Device for adjusting structural rigidity and fortification water level of double-wall steel cofferdam and construction method
By using detachable reinforcing components and connecting components in the cofferdam structure and adjusting the design water level of the cofferdam, the safety hazards and material waste problems of the cofferdam structure in the existing technology under occasional high water levels are solved, and the structural strength is achieved Flexible adjustment and improvement of construction efficiency.
Patent Information
- Application Number
- CN202411125237.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-16
- Publication Date
- 2024-10-15
AI Technical Summary
The design of the existing cofferdam structure is only based on a design water level, which may lead to material waste or safety hazards during actual construction. Especially in the case of occasional high water levels, the cofferdam structure cannot effectively respond and may be damaged by water pressure, causing project losses. .
Design a structure that includes multiple cofferdam segments, using detachable strengthening components and connecting components. By setting components such as horizontal ring plates, reinforcing ribs, and inclined trusses between wall panels, the cofferdam can be quickly adjusted when the actual water level changes. The design water level of the weir is raised from the low design water level A to the high design water level B to enhance the structural strength.
It can effectively reduce the cost of cofferdam construction, shorten the construction period, improve the safety factor, ensure construction safety, provide highly flexible and adaptable construction methods, and be able to respond flexibly when water levels change, reducing material consumption and construction risks.
Smart Images

Figure CN118774150A_ABST
Abstract
Description
Technical Field
[0001] The present application belongs to the field of construction engineering technology, and specifically relates to a device and a construction method for adjusting the structural rigidity and water level of a double-walled steel cofferdam. Background Art
[0002] In the prior art, during the construction of water conservancy projects, shipping projects and other infrastructure, cofferdams, as a temporary engineering structure to block water flow and protect the construction site, play a vital role in the construction process. The design and construction of cofferdams are directly related to the safety and efficiency of the project. In particular, the design height and strength of the cofferdam are often directly affected by the design water level. A reasonable design water level can ensure that the cofferdam structure can operate normally under the expected water level conditions.
[0003] In the prior art, the cofferdam structure is usually designed according to the construction water level, and the height and strength of the cofferdam are predetermined according to the highest point of the design water level. This design method can effectively ensure the safety of the cofferdam under normal water level conditions, but there are often the following problems in the actual construction process. First, there is a certain difference between the design water level and the actual water level. Due to the influence of factors such as weather and hydrological conditions, the actual highest water level may be significantly different from the design water level, resulting in the overall or local strength and stiffness of the cofferdam being too high or too low, causing material waste or safety hazards; secondly, the existing cofferdam structure is insufficient to cope with occasional high water levels. The existing cofferdam structure is usually designed only according to a design water level. When an occasional high water level occurs, once an event of exceeding the design water level occurs, the cofferdam may be damaged, causing serious losses to the project. Therefore, improvements are urgently needed. Summary of the invention
[0004] In order to solve the technical problem that in the prior art, the cofferdam structure is usually designed only according to a design water level, on the one hand, an excessively high design water level will significantly increase the construction cost of the cofferdam, and on the other hand, when a single design water level occurs occasionally at a high water level, once the actual water level exceeds the design water level, the cofferdam structure may be damaged by water pressure, and there are safety hazards in the actual implementation process, a cofferdam structure is proposed;
[0005] In order to solve the technical problem proposed in this application, this application also proposes a construction method of a cofferdam structure.
[0006] The present application adopts the following scheme: a cofferdam structure includes a plurality of cofferdam segments, wherein the cofferdam segments include:
[0007] A wall panel is arranged on the reference plane, and two wall panels are arranged opposite to each other;
[0008] A horizontal ring plate, which is arranged between the two wall plates, and a plurality of the horizontal ring plates are arranged at intervals along the height direction of the wall plates;
[0009] A reinforcement component, which is detachably disposed between the two wall panels, and when the actual water level in the cofferdam is higher than the low design water level A, the reinforcement component is used to raise the design water level of the cofferdam structure from the low design water level A to the high design water level B;
[0010] A connecting assembly, which is arranged between the reinforcing assembly and the wall plate, and is used to detachably mount the reinforcing assembly on the wall plate;
[0011] The low design water level A and the high design water level B satisfy the following relationship: 2≤high design water level B:low design water level A≤3.5.
