A hydrogen drying and purification device

By exchanging heat before regeneration of molecular sieve in the hydrogen drying and purification device and cooling of water in the gas-water separator, the problems of high regeneration temperature of molecular sieve and complex equipment structure are solved, and the effect of reducing condenser load and extending the life of molecular sieve is achieved. , simplifies the equipment structure and improves energy efficiency.

CN118807429BActive Publication Date: 2024-11-26SHANDONG HYDROGEN ENERGY TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411295756.3
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-09-18
Publication Date
2024-11-26
Estimated Expiration
2044-09-18

AI Technical Summary

Technical Problem

In the existing hydrogen drying and purification device, the regeneration temperature of the molecular sieve is high, resulting in an increase in the condenser load, and the equipment structure is complex, which has energy saving problems.

Method used

A hydrogen drying and purification device was designed to reduce the initial cooling by heat exchange before regeneration of the molecular sieve, and effluent and re-cooling were performed in the gas-water separator to reduce the load of the condenser, simplify the equipment structure, utilize waste heat, and reduce the regeneration of the molecular sieve. Count of times, extend its lifespan.

Benefits of technology

It reduces the working load of the condenser, reduces the water content of hydrogen entering the molecular sieve, extends the service life of the molecular sieve, simplifies the equipment structure, improves energy efficiency, and avoids additional water pump drainage requirements.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118807429B_ABST
    Figure CN118807429B_ABST
Patent Text Reader

Abstract

The present invention relates to the technical field of hydrogen production, specifically to a hydrogen drying and purification device, comprising a water removal jacket fixedly mounted on the top of the inner cavity of a gas-water separator through a gas collecting hood, the gas collecting hood being connected to the top gas outlet of the gas-water separator, the water removal jacket being provided with an interlayer, a connecting pipe being installed on the outer wall of the gas-water separator, the connecting pipe being provided with a hydrogen inlet pipe and a plurality of first gas inlets matching the water removal jacket, the interlayer being connected to a second gas inlet pipe and a second gas outlet pipe; the top gas outlet being connected to a condenser through a fifteenth pipeline, the condenser being provided with a first gas outlet pipe and a cold gas pipe, the cold gas pipe being connected to a second gas inlet pipe through a thirteenth pipeline, the first gas outlet pipe being connected to a first end of a first mixer through an eleventh pipeline, the second end of the first mixer being connected to a second gas outlet pipe through a fourth pipeline, the third end being connected to a molecular sieve module, and the molecular sieve module being connected to a storage tank. The present invention greatly reduces the workload of the condenser.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of hydrogen production, and in particular to a hydrogen drying and purification device. Background Art

[0002] Hydrogen production by water electrolysis is usually done by hydrolyzing alkaline water in an electrolyzer at 90 degrees Celsius to produce hydrogen and oxygen. The produced hydrogen is ultimately used as fuel or chemical raw material.

[0003] The hydrogen produced by electrolysis of water contains a large amount of water vapor and needs to be fully dried before it can be stored and used. The Chinese invention patent with application number CN201610061561.1 discloses a hydrogen purification and drying device and its working method. The hydrogen carrying water vapor in the device first enters one of the molecular sieves, regenerates the molecular sieve after heating, then enters the condenser to discharge water, and finally enters another molecular sieve for deep drying. Although the structure of the device is simplified, the temperature of the molecular sieve regenerator is very high, and it is directly passed into the condenser for dehydration, which greatly increases the load of the condenser. Summary of the invention

[0004] In order to solve the defects in the prior art, the present invention provides a hydrogen drying and purification device, which is specifically implemented by the following technical solutions:

[0005] A hydrogen drying and purification device comprises an air-water separator with a water outlet pipe and a water removal jacket installed inside, the top of the water removal jacket is fixedly installed on the top of the inner cavity of the air-water separator through an air collecting hood, and a gap is provided between the side wall and the inner wall of the air-water separator, the air collecting hood is communicated with the top air outlet of the air-water separator, the water removal jacket is provided with an interlayer, an annular connecting pipe is installed on the outer wall of the air-water separator, the connecting pipe is provided with a hydrogen inlet pipe and a plurality of first air inlets matching the water removal jacket, and a second air inlet pipe and a second air outlet pipe communicating with the interlayer are also fixedly installed on the water removal jacket; the top air outlet is connected to a condenser through a fifteenth pipeline, the condenser is provided with a first air outlet pipe and a cold air pipe, the cold air pipe is connected to the second air inlet pipe through a thirteenth pipeline, the first air outlet pipe is connected to the first end of a first mixer through an eleventh pipeline, the second end of the first mixer is connected to the second air outlet pipe through a fourth pipeline, and the third end is connected to a molecular sieve module, and the molecular sieve module is connected to a storage tank.

