A tunnel shield machine status monitoring method and system based on multi-source data
By analyzing the initial multi-source data of the tunnel and the initial data of the shield machine, combining real-time environmental factors to calculate the alarm index, and evaluating and adjusting the status of the shield machine, the problems of inaccurate monitoring and analysis and large load in the existing technology are solved, and the problems of inaccurate monitoring and analysis and large load are improved. The accuracy and efficiency of tunnel shield machine status monitoring.
Patent Information
- Application Number
- CN202411280383.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-13
- Publication Date
- 2024-12-17
- Estimated Expiration
- 2044-09-13
AI Technical Summary
The existing tunnel shield machine status monitoring method and system based on multi-source data increase the unit system load during monitoring and analysis, and due to the complex environmental factors of the shield machine during the working process, the monitoring system affects the status of the shield machine. analytical accuracy.
By analyzing the initial multi-source data of the tunnel, the initial environmental impact factor of the tunnel is obtained, and combining the initial multi-source data of the shield machine, the environmental factors are collected and analyzed in real time, the working status alarm index is calculated, and the shield machine status evaluation and tuning are carried out. Reduce the possibility of failure.
It improves the accuracy and efficiency of shield machine status monitoring, reduces the possibility of shield machine failure, and reduces the load on the unit system.
Smart Images

Figure CN118794493B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of shield machine monitoring, and in particular to a tunnel shield machine status monitoring method and system based on multi-source data. Background Art
[0002] The tunnel boring machine is a kind of engineering machinery equipment specially used for underground tunnel construction. It is usually used to excavate underground tunnels, especially in the construction of subways in urban areas. The working principle of the shield machine is to use the prefabricated reinforced concrete tunnel lining to support and stabilize the tunnel wall, and at the same time, through the propulsion system, the shield machine itself is pushed forward to realize the excavation and construction of the tunnel. How to use a variety of sensors and data sources to monitor and analyze the various parameters and states of the shield machine in real time during operation to ensure its safe and efficient operation is of great significance.
[0003] The existing tunnel shield machine status monitoring method and system based on multi-source data will increase the load of the unit system when monitoring and analyzing multi-source data. In addition, due to the complex environmental factors during the operation of the shield machine, the accuracy of the monitoring system's analysis of the shield machine status is affected. Therefore, it is necessary to provide a tunnel shield machine status monitoring method and system based on multi-source data to solve the above-mentioned problems. Summary of the invention
[0004] In order to solve the above technical problems, a tunnel shield machine status monitoring method and system based on multi-source data are provided. This technical solution solves the existing tunnel shield machine status monitoring method and system based on multi-source data proposed in the above background technology. Monitoring and analysis of multi-source data will increase the load of the unit system, and due to the complex environmental factors of the shield machine during operation, the accuracy of the monitoring system's analysis of the shield machine status is affected.
[0005] In order to achieve the above purpose, the technical solution adopted by the present invention is:
[0006] A tunnel shield machine condition monitoring method based on multi-source data, comprising:
[0007] Conducting on-site survey of the newly built tunnel and collecting initial multi-source data of the tunnel, wherein the initial multi-source data of the tunnel includes initial environment information of the tunnel and initial stratum information of the tunnel;
[0008] Based on the analysis of the initial multi-source data of the tunnel, the initial environmental impact factors of the tunnel are obtained;
[0009] Acquire initial multi-source data of the shield machine under the influence of initial environmental influencing factors of the tunnel, wherein the initial multi-source data of the shield machine includes initial mechanical state information of the shield machine, initial electrical state information of the shield machine, and initial posture information of the shield machine;
[0010] Acquire the real-time instruction information of the shield machine and the real-time environmental influencing factors of the tunnel, and obtain the real-time multi-source data of the shield machine under the influence of the real-time environmental influencing factors of the tunnel;
[0011] Based on the analysis of the initial multi-source data and the real-time multi-source data of the shield machine, the shield machine working status alarm index is obtained;
[0012] The working status of the shield machine is evaluated based on the shield machine working status alarm index, and the status of the shield machine is optimized according to the evaluation result of the shield machine working status.
[0013] Preferably, the on-site survey of the newly built tunnel and the collection of initial multi-source data of the tunnel specifically include:
[0014] Acquire the planned area of the new tunnel, and monitor the surface conditions and climate conditions within the planned area of the new tunnel to obtain initial surface information and initial climate information;
[0015] Process the initial surface information and initial climate information to obtain the initial tunnel environment information;
[0016] A pressure sensor is set at the front end of the shield machine to monitor the soil index in front of the shield machine, and obtain the soil initial pressure parameter, soil initial moisture index, soil initial temperature index and soil initial hardness index;
[0017] Displacement sensors and stress sensors are installed on the tunnel wall to monitor the deformation of the tunnel wall and the stress of the tunnel structure, and the initial displacement parameters of the tunnel wall and the initial stress index of the tunnel structure are obtained;
[0018] Data processing is performed on soil initial pressure parameters, soil initial moisture index, soil initial temperature index, soil initial hardness index, tunnel wall initial displacement parameters and tunnel structure initial stress index to obtain tunnel initial stratum information;
[0019] The initial environment information and initial stratum information of the tunnel are integrated to obtain the initial multi-source data of the tunnel.
[0020] Preferably, the initial environment impact factor of the tunnel is obtained based on the analysis of the initial multi-source data of the tunnel, specifically including:
[0021] Collecting tunnel historical multi-source data, processing the data in the tunnel historical multi-source data corresponding to the tunnel initial multi-source data, and obtaining tunnel historical environmental information and tunnel historical stratigraphic information;
[0022] Obtain historical fault information of shield machines, and perform fault tree analysis on historical fault information of shield machines and historical multi-source data of tunnels to obtain frequent fault information and multi-source data of common tunnels in different tunnel projects;
[0023] Conduct correlation analysis on the historical fault information of the shield machine and the multi-source data of the common tunnel to obtain the multi-source impact characteristic data of the tunnel;
[0024] Process the multi-source influence characteristic data of the tunnel, and determine the shield machine mechanical performance influence index and shield machine electrical performance influence index based on the tunnel historical environment information and tunnel historical stratum information;
[0025] Conduct data analysis on the shield machine mechanical performance impact index and shield machine electrical performance impact index to obtain the initial environmental impact factor of the tunnel;
[0026] The calculation formula of the shield machine mechanical performance influence index is:
[0027] ;
[0028] In the formula, is the shield machine mechanical performance influence index, To adjust the scale factor of the formula, is the empirical coefficient of the influence of tunnel wall displacement parameters on the mechanical properties of the shield machine, is the empirical coefficient of the influence of tunnel structure stress index on the mechanical properties of shield machine, is the empirical coefficient of the influence of soil pressure parameters on the mechanical properties of the shield machine, is the empirical coefficient of the influence of soil hardness index on the mechanical properties of shield machine, is the empirical coefficient of the influence of soil temperature index on the mechanical properties of shield machine, is the empirical coefficient of the influence of soil moisture index on the mechanical properties of shield machine, For the Soil pressure parameters of the day, For the Soil hardness index of the day, For the Soil temperature index for the day, For the Soil moisture index for the day, For the The tunnel wall displacement parameters of the day, is the tunnel wall position parameter on the first day, and They are reference pressure, reference hardness, reference temperature and reference humidity respectively;
[0029] The calculation formula of the shield machine electrical performance influence index is:
[0030] ;
[0031] In the formula, is the shield machine electrical performance impact index, To adjust the scale factor of the formula, and are weight coefficients, , , , , and They are the soil pressure parameters, soil moisture index, soil temperature index, soil hardness index, tunnel wall position parameters and tunnel structure stress index of the newly built tunnel on the first day. For the Tunnel structure stress index of the day;
[0032] The calculation formula of the initial environmental impact factor of the tunnel is:
[0033] ;
[0034] In the formula, is the initial environmental impact factor of the tunnel, is a quadratic function, and There is a positive correlation.
