Automatic chiseling device for new and old spliced wide bridge joint concrete interface and construction method of automatic chiseling device

By designing an automated deburring device and using multi-degree-of-freedom robotic arms and sensors to monitor and adjust deburring parameters in real time, the problem of low efficiency and difficult quality assurance in traditional deburring operations has been solved, and efficient and precise bridge joint processing has been achieved.

CN118849221APending Publication Date: 2024-10-29齐鲁高速公路股份有限公司

Patent Information

Application Number
CN202411070118.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-06
Publication Date
2024-10-29

AI Technical Summary

Technical Problem

Traditional deburring operations rely on manual operations, which are inefficient and difficult to guarantee quality. Moreover, existing automated equipment has a single function and cannot optimize deburring parameters in real time, posing safety risks.

Method used

An automated device for deburring the concrete interface between old and new wide bridge joints is designed, including a track positioning and moving mechanism, a deburring spraying mechanism, a cleaning and collection mechanism and a central control mechanism. It uses a multi-degree-of-freedom robotic arm and multi-functional sensors for real-time monitoring. Chiseling status and adjusting chiseling parameters based on deep learning analysis.

Benefits of technology

It realizes automated, efficient and precise chiseling operations, significantly improves construction efficiency and quality, and reduces manual work risks.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118849221A_ABST
    Figure CN118849221A_ABST
Patent Text Reader

Abstract

The invention discloses an automatic chiseling device for a new and old spliced wide bridge joint concrete interface and a construction method of the automatic chiseling device, and belongs to the technical field of bridge construction. The automatic chiseling device integrates a rail positioning and moving mechanism, a chiseling and spraying mechanism, a cleaning and collecting mechanism and a central control mechanism; the scabbling device comprises a walking moving assembly, a lifting frame and a cleaning and collecting mechanism, the cleaning and collecting mechanism is installed on the lifting frame and provided with a multifunctional sensor, a dust collector, a high-pressure spraying gun and a scabbling machine, the cleaning and collecting mechanism is installed on the walking moving assembly and provided with a layered screening part and a slag liquid collecting opening which is communicated with the layered screening part and is in an open strip shape, and automatic, efficient and accurate scabbling operation can be achieved. By adopting the multi-degree-of-freedom mechanical arm and the multifunctional sensor, the device can adapt to different construction conditions, monitor the scabbling state in real time, and automatically adjust scabbling parameters according to a deep learning analysis result, so that the construction efficiency and quality are remarkably improved, and meanwhile, the risk of manual operation is reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of bridge construction, and in particular relates to an automated device for roughening a concrete interface of a joint between a new and an old bridge and a construction method thereof. Background Art

[0002] In the process of bridge construction and maintenance, the treatment of the joints between new and old bridges is a key link to ensure the stability and durability of the structure. Traditional roughening operations usually rely on manual operations. This process is not only labor-intensive and inefficient, but also difficult to ensure the construction quality and poses safety hazards. With the acceleration of urbanization and the continuous renewal of infrastructure, the demand for automated and intelligent bridge joint treatment is growing.

[0003] In the existing technology, although some automated equipment is used in roughening operations, they are often single-function and lack flexibility and adaptability. For example, some equipment may only be able to handle joints of a specific shape or size, or cannot effectively collect and process the waste residue and wastewater generated during the operation. In addition, automated equipment often requires manual intervention to adjust the roughening parameters in actual operation, and cannot optimize the operation process in real time according to actual construction conditions. Summary of the invention

[0004] The purpose of the present invention is to overcome the deficiencies in the prior art and to provide an automated device for roughening the concrete interface of a new-old bridge joint and a construction method thereof.

