A defogging device for highway tunnels

By installing processing pipes, dust extraction pipes, sealing pipes, defogging components, and dust removal components inside the tunnel, a negative ion enrichment area is formed, solving the problem of incomplete smog removal by existing devices and achieving efficient air purification inside the tunnel and blocking external smog.

CN118774934BActive Publication Date: 2024-11-12山西工程科技职业大学
View PDF 4 Cites 0 Cited by

Patent Information

Application Number
CN202411252639.9
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-09-09
Publication Date
2024-11-12
Estimated Expiration
2044-09-09

AI Technical Summary

Technical Problem

Existing tunnel smog removal devices reduce smog levels around the device during air intake and exhaust, but the overall smog removal effect in the tunnel is poor.

Method used

The system employs a treatment duct, a dust extraction duct, a sealing duct, a defogging component, a dust removal component, and a sealing component. It uses a fan pump to draw in air, uses the defogging component to filter out water mist, the dust removal component to remove dust, and the sealing component to block external smog from entering, forming a negative ion enrichment area to achieve overall airflow purification.

Benefits of technology

It improves the air purification effect inside the tunnel, prevents smog from entering the tunnel, and enhances the overall smog removal effect of the tunnel.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118774934B_ABST
    Figure CN118774934B_ABST
Patent Text Reader

Abstract

The present application relates to a defogging device for highway tunnels, and relates to the technical field of tunnel haze cleaning, which includes: a processing pipeline, which is fixed in the tunnel and extends from one end of the tunnel to the other end of the tunnel, and air pumps are arranged at both ends of the processing pipeline; a dust suction pipeline, which is located in the tunnel and connected with the processing pipeline, and a plurality of dust suction holes are opened on the dust suction pipeline; two sealing pipelines are arranged, and are respectively connected to the two ends of the processing pipeline; a defogging assembly is arranged at the connection between the dust suction pipeline and the processing pipeline, and is used to filter out water mist in the haze; a dust removal assembly is arranged in the processing pipeline, and is used to remove dust in the haze; two sealing assemblies are arranged, and correspond to the sealing pipelines one by one, and the sealing assembly is used to prevent the haze outside the tunnel from entering the tunnel. The present application has the effect of improving the overall haze removal effect of the tunnel.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of tunnel haze cleaning, and in particular to a haze removal device for highway tunnels. Background Art

[0002] Highway tunnels often have smog, which reduces visibility in the tunnels and increases the danger of vehicles driving in the tunnels. In smog weather, in order to improve the safety of vehicles driving in the tunnels, it is necessary to install smog removal devices in the tunnels.

[0003] The existing tunnel de-mist device includes a filter and an electrostatic dust removal mechanism. The air in the tunnel is drawn into the tunnel de-mist device through a wind pump, and then the air is discharged into the tunnel. The filter filters the moisture in the haze, and the electrostatic dust removal mechanism removes the dust in the haze to achieve the cleaning of the haze in the tunnel.

[0004] In the above scheme, the de-haze device sucks the air around itself and discharges the filtered air to its surroundings, so that the haze content in the air around the de-haze device can be reduced, but it is easy to cause poor haze removal effect in the whole tunnel. Summary of the invention

[0005] In order to improve the overall haze removal effect of the tunnel, the present application provides a haze removal device for a highway tunnel.

[0006] The present application provides a defogging device for a highway tunnel, which adopts the following technical solution:

[0007] A haze removal device for a highway tunnel, comprising:

[0008] The processing pipeline is fixedly installed in the tunnel and extends from one end of the tunnel to the other end of the tunnel. Air pumps are arranged at both ends of the processing pipeline.

[0009] A plurality of dust collection pipes are provided and arranged along the extension direction of the processing pipe. The dust collection pipes are connected with the processing pipes and a plurality of dust collection holes are provided on the dust collection pipes.

[0010] Two sealing pipes are provided and are respectively connected to the two ends of the processing pipe;

[0011] A plurality of demisting components are provided, and correspond to the dust collecting pipes one by one. The demisting components are provided at the connection between the dust collecting pipe and the processing pipe, and are used to filter out water mist in the haze;

[0012] A dust removal assembly is disposed in the processing pipeline and is used to remove dust from the haze;

[0013] The sealing components are provided in two groups and correspond to the sealing pipes one by one. The sealing components include a blowing nozzle, a guide strip and a first negative ion generator;

[0014] in,

[0015] The sealing pipe is annular, and a plurality of blowing nozzles are provided, and all are connected to the inner side of the sealing pipe. The plurality of blowing nozzles are arranged along the extension direction of the sealing pipe, and the ends away from the sealing pipe are all linear, and the linear ends of the blowing nozzles are located in the plane where the sealing pipe is located;

[0016] A plurality of guide strips are provided, and correspond to the blowing nozzles one by one. The guide strips are fixedly arranged in the middle of the linear end of the blowing nozzle, and the two blowing directions of the guiding blowing nozzles are respectively toward the inside of the tunnel and the outside of the tunnel;

[0017] A plurality of first negative ion generators are provided, and correspond to the blowing nozzles one by one. The first negative ion generator is fixed on the blowing nozzle, and the discharge needle of the first negative ion generator is located in the blowing nozzle.