[0035] Preferably, the obtaining of initial multi-source data of the shield machine under the influence of the initial environmental impact factors of the tunnel specifically includes:
[0036] Use monitoring equipment to obtain the mechanical status information of the shield machine foundation and the electrical status information of the shield machine foundation;
[0037] The mechanical state information of the shield machine foundation and the electrical state information of the shield machine foundation are evaluated respectively to obtain the mechanical state index of the shield machine foundation and the electrical state index of the shield machine foundation;
[0038] The shield machine foundation mechanical state index is associated with the shield machine mechanical performance influence index to obtain the shield machine initial mechanical state index;
[0039] The shield machine foundation electrical status index is associated with the shield machine electrical performance impact index to obtain the shield machine initial electrical status index;
[0040] Establish a three-dimensional coordinate system with the shield machine as the center point, and obtain the initial posture parameters of the shield machine;
[0041] The initial mechanical state index, initial electrical state index and initial attitude parameters of the shield machine are integrated and data processed to obtain the initial multi-source data of the shield machine.
[0042] Preferably, the step of acquiring the real-time instruction information of the shield machine and the real-time environment influencing factors of the tunnel to obtain the real-time multi-source data of the shield machine under the influence of the real-time environment influencing factors of the tunnel specifically includes:
[0043] Collect real-time surface information and climate information, and process the data to obtain real-time tunnel environment information;
[0044] Real-time collection of soil real-time index information at the front end of the shield machine, real-time displacement parameters of the tunnel wall, and real-time structural stress index of the tunnel;
[0045] The real-time soil index information, the real-time displacement parameters of the tunnel wall and the real-time structural stress index of the tunnel are processed to obtain the real-time stratum information of the tunnel;
[0046] Integrate the real-time tunnel environment information and real-time tunnel stratum information to obtain real-time multi-source tunnel data;
[0047] Correlate the tunnel real-time multi-source data and the tunnel initial environmental impact factor to obtain the tunnel real-time environmental impact factor;
[0048] Based on the real-time environmental impact factors, the initial posture information of the shield machine, the mechanical status information of the shield machine foundation and the electrical status information of the shield machine foundation, the real-time multi-source data of the tunnel shield machine is obtained.
[0049] Preferably, the shield machine working status alarm index is obtained based on analyzing the initial multi-source data of the shield machine and the real-time multi-source data of the shield machine, specifically including:
[0050] Obtain the real-time mechanical status information and electrical status information of the shield machine from the real-time multi-source data of the shield machine;
[0051] Obtain the real-time mechanical state index of the shield machine and the real-time electrical state index of the shield machine in the real-time mechanical state information of the shield machine and the real-time electrical state information of the shield machine;
[0052] The difference between the real-time mechanical status index of the shield machine and the basic mechanical status index of the shield machine is used as the mechanical fault alarm value of the shield machine;
[0053] The difference between the real-time electrical status index of the shield machine and the basic electrical status index of the shield machine is used as the electrical fault alarm value of the shield machine;
[0054] Based on the shield machine mechanical fault alarm value and the shield machine electrical fault alarm value, the shield machine working status alarm index is obtained.
[0055] Preferably, the working state of the shield machine is evaluated based on the shield machine working state alarm index, and the state of the shield machine is optimized according to the evaluation result of the working state of the shield machine, which specifically includes:
[0056] The difference between the square of the shield machine mechanical fault alarm value and the square of the shield machine electrical fault alarm value is used as the shield machine working status alarm index;
[0057] Obtain the total value of the shield machine foundation mechanical state index and the shield machine foundation electrical state index, and use one quarter of the square of the total value as the shield machine working state alarm index threshold;
[0058] Based on the shield machine working state alarm index threshold, the shield machine working state alarm index is evaluated to obtain shield machine working state evaluation information;
[0059] The shield machine working status assessment information is used as the shield machine working status assessment result to optimize the shield machine status.
[0060] Furthermore, a tunnel shield machine status monitoring system based on multi-source data is proposed, which is used to implement any of the above monitoring methods, including:
[0061] A main control module, wherein the main control module is used to receive initial multi-source data of the tunnel, initial environment information of the tunnel, initial stratum information of the tunnel, initial multi-source data of the shield machine, initial mechanical state information of the shield machine, initial electrical state information of the shield machine, and initial posture information of the shield machine, analyze the initial multi-source data of the tunnel, obtain initial environment impact factors of the tunnel, obtain initial multi-source data of the shield machine under the influence of the initial environment impact factors of the tunnel, obtain real-time instruction information of the shield machine and real-time environment impact factors of the tunnel, obtain real-time multi-source data of the shield machine under the influence of the real-time environment impact factors of the tunnel, analyze the initial multi-source data of the shield machine and the real-time multi-source data of the shield machine, obtain an alarm index of the working state of the shield machine, and optimize the state of the shield machine according to the evaluation result of the working state of the shield machine;
[0062] A monitoring module, wherein the monitoring module is used to conduct on-site surveys of newly built tunnels, collect initial multi-source data of the tunnels, monitor the surface conditions and climate conditions within the planned area of the newly built tunnels, obtain initial surface information and initial climate information, set a pressure sensor at the front end of the shield machine to monitor the soil index in front of the shield machine, obtain the initial soil pressure parameter, the initial soil moisture index, the initial soil temperature index and the initial soil hardness index, install a displacement sensor and a stress sensor on the tunnel wall to monitor the deformation of the tunnel wall and the stress of the tunnel structure, obtain the initial displacement parameter of the tunnel wall and the initial stress index of the tunnel structure, and obtain the real-time tunnel environment information and the real-time tunnel formation information;
[0063] An evaluation module, wherein the evaluation module is used to evaluate the mechanical state information of the shield machine foundation and the electrical state information of the shield machine foundation, respectively, to obtain the mechanical state index of the shield machine foundation and the electrical state index of the shield machine foundation, and to evaluate the working state of the shield machine according to the working state alarm index of the shield machine;
[0064] A transmission module, which is used for data transmission between the main control module, the monitoring module, the evaluation module and the display module;
[0065] The display module is used to display the monitoring results of the monitoring module, the processing results of the main control module, the evaluation results of the evaluation module and the optimization process of the shield machine status.
