corresponding survey data obtained from the potential influencing factors of each service node; Specifically, after identifying the potential influencing factors of each business node, it is necessary to further obtain research data on these factors and analyze their correlation with business goals. The focus of this step is to screen and optimize the influencing factors to ensure the accuracy and pertinence of the evaluation system.
[0079] Specifically, it is necessary to first design a corresponding research plan for each potential influencing factor, formulate a questionnaire or interview outline, and collect experience data from front-line business personnel and experts. The research content should include the impact of the factor on the goal achievement, the mechanism of action, etc., and comprehensively reflect the actual situation of the factor in a combination of quantitative and qualitative data.
[0080] Secondly, based on the survey data, it is necessary to use quantitative analysis or expert review to evaluate the correlation between each potential factor and the business goal. The correlation reflects the importance and influence of the factor on the goal, and is the main basis for the subsequent identification of key factors. The correlation between the factor and the goal can be calculated or determined through statistical analysis or scoring.
[0081] In addition, it is necessary to conduct an in-depth interpretation of the results of the correlation analysis, clarify the action path and internal logic between each factor and the target, and verify the rationality of the analysis results. For factors with a high degree of correlation, it is necessary to further analyze their mechanism of action and understand the specific way in which they affect the target, so as to prepare for the subsequent establishment of an evaluation model.
[0082] Based on the above embodiment, as an optional embodiment, the obtaining corresponding survey data based on the potential influencing factors of each service node to determine the correlation between the potential influencing factors and each service node includes: S701, based on the potential influencing factors of each business node, corresponding survey data is obtained for statistical analysis to obtain statistical data; Specifically, after obtaining the survey data of potential influencing factors of each business node, it is necessary to conduct statistical analysis on these data to obtain quantifiable statistical data. The purpose of this step is to convert qualitative descriptions into measurable quantitative indicators, laying a data foundation for subsequent correlation calculations and influencing factor optimization.
[0083] Specifically, we first need to classify and standardize the survey data of each potential influencing factor. Survey data may come from multiple channels, including questionnaires, interview records, etc., and the data may be in various forms. We need to standardize it and convert qualitative descriptions into unified numerical or graded forms.
[0084] Secondly, it is necessary to select appropriate statistical analysis methods for the standardized data to perform quantitative calculations and obtain statistical indicators that can reflect the actual situation of the influencing factors. Common statistical analysis methods include mean, standard deviation, frequency statistics, etc. The selection of specific methods needs to be combined with data type and distribution characteristics. For influencing factors that cannot be directly measured by some indicators, they can also be indirectly quantified by scoring or grading.
[0085] On this basis, it is necessary to interpret and organize the statistical analysis results to form a standardized statistical data set to prepare for the subsequent correlation calculation. For problems such as missing values or outliers, reasonable interpolation or elimination methods need to be adopted to ensure the integrity and accuracy of the data.
[0086] Taking the influencing factor of "employee operating skills" in the machining process as an example, we can obtain the scoring data of employee operating skills through on-site assessment, historical data, etc., and convert the qualitative description into a grading form such as "skilled", "average", and "unfamiliar". Then, for these graded data, we can use the frequency statistics method to calculate the proportion of employees at each level, forming a statistical data set that can intuitively reflect the overall level of operating skills.
[0087] S702: Calculate the correlation between the potential influencing factors and each service node based on the statistical data to obtain the correlation between the potential influencing factors and each service node.
[0088] Specifically, after obtaining the statistical data of potential influencing factors, it is necessary to calculate the correlation between the influencing factors and business goals based on these data. The correlation reflects the importance and effect of the influencing factors on the goals, and is an important basis for subsequent optimization of influencing factors and construction of an evaluation system.
[0089] Specifically, we first need to determine the specific method of calculating the correlation, which mainly includes mathematical and statistical methods such as correlation analysis and regression analysis. Different methods have different applicable scenarios, and we need to select a suitable calculation model based on the data type and distribution characteristics. At the same time, for some qualitatively described influencing factors, we can also use qualitative analysis methods such as scoring method and hierarchical analysis method for indirect calculation. Secondly, we need to use the existing statistical data set for each potential influencing factor, substitute it into the selected calculation model, and obtain the correlation value between the factor and the business goal. The calculation of correlation needs to follow certain mathematical rules to ensure the rigor of the calculation process and the accuracy and interpretability of the results.
