Power plant electrical load balance adjustment method based on dynamic scheduling strategy

Through dynamic dispatching strategies and improved machine learning models, combined with real-time monitoring and feedback mechanisms, the flexibility and responsiveness issues of power plant load dispatching are solved, dynamic adaptive adjustment of power plant loads and thermal energy optimization are achieved, and operational efficiency and energy are improved. Utilization.

CN118739325AInactive Publication Date: 2024-10-01TAIYUAN DESIGN RES INST FOR COAL IND
View PDF 0 Cites 3 Cited by

Patent Information

Application Number
CN202410984194.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-22
Publication Date
2024-10-01
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

Existing power plant load dispatching methods lack flexibility and real-time response capabilities, making it difficult to cope with rapid changes in power plant operating conditions and external loads. Moreover, traditional methods rely on manual operations and fixed dispatching rules and cannot achieve the optimal operating status of the power plant.

Method used

A power plant power load balance adjustment method based on dynamic dispatching strategies is adopted. By obtaining real-time operating data, an improved machine learning model is used to predict load demand, and a dynamic dispatching algorithm is combined to generate an optimized dispatching plan. The power load distribution is dynamically adjusted, and through heat storage and release The thermal system optimizes thermal energy utilization, real-time monitoring and feedback to adjust scheduling strategies.

Benefits of technology

It achieves accurate prediction of the power plant's operating status and load demand, improves the flexibility and accuracy of dispatching, significantly improves the energy utilization efficiency and operational stability of the power plant, and ensures the best operating status under different load conditions.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118739325A_ABST
    Figure CN118739325A_ABST
Patent Text Reader

Abstract

The invention provides a power plant electrical load balance adjustment method based on a dynamic scheduling strategy, and belongs to the technical field of power plant electrical load balance adjustment. The technical problem to be solved is to provide the power plant electrical load balance adjustment method based on the dynamic scheduling strategy. According to the technical scheme, the method comprises the steps of obtaining a real-time operation data set of a power plant; carrying out cleaning and de-noising processing on the collected real-time operation data set; inputting the preprocessed real-time operation data set into a machine learning model; generating a load scheduling scheme by using a dynamic scheduling algorithm based on a future load demand prediction result; dynamic scheduling of power plant loads is realized; when the load is high, the heat storage system is used for storing redundant heat energy, and when the load is low, the heat release system is used for releasing the stored heat energy. Potential problems are identified and fed back; carrying out self-adaptive adjustment on a scheduling algorithm and a machine learning model by utilizing feedback data; the method is applied to power plant electric load balance adjustment and optimization.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention provides a method for balancing and adjusting electric load of a power plant based on a dynamic dispatching strategy, belonging to the technical field of balancing and adjusting electric load of a power plant. Background Art

[0002] At present, self-contained coal-fired power plants occupy an important position in the power system, and the electric load dispatching situation of this type of power plant will be related to the operating efficiency and energy utilization rate of the power plant. The traditional load dispatching method currently used in power plants usually relies on static or semi-static strategies, lacks flexibility and real-time response capabilities, and is difficult to cope with the rapid changes in the operating status of the power plant and the external load, resulting in low operating efficiency of the power plant and insufficient energy utilization; in addition, the traditional load dispatching method adopts manual operation, through simple rule algorithms, relying on the experience of operators for manual dispatching, and it is difficult to accurately control the load distribution of the power plant; although the adopted rule algorithm can realize automatic dispatching, its dispatching rules are usually fixed and cannot be dynamically adjusted according to the actual operating conditions. When facing rapid load changes, the load dispatching and distribution method often shows obvious lag and inefficiency, making it difficult to achieve the optimal operating state of the power plant.

[0003] At present, there are also schemes based on optimization algorithms and machine learning for power plant load scheduling, but there are still many defects in the actual application process. For example, some methods only consider a single optimization goal, such as minimizing operating costs or maximizing economic benefits, and fail to fully balance the safety, stability and economy of the power plant; in addition, many existing methods fail to make full use of real-time operating data in the process of model training and optimization, resulting in the lack of real-time and adaptability of the scheduling scheme during actual implementation; therefore, how to balance and optimize the scheduling and distribution of electric loads in self-contained coal-fired power plants will be a problem that technicians in this field urgently need to solve. Summary of the invention

[0004] In order to overcome the deficiencies in the prior art, the present invention aims to solve the technical problem of providing a method for balancing and adjusting the electric load of a power plant based on a dynamic scheduling strategy.

[0005] In order to solve the above technical problems, the technical solution adopted by the present invention is: a method for adjusting the power load balance of a power plant based on a dynamic scheduling strategy, comprising the following adjustment steps:

[0006] Step S1, obtaining a real-time operating data set of a power plant, including temperature, pressure and power load data;

[0007] Step S2: pre-processing the collected real-time operation data set by cleaning and denoising;

[0008] Step S3: input the preprocessed real-time operation data set into the machine learning model, analyze the current operation status of the power plant, and use the machine learning model to predict the future load demand of the power plant;

[0009] Step S4: Based on the prediction result of the future load demand of the power plant, a load scheduling plan is generated using a dynamic scheduling algorithm, and the preliminary load scheduling plan is optimized by considering the current operating status, historical operating data and predicted load demand of the power plant to generate an optimized load scheduling plan;

[0010] Step S5, inputting the optimized load dispatching scheme into the dispatching control system, dynamically adjusting the power plant's load distribution, and dynamically dispatching the power plant's load;

[0011] Step S6: During the dynamic scheduling process:

[0012] When high load is detected, the thermal storage system of the power plant is controlled to store excess thermal energy;

[0013] When low load is detected, the power plant's heat release system is controlled to release stored heat energy;

[0014] Step S7: Use sensors and monitoring systems to monitor the control of the power plant dynamic dispatch in real time, record the operation data, and evaluate the execution effect of the dispatch strategy based on the real-time monitoring data, identify potential problems and provide feedback;

[0015] Step S8: Use feedback data to adaptively adjust the dispatch algorithm and machine learning model, optimize model parameters, combine real-time data and historical data, and continuously improve the dispatch strategy to ensure that the power plant remains in operation under different load conditions;

[0016] Step S9, repeating steps S1-S8, and finally achieving dynamic adaptive adjustment of power plant load balance optimization.

