Calculation method of minimum active support force of full-face excavation face in shallow tunnel
By using a calculation model for the arc-to-plane failure mode and a moment integration method, the problem of overly conservative calculation of active support force in the full-section excavation of shallow tunnels was solved. A more accurate method for calculating the minimum active support force was provided, which reduced engineering costs and improved construction safety.
Patent Information
- Application Number
- CN202411259077.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-10
- Publication Date
- 2024-11-12
- Estimated Expiration
- 2044-09-10
AI Technical Summary
In existing technologies, when excavating shallow tunnels across the entire cross-section, the calculation results of active support force are too conservative. They do not take into account the non-smoothness of the back wall and the presence of friction, which leads to excessive active support, waste of engineering materials, and may cause ground heave.
A circular arc to plane failure mode was adopted to establish a calculation model. The active earth pressure coefficient was calculated by using the moment equation of the failure surface and integration, and the minimum active support force of the tunnel face was solved. The influence of non-smooth wall back and friction in actual engineering was taken into account.
It enables more accurate calculation of active support force, reduces material waste, lowers project costs, and ensures construction safety.
Smart Images

Figure CN118779971B_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of tunnel engineering, and in particular relates to a method for calculating the minimum active support force of a full-section excavation face of a shallow tunnel. Background Art
[0002] At present, my country is vigorously promoting the construction of subways, highways and other projects. As an important part of highways and railways, tunnels are of great significance to the quality and construction safety of the entire project. At present, in the analysis and calculation process of full-section excavation of shallow buried tunnels, it is necessary to calculate the active support force of the face so as to take appropriate active support measures during construction to ensure the stability of the face.
[0003] The commonly used failure mode in calculating active support force of the tunnel face is the N.Horn instability failure mode, such as Figure 1 As shown in the figure, the calculation of tunnel face stability is generally based on the limit analysis upper limit method or the limit equilibrium method. Among them, the limit analysis upper limit method starts from the velocity field that is assumed to satisfy the velocity boundary conditions, and then satisfies the plasticity conditions and the dynamic capacity conditions. According to the principle of minimum energy consumption, the velocity field that satisfies the velocity boundary conditions is obtained, which is considered to be the true velocity field, and the obtained solution is greater than the true solution. The limit equilibrium method usually assumes a sliding surface (or failure surface) and gives the stress along this sliding surface. The static equilibrium method is used to calculate the most dangerous sliding surface through comparison to obtain the limit load. Since the upper limit method is easy to solve, it has been studied more in the industry, but the calculation results are too large and conservative.
[0004] Specifically, the active support force of the tunnel face is calculated by the active earth pressure of the tunnel face. Currently, the active earth pressure of the tunnel face is usually calculated using the Rankine active earth pressure theory. The calculation formula of the Rankine active earth pressure is expressed as follows:
[0005] ;
[0006] The above formula can be rewritten as follows:
[0007] ;
[0008] In the above two formulas, , are the active earth pressures at the top and bottom of the tunnel face, is the surface load, is the internal friction angle of the soil, is the cohesion of the soil, The soil layer is heavy. is the tunnel height, , , is the active earth pressure coefficient.
[0009] From the above two formulas, it can be seen that the active earth pressure on the tunnel face calculated using the Rankine active earth pressure theory depends on the surface load and Rankine active earth pressure coefficient , , Rankine's active earth pressure theory assumes that the wall is rigid, the wall back is vertical, the backfill surface is horizontal, the wall back is smooth, and there is no friction between the wall back and the backfill. Since Rankine's active earth pressure theory ignores the fact that the wall back is not smooth and there is friction in actual engineering, the calculated active earth pressure will be too large; that is, when the surface load When a certain value is given, the calculated active earth pressure on the tunnel face is and If the value is too large, referring to this value to set active support measures during construction will lead to conservative active support of the tunnel face, waste of engineering materials, increase of engineering cost, and even cause adverse conditions such as surface uplift due to excessive active support.
[0010] In view of this, in order to make the construction of shallow tunnels more economical and reasonable and ensure construction safety, it is necessary to conduct in-depth research on the minimum active support force of the full-section excavation face of shallow tunnels. Summary of the invention
[0011] In view of the shortcomings existing in the relevant technologies, the present invention provides a method for calculating the minimum active support force of the full-section excavation face of a shallow tunnel, aiming to solve the problems that the calculation results of the active support force in the prior art are conservative and do not take into account the non-smoothness of the wall back and the existence of friction in actual projects, so that the calculation results of the minimum active support force of the face are more accurate and scientific, so as to reduce the waste of active support facilities and reduce the project cost while ensuring construction safety.
