Digital management system and method for photovoltaic construction
Through the digital management system, historical and real-time data analysis is used to calculate the comprehensive risk value of construction equipment, determine and generate maintenance instructions or set maintenance time intervals, solving the problem of low efficiency caused by manual maintenance of photovoltaic power generation construction equipment, and realizing intelligent Chemical maintenance has improved construction efficiency and quality.
Patent Information
- Application Number
- CN202410672060.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-05-28
- Publication Date
- 2024-10-01
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
In the existing technology, the maintenance of photovoltaic power generation construction equipment relies on manual labor, which is prone to operational errors, resulting in low maintenance efficiency, reduced construction speed, and the inability to realize intelligent maintenance.
Design a digital management system that obtains historical data of construction equipment, establishes a maintenance analysis model, collects real-time data, calculates comprehensive risk values, determines whether the equipment has construction risks, and generates maintenance instructions or sets maintenance time intervals to avoid manual participation. error.
Intelligent maintenance of construction equipment is realized, construction efficiency and quality are improved, and construction risks are reduced.
Smart Images

Figure CN118735490A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of photovoltaic power generation, and in particular to a digital management system and method for photovoltaic construction. Background Art
[0002] Photovoltaic power generation construction management refers to the systematic management and supervision of the planning, design, construction, operation and other aspects of the development and construction of photovoltaic power stations to ensure the smooth implementation of the project and achieve the expected performance standards. In general, photovoltaic power generation construction management can effectively improve the quality of photovoltaic power generation projects, ensure construction safety, and promote the sustainable and healthy development of the photovoltaic power generation industry.
[0003] In order to ensure the safety of construction equipment during the photovoltaic power generation construction process, it is necessary to inspect and maintain the construction equipment to identify and repair potential safety hazards. In the prior art, when inspecting and maintaining construction equipment, only manual inspection is relied on. However, maintenance personnel may make operational errors during the inspection. If the errors are not discovered in time, subsequent operations will also make mistakes. This leads to low efficiency in the inspection and maintenance of construction equipment and reduces the speed of photovoltaic power generation construction. Summary of the invention
[0004] The embodiments of the present invention provide a digital management system and method for photovoltaic construction, which are used to solve the technical problems in the prior art that construction equipment cannot be intelligently maintained, maintenance errors caused by manual participation cannot be avoided, and the maintenance efficiency of construction equipment and photovoltaic power generation construction efficiency are reduced.
[0005] In order to achieve the above object, the present invention provides a digital management system for photovoltaic construction, comprising:
[0006] Establishing a module for acquiring historical construction data of construction equipment, analyzing the historical construction data, and establishing a maintenance analysis model based on the analysis results;
[0007] An analysis module, used for collecting real-time construction data of the construction equipment, inputting the real-time construction data into the maintenance analysis model, and outputting a plurality of maintenance analysis values of the construction equipment based on the maintenance analysis model;
[0008] A determination module, used to determine the comprehensive risk value of the construction equipment according to all the maintenance analysis values;
[0009] The maintenance module is used to determine whether the construction equipment has a construction risk based on the comprehensive risk value. If so, a maintenance instruction is generated for the construction equipment. If not, a maintenance time interval for the construction equipment is set.
[0010] Furthermore, the establishment module is used to:
[0011] The establishment module is used to construct a data set based on the historical construction data;
[0012] The establishment module is used to sample the data set according to a preset ratio to obtain a training subset and a test subset;
[0013] The establishment module is used to obtain a pre-selected neural network model, and iteratively train the neural network model according to the training subset, evaluate the iteratively trained neural network model according to the test subset, and obtain the maintenance analysis model; wherein,
[0014] The establishment module is used to reduce the amplitude of the change of the neural network model in the gradient direction if the evaluation value of the neural network model after the current iterative training is less than the evaluation value of the neural network model after the previous iterative training, and continue the iterative training until a preset number of iterations is reached;
[0015] The establishment module is used to stop iterative training if the evaluation value of the neural network model after the current iterative training is greater than or equal to the evaluation value of the neural network model after the previous iterative training.