[0066] Preferably, the main control module includes:
[0067] A data receiving unit, the data receiving unit is used to receive initial multi-source data of the tunnel, initial environment information of the tunnel, initial stratum information of the tunnel, initial multi-source data of the shield machine, initial mechanical state information of the shield machine, initial electrical state information of the shield machine and initial posture information of the shield machine;
[0068] A data processing unit, the data processing unit is used to analyze the initial multi-source data of the tunnel, obtain the initial environmental impact factor of the tunnel, obtain the initial multi-source data of the shield machine under the influence of the initial environmental impact factor of the tunnel, obtain the real-time instruction information of the shield machine and the real-time environmental impact factor of the tunnel, obtain the real-time multi-source data of the shield machine under the influence of the real-time environmental impact factor of the tunnel, analyze the initial multi-source data of the shield machine and the real-time multi-source data of the shield machine, and obtain the working status alarm index of the shield machine;
[0069] The tuning unit is used to tune the state of the shield machine according to the working state evaluation result of the shield machine.
[0070] Preferably, the evaluation module comprises:
[0071] A data evaluation unit, wherein the information evaluation unit is used to evaluate the mechanical state information of the shield machine foundation and the electrical state information of the shield machine foundation, respectively, to obtain a mechanical state index of the shield machine foundation and an electrical state index of the shield machine foundation;
[0072] The state evaluation unit is used to evaluate the working state of the shield machine according to the shield machine working state alarm index.
[0073] Compared with the prior art, the present invention has the following beneficial effects:
[0074] This scheme proposes a tunnel shield machine status monitoring method and system based on multi-source data. By analyzing the initial multi-source data of the tunnel, the initial environmental impact factor of the tunnel is obtained, and the initial multi-source data of the shield machine under the influence of the initial environmental impact factor of the tunnel is obtained, as well as the real-time multi-source data of the shield machine under the influence of the real-time environmental impact factor of the tunnel. Based on the analysis of the initial multi-source data of the shield machine and the real-time multi-source data of the shield machine, the shield machine working status alarm index is obtained, and the shield machine working status alarm index is used to evaluate the shield machine working status, predict the shield machine working status, and timely optimize the shield machine status, so that the monitoring system can timely obtain the shield machine working status according to the tunnel environment and the stratum information that the shield machine needs to excavate when monitoring the status of the tunnel shield machine, thereby reducing the possibility of failure of the shield machine.
[0075] This scheme proposes a tunnel shield machine status monitoring method and system based on multi-source data. The method obtains the historical fault information of the shield machine and performs fault tree analysis on the historical fault information of the shield machine and the historical multi-source data of the tunnel to obtain frequent fault information and common tunnel multi-source data in different tunnel projects. Finally, based on the historical environment information of the tunnel and the historical formation information of the tunnel, the mechanical performance impact index of the shield machine and the electrical performance impact index of the shield machine are determined to improve the accuracy of the monitoring system's analysis of the working status of the shield machine. At the same time, the fault tree analysis is used to obtain frequent fault information, and the analysis of the tunnel environment and formation data will cause the fault information with the highest frequency of the shield machine to reduce the load on the unit system. BRIEF DESCRIPTION OF THE DRAWINGS
[0076] Figure 1 A flow chart of a tunnel shield machine status monitoring method based on multi-source data proposed by the present invention;
[0077] Figure 2 This is a flow chart for obtaining the initial environmental impact factors in the present invention;
[0078] Figure 3 It is a flowchart for obtaining the shield machine working status alarm index in the present invention;
[0079] Figure 4 This is a system framework diagram of a tunnel shield machine status monitoring system based on multi-source data proposed in the present invention. DETAILED DESCRIPTION
[0080] The following description is used to disclose the present invention so that those skilled in the art can implement the present invention. The preferred embodiments described below are only examples, and those skilled in the art may think of other obvious variations.
[0081] Reference Figure 1 - Figure 4As shown, a tunnel shield machine condition monitoring method based on multi-source data includes:
[0082] Conduct on-site surveys on newly built tunnels and collect initial multi-source data of the tunnels, including initial environment information and initial stratum information of the tunnels.
[0083] Based on the analysis of the initial multi-source data of the tunnel, the initial environmental impact factors of the tunnel are obtained;
[0084] Obtaining initial multi-source data of the shield machine under the influence of initial environmental factors of the tunnel, the initial multi-source data of the shield machine includes initial mechanical state information of the shield machine, initial electrical state information of the shield machine and initial posture information of the shield machine;
[0085] Acquire the real-time instruction information of the shield machine and the real-time environmental influencing factors of the tunnel, and obtain the real-time multi-source data of the shield machine under the influence of the real-time environmental influencing factors of the tunnel;
[0086] Based on the analysis of the initial multi-source data and the real-time multi-source data of the shield machine, the shield machine working status alarm index is obtained;
[0087] The working status of the shield machine is evaluated based on the shield machine working status alarm index, and the status of the shield machine is optimized according to the evaluation result of the shield machine working status.
[0088] Specifically, the initial multi-source data of the tunnel are the environmental information and stratigraphic information of the newly built tunnel before the shield machine starts excavating, including the initial environment information of the tunnel and the initial stratigraphic information of the tunnel. The initial environment information of the tunnel is used to describe the climate, hydrology and other environmental conditions before the tunnel construction to ensure the accuracy of the safety measures during the shield machine excavation. The initial stratigraphic information of the tunnel is used to describe the thickness and strength of the soil and rock layers in the area where the tunnel is located to evaluate the impact of geological conditions on the excavation of the shield machine. The initial environmental impact factor of the tunnel is a comprehensive indicator of the impact of the climate inside and outside the newly built tunnel and the soil and rock inside the tunnel on the mechanical and electrical performance of the shield machine. The shield machine working status alarm index is a predictive indicator of possible failures of the shield machine during excavation.