[0090] On this basis, it is necessary to normalize the calculation results and unify the correlation values of different factors to the same dimension to facilitate subsequent sorting and comparison. At the same time, it is also necessary to set a reasonable confidence interval to determine the credibility of the calculation results and ensure the rigor of the evaluation system. Taking the machining process as an example, for the factor of "employee operating skills", the method of multivariate linear regression analysis can be used, with the employee operating skill score as the independent variable, the qualified rate of processed parts and production efficiency as the dependent variables, and the correlation coefficient between the factor and the target, that is, the correlation value, is obtained through regression calculation. For some influencing factors that cannot be directly quantified, such as equipment status, internal experts can be invited to score and their correlation can be indirectly calculated through hierarchical analysis.
[0091] Through this implementation step, with the help of scientific mathematical statistics methods and qualitative analysis tools, the correlation between each potential influencing factor and the business goal is quantified, laying a solid foundation for the optimization of influencing factors. The rigorous correlation analysis effectively solves the deficiency of the existing evaluation method that lacks scientific correlation judgment, ensures the pertinence and reliability of the evaluation content, and fundamentally improves the scientificity and authority of the evaluation results.
[0092] S603: According to the relevance of each service node, the potential influencing factors with a relevance greater than a preset relevance threshold are used as influencing factors of each service node.
[0093] Specifically, after obtaining the correlation data between potential influencing factors and business goals, it is necessary to screen out the key influencing factors that really have a significant impact on the goals based on the preset correlation threshold. The purpose of this step is to further optimize the influencing factors, ensure the simplicity and pertinence of the evaluation indicators, and avoid the evaluation system being bloated and out of focus due to too many factors.
[0094] Specifically, we first need to determine the quantitative standard of the correlation threshold. The correlation threshold reflects the tolerance for the importance of influencing factors, and can be set through expert review or scoring in combination with the actual situation of the enterprise and management requirements. Generally speaking, the setting of the threshold requires a balance between evaluation accuracy and ease of operation. Too high a threshold will cause omissions, while too low a threshold will introduce too many irrelevant factors.
[0095] Secondly, it is necessary to sort each potential influencing factor according to the correlation score results, and select those factors with high ranking and correlation higher than the preset threshold as the final set of influencing factors. For some influencing factors with correlation close to the critical value, it can be combined with qualitative analysis to comprehensively consider factors such as their importance and measurability to determine whether to include them in the final set.
[0096] On this basis, it is also necessary to sort out and summarize the final set of influencing factors, clarify the key connotation of each factor, and prepare for the subsequent label formulation and quantitative calculation. At the same time, the hierarchical relationship and internal logic of the factors in the set should also be analyzed to ensure the systematicness and comprehensiveness of the influencing factor system.
[0097] Taking machining as an example, assume that the correlation threshold is set to 0.7. According to the previous survey scores, the correlations of factors such as employee operating skills and equipment accuracy are all higher than 0.7, so they are determined to be the final influencing factors. However, factors such as raw material quality, temperature and humidity have lower correlations and are excluded. It is necessary to further analyze the above two factors, clarify the logic of their interaction with the goals, and determine that the operating skill level and equipment accuracy are the core content.
[0098] S503: Form the service label based on the influencing factors of each service node.
[0099] Specifically, after completing the analysis of influencing factors, it is necessary to further form business labels based on these factors. Business labels are the basic components of the evaluation indicator system, which directly determine the object and content of the evaluation and are the link between business phenomena and evaluation activities. Only by scientifically constructing business labels can the pertinence and effectiveness of the evaluation results be ensured.
[0100] Specifically, we first need to design label entries that can accurately reflect the connotation of each business node based on the identified key influencing factors. Label entries should be close to business practices, use concise and easy-to-understand language, avoid overly abstract or difficult expressions, and ensure comprehensibility in applications.
[0101] Secondly, it is necessary to classify and optimize the proposed tag entries, merge related or similar tags to avoid duplication and overlap. At the same time, redundant tags that are too detailed should be eliminated to keep the tag system refined and highly cohesive.
[0102] On this basis, it is also necessary to establish a hierarchical relationship of labels. Since there are influencing factors of different granularities within the business node, the labels should be given reasonable primary and secondary levels according to the importance and influence of the factors, forming a hierarchical label system.
[0103] Taking machining as an example, based on the identified influencing factors "employee operating skills" and "equipment accuracy", the labels can be initially drafted as "operation skill level" and "equipment accuracy value". After further optimization, the two labels can be merged into "processing human-machine capability", with the hierarchical relationship as the main label, and two sub-labels under it, "operation skills" and "equipment accuracy".
