Synchronous double-slurry construction method for shield
By monitoring the formation characteristics in real time and using the digital control system to automatically adjust the ratio of liquid A and liquid B, the problem of unstable solidification time of the simultaneous dual-liquid slurry in shield tunneling was solved, achieving uniform mixing and timely solidification of the slurry, and improving construction efficiency. and quality.
Patent Information
- Application Number
- CN202411084339.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-08
- Publication Date
- 2024-10-15
AI Technical Summary
The solidification time of the existing shield's synchronized dual-liquid slurry after mixing is unstable, leading to pipeline blockage and poor solidification effects.
Through geological survey and real-time monitoring of formation characteristic data, the digital control system and algorithm are used to calculate the proportioning instructions of liquid A and liquid B, and automatically adjust the working parameters of the metering pump to realize the instant proportion adjustment of liquid A and liquid B to ensure slurry mixing. Uniformity and stability of setting time.
It achieves precise mixing control of the double-liquid slurry ratio, ensuring timely solidification of the slurry, reducing the risk of ground subsidence, and improving the efficiency and quality of shield tunneling construction.
Smart Images

Figure CN118774887A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of tunnel construction, and in particular to a synchronous double-liquid slurry construction method for a shield machine. Background Art
[0002] At present, the synchronous double-liquid slurry of shield tunneling mainly adopts the mixed construction of liquid A and liquid B, where liquid A is synchronous mortar and liquid B is thickener. They will quickly react chemically when in contact to form a high-strength and well-sealed consolidated body to fill the gaps left after shield excavation, support the surrounding soil, prevent ground settlement, and enhance the stability of the tunnel structure.
[0003] In practical applications, the ratio of liquid A and liquid B needs to be precisely adjusted to ensure that the slurry can solidify within an appropriate time, neither solidifying prematurely to cause pumping difficulties nor solidifying late to prevent effective support. Through digital control systems and precision metering equipment, dynamic adjustment of the ratio of the two-liquid slurry can be achieved during the construction process to ensure construction quality and efficiency.
[0004] In the prior art, after the synchronous slurry of the shield is mixed at the tail of the shield and then injected into the wall through a pipeline, due to the difference in the diameters of liquid A and liquid B and the different pressures of the metering pumps, the mixing effect of liquid A and liquid B is poor, and the solidification time of the synchronous double-liquid slurry is unstable, resulting in blockage of the grouting pipeline, poor effect of the synchronous slurry in fixing the pipe segments, poor waterproofing quality, and poor control of delayed settlement. Due to the uneven mixing, the slurry solidification time is unstable, resulting in pipeline blockage or poor solidification effect. Summary of the invention
[0005] The present invention provides a synchronous double-liquid slurry construction method for a shield machine, aiming to solve the problem in the background technology that the slurry solidification time is unstable due to uneven mixing, resulting in pipeline blockage or poor solidification effect.
[0006] The present invention is achieved through the following technical solutions:
[0007] A synchronous double-liquid slurry construction method for a shield machine comprises the following steps:
[0008] S1, before shield construction, geological survey is carried out to obtain the characteristics of the strata, and geological radar and ultrasonic detection technology are used to monitor the changes in the strata structure;
[0009] S2, collecting the formation property data and the monitored formation structure change data in S1, and generating an initial test combination of fluid A and fluid B for the current formation properties based on the collected data;
[0010] S3, input the formation monitoring data into the shield machine control system in real time. The system analyzes and processes the data through a preset algorithm and calculates the mixing ratio instructions of liquid A and liquid B;
[0011] S4, the control system automatically adjusts the working parameters of the metering pump according to the calculated ratio instruction, controls the flow ratio of liquid A and liquid B, and realizes the instant ratio adjustment of the double liquid slurry of liquid A and liquid B.
[0012] Furthermore, the formation characteristics in S1 include soil type, stability and moisture content.
[0013] Further, the specific steps of S2 are as follows:
[0014] S21: Evaluate the bearing capacity, compression force and groundwater flow of the formation based on the collected data;
[0015] S22: Determine the initial range threshold of the desired coagulation time and coagulation effect;
[0016] S23: presetting the ratio of liquid A to liquid B, and setting a number of test combinations for liquid A and liquid B;
[0017] S24: Calculate the solidification time under actual formation conditions according to different test levels, then determine the solidification effect of the test combination that meets the solidification time, and select the test combination whose solidification effect is within the threshold range.