[0012] The present invention provides a method for calculating the minimum active support force of a shallow tunnel full-section excavation face, comprising the following steps:
[0013] S1. A calculation model is established based on the surface load, soil physical properties, structural characteristics of shallow buried tunnels, and the failure mode of the soil in front of the tunnel face when the shallow buried tunnel is fully excavated.
[0014] The soil damage area in front of the tunnel face is composed of the first soil block area and the second soil block area. The second soil block area is a curved wedge-shaped body in front of the tunnel face and its fracture surface is a circular arc surface. The first soil block area is an inverted cone-shaped body located obliquely above the second soil block area and its fracture surface is a plane, so that the fracture surface of the soil damage area in front of the tunnel face presents a circular arc surface ~ plane failure mode; the partition surface between the first soil block area and the second soil block area intersects with the extension surface of the tunnel face at the surface;
[0015] S2. Analyze and integrate the moment equation along the fracture surface of the soil failure area in front of the tunnel face to obtain the moment balance equation on the entire fracture surface;
[0016] S3, integrating the moment balance equation on the entire fracture surface to obtain the moment integral equation on the entire fracture surface;
[0017] S4. Solve the moment integral equation on the entire fracture surface to obtain the moment integral equation at any height on the tunnel face. Active earth pressure at Calculation formula and active earth pressure coefficient , , The calculation formula of
[0018] S5. Calculate the active earth pressure coefficient , , ;
[0019] S6. Analyze and solve the minimum active support force of the tunnel face.
[0020] In some embodiments, step S1 further includes defining model parameters, the model parameters including surface loads 、The internal friction angle of soil , soil cohesion , soil weight , shallow tunnel top burial depth , shallow tunnel height , the slope of the fracture surface of the first soil block area , the slope of the fracture surface in the second soil block area , the surface collapse range corresponding to the soil damage area in front of the tunnel face .
[0021] In some embodiments, in step S2, the moment equations are analyzed along the fracture surface of the first soil block area and the fracture surface of the second soil block area, which are expressed as equations (1) and (2) respectively, and the moment balance equation on the entire fracture surface is expressed as equation (3);
[0022] (1);
[0023] (2);
[0024] (3);
[0025] In formula (1) to formula (3), is the slope of the fracture surface in the soil failure area in front of the tunnel face, is the X coordinate value of any point on the entire fracture surface; It is the Z coordinate value of any point on the entire fracture surface.
[0026] In some of the embodiments, in step S3, the integral equation of the moment on the entire fracture surface is expressed as formula (4);
[0027] (4).
[0028] In some embodiments, in step S4, any height of the tunnel face obtained Active earth pressure at The calculation formula is expressed as formula (5); the active earth pressure coefficient obtained is , , The calculation formulas are expressed as formula (6)-formula (8) respectively;
[0029] (5);
[0030] (6);
[0031] (7);
[0032] (8).
[0033] In some embodiments, in step S5, according to the internal friction angle of the soil during the full-section excavation of the shallow tunnel, , and use equations (6) to (8) to solve the active earth pressure coefficient , , .
[0034] In some embodiments, in step S6, the active earth pressure coefficient is calculated using equation (5): , , , and order , solve for the active earth pressure at the bottom of the tunnel face , the minimum active support force of the tunnel face is equal to the active earth pressure at the bottom of the tunnel face .
