Large-amplitude reservoir type flexible photovoltaic system and installation and maintenance method thereof

Through the large-amplitude reservoir-type flexible photovoltaic system, the installation and maintenance of photovoltaic panels on the reservoir surface of the pumped storage power station are realized by using the combination of anchor points, plate-bearing cables and maintenance cables, solving the problem of photovoltaic panels in the existing technology. It solves the installation and maintenance problems in the reservoir environment and improves the power generation efficiency and maintenance efficiency.

CN118739984AActive Publication Date: 2024-10-01CHINA THREE GORGES PROJECTS DEV CO LTD
View PDF 10 Cites 0 Cited by

Patent Information

Application Number
CN202411079198.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-07
Publication Date
2024-10-01
Estimated Expiration
2044-08-07

AI Technical Summary

Technical Problem

On the reservoir surface of a pumped storage power station, there is no mature technical solution for how to effectively install, operate and maintain photovoltaic panels to fully utilize the engineering economic and social benefits of the reservoir.

Method used

A large-amplitude reservoir-type flexible photovoltaic system is adopted, including a cableway unit, a photovoltaic unit and an inspection unit. Through the combination of anchor points, plate-bearing cables and inspection cables, an inspection vehicle is used to install and inspect photovoltaic panels on the reservoir surface. Flexible layout and maintenance.

Benefits of technology

The installation and maintenance of photovoltaic panels on the reservoir surface of the pumped storage power station are realized, which improves the power generation efficiency, avoids the poor economic efficiency and cumbersome procedures of using large-tonnage machinery, and ensures personnel safety and a flexible and efficient maintenance process.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118739984A_ABST
    Figure CN118739984A_ABST
Patent Text Reader

Abstract

A large-amplitude reservoir type flexible photovoltaic system and an installation and maintenance method thereof, the large-amplitude reservoir type flexible photovoltaic system comprises a cableway unit, a photovoltaic unit and a maintenance unit, the cableway unit comprises anchor points and bearing plate cables, the periphery of a reservoir basin is provided with a platform, the two opposite sides of the platform are respectively provided with a plurality of anchor points, the corresponding anchor points on the two sides are respectively provided with the bearing plate cables, and the maintenance unit is provided with a plurality of bearing plate cables. The photovoltaic unit comprises a photovoltaic panel set, the bottom of the photovoltaic panel set is clamped and installed on at least two plate bearing cables through a plurality of plate wheels, the two ends of the photovoltaic panel set are connected with anchor points through locking ropes respectively, the maintenance unit comprises a plurality of maintenance cars, and the maintenance cars move on the platform. The maintenance car is provided with a retracting and releasing device used for retracting and releasing the photovoltaic panel group and a tensioning device used for tensioning the plate bearing cable. Through the structure, the photovoltaic panel can be installed, operated and overhauled in the reservoir basin of the water pumping and storing reservoir.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of photovoltaic installation, operation and maintenance of pumped storage reservoirs, and in particular to a large-amplitude reservoir-type flexible photovoltaic system and an installation, operation and maintenance method thereof. Background Art

[0002] A pumped-storage power station is an energy storage device with an electric power regulation function. It is characterized by having upper and lower reservoirs with different elevations and a large water area. How to make full use of the reservoir surface of a pumped-storage power station to achieve greater engineering economic and social benefits is a topic worthy of study, and there is no relevant mature technology. For example, using the water surface of the upper and lower reservoirs to generate electricity can not only increase the amount of power generated, but also partially block the evaporation loss of water caused by the sun's radiation to the water surface. Since a large amount of water is stored in the reservoir basin and the water level of the reservoir varies greatly, the area of ​​the reservoir changes greatly with the change of the water level. Therefore, how to install, operate and maintain photovoltaic panels under such operating conditions of a pumped-storage reservoir is also a difficult problem in the industry. Therefore, the present application proposes a large-amplitude reservoir-type flexible photovoltaic system and its installation, operation and maintenance methods. Summary of the invention

[0003] In order to solve the current technical problems, the main purpose of the present invention is to provide a large-amplitude reservoir-type flexible photovoltaic system for installing photovoltaic panels above the reservoir surface of a pumped-storage power station.

[0004] The present invention also provides an installation method for a large-amplitude reservoir-type flexible photovoltaic system, which is used for installing photovoltaic panels on the reservoir surface of a pumped-storage power station.

[0005] The present invention also provides a maintenance method for a large-amplitude reservoir-type flexible photovoltaic system, which is used for maintaining photovoltaic panels in a pumped-storage power station.

[0006] The technical solution adopted by the present invention is: a large-amplitude reservoir-type flexible photovoltaic system, including a cableway unit, a photovoltaic unit and a maintenance unit, the cableway unit including anchor points and plate cables, a platform is arranged around the reservoir basin, a plurality of anchor points are respectively installed on the opposite sides of the platform, and plate cables are respectively installed on the corresponding anchor points on the two sides, the photovoltaic unit includes a photovoltaic panel group, the bottom of the photovoltaic panel group is clamped and installed on at least two plate cables by a plurality of plate wheels, and the two ends of the photovoltaic panel group are respectively connected to the anchor points by locking ropes, the maintenance unit includes a plurality of maintenance vehicles, the maintenance vehicles move on the platform, and the maintenance vehicles are equipped with a retracting and releasing device for retracting and releasing the photovoltaic panel group and a tensioning device for tensioning the plate cables.

[0007] The anchor point is provided with a conical groove, the diameter of which decreases from the platform to the basin side. The top of the anchor point has a notch connected to the conical groove. Two plug plates with conical structures are installed in the conical groove, and the two plug plates clamp the support plate cable.

[0008] A first pad is installed on the inner side of the plug plate.

[0009] A locking ring is arranged on the top of the anchor point, and the locking rope is connected and fixed to the locking ring.

[0010] Both ends of the support cable are provided with stop cable ends.

[0011] The photovoltaic unit also includes a combiner box, an inverter and a transformer. Each photovoltaic panel group is electrically connected to the combiner box through a cable, the combiner box is electrically connected to the inverter, and the inverter is electrically connected to the transformer.

[0012] There are two groups of photovoltaic panels on the support cable, the adjacent ends of the two groups of photovoltaic panels are not connected, and the ends away from each other are connected to the anchor points through locking ropes respectively.

[0013] The photovoltaic panel group includes a plurality of photovoltaic panels, both ends of the photovoltaic panels are respectively provided with connecting plates, and adjacent photovoltaic panels are connected by the connecting plates.

[0014] The connecting plates between adjacent photovoltaic panels are hinged by latches.

[0015] The plate wheel comprises an upper clamping wheel, a lower clamping wheel and a vertical plate. The upper clamping wheel and the lower clamping wheel are installed between the two vertical plates to rotate up and down, and the plate supporting cable is located between the upper clamping wheel and the lower clamping wheel.

[0016] The platform is provided with a track, and the bottom of the maintenance vehicle is provided with a track wheel set, and the maintenance vehicle travels on the track through the track wheel set.

[0017] The retracting and releasing device is a winch, which is installed on the top of the maintenance vehicle. A traction rope is installed on the winch. When the traction rope is connected to the photovoltaic panel group, it is used to retract and release the photovoltaic panel group.

[0018] A supporting wheel is installed on the maintenance vehicle at the side close to the reservoir, and the supporting wheel is used for lifting the traction rope.

[0019] The tensioning device includes a fixed clamping seat and a movable clamping seat, and the fixed clamping seat and the movable clamping seat are used to clamp the plate cable. A guide rail is installed on the maintenance vehicle on the side of the fixed clamping seat away from the basin, and a guide seat is installed at the bottom of the movable clamping seat. The movable clamping seat is slidably installed on the guide rail through the guide seat. A step-changing cylinder is installed on the fixed clamping seat or the maintenance vehicle, and the step-changing cylinder is connected to the movable clamping seat. The step-changing cylinder is extended and retracted to drive the movable clamping seat to move on the guide rail.

[0020] The fixed card base and the movable card base have the same structure. The fixed card base includes a mounting seat, a clamping block and a clamping cylinder. The mounting seat is provided with a slot that is wide at the top and narrow at the bottom. The clamping block is a semi-ring structure. There are two clamping blocks. The lower ends of the two clamping blocks are hinged through a hinge seat. The lower part of the slot of the mounting seat is provided with a mounting cavity. The clamping cylinder is installed in the mounting cavity. The telescopic end of the clamping cylinder is hinged to the hinge seat.