[0018] By adopting the above technical scheme, two air pumps suck the air inside the tunnel into the sealed pipe through the dust suction holes and the processing pipe on the dust suction pipe, and then blow it to the port position of the tunnel through the blowing nozzle, so as to realize the overall flow of tunnel air; the demisting component can filter out the moisture in the haze, and the dust removal component can remove the dust in the haze, so that the air in the tunnel can be purified during the flow process; the guide bar guides the air blown out of the blowing nozzle, so that part of the air is blown into the tunnel and the other part of the air is blown out of the tunnel, the first negative ion generator adds negative ions to the air blown out of the blowing nozzle, and the annular sealed pipe forms a wind wall at the tunnel entrance with the help of the blowing nozzle, and a negative ion enrichment area is formed in the middle of the wind wall, the wind wall blocks the air and haze outside the tunnel from entering, and replenishes purified air into the tunnel, the negative ion enrichment area in the middle of the wind wall purifies and dusts the air passing through the wind wall, so that the air replenished from the tunnel port to the inside of the tunnel is not easy to carry haze, so that the air inside the tunnel can be purified as a whole, and the haze outside the tunnel is not easy to enter the tunnel, thereby improving the overall haze removal effect of the tunnel.

[0019] Optionally, the demisting assembly includes a demisting box and a demisting screen, the demisting box is connected to the connecting point of the dust suction pipe and the processing pipe, and the demisting screen is fixed in the demisting box.

[0020] By adopting the above technical solution, the air in the tunnel will first flow through the demisting mesh when entering the treatment pipe from the dust collection pipe. The demisting mesh can filter the water mist in the air and remove the moisture in the haze.

[0021] Optionally, the defogger assembly further includes a partition, which is fixed in the dust suction duct. The partition separates the dust suction duct into a water storage chamber and a dust suction chamber. The dust suction hole is located on the side wall of the dust suction chamber. The defogger mesh is tilted and guides water flow into the water storage chamber.

[0022] By adopting the above technical solution, the demisting mesh filters the water mist on itself and gradually accumulates it to form a water flow. The inclined demisting mesh can guide the water flow into the water storage cavity formed by the partition and the dust suction pipe, so that the water filtering capacity of the demisting mesh is not easily reduced.

[0023] Optionally, the dust removal component includes:

[0024] Two main sprockets are provided, and both are rotatably connected to the two ends of the processing pipeline through the first rotating shaft;

[0025] A chain is sleeved on two main sprockets and meshes with the main sprockets;

[0026] A plurality of auxiliary sprockets are provided and arranged along the extension direction of the chain. The auxiliary sprockets are rotatably connected to the processing pipeline through the second rotating shaft, the auxiliary sprockets are meshed with the chain, and the auxiliary sprockets support and tension the chain;

[0027] A plurality of second negative ion generators are arranged along the extension direction of the chain and are all fixedly connected to the chain;

[0028] The connecting point between the dust collection pipe and the processing pipe is located in the area surrounded by the chain, and the discharge needle of the second negative ion generator is located in the area surrounded by the chain.

[0029] By adopting the above technical solution, the second negative ion generator releases negative ions into the area surrounded by the chain, and the main sprocket is rotated to rotate the chain. The chain drives the second negative ion generator to move and drives the auxiliary sprocket to rotate, so that the negative ions in the area surrounded by the chain are easily evenly distributed. The evenly distributed negative ions purify and remove dust from the air entering the treatment pipe from the dust collection pipe, so that the air inside the tunnel can be dust-free.

[0030] Optionally, a sponge is provided on the top surface of the main sprocket, and multiple sponges are provided in the vertical direction. The multiple sponges are fixedly connected to the processing pipeline through a support plate. When the second negative ion generator moves to the sponge, the discharge needle of the second negative ion generator slides between two adjacent sponges.

[0031] By adopting the above technical solution, the discharge needle of the second negative ion generator can slide through the sponge during movement, and the sponge can clean the discharge needle of the second negative ion generator, so that the discharge needle of the second negative ion generator is not easily reduced in its ability to release negative ions due to dust accumulation.

[0032] Optionally, the processing pipeline is provided with a dust cleaning component, the dust cleaning component is provided with multiple groups, and corresponds to the auxiliary sprockets one by one, the auxiliary sprockets are fixedly connected to the second rotating shaft, and the dust cleaning component includes an ash collecting shell, an ash outlet box, a first ash outlet plate and a second ash outlet plate;

[0033] The ash collecting shell is conical and connected to the processing pipeline at a position corresponding to the auxiliary sprocket;

[0034] The ash box is fixedly arranged at the top corner of the ash collecting shell;

[0035] The second rotating shaft is rotatably arranged on the ash discharging box, the first ash discharging plate and the second ash discharging plate are both fixedly arranged on the second rotating shaft, the first ash discharging plate is attached to one end of the ash discharging box close to the ash collecting shell, and the second ash discharging plate is attached to one end of the ash discharging box away from the ash collecting shell;

[0036] Both ends of the ash box are provided with ash discharge holes, the first ash discharge plate is provided with a first ash discharge hole, and the second ash discharge plate is provided with a second ash discharge hole. When the first ash discharge hole is directly opposite to the ash discharge hole adjacent to it, the second ash discharge hole is in a misaligned state with the ash discharge hole adjacent to it.