[0012] Furthermore, the connection component includes:
[0013] A connecting groove is provided on the horizontal ring plate, and a plurality of connecting grooves are provided at intervals along the length direction of the horizontal ring plate;
[0014] The socket components are arranged on the wall panels and are spaced apart along the length direction of the wall panels. Each of the socket components is located between the two connecting grooves.
[0015] Furthermore, the reinforcement assembly comprises:
[0016] First stiffening ribs, which are arranged on the wall panel and a plurality of them are arranged at intervals along the length direction of the wall panel;
[0017] Second stiffening ribs, which are detachably mounted on the wall panel and are arranged in plurality at intervals along the length direction of the wall panel;
[0018] A truss group, which is arranged on the horizontal ring plate and located between the two wall plates;
[0019] When the horizontal ring plate is matched and arranged between the two wall plates, the first stiffening rib can be matched and extended into the connecting groove;
[0020] When the second stiffening rib is matched and socketed on the socket assembly, the second stiffening rib can be matched and extended into the connecting groove.
[0021] Furthermore, the socket assembly includes two L-shaped socket plates, a socket slot provided between the two socket plates, and a reinforcing rib provided on the L-shaped socket plates, and the second reinforcing rib can be matched and inserted on the socket slot.
[0022] Furthermore, the truss group includes:
[0023] An inclined truss is obliquely arranged on the horizontal ring plate, and a plurality of the inclined trusses are staggered along the length direction of the horizontal ring plate;
[0024] A horizontal truss is arranged on the horizontal ring plate, and a plurality of horizontal trusses are arranged at intervals along the length direction of the horizontal ring plate. The horizontal truss is perpendicular to the wall plate and is located between the two inclined trusses.
[0025] Furthermore, an angle A is provided between the inclined truss and the wall panel, and the angle A satisfies the following relationship: 45°≤angle A≤70°.
[0026] Furthermore, threaded connection holes are provided at both ends of the horizontal truss, and the horizontal truss can be detachably mounted on the horizontal ring plate through the threaded connection holes.
[0027] Furthermore, the connection assembly also includes an inner support fixing member arranged on the outer wall of the wall panel, and an inner support member is arranged on the inner support fixing member, and the inner support member is used to raise the design water level of the cofferdam.
[0028] Furthermore, the reinforcement assembly further comprises:
[0029] Densified bulkhead plates, which are arranged on the top and bottom surfaces of the horizontal ring plate, and the densified bulkhead plates are located at both ends of the horizontal ring plate along the length direction of the horizontal ring plate;
[0030] A supporting reinforcement plate is arranged between the two horizontal ring plates, located at a position corresponding to the inner support member and connected to the inner support member.
[0031] In order to solve the technical problem proposed in this application, this application proposes a construction method of a cofferdam structure, comprising the following steps:
[0032] Step 101. Design
[0033] Conduct soil strength test on the reference plane, and formulate the low design water level A and high design water level B of the cofferdam structure based on the soil strength test results;
[0034] Step 102. Cofferdam segment manufacturing
[0035] Manufacturing a cofferdam segment in combination with the low design water level A and the high design water level B proposed in step 101, wherein the cofferdam segment includes a wall plate, a horizontal ring plate, a connection assembly, and a reinforcement assembly;
[0036] Step 103. Cofferdam construction
[0037] The wall panels, horizontal ring panels, connection components, and reinforcement components manufactured in step 102 are sequentially connected to obtain a cofferdam segment, and a cofferdam structure is obtained by sequentially arranging a plurality of cofferdam segments in a planned cofferdam area.