[0005] To achieve the above object, the present invention is implemented by adopting the following technical solutions:

[0006] The present invention provides an automatic device for roughening the concrete interface of a new and old bridge joint, comprising a track positioning and moving mechanism, a roughening and spraying mechanism, a cleaning and collecting mechanism, and a central control mechanism;

[0007] The track positioning moving mechanism is equipped with a track arranged parallel to the longitudinal direction of the joint between the new and old widened bridges and a walking moving assembly reciprocating along the track and equipped with a lifting frame;

[0008] The chiseling and spraying mechanism is installed on a lifting frame and is equipped with a multi-function sensor, a vacuum cleaner, a high-pressure spray gun and a chiseling machine. The chiseling machine is non-vertically facing the joint end face of the new and old bridges at a preset angle through a multi-degree-of-freedom mechanical arm. The vacuum nozzle of the vacuum cleaner is arranged on the multi-degree-of-freedom mechanical arm and is located directly above the chiseling machine. The spray gun of the high-pressure spray gun is arranged on the multi-degree-of-freedom mechanical arm and is located above the side of the chiseling machine. The multi-function sensor is arranged at the free end of the multi-degree-of-freedom mechanical arm and faces the chiseling machine.

[0009] The cleaning and collecting mechanism is installed on the walking and moving assembly, and is provided with a layered screening part and a slag and liquid collecting port in the shape of an open strip which is connected to the layered screening part. The slag and liquid collecting port is arranged on the multi-degree-of-freedom mechanical arm and is located directly below the haircutting machine.

[0010] The central control mechanism is installed on the track positioning mobile mechanism, and is respectively connected to the walking mobile component, the multifunctional sensor of the chiseling and spraying mechanism, the vacuum cleaner, the high-pressure spray gun and the chiseling machine, and is wirelessly connected to the external control terminal.

[0011] Furthermore, the chiseling machine is detachably equipped with chiseling bits of various diameters and shapes, and the chiseling bits include standard straight blades, conical shapes, and corrugated shapes.

[0012] Furthermore, the multifunctional sensor includes a photoelectric sensor, a proximity sensor, a laser ranging sensor, a speed sensor and a torque sensor.

[0013] Furthermore, the layered screening part of the cleaning and collecting mechanism is a spiral multi-layer filtering structure, the interior of which is divided into multiple discharge channels up and down by multiple sieves of different diameters and mesh sizes for screening and separating waste residues and wastewater, and different discharge channels are respectively connected to different external recovery boxes.

[0014] Furthermore, the multi-degree-of-freedom robotic arm adopts four degrees of freedom, five degrees of freedom or six degrees of freedom.

[0015] Furthermore, the detachable nozzle of the high-pressure blasting gun is a fan-shaped nozzle, a straight nozzle or a variable-angle nozzle.

[0016] In a second aspect, an embodiment of the present invention provides an automated construction method for roughening the concrete interface of a new and old bridge joint, wherein the roughening process is performed at the concrete interface of the new and old bridge joint using an automated device for roughening the concrete interface of the new and old bridge joint as described in any one of claims 1 to 6, specifically comprising the following steps:

[0017] Step S1: Check and prepare the track positioning moving mechanism, the roughening spraying mechanism, the cleaning and collecting mechanism and the central control mechanism of the automatic device for roughening the concrete interface of the joint between the new and old bridges;

[0018] Step S2: Fix the track positioning moving mechanism at appropriate positions on both sides of the joint between the new and old widened bridges to ensure that the track is parallel to the joint and firmly installed; install the walking moving assembly on the track, and ensure that the lifting frame can be lifted and lowered smoothly to adapt to the roughening points at different heights;

[0019] Step S3: Calibrate and test all sensors including the photoelectric sensor, proximity sensor, laser distance sensor, speed sensor and torque sensor of the multifunctional sensor in the roughening and spraying mechanism; and select and install a drill head of appropriate diameter and shape on the roughening machine according to construction requirements such as different concrete interface strength and roughening depth;

[0020] Step S4: Start the automation device through the central control mechanism and establish a wireless communication connection with the external control terminal to ensure that the operator can monitor and control in real time;

