Square pile foundation impact hole forming process

By fixing the hammer head of a special pile driver with a non-rotating wire rope, combined with the freezing method and wall protection treatment, the problems of poor hole quality and low efficiency in the traditional square pile foundation hole forming process have been solved, and the problem of poor hole forming in environments with poor geological conditions has been achieved. Highly efficient and stable hole formation.

CN118774567APending Publication Date: 2024-10-15CCCC SHEC FIRST HIGHWAY ENG
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411005078.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-25
Publication Date
2024-10-15

AI Technical Summary

Technical Problem

The traditional square pile foundation drilling process has problems such as difficulty in ensuring the quality of the hole and low construction efficiency. Especially during the drilling process, the hole is prone to tilt and distortion caused by the rotation of the hammer head, and it is not effective in environments with poor geological conditions. into holes.

Method used

A special pile hammer hammer head of a pile driver is fixed with a non-rotating wire rope. The unstable geology is treated by freezing method, a steel casing is buried, and the hole wall is protected and silt is removed through small-stroke hammering and slurry changing methods to ensure that the drilling is vertical. performance and quality.

Benefits of technology

It improves the efficiency and quality of hole formation, ensures safe and smooth hole formation in environments with poor geological conditions, reduces tilt and distortion caused by hammer head rotation, and enhances the stability and safety of construction.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118774567A_ABST
    Figure CN118774567A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of pile foundation forming, in particular to a square pile foundation impact hole-forming process which comprises the following steps: S1, designing a hammer head shape of a pile hammer of an impact pile driver according to pile foundation requirements; s2, a pile hammer of the pile driver and the non-rotating steel wire rope are fixed, the twisting directions of inner-layer strands and outer-layer strands of the non-rotating steel wire rope are opposite, the rotating force of the outer-layer strands is limited, and it is guaranteed that the drilled hole is vertically downward; s3, drilling is conducted on the hole-forming geology, the geological condition is known, and the unstable geology is treated through a freezing method to reinforce the geology; and S4, a square steel casing is buried, and the top face is 20 cm higher than the ground. The lower portion of the hammer head is square, the free falling body is used for drilling to form a square hole, the non-rotating steel wire rope is adopted, the situation that in the drilling process, due to rotation of the hammer head, a formed hole is inclined and distorted is avoided, and safe and smooth hole forming is achieved under the special conditions that mechanical equipment is poor in geological condition, hole forming cannot be achieved in other modes, and the shape of the formed hole is required; and a better use prospect is brought.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of pile foundation forming, and in particular relates to a square pile foundation impact hole forming process. Background Art

[0002] Square pile foundation, also known as square pile, is a common form of pile foundation. Its cross-sectional shape is square or rectangular, and its contact area with the soil is large, which is conducive to dispersing the load. Due to its cross-sectional shape and large contact area, the square pile foundation has a higher bearing capacity in both vertical and horizontal directions, and can better bear the weight and other external loads from the building, improve the overall stability of the building, and is simple and convenient to install, with a short construction period, suitable for most occasions. In highway construction, square pile foundations are used for various types of roadbed support, such as compacted layers after filling, roadbeds and bridge pier foundations, etc., to ensure the stability and safety of highways; the foundation construction of bridge piers is a vital part of bridge engineering, and square pile foundations are widely used in the reinforcement and support of bridge pier foundations due to their strong bearing capacity; square pile foundations also play an important role in the construction of high-rise buildings, earthwork projects and underground foundations;

[0003] However, the traditional hole-making technology has many limitations in the construction of square pile foundations, such as the difficulty in ensuring the quality of the hole and the low construction efficiency. During the impact hole-making process, the hammer head of the pile driver rotates during the drilling process, causing the hole to be tilted and twisted, and it is impossible to make a hole in an environment with poor geological conditions. In this regard, we proposed a square pile foundation impact hole-making technology. Summary of the invention

[0004] In view of the deficiencies in the prior art, the present invention provides a square pile foundation impact hole forming process to solve the above technical problems.