[0021] A second pad is installed on the inner side of the clamping block.

[0022] The guide rail is provided with a plurality of pin holes along the length direction, and the guide seat is provided with a limit hole. The limit pin is inserted into the limit hole and one of the pin holes, so as to limit and fix the movable clamping seat and the guide rail.

[0023] A rope supporting device is hingedly installed on the maintenance vehicle at one side of the fixed base close to the storage basin. The rope supporting device includes a support plate and a support plate cylinder. The support plate is hinged to the maintenance vehicle, and one end of the support plate cylinder is hinged to the maintenance vehicle, and the other side is hinged to the support plate.

[0024] The maintenance vehicle is also equipped with a locking cylinder, and a locking groove is provided on the platform at a position corresponding to the photovoltaic panel group, and the telescopic end of the locking cylinder is inserted into the locking groove when extended.

[0025] A counterweight is also installed on the inspection vehicle.

[0026] The maintenance vehicle is also equipped with an electric control cabinet and a communication box, through which the operation of the retracting and extending device and the tensioning device is controlled.

[0027] The anchor point is also provided with a rope locking member, and the rope locking members corresponding to the anchor points on both sides are connected with maintenance ropes, and the maintenance ropes are located above the photovoltaic panel group.

[0028] The lower end of the locking rope member passes through the anchor point and then extends into the ground.

[0029] The method for installing a large-amplitude reservoir-type flexible photovoltaic system includes the following steps: S1. Install the plate-carrying cable; drive the two maintenance vehicles to the positions corresponding to the plate-carrying cable installation, first install the auxiliary cable on the retracting device of the maintenance vehicle on one side, then install the plate-carrying cable on the retracting device of the maintenance vehicle on the other side, connect the auxiliary cable with the plate-carrying cable, and pull the auxiliary cable across the basin by pulling the auxiliary cable through the retracting device. After pulling it into place, remove the auxiliary cable, and connect and fix the two ends of the plate-carrying cable to the anchor points on both sides respectively; S2. The photovoltaic panel group is released; the photovoltaic panel group release method includes installing two groups of photovoltaic panels on the same group of support cables, and installing one group of photovoltaic panels on the same group of support cables; The steps for installing the left and right photovoltaic panels on the same set of support cables are as follows: When installing one of the photovoltaic panel groups, first lock the inspection vehicle at one end of a group of panel cables, then connect the first photovoltaic panel with the panel wheel and cable installed to the anchor point through the locking rope, install the photovoltaic panel to a group of panel cables through the panel wheel, then connect the photovoltaic panel with the pulling rope on the retracting device, loosen the connection between the locking rope and the photovoltaic panel, and release the pulling rope from the retracting device until the installation space of the second photovoltaic panel is reserved near the anchor point on the panel cable. After connecting the second photovoltaic panel to the anchor point through the locking rope, install the second photovoltaic panel to this group of panel cables through the panel wheel, and then fine-tune the retracting and releasing pulling rope through the retracting device to connect the first and second photovoltaic panels, and so on until the installation of all photovoltaic panels in this group is completed; the installation of the photovoltaic panel group on the same group of panel cables on the other side is carried out in the same way; after the installation is completed, the photovoltaic panel near the anchor point is connected and fixed to the anchor point through the locking rope; The steps for installing a group of photovoltaic panels on the same group of support cables are as follows: Lock a maintenance vehicle at one end of a group of support cables, then connect the first photovoltaic panel with the panel wheel and cable installed to the anchor point through the locking rope, install the photovoltaic panel on a group of support cables through the panel wheel, and then connect the photovoltaic panel through the pulling rope on the retracting device, connect the pulling rope of the retracting device on the maintenance vehicle at the other end of the support cable to the side of the first photovoltaic panel close to the basin, and then loosen the connection between the locking rope and the photovoltaic panel, the retracting device on one end of the maintenance vehicle releases the pulling rope, and the retracting device on the other end of the maintenance vehicle retracts the pulling rope until the installation space of the second photovoltaic panel is reserved on the support cable close to the anchor point end, after connecting the second photovoltaic panel to the locking rope, fine-tune the retracting and releasing pulling rope through the retracting device to connect the first and second photovoltaic panels, and so on until the installation of all photovoltaic panels on this side is completed. After the installation is completed, the photovoltaic panels at both ends are respectively connected and fixed to the anchor points on both sides through locking ropes; S3. Adjust the verticality of the plate cable; lock a maintenance vehicle at one end of a group of plate cables, place the end of the plate cable on the platform on the fixed clamp and the movable clamp in turn, first move the movable clamp along the guide rail to the position closest to the fixed clamp under the drive of the step-changing cylinder, extend the clamping cylinders on the fixed clamp and the movable clamp, move the two clamping blocks upward and open, put the plate cable into the two clamping blocks, then retract the clamping cylinder of the movable clamp, the movable clamp holds the plate cable tightly and fixes it, and then the step-changing cylinder extends the piston Rod, the movable clamping seat moves along the guide rail to move the plate cable together for tensioning; if the movable clamping seat moves to the stroke terminal and the plate cable has not been tensioned, at this time, the clamping cylinder of the fixed clamping seat retracts, and the fixed clamping seat holds and fixes the plate cable, then the clamping cylinder of the movable clamping seat extends to release the plate cable, and then retracts the step-changing cylinder to move the movable clamping seat close to the fixed clamping seat, and then repeats the above steps until the plate cable is tensioned into place, and then the plate cable is connected and fixed to the anchor point to complete the adjustment operation; to loosen the plate cable, the reverse operation of the above steps is adopted.

[0030] A maintenance method for realizing the large-amplitude reservoir-type flexible photovoltaic system, the maintenance method comprises the following steps: When inspecting or repairing the photovoltaic panel group, the personnel go up to the photovoltaic panel group to inspect or repair it. The maintenance personnel hang the safety belt on the maintenance rope and use the maintenance rope as a railing handrail.

[0031] The present invention has the following beneficial effects: 1. The cableway unit of the present invention is used to install the photovoltaic panel group of the photovoltaic unit. The photovoltaic unit generates electricity through the photovoltaic panel group. The maintenance unit is used to install and adjust the cableway unit and the photovoltaic panel group. The anchor point is used to connect the support cable and the locking rope. The bottom of the photovoltaic panel group has a plate wheel, which is used for sliding clamping and installation on the support cable to facilitate the installation and replacement of the photovoltaic panel group. Through the above structure, the installation of photovoltaic panels can be realized in the reservoir basin of the pumped storage reservoir. Through the above structure, the installation and maintenance of photovoltaic panels can be realized in the reservoir basin of the pumped storage reservoir.

[0032] 2. This patent adopts simple anchor points, support cables and maintenance cables to achieve the installation and reliable use of large-span flexible bracket photovoltaic panels. It has strong bearing capacity, large photovoltaic panel installation volume and very high power generation efficiency.

[0033] 3. This patent uses an innovatively designed multifunctional maintenance vehicle to conveniently and reliably install or remove photovoltaic panels quickly and efficiently, avoiding the problems of poor economy, high site requirements, and cumbersome procedures caused by the use of large-tonnage lifting machinery.

[0034] 4. In addition to using maintenance vehicles for maintenance, this patent also innovatively designs maintenance ropes, which allow personnel to go up to the photovoltaic panels for inspection and maintenance. This not only ensures the safety of personnel maintenance, but also gives full play to the flexible and efficient characteristics of personnel operations, and also plays a role in lightning protection, and is highly practical. BRIEF DESCRIPTION OF THE DRAWINGS

[0035] In order to more clearly illustrate the specific implementation methods of the present invention or the technical solutions in the prior art, the drawings required for use in the specific implementation methods or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are some implementation methods of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0036] The present invention will be further described below in conjunction with the accompanying drawings and embodiments.

[0037] Figure 1 It is a schematic diagram of the overall structure of the present invention.

[0038] Figure 2 It is a schematic diagram of the cross-sectional structure of the present invention.

[0039] Figure 3 It is a schematic diagram of the top view structure of the present invention.

[0040] Figure 4 It is a schematic diagram of the main structure of the anchor point of the present invention.