[0021] Step S5: operate the walking moving assembly to move along the track, fix the roughening points according to the internal preset walking route, use the lifting frame to adjust the roughening machine to an appropriate height, and use the four-degree-of-freedom mechanical arm to adjust the roughening machine to a preset angle relative to the end faces of the joints on both sides. The central control mechanism starts the roughening machine, vacuum cleaner, high-pressure spray gun and multi-function sensor according to the preset instructions and starts the roughening and cleaning operations on the joints of the new and old widened bridges point by point;

[0022] Step S6: During the roughening process, the roughening waste residue and the waste liquid sprayed by the high-pressure water flow are collected through the open strip-shaped residue liquid collection port of the cleaning collection mechanism, and the waste residue and waste water are collected and separated through the connected layered screening part, and at the same time, the dust suction nozzle of the vacuum cleaner is used to absorb the dust at high pressure above the roughening point to ensure the cleanliness of the construction site;

[0023] Step S7: Use a multifunctional sensor to monitor the chiseling status of the chiseling points in real time, obtain data parameters such as the chiseling machine force, chiseling bit speed, chiseling depth, interface point abnormality, dust concentration, etc., and transmit them to the central control mechanism in real time for deep learning analysis and judgment based on historical chiseling data, and monitor and adjust the chiseling construction of the points in real time according to the judgment results;

[0024] Step S8: After the roughening operation of the current point is completed, the roughening process of the next point is carried out according to the preset route; after the roughening of the entire joint end surface is completed, the automatic device is turned off, and the equipment is cleaned and maintained;

[0025] Step S9: Perform a quality inspection on the roughened bridge joints to ensure that they meet relevant construction standards and requirements.

[0026] Furthermore, a multifunctional sensor is used to monitor the chiseling status of the chiseling points in real time. The specific operation steps are as follows:

[0027] At a preset chiseling point, the distance between the chiseling mechanism and the end face is monitored in real time through the proximity sensor and the distance sensor. When the chiseling mechanism is at the first distance or contacts the end face, the four-degree-of-freedom mechanical arm is stopped from moving and the chiseling machine is started to chisel and drill holes at the chiseling point. At the same time, the vacuum cleaner is started to absorb dust directly above and the high-pressure spray gun is started to spray with high-pressure water.

[0028] The interface status of the chiseling points is monitored by an image sensor. If cracks exceeding the threshold length and falling-off of the threshold area are detected at the joint end face or the chiseling point at the adjacent monitoring moments, the operation is stopped and an alarm is issued; otherwise, the monitoring is normal and the chiseling operation continues;

[0029] If it is detected that the chiseling point is where the steel mesh is laid, a single adjustment is made in the vertical or horizontal direction at a first preset spacing; if after a single adjustment, multiple consecutive points in the same horizontal or vertical direction have abnormalities, the preset route at the end face of the joint is uniformly adjusted in the vertical or horizontal direction at a second preset spacing; otherwise, the chiseling monitoring is normal and the chiseling operation continues;

[0030] The chiseling depth is monitored in real time using a laser rangefinder sensor and compared with the preset value of the chiseling depth to determine whether the chiseling depth is consistent: if the preset value of the chiseling depth is not reached within the preset time, the chiseling machine angle, chiseling force and speed are adjusted through the central control mechanism until the preset value of the chiseling depth is restored within the preset time; otherwise, the chiseling monitoring is normal and the chiseling operation continues;

[0031] When the chiseling machine is at a second distance relative to the joint end surface or the chiseling depth is reached, the chiseling operation is stopped.