[0005] To achieve the above object, the present invention provides the following technical solution: a square pile foundation impact hole forming process, the impact hole forming steps are:

[0006] S1. Design the hammer head shape of the impact pile driver according to the pile foundation requirements;

[0007] S2, fix the pile hammer of the pile driver and the non-rotating wire rope, wherein the inner strands of the non-rotating wire rope are twisted in opposite directions to the outer strands, so as to limit the rotation force of the outer strands and ensure that the drilling is vertically downward;

[0008] S3. Drill the geology of the hole to understand the geological conditions, and use freezing method to treat unstable geology to strengthen the geology;

[0009] S4. Bury a square steel casing with the top surface 20cm above the ground;

[0010] S5. Place the drilling rig on a flat and stable ground, fix it, and control the error between the drill bit center and the casing center;

[0011] S6. Aim the impact drill bit at the center of the casing, use the pile driver hammer to hammer with a small stroke, add stone and clay slurry to protect the wall, and squeeze the hole wall tightly;

[0012] S7, accelerate the hammer speed and stroke, remove the silt and sediment at the bottom of the hole by using the slag removal tube, hang the steel cage, aim at the center of the pile hole and slowly lower it, and perform secondary slag removal by the slurry replacement method;

[0013] S8. Pour concrete into the bottom of the hole, control the slump of concrete, process and transport the waste mud, and complete the impact treatment of the square pile foundation.

[0014] Preferably, in step S1, the lower part of the hammer head of the pile driver is square, the middle part is cross-shaped, and the top surface is round. The bottom of the hammer head of the pile driver is welded with a middle tooth and a side pressure. The middle and bottom of the hammer head of the pile driver are welded, and four groups of lifting ears are provided. The lifting ears are used to insert the safety steel rope. A hole is opened in the middle of the top surface of the hammer head of the pile driver, and it is fixed to the non-rotating steel wire rope through the opened hole.

[0015] Preferably, the non-rotating steel wire rope in step S2 includes a phosphate coated steel wire rope, a galvanized steel wire rope and a smooth steel wire rope, and the non-rotating steel wire rope includes an inner strand and an outer strand. By twisting the steel wires of the inner and outer strands in opposite directions, the rotational force of the non-rotating steel wire rope in the clockwise and counterclockwise directions is equal, and the forces in the two directions are offset, so that the non-rotating steel wire rope is stable and does not rotate.

[0016] Preferably, in step S3, the geological drilling is performed by carrying the drilling equipment to the ground where the hole is to be drilled, using the drill bit to penetrate into the ground, and then taking out the drill bit to bring out the underground soil sample, collecting the sample, and sending it to the laboratory for analysis to obtain the geological conditions of the hole to be drilled; the freezing method treatment steps are:

[0017] A1. Dig a deep hole in the current geology and lead it into the underground;

[0018] A2. Place the freezing pipe into the deep hole, fix it, and connect the freezing pipe to the freezing equipment;

[0019] A3. Start the refrigeration equipment and transport cold air to the underground through the freezing pipes. The circulation of the freezing pipes will take away the heat from the underground and gradually freeze the water in the bottom layer to form a frozen soil curtain. Subsequent construction will be carried out on the frozen soil curtain.

[0020] Preferably, in step S4, a foundation pit is excavated by an excavator before the steel casing is buried, and the steel casing is placed inside the foundation pit. The thickness of the steel casing is 6 mm.

[0021] Preferably, in step S5, the drilling rig is fixed by fixing it with other fixed structures through the pulling force of other fixed structures. Other structures include anchor points and trees. The placed drilling rig is connected and pulled with other structures through a towing rope, and the traction force of the towing rope is adjusted to stably fix the drilling rig on the ground for construction.

[0022] Preferably, in step S6, when performing small-stroke hammering, the height of the hammer head of the pile driver is 0.5m-0.7m, and during the small-stroke hammering, stone and clay slurry are added in time to protect the wall, wherein the density of the clay is 1.15t / m 3 After every 2m of impact, the slag is discharged and the clay wall is filled. During the hammering process, the verticality of the hole is checked every 2m.