[0018] Furthermore, the calculation formulas involved in the bearing capacity, compression force and groundwater flow in S21 are:
[0019] Bearing capacity of the stratum:
[0020] q ult =N q ×γ sat ×D f
[0021] Among them, q ult is the ultimate bearing capacity of soil; N q is the bearing capacity coefficient; sat D is saturated weight; f is the base width;
[0022] Compression force:
[0023]
[0024] Among them, E c is the one-dimensional compression modulus; Δp is the vertical stress increment; Δe is the corresponding reduction in void ratio; S is the expected settlement; p is the uniformly distributed load acting on the soil layer; H is the thickness of the soil layer;
[0025] Groundwater flow:
[0026]
[0027] Among them, Q is the flow rate; k is the permeability coefficient; A is the water flow cross-sectional area; Δh is the head difference; L is the length of the water flow path; V is the amount of water passing through the sample; and t is the test time.
[0028] Further, the expression for calculating the solidification time under actual formation conditions in S24 is:
[0029]
[0030] Where T is the basic solidification time; a, b, c, d, e, f and n 1 is the coefficient obtained by fitting the experimental data; A is the proportion of liquid A; B is the proportion of liquid B; T ambient is the ambient temperature; T ref is the reference temperature;
[0031] Introducing the bearing capacity, compression force and groundwater flow of the stratum into the formula, the calculation formula is:
[0032]
[0033] Among them, T cond k is the solidification time after the bearing capacity, compression force and groundwater flow of the formation are introduced; a is a proportionality constant related to material properties; P b is the reference bearing capacity value; k c is the coefficient related to the material; σ is the threshold; k d is a coefficient related to the material; k e is the coefficient related to the environment; T s is the groundwater temperature; T h is the ambient temperature.
[0034] Further, the specific steps of S3 are as follows:
[0035] S31: Remove outliers and noise from the collected data and integrate data from different sensors;
[0036] S32: evaluating the difference between the current formation and the preset ideal formation model based on the processed data, and identifying the immediate changes in formation conditions;
[0037] S33: using a pre-programmed algorithm, inputting current formation state data, and calculating a solution for adjusting the ratio of liquid A and liquid B;
[0038] S34: combining the initial range threshold of the coagulation time and the effect, optimizing the ratio instruction by using an algorithm, and converting the calculated optimal ratio of liquid A and liquid B into a specific operation instruction;
[0039] S35: After executing the new ratio instruction, continue to monitor the solidification process and formation response, collect feedback data, evaluate the effect of the ratio adjustment in real time based on the feedback data, and manually intervene to adjust the ratio instruction to form a closed-loop control.
[0040] Furthermore, the expression of the algorithm in S33 is:
[0041]
[0042] in, To find the β vector that minimizes the objective function; β is a vector that contains all the coefficients of the model; β 0 is the intercept term; β j is the coefficient corresponding to the input variable; i is the actual observed solidification time of the i-th sample; x ij is the value of the i-th sample on the j-th feature; m is the number of samples; n is the number of features; λ 1 is the weight of L1 regularization; λ 2 is the weight of L2 regularization.
[0043] Further, the expression of the algorithm for optimizing the ratio instruction in S34 is:
[0044]
[0045] Among them, θ j (t+1) is the jth model parameter at the t+1th iteration; θ j (t) is the jth model parameter at the tth iteration; α is the learning rate; N is the number of training samples; θ j is the jth model parameter; L(θ,x i ,y i ) is the loss function; θ is the set of all model parameters; x i is the feature of the i-th sample input; y i is the actual observed value of the i-th sample; λ is the regularization parameter; t is the number of iterations; i=1,2,…,N.
[0046] Further, the specific steps of S4 are as follows:
[0047] S41: The control system receives the latest proportioning instruction from the algorithm model, and the software in the control system parses the received instruction and converts it into a specific control signal to prepare to adjust the working mode of the metering pump;
[0048] S42: adjusting the rotation speed or valve opening of the metering pump controlling liquid A and the metering pump controlling liquid B according to the instruction to achieve the required flow ratio, and adjusting the outlet pressure of the metering pump to ensure that the metering pump of liquid A and the metering pump of liquid B work synchronously to maintain a stable mixing ratio;
[0049] S43: During the ratio adjustment process, the control system continuously monitors the parameters of the metering pump, compares them with the target values, and makes fine adjustments through a closed-loop feedback mechanism;
[0050] S44: Implement safety monitoring. If an operating condition beyond the preset safety range is detected, an alarm is immediately triggered and preventive measures are taken.