[0032] Furthermore, the data is transmitted to the central control organization in real time for deep learning analysis and judgment based on historical roughening data, and the roughening construction of the points is monitored and adjusted in real time according to the judgment results. The specific operation steps are as follows:

[0033] The parameters such as the concrete strength grade of the joint end face to be roughened, the roughening route, the roughening depth, the type of the drill head, the preset time of roughening, etc. are pre-set and input in the central control mechanism;

[0034] At the beginning of the chiseling, a multifunctional sensor is used to monitor and collect the chiseling status data of the chiseling points in real time, and the real-time collected data is integrated with the historical chiseling data. Based on the RNN recurrent neural network model pre-trained with the historical chiseling data, a deep learning analysis is performed on the chiseling data set to automatically match the optimal chiseling machine angle, chiseling force, speed and other parameters;

[0035] The central control mechanism monitors the chiseling process in real time to ensure that the chiseling operation is carried out according to the preset chiseling depth and route, and automatically adjusts the angle, force and speed of the chiseling machine based on the model deep learning analysis results of the real-time chiseling data;

[0036] During the chiseling process, if the sensor detects an abnormal situation as described in claim 8, the central control mechanism will immediately adjust the chiseling parameters or issue an alarm;

[0037] After the roughening is completed, the central control mechanism records the roughening data and feeds it back to the RNN recurrent neural network model for model training and optimization.

[0038] Furthermore, the following steps are included: the central control mechanism monitors the amount of dust and dust concentration generated by the chiseling through sensors to adjust the suction power of the vacuum cleaner in real time, and monitors and adjusts the water flow and water speed of the high-pressure spray gun through sensors.

[0039] Compared with the prior art, the present invention has the following beneficial effects:

[0040] The present invention provides an automated device for roughening the concrete interface of the joint between the new and old widened bridges and a construction method thereof. The device integrates a track positioning and moving mechanism, a roughening and spraying mechanism, a cleaning and collecting mechanism, and a central control mechanism, and can realize automated, efficient, and precise roughening operations. By adopting a multi-degree-of-freedom mechanical arm and a multi-functional sensor, the device can adapt to different construction conditions, monitor the roughening status in real time, and automatically adjust the roughening parameters according to the results of deep learning analysis, which significantly improves the construction efficiency and quality, while reducing the risk of manual operations. BRIEF DESCRIPTION OF THE DRAWINGS

[0041] Figure 1 to Figure 3 The present invention is a schematic diagram of the three-dimensional structure of an automated device for roughening the concrete interface of a joint between a new and an old bridge provided in accordance with an embodiment of the present invention.

[0042] Figure 4 It is a schematic front view of the structure of an automated device for roughening the concrete interface of a joint between a new and an old bridge provided in accordance with an embodiment of the present invention;

[0043] Figure 5 The diagram is a partial structural diagram of a chiseling and spraying mechanism provided at the free end of a multi-degree-of-freedom robotic arm.

[0044] In the figure:

[0045] 1. Concrete box girder; 2. Bridge deck; 3. Track; 4. Traveling and moving components; 5. Lifting frame; 6. Multi-degree-of-freedom robotic arm; 7. High-pressure spray gun; 8. Vacuum cleaner; 9. Dust nozzle; 10. Cleaning and collecting mechanism; 11. Slag and liquid collection port; 13. Chiseling machine; 14. Sensor. DETAILED DESCRIPTION

[0046] The present invention will be further described below in conjunction with the accompanying drawings. The following embodiments are only used to more clearly illustrate the technical solution of the present invention, and cannot be used to limit the protection scope of the present invention.

[0047] In the description of the present invention, it should be understood that the terms "center", "longitudinal", "lateral", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside" and the like indicate positions or positional relationships based on the positions or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as limiting the present invention. In addition, the terms "first", "second", and the like are only used for descriptive purposes, and cannot be understood as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Thus, features defined as "first", "second", and the like may explicitly or implicitly include one or more of the features. In the description of the present invention, unless otherwise specified, "multiple" means two or more.

[0048] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood by specific circumstances.

[0049] like Figure 1 to Figure 4 As shown, an embodiment of the present invention provides an automated device for roughening the concrete interface of the joint between a new and an old widened bridge. The device includes a track positioning and moving mechanism, a roughening and spraying mechanism, a cleaning and collecting mechanism 10 and a central control mechanism. The device is applied between the two bridge deck end faces of two concrete box girders to be connected, and can quickly perform roughening processing.