[0006] The condenser is also connected to the water inlet pipe in sequence through the collecting pipe and the fourteenth pipeline, and the water inlet pipe is installed in the gas-water separator.

[0007] The molecular sieve module includes a fifth pipeline having one end connected to the third end of the first mixer, the other end of the fifth pipeline being connected to the third pipeline, the fifth pipeline being connected to the second adsorber and the first adsorber respectively through the sixteenth pipeline and the seventh pipeline, the sixteenth pipeline being fixedly connected to the third pipeline through the sixth pipeline, the third pipeline being connected to the heat exchanger, the second pipeline, and the second mixer on the first pipeline in sequence, the first pipeline being connected to the hydrogen inlet pipe; a second valve body is installed on the fifth pipeline between the seventh pipeline and the third pipeline, and a second valve body is installed on the fifth pipeline between the sixteenth pipeline and the seventh pipeline There is a third valve body, a fourth valve body is installed on the sixth pipeline, and an eighth valve body is installed on the sixteenth pipeline between the fifth pipeline and the sixth pipeline; the second adsorber is connected to the tenth pipeline through a ninth pipeline, one end of the tenth pipeline is connected to the storage tank, and the other end is connected to the first adsorber through a third air outlet pipe, an eighth pipeline is also installed between the ninth pipeline and the third air outlet pipe, and a heater and a sixth valve body are installed on the eighth pipeline; a fifth valve body is installed on the tenth pipeline between the ninth pipeline and the third air outlet pipe, and a seventh valve body is also installed on the ninth pipeline between the tenth pipeline and the eighth pipeline.

[0008] The dewatering jacket comprises a shell, a hollow interlayer is arranged in the shell, the interlayer is divided into a first chamber and a second chamber by two partitions, the second air inlet pipe is connected to the first chamber, and the second air outlet pipe is connected to the second chamber; a plurality of hollow corrugated plates are also fixedly installed inside the shell, and the two ends of the corrugated plates are respectively connected to the first chamber and the second chamber.

[0009] An expansion tube is installed on the fourteenth pipeline.

[0010] The condenser includes an upper shell and a lower shell which are detachably connected together, the first air outlet pipe is arranged at the first end of the upper shell, a mounting frame is fixedly installed in the lower shell, a second radiator is arranged on the top of the mounting frame, and a first radiator is arranged on the bottom, a semiconductor refrigeration plate is installed between the first radiator and the second radiator via thermal conductive adhesive, the second end of the lower shell is connected to the fifteenth pipeline via the first air inlet pipe, the first end of the lower shell is connected to the second end of the upper shell via the heat dissipation pipe; the cold air pipe is installed at the second end of the lower shell.

[0011] The tenth valve body is installed on the thirteenth pipeline.

[0012] The second end of the upper shell is also equipped with an air supply pipe, which is connected to the storage tank through a twelfth pipeline, and a ninth valve body is installed on the twelfth pipeline.

[0013] A water collecting trough is provided at one end of the bottom of the lower shell body close to the first air inlet pipe. The water collecting trough is fixedly connected to a plurality of downpipes. One end of the downpipe away from the water collecting trough is fixedly connected to one end of the collecting pipe.

[0014] The storage tank is installed with a first temperature sensor and a pressure sensor.

[0015] The technical solution of the present invention has the following advantages:

[0016] The high-temperature regeneration gas of the molecular sieve will first pass through the heat exchanger for preliminary cooling, and then be mixed with the newly prepared hydrogen and enter the gas-water separator for preliminary water discharge and cooling again; the hydrogen coming out of the gas-water separator enters the condenser for water discharge, and part of the hydrogen passing through the condenser directly enters the molecular sieve in the adsorber, and the other part passes into the gas-water separator to cool the gas-water separator before entering the molecular sieve, which greatly reduces the workload of the condenser; it can also reduce the water content of the hydrogen entering the molecular sieve, thereby reducing the number of regenerations of the molecular sieve and extending the life of the molecular sieve. At the same time, the waste heat can be fully utilized.