[0089] Furthermore, the newly built tunnel is surveyed on site to collect initial multi-source data of the tunnel, including:
[0090] Acquire the planned area of the new tunnel, and monitor the surface conditions and climate conditions within the planned area of the new tunnel to obtain initial surface information and initial climate information;
[0091] Process the initial surface information and initial climate information to obtain the initial tunnel environment information;
[0092] A pressure sensor is set at the front end of the shield machine to monitor the soil index in front of the shield machine, and obtain the soil initial pressure parameter, soil initial moisture index, soil initial temperature index and soil initial hardness index;
[0093] Displacement sensors and stress sensors are installed on the tunnel wall to monitor the deformation of the tunnel wall and the stress of the tunnel structure, and the initial displacement parameters of the tunnel wall and the initial stress index of the tunnel structure are obtained;
[0094] Data processing is performed on soil initial pressure parameters, soil initial moisture index, soil initial temperature index, soil initial hardness index, tunnel wall initial displacement parameters and tunnel structure initial stress index to obtain tunnel initial stratum information;
[0095] The initial environment information and initial stratum information of the tunnel are integrated to obtain the initial multi-source data of the tunnel.
[0096] Specifically, the planning area for a new tunnel is an area within a certain range where the soil that requires a shield machine for excavation is located. The planned area needs to take into account the influence of surrounding buildings, trees, etc. Therefore, the initial surface information that needs to be considered includes the surface topography, land use, building distribution, underground facility location, and surface settlement and displacement. The initial climate information needs to consider regional precipitation, temperature, humidity and other information, which is helpful to evaluate groundwater level changes and their impact on construction. The temperature will affect the performance of the shield machine and construction materials, especially at extreme temperatures. Humidity affects the moisture content of the soil, which in turn affects the effectiveness of the excavation and support system.
[0097] Furthermore, based on the analysis of the initial multi-source data of the tunnel, the initial environmental impact factors of the tunnel are obtained, including:
[0098] Collecting tunnel historical multi-source data, processing the data in the tunnel historical multi-source data corresponding to the tunnel initial multi-source data, and obtaining tunnel historical environmental information and tunnel historical stratigraphic information;
[0099] Obtain historical fault information of shield machines, and perform fault tree analysis on historical fault information of shield machines and historical multi-source data of tunnels to obtain frequent fault information and multi-source data of common tunnels in different tunnel projects;
[0100] Conduct correlation analysis on the historical fault information of the shield machine and the multi-source data of the common tunnel to obtain the multi-source impact characteristic data of the tunnel;
[0101] Process the multi-source influence characteristic data of the tunnel, and determine the shield machine mechanical performance influence index and shield machine electrical performance influence index based on the tunnel historical environment information and tunnel historical stratum information;
[0102] Conduct data analysis on the shield machine mechanical performance impact index and shield machine electrical performance impact index to obtain the initial environmental impact factor of the tunnel;
[0103] Specifically, the shield machine mechanical performance impact index is a comprehensive indicator of the impact of the environment and strata in the area where the new tunnel is located on the shield machine's mechanical performance. The shield machine electrical performance impact index is a comprehensive indicator of the impact of the environment and strata in the area where the new tunnel is located on the shield machine's electrical performance. For example, extreme temperature (too high or too low) may affect the viscosity of the shield machine's hydraulic oil, causing the performance of the hydraulic system to deteriorate. High humidity environment may cause short circuits or corrosion of electrical equipment and control systems, affecting the reliability of the equipment. Different types of soil (such as clay, sand, pebbles, etc.) will have different effects on the shield machine's propulsion force, excavation speed and cutterhead wear.
[0104] The specific steps of performing fault tree analysis on the historical fault information of the shield machine and the historical multi-source data of the tunnel to obtain frequent fault information include:
[0105] S1: Collect historical data of failures of shield machines during tunnel excavation, including failure records of shield machines and various data during tunnel construction, such as equipment logs, maintenance records, environmental data, etc.
[0106] S2: Establish a fault tree model to decompose the fault event into more basic events and identify potential fault causes;
[0107] S3: Identify the frequency and pattern of various types of failures through statistical analysis;
[0108] S4: Identify the main factors that lead to frequent failures, such as equipment design defects, operating errors, environmental conditions, etc.
[0109] In step S2, the steps of establishing the fault tree model include:
[0110] S21: Identify the main problem or top-level event of the fault tree, such as "shield machine failure";
[0111] S22: Identify the main cause of the top-level event, such as "power system failure" or "hydraulic system problem";
[0112] S23: Further decompose the main fault cause into secondary events, for example, "power system failure" may be decomposed into "engine overheating" or "fuel supply problem";
[0113] S24: Use logic gates (AND, OR) to connect these events and describe the relationship between them. For example, if "engine overheating" and "fuel supply problem" can both cause "power system failure", connect them with an OR gate.
[0114] S25: Decompose secondary events into primary events, which are the most basic events that can be directly observed or recorded, such as "cooling system failure" or "fuel pump failure";
[0115] S26: Verify the accuracy and completeness of the fault tree model to ensure that all possible fault paths are covered and modified based on the actual data collected;
[0116] Among them, the calculation formula of the shield machine mechanical performance influence index is:
[0117] ;
[0118] In the formula, is the shield machine mechanical performance influence index, To adjust the scale factor of the formula, is the empirical coefficient of the influence of tunnel wall displacement parameters on the mechanical properties of the shield machine, is the empirical coefficient of the influence of tunnel structure stress index on the mechanical properties of shield machine, is the empirical coefficient of the influence of soil pressure parameters on the mechanical properties of the shield machine, is the empirical coefficient of the influence of soil hardness index on the mechanical properties of shield machine, is the empirical coefficient of the influence of soil temperature index on the mechanical properties of shield machine, is the empirical coefficient of the influence of soil moisture index on the mechanical properties of shield machine, For the Soil pressure parameters of the day, For the Soil hardness index of the day, For the Soil temperature index for the day, For the Soil moisture index for the day, For the The tunnel wall displacement parameters of the day, is the tunnel wall position parameter on the first day, and They are reference pressure, reference hardness, reference temperature and reference humidity respectively;
[0119] The calculation formula of the shield machine electrical performance impact index is:
[0120] ;
[0121] In the formula, is the shield machine electrical performance impact index, To adjust the scale factor of the formula, and are weight coefficients, , , , , and They are the soil pressure parameters, soil moisture index, soil temperature index, soil hardness index, tunnel wall position parameters and tunnel structure stress index of the newly built tunnel on the first day. For the Tunnel structure stress index of the day;
[0122] The calculation formula of the initial environmental impact factor of the tunnel is:
[0123] ;
[0124] In the formula, is the initial environmental impact factor of the tunnel, is a quadratic function, and There is a positive correlation.