[0023] Preferably, in step S7, the steel cage is manufactured and welded in sections at the construction site, and the steel cage is slowly hoisted to ensure that the center of the hook coincides with the center of gravity of the steel cage to ensure balance; the slurry replacement method is used to install the catheter, and a mud pump is used to press high-quality mud into the hole through the catheter. As the high-quality mud is delivered, the original mud in the hole is replaced, and in the process of pressing the mud, the sediment at the bottom of the hole is discharged.

[0024] Preferably, the method for controlling the slump of concrete in step S8 includes increasing or decreasing the amount of cement, adjusting the aggregate particle size, optimizing the ratio of cement to aggregate, and adding concrete additives to control the slump of concrete.

[0025] Preferably, in step S8, the waste sludge is transported by truck, and flocculants are added to the waste sludge for treatment during transportation.

[0026] Compared with the prior art, the present invention has the following beneficial effects:

[0027] The lower part of the hammer head of the present application is square, and free fall is used to drill to form a square hole. A non-rotating wire rope is used to prevent the hammer head from rotating during the drilling process and causing the hole to be tilted or twisted. Mechanical equipment is used to safely and smoothly drill holes under special conditions where the geological conditions are poor and other methods cannot drill holes, but there are requirements for the hole shape, bringing better usage prospects. BRIEF DESCRIPTION OF THE DRAWINGS

[0028] Figure 1 It is a flowchart of the process steps of square pile foundation impact hole forming in the present invention;

[0029] Figure 2 The present invention is a schematic diagram of the structure of the hammer head of the pile hammer of the pile driver. DETAILED DESCRIPTION

[0030] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0031] The present invention provides a technical solution: a square pile foundation impact hole forming process, the impact hole forming steps are:

[0032] S1. Design the hammer head shape of the impact pile driver according to the pile foundation requirements;

[0033] S2, fix the pile hammer of the pile driver and the non-rotating wire rope, wherein the inner strands of the non-rotating wire rope are twisted in opposite directions to the outer strands, so as to limit the rotation force of the outer strands and ensure that the drilling is vertically downward;

[0034] S3. Drill the geology of the hole to understand the geological conditions, and use freezing method to treat unstable geology to strengthen the geology;

[0035] S4. Bury a square steel casing with the top surface 20cm above the ground;

[0036] S5. Place the drilling rig on a flat and stable ground, fix it, and control the error between the drill bit center and the casing center;

[0037] S6. Aim the impact drill bit at the center of the casing, use the pile driver hammer to hammer with a small stroke, add stone and clay slurry to protect the wall, and squeeze the hole wall tightly;

[0038] S7, accelerate the hammer speed and stroke, remove the silt and sediment at the bottom of the hole by using the slag removal tube, hang the steel cage, aim at the center of the pile hole and slowly lower it, and perform secondary slag removal by the slurry replacement method;

[0039] S8. Pour concrete into the bottom of the hole, control the slump of concrete, process and transport the waste mud, and complete the impact treatment of the square pile foundation.

[0040] The square hammer head designed in this application can more effectively match the square pile hole to improve the efficiency and quality of hole making. A non-rotating wire rope is used as a connection to prevent the hammer head from rotating during the drilling process and causing the hole to be tilted and twisted. Emphasis is placed on precise control, geological adaptability treatment and environmental protection measures to ensure the hole making of the square pile foundation.

[0041] Furthermore, in step S1, the lower part of the hammer head of the pile driver is square, the middle part is cross-shaped, and the top surface is round. The bottom of the hammer head of the pile driver is welded with a center tooth and a side pressure. The middle and bottom of the hammer head of the pile driver are welded, and four sets of lifting ears are provided. The lifting ears are used to insert a safety steel rope. A hole is opened in the middle of the top surface of the hammer head of the pile driver, and it is fixed to the non-rotating steel wire rope through the opened hole.