[0041] Figure 5 for Figure 4 Schematic diagram of the AA section structure.

[0042] Figure 6 It is a schematic diagram of the connection between the maintenance unit and the carrier cable of the present invention.

[0043] Figure 7 It is a schematic diagram of the main structure of the maintenance unit of the present invention.

[0044] Figure 8 It is a left-side structural schematic diagram of the maintenance unit of the present invention.

[0045] Fig. 9 It is a schematic structural diagram of the fixed card holder and the movable card holder of the present invention.

[0046] Fig.10 It is a schematic diagram of the structure in which the plate wheel of the present invention is installed on the plate supporting cable.

[0047] In the figure: Basin 100, platform 101, track 102, locking groove 103; Cableway unit 200, anchor point 210, conical groove 211, plug plate 212, rope lock member 213, locking ring 214, first pad 215, carrier cable 220, stopper cable end 221, and maintenance cable 230; Photovoltaic unit 300, photovoltaic panel 310, connecting plate 311, latch 312, locking rope 313, plate wheel 320, upper clamping wheel 321, lower clamping wheel 322, vertical plate 323, junction box 330, inverter 340, transformer 350; Maintenance unit 400, maintenance vehicle 410, track wheel set 411, locking cylinder 412, electric control cabinet 413, communication box 414, counterweight 415, supporting wheel 416, retracting device 420, traction rope 421, fixed card seat 430, mounting seat 431, card slot 432, clamping block 433, mounting cavity 434, hinge seat 435, clamping cylinder 436, second pad 437, movable card seat 440, guide seat 441, limiting hole 442, guide rail 450, pin hole 451, step-changing cylinder 460, rope supporting device 470, support plate 471, support plate cylinder 472. DETAILED DESCRIPTION

[0048] The technical solution of the present invention will be described clearly and completely below in conjunction with the accompanying drawings. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of them. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0049] In the description of the present invention, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", etc., indicating the orientation or positional relationship, are based on the orientation or positional relationship shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as limiting the present invention. In addition, the terms "first", "second", and "third" are used for descriptive purposes only, and cannot be understood as indicating or implying relative importance.

[0050] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0051] In addition, the technical features involved in the different embodiments of the present invention described below can be combined with each other as long as they do not conflict with each other.

[0052] Embodiment 1: See also Figure 1-3 As shown, a large-amplitude reservoir-type flexible photovoltaic system includes a cableway unit 200, a photovoltaic unit 300 and a maintenance unit 400, the cableway unit 200 includes an anchor point 210 and a support cable 220, a platform 101 is arranged around the reservoir basin 100, a plurality of anchor points 210 are respectively installed on opposite sides of the platform 101, and support cables 220 are respectively installed on the corresponding anchor points 210 on both sides, the photovoltaic unit 300 includes a photovoltaic panel group, the bottom of the photovoltaic panel group is clamped and installed on at least two support cables 220 by a plurality of plate wheels 320, and the two ends of the photovoltaic panel group are connected to the anchor point 210 by locking ropes 313, respectively, and the maintenance unit 400 includes a plurality of maintenance vehicles 410, the maintenance vehicle 410 moves on the platform 101, and the maintenance vehicle 410 is installed with a retracting device 420 for retracting and releasing the photovoltaic panel group and a tensioning device for tensioning the support cable 220.

[0053] The cableway unit 200 is used to install the photovoltaic panel group of the photovoltaic unit 300. The photovoltaic unit 300 generates electricity through the photovoltaic panel group. The maintenance unit 400 is used to install and adjust the cableway unit 200 and the photovoltaic panel group. The anchor point 210 is used to connect the support cable 220 and the locking rope 313. The bottom of the photovoltaic panel group has a plate wheel 320, which is used to slide and clamp and install on the support cable 220, so as to facilitate the installation and replacement of the photovoltaic panel group. Through the above structure, the photovoltaic panel can be installed in the reservoir basin 100 of the pumped reservoir.

[0054] See also Figure 4 , 5 The anchor point 210 is provided with a conical groove 211, the diameter of which decreases from the platform 101 to the side of the basin 100, and the top of the anchor point 210 has a notch connected to the conical groove 211, and a two-petal plug plate 212 with a conical structure is installed in the conical groove 211, and the two plug plates 212 clamp the support plate cable 220. The support plate cable 220 is clamped by the two-petal plug plate 212 with a conical structure, so that the support plate cable 220 and the anchor point 210 are connected conveniently and reliably.

[0055] For further information, see Figure 4 A first pad 215 is installed on the inner side of the plug plate 212. Specifically, the first pad 215 is a copper pad that fits the inner hole of the plug plate 212. The copper pad has a larger friction coefficient and is easy to deform. When subjected to the extrusion force, it forms a larger friction force with the carrier cable 220. In addition, the tapered structure of the plug plate 212 allows the plug plate 212 to be clamped outside the carrier cable 220, thereby ensuring that the carrier cable 220 does not fall out of the anchor point.

[0056] See also Figure 4 , 5 A locking ring 214 is provided at the top of the anchor point 210 , and the locking rope 313 is connected and fixed to the locking ring 214 .

[0057] For further information, see Figure 5 , both ends of the carrier cable 220 are provided with stopper ends 221. The stopper ends 221 are only used as insurance measures after slipping to prevent the carrier cable 220 from slipping off the anchor point 210. Specifically, the diameter of the stopper ends 221 is larger than the minor diameter of the tapered groove 211.

[0058] See also Figure 1 The photovoltaic unit 300 also includes a combiner box 330, an inverter 340 and a transformer 350. Each photovoltaic panel group is electrically connected to the combiner box 330 through a cable, the combiner box 330 is electrically connected to the inverter 340, and the inverter 340 is electrically connected to the transformer 350. The current collected by the cables is first aggregated by the combiner box, and then uniformly converted into alternating current through the inverter, and then transmitted to the outside after being stepped up by the transformer.

[0059] In one embodiment, there are two groups of photovoltaic panels on the support cable 220, which are not shown in the figure. The adjacent ends of the two groups of photovoltaic panels are not connected, and the ends away from each other are connected to the anchor point 210 through locking ropes 313 respectively.

[0060] See also Figure 6 The photovoltaic panel group includes a plurality of photovoltaic panels 310, and connecting plates 311 are respectively provided at both ends of the photovoltaic panels 310, and adjacent photovoltaic panels 310 are connected through the connecting plates 311. The connecting plates 311 are provided to facilitate the connection between adjacent photovoltaic panels 310. When connected, holes are provided on the connecting plates 311, and the connecting plates 311 of adjacent photovoltaic panels 310 can be connected by bolts or steel wire ropes.

[0061] In one embodiment, the connecting plates 311 between adjacent photovoltaic panels 310 are hinged by means of a latch 312 .

[0062] See also Figure 6 and Fig.10 The plate wheel 320 includes an upper clamping wheel 321, a lower clamping wheel 322 and a vertical plate 323. The upper clamping wheel 321 and the lower clamping wheel 322 are installed between the two vertical plates 323 to rotate up and down, and the panel cable 220 is located between the upper clamping wheel 321 and the lower clamping wheel 322. Multiple sets of plate wheels 320 are arranged under each photovoltaic panel, so that the photovoltaic panel can be put back and forth on the panel cable 220 under the traction of the maintenance vehicle. Each set of plate wheels is divided into an upper clamping wheel 321 above the panel cable and a lower clamping wheel 322 clamped under the panel cable. The upper clamping wheel 321 and the lower clamping wheel 322 are reliably clamped on the panel cable by the vertical plates 323 on both sides through bolts, ensuring that the photovoltaic panel will not derail from the panel cable during installation or operation.

[0063] See also Figure 6-8 A track 102 is provided on the platform 101 , and a track wheel set 411 is provided at the bottom of the maintenance vehicle 410 , and the maintenance vehicle 410 travels on the track 102 via the track wheel set 411 .

[0064] In one embodiment, the retracting and releasing device 420 is a winch, which is installed on the top of the maintenance vehicle 410. A traction rope 421 is installed on the winch. When the traction rope 421 is connected to the photovoltaic panel group, it is used to retract and release the photovoltaic panel group.