[0017] The condensed water of the condenser flows into the gas-water separator for unified recovery, which can simplify the equipment structure and make the whole structure more compact. In addition, the condenser does not need an additional water pump to drain water, which is more energy-efficient. BRIEF DESCRIPTION OF THE DRAWINGS

[0018] In order to more clearly illustrate the specific implementation methods of the present invention or the technical solutions in the prior art, the drawings required for use in the specific implementation methods or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are some implementation methods of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0019] Figure 1 It is a structural schematic diagram of the present invention;

[0020] Figure 2 It is a structural schematic diagram of a water remover;

[0021] Figure 3 is a cross-sectional schematic diagram of a water eliminator;

[0022] Figure 4 is a schematic diagram of the structure of the condenser;

[0023] Figure 5 Schematic diagram of the internal structure of the condenser;

[0024] Figure 6 is a schematic diagram of the installation of the first radiator;

[0025] Figure 7 is a schematic diagram of the structure of the lower shell;

[0026] Figure 8 is a structural schematic diagram of a first radiator;

[0027] Fig. 9 It is a schematic structural diagram of the second radiator.

[0028] In the figure: 1-first valve body, 2-drain port, 3-gas-water separator, 4-water inlet, 5-hydrogen inlet pipe, 6-connecting pipe, 7-first pipeline, 8-second pipeline, 9-heat exchanger, 10-third pipeline, 11-fourth pipeline, 12-fifth pipeline, 13-second valve body, 14-sixth pipeline, 15-seventh pipeline, 16-third valve body, 17-fourth valve body, 18-first adsorber, 19-eighth pipeline, 20-fifth valve body, 21-heater, 22-sixth valve body, 23-seventh valve body, 24-ninth pipeline, 25-second adsorber, 26-tenth pipeline, 27-storage tank, 28-eighth valve body, 29-first mixer, 30-eleventh pipeline, 31-twelfth pipeline;

[0029] 32-condenser, 321-upper shell, 322-lower shell, 323-heat dissipation pipe, 324-air supply pipe, 325-cold air pipe, 326-first end cover, 327-downpipe, 328-second end cover, 329-first air inlet pipe, 3210-first air outlet pipe, 3211-second radiator, 3212-first vent hole, 3213-first sealing gasket, 3214-first edge, 3215-installation frame, 3216-second sealing gasket, 3217-third sealing gasket, 3218-first radiator, 3219-water collecting tank, 3220-second edge, 3221-first fin, 3222-third edge, 3223-second fin, 3224-first wire hole, 3225-semiconductor cooling plate;

[0030] 33-the thirteenth pipeline, 34-the collecting pipe, 35-the fourteenth pipeline, 36-the expansion pipe, 37-the first air inlet, 38-the water inlet pipe, 39-the water outlet pipe;

[0031] 40- dehumidifier, 401- gas collecting hood;

[0032] 402-water removal jacket, 4021-shell, 4022-partition plate, 4023-corrugated plate;

[0033] 403 - second air inlet pipe, 404 - second air outlet pipe. DETAILED DESCRIPTION

[0034] The technical solution of the present invention will be described clearly and completely below in conjunction with the accompanying drawings. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0035] In the description of the present invention, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", etc., indicating the orientation or positional relationship, are based on the orientation or positional relationship shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the modules or elements referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as limiting the present invention. In addition, the terms "first", "second", and "third" are used for descriptive purposes only and cannot be understood as indicating or implying relative importance.

[0036] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0037] In addition, the technical features involved in the different embodiments of the present invention described below can be combined with each other as long as they do not conflict with each other.

[0038] As attached Figure 1 As shown, the present invention provides a hydrogen drying and purification device, comprising a gas-water separator 3 , a sewage outlet 2 is provided at the bottom of the gas-water separator 3 , and a first valve body 1 is installed on the sewage outlet 2 .

[0039] The inside of the gas-water separator 3 is sequentially installed with a water outlet pipe 39 , a water inlet pipe 38 and a water remover 40 from bottom to top; the water outlet pipe 39 and the water inlet pipe 38 are both located at the lower part of the gas-water separator 3 at one end and extend out of the gas-water separator 3 at the other end.

[0040] The dehumidifier 40 is located on the top of the gas-water separator 3 and has an interlayer; the top of the dehumidifier 40 is communicated with the top gas outlet of the gas-water separator 3 .

[0041] A gap is provided between the side wall of the water remover 40 and the inner wall of the gas-water separator 3 .

[0042] An annular connecting pipe 6 is fixedly mounted on the upper portion of the outer wall of the gas-water separator 3, and the connecting pipe 6 is connected to the gas-water separator 3 through a plurality of first air inlets 37, and the first air inlets 37 face the upper portion of the side wall of the water remover 40. A hydrogen inlet pipe 5 is provided on the connecting pipe 6, and the hydrogen inlet pipe 5 is connected to the first pipeline 7 through a flange for introducing hydrogen.