[0035] Based on the above technical scheme, the method for calculating the minimum active support force of the full-section excavation face of a shallow tunnel in the embodiment of the present invention, through the combined use of a calculation model established based on the arc surface to plane failure mode of the soil body in front of the face during the full-section excavation of a shallow tunnel, a rupture surface moment balance equation, and a calculation formula for the active earth pressure of the face and the active earth pressure coefficient, can solve the problems of the prior art that the active support force calculation results are conservative due to ignoring the fact that the wall back is not smooth and there is friction in actual projects, and excessive active support causes surface uplift, etc., overcomes the limitations of the traditional Rankine active earth pressure theory, makes the calculation results of the minimum active support force of the face more accurate and scientific, reduces the waste of active support facilities and reduces the project cost while ensuring construction safety. BRIEF DESCRIPTION OF THE DRAWINGS
[0036] The drawings described herein are used to provide a further understanding of the present invention and constitute a part of this application. The exemplary embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute an improper limitation of the present invention. In the drawings:
[0037] Figure 1 It is a schematic diagram of the N.Horn instability failure mode under the prior art;
[0038] Figure 2 It is a flow chart of the method for calculating the minimum active support force of the full-section excavation face of a shallow tunnel according to the present invention;
[0039] Figure 3 It is a schematic diagram of the calculation model in the method for calculating the minimum active support force of the full-section excavation face of a shallow tunnel according to the present invention. DETAILED DESCRIPTION
[0040] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of the present invention.
[0041] In the description of the present invention, it should be understood that the terms "center", "lateral", "longitudinal", "up", "down", "top", "bottom", "inside", "outside", "left", "right", "front", "back", "vertical", "horizontal", etc., indicating orientations or positional relationships, are based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the present invention.
[0042] The terms "first", "second", etc. are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Thus, a feature defined as "first", "second", etc. may explicitly or implicitly include one or more of the features.
[0043] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a direct connection, or an indirect connection through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0044] refer to Figure 2-Figure 3 As shown, the present invention provides a method for calculating the minimum active support force of a shallow tunnel full-section excavation face, the method comprising the following steps:
[0045] S1. A calculation model is established based on the surface load, physical properties of soil layers, structural characteristics of shallow tunnels, and the failure mode of the soil in front of the tunnel face when the shallow tunnel is excavated in full section. The failure area of the soil in front of the tunnel face is composed of the first soil block area and the second soil block area. The second soil block area is an arc-shaped wedge in front of the tunnel face, and its rupture surface is an arc surface. The first soil block area is an inverted cone located obliquely above the second soil block area, and its rupture surface is a plane. As a result, the rupture surface of the failure area of the soil in front of the tunnel face presents a failure mode of an arc surface to a plane. The partition surface between the first soil block area and the second soil block area intersects with the extension surface of the tunnel face at the surface.
[0046] It should be noted that the failure mode of the soil in front of the full-section excavation face of the shallow tunnel in this embodiment is different from the N.Horn instability failure mode in the prior art; this embodiment finds that when a shallow tunnel is excavated, due to the shallow top burial depth, the fracture surface range of the face tends to expand toward the ground surface in front of the face, resulting in the face being unstable and the failure zone eventually penetrating the ground surface, that is, taking into account the fact that the back of the wall is not smooth and there is friction in the actual project that is ignored by the prior art, and therefore innovatively proposes the following Figure 3 The failure mode of the arc surface to the plane is shown in the figure; and through simulation analysis and experimental verification, it is shown that this failure mode is more suitable for the instability failure during the excavation of shallow buried tunnels.
[0047] refer to Figure 3As shown in the figure, it is further explained that, assuming that the ground surface is horizontal, the soil damage area in front of the tunnel face AD is divided into two areas for consideration, namely, the first soil block area FOE and the second soil block area AOF. The second soil block area AOF is an arc wedge in front of the tunnel face AD, and its fracture surface AF is an arc surface. The first soil block area FOE is an inverted cone located obliquely above the second soil block area AOF, and its fracture surface FE is a plane, so that the fracture surface AFE of the soil damage area in front of the tunnel face AD presents a failure mode of an arc surface ~ a plane; the partition surface FO between the first soil block area FOE and the second soil block area AOF intersects with the extension surface DO of the tunnel face AD at the ground surface O. Those skilled in the art can understand that, usually, the direction away from the tunnel excavation direction at the ground surface O is taken as the positive X direction, and the direction toward the inside of the ground surface at the ground surface O is taken as the positive Z direction, and the angle between the fracture surface FE and the positive X direction is expressed as The angle between the partition surface FO and the positive X direction between the first soil block area FOE and the second soil block area AOF is expressed as .
[0048] S2. Analyze and integrate the moment equation along the fracture surface AFE of the soil failure area in front of the tunnel face AD to obtain the moment equilibrium equation on the entire fracture surface AFE.
[0049] S3. Integrate the moment balance equation on the entire fracture surface AFE to obtain the moment integral equation on the entire fracture surface AFE.