[0037] By adopting the above technical scheme, the conical ash collecting shell can collect dust at its own top corner, and the auxiliary sprocket can drive the second rotating shaft to rotate during the rotation of the chain, and the second rotating shaft drives the first ash outlet plate and the second ash outlet plate to rotate. When the first ash outlet hole is opposite to the ash outlet hole close to itself, the dust can fall into the ash outlet box, and when the second ash outlet hole is opposite to the ash outlet hole close to itself, the dust can be discharged from the ash outlet box to the outside, thereby facilitating the automatic discharge of dust from the treatment pipeline, and because when the first ash outlet hole is connected to the ash outlet box, the second ash outlet hole is closed to the ash outlet box, so that the ash discharge process can always maintain the closedness of the treatment pipeline.

[0038] Optionally, a plurality of pull ropes are fixedly connected to the chain along the extension direction, a knocking block is fixedly connected to one end of the pull rope away from the chain, and the length of the pull rope is greater than the distance between the chain and the opening of the ash collecting shell.

[0039] By adopting the above technical solution, the chain pulls the knocking block to move through the pull rope. Since the length of the pull rope is greater than the distance between the chain and the opening of the ash collecting shell, the knocking block can knock on the side wall of the ash collecting shell during movement, thereby improving the dust collecting ability of the ash collecting shell.

[0040] Optionally, a filter assembly is provided in the processing pipeline, the filter assembly includes a filter screen, two filter screens are provided and correspond one to one with the air pump, the filter screens are located on a side of the air pump close to the main sprocket and are connected to the processing pipeline.

[0041] By adopting the above technical solution, the filter net further filters the purified air, thereby improving the air purification effect inside the tunnel.

[0042] Optionally, the filter screen is rotatably connected to the processing pipeline, and the filter assembly also includes a scraper rod. Two scraper rods are provided and correspond to the filter screen one by one. The scraper rod is fixedly connected to the processing pipeline and fits on the filter screen. The filter screen is connected to a drive assembly, and the drive assembly includes a ring gear, a gear and a motor. The ring gear is coaxially fixed to the filter screen, the gear is meshed with the ring gear, the gear is coaxially fixed to the output shaft of the motor, and the motor is fixedly connected to the processing pipeline.

[0043] By adopting the above technical solution, the motor drives the gear to rotate, the gear drives the ring gear to rotate, the ring gear drives the filter to rotate, the rotating filter can move relative to the scraper rod, so that the scraper rod can scrape off the dust on the filter, so that the filter can achieve self-cleaning.

[0044] Optionally, the output shaft of the motor is coaxially connected to a worm, the worm is meshed with a worm wheel, the worm wheel is coaxially connected to the first rotating shaft, and the first rotating shaft is coaxially connected to the main sprocket.

[0045] By adopting the above technical solution, the motor can drive the first rotating shaft to rotate through the worm and the worm wheel while driving the filter, and the first rotating shaft can drive the main sprocket to rotate, so that the main sprocket can drive the chain to rotate with the driving force of the filter.

[0046] In summary, the present application includes at least one of the following beneficial technical effects:

[0047] 1. By setting up a processing pipeline, a dust collection pipeline, a sealing pipeline, a demisting component, a dust removal component and a sealing component, the air in the tunnel can be flow-purified as a whole, and the haze outside the tunnel is not easy to enter the tunnel, thereby improving the overall haze removal effect of the tunnel;

[0048] 2. By providing the blowing nozzle, the guide strip and the first negative ion generator, a wind wall and a negative ion enrichment area can be formed at the tunnel entrance, so that the haze outside the tunnel is not easy to enter the tunnel;

[0049] 3. By setting the main sprocket, chain and second negative ion generator, the air entering the treatment pipeline can be easily purified;

[0050] 4. By arranging the ash collecting shell, the ash discharging box, the first ash discharging plate and the second ash discharging plate, the dust in the processing pipeline can be easily discharged. BRIEF DESCRIPTION OF THE DRAWINGS

[0051] Figure 1 It is a schematic diagram of the structure of the embodiment of the present application installed in a tunnel;

[0052] Figure 2 It is a schematic diagram of the structure of an embodiment of the present application;

[0053] Figure 3It is a schematic diagram of the structure of the dust removal component;

[0054] Figure 4 is a cross-sectional view of the demisting assembly;

[0055] Figure 5 It is a schematic diagram of the structure of the filter component and the drive component;

[0056] Figure 6 It is a schematic diagram of the structure of the dust cleaning component;

[0057] Figure 7 yes Figure 3 Magnified view at A in the middle;

[0058] Figure 8 It is a structural schematic diagram of the sealing component.