[0104] S202, determining the business indicator item according to the indicator scheme theme; Specifically, after determining the theme of the indicator plan, it is necessary to further clarify the specific business indicator items based on the theme content. Business indicator items are the basic units for building an indicator system, which directly determine the specific content and coverage of the evaluation. Therefore, the reasonable setting of indicator items is the key to ensuring the pertinence and integrity of the indicator system.
[0105] Specifically, after the indicator scheme theme is established, the theme connotation needs to be deeply analyzed and understood first. Although the theme summarizes the evaluation objectives, it is still somewhat general and needs to be further refined and quantified. The specific content covered by the theme should be sorted out in combination with business scenarios and professional knowledge, and all dimensions that need to be evaluated should be fully identified.
[0106] Next, for each dimension, you need to set the corresponding business indicator items. Business indicator items are the smallest units of quantitative evaluation and should have clear definitions and calculation methods to directly reflect the business operation status. When setting indicator items, you need to fully consider the subject content and the corresponding business logic, strive to cover a comprehensive range, be specific in content, and avoid duplication and overlap.
[0107] For example, for the topic of "project construction quality assessment", it can be broken down from multiple dimensions such as project quality control, process management, material control, etc., and specific indicators can be set under each dimension, such as "pump body appearance defect rate", "electric welding process qualification rate", "steel quality qualification rate", etc.
[0108] Through the above implementation steps, the abstract indicator scheme theme is transformed into a series of specific and operational indicator items, and the connotation of the scheme theme can be fully reflected in the indicator items. At the same time, the indicator items are closely linked to the business scenarios, which can objectively reflect the actual operation status of the engineering project and lay the foundation for the configuration of the subsequent calculation model and the construction of the indicator system.
[0109] S203: Determine the business semantics corresponding to the business indicator item according to the indicator scheme theme and the business indicator item.
[0110] Specifically, after setting the business indicator items, it is necessary to further clarify the business semantics corresponding to each indicator item based on the indicator scheme theme and the indicator item itself. Business semantics refers to the interpretation and explanation of the connotation of the indicator, which reveals the intrinsic connection between the indicator and the actual business, and gives the indicator rich content and value.
[0111] Specifically, we first need to review the indicator scheme theme and deeply understand the business operation goals and evaluation ideas involved in the theme. The theme reflects the core focus of the evaluation and provides an overall framework for the definition of business semantics.
[0112] Next, you need to compare the business indicator items themselves and interpret their connotations in combination with business scenarios and professional knowledge. Since the business indicator items are proposed based on business needs and processes, each indicator corresponds to specific business content and management concerns. In-depth analysis should be conducted from multiple dimensions such as indicator naming, definition, and calculation formula to accurately understand the business essence reflected by the indicator.
[0113] For example, for the indicator item "Pump body appearance defect rate", its business semantics can be interpreted as: this indicator reflects the quality control level in the pump body production process, is used to monitor the frequency of appearance defects, and evaluates the implementation of production process standardization. It is an important reference indicator to ensure product delivery quality.
[0114] By clarifying the business semantics, abstract indicators are closely linked to specific business needs and management goals, so that subsequent data collection and model building can focus on actual business scenarios and avoid evaluation becoming a formality. At the same time, semantic interpretation also provides an important reference for the improvement and adjustment of the indicator system, ensuring the pertinence of the system content and the ability to continuously optimize.
[0115] In addition, clear business semantics can also enhance the scientificity and authority of the indicator system, making it no longer a simple accumulation of data, but built on a solid theoretical foundation with strong explanatory and persuasive power. This will help the indicator system gain wider recognition and adoption in practical applications.
[0116] S102: According to the business indicator items and the business semantics, a calculation model corresponding to the business indicator items is configured, and an indicator system is constructed based on the calculation model, the business indicator items and the business semantics.
[0117] Specifically, after determining the business indicator items and business semantics, the next step is to configure the corresponding calculation model based on these indicator contents, and build a complete indicator system on this basis. The importance of this step lies in that only abstract indicator contents cannot be directly applied to engineering project evaluation. Indicators must be concretized through quantitative calculations to truly play their monitoring and evaluation roles.