[0038] Compared with the prior art, this application has the following beneficial effects:
[0039] The present application provides a device and a construction method for adjusting the rigidity and water level of a double-walled steel cofferdam structure, which comprises a plurality of wall panels arranged on a reference plane, a horizontal ring plate arranged between two wall panels, a reinforcing component detachably arranged between the two wall panels, and a connecting component arranged between the reinforcing component and the wall panels. By detachably arranging the reinforcing component on the two wall panel components, when the actual water level is higher than the low design water level A of the cofferdam structure, the reinforcing component can be detachably arranged between the two wall panels, and the design water level of the cofferdam structure can be quickly raised from the low design water level A to the high design water level B. On the one hand, the construction cost of the cofferdam structure can be effectively reduced, and on the other hand, the technical problem that the actual water level is higher than the low design water level A can be flexibly dealt with, and the construction period can be effectively shortened, the safety factor of the cofferdam structure can be improved, and the construction safety can be ensured. The device has the advantages of simple construction steps, high flexibility, strong applicability, and easy promotion and implementation. BRIEF DESCRIPTION OF THE DRAWINGS
[0040] In order to more clearly illustrate the technical solutions in the embodiments of the present application, the drawings required for describing the embodiments are briefly introduced below.
[0041] Figure 1 It is a schematic diagram of the structure of the cofferdam segment that meets the requirements of the low design water level A in this application;
[0042] Figure 2 It is a top view of the cofferdam section that meets the requirements of low design water level A in this application;
[0043] Figure 3 It is a structural schematic diagram of the cofferdam segment in the process of raising the low design water level A to the design water level B in this application;
[0044] Figure 4 It is a top view of the cofferdam section that meets the high design water level B requirement of this application;
[0045] Figure 5 It is a schematic diagram of the internal structure of the cofferdam segment of the present application;
[0046] Figure 6 It is a structural schematic diagram of the socket assembly of the present application;
[0047] Figure 7 is a top view of the socket assembly of the present application;
[0048] Figure 8 It is a schematic diagram of the structure after the socket assembly and the length adjustment plate of the present application are combined;
[0049] Fig. 9 It is a schematic diagram of the internal structure of another part of the cofferdam segment of the present application;
[0050] Fig.10 It is a schematic diagram of the structure of the support reinforcement plate of this application;
[0051] Fig.11 It is a schematic diagram of the assembly structure of the inner support member and the inner support fixing member of the present application. DETAILED DESCRIPTION
[0052] Combined with Figure 1-11 As shown, the technical solution is further described, a cofferdam structure includes a plurality of cofferdam segments, and the cofferdam segments include:
[0053] A wall panel 1 is arranged on the reference plane, and two wall panels 1 are arranged opposite to each other;
[0054] A horizontal ring plate 2, which is disposed between the two wall plates 1, and a plurality of the horizontal ring plates 2 are disposed at intervals along the height direction of the wall plates 1;
[0055] A reinforcement component 3, which is detachably disposed between the two wall panels 1, and when the actual water level in the cofferdam is higher than the low design water level A, the reinforcement component 3 is used to raise the design water level of the cofferdam structure from the low design water level A to the high design water level B;
[0056] A connecting component 4, which is disposed between the reinforcing component 3 and the wall panel 1, and is used to detachably mount the reinforcing component 3 on the wall panel 1;
[0057] The low design water level A and the high design water level B satisfy the following relationship: 2≤high design water level B:low design water level A≤3.5.
[0058] During the implementation of this embodiment, the high design water level B: the low design water level A=2.
[0059] The present application provides a device and a construction method for adjusting the rigidity and water level of a double-wall steel cofferdam structure, which comprises a plurality of wall panels arranged on a reference plane, a horizontal ring plate arranged between two wall panels, a reinforcing assembly detachably arranged between the two wall panels, and a connecting assembly arranged between the reinforcing assembly and the wall panels. By detachably arranging the reinforcing assembly on the two wall panel assemblies, when the actual water level is higher than the low design water level A of the cofferdam structure, the reinforcing assembly can be detachably arranged between the two wall panels, and the design water level of the cofferdam structure can be quickly raised from the low design water level A to the high design water level B. On the one hand, the construction cost of the cofferdam structure can be effectively reduced, and on the other hand, the technical problem that the actual water level is higher than the low design water level A can be flexibly dealt with. After the cofferdam is put into use in the project, it is possible to add connecting parts and fixing parts to the cofferdam structure, so that the rigidity of the cofferdam structure is adjustable, the strength is variable, the material consumption is less, the turnover of consumables is more flexible, the construction is convenient and quick, the construction period is short, and there are many adaptable situations, which saves construction costs. The device has the advantages of simple construction steps, high flexibility, strong applicability, and easy promotion and implementation.