[0125] It is understandable that the higher the values of soil pressure parameters, soil moisture index, soil temperature index, etc. of the new tunnel that the shield machine needs to excavate, the greater the value of the shield machine's mechanical performance index. Because some specific mechanical parts of the shield machine, such as the cutterhead and other mechanical parts, will wear out over time during the excavation work, it is necessary to consider the total value of the soil pressure parameters, soil hardness index, etc. every day during the excavation period. The electrical components of the shield machine are not prone to wear and tear over time, and some electrical properties of the electrical components of the shield machine will gradually return to normal after the shield machine stops working, or even The environment inside the tunnel may improve the electrical performance of the shield machine. Therefore, only the difference between the soil pressure parameters, soil moisture index, etc. of the shield machine every day during the excavation period and the shield machine on the first day of work can be considered. The larger the absolute value of the difference, the greater the shield machine electrical performance impact index. However, the larger the absolute value of the difference between the tunnel wall position parameters and the tunnel structure stress index of each day during the excavation period and the shield machine on the first day of work, the smaller the shield machine electrical performance impact index, because the larger the absolute value of the difference between the tunnel wall position parameters and the tunnel structure stress index, the better its electrical performance will be, and it will not be easily affected by these data.
[0126] Furthermore, the initial multi-source data of the shield machine under the influence of the initial environmental impact factors of the tunnel are obtained, including:
[0127] Use monitoring equipment to obtain the mechanical status information of the shield machine foundation and the electrical status information of the shield machine foundation;
[0128] The mechanical state information of the shield machine foundation and the electrical state information of the shield machine foundation are evaluated respectively to obtain the mechanical state index of the shield machine foundation and the electrical state index of the shield machine foundation;
[0129] The shield machine foundation mechanical state index is associated with the shield machine mechanical performance influence index to obtain the shield machine initial mechanical state index;
[0130] The shield machine foundation electrical status index is associated with the shield machine electrical performance impact index to obtain the shield machine initial electrical status index;
[0131] Establish a three-dimensional coordinate system with the shield machine as the center point, and obtain the initial posture parameters of the shield machine;
[0132] The initial mechanical state index, initial electrical state index and initial attitude parameters of the shield machine are integrated and data processed to obtain the initial multi-source data of the shield machine.
[0133] Furthermore, the real-time instruction information of the shield machine and the real-time environmental influencing factors of the tunnel are obtained, and the real-time multi-source data of the shield machine under the influence of the real-time environmental influencing factors of the tunnel are obtained, including:
[0134] Collect real-time surface information and climate information, and process the data to obtain real-time tunnel environment information;
[0135] Real-time collection of soil real-time index information at the front end of the shield machine, real-time displacement parameters of the tunnel wall, and real-time structural stress index of the tunnel;
[0136] The real-time soil index information, the real-time displacement parameters of the tunnel wall and the real-time structural stress index of the tunnel are processed to obtain the real-time stratum information of the tunnel;
[0137] Integrate the real-time tunnel environment information and real-time tunnel stratum information to obtain real-time multi-source tunnel data;
[0138] Correlate the tunnel real-time multi-source data and the tunnel initial environmental impact factor to obtain the tunnel real-time environmental impact factor;
[0139] Based on the real-time environmental impact factors, the initial posture information of the shield machine, the mechanical status information of the shield machine foundation and the electrical status information of the shield machine foundation, the real-time multi-source data of the tunnel shield machine is obtained.
[0140] Specifically, the tunnel real-time environmental impact factor is obtained by the tunnel real-time multi-source data and the tunnel initial environmental impact factor through the calculation formula of the tunnel initial environmental impact factor.
[0141] Furthermore, based on the analysis of the initial multi-source data of the shield machine and the real-time multi-source data of the shield machine, the shield machine working status alarm index is obtained, including:
[0142] Obtain the real-time mechanical status information and electrical status information of the shield machine from the real-time multi-source data of the shield machine;
[0143] Obtain the real-time mechanical state index of the shield machine and the real-time electrical state index of the shield machine in the real-time mechanical state information of the shield machine and the real-time electrical state information of the shield machine;
[0144] The difference between the real-time mechanical status index of the shield machine and the basic mechanical status index of the shield machine is used as the mechanical fault alarm value of the shield machine;
[0145] The difference between the real-time electrical status index of the shield machine and the basic electrical status index of the shield machine is used as the electrical fault alarm value of the shield machine;
[0146] Based on the shield machine mechanical fault alarm value and the shield machine electrical fault alarm value, the shield machine working status alarm index is obtained.
[0147] Specifically, the shield machine basic mechanical condition index is a comprehensive indicator used to evaluate the operating status and health level of the shield machine. It reflects the overall working condition of the shield machine by comprehensively considering the performance, wear and working efficiency of multiple mechanical components, such as the degree of component wear, measuring the wear of key components such as the cutterhead, cutter, screw conveyor, including the wear rate and current wear amount, the propulsion speed of the shield machine, cutting efficiency and overall working efficiency, etc. The shield machine basic electrical condition index is used to evaluate the health and operating status of the shield machine electrical system. It comprehensively considers the performance and status of each component of the electrical system to reflect the reliability and efficiency of the overall electrical system, such as the health of electrical components, and evaluates the operating status and performance of electrical components such as motors, inverters, and controllers; Power supply stability, monitoring the stability and quality of power supply, such as voltage fluctuations and power outages.
[0148] Furthermore, the working state of the shield machine is evaluated based on the shield machine working state alarm index, and the state of the shield machine is optimized according to the evaluation result of the shield machine working state, including:
[0149] The difference between the square of the shield machine mechanical fault alarm value and the square of the shield machine electrical fault alarm value is used as the shield machine working status alarm index;
[0150] Obtain the total value of the shield machine foundation mechanical state index and the shield machine foundation electrical state index, and use one quarter of the square of the total value as the shield machine working state alarm index threshold;
[0151] Based on the shield machine working state alarm index threshold, the shield machine working state alarm index is evaluated to obtain shield machine working state evaluation information;
[0152] The shield machine working status assessment information is used as the shield machine working status assessment result to optimize the shield machine status.