[0118] Specifically, we first need to determine the input parameters corresponding to the indicators based on the business indicator items and business semantics. Input parameters are the basic data required for quantitative calculation of indicators, usually composed of a series of influencing factors. We need to analyze the key factors affecting the performance of indicators based on the connotation and semantic understanding of indicators, and incorporate them into the model as input parameters. Only when the input parameter data comes from actual business can the calculation results truly reflect the project status.
[0119] After determining the input parameters, you need to configure the calculation formula according to the business logic corresponding to the input parameters and business indicators. The calculation formula describes the specific algorithm for converting the input parameter data into the indicator value, which is the core of the model. You should fully consider the business logic and professional knowledge, and design a scientific and reasonable formula to accurately describe the connotation of the indicator.
[0120] Finally, a calculation model is constructed based on the calculation formula and business indicator items. The calculation model integrates various elements such as indicator definition, input parameters and formulas, and is a tool for quantifying abstract indicators. Through the automatic calculation of the model, the specific values of various indicators can be obtained quickly and accurately, providing data support for project evaluation.
[0121] After configuring the calculation model of each indicator, the final indicator system can be constructed based on the model, indicator items and semantics. This system organically combines business scenario description, indicator connotation interpretation and quantitative calculation, fully depicts the overall picture of project operation, and provides an important reference for managers to timely discover abnormal problems and take targeted measures.
[0122] Based on the above embodiment, as an optional embodiment, configuring the calculation model corresponding to the business indicator item according to the business indicator item and the business semantics includes: S301, determining an input parameter corresponding to the business indicator item according to the business indicator item and the business semantics; Specifically, after clarifying the business indicator items and business semantics, it is necessary to further determine the input parameters corresponding to each indicator item to prepare data for quantitative calculation. The input parameters are the basic data source of the calculation model, and their reasonable selection directly determines the accuracy of the calculation results and the practicality of the indicator system.
[0123] Specifically, we first need to analyze the key factors that affect the performance of the indicator based on the connotation and definition of the business indicator. Although the indicator is highly generalized, it is essentially a measurement of certain business activities or states, and is inevitably subject to a series of influencing factors. We need to comprehensively sort out these influencing factors through professional knowledge and understanding of business scenarios.
[0124] Secondly, it is necessary to further combine business semantics to examine and screen the influencing factors. Business semantics explains the intrinsic connection between the indicator items and the actual business, and points out the core objectives of the evaluation. According to the semantic connotation, key factors that are closely related to the indicators and have a greater impact on the evaluation objectives should be retained, and irrelevant and minor influencing factors should be eliminated.
[0125] For example, for the indicator item "Pump body appearance defect rate", according to its definition, we can preliminarily analyze that the influencing factors include production worker skill level, tooling mold accuracy, and strictness of inspection standards. Further analysis combined with its business semantics "reflecting the quality control level in the pump body production process" may ultimately determine that the production worker skill level, mold accuracy, and inspection standards are the input parameters of this indicator.
[0126] Through the above analysis and screening, we obtained a set of key influencing factors that are highly correlated with the indicators, which serve as the input data source of the model, laying a solid foundation for subsequent quantitative calculations. The reasonable selection of input parameters is conducive to the scientific definition of the model calculation formula and improves the credibility of the results; at the same time, it also ensures the consistency of the calculation results with the actual business connotation and avoids the risk of evaluation deviation.
[0127] Based on the above embodiment, as an optional embodiment, determining the input parameter corresponding to the business indicator item according to the business indicator item and the business semantics includes: S401, determining an indicator factor corresponding to the business indicator according to the business indicator item and the business semantics; Specifically, when determining the input parameters, it is necessary to first identify the indicator factors that affect the indicator performance based on the business indicator items and business semantics. The indicator factor is the basic unit of the input parameter, reflecting the smallest granularity factor that affects the indicator, and is an important link in converting qualitative content into computable data.
[0128] Specifically, we first need to deeply understand the definition and connotation of business indicators and clarify the specific business activities or states that the indicators are intended to reflect and measure. Although the indicators are highly generalized, their core goal is to evaluate specific business content, and we must accurately grasp this core.
[0129] Secondly, it is necessary to analyze the connotation of indicators in combination with business semantics to clarify the key factors that affect the performance of indicators. Business semantics explains the intrinsic connection between indicators and actual business scenarios, reveals the business logic and mechanism that affect indicators, and provides important clues for the identification of indicator factors.
[0130] On this basis, it is necessary to integrate business knowledge and professional experience to further decompose the influencing factors and identify the most basic and indivisible indicator factors. The indicator factors should be as detailed as possible to reflect the fundamentals that affect the indicators, but at the same time they should not be too general to avoid missing the impact on the indicators.