[0065] See also Figure 7 A supporting wheel 416 is installed on the maintenance vehicle 410 at the side close to the storage basin 100 , and the supporting wheel 416 is used to support the traction rope 421 to prevent the traction rope 421 from rubbing against the maintenance vehicle 410 .

[0066] See also Figure 6-8The tensioning device includes a fixed clamping seat 430 and a movable clamping seat 440, which are used to clamp the plate cable 220. A guide rail 450 is installed on the maintenance vehicle 410 at a side of the fixed clamping seat 430 away from the reservoir 100, and a guide seat 441 is installed at the bottom of the movable clamping seat 440. The movable clamping seat 440 is slidably installed on the guide rail 450 through the guide seat 441. A step-changing cylinder 460 is installed on the fixed clamping seat 430 or the maintenance vehicle 410, and the step-changing cylinder 460 is connected to the movable clamping seat 440. The step-changing cylinder 460 is extended and retracted to drive the movable clamping seat 440 to move on the guide rail 450. When in use, the plate cable 220 can be adjusted to be tightened or loosened through the cooperation of the fixed clamping seat 430 and the movable clamping seat 440, thereby adjusting the sag of the plate cable 220.

[0067] For details, see Fig. 9 The fixed card seat 430 and the movable card seat 440 have the same structure. The fixed card seat 430 includes a mounting seat 431, a clamping block 433 and a clamping cylinder 436. The mounting seat 431 is provided with a slot 432 that is wide at the top and narrow at the bottom. The clamping block 433 is a semi-ring structure. The clamping block 433 has two, and the lower ends of the two clamping blocks 433 are hinged through a hinge seat 435. The lower part of the slot 432 of the mounting seat 431 is provided with a mounting cavity 434. The clamping cylinder 436 is installed in the mounting cavity 434, and the telescopic end of the clamping cylinder 436 is hinged with the hinge seat 435. Through the action of the clamping cylinder 436, the carrier cable 220 can be clamped or released.

[0068] Furthermore, a second pad 437 is installed inside the clamping block 433. The second pad 437 is a copper pad, and its function is the same as that of the first pad 215 in the plug plate 212.

[0069] For further information, see Figure 7 , 8 The guide rail 450 is provided with a plurality of pin holes 451 along the length direction, and the guide seat 441 is provided with a limit hole 442. The limit pin 443 is inserted into the limit hole 442 and one of the pin holes 451, so as to limit and fix the movable clamping seat 440 and the guide rail 450. When the movable clamping seat 440 clamps the plate cable 220 and the fixed clamping seat 430 releases the plate cable 220, the limit pin 443 is inserted into the limit hole 442 and one of the pin holes 451, so as to limit and fix the movable clamping seat 440 and the guide rail 450, so as to prevent the movable clamping seat 440 from slipping off or the clamping cylinder 436 from leaking due to failure, thereby causing accidents.

[0070] See also Figure 6 , 7A rope supporting device 470 is hingedly installed on the maintenance vehicle 410 at one side of the fixed base 430 close to the reservoir 100. The rope supporting device 470 includes a supporting plate 471 and a supporting plate cylinder 472. The supporting plate 471 is hinged to the maintenance vehicle 410. One end of the supporting plate cylinder 472 is hinged to the maintenance vehicle 410, and the other side is hinged to the supporting plate 471. When the plate cable 220 is tensioned, the supporting plate 471 of the rope supporting device 470 is used to support the plate cable 220 so that the plate cable 220 can pass through the fixed base 430 and the movable base 440 in a straight manner.

[0071] Continue to see Figure 6 , 7 The maintenance vehicle 410 is also equipped with a locking cylinder 412. The platform 101 is provided with a locking groove 103 at the position corresponding to the photovoltaic panel group. The telescopic end of the locking cylinder 412 is inserted into the locking groove 103 when extended. Since the maintenance vehicle 410 is subjected to force on one side in the working state, in order to improve the stability of the maintenance vehicle 410, when the maintenance vehicle 410 stops, the telescopic end of the locking cylinder 412 is extended and inserted into the locking groove 103 pre-excavated and provided on the platform 101 to increase the anti-overturning capability. Multiple locking cylinders 412 can be installed around the maintenance vehicle 410.

[0072] Furthermore, a counterweight 415 is installed on the maintenance vehicle 410 to further improve the anti-overturning force capability.

[0073] See also Figure 7 The maintenance vehicle 410 is also equipped with an electric control cabinet 413 and a communication box 414, which control the operation of the retracting device 420 and the tensioning device. The electric control cabinet 413 and the communication box 414 are used to supply power and control the winch, the clamping cylinder 436 and the step-changing cylinder 460.

[0074] Embodiment 2: Based on Example 1, see Figure 2 , 4 5. A rope lock 213 is also provided on the anchor point 210. The rope locks 213 on both sides of the anchor points 210 are connected with maintenance ropes 230. The maintenance ropes 230 are located above the photovoltaic panel group. On the one hand, they can be used as handrails when personnel go up to the photovoltaic panel 310 for maintenance; on the other hand, they can also be used to tie safety belts or safety ropes to ensure the safety of maintenance personnel.

[0075] Furthermore, the lower end of the lock rope member 213 passes through the anchor point 210 and then extends into the ground. Because the height of the maintenance cable 230 is higher than the support cable and the photovoltaic panel, if a lightning strike occurs, the lightning will first pass through the maintenance cable and the lock rope member 213 to the ground, thus achieving a lightning protection effect. Specifically, the upper end of the lock rope member 213 is ring-shaped, and the lower end is rod-shaped and extends into the ground.

[0076] Embodiment three: A method for installing a large-amplitude reservoir-type flexible photovoltaic system, the installation method comprising the following steps: S1. Install the plate cable 220; drive the two maintenance vehicles 410 to the position corresponding to the plate cable 220 to be installed, first install the auxiliary cable on the retracting device 420 of the maintenance vehicle 410 on one side, then install the plate cable 220 on the retracting device 420 of the maintenance vehicle 410 on the other side, connect the auxiliary cable with the plate cable 220, and pull the plate cable 220 across the basin 100 by pulling the auxiliary cable through the retracting device 420. After pulling it into place, remove the auxiliary cable, and connect and fix the two ends of the plate cable 220 to the anchor points 210 on both sides respectively; S2 photovoltaic panel group slipping; photovoltaic panel group slipping method includes the same group of support cable 220 are installed on the left and right groups of photovoltaic panels, and the same group of support cable 220 installed on a photovoltaic panel group; The steps for installing the left and right photovoltaic panels on the same set of support cables are as follows: When installing one of the photovoltaic panel groups, first lock the inspection vehicle 410 to one end of a group of support cables 220, then connect the first photovoltaic panel 310 with the plate wheel 320 and the cable installed to the anchor point 210 through the locking rope 313, install the photovoltaic panel 310 to a group of support cables 220 through the plate wheel 320, and then connect the photovoltaic panel 310 with the pulling rope on the retracting device 420 to bring force, loosen the connection between the locking rope 313 and the photovoltaic panel 310, and release the pulling rope from the retracting device 420 until a second gap is left on the support cable 220 near the anchor point 210. The installation space of the first photovoltaic panel is filled with a plurality of photovoltaic panels. After the second photovoltaic panel is connected to the anchor point 210 through the locking rope 313, the second photovoltaic panel is installed on the group of support cables 220 through the panel wheel 320, and the retracting and releasing pulling rope is fine-tuned through the retracting and releasing device 420 to connect the first photovoltaic panel with the second photovoltaic panel, and so on until the installation of all photovoltaic panels in this group is completed; the installation of the photovoltaic panel group on the same group of support cables on the other side is also carried out in this way; after the installation is completed, the photovoltaic panel close to the anchor point 210 is connected and fixed to the anchor point 210 through the locking rope 313; The steps for installing a group of photovoltaic panels on the same group of support cables 220 are as follows: Lock a maintenance vehicle 410 to one end of a group of support cables 220, then connect the first photovoltaic panel 310 with the plate wheel 320 and the cable to the anchor point 210 through the locking rope 313, install the photovoltaic panel 310 to a group of support cables 220 through the plate wheel 320, and then connect the photovoltaic panel 310 connected by the pulling rope on the retracting device 420, connect the pulling rope of the retracting device 420 on the maintenance vehicle 410 at the other end of the support cable 220 to the first photovoltaic panel near the basin, and then release the connection between the locking rope 313 and the photovoltaic panel. The retracting device 420 on the maintenance vehicle 410 at one end releases the pulling rope, and the retracting device 420 on the maintenance vehicle 410 at the other end retracts the pulling rope until the installation space of the second photovoltaic panel is reserved near the anchor point on the support cable 220. After the second photovoltaic panel is connected to the locking rope, the retracting device 420 fine-tunes the retracting pulling rope to connect the first photovoltaic panel to the second photovoltaic panel, and so on until the installation of all photovoltaic panels on this side is completed. After the installation is completed, the photovoltaic panels at both ends are respectively connected and fixed to the anchor points 210 on both sides through the locking ropes 313; S3. Adjust the verticality of the plate cable 220; lock a maintenance vehicle 410 at one end of a group of plate cables 220, and place the end of the plate cable 220 on the platform 101 on the fixed clamping seat 430 and the movable clamping seat 440 in turn. First, the movable clamping seat 440 is moved along the guide rail 450 to the position closest to the fixed clamping seat 430 under the drive of the step-changing cylinder 460. The clamping cylinders 436 on the fixed clamping seat 430 and the movable clamping seat 440 are extended, and the two clamping blocks 433 are moved up and opened, and the plate cable 220 is placed in the two clamping blocks 433. Then, the clamping cylinder 436 of the movable clamping seat 440 is retracted, and the movable clamping seat 440 holds and fixes the plate cable 220, and then the step-changing cylinder 460 is moved. The piston rod is extended, and the movable clamping seat 440 moves along the guide rail 450 to move the plate cable 220 together for tensioning; if the movable clamping seat 440 moves to the end of the stroke and the plate cable 220 has not been tensioned, at this time, the clamping cylinder 436 of the fixed clamping seat 430 retracts, and the fixed clamping seat 430 holds and fixes the plate cable 220, and then the clamping cylinder 436 of the movable clamping seat 440 extends to release the plate cable 220, and then retracts the step-changing cylinder 460 to move the movable clamping seat 440 to a position close to the fixed clamping seat 430, and then repeats the above steps until the plate cable 220 is tensioned into place, and then the plate cable 220 is connected and fixed to the anchor point 210 to complete the adjustment operation; to loosen the plate cable 220, the reverse operation of the above steps is adopted.