[0043] By taking in air through a plurality of first air inlets 37 , hydrogen can be fully contacted with the water remover 40 , thereby improving the water removal effect.

[0044] The gas-water separator 3 is filled with water, and the ends of the water outlet pipe 39 and the water inlet pipe 38 located inside the gas-water separator 3 are always below the liquid level. A water inlet 4 and a water level sensor are provided on the side wall of the gas-water separator 3. The water outlet pipe 39 is connected to a return water pump (not shown) to discharge excess water in the gas-water separator 3.

[0045] The bottom of the water inlet pipe 38 is closer to the bottom wall of the gas-water separator 3 than the bottom of the water outlet pipe 39, which can prevent hydrogen from overflowing.

[0046] The structure of the water remover 40 is shown in the attached Figure 2 As shown, it includes a water removal jacket 402 which is cylindrical and provided with an interlayer, and an air collecting hood 401 is fixedly installed on the top of the water removal jacket 402. The air collecting hood 401 is fixedly installed on the inner wall of the gas-water separator 3 and is connected to the top air outlet of the gas-water separator 3.

[0047] A second air inlet pipe 403 and a second air outlet pipe 404 are also fixedly mounted on the water removal jacket 402. The second air inlet pipe 403 is used to introduce cooling air into the interlayer, and the second air outlet pipe 404 is used to discharge the cooling air in the interlayer.

[0048] The specific structure of the water removal jacket 402 is shown in the attached Figure 3 As shown, it includes an annular shell 4021 , and the top of the shell 4021 is fixedly connected to the air collecting hood 401 .

[0049] A hollow interlayer is provided in the shell 4021 , and two partitions 4022 are fixedly installed in the interlayer. The two partitions 4022 are located at two ends of the same diameter of the water removal jacket 402 , thereby dividing the interlayer into a first chamber and a second chamber.

[0050] The second air inlet pipe 403 is communicated with the lower part of the first chamber, and the second air outlet pipe 404 is communicated with the upper part of the second chamber.

[0051] A plurality of hollow corrugated plates 4023 are fixedly installed inside the shell 4021 , and two ends of the corrugated plates 4023 are respectively connected to the first chamber and the second chamber.

[0052] When in use, hydrogen carrying water vapor enters the connecting pipe 6 from the hydrogen inlet pipe 5 through the delivery pump (not shown), and then enters the gas-water separator 3 through the first air inlet 37, where it first collides with the outer wall of the shell 4021, and the water vapor in the hydrogen gathers on the shell 4021 and is partially removed; then the hydrogen gas flow enters the dewatering jacket 402 from the bottom of the dewatering jacket 402, where it collides with the corrugated plate 4023, and the flow rate slows down. Because cooling air is introduced into the dewatering jacket 402, the water vapor in the hydrogen gathers and condenses on the corrugated plate 4023, and is partially removed, and finally discharged from the gas-water separator 3 through the top air outlet.

[0053] The top air outlet is connected to the condenser 32 through the fifteenth pipeline, the condenser 32 is connected to the first end of the first mixer 29 through the eleventh pipeline 30 , and the second end of the first mixer 29 is connected to the second air outlet pipe 404 through the fourth pipeline 11 .

[0054] The condenser 32 is also connected to the second air intake pipe 403 via a thirteenth pipeline 33 .

[0055] A collecting pipe 34 is fixedly mounted on one end of the condenser 32 , and the collecting pipe 34 is connected to the water inlet pipe 38 through a fourteenth pipeline 35 .

[0056] An expansion tube 36 is installed on the fourteenth pipeline 35 , and the diameter of the expansion tube 36 is larger than the diameter of the fourteenth pipeline 35 at both ends thereof.

[0057] The hydrogen discharged from the gas-water separator 3 enters the condenser 32 through the fifteenth pipeline, and the condenser 32 cools the hydrogen to 1 to 2 degrees Celsius to achieve condensation and dehydration; a part of the hydrogen after condensation and dehydration enters the first mixer 29 through the eleventh pipeline 30, and the other part enters the dehydration jacket 402 as cooling gas. The condensed water generated by the condenser 32 enters the gas-water separator 3 through the collecting pipe 34, the fourteenth pipeline 35, and the water inlet pipe 38 in sequence.

[0058] When the liquid level sensor detects that the liquid level reaches the set maximum water level, the controller controls the return pump to pump out the condensed water until the sensor detects that the liquid level reaches the set minimum water level.