[0153] Specifically, the shield machine working status alarm index can be obtained by setting the unit time according to the excavation period during the tunneling work of the tunnel shield machine. In order to ensure that the monitoring system analyzes the working status of the shield machine more accurately, the unit time can be set to one minute or shorter. Although this will increase the load of the unit operation system, when calculating the shield machine mechanical performance impact index, the shield machine electrical performance impact index and the tunnel real-time environmental impact factor, the number of times the monitoring module collects the initial multi-source data of the tunnel and the real-time data of the tunnel will increase. However, in a day, the real-time surface information and the real-time climate information usually do not change so quickly, especially the real-time surface information is difficult to change during tunnel construction. The number of times the monitoring module collects the initial multi-source data of the tunnel and the real-time data of the tunnel can be reduced, the load of the monitoring system can be reduced, and the efficiency of the monitoring system in analyzing the working status of the shield machine can be improved.
[0154] Furthermore, a tunnel shield machine status monitoring system based on multi-source data is proposed, which is used to implement any of the above monitoring methods, including:
[0155] A main control module, which is used to receive initial multi-source data of the tunnel, initial environment information of the tunnel, initial stratum information of the tunnel, initial multi-source data of the shield machine, initial mechanical state information of the shield machine, initial electrical state information of the shield machine, and initial posture information of the shield machine, analyze the initial multi-source data of the tunnel, obtain the initial environment impact factor of the tunnel, obtain the initial multi-source data of the shield machine under the influence of the initial environment impact factor of the tunnel, obtain the real-time instruction information of the shield machine and the real-time environment impact factor of the tunnel, obtain the real-time multi-source data of the shield machine under the influence of the real-time environment impact factor of the tunnel, analyze the initial multi-source data of the shield machine and the real-time multi-source data of the shield machine, obtain the working state alarm index of the shield machine, and optimize the state of the shield machine according to the working state evaluation result of the shield machine;
[0156] Monitoring module: The monitoring module is used to conduct on-site surveys of newly built tunnels, collect initial multi-source data of tunnels, monitor surface conditions and climate conditions within the planning area of newly built tunnels, obtain initial surface information and initial climate information, set a pressure sensor at the front end of the shield machine to monitor soil indicators in front of the shield machine, obtain initial soil pressure parameters, initial soil moisture index, initial soil temperature index and initial soil hardness index, install displacement sensors and stress sensors on the tunnel wall to monitor the deformation of the tunnel wall and the stress of the tunnel structure, obtain initial displacement parameters of the tunnel wall and initial stress index of the tunnel structure, and obtain real-time tunnel environment information and real-time tunnel formation information;
[0157] An evaluation module is used to evaluate the mechanical state information of the shield machine foundation and the electrical state information of the shield machine foundation respectively, obtain the mechanical state index of the shield machine foundation and the electrical state index of the shield machine foundation, and evaluate the working state of the shield machine according to the working state alarm index of the shield machine;
[0158] Transmission module, which is used for data transmission among the main control module, the monitoring module, the evaluation module and the display module;
[0159] Display module: The display module is used to display the monitoring results of the monitoring module, the processing results of the main control module, the evaluation results of the evaluation module and the tuning process of the shield machine status.
[0160] Furthermore, the main control module includes:
[0161] A data receiving unit, the data receiving unit is used to receive initial multi-source data of the tunnel, initial environment information of the tunnel, initial stratum information of the tunnel, initial multi-source data of the shield machine, initial mechanical state information of the shield machine, initial electrical state information of the shield machine and initial posture information of the shield machine;
[0162] The data processing unit is used to analyze the initial multi-source data of the tunnel, obtain the initial environmental impact factor of the tunnel, obtain the initial multi-source data of the shield machine under the influence of the initial environmental impact factor of the tunnel, obtain the real-time instruction information of the shield machine and the real-time environmental impact factor of the tunnel, obtain the real-time multi-source data of the shield machine under the influence of the real-time environmental impact factor of the tunnel, analyze the initial multi-source data of the shield machine and the real-time multi-source data of the shield machine, and obtain the working status alarm index of the shield machine;
[0163] The tuning unit is used to optimize the state of the shield machine according to the evaluation result of the working state of the shield machine.
[0164] Furthermore, the assessment modules include:
[0165] The data evaluation unit, the information evaluation unit is used to evaluate the shield machine foundation mechanical state information and the shield machine foundation electrical state information respectively, and obtain the shield machine foundation mechanical state index and the shield machine foundation electrical state index;
[0166] The status evaluation unit is used to evaluate the working status of the shield machine according to the shield machine working status alarm index.
[0167] Furthermore, the monitoring module includes:
[0168] The first monitoring unit is used to conduct on-site survey of the newly built tunnel, collect initial multi-source data of the tunnel, monitor the surface conditions and climate conditions within the planning area of the newly built tunnel, and obtain initial surface information and initial climate information;
[0169] The second monitoring unit is used to set a pressure sensor at the front end of the shield machine to monitor the soil indicators in front of the shield machine, obtain the initial soil pressure parameters, the initial soil moisture index, the initial soil temperature index and the initial soil hardness index, install displacement sensors and stress sensors on the tunnel wall to monitor the deformation of the tunnel wall and the stress of the tunnel structure, obtain the initial displacement parameters of the tunnel wall and the initial stress index of the tunnel structure, and obtain the real-time environment information and real-time formation information of the tunnel.
[0170] In summary, the advantages of the present invention are: by analyzing the initial multi-source data of the tunnel, the initial environmental impact factor of the tunnel is obtained, and the initial multi-source data of the shield machine under the influence of the initial environmental impact factor of the tunnel is obtained, and by obtaining the real-time instruction information of the shield machine and the real-time environmental impact factor of the tunnel, the real-time multi-source data of the shield machine under the influence of the real-time environmental impact factor of the tunnel is obtained, based on the analysis of the initial multi-source data of the shield machine and the real-time multi-source data of the shield machine, the shield machine working state alarm index is obtained, the shield machine working state alarm index is used to evaluate the shield machine working state, predict the shield machine working state, and timely optimize the shield machine state, so that when the monitoring system is monitoring the state of the tunnel shield machine, it can timely obtain the shield machine working state according to the environment of the tunnel and the stratum information that the shield machine needs to excavate, thereby reducing the possibility of failure of the shield machine;
[0171] By obtaining the historical fault information of the shield machine and performing fault tree analysis on the historical fault information of the shield machine and the historical multi-source data of the tunnel, frequent fault information and common tunnel multi-source data in different tunnel projects are obtained. Finally, based on the historical environment information of the tunnel and the historical formation information of the tunnel, the mechanical performance impact index of the shield machine and the electrical performance impact index of the shield machine are determined to improve the accuracy of the monitoring system's analysis of the working status of the shield machine. At the same time, fault tree analysis is used to obtain frequent fault information, and analysis of the tunnel environment and formation data will cause the shield machine to have the highest frequency of fault information, thereby reducing the load on the unit system.