[0051] Furthermore, it also includes S5, establishing a construction log to analyze and optimize the model; the content of the construction log in S5 includes the parameters, implementation time and actual effect of each ratio adjustment.
[0052] Compared with the prior art, the present invention has the following advantages and beneficial effects:
[0053] A synchronous double-liquid slurry construction method for shield in the present invention solves the problem of synchronous double-liquid slurry pipeline blockage. Combined with the control system, it can achieve precise proportional mixing control, ensure the mixing effect of liquid A and liquid B, and the double-liquid slurry is adjusted in proportion according to the changes in the stratum. The solidification time accuracy can reach 0.1 second, which provides a favorable guarantee for timely filling the gap behind the pipe segment, stabilizing the pipe segment, and reducing the risk of ground subsidence. At the same time, it reduces the time for pipeline dredging and improves the shield construction efficiency. BRIEF DESCRIPTION OF THE DRAWINGS
[0054] The drawings described herein are used to provide a further understanding of the embodiments of the present invention, constitute a part of this application, and do not constitute a limitation of the embodiments of the present invention. In the drawings:
[0055] Figure 1 A method flow chart of an embodiment of a synchronous double-liquid slurry construction method for a shield machine according to the present invention;
[0056] Figure 2 Circuit control diagram for dual slurry injection;
[0057] Figure 3 Layout diagram for dual-liquid slurry injection.
[0058] Marks and corresponding parts names in the attached drawings:
[0059] A liquid grouting pipe 1, B liquid grouting pipe 2, shield tail grouting pipe 3, slurry mixing device 4. DETAILED DESCRIPTION
[0060] In order to make the objectives, technical solutions and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with embodiments and drawings. The exemplary embodiments of the present invention and their description are only used to explain the present invention and are not intended to limit the present invention.
[0061] Example
[0062] like Figure 1-Figure 3 As shown, this embodiment provides a synchronous double-liquid slurry construction method for a shield machine. In this embodiment, the original synchronous grouting pipe and the spare grouting pipe of the shield machine are used to inject the A liquid and the B liquid of the synchronous double-liquid slurry respectively, and a mixing device is set at the tail of the shield for mixing. The device has a simple structure, better mixing effect, and no pipe blockage. The device adopts a variable frequency pump for numerical control during the injection of the synchronous double-liquid slurry, and can accurately control the mix ratio to achieve the effect of timely consolidation of the slurry. It can avoid the previous situation in which the A liquid and the B liquid are mixed in the tail of the shield and then enter the shield tail grouting pipeline, causing pipeline blockage and uncontrollable solidification of the synchronous double-liquid slurry.
[0063] Reference Figure 3 As shown, the devices involved in the construction process of the double liquid slurry include A liquid grouting pipe 1, B liquid grouting pipe 2, shield tail grouting pipe 3 and slurry mixing device 4, refer to Figure 2 , the specific construction steps are:
[0064] Step 1: Add synchronous mortar to liquid tank A;
[0065] Step 2: Add thickener to the B liquid tank;
[0066] Step 3: Start the mortar pump and mud pump at the same time in the operating system, set the pump power according to the set volume ratio of liquid A and liquid B to ensure the injection volume matches;
[0067] Step 4: Liquid A and liquid B are mixed and sprayed out from the grouting pipeline outside the shield tail;
[0068] Step 5: Liquid A and liquid B are mixed in the slurry mixing device 4 and then solidified behind the shield tail.
[0069] However, after the liquid A and liquid B are mixed at the shield tail, they are injected into the gap outside the shield tail through the pipeline of the shield tail. Due to the uneven mixing, the slurry solidification time is unstable, resulting in pipeline blockage or poor solidification effect. According to the shortcomings and difficulties of the above-mentioned construction technology, a synchronous double-liquid slurry construction method for shield in this embodiment is based on the original scheme, and the slurry is mixed outside the shield tail. At the same time, variable frequency precise control of the mixing ratio and a more advanced mixing method are provided to improve the construction quality of synchronous double slurry. The problem of synchronous double-liquid slurry pipeline blockage is solved, and combined with a digital variable frequency control system, precise proportion mixing control is achieved to ensure the effect of mixing liquid A and liquid B. At the same time, the double-liquid slurry is adjusted according to the changes in the stratum, and the solidification time accuracy can reach 0.1 seconds, which provides favorable guarantees for timely filling the gap behind the pipe segment, stabilizing the pipe segment, and reducing the risk of ground subsidence. At the same time, the time for pipeline dredging is reduced, and the efficiency of shield construction is improved.