[0059] The water inlet end of the water inlet pipe 38 is arranged above the water outlet pipe 39, and the expansion pipe 36 is installed on the fourteenth pipeline 35, so as to prevent the condensed water from flowing back and ensure that the condensed water in the condenser 32 can be discharged normally.

[0060] The third end of the first mixer 29 is connected to the adsorber of the molecular sieve module, and the adsorber is connected to the storage tank 27 and the heat exchanger 9 through the tenth pipeline 26 and the third pipeline 10 respectively. The heat exchanger 9 is connected to the second mixer through the second pipeline 8, and the second mixer is installed on the first pipeline 7.

[0061] Specifically, the third end of the first mixer 29 is fixedly connected to the first end of the fifth pipeline 12 via a flange, and the first end of the sixteenth pipeline and the first end of the seventh pipeline 15 are fixedly connected to the fifth pipeline 12 in sequence, that is, two tees are installed on the fifth pipeline 12, and the two tees are respectively connected to the first end of the sixteenth pipeline and the first end of the seventh pipeline 15; the second end of the sixteenth pipeline is fixedly connected to the first end of the second adsorber 25 via a flange, and the second end of the seventh pipeline 15 is connected to the first end of the first adsorber 18 via a flange.

[0062] The sixteenth pipeline is also connected to the first end of the sixth pipeline 14 through a tee; the second end of the sixth pipeline 14 and the second end of the fifth pipeline 12 are respectively fixedly connected to the third pipeline 10. The third pipeline 10 is fixedly connected to the first end of the heat exchanger 9, the second end of the heat exchanger 9 is fixedly connected to the first alkaline water pipe, and the third end of the heat exchanger 9 is connected to the second mixer on the first pipeline 7 through the second pipeline 8.

[0063] The fourth end of the heat exchanger 9 is fixedly connected to the second alkaline water pipe.

[0064] The fifth pipeline 12 is installed with a second valve body 13 and a third valve body 16 , wherein the second valve body 13 is located between the seventh pipeline 15 and the third pipeline 10 , and the third valve body 16 is located between the sixteenth pipeline and the seventh pipeline 15 ; the sixth pipeline 14 is installed with a fourth valve body 17 .

[0065] An eighth valve body 28 is installed on the sixteenth pipeline, and the eighth valve body 28 is located between the fifth pipeline 12 and the sixth pipeline 14 .

[0066] The second end of the second adsorber 25 is connected to the tenth pipeline 26 via the ninth pipeline 24, and the second end of the first adsorber 18 is connected to the storage tank 27 via the third outlet pipe and the tenth pipeline 26. The storage tank 27 is used to store the dried hydrogen.

[0067] A first temperature sensor, a pressure sensor and a safety valve are installed on the storage tank 27; the first temperature sensor and the pressure sensor are electrically connected to the controller.

[0068] An eighth pipeline 19 is further installed between the ninth pipeline 24 and the third air outlet pipe, and a heater 21 and a sixth valve body 22 are installed on the eighth pipeline 19 .

[0069] The fifth valve body 20 is installed on the tenth pipeline 26 , and the fifth valve body 20 is located between the ninth pipeline 24 and the third air outlet pipe.

[0070] A seventh valve body 23 is also installed on the ninth pipeline 24 , and the seventh valve body 23 is located between the tenth pipeline 26 and the eighth pipeline 19 .

[0071] The second valve body 13 , the third valve body 16 , the fourth valve body 17 , and the eighth valve body 28 are preferably stop valves, and the fifth valve body 20 , the sixth valve body 22 , and the seventh valve body 23 are preferably flow valves.

[0072] Thus, the hydrogen from the first mixer 29 first enters the fifth pipeline 12, at which time the eighth valve body 28 and the seventh valve body 23 are in a fully open state, and the second valve body 13, the third valve body 16, the fourth valve body 17, the fifth valve body 20, and the sixth valve body 22 are in a closed state. The hydrogen is adsorbed by the molecular sieve in the second adsorber 25 to remove moisture, and then enters the storage tank 27 through the ninth pipeline 24 and the tenth pipeline 26.

[0073] After the second adsorber 25 has been adsorbed for a period of time, the third valve body 16, the fourth valve body 17, the fifth valve body 20, the sixth valve body 22, and the heater 21 are opened, and the seventh valve body 23 and the eighth valve body 28 are closed. At this time, the hydrogen enters the first adsorber 18 through the seventh pipeline 15, and is adsorbed by the molecular sieve in the first adsorber 18 to remove moisture. Due to the control of the fifth valve body 20 and the sixth valve body 22, part of the hydrogen enters the eighth pipeline 19; the hydrogen entering the eighth pipeline 19 is heated by the heater 21 and enters the second adsorber 25 to regenerate the molecular sieve in the second adsorber 25, and then carries the hydrogen with moisture generated by the molecular sieve regeneration into the heat exchanger 9 through the sixth pipeline 14 and the third pipeline 10, and performs heat exchange with the alkaline water to be electrolyzed introduced into the heat exchanger 9; after the hydrogen comes out of the heat exchanger 9, it is mixed with the newly produced hydrogen and enters the gas-water separator 3 for dehydration. This can greatly reduce the load of the condenser 32, so that the condenser 32 can use a smaller power and can also remove moisture better.