[0060] During the implementation of this embodiment, the connection component 4 includes:
[0061] A connecting groove 40 is provided on the horizontal ring plate 2, and a plurality of connecting grooves 40 are provided at intervals along the length direction of the horizontal ring plate 2;
[0062] The socket components 41 are arranged on the wall panel 1 and are spaced apart along the length direction of the wall panel 1 . Each of the socket components 41 is located between two connecting grooves 40 .
[0063] During the implementation of this embodiment, the reinforcement component 3 includes:
[0064] First stiffening ribs 30, which are arranged on the wall panel 1, and a plurality of them are arranged at intervals along the length direction of the wall panel 1;
[0065] Second stiffening ribs 31, which are detachably mounted on the wall panel 1, and a plurality of second stiffening ribs 31 are spaced apart along the length direction of the wall panel 1;
[0066] A truss group 32, which is arranged on the horizontal ring plate 2 and located between the two wall panels 1;
[0067] When the horizontal ring plate 2 is matched and arranged between the two wall plates 1, the first stiffening rib 30 can be matched and extended into the connecting groove 40;
[0068] When the second stiffening rib 31 is matched and socketed on the socket assembly 41 , the second stiffening rib 31 can be matched and extended into the connecting groove 40 .
[0069] In the actual implementation process, the socket assembly is welded at the wall plate above the intersection of the vertical axis of the second stiffening rib and the horizontal plane where the horizontal ring plate is located, and at the wall plate corresponding to the intersection of the vertical axis of the second stiffening rib and the horizontal plane of the cofferdam top;
[0070] During the implementation of this embodiment, the socket assembly 41 includes two L-shaped socket plates 410, a socket slot 411 arranged between the two L-shaped socket plates 410, and a reinforcing rib 413 arranged on the L-shaped socket plates 410, and the second reinforcing rib 31 can be matched and inserted in the socket slot 411.
[0071] During the actual implementation process, a length adjustment plate 6 is also provided at the bottom of the socket assembly. By welding the length adjustment plate 6 at the bottom of the socket assembly, the length of the second stiffening rib can be controlled and the vertical constraint can be increased. After the socket is completed, the second stiffening rib is welded to the surrounding wall panel of the socket assembly.
[0072] During the implementation of this embodiment, the truss group 32 includes:
[0073] An inclined truss 320 is obliquely disposed on the horizontal ring plate 2, and a plurality of the inclined trusses 320 are staggered along the length direction of the horizontal ring plate 2;
[0074] The horizontal trusses 321 are disposed on the horizontal ring plate 2 , and a plurality of the horizontal trusses 321 are spaced apart along the length direction of the horizontal ring plate 2 . The horizontal trusses 321 are perpendicular to the wall plate 1 and are located between the two inclined trusses 320 .
[0075] During the implementation of this embodiment, an angle A is provided between the inclined truss 320 and the wall panel 1 , and the angle A satisfies the following relationship: 45°≤angle A≤70°. During the actual implementation, the angle A is 70°.
[0076] During the implementation of this embodiment, threaded connection holes 5 are provided at both ends of the horizontal truss 321 , and the horizontal truss 321 can be detachably mounted on the horizontal ring plate 2 through the threaded connection holes 5 .
[0077] During the actual implementation process, holes are opened at designated positions of the horizontal ring plate and the horizontal truss, wherein circular holes for bolts are opened in the horizontal ring plate, and threaded connection holes are opened at both ends of the horizontal truss, and the threaded connection holes are oblong holes for bolts; when the design water level of the cofferdam structure is raised from the low design water level A to the high design water level B, the specific layout form and node force form of the horizontal truss can be changed by bolting the horizontal truss to the horizontal ring plate.