[0016] Furthermore, the determining module is used to:
[0017] The determination module is used to generate a maintenance analysis value sequence M according to all maintenance analysis values, wherein M={m1, m2, m3, ..., mp}, and p is the number of maintenance analysis values;
[0018] The determining module is used to extract the same maintenance analysis value from the maintenance analysis value sequence M and obtain a plurality of sub-maintenance analysis value sequences;
[0019] The determination module is used to count a first quantity Q1 of sub-maintenance analysis value sequences;
[0020] The determination module is used to extract a maintenance analysis value from all sub-maintenance analysis value sequences respectively, and calculate the first maintenance analysis value and the value R1;
[0021] The determination module is used to obtain a preset maintenance analysis value, remove all sub-maintenance analysis value sequences that are less than the preset maintenance analysis value, and count a second number Q2 of remaining sub-maintenance analysis value sequences;
[0022] The determination module is used to extract one maintenance analysis value from each of the remaining sub-maintenance analysis value sequences, and calculate the second maintenance analysis value and the value R2;
[0023] The determination module is used to calculate the comprehensive risk value of the construction equipment according to the first quantity Q1, the second quantity Q2, the first maintenance analysis value and value R1, and the second maintenance analysis value and value R2.
[0024] Furthermore, the maintenance module is used to:
[0025] The maintenance module is used to determine the standard comprehensive risk value;
[0026] The maintenance module is used to determine whether the construction equipment has a construction risk according to the relationship between the comprehensive risk value and the standard comprehensive risk value;
[0027] The maintenance module is used to determine that there is no construction risk for the construction equipment when the comprehensive risk value is less than the standard comprehensive risk value;
[0028] The maintenance module is used to determine that the construction equipment has a construction risk when the comprehensive risk value is greater than or equal to the standard comprehensive risk value.
[0029] Furthermore, the maintenance module is used to:
[0030] The maintenance module is used to calculate the comprehensive risk difference between the standard comprehensive risk value and the comprehensive risk value;
[0031] The maintenance module is used to set the maintenance time interval of the construction equipment according to the comprehensive risk difference.
[0032] Furthermore, the maintenance module is used to:
[0033] The maintenance module is used to preset a first preset comprehensive risk difference value and a second preset comprehensive risk difference value;
[0034] The maintenance module is used to pre-set a first preset maintenance time interval, a second preset maintenance time interval and a third preset maintenance time interval;
[0035] The maintenance module is used to set the maintenance time interval of the construction equipment to the first preset maintenance time interval when the comprehensive risk difference is less than the first preset comprehensive risk difference;
[0036] The maintenance module is used for setting the maintenance time interval of the construction equipment to the second preset maintenance time interval when the comprehensive risk difference is greater than or equal to the first preset comprehensive risk difference and less than the second preset comprehensive risk difference;
[0037] The maintenance module is used to set the maintenance time interval of the construction equipment to the third preset maintenance time interval when the comprehensive risk difference is greater than or equal to the second preset comprehensive risk difference.
[0038] Furthermore, it also includes:
[0039] A simulation module, used to obtain a predetermined photovoltaic power generation construction project plan and simulate the photovoltaic power generation construction project plan;
[0040] A second determination module is used to determine the working loss factor of the construction equipment based on the simulation result;
[0041] The correction module is used to correct the maintenance time interval of the construction equipment according to the working loss factor to obtain a target maintenance time interval.
[0042] Furthermore, the correction module is used to:
[0043] The correction module is used to preset a first preset working loss factor and a second preset working loss factor;
[0044] The correction module is used to preset a first preset time interval correction coefficient, a second preset time interval correction coefficient and a third preset time interval correction coefficient;
[0045] The correction module is used for correcting the maintenance time interval based on the third preset time interval correction coefficient when the working loss factor is less than the first preset working loss factor;
[0046] The correction module is used for correcting the maintenance time interval based on the second preset time interval correction coefficient when the working loss factor is greater than or equal to the first preset working loss factor and less than the second preset working loss factor;
[0047] The correction module is used for correcting the maintenance time interval based on the first preset time interval correction coefficient when the working loss factor is greater than or equal to the second preset working loss factor.
[0048] In order to achieve the above object, the present invention also provides a digital management method for photovoltaic construction, which is applied to the above digital management system for photovoltaic construction, comprising:
[0049] Acquire historical construction data of the construction equipment, analyze the historical construction data, and establish a maintenance analysis model based on the analysis results;
[0050] Collecting real-time construction data of the construction equipment, inputting the real-time construction data into the maintenance analysis model, and outputting a plurality of maintenance analysis values of the construction equipment based on the maintenance analysis model;
[0051] Determine the comprehensive risk value of the construction equipment based on all the inspection and analysis values;
[0052] Based on the comprehensive risk value, it is determined whether the construction equipment has a construction risk. If so, a maintenance instruction is generated for the construction equipment. If not, a maintenance time interval for the construction equipment is set.