[0074] When the molecular sieve of the first adsorber 18 is saturated with adsorption, the fifth valve body 20, the fourth valve body 17 and the third valve body 16 are closed; the second valve body 13, the sixth valve body 22, the seventh valve body 23 and the eighth valve body 28 are opened; after the hydrogen coming out of the first mixer 29 passes through the second adsorber 25, a part of it enters the storage tank 27 through the tenth pipeline 26, and the other part is heated by the heater 21 to regenerate the molecular sieve in the first adsorber 18, and the hydrogen carries the water vapor generated by the regeneration through the fifth pipeline 12 to enter the third pipeline 10, and then enters the heat exchanger 9 to exchange heat with the alkaline water to be electrolyzed introduced into the heat exchanger 9; after the hydrogen comes out of the heat exchanger 9, it is mixed with the newly produced hydrogen and enters the gas-water separator 3 for dehydration.

[0075] The structure of the condenser 32 is shown in the attached figure. Figure 4 and attached Figure 5 As shown, it includes an upper shell 321 and a lower shell 322 detachably connected together by bolts, and a second sealing gasket 3216 is installed at the connection between the upper shell 321 and the lower shell 322.

[0076] A first air outlet pipe 3210 is provided at the first end of the upper shell 321 , and the first air outlet pipe 3210 is connected to the eleventh pipeline 30 via a flange or a pipe joint.

[0077] As attached Figure 5 , Attachment Figure 6 , Attachment Figure 7 As shown, the top of the lower shell 322 is provided with a first edge 3214, and the upper shell 321 is provided with a fourth edge matching the first edge 3214. During installation, the first edge 3214 is installed with the second sealing gasket 3216 and then buckled with the fourth edge, and then the bolts are installed.

[0078] The first end of the lower shell 322 is mounted with a second end cover 328 by bolts, and the second end is mounted with a first end cover 326 by bolts. A first sealing gasket 3213 is installed between the first end cover 326 , the second end cover 328 and the lower shell 322 .

[0079] The second end cover 328 is provided with a first air inlet pipe 329 , and the first air inlet pipe 329 is connected to the fifteenth pipeline via a flange.

[0080] An installation frame 3215 is fixedly installed in the lower shell 322. A second heat sink 3211 is provided on the top of the installation frame 3215, and a first heat sink 3218 is provided on the bottom. A semiconductor cooling plate 3225 is installed between the first heat sink 3218 and the second heat sink 3211 via thermal conductive adhesive.

[0081] The structure of the first radiator 3218 is shown in the attached figure Figure 8 As shown, it includes a first connecting plate with a plurality of first fins 3221 fixedly mounted thereon, and both ends of the first connecting plate are provided with second edges 3220. The second edges 3220 match the mounting frame 3215.

[0082] The structure of the second radiator 3211 is as shown in the attached figure Fig. 9 As shown, it includes a second connecting plate fixedly mounted with a plurality of second fins 3223, and a receiving cavity is provided on one side of the second connecting plate away from the second fins 3223. At least one semiconductor cooling fin 3225 is installed in the receiving cavity through heat-conducting glue.

[0083] The second connecting plate is provided with a third edge 3222 matching the mounting frame 3215. The third edge 3222 is provided with a first wire hole 3224 matching the semiconductor cooling plate 3225, and the upper shell 321 is provided with a second wire hole (not shown) matching the first wire hole 3224.

[0084] A second temperature sensor is also mounted on the upper housing 321 .

[0085] During installation, first install the semiconductor refrigeration plate 3225 on the second radiator 3211, then place the second radiator 3211 and the first radiator 3218 on the mounting frame 3215, and bolts pass through the third edge 3222, the mounting frame 3215, and the second edge 3220 in sequence to achieve fixed installation; a third sealing gasket 3217 is also installed at the connection between the second radiator 3211 and the mounting frame 3215, so as to achieve sealing isolation between the upper shell 321 and the lower shell 322.