[0017] The specific method for obtaining data in step S1 is:

[0018] Step S11, obtaining the temperature data T(t) of the power plant through the sensor network, the expression is:

[0019]

[0020] Where T is temperature, t is time, N is the number of sensors, T i is the temperature measured by the i-th sensor, α is the weight attenuation factor, t i is the measurement time of the i-th sensor;

[0021] Step S12: Obtain the pressure data P(t) of the power plant through the sensor network, expressed as:

[0022]

[0023] Among them, P i is the pressure measured by the i-th sensor, ω is the frequency factor, t i is the measurement time of the i-th sensor;

[0024] Step S13: Obtain the power load data L(t) of the power plant through the sensor network, and the expression is:

[0025]

[0026] Among them, L i is the electric load measured by the i-th sensor, β is the time decay factor;

[0027] Step S14: Obtain the fuel consumption data F(t) of the power plant through the sensor network, expressed as:

[0028]

[0029] Where f(τ) is the fuel consumption rate at time τ, and γ is the time decay factor;

[0030] Step S15: Obtain steam flow data S(t) of the power plant through the sensor network, expressed as:

[0031]

[0032] Among them, S i is the steam flow rate measured by the i-th sensor, θ is the frequency factor;

[0033] Step S16: Combine the temperature, pressure, electrical load, fuel consumption and steam flow data to construct a real-time operation data set D(t), expressed as:

[0034] D(t)={T(t),P(t),L(t),F(t),S(t)}.

[0035] The specific method for predicting the future load demand of the power plant in step S3 is:

[0036] Step S31, inputting the preprocessed real-time running data set into the improved LSTM model;

[0037] Step S32, performing time series segmentation on the data set to form a training data set and a test data set, wherein the training data set is used to train the improved LSTM model, and the test data set is used to verify the performance of the improved LSTM model;

[0038] Step S33, defining the structure of the improved LSTM model, including an input layer, an adaptive convolution layer, a hybrid LSTM-GRU layer, a multi-head attention mechanism, a fully connected layer and an output layer;

[0039] Step S34: In the adaptive convolution layer, the local features of the data are extracted by adaptive convolution operation. The output of the adaptive convolution layer is represented as C adapt (t):

[0040]

[0041] Among them, σ is the activation function, w k (t) is the adaptive convolution kernel weight, x(t) is the input data, K is the convolution kernel size, and b(t) is the time-related bias term;

[0042] Step S35: The output C of the adaptive convolutional layer adapt (t) is input into the hybrid LSTM-GRU layer to capture the long-term and short-term dependencies of the time series. The output of the hybrid LSTM-GRU layer is represented as H mix (t), the calculation formula is:

[0043] i t =σ(W i ·[C adapt (t), h t-1 ]+b i );

[0044] f t =σ(W f ·[C adapt (t), h t-1 ]+b f );

[0045] o t =σ(W o ·[C adapt (t), h t-1 ]+b o );

[0046]

[0047] r t =σ(W r ·[C adapt (t), h t-1 ]+b r );

[0048] z t =σ(W z ·C adapt (t), h t-1 ]+b z );

[0049]

[0050] H mix (t) = [h t , c t ];

[0051] Among them, r t is the reset gate, z t is the update gate, and other symbol definitions are the same as those of conventional LSTM. The hybrid LSTM-GRU layer combines the advantages of LSTM and GRU;

[0052] Step S36: After the hybrid LSTM-GRU layer, introduce a multi-head attention mechanism to weight the output of the hybrid layer and calculate the weighted output A multi (t), the calculation formula is:

[0053]

[0054] Where H is the number of attention heads, is the attention score of the h-th head, and the other symbol definitions are the same as those of single-head attention;

[0055] Step S37: Output A of the multi-head attention mechanism multi (t) is input into the fully connected layer, and after being processed by the fully connected layer, the final load demand forecast result L is generated. pred (t), the calculation formula is:

[0056] L pred (t) = W fc ·A multi (t)+b fc ;

[0057] Among them, W fc is the weight matrix of the fully connected layer, b fc is the bias term of the fully connected layer;

[0058] Step S38: Through the training process, the training data set is used to optimize the parameters of the improved LSTM model, and the model parameter θ is updated to minimize the prediction error. The expression is:

[0059]

[0060] Among them, N is the number of training samples, θ is the model parameter, L(t i ) is the actual load demand, L pred (t i ) is the predicted load demand.

[0061] The specific method for generating the optimized load dispatching scheme in step S4 is:

[0062] Step S41: The predicted load demand result L pred (t) as input, combined with the current operating status S of the power plant current And historical operation data H(t) to generate a preliminary load dispatching plan;

[0063] Step S42: Optimize the preliminary scheduling plan using a dynamic scheduling algorithm to generate an optimized scheduling plan:

[0064] Define the objective function x(t) of the preliminary scheduling scheme, expressed as:

[0065]

[0066] Among them, T set (t) and P set (t) is the set temperature and pressure target value, λ1 and λ2 are weight factors;

[0067] The objective function f(x) of the optimized scheduling scheme is defined to minimize the operating cost and energy loss of the power plant. The expression is:

[0068]

[0069] Among them, α, β, and γ are adjustment factors used to balance different cost items;

[0070] Construct constraints to ensure that the dispatching plan is optimized under the premise of meeting the safety and stability of power plant operation. The expression is:

[0071]

[0072] The objective function is optimized using genetic algorithm to obtain the optimized scheduling solution x * , the calculation formula is:

[0073] x * =argmin x f(x);

[0074] Step S43: The optimized scheduling scheme x * As the final scheduling plan.