[0042] like Figure 2 As shown in the figure, the hammer head is divided into the top, middle and bottom. The design of the hammer head takes into account the needs of square pile foundations. The lower part is designed to be square, and the directional structure perfectly matches the square pile hole, ensuring uniform force during the impact process and improving the hole-making efficiency and quality. The middle part adopts a cross-shaped structure to enhance the overall strength of the hammer head and make the impact force more evenly dispersed during the transmission process, reducing stress concentration. The top surface is designed to be round, which is convenient for connection and fixation with drilling rig components. Overall, this multi-section design of the hammer head not only meets the construction requirements, but also reflects the rationality of the structure.

[0043] The top is the center of the circle, and a hole is opened in the middle of the top circle to connect the non-rotating wire rope, ensuring that the hammer head is always stably connected to the drilling rig during the impact process;

[0044] The middle part of the hammer head is designed in a cross shape, which enhances the stability of the hammer head. The top and bottom are connected by welding to form a whole. The lifting lug is made of high-strength material and can withstand huge tension to penetrate the insurance steel rope for connection.

[0045] The bottom of the hammer head is welded with middle teeth and side teeth. The tooth structure can penetrate deep into the rock and soil layer during impact, effectively breaking hard soil and rocks, and improving the hole-making efficiency. The arrangement of the middle teeth and side teeth ensures uniform force during the impact process and extends the service life of the hammer head.

[0046] Furthermore, in step S2, the non-rotating steel wire rope includes a phosphate coated steel wire rope, a galvanized steel wire rope and a smooth steel wire rope, and the non-rotating steel wire rope includes an inner strand and an outer strand. By twisting the steel wires of the inner and outer strands in opposite directions, the rotational force of the non-rotating steel wire rope in the clockwise and counterclockwise directions is equal, and the forces in the two directions are offset, so that the non-rotating steel wire rope is stable and does not rotate.

[0047] The opposite twist direction design of the inner and outer layers of the non-rotating wire rope in the present application enables the wire rope to effectively offset the rotational force and maintain the stability of the object when subjected to external force. The structure of the non-rotating wire rope enables it to withstand higher tension while reducing the additional stress caused by rotation, thereby improving the overall load-bearing capacity. Due to the reduction of rotation and friction, the wear of the non-rotating wire rope is reduced, thereby extending its service life.

[0048] Furthermore, in step S3, the geological drilling is performed by carrying the drilling equipment to the ground where the hole is to be drilled, using the drill bit to penetrate into the ground, and then taking out the drill bit to bring out the underground soil sample, collecting the sample, and sending it to the laboratory for analysis to obtain the geological conditions of the hole to be drilled; the freezing method processing steps are:

[0049] A1. Dig a deep hole in the current geology and lead it into the underground;

[0050] A2. Place the freezing pipe into the deep hole, fix it, and connect the freezing pipe to the freezing equipment;

[0051] A3. Start the refrigeration equipment and transport cold air to the underground through the freezing pipes. The circulation of the freezing pipes will take away the heat from the underground and gradually freeze the water in the bottom layer to form a frozen soil curtain. Subsequent construction will be carried out on the frozen soil curtain.

[0052] In this application, preliminary drilling is performed to understand the geological conditions in advance, identify and deal with potential unstable geological layers, including soft soil layers and quicksand layers, and promptly reinforce the unstable geology to enhance geological stability, provide a solid foundation for subsequent pile foundation construction, and reduce the risk of impact drilling.

[0053] Furthermore, in step S4, a foundation pit is excavated by an excavator before the steel casing is buried, and the steel casing is placed inside the foundation pit. The thickness of the steel casing is 6 mm.

[0054] The square steel casing in the present application can isolate external debris and water flow and protect the hole wall from damage.

[0055] Furthermore, in step S5, the drilling rig is fixed to other fixed structures by the pulling force of other fixed structures. Other structures include anchor points and trees. The placed drilling rig is connected and pulled by the other structures through the towing rope, and the traction force of the towing rope is adjusted to stably fix the drilling rig on the ground for construction.

[0056] In the present application, the drilling rig is fixed by traction, which can reduce the deviation of the drilling rig during the drilling process, prevent accidental movement during the construction process, and cause the drilling rig to overturn, thereby protecting the construction process.