[0086] A water collecting trough 3219 is provided at one end of the bottom of the lower shell 322 near the first air inlet pipe 329 , and the water collecting trough 3219 is fixedly connected to a plurality of downpipes 327 , and one end of the downpipes 327 away from the water collecting trough 3219 is fixedly connected to one end of the collecting pipe 34 .

[0087] The end of the first fin 3221 abuts against the inner wall of the lower shell 322, and the end of the first fin 3221 abuts against the inner wall of the upper shell 321, so that hydrogen can only pass through the gaps between adjacent fins and between the fins and the corresponding shells, thereby improving the cooling effect.

[0088] During installation, the entire condenser 32 should be installed at an angle, that is, the height of the end where the water collecting tank 3219 is provided should be lower than the height of the end where the water collecting tank 3219 is not provided.

[0089] A plurality of U-shaped heat dissipation pipes 323 are installed between the first end cover 326 and the second end of the upper shell 321; an air supply pipe 324 is also installed at the second end of the upper shell 321, and the air supply pipe 324 is connected to the storage tank 27 through the twelfth pipeline 31. A ninth valve body is installed on the twelfth pipeline 31, and the ninth valve body preferably adopts a flow valve.

[0090] A cold air pipe 325 is fixedly mounted on the first end cover 326 , and the cold air pipe 325 is connected to the second air inlet pipe 403 via the thirteenth pipeline 33 ; a tenth valve body is mounted on the thirteenth pipeline 33 , and the tenth valve body is preferably a flow valve.

[0091] The first end cover 326 is provided with a first vent hole 3212 matching the heat dissipation pipe 323 and the cold air pipe 325 , and the second end of the upper shell 321 is provided with a second vent hole matching the heat dissipation pipe 323 and the air supply pipe 324 .

[0092] The hydrogen coming out of the gas-water separator 3 enters the lower shell 322 through the first air inlet pipe 329 and is condensed by the first radiator 3218. The condensed water enters the water collecting tank 3219 and then passes through the downpipe 327, the collecting pipe 34, the fourteenth pipeline 35 and the water inlet pipe 38 in sequence to enter the gas-water separator 3.

[0093] A part of the hydrogen after condensation and dehydration enters the upper shell 321 through the heat dissipation pipe 323, and contacts the second radiator 3211 to dissipate heat for the semiconductor refrigeration plate 3225, and then enters the eleventh pipeline 30 from the first air outlet pipe 3210; the other part enters the thirteenth pipeline 33 through the cold air pipe 325, and finally enters the water separator 40 as cooling air.

[0094] The tenth valve body is used to control the flow rate of the cooling air entering the water eliminator 40 .

[0095] When the second temperature sensor detects that the temperature is too high, the ninth valve body will be opened to increase the hydrogen flow rate and improve the heat dissipation efficiency. Of course, the opening of the tenth valve body can also be reduced at the same time.

[0096] All valve bodies and sensors in this embodiment are connected to the controller.

[0097] Obviously, the above embodiments are merely examples for the purpose of clear explanation, and are not intended to limit the implementation methods. For those skilled in the art, other different forms of changes or modifications can be made based on the above description. It is not necessary and impossible to list all the implementation methods here. The obvious changes or modifications derived therefrom are still within the scope of protection of the invention.

Claims

1. A hydrogen drying and purification device, characterized in that: The invention comprises a gas-water separator (3) having a water outlet pipe (39) and a water removal jacket (402) installed therein, wherein the top of the water removal jacket (402) is fixedly installed on the top of the inner cavity of the gas-water separator (3) through an air collecting hood (401), and a gap is provided between the side wall and the inner wall of the gas-water separator (3), the air collecting hood (401) is communicated with the top gas outlet of the gas-water separator (3), the water removal jacket (402) is provided with an interlayer, an annular connecting pipe (6) is installed on the outer wall of the gas-water separator (3), the connecting pipe (6) is provided with a hydrogen inlet pipe (5) and a plurality of first gas inlets (37) matching the water removal jacket (402), and the water removal jacket (402) is also fixedly installed with a gas inlet pipe (5) and a plurality of first gas inlets (37) matching the water removal jacket (402). The interlayer is connected to a second air inlet pipe (403) and a second air outlet pipe (404); the top air outlet is connected to the condenser (32) via a fifteenth pipeline; the condenser (32) is provided with a first air outlet pipe (3210) and a cold air pipe (325); the cold air pipe (325) is connected to the second air inlet pipe (403) via a thirteenth pipeline (33); the first air outlet pipe (3210) is connected to a first end of a first mixer (29) via an eleventh pipeline (30); the second end of the first mixer (29) is connected to the second air outlet pipe (404) via a fourth pipeline (11); the third end is connected to a molecular sieve module; and the molecular sieve module is connected to a storage tank (27).