[0075] The specific method for dynamically dispatching the power plant load in step S5 is:

[0076] Step S51: The final scheduling plan x * Input to the dispatch control system;

[0077] Step S52: The dispatch control system receives the final dispatch plan x * After that, the power load distribution of the power plant is dynamically adjusted according to the dispatch plan;

[0078] Step S53: The dispatching control system dynamically adjusts the electric load distribution using the real-time monitoring data to meet the operation requirements of the power plant;

[0079] Step S54: During the dynamic adjustment process, the dispatch control system * Calculate the load distribution L for each time period t alloc (t), the expression is:

[0080] L alloc (t) = L pred (t)+ΔL(t);

[0081] Among them, ΔL(t) is the load increment adjusted in real time;

[0082] Step S55: The dispatching control system monitors and records the operating status of the power plant in real time to ensure that the temperature, pressure and load of the power plant are within a safe and stable range;

[0083] Step S56: If the load demand is detected during operation and the predicted result L pred (t) has a deviation, the dispatch control system redistributes the load according to the real-time data and adjusts ΔL(t) to minimize the operation error;

[0084] Step S57, the dispatching control system continuously executes steps S51-S56 in a loop.

[0085] The specific method of dynamic scheduling in step S6 is:

[0086] Step S61: When the power plant is under high load, the thermal storage system is used to store excess thermal energy Q store (t), where Q stort (t) is the thermal energy stored at time t and satisfies:

[0087] Q store (t) = η store ·(Q excess (t)-Q use (t));

[0088] Among them, η store is the thermal storage efficiency, Q excess (t) is the excess heat energy, Q use (t) is the thermal energy currently used;

[0089] Step S62: When the power plant is under low load, the heat release system is used to release the stored heat energy Q release (t), where Qrelease (t) is the heat energy released at time t and satisfies:

[0090] Q release (t) = η release Q store (t);

[0091] Among them, η release is the heat release efficiency;

[0092] Step S63: dynamically adjust the heat storage and heat release process according to the load demand L(t) of the power plant to ensure the optimal utilization of heat energy in the power plant under different load conditions;

[0093] Step S64: Calculate excess heat energy Q at high load excess (t) and the current thermal energy used Q use (t) to determine the amount of heat stored;

[0094] Step S65: Calculate the heat energy Q to be released at low load release (t) to meet load requirements;

[0095] Step S66: combining the temperature and pressure data T(t) and P(t) acquired by the sensor network to monitor and adjust the heat storage and heat release process in real time;

[0096] Step S67: construct an optimization model to define the objective function f(Q) of the heat storage and heat release process to minimize energy loss and operating cost. The expression is:

[0097]

[0098] Among them, C store (t) and C release (t) are the operating costs of heat storage and heat release, respectively, and λ is the weight factor;

[0099] Step S68, optimizing the objective function f(Q) by using an optimization algorithm to obtain an optimal heat storage and heat release strategy;

[0100] Step S69: Apply the optimized heat storage and release strategy to the operation control of the power plant.

[0101] The specific method of evaluating the execution effect of the scheduling strategy based on the real-time monitoring data, identifying potential problems and providing feedback in step S7 is:

[0102] Step S71: monitor the execution of the scheduling plan in real time through the sensor network and monitoring system, obtain key operation data, and record and store real-time monitoring data;

[0103] Step S72: Evaluate the execution effect of the scheduling strategy based on the real-time monitoring data and calculate the execution error E(t), which is expressed as:

[0104]

[0105] Among them, L i (t) is the actual load, L pred (t) is the predicted load, N is the number of monitoring points;

[0106] Step S73: Identify potential problems in the scheduling process, including abnormal fluctuations in temperature, pressure, and electrical load;

[0107] Step S74, generating feedback data, including execution error E(t), identified problems and possible causes;

[0108] Step S75: input the feedback data into the dispatch control system as a basis for adjusting the dispatch strategy and optimization algorithm;

[0109] Step S76: Adaptively adjust the scheduling algorithm and machine learning model using the feedback data to optimize model parameters;

[0110] Step S77: Combine real-time data and historical data to continuously improve the dispatching strategy to ensure the optimal operating state of the power plant under different load conditions.

[0111] The beneficial effects of the present invention compared with the prior art are as follows: the present invention realizes accurate prediction of the operating state of the power plant and future load demand through a dynamic scheduling algorithm and an improved long short-term memory network model. Compared with the traditional static or semi-static scheduling method, the present invention can respond to the changes in the operating state of the power plant and the external load in real time, dynamically adjust the electric load distribution of the power plant, and significantly improve the flexibility and accuracy of scheduling; the present invention stores excess heat energy at high load and releases the stored heat energy at low load by setting up a heat storage and heat release system, and ensures the maximization of heat energy utilization and the minimization of operating costs by constructing an optimization model of the heat storage and heat release process and optimizing it using a genetic algorithm, thereby improving the energy utilization efficiency and operating stability of the power plant; the present invention monitors the operating data of the power plant in real time by setting up a sensor network and a monitoring system, and evaluates the execution effect of the scheduling strategy based on the real-time data, identifies potential problems through a feedback mechanism and makes adaptive adjustments, optimizes the parameters of the scheduling algorithm and the machine learning model, ensures the optimal operating state of the power plant under different load conditions, and enables the power plant to continuously optimize the operating strategy and improve the overall operating efficiency by executing the above-mentioned real-time monitoring and adaptive optimization mechanism. BRIEF DESCRIPTION OF THE DRAWINGS

[0112] The present invention will be further described below in conjunction with the accompanying drawings:

[0113] Figure 1 The present invention is a flow chart of the steps of optimizing the balance adjustment of the power plant electric load. DETAILED DESCRIPTION

[0114] like Figure 1 As shown, the power plant load balance adjustment method based on dynamic scheduling strategy provided by the present invention specifically relates to a self-contained coal-fired power plant load balance optimization control scheme, which establishes a dynamic adaptive adjustment mechanism, and continuously improves the scheduling strategy and optimization model through the combination of real-time data and historical data to ensure the optimal operating state of the power plant under different load conditions; the present invention specifically improves the accuracy and reliability of load demand prediction by improving the LSTM model, combining the adaptive convolution layer, the hybrid LSTM-GRU layer and the multi-head attention mechanism, and optimizes the scheduling scheme through the genetic algorithm, thereby realizing the effective combination of machine learning and optimization algorithm, and improving the scientificity and rationality of the scheduling scheme; the present invention finally realizes the dynamic adaptive adjustment of the load balance optimization of the power plant by continuously executing data collection, model prediction, scheme optimization, execution monitoring and feedback adjustment in a cycle.