[0077] Embodiment 4: A maintenance method for realizing the large-amplitude reservoir-type flexible photovoltaic system, the maintenance method comprises the following steps: When the photovoltaic panel group is being inspected or repaired, personnel go up to the photovoltaic panel group for inspection or repair, and the maintenance personnel hang the safety belt on the maintenance rope 230, and the maintenance personnel use the maintenance rope 230 as a handrail.

[0078] The structure and operation principle of the present invention are further described in detail below: The patented device includes a cableway unit 200, a photovoltaic unit 300, a maintenance unit 400, etc. The cableway unit 200 is composed of an anchor point 210, a support cable 220, a maintenance cable 230, etc. The photovoltaic system 300 is composed of a photovoltaic panel 310, a junction box 330, an inverter 340, a transformer 350, and a conductor, etc. The maintenance system 400 is composed of a maintenance vehicle 410 and its retracting and tensioning device, etc. The specific details are as follows: 1. Cableway unit: 1. Supporting plate cable 220: Supporting plate cable 220 is a cableway device for carrying photovoltaic panels. Preferably, two cables form a group. A row of photovoltaic panels is stably placed on supporting plate cable 220. Both ends of supporting plate cable are respectively hung on anchor points 210 set around reservoir basin 100. The verticality of each group of supporting plate cable is adjusted to be consistent so that photovoltaic panels can be stably placed thereon. Stop cable ends 221 are respectively set at both ends of supporting plate cable. Stop cable ends 221 are conical structures of metals such as zinc casted at the maintenance cable end and the steel wire of the maintenance cable, which are used to prevent the maintenance cable from falling off and being stuck.

[0079] 2. Maintenance rope 230: The maintenance rope 230 is also suspended on the anchor point 210, but the suspension position is higher than the support plate rope 220, that is, it is suspended on the lock rope part 213 installed on the upper surface of the anchor point through a U-shaped buckle. The lower end of the lock rope part 213 passes through the anchor point and is reliably connected to the ground. The maintenance rope has the functions of protecting personnel during the maintenance process and lightning protection rope. In terms of personnel protection during the maintenance process: on the one hand, it serves as a handrail rope when personnel go up to the photovoltaic panel for maintenance; on the other hand, a safety belt or safety rope can also be tied to ensure the safety of maintenance personnel. As a lightning protection rope, because the height of the maintenance rope is higher than the support plate rope and the photovoltaic panel, if a lightning strike occurs, the lightning will first pass through the maintenance rope from the rope ring to the grounding piece, thus achieving the effect of lightning protection.

[0080] 3. Anchor point 210: Anchor point 210 is a concrete pier column structure reliably connected to platform 101 through steel bars, etc. A conical groove 211 is provided in the middle of the anchor point. The cross-sectional diameter of the conical groove decreases from the platform to the reservoir. A notch is provided at the top of the anchor point so that the plate cable 220 can enter the groove and lock. After the plate cable 220 enters the conical groove from the upper part of the anchor point, a plug plate 212 provided with two conical halves is put on the outside of the plate cable in the conical groove. The plug plate is lined with a first pad 215. The first pad 215 is a copper pad. Because the copper pad has a larger friction coefficient, it will form a larger friction force with the plate cable 220 after being squeezed. In addition, the rear end diameter of the plug plate 212 is larger than the tail end diameter of the conical hole of the anchor point. In this way, the plate cable 220 can be clamped by being stuck outside the plate cable 220 to ensure that the plate cable 220 does not fall out of the anchor point. The stopper end at the tail end of the plate cable 220 serves as a safety measure after slipping.

[0081] 2. Photovoltaic unit: The photovoltaic panels 310 carried on each pair of carrying cables 220 are connected by connecting plates 311, and the photovoltaic panels on the left and right sides closest to the reservoir are reliably connected to the locking rings 214 on the anchor points through locking ropes 313 in the working state. Multiple sets of plate wheels 320 are set under each photovoltaic panel so that the photovoltaic panels can be put back and forth on the plate cables 220 under the traction of the maintenance vehicle. Each set of plate wheels 320 is divided into an upper clamping wheel 321 clamped above the plate cables 220, and a lower clamping wheel 322 clamped below the plate cables. The upper clamping wheel 321 and the lower clamping wheel 322 are reliably clamped on the plate cables 220 by bolts connected by vertical plates 323 on both sides, ensuring that the photovoltaic panels will not derail from the plate cables during installation or operation. The photovoltaic panels on each pair of load-bearing cables can be one group or two groups, because the purpose of the two groups is that the span of the load-bearing cables is large, and the load-bearing cables 220 form a U-shaped hanging state due to gravity. They are retracted and released on the platforms on the left and right sides of the reservoir respectively, so that the photovoltaic panels 310 can meet at the bottom of the U-shape, which belongs to downhill retraction and release, and is convenient for retraction and release. In terms of the number of photovoltaic panels, the efficiency is higher when the maintenance vehicles arranged on the platforms on the left and right sides of the reservoir are used for retraction and release. For example, the photovoltaic panels on a pair of load-bearing cables are divided into two groups, and the photovoltaic panels belonging to different groups in the middle of the reservoir are not connected, so that they can be retracted and released from both ends by the maintenance vehicle. The sides of each group of photovoltaic panels are connected in series with cables and then connected to the inverter, junction box and transformer installed on the platform. The current collected by the cables is first aggregated by the junction box, and then the DC power is converted into AC power through the inverter, and then the voltage is increased by the transformer and then transmitted to the outside.

[0082] 3. Maintenance system.