[0059] Description of reference numerals:

[0060] 1. Processing pipeline; 11. Air pump; 2. Dust suction pipeline; 21. Dust suction hole; 3. Sealing pipeline; 4. Demisting assembly; 41. Demisting box; 42. Demisting screen; 43. Partition; 5. Dust removal assembly; 51. Main sprocket; 511. First rotating shaft; 52. Chain; 53. Auxiliary sprocket; 531. Second rotating shaft; 54. Second negative ion generator; 55. Sponge; 56. Support plate; 6. Sealing assembly; 61. Blowing nozzle; 62. Guide Toward bar; 63, first negative ion generator; 7, cleaning component; 71, ash collecting shell; 72, ash box; 721, ash discharge hole; 73, first ash discharge plate; 731, first ash discharge hole; 74, second ash discharge plate; 741, second ash discharge hole; 75, pull rope; 76, knocking block; 8, filter component; 81, filter net; 82, scraper rod; 9, drive component; 91, gear ring; 92, gear; 93, motor; 94, worm; 95, worm wheel. DETAILED DESCRIPTION

[0061] The following is combined with Figure 1-8 This application is described in further detail.

[0062] The present application embodiment discloses a haze removal device for a highway tunnel. Figure 1 , Figure 2 and Figure 3A demisting device for a highway tunnel comprises a processing pipeline 1, a dust suction pipeline 2, a sealing pipeline 3, a demisting assembly 4, a dust removal assembly 5 and a sealing assembly 6. The processing pipeline 1 is fixedly arranged in the tunnel and extends from one end of the tunnel to the other end of the tunnel. Air pumps 11 are arranged at both ends of the processing pipeline 1. The dust suction pipeline 2 is connected to the processing pipeline 1 and is provided with a dust suction hole 21. Two sealing pipelines 3 are provided and are respectively connected to the two ends of the processing pipeline 1. The demisting assembly 4 is arranged at the connection between the dust suction pipeline 2 and the processing pipeline 1 and is used to filter out water mist in the haze. The dust removal assembly 5 is arranged in the processing pipeline 1 and is used to remove dust in the haze. Two groups of sealing assemblies 6 are provided and are arranged on the sealing pipeline 3 one by one. The sealing assembly 6 is used to prevent haze outside the tunnel from entering the tunnel.

[0063] When in use, the air pump 11 is started, and the air at the dust suction hole 21 is drawn by the air pump 11 into the dust suction pipe 2, the processing pipe 1 and the sealing pipe 3, and the air is discharged from the sealing component 6 to the port position of the tunnel, so that the air in the tunnel can flow as a whole, the demisting component 4 filters out the water mist in the haze, the dust removal component 5 removes the dust in the haze, and the sealing component 6 blocks the haze outside the tunnel from entering the tunnel, so as to purify the air in the tunnel, thereby improving the overall haze removal effect of the tunnel.

[0064] Reference Figure 1 and Figure 3 The processing pipeline 1 is in a rectangular tube shape and is located at the top of the tunnel. The extension direction of the processing pipeline 1 is consistent with the extension direction of the tunnel. The air pump 11 is fixed inside the processing pipeline 1.

[0065] Reference Figure 3 and Figure 4 , there are multiple dust suction pipes 2, which are arranged along the extension direction of the treatment pipe 1. The dust suction pipe 2 is located on the side of the treatment pipe 1 away from the top of the tunnel. The dust suction pipe 2 is in a rectangular tube shape and is curved in an arc shape in the direction away from the treatment pipe 1. The dust suction pipe 2 is vertically arranged, and the middle part is connected to the bottom surface of the treatment pipe 1. There are multiple dust suction holes 21, which are arranged along the extension direction of the dust suction pipe 2. The dust suction holes 21 are circular and located on the side of the dust suction pipe 2 away from the treatment pipe 1.

[0066] There are multiple groups of defogger assemblies 4, which correspond one to one with the dust suction ducts 2. The defogger assemblies 4 include a defogger box 41, a defogger mesh 42 and a partition 43. The defogger box 41 is in a rectangular box and is located between the dust suction duct 2 and the processing duct 1. The defogger box 41 is horizontally arranged, and the top end is connected to the processing duct 1. The dust suction duct 2 is passed through the bottom of the defogger box 41 and is connected to the inside of the defogger box 41.

[0067] Reference Figure 4There are two partitions 43, which are symmetrically fixed in the dust suction pipe 2. The partition 43 is in the shape of a rectangular plate and is bent into an arc that matches the dust suction pipe 2. The partition 43 is located in the middle of the dust suction pipe 2, and the extension direction is consistent with the extension direction of the dust suction pipe 2. The partition 43 divides the dust suction pipe 2 into a water storage chamber and a dust suction chamber. The water storage chamber and the dust suction chamber are arranged in a vertical direction, and the water storage chamber is located above the dust suction chamber. The dust suction hole 21 is located on the bottom wall of the dust suction chamber.

[0068] The demisting screen 42 is fixed in the demisting box 41 and is bent in the middle. The fold of the demisting screen 42 is perpendicular to the tangent of the middle of the dust suction pipe 2. The demisting screen 42 is located above the partition 43, and the two sides of the fold are inclined in the direction close to the partition 43. The bottom end of the demisting screen 42 is located at the inlet of the water storage chamber, and the demisting screen 42 guides the water flow into the water storage chamber.