[0053] Furthermore, after setting the maintenance time interval of the construction equipment, the method further includes:
[0054] Acquire a predetermined photovoltaic power generation construction project plan, and simulate the photovoltaic power generation construction project plan;
[0055] Determining the working loss factor of the construction equipment based on the simulation results;
[0056] The maintenance time interval of the construction equipment is corrected according to the working loss factor to obtain a target maintenance time interval.
[0057] Compared with the prior art, the present invention has the following beneficial effects:
[0058] The present invention discloses a digital management system and method for photovoltaic construction, which includes: an establishment module, an analysis module, a determination module and a maintenance module. The establishment module obtains historical construction data of construction equipment, analyzes the historical construction data, and establishes a maintenance analysis model based on the analysis results; the analysis module collects real-time construction data, inputs the real-time construction data into the maintenance analysis model, and outputs multiple maintenance analysis values of the construction equipment based on the maintenance analysis model; the determination module determines the comprehensive risk value of the construction equipment according to all the maintenance analysis values; the maintenance module determines whether the construction equipment has a construction risk based on the comprehensive risk value, and if so, generates a maintenance instruction for the construction equipment, and if not, sets the maintenance time interval of the construction equipment, so that the construction equipment can be intelligently maintained, avoiding maintenance errors caused by manual participation, improving construction efficiency and quality, and reducing construction risks. BRIEF DESCRIPTION OF THE DRAWINGS
[0059] Various other advantages and benefits will become apparent to those of ordinary skill in the art by reading the detailed description of the preferred embodiments below. The accompanying drawings are only for the purpose of illustrating the preferred embodiments and are not to be considered as limiting the present invention. Moreover, the same reference symbols are used throughout the accompanying drawings to represent the same components. In the accompanying drawings:
[0060] Figure 1 A schematic structural diagram of a digital management system for photovoltaic construction in an embodiment of the present invention is shown;
[0061] Figure 2 A schematic flow chart of a protection-based automatic scraper control method in an embodiment of the present invention is shown. DETAILED DESCRIPTION
[0062] The specific implementation of the present invention is further described in detail below in conjunction with the accompanying drawings and examples. The following examples are used to illustrate the present invention, but are not intended to limit the scope of the present invention.
[0063] In the description of the present application, it should be understood that the terms "center", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", etc., indicating orientations or positional relationships, are based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present application and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the present application.
[0064] The terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Thus, a feature defined as "first" or "second" may explicitly or implicitly include one or more of the features. In the description of this application, unless otherwise specified, "plurality" means two or more.
[0065] In the description of this application, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in this application can be understood according to specific circumstances.
[0066] The following is a description of preferred embodiments of the present invention with reference to the accompanying drawings.
[0067] like Figure 1 As shown, an embodiment of the present invention discloses a digital management system for photovoltaic construction, including:
[0068] Establishing a module for acquiring historical construction data of construction equipment, analyzing the historical construction data, and establishing a maintenance analysis model based on the analysis results;
[0069] An analysis module, used for collecting real-time construction data of the construction equipment, inputting the real-time construction data into the maintenance analysis model, and outputting a plurality of maintenance analysis values of the construction equipment based on the maintenance analysis model;
[0070] A determination module, used to determine the comprehensive risk value of the construction equipment according to all the maintenance analysis values;
[0071] The maintenance module is used to determine whether the construction equipment has a construction risk based on the comprehensive risk value. If so, a maintenance instruction is generated for the construction equipment. If not, a maintenance time interval for the construction equipment is set.
[0072] The beneficial effects of the above technical solution are: it can carry out intelligent maintenance of construction equipment, avoid maintenance errors caused by manual participation, improve construction efficiency and quality, and reduce construction risks.