[0050] S4. Solve the moment integral equation on the entire fracture surface AFE to obtain the moment integral equation at any height on the tunnel face AD. Active earth pressure at The calculation formula of active earth pressure coefficient can be obtained , , The calculation formula is: It is the height difference between a point on the tunnel face AD and the ground surface.
[0051] S5. Calculate the active earth pressure coefficient , , .
[0052] S6. Analyze and solve the minimum active support force of the tunnel face; specifically, use any height AD on the tunnel face Active earth pressure at The calculation formula and the calculated active earth pressure coefficient , , , any height on the tunnel face AD can be obtained Active earth pressure at , and the minimum active support force of the tunnel face is equal to the active earth pressure on the tunnel face AD The maximum value of .
[0053] The above-mentioned illustrative embodiment, through a series of process steps such as the establishment of a calculation model based on the arc surface to plane failure mode, the analysis of the moment equation of the rupture surface, and the acquisition of the calculation formula for the active earth pressure of the face and the active earth pressure coefficient, solves the problems of the prior art that the calculation results of the active support force are conservative due to ignoring the fact that the back of the wall is not smooth and there is friction in actual engineering, and the excessive active support causes surface uplift. A method for calculating the minimum active support force of the full-section excavation face of a shallow tunnel is creatively proposed, and the calculation of the minimum active support force of the face is made more accurate, scientific and reasonable, which ensures construction safety while reducing the waste of active support engineering materials and reducing engineering costs, which is beneficial to the optimal design of shallow tunnel engineering construction.
[0054] In some embodiments, step S1 also includes defining model parameters, the model parameters include surface loads 、The internal friction angle of soil , soil cohesion , soil weight , shallow tunnel top burial depth , shallow tunnel height , the slope of the fracture surface of the first soil block area , the slope of the fracture surface in the second soil block area , the surface collapse range corresponding to the soil damage area in front of the tunnel face ; Further, the buried depth of the top of the shallow tunnel is the height difference between the top surface of the shallow tunnel and the ground surface, and the height of the shallow tunnel is the height difference between the bottom surface of the tunnel and the top surface of the tunnel; for the failure mode of the soil in front of the heading face AD during the full-section excavation of the shallow tunnel in this embodiment, the surface collapse range corresponding to the soil damage area in front of the heading face AD is the surface collapse range corresponding to the first soil block area FOE, that is, the surface collapse range corresponding to EO.
[0055] In some embodiments, in step S2, a method combining the upper limit method of limit analysis and the limit equilibrium method is used to perform a detailed analysis of the soil in front of the tunnel face AD; the moment equation is analyzed along the fracture surface FE of the first soil block area FOE and the fracture surface AF of the second soil block area AOF, and they are expressed as formula (1) and formula (2) respectively, and the moment equilibrium equation on the entire fracture surface AFE is obtained as formula (3); in some embodiments, in step S3, the moment equilibrium equation on the entire fracture surface AFE is integrated, and the moment integral equation on the entire fracture surface AEE is obtained as formula (4);
[0056] (1);
[0057] (2);
[0058] (3);
[0059] (4);
[0060] In formula (1) to formula (4), is the X coordinate value of any point on the entire fracture surface AFE; is the Z coordinate value of any point on the entire fracture surface AFE, is the slope of the fracture surface AFE in the soil failure area in front of the tunnel face AD. It can be understood that when the moment equation is integrated along the fracture surface AF, equal , when integrating along the fracture surface FE equal This exemplary embodiment realizes the analysis and integration of the moment equation along the rupture surface of the arc surface to the plane of the soil body in front of the tunnel face AD, making it more suitable for the stress condition of the soil body in front of the tunnel face AD during shallow tunnel excavation.
[0061] In some embodiments, in step S4, the moment integral equation on the entire fracture surface AFE is solved, and the moment integral equation on any height of the tunnel face AD is obtained. Active earth pressure at The calculation formula is expressed as formula (5); the active earth pressure coefficient obtained is , , The calculation formulas are expressed as formula (6)-formula (8) respectively;
[0062] (5);
[0063] (6);
[0064] (7);
[0065] (8).