[0078] During the implementation of this embodiment, the connection assembly 4 also includes an inner support fixing member 42 arranged on the outer wall of the wall panel 1, and an inner support member 33 is arranged on the inner support fixing member 42. The inner support member 33 is used to raise the design water level of the cofferdam.
[0079] During the implementation of this embodiment, the reinforcement component 3 further includes:
[0080] The encrypted bulkhead plates 34 are arranged on the top and bottom surfaces of the horizontal ring plate 2. The encrypted bulkhead plates 34 are located at both ends of the horizontal ring plate 2 along the length direction of the horizontal ring plate 2;
[0081] The supporting reinforcement plate 35 is disposed between the two horizontal ring plates 2 and is located at a position corresponding to the inner support member 33 and connected to the inner support member 33 .
[0082] In the actual implementation process, welding the support reinforcement plate and the encrypted bulkhead plate structure at the wall panel corresponding to the inner support member can solve the problem of local stiffness mismatch at the corresponding wall panel after installing the inner support member.
[0083] In order to solve the technical problem raised by the present application, the present application also provides a construction method of a cofferdam structure, comprising the following steps:
[0084] Step 101. Design
[0085] Conduct soil strength test on the reference plane, and formulate the low design water level A and high design water level B of the cofferdam structure based on the soil strength test results;
[0086] Step 102. Cofferdam segment manufacturing
[0087] Manufacturing a cofferdam segment in combination with the low design water level A and the high design water level B proposed in step 101, wherein the cofferdam segment includes a wall plate, a horizontal ring plate, a connection assembly, and a reinforcement assembly;
[0088] Step 103. Cofferdam construction
[0089] The wall panels, horizontal ring panels, connection components, and reinforcement components manufactured in step 102 are sequentially connected to obtain a cofferdam segment, and a cofferdam structure is obtained by sequentially arranging a plurality of cofferdam segments in a planned cofferdam area.
[0090] In the process of cofferdam construction in step 103, the wall panels, horizontal ring panels, connection components, and reinforcement components are sequentially connected to manufacture cofferdam segments, including the following steps:
[0091] Step 201. Preprocessing
[0092] Weld the first stiffening ribs at intervals along the length direction of the wall panel, weld the sockets at intervals along the length direction of the wall panel at preset positions on the wall panel, weld the inner support fixings at preset positions of the wall panel, cut or drill holes in the horizontal ring plate and the horizontal truss as required, and weld the inclined truss to the horizontal ring plate;
[0093] The socket assembly is welded on the wall plate of the cofferdam. The specific installation principle is to weld the socket assembly at the wall plate above the intersection of the vertical axis of the second stiffening rib and the horizontal plane where the horizontal ring plate is located, and at the wall plate corresponding to the intersection of the vertical axis of the second stiffening rib and the horizontal plane of the cofferdam top. The socket connection assembly can be welded with a length adjustment plate according to demand to control the length of the second stiffening rib and increase vertical constraints;
[0094] Among them, the horizontal ring plate is provided with circular holes for bolts, and the horizontal ring plate is cut at the part where the first stiffening rib and the second stiffening rib pass to ensure that the components can pass through the horizontal ring plate, and the horizontal truss is provided with oblong holes for bolts.
[0095] Step 202. Cofferdam segment assembly
[0096] After the wall panels are set at preset positions on the reference plane, multiple horizontal ring plates are welded to the wall panels along the height direction of the wall panels. After the welding of the horizontal ring plates is completed, the dense bulkhead plates are welded to the top and bottom surfaces of the horizontal ring plates to obtain a cofferdam structure that can meet the design requirements of the low design water level A.