[0070] like Figure 1 As shown, a synchronous double-liquid slurry construction method for a shield in this embodiment includes the following steps:
[0071] S1, before shield construction, geological survey is carried out to obtain the characteristics of the strata, and geological radar and ultrasonic detection technology are used to monitor the changes in the strata structure;
[0072] The characteristics of the formation include soil type, stability and moisture content. Different formation types require shield machines with different excavation capabilities and cutterhead configurations. For example, hard rock sections may require more powerful cutters and a larger thrust system, while soft soil formations may require a better soil improvement system.
[0073] Geological survey data helps determine the most suitable shield machine model and design parameters; the stability of the stratum directly affects the setting of excavation parameters. The assessment of stability helps prevent problems such as instability of the excavation face and excessive surface settlement, ensuring construction safety and efficiency; the moisture content and stratum type affect the selection of the ratio of synchronous grouting materials. The ratio of double liquid slurry or other grouting materials needs to be adjusted according to the specific conditions of the stratum to achieve a good filling effect, prevent groundwater infiltration, maintain the stability of the soil around the tunnel, and reduce stratum deformation.
[0074] At the same time, geological radar can identify the interfaces of different media, such as soil, rock layer, groundwater level, etc., by emitting high-frequency electromagnetic waves and receiving their reflected signals in the strata, thereby revealing the layered structure and thickness changes of the strata; geological radar can detect changes in groundwater levels because water bodies have a significant reflection effect on electromagnetic waves, and the propagation characteristics of ultrasonic waves in water are also different from those in solid media. These differences can help determine the location and changes of groundwater levels. Although it is difficult to measure water content directly, geological radar can estimate soil humidity or water content by analyzing the degree of signal attenuation, because an increase in water content will lead to an increase in the attenuation of electromagnetic waves.
[0075] S2, collects the formation property data and the monitored formation structure change data in S1, and generates the initial test combination of A liquid and B liquid for the current formation characteristics based on the collected data and historical construction experience. The specific steps are as follows:
[0076] S21: Based on the collected data, the bearing capacity, compression force and groundwater flow of the formation are evaluated. The calculation formula is as follows:
[0077] Bearing capacity of the stratum:
[0078] q ult =N q ×γ sat ×D f
[0079] Among them, q ult The ultimate bearing capacity of the soil refers to the maximum pressure that the foundation soil can withstand without being damaged; N q is the bearing capacity coefficient, which is determined by soil type, structure and test conditions, and reflects the ability of soil to resist external forces; γ sat is the saturated gravity, the weight of saturated soil per unit volume, taking into account the mass of water in the soil, which affects the calculation of bearing capacity; D f The width of the foundation is one of the dimensions of the foundation, which affects the contact area with the foundation and the load distribution;
[0080] The bearing capacity of the stratum directly affects the foundation design, but does not directly change the setting time of the grouting material. However, if a soft soil stratum with low bearing capacity requires a larger amount of grouting reinforcement, the increased grouting volume may require adjusting the ratio of liquid A and liquid B to maintain the ideal setting properties, thereby indirectly affecting the setting time;
[0081] Compression force:
[0082]
[0083] Among them, E cis the one-dimensional compression modulus, which indicates the ability of soil to resist compression; Δp is the vertical stress increment, i.e., the additional pressure applied to the soil layer; Δe is the corresponding reduction in porosity, i.e., the reduction ratio of the pore volume of the soil under pressure; S is the expected settlement, i.e., the amount of subsidence of the soil layer under load; p is the uniformly distributed load acting on the soil layer; H is the thickness of the soil layer;
[0084] The compressibility of the soil may cause the formation to settle, which may exert additional pressure on the injected grouting material. The settlement of highly compressible formations during or after construction may increase the lateral constraints on the grouting body and affect its internal stress state, which may accelerate or slow down the solidification process in local areas, especially when the thermal effects generated during the solidification process interact with the thermal conductivity of the soil;
[0085] Groundwater flow:
[0086]
[0087] Among them, QQ is the flow rate; k is the permeability coefficient; A is the cross-sectional area of the water flow; Δh is the head difference; L is the length of the water flow path; V is the amount of water passing through the sample; t is the test time. The presence and flow of groundwater have a significant impact on the solidification time. High moisture content can dilute the slurry and prolong the solidification time. It may also carry dissolved substances to react with the slurry and affect the solidification mechanism. In addition, the flow of groundwater may take away heat, affecting the heat balance during the solidification process, thereby changing the solidification rate. If the groundwater pressure is high, it may also cause changes in the slurry penetration path, affecting the continuity and integrity of the solidified body.