[0172] The above shows and describes the basic principles, main features and advantages of the present invention. Those skilled in the art should understand that the present invention is not limited to the above embodiments. The above embodiments and the specification only describe the principles of the present invention. The present invention may be subject to various changes and improvements without departing from the spirit and scope of the present invention. These changes and improvements fall within the scope of the present invention.
[0173] The scope of protection is defined by the following claims and their equivalents.
Claims
1. A tunnel shield machine status monitoring method based on multi-source data, characterized in that: include: Conducting on-site survey of the newly built tunnel and collecting initial multi-source data of the tunnel, wherein the initial multi-source data of the tunnel includes initial environment information of the tunnel and initial stratum information of the tunnel; Based on the analysis of the initial multi-source data of the tunnel, the initial environmental impact factors of the tunnel are obtained; Acquire initial multi-source data of the shield machine under the influence of initial environmental influencing factors of the tunnel, wherein the initial multi-source data of the shield machine includes initial mechanical state information of the shield machine, initial electrical state information of the shield machine, and initial posture information of the shield machine; Acquire the real-time instruction information of the shield machine and the real-time environmental influencing factors of the tunnel, and obtain the real-time multi-source data of the shield machine under the influence of the real-time environmental influencing factors of the tunnel; Based on the analysis of the initial multi-source data and the real-time multi-source data of the shield machine, the shield machine working status alarm index is obtained; The working status of the shield machine is evaluated based on the shield machine working status alarm index, and the status of the shield machine is optimized according to the evaluation result of the shield machine working status.
2. The tunnel shield machine status monitoring method based on multi-source data according to claim 1 is characterized in that: The on-site survey of the newly built tunnel and the collection of initial multi-source data of the tunnel specifically include: Acquire the planned area of the new tunnel, and monitor the surface conditions and climate conditions within the planned area of the new tunnel to obtain initial surface information and initial climate information; Process the initial surface information and initial climate information to obtain the initial tunnel environment information; A pressure sensor is set at the front end of the shield machine to monitor the soil index in front of the shield machine, and obtain the soil initial pressure parameter, soil initial moisture index, soil initial temperature index and soil initial hardness index; Displacement sensors and stress sensors are installed on the tunnel wall to monitor the deformation of the tunnel wall and the stress of the tunnel structure, and the initial displacement parameters of the tunnel wall and the initial stress index of the tunnel structure are obtained; The initial soil pressure parameter, initial soil moisture index, initial soil temperature index, initial soil hardness index, initial displacement parameter of the tunnel wall and initial stress index of the tunnel structure are processed to obtain the initial stratum information of the tunnel; The initial environment information and initial stratum information of the tunnel are integrated to obtain the initial multi-source data of the tunnel.
3. The tunnel shield machine status monitoring method based on multi-source data according to claim 2 is characterized in that: The initial environment impact factors of the tunnel are obtained based on the analysis of the initial multi-source data of the tunnel, which specifically include: Collecting tunnel historical multi-source data, processing the data in the tunnel historical multi-source data corresponding to the tunnel initial multi-source data, and obtaining tunnel historical environmental information and tunnel historical stratigraphic information; Obtain historical fault information of shield machines, and perform fault tree analysis on historical fault information of shield machines and historical multi-source data of tunnels to obtain frequent fault information and multi-source data of common tunnels in different tunnel projects; Conduct correlation analysis on the historical fault information of the shield machine and the multi-source data of the common tunnel to obtain the multi-source impact characteristic data of the tunnel; Process the multi-source influence characteristic data of the tunnel, and determine the shield machine mechanical performance influence index and shield machine electrical performance influence index based on the tunnel historical environment information and tunnel historical stratum information; Conduct data analysis on the shield machine mechanical performance impact index and shield machine electrical performance impact index to obtain the initial environmental impact factor of the tunnel; The calculation formula of the shield machine mechanical performance influence index is: ; In the formula, is the shield machine mechanical performance influence index, To adjust the scale factor of the formula, is the empirical coefficient of the influence of tunnel wall displacement parameters on the mechanical properties of the shield machine, is the empirical coefficient of the influence of tunnel structure stress index on the mechanical properties of shield machine, is the empirical coefficient of the influence of soil pressure parameters on the mechanical properties of the shield machine, is the empirical coefficient of the influence of soil hardness index on the mechanical properties of shield machine, is the empirical coefficient of the influence of soil temperature index on the mechanical properties of shield machine, is the empirical coefficient of the influence of soil moisture index on the mechanical properties of shield machine, For the Soil pressure parameters of the day, For the Soil hardness index of the day, For the Soil temperature index for the day, For the Soil moisture index for the day, For the The tunnel wall displacement parameters of the day, is the tunnel wall position parameter on the first day, , , and They are reference pressure, reference hardness, reference temperature and reference humidity respectively; The calculation formula of the shield machine electrical performance influence index is: ; In the formula, is the electrical performance impact index of the shield machine, To adjust the scale factor of the formula, , , , , and are weight coefficients, , , , , and They are the soil pressure parameters, soil moisture index, soil temperature index, soil hardness index, tunnel wall position parameters and tunnel structure stress index of the newly built tunnel on the first day. For the Tunnel structure stress index of the day; The calculation formula of the initial environmental impact factor of the tunnel is: ; In the formula, is the initial environmental impact factor of the tunnel, is a quadratic function, and There is a positive correlation.
4. The tunnel shield machine status monitoring method based on multi-source data according to claim 3 is characterized in that: The obtaining of the initial multi-source data of the shield machine under the influence of the initial environmental impact factors of the tunnel specifically includes: Use monitoring equipment to obtain the shield machine foundation mechanical status information and shield machine foundation electrical status information; The mechanical state information of the shield machine foundation and the electrical state information of the shield machine foundation are evaluated respectively to obtain the mechanical state index of the shield machine foundation and the electrical state index of the shield machine foundation; The shield machine foundation mechanical state index is associated with the shield machine mechanical performance influence index to obtain the shield machine initial mechanical state index; The shield machine foundation electrical status index is associated with the shield machine electrical performance impact index to obtain the shield machine initial electrical status index; Establish a three-dimensional coordinate system with the shield machine as the center point, and obtain the initial posture parameters of the shield machine; The initial mechanical state index, initial electrical state index and initial attitude parameters of the shield machine are integrated and data processed to obtain the initial multi-source data of the shield machine.