[0073] In some embodiments of the present application, the establishment module is used to:
[0074] The establishment module is used to construct a data set based on the historical construction data;
[0075] The establishment module is used to sample the data set according to a preset ratio to obtain a training subset and a test subset;
[0076] The establishment module is used to obtain a pre-selected neural network model, and iteratively train the neural network model according to the training subset, evaluate the iteratively trained neural network model according to the test subset, and obtain the maintenance analysis model; wherein,
[0077] The establishment module is used to reduce the amplitude of the change of the neural network model in the gradient direction if the evaluation value of the neural network model after the current iterative training is less than the evaluation value of the neural network model after the previous iterative training, and continue the iterative training until a preset number of iterations is reached;
[0078] The establishment module is used to stop iterative training if the evaluation value of the neural network model after the current iterative training is greater than or equal to the evaluation value of the neural network model after the previous iterative training.
[0079] In this embodiment, the preset ratio may be 1:1 or 1:2, which is set according to actual conditions.
[0080] The beneficial effect of the above technical solution is: the present invention iteratively trains the neural network model according to the training subset, evaluates the iteratively trained neural network model according to the test subset, and obtains the maintenance analysis model, which can lay the foundation for determining whether the construction equipment needs maintenance and provide a reliable basis for judgment.
[0081] In some embodiments of the present application, the determining module is used to:
[0082] The determination module is used to generate a maintenance analysis value sequence M according to all maintenance analysis values, wherein M={m1, m2, m3, ..., mp}, and p is the number of maintenance analysis values;
[0083] The determining module is used to extract the same maintenance analysis value from the maintenance analysis value sequence M and obtain a plurality of sub-maintenance analysis value sequences;
[0084] The determination module is used to count a first quantity Q1 of sub-maintenance analysis value sequences;
[0085] The determination module is used to extract a maintenance analysis value from all sub-maintenance analysis value sequences respectively, and calculate the first maintenance analysis value and the value R1;
[0086] The determination module is used to obtain a preset maintenance analysis value, remove all sub-maintenance analysis value sequences that are less than the preset maintenance analysis value, and count a second number Q2 of remaining sub-maintenance analysis value sequences;
[0087] The determination module is used to extract one maintenance analysis value from each of the remaining sub-maintenance analysis value sequences, and calculate the second maintenance analysis value and the value R2;
[0088] The determination module is used to calculate the comprehensive risk value of the construction equipment according to the first quantity Q1, the second quantity Q2, the first maintenance analysis value and value R1, and the second maintenance analysis value and value R2.
[0089] In this embodiment, if M={0.3, 0.6, 0.8, 0.8, 0.9, 0.6}, the same maintenance analysis values are 0.8 and 0.6, and the sub-maintenance analysis value sequence is {0.6, 0.6}, {0.8, 0.8}, and Q1=4.
[0090] In this embodiment, the preset maintenance analysis value can be set according to actual conditions.
[0091] In this embodiment, if the preset maintenance analysis value is set to 0.5, the remaining maintenance analysis value sequence is {0.6, 0.6}, {0.8, 0.8}, {0.9}, and Q2 is 3.
[0092] The beneficial effect of the above technical solution is: the present invention calculates the comprehensive risk value of the construction equipment according to the first quantity Q1, the second quantity Q2, the first maintenance analysis value and value R1 and the second maintenance analysis value and value R2, and can determine whether there is a construction risk for the construction equipment to ensure construction safety.
[0093] In some embodiments of the present application, the determination module is used to calculate the comprehensive risk value of the construction equipment according to the following formula:
[0094]
[0095] Among them, S is the comprehensive risk value of construction equipment, and t is the preset maintenance analysis value.
[0096] In some embodiments of the present application, the maintenance module is used to:
[0097] The maintenance module is used to determine the standard comprehensive risk value;
[0098] The maintenance module is used to determine whether the construction equipment has a construction risk according to the relationship between the comprehensive risk value and the standard comprehensive risk value;
[0099] The maintenance module is used to determine that there is no construction risk for the construction equipment when the comprehensive risk value is less than the standard comprehensive risk value;
[0100] The maintenance module is used to determine that the construction equipment has a construction risk when the comprehensive risk value is greater than or equal to the standard comprehensive risk value.
[0101] In this embodiment, the standard comprehensive risk value can be set according to actual conditions.
[0102] In some embodiments of the present application, the maintenance module is used to:
[0103] The maintenance module is used to calculate the comprehensive risk difference between the standard comprehensive risk value and the comprehensive risk value;
[0104] The maintenance module is used to set the maintenance time interval of the construction equipment according to the comprehensive risk difference.