[0097] After the cofferdam is put into use, when a sharp change in water level is detected, and the actual water level of the cofferdam is higher than the low design water level A and lower than the high design water level B, the safety of the original structure cannot be guaranteed. It is necessary to increase the design water level of the cofferdam structure and improve the pressure bearing capacity of the cofferdam structure. At this time, the second stiffening rib can be matched and plugged into the socket assembly. Here, the socket assembly not only serves as a connecting component, but also plays a role in guiding and positioning. After the socket is completed, the second stiffening rib will be welded to the socket assembly and the wall plate at the same time to improve the socket stability and the pressure bearing capacity of the cofferdam;
[0098] After the socket welding of the second stiffening rib is completed, multiple horizontal trusses are bolted to the horizontal ring plate, so that the horizontal ring plate, the horizontal trusses and the wall plate form a common force system;
[0099] After the horizontal truss is installed, the support reinforcement plate is welded between the two horizontal ring plates, and the inner support of the steel pipe pile is simply fixed on the inner support fixing part by hoisting from below. When the inner support is welded to the wall plate at the corresponding position of the support reinforcement plate, the design water level of the cofferdam structure can be raised from the low design water level A to the high design water level B.
[0100] In the actual implementation process, the cofferdam structure corresponding to the low design water level A is as follows: the cofferdam structure with only the first stiffening rib on the wall plate and only the inclined truss on the horizontal ring plate, the stiffening ribs and the inclined trusses are sparsely distributed, and the supporting structure is less, corresponding to the lower design water level;
[0101] The cofferdam structure corresponding to the high design water level B is as follows: on the basis of the first stiffening ribs welded on the wall panels, the second stiffening ribs are socketed on the two first stiffening ribs, the horizontal trusses are bolted between the two inclined trusses, the distribution of the stiffening ribs on the wall panels is increased, and the distribution of the trusses on the horizontal ring plates is increased.
[0102] The present application provides a device and a construction method for adjusting the rigidity and water level of a double-walled steel cofferdam structure, which comprises a plurality of wall panels arranged on a reference plane, a horizontal ring plate arranged between two wall panels, a reinforcing component detachably arranged between the two wall panels, and a connecting component arranged between the reinforcing component and the wall panels. By detachably arranging the reinforcing component on the two wall panel components, when the actual water level is higher than the low design water level A of the cofferdam structure, the reinforcing component can be detachably arranged between the two wall panels, and the design water level of the cofferdam structure can be quickly raised from the low design water level A to the high design water level B. On the one hand, the construction cost of the cofferdam structure can be effectively reduced, and on the other hand, the technical problem that the actual water level is higher than the low design water level A can be flexibly dealt with, and the construction period can be effectively shortened, the safety factor of the cofferdam structure can be improved, and the construction safety can be ensured. The device has the advantages of simple construction steps, high flexibility, strong applicability, and easy promotion and implementation.
[0103] The above are only embodiments of the present invention and are not intended to limit the present invention. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention should be included in the protection scope of the present invention.
Claims
1. A device for adjusting the structural rigidity and water level of a double-walled steel cofferdam, characterized in that: The invention comprises a plurality of cofferdam segments, wherein the cofferdam segments include: A wall panel (1) is arranged on a reference plane, and two wall panels (1) are arranged opposite to each other; A horizontal ring plate (2), which is arranged between the two wall plates (1), and a plurality of the horizontal ring plates (2) are arranged at intervals along the height direction of the wall plates (1); A reinforcing component (3) which is detachably disposed between the two wall panels (1); when the actual water level in the cofferdam is higher than the low design water level A, the reinforcing component (3) is used to raise the design water level of the cofferdam structure from the low design water level A to the high design water level B; a connecting assembly (4), which is arranged between the reinforcing assembly (3) and the wall panel (1) and is used to detachably mount the reinforcing assembly (3) on the wall panel (1); The low design water level A and the high design water level B satisfy the following relationship: 2≤high design water level B:low design water level A≤3.
5.
2. A device for adjusting the structural rigidity and water level of a double-walled steel cofferdam according to claim 1, characterized in that: The connection component (4) comprises: A connecting groove (40) is provided on the horizontal ring plate (2), and a plurality of connecting grooves (40) are provided at intervals along the length direction of the horizontal ring plate (2); The socket components (41) are arranged on the wall panel (1) and are arranged at intervals along the length direction of the wall panel (1). Each of the socket components (41) is located between the two connecting grooves (40).