[0069] When in use, air enters the dust suction pipe 2 from the dust suction hole 21, and the demisting screen 42 filters the water mist in the air. The water mist accumulates on the demisting screen 42 to form a water flow, and the water flow flows into the water storage chamber along the inclined surface of the demisting screen 42, so that the moisture in the haze is easy to filter out.

[0070] Reference Figure 3 and Figure 5 The dust removal assembly 5 includes a main sprocket 51, a chain 52, an auxiliary sprocket 53 and a second negative ion generator 54. Two main sprockets 51 are provided and are respectively located at both ends of the processing pipeline 1. The main sprocket 51 is located on the side of the air pump 11 away from the end of the processing pipeline 1. The main sprocket 51 is coaxially fixed with a first rotating shaft 511. The first rotating shaft 511 is vertically arranged and rotatably connected to the processing pipeline 1.

[0071] The chain 52 is sleeved on the two main sprockets 51 and meshed with the main sprockets 51. The connection between the demister box 41 and the processing pipeline 1 is located in the area surrounded by the chain 52. In this embodiment, the tunnel is a linear tunnel. A plurality of auxiliary sprockets 53 are provided and arranged along the extension direction of the chain 52. The auxiliary sprocket 53 is located in the area surrounded by the chain 52 and meshed with the chain 52. The auxiliary sprocket 53 is coaxially fixed with a second rotating shaft 531. One end of the second rotating shaft 531 away from the auxiliary sprocket 53 is rotatably connected to the processing pipeline 1. The auxiliary sprocket 53 supports and tensions the chain 52.

[0072] Reference Figure 5 There are multiple second negative ion generators 54 along the extension direction of the chain 52, and they are all located above the chain 52. The second negative ion generator 54 is fixedly connected to the chain 52. There are four discharge needles of the second negative ion generator 54, which are arranged in a matrix. The discharge needles of the second negative ion generator 54 are located in the area surrounded by the chain 52.

[0073] A sponge 55 is provided on the top surface of the main sprocket 51. The sponge 55 is in the shape of a rectangular plate, and three sponges 55 are provided in the vertical direction. Two adjacent sponges 55 are arranged close to each other. The side of the three sponges 55 away from the meshing side of the main sprocket 51 and the chain 52 is fixedly connected to the processing pipeline 1 through a support plate 56. When the second negative ion generator 54 moves to the sponge 55, the discharge needle of the second negative ion generator 54 slides between two adjacent sponges 55.

[0074] Reference Figure 5 and Figure 6 A dust cleaning component 7 is arranged on the processing pipeline 1 . The dust cleaning component 7 is provided with multiple groups and corresponds to the auxiliary sprocket 53 one by one. The dust cleaning component 7 includes an ash collecting shell 71 , an ash outlet box 72 , a first ash outlet plate 73 and a second ash outlet plate 74 .

[0075] The ash collecting shell 71 is in a quadrangular pyramid shape and is connected to the bottom surface of the processing pipeline 1. The ash collecting shell 71 is located directly below the auxiliary sprocket 53. The ash discharging box 72 is in a circular box shape and is coaxially arranged with the auxiliary sprocket 53. The top of the ash discharging box 72 is fixedly arranged at the top corner of the ash collecting shell 71.

[0076] Reference Figure 6 The second rotating shaft 531 is rotatably provided on the ash outlet box 72. The first ash outlet plate 73 and the second ash outlet plate 74 are both circular plates and are coaxially fixed to the second rotating shaft 531. The first ash outlet plate 73 is attached to one end of the ash outlet box 72 close to the ash collecting shell 71, and the second ash outlet plate 74 is attached to the end of the ash outlet box 72 away from the ash collecting shell 71.

[0077] Two circular ash discharge holes 721 are provided at both ends of the ash discharge box 72. The two ash discharge holes 721 at each end of the ash discharge box 72 are symmetrically provided and penetrate the wall thickness of the ash discharge box 72. The ash discharge holes 721 at both ends of the ash discharge box 72 are directly opposite to each other. Two first ash discharge holes 731 are symmetrically provided on the first ash discharge plate 73. The first ash discharge holes 731 are circular and penetrate the thickness of the first ash discharge plate 73. The diameter of the first ash discharge hole 731 is equal to the diameter of the ash discharge hole 721 and is used to directly face the ash discharge hole 721 close to itself.

[0078] Two second ash outlet holes 741 are symmetrically provided on the second ash outlet plate 74. The second ash outlet holes 741 are circular and penetrate the thickness of the second ash outlet plate 74. The diameter of the second ash outlet hole 741 is equal to the diameter of the ash outlet hole 721 and is used to face the ash outlet hole 721 adjacent to itself. The line connecting the centers of the two second ash outlet holes 741 is perpendicular to the line connecting the centers of the two first ash outlet holes 731. When the first ash outlet hole 731 faces the ash outlet hole 721 adjacent to itself, the second ash outlet hole 741 is in a misaligned state with the ash outlet hole 721 adjacent to itself.