[0066] It should be noted that the calculation formula of the active earth pressure coefficient in this embodiment is different from the calculation formula of the active earth pressure coefficient under other failure modes currently commonly used in the industry, but is derived based on the arc surface to plane failure mode of the soil in front of the tunnel face AD during shallow tunnel excavation of the present invention. The fracture surface mode based on which the calculation formula relies has taken into account the extreme value condition of the yield function, so there is no need to calculate the extreme value; then in step S5, using formula (6) to formula (8), and according to the internal friction angle of the soil during shallow tunnel excavation , the active earth pressure coefficient of the shallow tunnel during full-section excavation can be calculated , , .
[0067] In some embodiments, in step S6, by analyzing formula (5), it can be known that the height The larger the value is, the higher the corresponding height on the tunnel face AD is. The greater the active earth pressure at the bottom of the tunnel face AD, the greater the active earth pressure at the bottom of the tunnel face AD. Maximum; therefore, using formula (5) and let , and according to the top depth of shallow buried tunnel , shallow tunnel height , soil weight during shallow tunnel excavation , soil cohesion , surface load And the calculated active earth pressure coefficient , , , the active earth pressure at the bottom of the tunnel face AD can be calculated when the shallow tunnel is excavated in full section , the minimum active support force of the tunnel face is equal to the active earth pressure at the bottom of the tunnel face AD .
[0068] Taking a shallow buried tunnel as an example, a specific example is used to compare and demonstrate the application of the Rankine active earth pressure theory in the prior art and the method for calculating the minimum active support force of the full-section excavation face of a shallow buried tunnel of the present invention. The calculation results of the active earth pressure coefficient and the minimum active support force of the full-section excavation face of the shallow buried tunnel are shown in Tables 1 and 2. Among them, the top burial depth of the shallow buried tunnel is ; Shallow tunnel height ; The ground surface is level and the ground load ; Soil layer weight , the internal friction angle of soil , the cohesion of soil .
[0069] Table 1 Comparison of active earth pressure coefficients calculated by Rankine and the present invention when the full-section excavation face of a shallow tunnel is completed
[0070]
[0071] Table 2 Calculation of the minimum active support force of a shallow tunnel when the full-section excavation face is completed by using Rankine and the present invention (unit: )contrast
[0072]
[0073] It can be seen from Table 1 that the active earth pressure coefficient calculated by the present invention is different from the active earth pressure coefficient calculated by the Rankine active earth pressure theory in the prior art. The difference is caused by the fact that the Rankine active earth pressure theory ignores the fact that the actual wall back is not smooth and there is friction, while the present invention takes into account the fact that the actual wall back is not smooth and there is friction.
[0074] It can be seen from Table 2 that the minimum active support force of the tunnel face calculated by the present invention is smaller than the minimum active support force calculated by the Rankine active earth pressure theory in the prior art, and the difference between the two increases with the cohesion of the soil. Increase the internal friction angle of the soil It becomes more and more obvious as it increases; it can be seen that the present invention can solve the problems of the prior art that the calculation results of the active support force are conservative and the surface uplift is caused by excessive active support due to ignoring the fact that the wall back is not smooth and there is friction in actual projects, so that the calculation of the minimum active support force of the heading face is more accurate, scientific and reasonable; in the engineering practice of full-section excavation of the heading face of a shallow tunnel, the minimum active support force of the heading face is solved according to the surface load, the parameters of the surrounding rock grade of the construction, that is, the physical properties of the soil layer, the structural characteristics of the shallow tunnel, etc., and the active support measures are set as a guide, thereby ensuring construction safety while reducing the waste of active support facilities and reducing the project cost.
[0075] It is further explained that the method for calculating the minimum active support force of the full-section excavation face of a shallow tunnel of the present invention can be applied not only to the full-section excavation construction of a shallow tunnel, but also to the shield construction of a shallow tunnel, and can be applied to the determination of the reinforcement range of a shallow tunnel and the size of the active support force during active reinforcement. For example, in the rescue operation of reinforcing the face with sandbags, this method can be used to solve the minimum active support force to calculate the reinforcement force of the sandbags, and then determine the amount of sandbags used.
[0076] In summary, the method for calculating the minimum active support force of the full-section excavation face of a shallow tunnel of the present invention solves the problems of the prior art that the active support force calculation results are conservative due to ignoring the fact that the back of the wall is not smooth and there is friction in actual projects, and excessive active support causes surface uplift, etc. It overcomes the limitations of the traditional Rankine active earth pressure theory, makes the calculation results of the minimum active support force of the face more accurate and scientific, reduces the waste of active support facilities and reduces the project cost while ensuring construction safety, thereby making the construction of shallow tunnels more economical and safer.