[0131] Taking "pump body appearance defect rate" as an example, based on its definition and semantics, we can preliminarily analyze that the key factors affecting this indicator include: production worker skills, production equipment performance, tooling mold accuracy, quality inspection standards, etc. After further analysis, production worker skills can be decomposed into operation proficiency, degree of refinement, etc.; production equipment performance can be decomposed into equipment age, maintenance, etc.; tooling mold accuracy can be decomposed into mold manufacturing process, number of times used, etc.; quality inspection standards can be decomposed into inspection personnel level, standard meticulousness, etc. These are the minimum granularity indicator factors that affect "pump body appearance defect rate".
[0132] Through the above implementation steps, the macro-influencing factors are refined into specific indicator factors, laying the foundation for the subsequent determination of input parameters. Only by fully identifying all the basic influencing units can the performance of indicators be scientifically and comprehensively evaluated. At the same time, the introduction of indicator factors also establishes a direct connection between abstract business content and actual data, ensuring the pertinence and accuracy of input parameter selection and subsequent calculations, and fundamentally improving the credibility of the evaluation results.
[0133] S402: Determine input parameters corresponding to the business indicator items according to the calculation rules and judgment rules of the indicator factors.
[0134] Specifically, after identifying the indicator factors, it is necessary to further determine the final input parameter set corresponding to the business indicator item based on the calculation rules and judgment rules of each factor. This step is the key link in converting qualitative content into computable data.
[0135] Specifically, first of all, it is necessary to analyze the corresponding calculation rules for each indicator factor, that is, the quantification method of the factor. Due to differences in data characteristics, the calculation rules of different factors may be quite different. It is necessary to reasonably design a quantitative algorithm based on actual conditions to convert the qualitative factor content into specific numerical or categorical data. Secondly, it is necessary to set reasonable judgment rules for each factor, that is, under what circumstances the factor is considered to have an impact on the indicator. This requires an in-depth understanding of the business logic relationship between indicators and factors, and a scientific analysis of the triggering conditions of the impact, so as to screen out the factor data that is truly related to the indicator and avoid interference from irrelevant information.
[0136] Under the guidance of calculation rules and judgment rules, factor data that meets the requirements can be extracted from the original data and used as the final input parameter set. It should be noted that the same factor may require different quantification and judgment methods in different business scenarios, and should be flexibly controlled according to specific circumstances.
[0137] Taking "Pump body appearance defect rate" as an example, for the factor "operation proficiency", the calculation rule can be set to comprehensively score based on employee assessment scores and length of service; the judgment rule is to only consider front-line workers, excluding logistics personnel. For the factor "equipment age", the calculation rule is to calculate the service life based on the equipment operation time; the judgment rule is to only consider equipment directly involved in production and processing, excluding auxiliary equipment. In this way, a series of input data sets that meet the requirements and can be used for quantitative calculations can be obtained.
[0138] Through this step, a direct connection is established between the abstract business content and the specific data source, providing basic data support for subsequent model building and calculation, and ensuring the pertinence and reliability of the evaluation results. At the same time, the rigorous analytical thinking reflected in this step also establishes a scientific working method for the evaluation activities, completely getting rid of the shortcomings of relying on subjective experience and lack of theoretical support in the past, and significantly improving the quality of the evaluation.
[0139] S302, configuring a calculation formula according to the input parameters and the business logic corresponding to the business indicator item; Specifically, after determining the input parameters corresponding to the business indicator items, the next step is to configure the calculation formula according to the business logic corresponding to the input parameters and indicator items. The calculation formula is the core part of the quantitative model, which directly determines the calculation method and accuracy of the indicator value and is the key to converting qualitative content into calculable results.
[0140] Specifically, first of all, you need to have a deep understanding of the connotation and definition of business indicator items, and clarify the specific objects and contents to be measured by the indicators. As the basic unit of evaluation, indicators must correspond to specific business activities or states. You must see the essence through the phenomenon and accurately grasp the actual connotation of the indicators. Secondly, you need to analyze the relationship between the indicator items and each input parameter, and accurately understand the inherent business logic between them. Each input parameter reflects a key factor that affects the performance of the indicator, but the degree of influence and mode of action may differ from the indicator. It is necessary to reasonably describe the logical relationship between the input parameters and indicators based on a deep understanding of the business scenario.