[0079] Reference Figure 5The chain 52 is fixedly connected with a plurality of pull ropes 75 along the extension direction. The pull rope 75 is located below the chain 52. A spherical knocking block 76 is fixedly connected to one end of the pull rope 75 away from the chain 52. The length of the pull rope 75 is greater than the distance between the chain 52 and the opening of the ash collecting shell 71.

[0080] Reference Figure 3 and Figure 5 A filter assembly 8 is arranged in the processing pipeline 1, and the filter assembly 8 includes a filter screen 81 and a scraper rod 82. There are two filter screens 81 and two scraper rods 82, and they correspond to each other. The filter screen 81 corresponds to the air pump 11 one by one, and is located on the side of the air pump 11 close to the main sprocket 51. The filter screen 81 is vertically arranged and rotatably connected to the processing pipeline 1. The scraper rod 82 is located on the side of the filter screen 81 close to the main sprocket 51, and is in the shape of a rectangular rod. One side of the scraper rod 82 is attached to the filter screen 81, and one end of the scraper rod 82 in the length direction is fixedly connected to the processing pipeline 1.

[0081] Reference Figure 5 and Figure 7 The filter screen 81 is connected to a driving assembly 9, which includes a ring gear 91, a gear 92, a motor 93, a worm 94 and a worm wheel 95. The ring gear 91 is coaxially fixed on the filter screen 81; the gear 92 is meshed with the ring gear 91 and is coaxially fixedly connected to the output shaft of the motor 93; the motor 93 is located on the side of the filter screen 81 away from the main sprocket 51 and is fixedly connected to the processing pipeline 1; the worm 94 is coaxially fixedly connected to the output shaft of the motor 93 and meshed with the worm wheel 95; the worm wheel 95 is coaxially fixedly connected to the first rotating shaft 511 close to itself.

[0082] When in use, the air passing through the defog box 41 flows into the treatment pipeline 1, and the motor 93 and the second negative ion generator 54 are started. The motor 93 drives the filter 81 to rotate through the gear 92 and the ring gear 91, and drives the main sprocket 51 to rotate through the worm 94 and the worm wheel 95. The main sprocket 51 drives the chain 52 to rotate, and the chain 52 drives the second negative ion generator 54 to move, so that the second negative ion generator 54 releases negative ions evenly into the area surrounded by the chain 52. The negative ions purify the air flowing into the treatment pipeline 1, and the filter 81 further filters the air purified by negative ions to achieve the removal of haze in the tunnel.

[0083] During the rotation of the filter 81, the scraper 82 scrapes off the dust on the filter 81 to clean the filter 81. When the second negative ion generator 54 moves to the sponge 55, the discharge needle of the second negative ion generator 54 slides between two adjacent sponges 55, and the sponge 55 cleans the dust on the discharge needle of the second negative ion generator 54. The chain 52 drives the pull rope 75 to move and drives the auxiliary sprocket 53 to rotate. The pull rope 75 drives the knocking block 76 to knock on the side wall of the ash collection shell 71, so that the dust is collected at the top angle position of the ash collection shell 71. The auxiliary sprocket 53 drives the first ash discharge plate 73 and the second ash discharge plate 74 to rotate through the second rotating shaft 531. When the first ash discharge hole 731 is opposite to the ash discharge hole 721, the dust falls into the ash discharge box 72. When the second ash discharge hole 741 is opposite to the ash discharge hole 721, the dust is discharged from the ash discharge box 72, so that the dust is easy to be automatically discharged from the processing pipeline 1.

[0084] Reference Figure 1 The sealing pipe 3 is annular and matches the port of the tunnel. The cross-section of the sealing pipe 3 along the extension direction is rectangular. The sealing pipe 3 is vertically arranged. The top end of the sealing pipe 3 is connected to the processing pipe 1, and the bottom end of the sealing pipe 3 is embedded in the ground of the tunnel port.

[0085] Reference Figure 2 and Figure 8 There are two sets of sealing components 6, which correspond to the sealing pipes 3 one by one. The sealing components 6 include a blowing nozzle 61, a guide strip 62 and a first negative ion generator 63.

[0086] There are multiple blowing nozzles 61, and they are arranged along the extension direction of the sealing pipe 3. The multiple blowing nozzles 61 are all located on the inner side of the sealing pipe 3. One end of the blowing nozzle 61 is rectangular, and the other end is linear. The rectangular end of the blowing nozzle 61 is connected to the sealing pipe 3, and the linear end of the blowing nozzle 61 is located in the plane where the sealing pipe 3 is located.

[0087] There are multiple guide strips 62, and they correspond one to one with the blowing nozzles 61. The guide strip 62 is fixed in the middle of the linear end of the blowing nozzle 61, and the length direction is consistent with the length direction of the linear end of the blowing nozzle 61. The cross-section of the guide strip 62 along the length direction is triangular, and one of the side edges is directly opposite to the inside of the blowing nozzle 61. The two side surfaces of the guide strip 62 guide the two blowing directions of the blowing nozzle 61 toward the inside and outside of the tunnel respectively.

[0088] There are multiple first negative ion generators 63 , which correspond to the blowing nozzles 61 one by one. The first negative ion generator 63 is fixed in the middle of the blowing nozzle 61 , and the discharge needle of the first negative ion generator 63 is fixedly inserted into the blowing nozzle 61 .