3. A device for adjusting the structural rigidity and water level of a double-walled steel cofferdam according to claim 2, characterized in that: The reinforcement component (3) comprises: A first stiffening rib (30) is provided on the wall panel (1), and a plurality of the first stiffening ribs are provided at intervals along the length direction of the wall panel (1); A second stiffening rib (31) which is detachably mounted on the wall panel (1), and a plurality of the second stiffening ribs (31) are spaced apart along the length direction of the wall panel (1); A truss group (32) is arranged on the horizontal ring plate (2) and is located between the two wall plates (1); When the horizontal ring plate (2) is matched and arranged between the two wall plates (1), the first stiffening rib (30) can be matched and extended into the connecting groove (40); When the second stiffening rib (31) is matched and socketed on the socket assembly (41), the second stiffening rib (31) can be matched and extended into the connecting groove (40).
4. A device for adjusting the structural rigidity and water level of a double-walled steel cofferdam according to claim 3, characterized in that: The socket assembly (41) comprises two L-shaped socket plates (410), a socket slot (411) arranged between the two L-shaped socket plates (410), and a reinforcing rib (413) arranged on the L-shaped socket plates (410), and the second reinforcing rib (31) can be matched and inserted into the socket slot (411).
5. The device for adjusting the structural rigidity and water level of a double-walled steel cofferdam according to claim 3, characterized in that: The truss group (32) comprises: An inclined truss (320) is arranged obliquely on the horizontal ring plate (2), and a plurality of the inclined trusses are arranged staggered along the length direction of the horizontal ring plate (2); A horizontal truss (321) is arranged on the horizontal ring plate (2), and a plurality of horizontal trusses (321) are arranged at intervals along the length direction of the horizontal ring plate (2). The horizontal truss (321) is perpendicular to the wall plate (1) and is located between the two inclined trusses (320).
6. The device for adjusting the structural rigidity and water level of a double-walled steel cofferdam according to claim 5, characterized in that: An angle A is provided between the inclined truss (320) and the wall panel (1), and the angle A satisfies the following relationship: 45°≤angle A≤70°.
7. The device for adjusting the structural rigidity and water level of a double-walled steel cofferdam according to claim 5, characterized in that: Threaded connection holes (5) are provided at both ends of the horizontal truss (321), and the horizontal truss (321) can be detachably mounted on the horizontal ring plate (2) through the threaded connection holes (5).
8. The device for adjusting the structural rigidity and water level of a double-walled steel cofferdam according to claim 1, characterized in that: The connection assembly (4) further comprises an inner support fixing member (42) arranged on the outer wall of the wall panel (1), an inner support member (33) being arranged on the inner support fixing member (42), and the inner support member (33) being used to raise the design water level of the cofferdam.
9. A device for adjusting the structural rigidity and water level of a double-walled steel cofferdam according to claim 8, characterized in that: The reinforcement component (3) further comprises: Densified bulkhead plates (34) are arranged on the top and bottom surfaces of the horizontal ring plate (2), and the densified bulkhead plates (34) are located at both ends of the horizontal ring plate (2) along the length direction of the horizontal ring plate (2); A supporting reinforcement plate (35) is provided between the two horizontal ring plates (2), is located at a position corresponding to the inner support member (33), and is connected to the inner support member (33).
10. A construction method for adjusting the structural rigidity and water level of a double-walled steel cofferdam, characterized in that: The following steps are involved: Step 101. Design Conduct soil strength test on the reference plane, and formulate the low design water level A and high design water level B of the cofferdam structure based on the soil strength test results; Step 102. Cofferdam segment manufacturing Manufacturing a cofferdam segment in combination with the low design water level A and the high design water level B proposed in step 101, wherein the cofferdam segment includes a wall plate, a horizontal ring plate, a connection assembly, and a reinforcement assembly; Step 103. Cofferdam construction The wall panels, horizontal ring panels, connection components, and reinforcement components manufactured in step 102 are sequentially connected to obtain a cofferdam segment, and a cofferdam structure is obtained by sequentially arranging a plurality of cofferdam segments in a planned cofferdam area.