[0088] S22: Determine the initial range threshold of the desired coagulation time and coagulation effect;
[0089] S23: presetting the ratio of liquid A to liquid B, and setting a number of test combinations for liquid A and liquid B;
[0090] S24: Calculate the solidification time under actual formation conditions according to different test levels, then determine the solidification effect of the test combination that meets the solidification time, select the test combination whose solidification effect is within the threshold range, and calculate the expression of the solidification time under actual formation conditions:
[0091]
[0092] Where T is the basic solidification time; a, b, c, d, e, f and n 1 is the coefficient obtained by fitting the experimental data, reflecting the complex effects of the ratio and ambient temperature on the solidification time; A is the ratio of liquid A; B is the ratio of liquid B; T ambient is the ambient temperature; T ref is the reference temperature;
[0093] represents the nonlinear effect of the ratio of liquid A and liquid B, where n 1 It can be a non-integer, reflecting the enhancing or weakening effect of the ratio on the solidification time; Describes the ambient temperature T ambient Relative to a reference temperature T ref The exponential effect on solidification time is more significant with greater temperature differences; A penalty term is introduced for the deviation of the mix ratio from a certain ideal value e. As the deviation increases, its contribution to the solidification time may increase or decrease nonlinearly, depending on the sign of the coefficient d.
[0094] Introducing the bearing capacity, compression force and groundwater flow of the stratum into the formula, the calculation formula is:
[0095]
[0096] Among them, T cond k is the solidification time after the bearing capacity, compression force and groundwater flow of the formation are introduced; a is a proportionality constant related to material properties; P b is the reference bearing capacity value; k c is the coefficient related to the material; σ is the threshold; k d is a coefficient related to the material; k e is the coefficient related to the environment; T s is the groundwater temperature; T h is the ambient temperature.
[0097] It is the correction term of bearing capacity on solidification time. Bearing capacity usually acts by affecting the pressure of the formation on the injected material. High bearing capacity may lead to more compact materials and may accelerate some solidification reactions.
[0098] is the correction of the setting time by the compression force; the compression force affects the stress state around the paste and may accelerate or slow down the solidification process. If it is assumed that compression makes the material more compact and helps solidification, the correction term may be proportional to the degree of compression, but it is necessary to consider that the effect weakens after a saturation point;
[0099] The bearing capacity and compressive force influence the setting time indirectly by affecting the stress environment of the grouting material. For example, higher soil pressure may lead to increased stress inside the setting material, accelerate certain chemical reaction processes, or affect the slurry flow and setting morphology due to physical squeezing. This part of the correction term may be adjusted by empirical coefficients based on foundation reaction or soil compressibility parameters.
[0100] k dQ+k e ·(T s -T h ) is the correction of the setting time by groundwater flow; groundwater can dilute the slurry and slow down the solidification process. At the same time, its flow can take away heat and affect the solidification reaction rate. Therefore, the presence and flow of groundwater not only affects the dilution of the slurry, but may also affect the thermal balance in the solidification process through heat exchange.