5. The tunnel shield machine status monitoring method based on multi-source data according to claim 4 is characterized in that: The real-time instruction information of the shield machine and the real-time environment influencing factors of the tunnel are obtained to obtain the real-time multi-source data of the shield machine under the influence of the real-time environment influencing factors of the tunnel, specifically including: Collect real-time surface information and climate information, and process the data to obtain real-time tunnel environment information; Real-time collection of soil real-time index information at the front end of the shield machine, real-time displacement parameters of the tunnel wall, and real-time structural stress index of the tunnel; The real-time soil index information, the real-time displacement parameters of the tunnel wall and the real-time structural stress index of the tunnel are processed to obtain the real-time stratum information of the tunnel; Integrate the real-time tunnel environment information and real-time tunnel stratum information to obtain real-time multi-source tunnel data; Correlate the tunnel real-time multi-source data and the tunnel initial environmental impact factor to obtain the tunnel real-time environmental impact factor; Based on the real-time environmental impact factors, the initial posture information of the shield machine, the mechanical status information of the shield machine foundation and the electrical status information of the shield machine foundation, the real-time multi-source data of the tunnel shield machine is obtained.
6. The method for monitoring the status of a tunnel shield machine based on multi-source data according to claim 5, characterized in that: The shield machine working status alarm index is obtained based on the analysis of the initial multi-source data of the shield machine and the real-time multi-source data of the shield machine, which specifically includes: Obtain the real-time mechanical status information and electrical status information of the shield machine from the real-time multi-source data of the shield machine; Obtain the real-time mechanical state index of the shield machine and the real-time electrical state index of the shield machine in the real-time mechanical state information of the shield machine and the real-time electrical state information of the shield machine; The difference between the real-time mechanical status index of the shield machine and the basic mechanical status index of the shield machine is used as the mechanical fault alarm value of the shield machine; The difference between the real-time electrical status index of the shield machine and the basic electrical status index of the shield machine is used as the electrical fault alarm value of the shield machine; Based on the shield machine mechanical fault alarm value and the shield machine electrical fault alarm value, the shield machine working status alarm index is obtained.
7. The method for monitoring the status of a tunnel shield machine based on multi-source data according to claim 6, characterized in that: The method of evaluating the working state of the shield machine based on the shield machine working state alarm index and optimizing the state of the shield machine according to the evaluation result of the working state of the shield machine specifically includes: The difference between the square of the shield machine mechanical fault alarm value and the square of the shield machine electrical fault alarm value is used as the shield machine working status alarm index; Obtain the total value of the shield machine foundation mechanical state index and the shield machine foundation electrical state index, and use one quarter of the square of the total value as the shield machine working state alarm index threshold; Based on the shield machine working state alarm index threshold, the shield machine working state alarm index is evaluated to obtain shield machine working state evaluation information; The shield machine working status assessment information is used as the shield machine working status assessment result to optimize the shield machine status.
8. A tunnel shield machine status monitoring system based on multi-source data, used to implement the monitoring method according to any one of claims 1 to 7, characterized in that: include: A main control module, wherein the main control module is used to receive initial multi-source data of the tunnel, initial environment information of the tunnel, initial stratum information of the tunnel, initial multi-source data of the shield machine, initial mechanical state information of the shield machine, initial electrical state information of the shield machine, and initial posture information of the shield machine, analyze the initial multi-source data of the tunnel, obtain initial environment impact factors of the tunnel, obtain initial multi-source data of the shield machine under the influence of the initial environment impact factors of the tunnel, obtain real-time instruction information of the shield machine and real-time environment impact factors of the tunnel, obtain real-time multi-source data of the shield machine under the influence of the real-time environment impact factors of the tunnel, analyze the initial multi-source data of the shield machine and the real-time multi-source data of the shield machine, obtain an alarm index of the working state of the shield machine, and optimize the state of the shield machine according to the evaluation result of the working state of the shield machine; A monitoring module, wherein the monitoring module is used to conduct on-site surveys of newly built tunnels, collect initial multi-source data of the tunnels, monitor the surface conditions and climate conditions within the planned area of the newly built tunnels, obtain initial surface information and initial climate information, set a pressure sensor at the front end of the shield machine to monitor the soil index in front of the shield machine, obtain the initial soil pressure parameter, the initial soil moisture index, the initial soil temperature index and the initial soil hardness index, install a displacement sensor and a stress sensor on the tunnel wall to monitor the deformation of the tunnel wall and the stress of the tunnel structure, obtain the initial displacement parameter of the tunnel wall and the initial stress index of the tunnel structure, and obtain the real-time tunnel environment information and the real-time tunnel formation information; An evaluation module, wherein the evaluation module is used to evaluate the mechanical state information of the shield machine foundation and the electrical state information of the shield machine foundation, respectively, to obtain the mechanical state index of the shield machine foundation and the electrical state index of the shield machine foundation, and to evaluate the working state of the shield machine according to the working state alarm index of the shield machine; A transmission module, which is used for data transmission between the main control module, the monitoring module, the evaluation module and the display module; The display module is used to display the monitoring results of the monitoring module, the processing results of the main control module, the evaluation results of the evaluation module and the optimization process of the shield machine status.
9. The tunnel shield machine status monitoring system based on multi-source data according to claim 8, characterized in that: The main control module comprises: A data receiving unit, the data receiving unit is used to receive initial multi-source data of the tunnel, initial environment information of the tunnel, initial stratum information of the tunnel, initial multi-source data of the shield machine, initial mechanical state information of the shield machine, initial electrical state information of the shield machine and initial posture information of the shield machine; A data processing unit, the data processing unit is used to analyze the initial multi-source data of the tunnel, obtain the initial environmental impact factor of the tunnel, obtain the initial multi-source data of the shield machine under the influence of the initial environmental impact factor of the tunnel, obtain the real-time instruction information of the shield machine and the real-time environmental impact factor of the tunnel, obtain the real-time multi-source data of the shield machine under the influence of the real-time environmental impact factor of the tunnel, analyze the initial multi-source data of the shield machine and the real-time multi-source data of the shield machine, and obtain the working status alarm index of the shield machine; The tuning unit is used to tune the state of the shield machine according to the working state evaluation result of the shield machine.
10. The tunnel shield machine status monitoring system based on multi-source data according to claim 8, characterized in that: The evaluation module includes: A data evaluation unit, wherein the information evaluation unit is used to evaluate the mechanical state information of the shield machine foundation and the electrical state information of the shield machine foundation, respectively, to obtain a mechanical state index of the shield machine foundation and an electrical state index of the shield machine foundation; The state evaluation unit is used to generate an alarm index according to the working state of the shield machine. Evaluate the working status of the shield machine.