[0141] On this basis, it is necessary to combine relevant theoretical knowledge such as statistics and operations research to design a scientific and reasonable calculation formula. The calculation formula should be able to accurately describe the relationship between the input and participating indicators, and convert the input data into the final indicator calculation results through a reasonable mathematical model. The complexity and method of the formula should be flexibly selected according to the specific situation, but the accuracy and interpretability of the results must be ensured.
[0142] For example, for the indicator item "Pump body appearance defect rate", the relationship between each participant can be analyzed: the higher the skill level of the production worker, the lower the defect rate; the higher the mold precision, the lower the defect rate; the stricter the inspection standard, the higher the defect rate statistics. Based on this logical relationship, after reasonable mathematical modeling, the calculation formula that may be obtained is: Defect rate = number of detected defects / (number of qualified products + 2*number of unqualified products), where the number of unqualified products is multiplied by a weight coefficient of 2, which is used to reflect the degree of influence of different worker skills and mold status on the defect rate.
[0143] Through this implementation step, the qualitative indicator connotation and business rules are transformed into a strict mathematical model, providing a clear calculation path for quantitative calculation. The scientific formula design not only ensures the accuracy of the calculation results, but more importantly, gives the results rich semantic connotations, making them closely fit the actual business scenarios, effectively reflecting the project operation status, and providing reliable data support for subsequent evaluation and decision-making.
[0144] S303: construct a calculation model corresponding to the business indicator item according to the calculation formula and the business indicator item.
[0145] Specifically, after configuring the calculation formula, you need to further build the final calculation model based on the formula and business indicator items. The calculation model is the core tool for quantitative evaluation, which closely combines qualitative business content with mathematical models to prepare for the construction of the indicator system.
[0146] Specifically, first, the basic contents such as the definition, calculation object, and dimension of the business indicator items need to be fully input into the model so that the model can clearly understand the specific content to be evaluated. The definition of the indicator items establishes the starting point and end point of the evaluation and must be closely aligned with other model elements. Secondly, the determined input parameter set needs to be imported into the model. The input parameter is the source of data for the calculation formula. The model needs to clarify the basic properties of each input parameter, such as the meaning, type, and unit of measurement, to prepare for data collection and processing. At the same time, the input parameter weight should also be set to reflect the degree of its influence on the indicator. The next step is to embed the configured calculation formula into the model. The calculation formula is the core algorithm of the model and determines the final calculation result. When embedding the formula, it is necessary to explain it in a popular way, clarify the business logic and theoretical basis behind the formula design, and enhance the transparency and interpretability of the model.
[0147] Finally, it is also necessary to set parameters such as the model's calculation cycle and result display format so that the model's operation and output can match the actual evaluation needs. At the same time, reasonable thresholds should be configured to grade the results and improve the operability of the evaluation conclusions.
[0148] Taking "appearance defect rate of pump body" as an example, the constructed calculation model should fully reflect various elements such as indicator definition, parameter interpretation, formula explanation, etc. For example, the indicator definition is "reflecting the appearance quality control level in the production process of pump body", the parameters are the skill level of production workers, mold accuracy, and inspection standards, the formula is defect rate = number of detected defects / (number of qualified products + 2*number of unqualified products), 2 is the influence weight of worker skills and mold conditions, etc.
[0149] Through this step, the scattered indicator connotations, influencing factors and calculation logic are connected in series to form a complete and computable evaluation model, which is ready for the construction of a quantitative indicator system. This model has the dual characteristics of business semantics and mathematical models, can accurately reflect actual business scenarios, and provides reliable data support for evaluation.
[0150] See also Figure 2 , Figure 2 An engineering construction indicator system configuration system architecture diagram provided in an embodiment of the present application, the engineering construction indicator system configuration system may include: Business indicator determination module 1, used to obtain the business scenario of the target project, and determine the business indicator items and the business semantics corresponding to the business indicator items according to the business scenario; The indicator system construction module 2 is used to configure the calculation model corresponding to the business indicator item according to the business indicator item and the business semantics, and to construct the indicator system based on the calculation model, the business indicator item and the business semantics.
[0151] Please refer to Figure 3 The application also discloses an electronic device. Figure 3 The electronic device 300 may include: at least one processor 301 , at least one network interface 304 , a user interface 303 , a memory 305 , and at least one communication bus 302 .
[0152] The communication bus 302 is used to realize the connection and communication between these components.
[0153] The user interface 303 may include a display screen (Display) and a camera (Camera). Optionally, the user interface 303 may also include a standard wired interface and a wireless interface.