[0083] The installation and maintenance of the photovoltaic panel 310 are completed by the maintenance vehicle 410 arranged on the platform. One or more maintenance vehicles 410 can be arranged on the platform 100 around the top of the reservoir 100. For example, two maintenance vehicles are arranged on the platforms on both sides of the top of the reservoir, respectively, and the left and right photovoltaic panel groups on the same group of support cables 220 can be recovered and installed respectively. The maintenance vehicle 410 moves on the circular track 102 of the platform through the track wheel group 411. The upper part is respectively provided with a retracting device 420 and a tensioning device. These two sets of devices are arranged on both sides of the maintenance vehicle 410. On one side, a winch and a communication box and an electric control box used in conjunction with it are arranged on the maintenance vehicle 410. The communication box and the electric control box are used to power and control the winch. The winch retracts and releases the traction rope 421 on the drum through the control of the motor. After the traction rope is reliably connected to the photovoltaic panel, the photovoltaic panel is retracted and released. The tensioning device disposed on the other side of the maintenance vehicle 410 is mainly used to tension or relax the maintenance cable 230 or the carrier cable 220 .

[0084] The fixed clamping seat 430 and the movable clamping seat 440 of the tensioning device have the same internal structure except that they can be moved or not. The interior of the mounting seat 431 is divided into an upper and lower chamber, the upper chamber forms a V-shaped groove, and a clamping cylinder 436 is installed in the lower chamber space. The clamping cylinder 436 is provided with hinge points at the upper and lower parts, respectively. The lower hinge point is hinged to the bottom plate of the mounting seat 431, and the upper hinge point is hinged to the two-petal clamping block 433. The clamping block 433 is lined with a copper pad, which is relatively soft. The clamping block 433 can increase the friction force through its connection with the support cable 220 or the support cable 220 is squeezed by force to ensure that no slipping occurs. The upper part of the mounting seat 431 is provided with a V-shaped groove. When the clamping cylinder 436 drives the two semi-cylindrical clamping blocks 433 to move downward, the internal width of the mounting seat 431 becomes smaller and smaller. Thus, the encircling and squeezing force of the two clamping blocks 433 on the maintenance cable or the plate carrier cable becomes larger and larger through the space squeezing, thereby ensuring that the maintenance cable or the plate carrier cable does not slip during the process of retracting and releasing. In order to ensure the stability of the clamping block 433, see Fig. 9 The clamping block 433 is limited in the groove in the clamping groove 432.

[0085] The tensioning device includes a rope supporting device 470, a fixed clamping seat 430, a movable clamping seat 440, a guide rail 450 and a step-changing cylinder 460. A sufficient length is reserved for each plate-carrying cable 220 or maintenance cable 230 at the anchor point 210 on the side of the platform 101. When it is necessary to perform a retractable operation, the plate-carrying cable or maintenance cable of the reserved length is first placed on the support plate 471 of the rope supporting device 470, and the angle is adjusted by the support plate cylinder 472 for support, and then placed on the fixed clamping seat 430 and the movable clamping seat 440 in turn for retractable operation. The fixed clamping seat 430 remains in a fixed position during the retractable process, and the movable clamping seat 440 reciprocates along the guide rail 450 through the push of the step-changing cylinder during the retractable process.

[0086] Anti-overturning device: The maintenance vehicle is subjected to unilateral force in its working state. In order to avoid overturning, an anti-overturning design is carried out. On the one hand, a counterweight box and a counterweight are arranged under the maintenance vehicle bracket. On the other hand, one or more locking cylinders 412 are arranged on one side of the platform. That is, when the maintenance vehicle stops running, the cylinder rod of the locking cylinder is extended and inserted into the locking groove 103 or the locking hole pre-excavated on the platform to increase the anti-overturning force.

[0087] 4. Installation, operation steps and working principle.

[0088] Installation of this patented photovoltaic system: Step 1: Preparation before installation: First, the track 102, anchor point 210 and locking groove 103 along the track of the maintenance vehicle are constructed, and then the maintenance vehicles on the left and right sides are assembled in place on the track.

[0089] Step 2: Install the plate cable and the inspection cable. The installation methods of the plate cable and the inspection cable are basically the same, and both are installed by the inspection vehicle. Drive the installed inspection vehicle to the position where the plate cable or the inspection cable needs to be installed. Since locking grooves are set at every section along the track corresponding to the anchor point, the locking cylinder can be started to insert the piston rod into the locking groove and lock it after the inspection vehicle is in place. First, wrap the thinner and lighter auxiliary rope around the winch of the inspection vehicle on one side, and wrap the plate cable around the winch of the inspection vehicle on the other side, connect the auxiliary rope with the plate cable, and then pull the plate cable into place by driving the auxiliary rope winch. After that, put the plate cable into the anchor point and lock it with a plug plate, and then cut off the excess length of the plate cable and cast or install the stopper. Similarly, the inspection cable is installed in the same way.

[0090] Step 3: Release the photovoltaic panels.

[0091] Two groups of photovoltaic panels are installed on the same group of support cables 220. Photovoltaic panels are released from both ends of each group of support cables. Take the installation on one side as an example: the maintenance vehicle is connected and released one by one when the locking cylinder is locked. First, the first photovoltaic panel with the plate wheel and cable installed is connected to the locking point of the anchor point through the locking rope, and then the winch is started to pull the rope to connect the photovoltaic panel, and the connection between the locking rope and the photovoltaic panel is loosened. The winch continues to release the pulling rope until the installation space of the second photovoltaic panel is reserved near the anchor point on the support cable. After the locking rope connecting the second photovoltaic panel to the locking point is connected, the winch pulling rope is fine-tuned so that the first and second photovoltaic panels are connected through the pin shaft, and so on until the installation of all photovoltaic panels on this side is completed. The installation of photovoltaic panels on the same group of support cables on the other side is carried out in the same way. A photovoltaic panel on the side of the platform 101 is reliably connected to the locking ring 214 on the anchor point through the locking rope 313.

[0092] A group of photovoltaic panels is installed on the same group of support cables. That is, each group of support cables only slides and installs photovoltaic panels from one side. Connect and slide the photovoltaic panels one by one on the maintenance vehicle with the locking cylinder locked. First, connect the first photovoltaic panel with the plate wheel and cable installed to the locking point of the anchor point through the locking rope, then start the winch to pull the rope to connect the photovoltaic panel near the anchor point, and connect the auxiliary installation rope on the winch of the maintenance vehicle on the other side to the hinge point near the basin side of the first photovoltaic panel. Then loosen the connection between the locking rope and the photovoltaic panel near the anchor point, continue to operate the winch to release the pulling rope, and the other winch to retract the auxiliary rope until the installation space of the second photovoltaic panel is reserved near the anchor point on the support cable. After connecting the second photovoltaic panel to the locking rope of the locking point, fine-tune the winch pulling rope so that the first and second photovoltaic panels are connected through the pin shaft, and so on until the installation of all photovoltaic panels on this side is completed. The first photovoltaic panel and the last photovoltaic panel are reliably connected to the locking rings 214 on the anchor points on both sides through the locking ropes 313.

[0093] Step 4: Adjust the verticality of the plate cable or maintenance cable. Place the section of the plate cable anchor point close to the platform side on the pallet 471, the fixed clamp 430 and the movable clamp 440 in sequence. First, move the movable clamp 440 along the guide rail 450 to the position closest to the fixed clamp 430 under the drive of the step-changing cylinder 460. The clamping cylinders 436 on the fixed clamp 430 and the movable clamp 440 are extended, and the two clamping blocks 433 are moved up and opened. The plate cable 220 is placed into the two clamping blocks 433. Then the clamping cylinder 436 of the movable clamp 440 is retracted, and the movable clamp 440 holds the plate cable 220 tightly and fixes it. Insert the limit pin 443 into the limit hole 442 and one of the pin holes 451, so as to limit and fix the movable clamp 440 and the guide rail 450. Then loosen the plug plate on the anchor point that clamps the plate cable to avoid opening. After the plug plate, the movable clamping seat 440 slips and causes danger. Then the step-changing cylinder 460 extends the piston rod, and the movable clamping seat 440 moves along the guide rail 450 to move and tension the plate cable 220 together; if the movable clamping seat 440 moves to the end of the stroke and the plate cable 220 has not been tensioned, at this time, the clamping cylinder 436 of the fixed clamping seat 430 retracts, and the fixed clamping seat 430 holds and fixes the plate cable 220. Then the clamping cylinder 436 of the movable clamping seat 440 extends to release the plate cable 220, and then retracts the step-changing cylinder 460 to move the movable clamping seat 440 to a position close to the fixed clamping seat 430, and then repeats the above steps until the plate cable 220 is tensioned into place, and then the plate cable 220 is connected and fixed to the anchor point 210 to complete the adjustment operation; to loosen the plate cable 220, the reverse operation of the above steps is adopted.