[0105] In this embodiment, the maintenance time interval may be a specific time, such as 10 minutes or 20 minutes.
[0106] In some embodiments of the present application, the maintenance module is used to:
[0107] The maintenance module is used to preset a first preset comprehensive risk difference value and a second preset comprehensive risk difference value;
[0108] The maintenance module is used to pre-set a first preset maintenance time interval, a second preset maintenance time interval and a third preset maintenance time interval;
[0109] The maintenance module is used to set the maintenance time interval of the construction equipment to the first preset maintenance time interval when the comprehensive risk difference is less than the first preset comprehensive risk difference;
[0110] The maintenance module is used for setting the maintenance time interval of the construction equipment to the second preset maintenance time interval when the comprehensive risk difference is greater than or equal to the first preset comprehensive risk difference and less than the second preset comprehensive risk difference;
[0111] The maintenance module is used to set the maintenance time interval of the construction equipment to the third preset maintenance time interval when the comprehensive risk difference is greater than or equal to the second preset comprehensive risk difference.
[0112] In this embodiment, the first preset comprehensive risk difference is smaller than the second preset comprehensive risk difference.
[0113] In this embodiment, the first preset maintenance time interval is smaller than the second preset maintenance time interval which is smaller than the third preset maintenance time interval.
[0114] The beneficial effect of the above technical solution is that the present invention sets the maintenance time interval according to the relationship between the comprehensive risk difference, the first preset comprehensive risk difference and the second preset comprehensive risk difference, thereby ensuring the setting accuracy and efficiency of the maintenance time interval and avoiding errors caused by manual participation.
[0115] In some embodiments of the present application, it also includes:
[0116] A simulation module, used to obtain a predetermined photovoltaic power generation construction project plan and simulate the photovoltaic power generation construction project plan;
[0117] A second determination module is used to determine the working loss factor of the construction equipment based on the simulation result;
[0118] The correction module is used to correct the maintenance time interval of the construction equipment according to the working loss factor to obtain a target maintenance time interval.
[0119] In this embodiment, the photovoltaic construction project plan includes construction time, construction volume, etc.
[0120] In some embodiments of the present application, the correction module is used to:
[0121] The correction module is used to preset a first preset working loss factor and a second preset working loss factor;
[0122] The correction module is used to preset a first preset time interval correction coefficient, a second preset time interval correction coefficient and a third preset time interval correction coefficient;
[0123] The correction module is used for correcting the maintenance time interval based on the third preset time interval correction coefficient when the working loss factor is less than the first preset working loss factor;
[0124] The correction module is used for correcting the maintenance time interval based on the second preset time interval correction coefficient when the working loss factor is greater than or equal to the first preset working loss factor and less than the second preset working loss factor;
[0125] The correction module is used for correcting the maintenance time interval based on the first preset time interval correction coefficient when the working loss factor is greater than or equal to the second preset working loss factor.
[0126] In this embodiment, the first preset working loss factor is smaller than the second preset working loss factor.
[0127] In this embodiment, the first preset time interval correction coefficient is smaller than the second preset time interval correction coefficient, which is smaller than the third preset time interval correction coefficient.
[0128] In this embodiment, the product of the preset time interval correction coefficient and the maintenance time interval is used as the target maintenance time interval.
[0129] The beneficial effect of the above technical solution is: the present invention selects the time interval correction coefficient according to the working loss factor, the first preset working loss factor and the second preset working loss factor, and corrects the maintenance time interval, which can realize the dynamic adjustment of the maintenance time interval, realize flexible setting, and ensure the accuracy of the gap.
[0130] In order to further explain the technical idea of the present invention, the technical solution of the present invention is now described in combination with specific application scenarios.
[0131] Correspondingly, such as Figure 2 As shown, the present application also provides a digital management method for photovoltaic construction, which is applied to the above-mentioned digital management system for photovoltaic construction, including:
[0132] Acquire historical construction data of the construction equipment, analyze the historical construction data, and establish a maintenance analysis model based on the analysis results;
[0133] Collecting real-time construction data of the construction equipment, inputting the real-time construction data into the maintenance analysis model, and outputting a plurality of maintenance analysis values of the construction equipment based on the maintenance analysis model;
[0134] Determine the comprehensive risk value of the construction equipment based on all the inspection and analysis values;
[0135] Based on the comprehensive risk value, it is determined whether the construction equipment has a construction risk. If so, a maintenance instruction is generated for the construction equipment. If not, a maintenance time interval for the construction equipment is set.