[0101] S3, input the formation monitoring data into the shield machine control system in real time. The system analyzes and processes the data through a preset algorithm and calculates the most suitable ratio instructions of liquid A and liquid B. The specific steps are as follows:
[0102] S31: Remove outliers and noise from the collected data and integrate data from different sensors;
[0103] S32: evaluating the difference between the current formation and the preset ideal formation model based on the processed data, and identifying the immediate changes in formation conditions;
[0104] S33: Using a pre-programmed algorithm, input the current formation state data and calculate the A liquid and B liquid ratio adjustment plan. The algorithm expression in this step is:
[0105]
[0106] This is the objective function of elastic net regression, which aims to minimize the sum of prediction error and regularization term. To find the β vector that minimizes the objective function; β is a vector that contains all the coefficients of the model; β 0 is the intercept term; β j is the coefficient corresponding to the input variable; i is the actual observed solidification time of the i-th sample; x ij is the value of the i-th sample on the j-th feature, representing the input variables, such as the proportion of liquid A, the proportion of liquid B, formation parameters, etc.; m is the number of samples, that is, the total number of observations in the data set; n is the number of features, that is, the total number of input variables; λ 1 is the weight of L1 regularization, which controls the intensity of L1 norm penalty. A larger λ1 tends to produce sparse solutions, that is, part of β j Will be compressed to 0 to achieve feature selection; 2 is the weight of L2 regularization, which controls the strength of L2 norm penalty. L2 regularization helps prevent overfitting by reducing all β j , but does not force some coefficients to be zero like L1.
[0107] S34: Combining the initial range threshold of the coagulation time and the effect, the algorithm is used to optimize the ratio instruction, and the calculated optimal ratio of liquid A and liquid B is converted into a specific operation instruction. The expression of the algorithm for optimizing the ratio instruction in this step is:
[0108]
[0109] The iterative formula of the gradient descent method contains a loss function with multiple parameters, taking into account the ratio of liquid A and liquid B and other factors that may affect the solidification time or effect (such as temperature, pressure, formation characteristics, etc.), and adding L2 regularization to limit the complexity of the model;
[0110] Among them, θ j (t+1) is the jth model parameter at the t+1th iteration; θ j (t) is the jth model parameter at the tth iteration; α is the learning rate; N is the number of training samples; θ j is the jth model parameter; L(θ,x i ,y i ) is the loss function; θ is the set of all model parameters; x i is the feature of the i-th sample input; y i is the actual observed value of the i-th sample; λ is the regularization parameter; t is the number of iterations; i=1,2,…,N;
[0111] S35: After executing the new ratio instruction, continue to monitor the solidification process and formation response, collect feedback data, evaluate the effect of the ratio adjustment in real time based on the feedback data, and manually intervene to adjust the ratio instruction to form a closed-loop control.
[0112] S4, the control system automatically adjusts the working parameters of the metering pump according to the calculated ratio instruction, controls the flow ratio of liquid A and liquid B, and realizes the instant ratio adjustment of the double liquid slurry of liquid A and liquid B. The specific steps are as follows:
[0113] S41: The control system receives the latest ratio instruction from the algorithm model, which includes the specific ratio of liquid A to liquid B optimized for the current formation conditions, flow requirements and other necessary operating parameters. The software in the control system parses the received instruction and converts it into a specific control signal to prepare to adjust the working mode of the metering pump, which includes identifying the pump to be adjusted, the target flow ratio and other related settings;
[0114] S42: according to the instruction, the speed or valve opening of the metering pump controlling the liquid A and the metering pump controlling the liquid B is adjusted to achieve the required flow ratio, and the outlet pressure of the metering pump is adjusted to ensure that the slurry can be effectively injected under a specific underground pressure, especially under complex geological conditions, to ensure that the metering pump of the liquid A and the metering pump of the liquid B work synchronously to maintain a stable mixing ratio, and to maintain the synchronous ratio of the two by real-time monitoring of the flow and feedback adjustment;
[0115] S43: During the proportioning process, the control system continuously monitors the actual flow rate, pressure and other key parameters of the metering pump, compares them with the target values, and makes fine adjustments through a closed-loop feedback mechanism, which includes using real-time monitoring equipment outputs such as flow meters and pressure sensors; analyzing monitoring data, quickly identifying any deviations, and automatically adjusting pump parameters to correct the deviations;
[0116] S44: Implement safety monitoring. If operating conditions beyond the preset safety range are detected, an alarm is immediately triggered and preventive measures are taken, such as automatically stopping the pump, switching to the backup system, or notifying the operator.
[0117] S5: Establish a construction log to analyze and optimize the model. The content of the construction log includes the parameters, implementation time and actual effect of each mix adjustment.