[0094] Step 5: Inspection and maintenance of photovoltaic panels. If the photovoltaic panels 310 require simple inspection and maintenance, it is not necessary to retract the photovoltaic panels to the platform. Personnel only need to go up to the photovoltaic panels for inspection or maintenance. To ensure the safety of maintenance personnel, maintenance personnel can hang their safety belts on the maintenance ropes. Maintenance personnel can also use the maintenance ropes as handrails to further ensure the convenience of the maintenance process.

[0095] Advantages of this patent The structure is novel and simple: This patent adopts simple anchor points, support cables, and maintenance cables to achieve the laying and reliable use of large-span flexible bracket photovoltaic panels. It has strong bearing capacity, a large number of photovoltaic panels can be laid, and the power generation efficiency is very high.

[0096] Simple and convenient installation and removal: This patented multifunctional maintenance vehicle with innovative design can conveniently and reliably install or remove photovoltaic panels quickly and efficiently, avoiding the problems of poor economy, high site requirements, and cumbersome steps caused by the use of large-tonnage lifting machinery.

[0097] Easy inspection and maintenance: In addition to using an inspection vehicle for inspection, this patent also innovatively designs an inspection rope, which allows personnel to go up to the photovoltaic panels for inspection and maintenance. This not only ensures the safety of personnel inspection and maintenance, but also gives full play to the flexible and efficient characteristics of personnel operations, and also plays a role in lightning protection, which is highly practical.

[0098] As an alternative implementation, the rope lock member 213 and the locking ring 214 may be designed as an integrated structure to achieve the same function, which is also within the protection scope of this patent.

[0099] Obviously, the above embodiments are merely examples for the purpose of clear explanation, and are not intended to limit the implementation methods. For those skilled in the art, other different forms of changes or modifications can be made based on the above description. It is not necessary and impossible to list all the implementation methods here. The obvious changes or modifications derived therefrom are still within the scope of protection of the invention.

Claims

1. A large-amplitude reservoir-type flexible photovoltaic system, characterized in that: The invention comprises a cableway unit (200), a photovoltaic unit (300) and a maintenance unit (400), wherein the cableway unit (200) comprises an anchor point (210) and a support cable (220), a platform (101) is arranged around the reservoir basin (100), a plurality of anchor points (210) are respectively installed on two opposite sides of the platform (101), and support cables (220) are respectively installed on the corresponding anchor points (210) on the two sides, and the photovoltaic unit (300) comprises a photovoltaic panel group, a photovoltaic The bottom of the panel group is clamped and installed on at least two panel cables (220) via a plurality of panel wheels (320), and the two ends of the photovoltaic panel group are respectively connected to the anchor point (210) via locking ropes (313). The maintenance unit (400) includes a plurality of maintenance vehicles (410), and the maintenance vehicles (410) move on the platform (101). The maintenance vehicles (410) are equipped with a retracting device (420) for retracting and releasing the photovoltaic panel group and a tensioning device for tensioning the panel cables (220).

2. A large-amplitude reservoir-type flexible photovoltaic system according to claim 1, characterized in that: The anchor point (210) is provided with a conical groove (211), the diameter of the conical groove (211) gradually decreases from the platform (101) to the side of the reservoir basin (100), the top of the anchor point (210) has a notch connected to the conical groove (211), and two plug plates (212) with a conical structure are installed in the conical groove (211), and the two plug plates (212) clamp the support plate cable (220).

3. A large-amplitude reservoir-type flexible photovoltaic system according to claim 2, characterized in that: A first pad (215) is installed on the inner side of the plug plate (212).

4. A large-amplitude reservoir-type flexible photovoltaic system according to claim 1, characterized in that: A locking ring (214) is provided at the top of the anchor point (210), and a locking rope (313) is connected and fixed to the locking ring (214).

5. A large-amplitude reservoir-type flexible photovoltaic system according to claim 2, characterized in that: Both ends of the support cable (220) are provided with stop cable ends (221).

6. A large-amplitude reservoir-type flexible photovoltaic system according to claim 1, characterized in that: The photovoltaic unit (300) further comprises a combiner box (330), an inverter (340) and a transformer (350); each photovoltaic panel group is electrically connected to the combiner box (330) via a cable; the combiner box (330) is electrically connected to the inverter (340); and the inverter (340) is electrically connected to the transformer (350).

7. The large-amplitude reservoir-type flexible photovoltaic system according to claim 1, characterized in that: There are two groups of photovoltaic panels on the support cable (220); the adjacent ends of the two groups of photovoltaic panels are not connected, and the ends that are far away from each other are respectively connected to the anchor point (210) via a locking rope (313).

8. A large-amplitude reservoir-type flexible photovoltaic system according to claim 1 or 7, characterized in that: The photovoltaic panel group comprises a plurality of photovoltaic panels (310), and connecting plates (311) are respectively provided at both ends of the photovoltaic panels (310), and adjacent photovoltaic panels (310) are connected via the connecting plates (311).

9. A large-amplitude reservoir-type flexible photovoltaic system according to claim 8, characterized in that: The connecting plates (311) between adjacent photovoltaic panels (310) are hinged via latches (312).

10. The large-amplitude reservoir-type flexible photovoltaic system according to claim 1, characterized in that: The plate wheel (320) comprises an upper clamping wheel (321), a lower clamping wheel (322) and a vertical plate (323); the upper clamping wheel (321) and the lower clamping wheel (322) are installed between the two vertical plates (323) to rotate up and down; the plate supporting cable (220) is located between the upper clamping wheel (321) and the lower clamping wheel (322).

11. The large-amplitude reservoir-type flexible photovoltaic system according to claim 1, characterized in that: A track (102) is arranged on the platform (101), and a track wheel set (411) is arranged at the bottom of the maintenance vehicle (410). The maintenance vehicle (410) travels on the track (102) via the track wheel set (411).

12. The large-amplitude reservoir-type flexible photovoltaic system according to claim 1, characterized in that: The retracting and unfolding device (420) is a winch, which is installed on the top of the maintenance vehicle (410). A traction rope (421) is installed on the winch. When the traction rope (421) is connected to the photovoltaic panel group, it is used to retract and unfold the photovoltaic panel group.

13. A large-amplitude reservoir-type flexible photovoltaic system according to claim 12, characterized in that: A supporting wheel (416) is installed on the maintenance vehicle (410) at a side close to the storage basin (100), and the supporting wheel (416) is used to support the traction rope (421).

14. The large-amplitude reservoir-type flexible photovoltaic system according to claim 1, characterized in that: The tensioning device comprises a fixed clamping seat (430) and a movable clamping seat (440), the fixed clamping seat (430) and the movable clamping seat (440) being used to clamp the support plate cable (220), a guide rail (450) being installed on the maintenance vehicle (410) at a side of the fixed clamping seat (430) away from the reservoir (100), a guide seat (441) being installed at the bottom of the movable clamping seat (440), the movable clamping seat (440) being slidably installed on the guide rail (450) via the guide seat (441), a step-changing cylinder (460) being installed on the fixed clamping seat (430) or the maintenance vehicle (410), the step-changing cylinder (460) being connected to the movable clamping seat (440), the step-changing cylinder (460) being extended and retracted to drive the movable clamping seat (440) to move on the guide rail (450).

15. A large-amplitude reservoir-type flexible photovoltaic system according to claim 14, characterized in that: The fixed card seat (430) and the movable card seat (440) have the same structure. The fixed card seat (430) comprises a mounting seat (431), a clamping block (433) and a clamping cylinder (436). The mounting seat (431) is provided with a clamping groove (432) which is wide at the top and narrow at the bottom. The clamping block (433) is a semi-ring structure. The clamping blocks (433) have two, and the lower ends of the two clamping blocks (433) are hinged via a hinge seat (435). The lower part of the clamping groove (432) of the mounting seat (431) is provided with a mounting cavity (434). The clamping cylinder (436) is installed in the mounting cavity (434), and the telescopic end of the clamping cylinder (436) is hinged to the hinge seat (435).

16. A large-amplitude reservoir-type flexible photovoltaic system according to claim 15, characterized in that: A second pad (437) is installed on the inner side of the clamping block (433).