[0089] When in use, the first negative ion generator 63 is started, and the first negative ion generator 63 releases negative ions into the blowing nozzle 61. The air pump 11 draws air to flow into the sealed pipe 3, and the air is blown out from the linear end of the blowing nozzle 61 carrying negative ions. Part of the air is blown into the tunnel, and the other part of the air is blown out of the tunnel, so that a wind wall is formed at the port position of the tunnel to block the haze outside the tunnel from entering, and a negative ion enrichment area is formed in the middle of the wind wall, so that the haze outside the tunnel is not easy to enter the tunnel, and the haze that breaks through the wind wall can be purified and removed in the negative ion enrichment area, thereby improving the overall haze removal effect of the tunnel.

[0090] The implementation principle of the haze removal device for a highway tunnel in the embodiment of the present application is as follows: when in use, the air pump 11, the motor 93, the first negative ion generator 63 and the second negative ion generator 54 are started, the air in the tunnel is sucked by the air pump 11 and blown out from the blowing nozzle 61 through the dust suction pipe 2, the processing pipe 1 and the sealing pipe 3, the motor 93 drives the filter 81 and the chain 52 to rotate, the first negative ion generator 63 releases negative ions into the blowing nozzle 61, and under the drive of the chain 52, the second negative ion generator 54 releases negative ions evenly into the area surrounded by the chain 52, the demisting mesh 42 filters out water mist in the air, the negative ions in the area surrounded by the chain 52 purify the dust in the air, the filter 81 further filters the air, and the purified air is blown out from the blowing nozzle 61 carrying negative ions, and a wind wall is formed, which blocks the haze outside the tunnel from entering the tunnel, thereby improving the overall haze removal effect of the tunnel.

[0091] The inclined demisting screen 42 guides the water flow into the water storage chamber. The sponge 55 cleans the dust on the discharge needle of the second negative ion generator 54. The auxiliary sprocket 53 drives the first ash discharge plate 73 and the second ash discharge plate 74 to rotate to clean the dust in the processing pipeline 1. The scraper rod 82 scrapes the dust on the filter screen 81 to clean the filter screen 81.

[0092] The above are all preferred embodiments of the present application, and the protection scope of the present application is not limited thereto. Therefore, any equivalent changes made according to the structure, shape, and principle of the present application should be included in the protection scope of the present application.

Claims

1. A haze removal device for a highway tunnel, characterized in that: include: A processing pipeline (1) is fixedly installed in the tunnel and extends from one end of the tunnel to the other end of the tunnel. Air pumps (11) are arranged at both ends of the processing pipeline (1); A plurality of dust collection pipes (2) are provided and arranged along the extension direction of the processing pipe (1); the dust collection pipe (2) is connected to the processing pipe (1); and a plurality of dust collection holes (21) are provided on the dust collection pipe (2); Two sealing pipes (3) are provided and are respectively connected to the two ends of the processing pipe (1); A plurality of demisting components (4) are provided, and correspond one to one with the dust collecting pipes (2); the demisting components (4) are provided at the connection point between the dust collecting pipe (2) and the processing pipe (1), and are used to filter out water mist in the haze; A dust removal component (5) is disposed in the processing pipeline (1) and is used to remove dust in the haze; The sealing components (6) are provided in two groups and correspond one to one with the sealing pipes (3). The sealing components (6) include a blowing nozzle (61), a guide strip (62) and a first negative ion generator (63); in, The sealing pipe (3) is annular in shape, a plurality of blowing nozzles (61) are provided, and all are connected to the inner side of the sealing pipe (3), the plurality of blowing nozzles (61) are arranged along the extension direction of the sealing pipe (3), and the ends away from the sealing pipe (3) are all linear, and the linear ends of the blowing nozzles (61) are located in the plane where the sealing pipe (3) is located; A plurality of guide strips (62) are provided, and correspond one to one with the blowing nozzles (61); the guide strips (62) are fixedly arranged in the middle of the linear end of the blowing nozzle (61), and the two blowing directions of the guiding blowing nozzle (61) are respectively directed toward the inside of the tunnel and the outside of the tunnel; A plurality of first negative ion generators (63) are provided, and correspond one to one with the blowing nozzles (61); the first negative ion generators (63) are fixedly mounted on the blowing nozzles (61); and the discharge needles of the first negative ion generators (63) are located inside the blowing nozzles (61).

2. A defogging device for a highway tunnel according to claim 1, characterized in that: The demisting assembly (4) comprises a demisting box (41) and a demisting screen (42); the demisting box (41) is connected to a connection point between the dust collection pipe (2) and the processing pipe (1); and the demisting screen (42) is fixedly arranged in the demisting box (41).

3. A defogging device for a highway tunnel according to claim 2, characterized in that: The demisting assembly (4) further comprises a partition (43) which is fixedly arranged in the dust suction duct (2). The partition (43) separates the dust suction duct (2) into a water storage chamber and a dust suction chamber. The dust suction hole (21) is located on the side wall of the dust suction chamber. The demisting screen (42) is arranged obliquely and guides water flow into the water storage chamber.