[0154] The network interface 304 may optionally include a standard wired interface or a wireless interface (such as a WI-FI interface).
[0155] Among them, the processor 301 may include one or more processing cores. The processor 301 uses various interfaces and lines to connect various parts in the entire server, and executes various functions of the server and processes data by running or executing instructions, programs, code sets or instruction sets stored in the memory 305, and calling data stored in the memory 305. Optionally, the processor 301 can be implemented in at least one hardware form of digital signal processing (Digital Signal Processing, DSP), field programmable gate array (Field~Programmable Gate Array, FPGA), and programmable logic array (Programmable Logic Array, PLA). The processor 301 can integrate one or a combination of a central processing unit (Central Processing Unit, CPU), a graphics processing unit (Graphics Processing Unit, GPU) and a modem. Among them, the CPU mainly processes the operating system, user interface and application programs; the GPU is responsible for rendering and drawing the content to be displayed on the display screen; the modem is used to process wireless communications. It can be understood that the above-mentioned modem may not be integrated into the processor 301, and it can be implemented separately through a chip.
[0156] Among them, the memory 305 may include a random access memory (Random Access Memory, RAM) and may also include a read-only memory (Read~Only Memory). Optionally, the memory 305 includes a non-transitory computer-readable medium. The memory 305 can be used to store instructions, programs, codes, code sets or instruction sets. The memory 305 may include a program storage area and a data storage area, wherein the program storage area may store instructions for implementing an operating system, instructions for at least one function (such as a touch function, a sound playback function, an image playback function, etc.), instructions for implementing the above-mentioned various method embodiments, etc.; the data storage area may store data involved in the above-mentioned various method embodiments, etc. The memory 305 may optionally be at least one storage system located away from the aforementioned processor 301. Refer to Figure 3 , the memory 305 as a computer storage medium may include an operating system, a network communication module, a user interface module and an application program of a method for configuring an engineering construction indicator system.
[0157] exist Figure 3In the electronic device 300 shown, the user interface 303 is mainly used to provide an input interface for the user and obtain the data input by the user; and the processor 301 can be used to call the application program storing the road assessment method in the memory 305. When executed by one or more processors 301, the electronic device 300 executes one or more methods in the above-mentioned embodiments. It should be noted that for the aforementioned method embodiments, for the sake of simple description, they are all expressed as a series of action combinations, but those skilled in the art should know that the present application is not limited to the described order of actions, because according to the present application, certain steps can be performed in other orders or simultaneously. Secondly, those skilled in the art should also know that the embodiments described in the specification are all preferred embodiments, and the actions and modules involved are not necessarily required for the present application. In the above embodiments, the description of each embodiment has its own emphasis. For the parts that are not described in detail in a certain embodiment, please refer to the relevant description of other embodiments.
[0158] In the several implementations provided in this application, it should be understood that the disclosed system can be implemented in other ways. For example, the system embodiments described above are only schematic, such as the division of units, which is only a logical function division. There may be other division methods in actual implementation, such as multiple units or components can be combined or integrated into another system, or some features can be ignored or not executed. Another point is that the mutual coupling or direct coupling or communication connection shown or discussed can be through some service interfaces, and the indirect coupling or communication connection of the system or unit can be electrical or other forms.
[0159] The units described as separate components may or may not be physically separated, and the components shown as units may or may not be physical units, that is, they may be located in one place or distributed on multiple network units. Some or all of the units may be selected according to actual needs to achieve the purpose of the solution of this embodiment.
[0160] The present application also provides a computer storage medium that can store multiple instructions, which are suitable for being loaded and executed by a processor as described above. Figure 1 The road assessment method of the embodiment shown in the figure can be found in the specific implementation process. Figure 1 The specific description of the illustrated embodiment will not be repeated here.
[0161] In addition, each functional unit in each embodiment of the present application may be integrated into one processing unit, or each unit may exist physically separately, or two or more units may be integrated into one unit. The above-mentioned integrated unit may be implemented in the form of hardware or in the form of software functional units.
[0162] If the integrated unit is implemented in the form of a software functional unit and sold or used as an independent product, it can be stored in a computer-readable memory. Based on this understanding, the technical solution of the present application, or the part that contributes to the prior art, or all or part of the technical solution can be embodied in the form of a software product. The computer software product is stored in a memory, including a number of instructions for a computer device (which can be a personal computer, server or network device, etc.) to perform all or part of the steps of the various embodiments of the present application. The aforementioned memory includes: various media that can store program codes, such as USB flash drives, mobile hard drives, magnetic disks or optical disks.