2. The hydrogen drying and purification device according to claim 1, characterized in that: The condenser (32) is also connected to a water inlet pipe (38) in sequence through a collecting pipe (34) and a fourteenth pipe (35), and the water inlet pipe (38) is installed in the gas-water separator (3).

3. The hydrogen drying and purification device according to claim 1, characterized in that: The molecular sieve module comprises a fifth pipeline (12) having one end connected to the third end of the first mixer (29), the other end of the fifth pipeline (12) being connected to the third pipeline (10), the fifth pipeline (12) being connected to the second adsorber (25) and the first adsorber (18) respectively through a sixteenth pipeline and a seventh pipeline (15), the sixteenth pipeline being further fixedly connected to the third pipeline (10) through a sixth pipeline (14), the third pipeline (10) being connected to the heat exchanger (9), the second pipeline (8), and the second mixer on the first pipeline (7) in sequence, the first pipeline (7) being connected to the hydrogen inlet pipe (5); a second valve body (13) being installed on the fifth pipeline (12) located between the seventh pipeline (15) and the third pipeline (10), and a third valve body (13) being installed on the fifth pipeline (12) located between the sixteenth pipeline and the seventh pipeline (15). 6), a fourth valve body (17) is installed on the sixth pipeline (14), and an eighth valve body (28) is installed on the sixteenth pipeline located between the fifth pipeline (12) and the sixth pipeline (14); the second adsorber (25) is connected to the tenth pipeline (26) through the ninth pipeline (24), one end of the tenth pipeline (26) is connected to the storage tank (27), and the other end is connected to the first adsorber (18) through the third gas outlet pipe, an eighth pipeline (19) is also installed between the ninth pipeline (24) and the third gas outlet pipe, and a heater (21) and a sixth valve body (22) are installed on the eighth pipeline (19); a fifth valve body (20) is installed on the tenth pipeline (26) located between the ninth pipeline (24) and the third gas outlet pipe, and a seventh valve body (23) is also installed on the ninth pipeline (24) located between the tenth pipeline (26) and the eighth pipeline (19).

4. The hydrogen drying and purification device according to claim 1, characterized in that: The dewatering jacket (402) comprises a shell (4021), wherein a hollow interlayer is provided in the shell (4021), wherein the interlayer is divided into a first chamber and a second chamber by two partitions (4022), wherein the second air inlet pipe (403) is connected to the first chamber, and the second air outlet pipe (404) is connected to the second chamber; and a plurality of hollow corrugated plates (4023) are also fixedly installed inside the shell (4021), wherein two ends of the corrugated plates (4023) are respectively connected to the first chamber and the second chamber.

5. The hydrogen drying and purification device according to claim 2, characterized in that: An expansion tube (36) is installed on the fourteenth pipeline (35).

6. The hydrogen drying and purification device according to claim 1, characterized in that: The condenser (32) comprises an upper shell (321) and a lower shell (322) which are detachably connected together; the first air outlet pipe (3210) is arranged at a first end of the upper shell (321); a mounting frame (3215) is fixedly installed in the lower shell (322); a second heat sink (3211) is arranged at the top of the mounting frame (3215) and a first heat sink (3218) is arranged at the bottom; a semiconductor cooling plate (3225) is installed between the first heat sink (3218) and the second heat sink (3211) via heat-conducting adhesive; the second end of the lower shell (322) is connected to the fifteenth pipeline via a first air inlet pipe (329); the first end of the lower shell (322) is connected to the second end of the upper shell (321) via a heat dissipation pipe (323); and the cold air pipe (325) is installed at the second end of the lower shell (322).

7. The hydrogen drying and purification device according to claim 6, characterized in that: A tenth valve body is installed on the thirteenth pipeline (33).

8. The hydrogen drying and purification device according to claim 6, characterized in that: The second end of the upper shell (321) is further provided with an air supply pipe (324), the air supply pipe (324) being connected to the storage tank (27) via a twelfth pipeline (31), and a ninth valve body being provided on the twelfth pipeline (31).

9. The hydrogen drying and purification device according to claim 6, characterized in that: A water collecting trough (3219) is provided at one end of the bottom of the lower shell (322) close to the first air inlet pipe (329); the water collecting trough (3219) is fixedly connected to a plurality of downpipes (327); and one end of the downpipe (327) away from the water collecting trough (3219) is fixedly connected to one end of the collecting pipe (34).