[0057] Furthermore, in step S6, when performing small-stroke hammering, the height of the hammer head of the pile driver is 0.5m-0.7m. During the small-stroke hammering, stone and clay slurry are added in time to protect the wall, wherein the density of the clay is 1.15t / m 3 After every 2m of impact, the slag is discharged and the clay wall is filled. During the hammering process, the verticality of the hole is checked every 2m.

[0058] The wall protection treatment in this application can effectively prevent the collapse of the hole wall during the impact process, form a preliminary stable hole wall structure, help reduce the loss of mud in the hole, and provide protection for subsequent construction. After every 2m of impact, slag discharge can keep the hole clean and discharge the internal gravel. Checking the verticality of the hole every 2m can timely discover and correct deviations, ensure the verticality of the pile body and the construction quality, and prevent accidents of pile body breakage.

[0059] Furthermore, in step S7, the steel cage is manufactured and welded in sections at the construction site, and the steel cage is slowly hoisted to ensure that the center of the hook coincides with the center of gravity of the steel cage to ensure balance; the slurry replacement method is used to install the catheter, and a mud pump is used to press high-quality mud into the hole through the catheter. As the high-quality mud is delivered, the original mud in the hole is replaced, and in the process of pressing the mud, the sediment at the bottom of the hole is discharged.

[0060] The steel cage of the present application is manufactured and welded in sections at the construction site, which can facilitate transportation and installation in a narrow construction site. The quality inspection and control can be more convenient during the welding process. The slow lifting of the steel cage can prevent the impact and shaking caused by excessive speed, thereby reducing the damage to the hole wall and the pile body. The benefit of the slurry replacement method can improve the quality of the hole, reduce the impact of sediment on the pile body, and ensure the bearing and stability of the pile body.

[0061] Furthermore, the concrete slump control method in step S8 includes increasing or decreasing the amount of cement, adjusting the aggregate particle size, optimizing the ratio of cement to aggregate and adding concrete additives to control the slump of concrete. In step S8, the waste mud is transported by truck, and flocculants are added to the waste mud for treatment during transportation.

[0062] In this application, slump refers to the plasticization and pumpability of concrete. It is measured by slump and reflects the fluidity, cohesion and water retention of concrete. The test steps are as follows:

[0063] A1. Prepare a trumpet-shaped slump bucket with a height of 300 mm, a bottom diameter of 200 mm and an upper diameter of 100 mm;

[0064] A2. Fill the concrete into the slump bucket three times. After each filling, use a tamping rod to tamp evenly along the bucket wall from the outside to the center to compact the concrete.

[0065] A3. Lift the slump bucket vertically and steadily, and the concrete will slump under its own gravity;

[0066] A4. Use a ruler to measure the height of the bucket and the height of the concrete after collapse. The difference is the slump.

[0067] Transporting waste mud by truck can reduce pollution to the environment. By adding flocculants, the suspended particles in the waste mud can be condensed into larger particles to facilitate subsequent processing operations and to centrally transport the waste mud to a special treatment site for treatment, thereby reducing interference with the construction site.

[0068] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device.

[0069] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A square pile foundation impact hole forming process, characterized in that: The steps of impact hole forming are: S1. Design the hammer head shape of the impact pile driver according to the pile foundation requirements; S2, fix the pile hammer of the pile driver and the non-rotating wire rope, wherein the inner strands of the non-rotating wire rope are twisted in opposite directions to the outer strands, so as to limit the rotation force of the outer strands and ensure that the drilling is vertically downward; S3. Drill the geology of the hole to understand the geological conditions, and use freezing method to treat unstable geology to strengthen the geology; S4. Bury a square steel casing with the top surface 20cm above the ground; S5. Place the drilling rig on a flat and stable ground, fix it, and control the error between the drill bit center and the casing center; S6. Aim the impact drill bit at the center of the casing, use the pile driver hammer to hammer with a small stroke, add stone and clay slurry to protect the wall, and squeeze the hole wall tightly; S7, accelerate the hammer speed and stroke, remove the silt and sediment at the bottom of the hole by using the slag removal tube, hang the steel cage, aim at the center of the pile hole and slowly lower it, and perform secondary slag removal by the slurry replacement method; S8. Pour concrete into the bottom of the hole, control the slump of concrete, process and transport the waste mud, and complete the impact treatment of the square pile foundation.