[0077] Finally, it should be noted that: the various embodiments in this specification are described in a progressive manner, and each embodiment focuses on the differences from other embodiments. The same or similar parts between the various embodiments can be referenced to each other.
[0078] The above embodiments are only used to illustrate the technical solution of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the preferred embodiments, ordinary technicians in the field should understand that the specific implementation methods of the present invention can still be modified or some technical features can be replaced by equivalents without departing from the spirit of the technical solution of the present invention, which should be included in the scope of the technical solution for protection of the present invention.
Claims
1. A method for calculating the minimum active support force of a shallow tunnel full-section excavation face, characterized in that: The following steps are involved: S1. A calculation model is established based on the surface load, soil physical properties, structural characteristics of shallow buried tunnels, and the failure mode of the soil in front of the tunnel face when the shallow buried tunnel is fully excavated. The soil damage area in front of the tunnel face is composed of a first soil block area and a second soil block area, the second soil block area is a curved wedge-shaped body in front of the tunnel face and its fracture surface is a circular arc surface, the first soil block area is an inverted cone-shaped body located obliquely above the second soil block area and its fracture surface is a plane, so that the fracture surface of the soil damage area in front of the tunnel face presents a circular arc surface to a plane damage mode; the partition surface between the first soil block area and the second soil block area intersects with the extension surface of the tunnel face at the surface; S2, analyzing and integrating the moment equation along the fracture surface of the soil failure area in front of the tunnel face to obtain the moment balance equation on the entire fracture surface; S3, performing an integral operation on the moment balance equation on the entire fracture surface to obtain a moment integral equation on the entire fracture surface; S4. Solve the moment integral equation on the entire fracture surface to obtain the moment integral equation at any height on the tunnel face. Active earth pressure at Calculation formula and active earth pressure coefficient , , The calculation formula of S5. Calculate the active earth pressure coefficient , , ; S6. Analyze and solve the minimum active support force of the tunnel face.
2. The method for calculating the minimum active support force of the full-face excavation face of a shallow tunnel according to claim 1 is characterized in that: Step S1 also includes defining model parameters, which include surface loads 、The internal friction angle of soil , soil cohesion , soil weight , shallow tunnel top burial depth , shallow buried tunnel height , the slope of the fracture surface of the first soil block area , the slope of the fracture surface in the second soil block area , the surface collapse range corresponding to the soil damage area in front of the tunnel face .
3. The method for calculating the minimum active support force of the full-face excavation face of a shallow tunnel according to claim 2 is characterized in that: In step S2, the moment equations are analyzed along the fracture surface of the first soil block area and the fracture surface of the second soil block area, which are expressed as equations (1) and (2) respectively, and the moment balance equation on the entire fracture surface is expressed as equation (3); (1); (2); (3); In formula (1) to formula (3), is the slope of the fracture surface in the soil failure area in front of the tunnel face, is the X coordinate value of any point on the entire fracture surface; It is the Z coordinate value of any point on the entire fracture surface.
4. The method for calculating the minimum active support force of the full-face excavation face of a shallow tunnel according to claim 3 is characterized in that: In step S3, the moment integral equation on the entire fracture surface is expressed as formula (4); (4)。 5. The method for calculating the minimum active support force of the full-face excavation face of a shallow tunnel according to claim 4 is characterized in that: In step S4, any height of the tunnel face is obtained Active earth pressure at The calculation formula is expressed as formula (5); the active earth pressure coefficient obtained is , , The calculation formulas are expressed as formula (6)-formula (8) respectively; (5); (6); (7); (8)。 6. The method for calculating the minimum active support force of the full-face excavation face of a shallow tunnel according to claim 5 is characterized in that: In step S5, according to the internal friction angle of the soil during the full-section excavation of the shallow tunnel , and use equations (6) to (8) to calculate the active earth pressure coefficient , , .
7. The method for calculating the minimum active support force of the full-face excavation face of a shallow tunnel according to claim 6 is characterized in that: In step S6, the active earth pressure coefficient is calculated using equation (5) , , , and order , solve for the active earth pressure at the bottom of the tunnel face , the minimum active support force of the tunnel face is equal to the active earth pressure at the bottom of the tunnel face .