[0118] It should be noted that the above description of the disclosed embodiments enables professionals and technicians in the field to implement or use the present application. Various modifications to these embodiments will be apparent to professionals and technicians in the field, and the general principles defined herein can be implemented in other embodiments without departing from the scope of the present application. Therefore, the present application will not be limited to the embodiments shown herein, but should conform to the widest scope consistent with the principles and novel features disclosed herein.
[0119] In the description of this document, the terms "installed", "set", "provided with", "connected", and "connected" should be understood in a broad sense. For example, it can be a fixed connection, a detachable connection, or an integral structure; it can be a mechanical connection, or an electrical connection; it can be a direct connection, or an indirect connection through an intermediate medium, or it can be an internal connection between two devices, elements, or components. For those of ordinary skill in the art, the specific meanings of the above terms in this application can be understood according to specific circumstances.
[0120] The structures, proportions, sizes, etc. drawn in the drawings in this application are only used to match the contents disclosed in this technical briefing book for technical personnel in this field to understand and read, and are not used to limit the restrictive conditions for the implementation of this application. Therefore, they have no substantive technical significance. Any structural modification, change in proportional relationship or adjustment of size should still fall within the scope of the technical content disclosed in this application without affecting the effects and purposes that can be achieved by this application.
[0121] The terms used in this document are those common terms currently widely used in the art in consideration of the functions of the present disclosure, but these terms may vary according to the intention of a person of ordinary skill in the art, precedents, or new technologies in the art. In addition, specific terms may be selected by the applicant, and in this case, their detailed meanings will be described in the detailed description of the present disclosure. Therefore, the terms used in the document should not be understood as simple names, but rather as an overall description based on the meaning of the terms and the present disclosure.
[0122] Flowcharts or text are used in this document to illustrate the operating steps performed according to the embodiments of the present application. It should be understood that the operating steps in the embodiments of the present application are not necessarily accurately performed in the order of recording. On the contrary, various steps can be processed in reverse order or simultaneously as needed. At the same time, other operations can also be added to these processes, or a certain step or several steps can be removed from these processes.
[0123] The above are only preferred embodiments of the present application and are not intended to limit the present application. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present application should be included in the protection scope of the present application.
Claims
1. A synchronous double-liquid slurry construction method for a shield, characterized in that: The following steps are involved: S1, before shield construction, geological survey is carried out to obtain the characteristics of the strata, and geological radar and ultrasonic detection technology are used to monitor the changes in the strata structure; S2, collecting the formation property data and the monitored formation structure change data in S1, and generating an initial test combination of fluid A and fluid B for the current formation properties based on the collected data; S3, input the formation monitoring data into the shield machine control system in real time. The system analyzes and processes the data through a preset algorithm and calculates the mixing ratio instructions of liquid A and liquid B; S4, the control system automatically adjusts the working parameters of the metering pump according to the calculated ratio instruction, controls the flow ratio of liquid A and liquid B, and realizes the instant ratio adjustment of the double liquid slurry of liquid A and liquid B.
2. A synchronous double-liquid slurry construction method for shield according to claim 1, characterized in that: The formation properties in S1 include soil type, stability and moisture content.
3. A synchronous double-liquid slurry construction method for shield according to claim 1, characterized in that: The specific steps of S2 are as follows: S21: Evaluate the bearing capacity, compression force and groundwater flow of the formation based on the collected data; S22: Determine the initial range threshold of the desired coagulation time and coagulation effect; S23: presetting the ratio of liquid A to liquid B, and setting a number of test combinations for liquid A and liquid B; S24: Calculate the solidification time under actual formation conditions according to different test levels, then determine the solidification effect of the test combination that meets the solidification time, and select the test combination whose solidification effect is within the threshold range.
4. A synchronous double-liquid slurry construction method for shield according to claim 3, characterized in that: The calculation formulas involved in the bearing capacity, compression force and groundwater flow in S21 are: Bearing capacity of the stratum: q ult =N q ×γ sat ×D f Among them, q ult is the ultimate bearing capacity of soil; N q is the bearing capacity coefficient; sat D is saturated weight; f is the base width; Compression force: Among them, E c is the one-dimensional compression modulus; Δp is the vertical stress increment; Δe is the corresponding reduction in void ratio; S is the expected settlement; p is the uniformly distributed load acting on the soil layer; H is the thickness of the soil layer; Groundwater flow: Among them, Q is the flow rate; k is the permeability coefficient; A is the water flow cross-sectional area; Δh is the head difference; L is the length of the water flow path; V is the amount of water passing through the sample; and t is the test time.