[0136] In some embodiments of the present application, after setting the maintenance time interval of the construction equipment, the method further includes:
[0137] Acquire a predetermined photovoltaic power generation construction project plan, and simulate the photovoltaic power generation construction project plan;
[0138] Determining the working loss factor of the construction equipment based on the simulation results;
[0139] The maintenance time interval of the construction equipment is corrected according to the working loss factor to obtain a target maintenance time interval.
[0140] In the description of the above embodiments, specific features, structures, materials or characteristics may be combined in a suitable manner in any one or more embodiments or examples.
[0141] Although the present invention has been described above with reference to the embodiments, various modifications may be made thereto and parts thereof may be replaced with equivalents without departing from the scope of the present invention. In particular, as long as there is no structural conflict, the various features in the embodiments disclosed by the present invention may be used in combination with each other in any manner, and the fact that these combinations are not fully described in this specification is only for the sake of omitting space and saving resources. Therefore, the present invention is not limited to the specific embodiments disclosed herein, but includes all technical solutions falling within the scope of the claims.
[0142] Those skilled in the art can understand that the above are only preferred embodiments of the present invention and are not intended to limit the present invention. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art can still modify the technical solutions recorded in the aforementioned embodiments or replace some of the technical features therein by equivalents. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.
Claims
1. A digital management system for photovoltaic construction, characterized in that: include: Establishing a module for acquiring historical construction data of construction equipment, analyzing the historical construction data, and establishing a maintenance analysis model based on the analysis results; An analysis module, used for collecting real-time construction data of the construction equipment, inputting the real-time construction data into the maintenance analysis model, and outputting a plurality of maintenance analysis values of the construction equipment based on the maintenance analysis model; A determination module, used to determine the comprehensive risk value of the construction equipment according to all the maintenance analysis values; The maintenance module is used to determine whether the construction equipment has a construction risk based on the comprehensive risk value. If so, a maintenance instruction is generated for the construction equipment. If not, a maintenance time interval for the construction equipment is set.
2. The digital management system for photovoltaic construction according to claim 1, characterized in that: The establishment module is used to: The establishment module is used to construct a data set based on the historical construction data; The establishment module is used to sample the data set according to a preset ratio to obtain a training subset and a test subset; The establishment module is used to obtain a pre-selected neural network model, and iteratively train the neural network model according to the training subset, evaluate the iteratively trained neural network model according to the test subset, and obtain the maintenance analysis model; wherein, The establishment module is used to reduce the amplitude of the change of the neural network model in the gradient direction if the evaluation value of the neural network model after the current iterative training is less than the evaluation value of the neural network model after the previous iterative training, and continue the iterative training until a preset number of iterations is reached; The establishment module is used to stop iterative training if the evaluation value of the neural network model after the current iterative training is greater than or equal to the evaluation value of the neural network model after the previous iterative training.
3. The digital management system for photovoltaic construction according to claim 1, characterized in that: The determination module is used for: The determination module is used to generate a maintenance analysis value sequence M according to all maintenance analysis values, wherein M={m1, m2, m3, ..., mp}, and p is the number of maintenance analysis values; The determining module is used to extract the same maintenance analysis value from the maintenance analysis value sequence M and obtain a plurality of sub-maintenance analysis value sequences; The determination module is used to count a first quantity Q1 of sub-maintenance analysis value sequences; The determination module is used to extract a maintenance analysis value from all sub-maintenance analysis value sequences respectively, and calculate the first maintenance analysis value and the value R1; The determination module is used to obtain a preset maintenance analysis value, remove all sub-maintenance analysis value sequences that are less than the preset maintenance analysis value, and count a second number Q2 of remaining sub-maintenance analysis value sequences; The determination module is used to extract one maintenance analysis value from each of the remaining sub-maintenance analysis value sequences, and calculate the second maintenance analysis value and the value R2; The determination module is used to calculate the comprehensive risk value of the construction equipment according to the first quantity Q1, the second quantity Q2, the first maintenance analysis value and value R1, and the second maintenance analysis value and value R2.