[0115] In an embodiment of the present invention, a method for optimizing the balance of electric load of a self-provided coal-fired power plant based on a dynamic scheduling strategy is provided, which specifically includes the following steps:

[0116] S1. Obtain the real-time operating data set of the power plant, including temperature, pressure and electrical load;

[0117] S2, cleaning and denoising the collected real-time operation data set;

[0118] S3, input the preprocessed real-time operation data set into the machine learning model, analyze the current operation status of the power plant, and use the machine learning model to predict future load demand;

[0119] S4. Based on the future load demand forecast results, a load dispatching plan is generated using a dynamic dispatching algorithm, and the preliminary dispatching plan is optimized to generate an optimized dispatching plan by taking into account the current operating status of the power plant, historical operating data, and predicted load demand;

[0120] S5. Input the optimized dispatching scheme into the dispatching control system, dynamically adjust the power plant's load distribution, and realize dynamic dispatching of the power plant's load;

[0121] S6. When the load is high, the thermal storage system is used to store excess heat energy, and when the load is low, the heat release system is used to release the stored heat energy to meet the load demand of the power plant;

[0122] S7. Monitor the execution of the scheduling plan in real time through sensors and monitoring systems, record key operating data, and evaluate the execution effect of the scheduling strategy based on real-time monitoring data, identify potential problems and provide feedback;

[0123] S8. Use feedback data to adaptively adjust the dispatch algorithm and machine learning model, optimize model parameters, combine real-time data and historical data, and continuously improve the dispatch strategy to ensure the optimal operation of the power plant under different load conditions;

[0124] S9. Repeat steps S1-S8 to achieve dynamic adaptive adjustment of power plant load balance optimization.

[0125] Optionally, the S1 includes the following steps:

[0126] S11. Obtain the temperature data of the power plant through the sensor network, expressed as T(t):

[0127]

[0128] Where T is temperature, t is time, N is the number of sensors, T i is the temperature measured by the i-th sensor, α is the weight attenuation factor, t i is the measurement time of the i-th sensor;

[0129] S12. Obtain the pressure data of the power plant through the sensor network, expressed as P(t):

[0130]

[0131] Among them, P i is the pressure measured by the i-th sensor, ω is the frequency factor, t i is the measurement time of the i-th sensor;

[0132] S13. Obtain the power plant's electrical load data through the sensor network, expressed as L(t):

[0133]

[0134] Among them, L i is the electric load measured by the i-th sensor, β is the time decay factor;

[0135] S14. Obtain the fuel consumption data of the power plant through the sensor network, expressed as F(t):

[0136]

[0137] Where f(τ) is the fuel consumption rate at time τ, and γ is the time decay factor;

[0138] S15. Obtain the steam flow data of the power plant through the sensor network, expressed as S(t):

[0139]

[0140] Among them, S i is the steam flow rate measured by the i-th sensor, θ is the frequency factor;

[0141] S16. Combine temperature, pressure, electrical load, fuel consumption and steam flow data to construct a real-time operation data set D(t):

[0142] D(t)={T(t),P(t),L(t),F(t),S(t)}.

[0143] Optionally, S3 includes the following steps:

[0144] S31, inputting the preprocessed real-time running data set into the improved LSTM model;

[0145] S32, splitting the data set into time series to form a training data set and a test data set, wherein the training data set is used to train the improved LSTM model, and the test data set is used to verify the performance of the improved LSTM model;

[0146] S33. Define the structure of the improved LSTM model, including input layer, adaptive convolution layer, hybrid LSTM-GRU layer, multi-head attention mechanism, fully connected layer and output layer;

[0147] S34. In the adaptive convolution layer, the local features of the data are extracted through adaptive convolution operation. The output of the adaptive convolution layer is represented as C adapt (t):

[0148]

[0149] Among them, σ is the activation function, w k (t) is the adaptive convolution kernel weight, x(t) is the input data, K is the convolution kernel size, and b(t) is the time-dependent bias term;

[0150] S35, the output C of the adaptive convolution layer adapt (t) is input into the hybrid LSTM-GRU layer to capture the long-term and short-term dependencies of the time series. The output of the hybrid LSTM-GRU layer is represented as H mix (t):

[0151] i t =σ(W i ·[C adapt (t), h t-1 ]+b i );

[0152] f t =σ(W f ·[C adapt (t), h t-1 ]+b f );

[0153] o t =σ(W o ·[C adapt (t), h t-1 ]+b o );

[0154]

[0155] r t =σ(W r ·[C adapt (t), h t-1 ]+b r );

[0156] z t =σ(W z ·[C adapt (t), h t-1 ]+b z );

[0157]

[0158]

[0159] H mix (t) = [h t , c t ];

[0160] Among them, r t is the reset gate, z t is the update gate, and other symbol definitions are the same as those of conventional LSTM. The hybrid LSTM-GRU layer combines the advantages of LSTM and GRU;

[0161] S36. After the hybrid LSTM-GRU layer, a multi-head attention mechanism is introduced to weight the output of the hybrid layer and calculate the weighted output A multi (t):

[0162]

[0163] Where H is the number of attention heads, is the attention score of the h-th head, and the other symbol definitions are the same as those of single-head attention;

[0164] S37. Output A of the multi-head attention mechanism multi(t) is input into the fully connected layer, and after being processed by the fully connected layer, the final load demand forecast result L is generated. pred (t):

[0165] L pred (t) = W fc ·A multi (t)+b fc ;

[0166] Among them, W fc is the weight matrix of the fully connected layer, b fc is the bias term of the fully connected layer;

[0167] S38. Through the training process, the training data set is used to optimize the parameters of the improved LSTM model and update the model parameters θ to minimize the prediction error:

[0168]

[0169] Among them, N is the number of training samples, θ is the model parameter, L(t i ) is the actual load demand, L pred (t i ) is the predicted load demand.