5. A synchronous double-liquid slurry construction method for shield according to claim 4, characterized in that: The expression for calculating the solidification time under actual formation conditions in S24 is: Where T is the basic coagulation time; a, b, c, d, e, f and n1 are coefficients obtained by fitting experimental data; A is the proportion of liquid A; B is the proportion of liquid B; T ambient is the ambient temperature; T ref is the reference temperature; Introducing the bearing capacity, compression force and groundwater flow of the stratum into the formula, the calculation formula is: Among them, T cond k is the solidification time after the bearing capacity, compression force and groundwater flow of the formation are introduced; a is a proportionality constant related to material properties; P b is the reference bearing capacity value; k c is the coefficient related to the material; σ is the threshold; k d is a coefficient related to the material; k e is the coefficient related to the environment; T s is the groundwater temperature; T h is the ambient temperature.
6. A synchronous double-liquid slurry construction method for shield according to claim 1, characterized in that: The specific steps of S3 are as follows: S31: Remove outliers and noise from the collected data and integrate data from different sensors; S32: evaluating the difference between the current formation and the preset ideal formation model based on the processed data, and identifying the immediate changes in formation conditions; S33: using a pre-programmed algorithm, inputting current formation state data, and calculating a solution for adjusting the ratio of liquid A and liquid B; S34: combining the initial range threshold of the coagulation time and the effect, optimizing the ratio instruction by using an algorithm, and converting the calculated optimal ratio of liquid A and liquid B into a specific operation instruction; S35: After executing the new ratio instruction, continue to monitor the solidification process and formation response, collect feedback data, evaluate the effect of the ratio adjustment in real time based on the feedback data, and manually intervene to adjust the ratio instruction to form a closed-loop control.
7. A synchronous double-liquid slurry construction method for shield according to claim 6, characterized in that: The expression of the algorithm in S33 is: in, To find the β vector that minimizes the objective function; β is a vector that contains all the coefficients of the model; β0 is the intercept term; β j is the coefficient corresponding to the input variable; i is the actual observed solidification time of the i-th sample; x ij is the value of the i-th sample on the j-th feature; m is the number of samples; n is the number of features; λ1 is the weight of L1 regularization; λ2 is the weight of L2 regularization.
8. A synchronous double-liquid slurry construction method for shield according to claim 6, characterized in that: The expression of the algorithm for optimizing the ratio instruction in S34 is: in, is the j-th model parameter at the t+1-th iteration; is the jth model parameter at the tth iteration; α is the learning rate; N is the number of training samples; θ j is the jth model parameter; L(θ, x i ,y i ) is the loss function; θ is the set of all model parameters; x i is the feature of the i-th sample input; y i is the actual observed value of the i-th sample; λ is the regularization parameter; t is the number of iterations; i = 1, 2, ..., N.
9. A synchronous double-liquid slurry construction method for shield according to claim 1, characterized in that: The specific steps of S4 are as follows: S41: The control system receives the latest proportioning instruction from the algorithm model, and the software in the control system parses the received instruction and converts it into a specific control signal to prepare to adjust the working mode of the metering pump; S42: adjusting the rotation speed or valve opening of the metering pump controlling liquid A and the metering pump controlling liquid B according to the instruction to achieve the required flow ratio, and adjusting the outlet pressure of the metering pump to ensure that the metering pump of liquid A and the metering pump of liquid B work synchronously to maintain a stable mixing ratio; S43: During the ratio adjustment process, the control system continuously monitors the parameters of the metering pump, compares them with the target values, and makes fine adjustments through a closed-loop feedback mechanism; S44: Implement safety monitoring. If an operating condition beyond the preset safety range is detected, an alarm is immediately triggered and preventive measures are taken.
10. A synchronous double-liquid slurry construction method for shield according to claim 1, characterized in that: It also includes S5, which establishes a construction log to analyze and optimize the model; the content of the construction log in S5 includes the parameters, implementation time and actual effect of each ratio adjustment.
Citation Information
Cited By
Grouting detection system and grouting method for shield tunnel wall
CN120798380A
Intelligent preparation control method for shield wall back grouting slurry
CN121209289A
A method for intelligent preparation and control of grouting fluid for backfilling of tunnel boring machines.
CN121209289B