4. The defogging device for a highway tunnel according to claim 1, characterized in that: The dust removal component (5) comprises: Two main sprocket wheels (51) are provided, and both are rotatably connected to two ends of the processing pipeline (1) via a first rotating shaft (511); A chain (52) is sleeved on the two main sprockets (51) and meshes with the main sprockets (51); A plurality of auxiliary sprockets (53) are provided and arranged along the extension direction of the chain (52); the auxiliary sprockets (53) are rotationally connected to the processing pipeline (1) via a second rotating shaft (531); the auxiliary sprockets (53) are meshed with the chain (52); the auxiliary sprockets (53) support and tension the chain (52); A plurality of second negative ion generators (54) are arranged along the extension direction of the chain (52), and are all fixedly connected to the chain (52); The connection point between the dust collection pipe (2) and the processing pipe (1) is located in the area surrounded by the chain (52), and the discharge needle of the second negative ion generator (54) is located in the area surrounded by the chain (52).

5. A defogging device for a highway tunnel according to claim 4, characterized in that: A sponge (55) is provided on the top surface of the main sprocket (51), and a plurality of sponges (55) are provided in a vertical direction. The plurality of sponges (55) are fixedly connected to the processing pipeline (1) via a support plate (56). When the second negative ion generator (54) moves to the sponge (55), the discharge needle of the second negative ion generator (54) slides and inserts between two adjacent sponges (55).

6. A defogging device for a highway tunnel according to claim 4, characterized in that: The processing pipeline (1) is provided with a ash cleaning assembly (7), wherein a plurality of ash cleaning assemblies (7) are provided and correspond one to one with the auxiliary sprockets (53), the auxiliary sprockets (53) are fixedly connected to the second rotating shaft (531), and the ash cleaning assembly (7) comprises an ash collecting shell (71), an ash discharging box (72), a first ash discharging plate (73) and a second ash discharging plate (74); The ash collecting shell (71) is conical and is connected to the processing pipeline (1) at a position corresponding to the auxiliary sprocket (53); The ash discharging box (72) is fixedly arranged at a top corner of the ash collecting shell (71); The second rotating shaft (531) is rotatably mounted on the ash discharging box (72); the first ash discharging plate (73) and the second ash discharging plate (74) are both fixedly mounted on the second rotating shaft (531); the first ash discharging plate (73) is attached to one end of the ash discharging box (72) close to the ash collecting shell (71); and the second ash discharging plate (74) is attached to one end of the ash discharging box (72) away from the ash collecting shell (71); Both ends of the ash box (72) are provided with ash discharge holes (721), the first ash discharge plate (73) is provided with a first ash discharge hole (731), and the second ash discharge plate (74) is provided with a second ash discharge hole (741); when the first ash discharge hole (731) is directly opposite to the adjacent ash discharge hole (721), the second ash discharge hole (741) is in a misaligned state with the adjacent ash discharge hole (721).

7. A defogging device for a highway tunnel according to claim 6, characterized in that: A plurality of pull ropes (75) are fixedly connected to the chain (52) along the extension direction, and a knocking block (76) is fixedly connected to one end of the pull rope (75) away from the chain (52). The length of the pull rope (75) is greater than the distance between the chain (52) and the opening of the ash collecting shell (71).

8. The defogging device for a highway tunnel according to claim 4, characterized in that: A filter assembly (8) is arranged in the processing pipeline (1), the filter assembly (8) comprising a filter screen (81), two filter screens (81) are arranged and correspond one to one with the air pump (11), the filter screens (81) are located on a side of the air pump (11) close to the main sprocket (51), and are connected to the processing pipeline (1).

9. A defogging device for a highway tunnel according to claim 8, characterized in that: The filter screen (81) is rotatably connected to the processing pipeline (1). The filter assembly (8) further comprises scraper rods (82). Two scraper rods (82) are provided and correspond to the filter screen (81) one by one. The scraper rods (82) are fixedly connected to the processing pipeline (1) and fit on the filter screen (81). The filter screen (81) is connected to a drive assembly (9). The drive assembly (9) comprises a gear ring (91), a gear (92) and a motor (93). The gear ring (91) is coaxially fixedly connected to the filter screen (81). The gear (92) meshes with the gear ring (91). The gear (92) is coaxially fixedly connected to the output shaft of the motor (93). The motor (93) is fixedly connected to the processing pipeline (1).

10. A defogging device for a highway tunnel according to claim 9, characterized in that: The output shaft of the motor (93) is coaxially fixedly connected to a worm (94), the worm (94) is meshed with a worm wheel (95), the worm wheel (95) is coaxially fixedly connected to the first rotating shaft (511), and the first rotating shaft (511) is coaxially fixedly connected to the main sprocket (51).

Citation Information

Patent Citations

  • Tunnel ventilation system capable of reducing polluted air circulation

    CN112065489A

  • Haze device is removed to highway tunnel intelligence

    CN207879377U

  • Ventilation method and ventilating device for tunnel inside of a pit

    JP2004339780A

  • A dustproof device for tunneling work

    KR1020160067247A