[0170] Optionally, S4 includes the following steps:

[0171] S41. The predicted load demand result L pred (t) as input, combined with the current operating status S of the power plant current And historical operation data H(t) to generate a preliminary load dispatching plan;

[0172] S42. Optimize the preliminary scheduling plan using a dynamic scheduling algorithm to generate an optimized scheduling plan:

[0173] Define the objective function x(t) of the preliminary scheduling solution:

[0174]

[0175] Among them, T set (t) and P set (t) is the set temperature and pressure target value, λ1 and λ2 are weight factors;

[0176] Define the objective function f(x) of the optimized scheduling scheme to minimize the operating cost and energy loss of the power plant:

[0177]

[0178] Among them, α, β, and γ are adjustment factors used to balance different cost items;

[0179] Construct constraints to ensure that the dispatch plan is optimized while meeting the safety and stability of power plant operation:

[0180]

[0181] The objective function is optimized using genetic algorithm to obtain the optimized scheduling solution x * :

[0182] x * =argmin x f(x);

[0183] S43, the optimized scheduling plan x * As the final scheduling plan.

[0184] Optionally, S5 includes the following steps:

[0185] S51, the final scheduling plan x * Input to the dispatch control system;

[0186] S52, the dispatch control system receives the final dispatch plan x * After that, the power load distribution of the power plant is dynamically adjusted according to the dispatch plan;

[0187] S53, the dispatch control system uses real-time monitoring data to dynamically adjust the electrical load distribution to meet the operation requirements of the power plant;

[0188] S54, during the dynamic adjustment process, the dispatch control system is based on the final dispatch plan x * Calculate the load distribution L for each time period t alloc (t), expressed as:

[0189] L alloc (t) = L pred (t)+ΔL(t);

[0190] Among them, ΔL(t) is the load increment adjusted in real time;

[0191] S55, the dispatching control system monitors and records the operating status of the power plant in real time to ensure that the temperature, pressure and load of the power plant are within a safe and stable range;

[0192] S56, if the load demand is detected during operation and the predicted result L pred (t) has a deviation, the dispatch control system redistributes the load according to the real-time data and adjusts ΔL(t) to minimize the operation error;

[0193] S57. The dispatching control system continuously executes steps S51-S56 in a loop.

[0194] Optionally, the S6 includes the following steps:

[0195] S61. When the power plant is under high load, the thermal storage system is used to store excess thermal energy, expressed as Q store (t), where Q store (t) is the thermal energy stored at time t, satisfying the following formula:

[0196] Q store (t) = η store ·(Q excess (t)-Q use (t));

[0197] Among them, η store is the thermal storage efficiency, Q excess (t) is the excess heat energy, Q use (t) is the thermal energy currently used;

[0198] S62. When the power plant is under low load, the heat release system is used to release the stored heat energy, expressed as Q release (t), where Q release (t) is the heat energy released at time t:

[0199] Q release (t) = η release Q store (t);

[0200] Among them, η release is the heat release efficiency;

[0201] S63. According to the load demand L(t) of the power plant, the heat storage and heat release process is dynamically adjusted to ensure the optimal utilization of the thermal energy of the power plant under different load conditions;

[0202] S64. Calculate excess heat Q at high load excess (t) and the current thermal energy used Q use (t) to determine the amount of heat stored;

[0203] S65. Calculate the heat energy Q to be released at low load release (t) to meet load requirements;

[0204] S66, combining the temperature and pressure data T(t) and P(t) obtained by the sensor network to monitor and adjust the heat storage and heat release process in real time;

[0205] S67. Construct an optimization model and define the objective function f(Q) of the heat storage and heat release process to minimize energy loss and operating cost, expressed as:

[0206]

[0207] Among them, C store (t) and C release (t) are the operating costs of heat storage and heat release, respectively, and λ is the weight factor;

[0208] S68, optimizing the objective function f(Q) by using an optimization algorithm to obtain an optimal heat storage and heat release strategy;

[0209] S69. Apply the optimized heat storage and release strategies to the operation control of the power plant.

[0210] Optionally, the S7 includes the following steps:

[0211] S71. Monitor the execution of the scheduling plan in real time through the sensor network and monitoring system, obtain key operation data, and record and store real-time monitoring data;

[0212] S72. Evaluate the execution effect of the scheduling strategy based on real-time monitoring data and calculate the execution error E(t):

[0213]

[0214] Among them, L i (t) is the actual load, L pred (t) is the predicted load, N is the number of monitoring points;

[0215] S73. Identify potential problems in the dispatch process, including abnormal fluctuations in temperature, pressure, and electrical load;

[0216] S74, generating feedback data, including execution error E(t), identified problems and possible causes;

[0217] S75, input the feedback data into the dispatch control system as a basis for adjusting the dispatch strategy and optimizing the algorithm;

[0218] S76. Use feedback data to adaptively adjust the scheduling algorithm and machine learning model to optimize model parameters;

[0219] S77. Combine real-time data and historical data to continuously improve dispatch strategies to ensure optimal operation of the power plant under different load conditions.

[0220] The present invention acquires the real-time operation data of the power plant by setting up a sensor network and a data acquisition system, including key parameters such as temperature, pressure, power load, fuel consumption and steam flow, and pre-processes these data; in view of the problem that the acquisition and processing of real-time data in the prior art are often not comprehensive enough, resulting in a lack of data support for scheduling decisions, the present invention provides a comprehensive and accurate data basis for scheduling decisions through systematic data acquisition and processing.