2. The square pile foundation impact hole forming process according to claim 1, characterized in that: In step S1, the lower part of the hammer head of the pile driver is square, the middle part is cross-shaped, and the top surface is round. The bottom of the hammer head of the pile driver is welded with a middle tooth and a side pressure. The middle and bottom of the hammer head of the pile driver are welded, and four sets of lifting ears are provided. The lifting ears are used to insert the safety steel rope. A hole is opened in the middle of the top surface of the hammer head of the pile driver, and it is fixed with the non-rotating steel wire rope through the opened hole.

3. The square pile foundation impact hole forming process according to claim 1 is characterized in that: The non-rotating steel wire rope in step S2 includes phosphate coated steel wire rope, galvanized steel wire rope and smooth steel wire rope. The non-rotating steel wire rope includes inner strands and outer strands. By twisting the inner and outer strands in opposite directions, the rotational force of the non-rotating steel wire rope in the clockwise and counterclockwise directions is equal, and the forces in the two directions are offset, so that the non-rotating steel wire rope is stable and does not rotate.

4. The square pile foundation impact hole forming process according to claim 1, characterized in that: In step S3, the geological drilling is performed by carrying the drilling equipment to the ground where the hole is to be drilled, using the drill bit to penetrate into the ground, and then taking out the drill bit to bring out the underground soil sample, collecting the sample, and sending it to the laboratory for analysis to obtain the geological conditions of the hole to be drilled; the freezing method processing steps are: A1. Dig a deep hole in the current geology and lead it into the underground; A2. Place the freezing pipe into the deep hole, fix it, and connect the freezing pipe to the freezing equipment; A3. Start the refrigeration equipment and transport cold air to the underground through the freezing pipes. The circulation of the freezing pipes will take away the heat from the underground and gradually freeze the water in the bottom layer to form a frozen soil curtain. Subsequent construction will be carried out on the frozen soil curtain.

5. The square pile foundation impact hole forming process according to claim 1, characterized in that: In step S4, a foundation pit is excavated by an excavator before the steel casing is buried, and the steel casing is placed inside the foundation pit. The thickness of the steel casing is 6 mm.

6. The square pile foundation impact hole forming process according to claim 1, characterized in that: In step S5, the drilling rig is fixed by being fixed to other fixed structures and the pulling force of other fixed structures is used to fix the drilling rig. Other structures include anchor points and trees. The placed drilling rig is connected and pulled with other structures by a towing rope, and the traction force of the towing rope is adjusted to stably fix the drilling rig on the ground for construction.

7. The square pile foundation impact hole forming process according to claim 1, characterized in that: In step S6, when performing small-stroke hammering, the height of the hammer head of the pile driver is 0.5m-0.7m. During the small-stroke hammering, stone blocks and clay slurry are added in time to protect the wall, where the density of the clay is 1.15t / m 3 After every 2m of impact, the slag is discharged and the clay wall is filled. During the hammering process, the verticality of the hole is checked every 2m.

8. The square pile foundation impact hole forming process according to claim 1, characterized in that: In step S7, the steel cage is manufactured and welded in sections at the construction site, and the steel cage is slowly hoisted to ensure that the center of the hook coincides with the center of gravity of the steel cage to ensure balance; the slurry replacement method is used to install the catheter, and a mud pump is used to press high-quality mud into the hole through the catheter. As the high-quality mud is delivered, the original mud in the hole is replaced. During the process of pressing the mud, the sediment at the bottom of the hole is discharged.

9. The square pile foundation impact hole forming process according to claim 1, characterized in that: The method for controlling the slump of concrete in step S8 includes increasing or decreasing the amount of cement, adjusting the aggregate particle size, optimizing the ratio of cement to aggregate, and adding concrete additives to control the slump of concrete.

10. The square pile foundation impact hole forming process according to claim 1, characterized in that: In step S8, the waste mud is transported by trucks, and flocculants are added to the waste mud for treatment during transportation.