[0163] The above are only exemplary embodiments of the present disclosure and cannot be used to limit the scope of the present disclosure. That is, any equivalent changes and modifications made according to the teachings of the present disclosure are still within the scope of the present disclosure. After considering the disclosure of the specification and the truth of practice, those skilled in the art will easily think of other embodiments of the present disclosure.
[0164] This application is intended to cover any variation, use or adaptation of the present disclosure, which follows the general principles of the present disclosure and includes common knowledge or customary technical means in the art not described in the present disclosure. The description and examples are to be regarded as exemplary only, and the scope and spirit of the present disclosure are defined by the claims.
Claims
1. A method for configuring an engineering construction index system, characterized in that: The method comprises: Acquire the business scenario of the target project, and determine the business indicator items and the business semantics corresponding to the business indicator items according to the business scenario; According to the business indicator items and the business semantics, a calculation model corresponding to the business indicator items is configured, and an indicator system is constructed based on the calculation model, the business indicator items and the business semantics.
2. The method according to claim 1, characterized in that The determining of the business indicator item and the business semantics corresponding to the business indicator item according to the business scenario includes: Determine a business tag according to the business scenario, and determine an indicator solution theme according to the business tag; Determine the business indicator items according to the indicator scheme theme; According to the indicator scheme theme and the business indicator item, the business semantics corresponding to the business indicator item is determined.
3. The method according to claim 1, characterized in that The configuring, according to the business indicator item and the business semantics, a calculation model corresponding to the business indicator item includes: Determine an input parameter corresponding to the business indicator item according to the business indicator item and the business semantics; Configure a calculation formula according to the business logic corresponding to the input parameter and the business indicator item; According to the calculation formula and the business indicator item, a calculation model corresponding to the business indicator item is constructed.
4. The method according to claim 3, characterized in that The determining, according to the business indicator item and the business semantics, an input parameter corresponding to the business indicator item includes: Determining an indicator factor corresponding to the business indicator according to the business indicator item and the business semantics; According to the calculation rule and judgment rule of the indicator factor, the input parameter corresponding to the business indicator item is determined.
5. The method according to claim 2, characterized in that: The determining of the service tag according to the service scenario includes: Performing business analysis on the business scenario, determining the business process and the business objectives of each process node, and determining the business objectives of each business node based on the business process; Analyze the influencing factors based on the business objectives of each business node and determine the influencing factors of each business node; The service label is formed based on the influencing factors of each service node.
6. The method according to claim 1, characterized in that The influencing factor analysis based on the business objectives of each business node to determine the influencing factors of each business node includes: Analyze the influencing factors based on the business objectives of each business node and determine the potential influencing factors of each business node; According to the potential influencing factors of each business node, corresponding survey data is obtained based on the potential influencing factors of each business node, and the correlation between the potential influencing factors and each business node is determined based on the corresponding survey data obtained based on the potential influencing factors of each business node; According to the relevance of each service node, the potential influencing factors with a relevance greater than a preset relevance threshold are used as influencing factors of each service node.
7. The method according to claim 6, characterized in that The obtaining corresponding survey data based on the potential influencing factors of each service node to determine the correlation between the potential influencing factors and each service node includes: Based on the potential influencing factors of each business node, corresponding survey data is obtained for statistical analysis to obtain statistical data; Based on the statistical data, a correlation calculation is performed on the correlation between the potential influencing factor and each service node to obtain the correlation between the potential influencing factor and each service node.
8. A system for configuring an engineering construction index system, characterized in that: The system comprises: A business indicator determination module is used to obtain the business scenario of the target project and determine the business indicator items and the business semantics corresponding to the business indicator items according to the business scenario; The indicator system construction module is used to configure the calculation model corresponding to the business indicator item according to the business indicator item and the business semantics, and to construct the indicator system based on the calculation model, the business indicator item and the business semantics.
9. A computer-readable storage medium, characterized in that: The computer-readable storage medium stores a plurality of instructions, and the instructions are suitable for being loaded by a processor and executing the method according to any one of claims 1 to 7.
10. An electronic device, characterized in that: It includes a processor, a memory and a transceiver, the memory is used to store instructions, the transceiver is used to communicate with other devices, and the processor is used to execute the instructions stored in the memory so that the electronic device executes the method according to any one of claims 1 to 7.