[0221] The present invention uses an improved long short-term memory network model to analyze the current operating status of the power plant and predict future load demand. In view of the problem that the prediction models in the prior art are usually simple and fail to fully capture the complex laws of power plant load changes, the present invention significantly improves the accuracy and reliability of load demand prediction by introducing adaptive convolutional layers, hybrid LSTM-GRU layers and multi-head attention mechanisms.

[0222] In terms of load scheduling scheme generation and optimization, the present invention constructs an optimization model based on a dynamic scheduling algorithm, comprehensively considers the current operating status of the power plant, historical operating data and predicted load demand, and optimizes the preliminary scheduling scheme; in view of the problem that the scheduling optimization methods in the prior art often only consider static or single optimization objectives and fail to make full use of real-time data and feedback information for dynamic adjustment, the present invention defines a multi-objective optimization function and uses a genetic algorithm to solve it, ensuring that the scheduling scheme maximizes the energy utilization efficiency while meeting the safety and stability of the power plant operation.

[0223] The present invention also introduces a heat storage and release system to store excess heat energy at high load and release the stored heat energy at low load to meet the load demand of the power plant; in view of the problem that the heat storage and release management methods in the prior art are relatively single and fail to achieve dynamic scheduling and optimization, the present invention constructs an optimization model of the heat storage and release process and uses a genetic algorithm for optimization to ensure maximum thermal energy utilization and minimum operating costs; by setting sensors and monitoring systems to monitor the execution of the scheduling plan in real time, record key operating data, and evaluate the execution effect of the scheduling strategy based on real-time monitoring data, identify potential problems and provide feedback; at the same time, in view of the problem that the monitoring and feedback mechanism in the prior art is relatively weak and it is difficult to achieve real-time adjustment and optimization of the scheduling plan, the present invention ensures that the scheduling strategy can be continuously optimized and adjusted to achieve the optimal operating state of the power plant by constructing a feedback model and an adaptive adjustment mechanism.

[0224] In an embodiment of the present invention, the balance adjustment optimization strategy is applied to the daily management of a power plant. It is assumed that the self-contained coal-fired power plant is located on an island. The power plant has multiple coal-fired units, which are mainly used to provide stable power supply to nearby mining areas and residential areas. With the continuous increase and fluctuation of electricity demand, traditional load scheduling strategies are difficult to cope with the rapidly changing load demand, which will lead to low operating efficiency and insufficient energy utilization of the power plant. In order to solve these problems, the power plant introduces the electric load balance optimization method based on the dynamic scheduling strategy proposed in the present invention, and finally realizes the dynamic scheduling and optimization of the power plant load by adopting a dynamic scheduling algorithm, an improved long short-term memory network model and a real-time monitoring feedback mechanism.

[0225] The power plant uses a DCS control system through a sensor network and data acquisition system to monitor the operating status of the power plant in real time, including key parameters such as boiler furnace temperature, main steam pressure, electrical load, fuel consumption and main steam flow. The collected data is cleaned and denoised to form a pre-processed real-time operating data set. The pre-processed real-time operating data set is input into the improved LSTM model to analyze the current operating status of the power plant and predict future load demand. The improved LSTM model improves the accuracy of load demand prediction through adaptive convolutional layers, hybrid LSTM-GRU layers and multi-head attention mechanisms. Based on the future load demand forecast results, combined with the current operating status and historical operating data of the power plant, a preliminary load scheduling plan is generated. The preliminary scheduling plan is optimized using a dynamic scheduling algorithm, taking into account multiple factors such as the power plant's operating cost, energy loss, temperature and pressure, and the objective function is solved by a genetic algorithm to generate an optimized scheduling plan. The optimized scheduling plan is input into the scheduling control system to dynamically adjust the power plant's electrical load distribution. When the load is high, the thermal storage system is used to store excess heat energy; when the load is low, the heat release system is used to release the stored heat energy to meet the load demand of the power plant. The dispatch control system uses real-time monitoring data to dynamically adjust the distribution of electrical loads to ensure that the operation of the power plant is always in the best state. The execution of the dispatch plan is monitored in real time through sensors and monitoring systems, and key operating data is recorded. The execution effect of the dispatch strategy is evaluated based on real-time monitoring data, potential problems are identified and feedback is provided. The feedback data is used to adaptively adjust the dispatch algorithm and machine learning model, optimize the model parameters, ensure that the dispatch strategy can be continuously improved, and realize dynamic adaptive adjustment of the load balance optimization of the power plant.

[0226] In order to verify the effectiveness of the present invention, the operation data of the power plant from December 2023 to March 2024 were randomly selected for comparative analysis. The difference in load scheduling effect between the method of the present invention and the traditional method is compared, and the specific data are shown in Table 1:

[0227] project Traditional methods Method of the present invention Average load forecast error (MW) 15.2 4.3 Peak load dispatch response time (minutes) 30 10 Comprehensive energy utilization rate of power plant (%) 72.5 89.8 Operating cost (ten thousand yuan) 320 280 Monthly fuel savings (tons) - 320 Thermal energy storage efficiency during high load period (%) - 85.4 Heat energy release efficiency during low load period (%) - 88.1 Monthly scheduling strategy adjustment times 10 3 Equipment failure rate (%) 2.5 1.1 System stability (number of days of trouble-free operation) 25 28

[0228] Table 1 Comparison data of load balance optimization methods for self-contained coal-fired power plants based on dynamic scheduling strategies

[0229] The analysis of Table 1 above shows that the method of the present invention is superior to the traditional method in many aspects. First, the load forecast error is reduced from 15.2MW to 4.3MW, which significantly improves the accuracy of load forecasting. Second, the peak load dispatch response time is shortened to 10 minutes, which improves the flexibility and response speed of dispatch. In addition, the comprehensive energy utilization rate of the power plant is increased from 72.5% to 89.8%, indicating that energy utilization is more efficient and the operating cost is reduced by 400,000 yuan, reflecting the economic advantage of the optimized dispatch strategy.