17. A large-amplitude reservoir-type flexible photovoltaic system according to claim 14, characterized in that: The guide rail (450) is provided with a plurality of pin holes (451) along the length direction, and the guide seat (441) is provided with a limit hole (442). A limit pin (443) is inserted into the limit hole (442) and one of the pin holes (451), thereby limiting and fixing the movable clamping seat (440) and the guide rail (450).

18. The large-amplitude reservoir-type flexible photovoltaic system according to claim 14, characterized in that: A rope-supporting device (470) is hingedly mounted on the maintenance vehicle (410) at one side of the fixed base (430) close to the reservoir (100). The rope-supporting device (470) comprises a support plate (471) and a support plate cylinder (472). The support plate (471) is hingedly connected to the maintenance vehicle (410). One end of the support plate cylinder (472) is hingedly connected to the maintenance vehicle (410), and the other end is hingedly connected to the support plate (471).

19. The large-amplitude reservoir-type flexible photovoltaic system according to claim 1, characterized in that: The maintenance vehicle (410) is also equipped with a locking cylinder (412), and a locking groove (103) is provided on the platform (101) at a position corresponding to the photovoltaic panel group, and the telescopic end of the locking cylinder (412) is inserted into the locking groove (103) when extended.

20. The large-amplitude reservoir-type flexible photovoltaic system according to claim 1, characterized in that: The maintenance vehicle (410) is also equipped with a counterweight (415).

21. The large-amplitude reservoir-type flexible photovoltaic system according to claim 1, characterized in that: The maintenance vehicle (410) is also equipped with an electric control cabinet (413) and a communication box (414), and the operation of the retractable device (420) and the tensioning device is controlled by the electric control cabinet (413) and the communication box (414).

22. The large-amplitude reservoir-type flexible photovoltaic system according to claim 1, characterized in that: The anchor point (210) is also provided with a rope locking member (213), and the rope locking members (213) corresponding to the anchor points (210) on both sides are connected with maintenance ropes (230), and the maintenance ropes (230) are located above the photovoltaic panel group.

23. A large-amplitude reservoir-type flexible photovoltaic system according to claim 22, characterized in that: The lower end of the locking rope member (213) passes through the anchor point (210) and then extends into the ground.

24. A method for installing a large-amplitude reservoir-type flexible photovoltaic system according to claim 15, the method comprising the following steps: S1. Install the plate-carrying cable (220); drive the two maintenance vehicles (410) to the positions corresponding to the positions where the plate-carrying cable (220) is to be installed, first install the auxiliary cable on the retracting device (420) of the maintenance vehicle (410) on one side, then install the plate-carrying cable (220) on the retracting device (420) of the maintenance vehicle (410) on the other side, connect the auxiliary cable with the plate-carrying cable (220), and pull the plate-carrying cable (220) across the basin (100) by pulling the auxiliary cable through the retracting device (420). After pulling it into place, remove the auxiliary cable, and connect and fix the two ends of the plate-carrying cable (220) to the anchor points (210) on both sides respectively; S2. The photovoltaic panel group is released; The photovoltaic panel group is released by installing two groups of photovoltaic panels on the same group of support cables (220) respectively, and installing a group of photovoltaic panels on the same group of support cables (220); The steps for installing the left and right photovoltaic panels on the same set of support cables are as follows: When installing one of the photovoltaic panel groups, the inspection vehicle (410) is first locked to one end of a group of panel cables (220), and then the first photovoltaic panel (310) installed with the panel wheel (320) and the cable is connected to the anchor point (210) through the locking rope (313), and the photovoltaic panel (310) is installed on the group of panel cables (220) through the panel wheel (320), and then the pulling rope on the retracting device (420) is connected to the photovoltaic panel (310) and the rear belt is tightened, and the connection between the locking rope (313) and the photovoltaic panel (310) is released, and the retracting device (420) releases the pulling rope until the panel cables (220) are close to the anchor point (220). 10) leaving space for the installation of the second photovoltaic panel at the end, connecting the second photovoltaic panel to the anchor point (210) via the locking rope (313), and then installing the second photovoltaic panel onto the group of support cables (220) via the panel wheel (320), and then fine-tuning the retracting and pulling rope via the retracting and releasing device (420) to connect the first photovoltaic panel to the second photovoltaic panel, and so on and so forth until the installation of all photovoltaic panels in this group is completed; the installation of the photovoltaic panel group on the same group of support cables on the other side is also carried out in the same manner; after the installation is completed, the photovoltaic panel close to the anchor point (210) is connected and fixed to the anchor point (210) via the locking rope (313); The steps of installing a group of photovoltaic panels on the same group of support cables (220) are as follows: A maintenance vehicle (410) is locked to one end of a group of support cables (220), and then the first photovoltaic panel (310) equipped with a panel wheel (320) and a cable is connected to the anchor point (210) through a locking rope (313), and the photovoltaic panel (310) is installed on a group of support cables (220) through the panel wheel (320), and then the photovoltaic panel (310) is connected through the pulling rope on the retracting device (420), and the pulling rope of the retracting device (420) on the maintenance vehicle (410) at the other end of the support cable (220) is connected to the first photovoltaic panel near the reservoir, and then the locking rope (313) is released. The photovoltaic panels are connected by releasing the pulling rope from the retracting device (420) on the maintenance vehicle (410) at one end, and retracting the pulling rope from the retracting device (420) on the maintenance vehicle (410) at the other end until a space for installing the second photovoltaic panel is left near the anchor point on the support cable (220). After the second photovoltaic panel is connected to the locking rope, the retracting and releasing pulling rope is finely adjusted by the retracting and releasing device (420) to connect the first photovoltaic panel to the second photovoltaic panel, and so on until all photovoltaic panels on this side are installed. After the installation is completed, the photovoltaic panels at both ends are respectively connected and fixed to the anchor points (210) on both sides by the locking ropes (313); S3. Adjusting the verticality of the plate cable (220); locking a maintenance vehicle (410) at one end of a group of plate cables (220), placing one end of the plate cable (220) on the platform (101) on the fixed clamping seat (430) and the movable clamping seat (440) in turn, first moving the movable clamping seat (440) along the guide rail (450) to the position closest to the fixed clamping seat (430) under the drive of the step cylinder (460), the clamping cylinder (436) on the fixed clamping seat (430) and the movable clamping seat (440) is extended, the two clamping blocks (433) are moved up and opened, and the plate cable (220) is placed in the two clamping blocks (433), then the clamping cylinder (436) of the movable clamping seat (440) is retracted, the movable clamping seat (440) holds the plate cable (220) tightly and fixes it, and then the step cylinder (460) is moved. 60) extends the piston rod, and the movable clamping seat (440) moves along the guide rail (450), and moves the plate cable (220) together to be tensioned; if the movable clamping seat (440) moves to the end of the stroke and the plate cable (220) has not been tensioned, at this time, the clamping cylinder (436) of the fixed clamping seat (430) retracts, and the fixed clamping seat (430) holds and fixes the plate cable (220), and then the clamping cylinder (436) of the movable clamping seat (440) extends to release the plate cable (220), and then retracts the step-changing cylinder (460) to move the movable clamping seat (440) to a position close to the fixed clamping seat (430), and then repeats the above steps until the plate cable (220) is tensioned into place, and then the plate cable (220) is connected and fixed to the anchor point (210), and the adjustment operation is completed; the plate cable (220) is loosened by the reverse operation of the above steps.

25. A maintenance method for a large-amplitude reservoir-type flexible photovoltaic system according to claim 23, the maintenance method comprising the following steps: When the photovoltaic panel group is being inspected or repaired, personnel go up to the photovoltaic panel group to inspect or repair it. The maintenance personnel hang their safety belts on the maintenance rope (230), and the maintenance personnel use the maintenance rope (230) as a handrail.

Citation Information

Patent Citations

  • Structure for arranging water surface photovoltaic array in reservoir with large variable-amplitude water level

    CN114275112A

  • Telescopic photovoltaic support

    CN115360966A

  • Photovoltaic flexible support and installation method thereof

    CN116582060A

  • Disassembling, assembling and maintaining device and method for suspension cable type flexible photovoltaic power station

    CN117755812A

  • Photovoltaic module transfer equipment

    CN218536815U