4. The digital management system for photovoltaic construction according to claim 1, characterized in that: The maintenance module is used for: The maintenance module is used to determine the standard comprehensive risk value; The maintenance module is used to determine whether the construction equipment has a construction risk according to the relationship between the comprehensive risk value and the standard comprehensive risk value; The maintenance module is used to determine that there is no construction risk for the construction equipment when the comprehensive risk value is less than the standard comprehensive risk value; The maintenance module is used to determine that the construction equipment has a construction risk when the comprehensive risk value is greater than or equal to the standard comprehensive risk value.
5. The digital management system for photovoltaic construction according to claim 1, characterized in that: The maintenance module is used for: The maintenance module is used to calculate the comprehensive risk difference between the standard comprehensive risk value and the comprehensive risk value; The maintenance module is used to set the maintenance time interval of the construction equipment according to the comprehensive risk difference.
6. The digital management system for photovoltaic construction according to claim 5, characterized in that: The maintenance module is used for: The maintenance module is used to preset a first preset comprehensive risk difference value and a second preset comprehensive risk difference value; The maintenance module is used to pre-set a first preset maintenance time interval, a second preset maintenance time interval and a third preset maintenance time interval; The maintenance module is used to set the maintenance time interval of the construction equipment to the first preset maintenance time interval when the comprehensive risk difference is less than the first preset comprehensive risk difference; The maintenance module is used for setting the maintenance time interval of the construction equipment to the second preset maintenance time interval when the comprehensive risk difference is greater than or equal to the first preset comprehensive risk difference and less than the second preset comprehensive risk difference; The maintenance module is used to set the maintenance time interval of the construction equipment to the third preset maintenance time interval when the comprehensive risk difference is greater than or equal to the second preset comprehensive risk difference.
7. The digital management system for photovoltaic construction according to claim 6, characterized in that: Also includes: A simulation module, used to obtain a predetermined photovoltaic power generation construction project plan and simulate the photovoltaic power generation construction project plan; A second determination module is used to determine the working loss factor of the construction equipment based on the simulation result; The correction module is used to correct the maintenance time interval of the construction equipment according to the working loss factor to obtain a target maintenance time interval.
8. The digital management system for photovoltaic construction according to claim 7, characterized in that: The correction module is used for: The correction module is used to preset a first preset working loss factor and a second preset working loss factor; The correction module is used to preset a first preset time interval correction coefficient, a second preset time interval correction coefficient and a third preset time interval correction coefficient; The correction module is used for correcting the maintenance time interval based on the third preset time interval correction coefficient when the working loss factor is less than the first preset working loss factor; The correction module is used for correcting the maintenance time interval based on the second preset time interval correction coefficient when the working loss factor is greater than or equal to the first preset working loss factor and less than the second preset working loss factor; The correction module is used for correcting the maintenance time interval based on the first preset time interval correction coefficient when the working loss factor is greater than or equal to the second preset working loss factor.
9. A digital management method for photovoltaic construction, applied to the digital management system for photovoltaic construction as claimed in any one of claims 1 to 8, characterized in that: include: Acquire historical construction data of the construction equipment, analyze the historical construction data, and establish a maintenance analysis model based on the analysis results; Collecting real-time construction data of the construction equipment, inputting the real-time construction data into the maintenance analysis model, and outputting a plurality of maintenance analysis values of the construction equipment based on the maintenance analysis model; Determine the comprehensive risk value of the construction equipment based on all the inspection and analysis values; Based on the comprehensive risk value, it is determined whether the construction equipment has a construction risk. If so, a maintenance instruction is generated for the construction equipment. If not, a maintenance time interval for the construction equipment is set.
10. The digital management method for photovoltaic construction according to claim 9, characterized in that: After setting the maintenance time interval of the construction equipment, the method further includes: Acquire a predetermined photovoltaic power generation construction project plan, and simulate the photovoltaic power generation construction project plan; Determining the working loss factor of the construction equipment based on the simulation results; The maintenance time interval of the construction equipment is corrected according to the working loss factor to obtain a target maintenance time interval.
Citation Information
Cited By
Equipment maintenance system and method for heat supply pipe network
CN119762036A
A device maintenance system and method for a heating pipe network
CN119762036B
Natural gas tiny leakage MFCC detection system and method based on voiceprint coupling
CN120062565A