[0230] The thermal energy storage efficiency during high-load periods and the thermal energy release efficiency during low-load periods reached 85.4% and 88.1% respectively, proving the effectiveness of the thermal storage and release systems under different load conditions. The number of scheduling strategy adjustments per month was reduced to 3 times, reducing the impact of frequent adjustments on system stability, and the equipment failure rate was reduced to 1.1%. The system stability was improved, and the number of trouble-free operation days increased to 28 days, indicating that the system operation was more stable and reliable.

[0231] In summary, the method of the present invention realizes dynamic scheduling and optimization of power plant load through dynamic scheduling strategy, improved LSTM model and real-time monitoring feedback mechanism, and significantly improves the operating efficiency and energy utilization of the power plant.

[0232] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit it. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or replace some or all of the technical features therein with equivalents. However, these modifications or replacements do not cause the essence of the corresponding technical solutions to deviate from the scope of the technical solutions of the embodiments of the present invention.

Claims

1. A method for balancing power plant load based on a dynamic dispatching strategy, characterized in that: The adjustment steps include the following: Step S1, obtaining a real-time operating data set of a power plant, including temperature, pressure and power load data; Step S2: pre-processing the collected real-time operation data set by cleaning and denoising; Step S3: input the preprocessed real-time operation data set into the machine learning model, analyze the current operation status of the power plant, and use the machine learning model to predict the future load demand of the power plant; Step S4: Based on the prediction result of the future load demand of the power plant, a load scheduling plan is generated using a dynamic scheduling algorithm, and the preliminary load scheduling plan is optimized by considering the current operating status, historical operating data and predicted load demand of the power plant to generate an optimized load scheduling plan; Step S5, inputting the optimized load dispatching scheme into the dispatching control system, dynamically adjusting the power plant's load distribution, and dynamically dispatching the power plant's load; Step S6: During the dynamic scheduling process: When high load is detected, the thermal storage system of the power plant is controlled to store excess thermal energy; When low load is detected, the power plant's heat release system is controlled to release stored heat energy; Step S7: Use sensors and monitoring systems to monitor the control of the power plant dynamic dispatch in real time, record the operation data, and evaluate the execution effect of the dispatch strategy based on the real-time monitoring data, identify potential problems and provide feedback; Step S8: Use feedback data to adaptively adjust the dispatch algorithm and machine learning model, optimize model parameters, combine real-time data and historical data, and continuously improve the dispatch strategy to ensure that the power plant remains in operation under different load conditions; Step S9, repeating steps S1-S8, and finally achieving dynamic adaptive adjustment of power plant load balance optimization.

2. The method for balancing and adjusting power plant load based on a dynamic dispatching strategy according to claim 1 is characterized in that: The specific method for obtaining data in step S1 is: Step S11, obtaining the temperature data T(t) of the power plant through the sensor network, the expression is: Where T is temperature, t is time, N is the number of sensors, T i is the temperature measured by the i-th sensor, α is the weight attenuation factor, t i is the measurement time of the i-th sensor; Step S12: Obtain the pressure data P(t) of the power plant through the sensor network, expressed as: Among them, P i is the pressure measured by the i-th sensor, ω is the frequency factor, t i is the measurement time of the i-th sensor; Step S13: Obtain the power load data L(t) of the power plant through the sensor network, and the expression is: Among them, L i is the electric load measured by the i-th sensor, β is the time decay factor; Step S14: Obtain the fuel consumption data F(t) of the power plant through the sensor network, expressed as: Where f(τ) is the fuel consumption rate at time τ, and γ is the time decay factor; Step S15: Obtain steam flow data S(t) of the power plant through the sensor network, expressed as: Among them, S i is the steam flow rate measured by the i-th sensor, θ is the frequency factor; Step S16: Combine the temperature, pressure, electrical load, fuel consumption and steam flow data to construct a real-time operation data set D(t), expressed as: D(t)={T(t),P(t),L(t),F(t),S(t)}.

3. The method for balancing and adjusting power plant load based on a dynamic dispatching strategy according to claim 2 is characterized in that: The specific method for predicting the future load demand of the power plant in step S3 is: Step S31, inputting the preprocessed real-time operation data set into the improved LSTM model; Step S32, performing time series segmentation on the data set to form a training data set and a test data set, wherein the training data set is used to train the improved LSTM model, and the test data set is used to verify the performance of the improved LSTM model; Step S33, defining the structure of the improved LSTM model, including an input layer, an adaptive convolution layer, a hybrid LSTM-GRU layer, a multi-head attention mechanism, a fully connected layer and an output layer; Step S34: In the adaptive convolution layer, the local features of the data are extracted by adaptive convolution operation. The output of the adaptive convolution layer is represented as C adapt (t): Among them, σ is the activation function, w k (t) is the adaptive convolution kernel weight, x(t) is the input data, K is the convolution kernel size, and b(t) is the time-related bias term; Step S35: The output C of the adaptive convolutional layer adapt (t) is input into the hybrid LSTM-GRU layer to capture the long-term and short-term dependencies of the time series. The output of the hybrid LSTM-GRU layer is represented as H mix (t), the calculation formula is: i t =σ(W i ·[C adapt (t),h t-1 ]+b i ); f t =o(W f ·[C adapt (t),h t-1 ]+b f ); o t =σ(W o ·[C adapt (t),h t-1 ]+b o ); r t =σ(W r ·[C adapt (t),h t-1 ]+b r ) z t =o(W z ·[C adapt (t),h t-1 ]+b z ) h t =tanh(W h ·[C adapt (t),(r t ·h t-1 )]+b h ); H mix (t)=[h t ,c t ] Among them, r t is the reset gate, z t is the update gate, and other symbol definitions are the same as those of conventional LSTM. The hybrid LSTM-GRU layer combines the advantages of LSTM and GRU; Step S36: After the hybrid LSTM-GRU layer, introduce a multi-head attention mechanism to weight the output of the hybrid layer and calculate the weighted output A multi (t), the calculation formula is: Where H is the number of attention heads, is the attention score of the h-th head, and the other symbol definitions are the same as those of single-head attention; Step S37: Output A of the multi-head attention mechanism multi (t) is input into the fully connected layer, and after being processed by the fully connected layer, the final load demand forecast result L is generated. pred (t), the calculation formula is: L pred (t)=W fc ·A multi (t)+b fc ; Among them, W fc is the weight matrix of the fully connected layer, b fc is the bias term of the fully connected layer; Step S38: Through the training process, the training data set is used to optimize the parameters of the improved LSTM model, and the model parameter θ is updated to minimize the prediction error. The expression is: Among them, N is the number of training samples, θ is the model parameter, L(t i ) is the actual load demand, L pred (t i ) is the predicted load demand.

4. The method for balancing and adjusting power plant load based on a dynamic dispatching strategy according to claim 3 is characterized in that: The specific method for generating the optimized load dispatching scheme in step S4 is: Step S41: The predicted load demand result L pred (t) as input, combined with the current operating status S of the power plant current And historical operation data H(t) to generate a preliminary load dispatching plan; Step S42: Optimize the preliminary scheduling plan using a dynamic scheduling algorithm to generate an optimized scheduling plan: Define the objective function x(t) of the preliminary scheduling scheme, expressed as: Among them, T set (t) and P set (t) is the set temperature and pressure target value, λ1 and λ2 are weight factors; The objective function f(x) of the optimized scheduling scheme is defined to minimize the operating cost and energy loss of the power plant. The expression is: Among them, α, β, and γ are adjustment factors used to balance different cost items; Construct constraints to ensure that the dispatching plan is optimized under the premise of meeting the safety and stability of power plant operation. The expression is: The objective function is optimized using genetic algorithm to obtain the optimized scheduling solution x * , the calculation formula is: x * =argmin x f(x); Step S43: The optimized scheduling scheme x * As the final scheduling plan.

5. The method for balancing and adjusting power plant load based on a dynamic dispatching strategy according to claim 4 is characterized in that: The specific method for dynamically dispatching the power plant load in step S5 is: Step S51: The final scheduling plan x * Input to the dispatch control system; Step S52: The dispatch control system receives the final dispatch plan x * After that, the power load distribution of the power plant is dynamically adjusted according to the dispatch plan; Step S53: The dispatching control system dynamically adjusts the electrical load distribution using the real-time monitoring data to meet the operation requirements of the power plant; Step S54: During the dynamic adjustment process, the dispatch control system * Calculate the load distribution L for each time period t alloc (t), the expression is: L alloc (t)=L pred (t)+ΔL(t); Among them, ΔL(t) is the load increment adjusted in real time; Step S55: The dispatching control system monitors and records the operating status of the power plant in real time to ensure that the temperature, pressure and load of the power plant are within a safe and stable range; Step S56: If the load demand is detected during operation and the predicted result L pred (t) has a deviation, the dispatch control system redistributes the load according to the real-time data and adjusts ΔL(t) to minimize the operation error; Step S57, the dispatching control system continuously executes steps S51-S56 in a loop.

6. A method for balancing and adjusting power plant load based on a dynamic dispatching strategy according to claim 5, characterized in that: The specific method of dynamic scheduling in step S6 is: Step S61: When the power plant is under high load, the thermal storage system is used to store excess thermal energy Q store (t), where Q store (t) is the thermal energy stored at time t and satisfies: Q store (t)=η store ·(Q excess (t)-Q use (t)); Among them, η store is the thermal storage efficiency, Q excess (t) is the excess heat energy, Q use (t) is the thermal energy currently used; Step S62: When the power plant is under low load, the heat release system is used to release the stored heat energy Q release (t), where Q release (t) is the heat energy released at time t and satisfies: Q release (t)=η release ·Q store (t); Among them, η release is the heat release efficiency; Step S63: dynamically adjust the heat storage and heat release process according to the load demand L(t) of the power plant to ensure the optimal utilization of heat energy in the power plant under different load conditions; Step S64: Calculate excess heat energy Q at high load excess (t) and the current thermal energy used Q use (t) to determine the amount of heat stored; Step S65: Calculate the heat energy Q to be released at low load release (t) to meet load requirements; Step S66: combining the temperature and pressure data T(t) and P(t) acquired by the sensor network to monitor and adjust the heat storage and heat release process in real time; Step S67: construct an optimization model to define the objective function f(Q) of the heat storage and heat release process to minimize energy loss and operating cost. The expression is: Among them, C store (t) and C release (t) are the operating costs of heat storage and heat release, respectively, and λ is the weight factor; Step S68, optimizing the objective function f(Q) by using an optimization algorithm to obtain an optimal heat storage and heat release strategy; Step S69: Apply the optimized heat storage and release strategy to the operation control of the power plant.

7. A method for adjusting power plant load balance based on a dynamic dispatch strategy according to claim 6, characterized in that: The specific method of evaluating the execution effect of the scheduling strategy based on the real-time monitoring data, identifying potential problems and providing feedback in step S7 is: Step S71: monitor the execution of the scheduling plan in real time through the sensor network and monitoring system, obtain key operation data, and record and store real-time monitoring data; Step S72: Evaluate the execution effect of the scheduling strategy based on the real-time monitoring data and calculate the execution error E(t), which is expressed as: Among them, L i (t) is the actual load, L pred (t) is the predicted load, N is the number of monitoring points; Step S73: Identify potential problems in the scheduling process, including abnormal fluctuations in temperature, pressure, and electrical load; Step S74, generating feedback data, including execution error E(t), identified problems and possible causes; Step S75: input the feedback data into the dispatch control system as a basis for adjusting the dispatch strategy and optimization algorithm; Step S76: Adaptively adjust the scheduling algorithm and machine learning model using the feedback data to optimize model parameters; Step S77: Combine real-time data and historical data to continuously improve the dispatching strategy to ensure the optimal operating state of the power plant under different load conditions.

Citation Information

Cited By

  • Industrial internet cloud platform based on data intelligence

    CN118900275A

  • Industrial Internet cloud platform based on data intelligence

    CN118900275B

  • Integrated system and method

    CN119024703A