[0050] The track positioning and moving mechanism is equipped with a track 3 arranged longitudinally and parallel to the joint of the new and old widened bridges and a walking and moving assembly 4 that moves back and forth along the track 3 and is equipped with a lifting frame 5. The track 3 can be automatically extended and retracted through an electric push rod or a hydraulic system to adapt to beams of different widths; and after the track 3 is extended and retracted, a mechanical locking or electromagnetic adsorption method is used to ensure the stability of the track 3 during the construction process. Among them, the track 3, the walking and moving assembly 4 and the lifting frame 5 of the track positioning and moving mechanism can be made of aluminum alloy, which is light, high-strength and has good corrosion resistance.

[0051] The walking moving assembly 4 can be wheeled or tracked, and the position positioning and braking are performed by the control system, and the movement and roughening operations are performed in sequence. Among them, the wheels can be solid structures to avoid the possible leakage problem of pneumatic wheels. The shape and size of the wheels need to be optimized and designed according to different construction environments to adapt to beams with different surface conditions.

[0052] The walking moving assembly 4 and the lifting frame 5 can be driven by a servo motor or a motor gear transmission. Among them, the servo motor has the characteristics of high responsiveness, high precision and large torque, and is used for speed and position control of the moving mechanism. The gear transmission system adopts high-precision gears and bearings to reduce errors and wear during the transmission process and improve transmission efficiency.

[0053] like Figure 5 As shown, the chiseling and spraying mechanism is installed on the lifting frame 5 and is equipped with a multi-function sensor 14, a vacuum cleaner 8, a high-pressure spray gun 7 and a chiseling machine 13. The chiseling machine 13 is non-vertically facing the end face of the joint of the new and old widened bridges through a multi-degree-of-freedom mechanical arm 6 at a preset angle. The suction nozzle 9 of the vacuum cleaner 8 is arranged on the multi-degree-of-freedom mechanical arm 6 and is located directly above the chiseling machine 13. The spray gun of the high-pressure spray gun 7 is arranged on the multi-degree-of-freedom mechanical arm 6 and is located above the side of the chiseling machine 13. The multi-function sensor 14 is arranged at the free end of the multi-degree-of-freedom mechanical arm 6 and faces the chiseling machine 13.

[0054] The chisel bit can be replaced by simple quick disassembly without tools, which greatly reduces the replacement time. A variety of diameters and shapes of chisel bits are used to meet different concrete strength and chiseling requirements, including standard straight edge, tapered, and corrugated shapes. The chisel bit is made of carbide or high-speed steel, which has high hardness and wear resistance, suitable for large impact loads and long-term operations, reducing replacement frequency and maintenance costs.

[0055] Furthermore, the multifunctional sensor 14 includes a photoelectric sensor 14, a proximity sensor 14, a laser ranging sensor 14, a speed sensor 14 and a torque sensor 14. The sensors 14 are arranged on the walking moving component 4 and the multi-degree-of-freedom mechanical arm 6 to ensure all-round monitoring of the status of the entire device. For example, the position sensor 14 is installed at both ends of the wheel-rail system, and the image sensor 14 and the ranging sensor 14 are installed at the free end of the multi-degree-of-freedom mechanical arm 6 to monitor the absolute position and relative position of the device; at the same time, it can identify cracks, defects and other features on the concrete surface and provide real-time feedback.

[0056] Furthermore, the multi-degree-of-freedom robot arm 6 adopts four degrees of freedom, five degrees of freedom or six degrees of freedom.

[0057] The high-pressure spray gun 7 can use a piston pump, a plunger pump or a diaphragm pump. Among them, the piston pump provides high pressure and large flow, which is suitable for heavy cleaning operations; the plunger pump and the diaphragm pump perform better in terms of precise control and wear resistance. The detachable nozzle of the high-pressure spray gun 7 uses a fan nozzle, a straight nozzle or a variable angle nozzle to meet different spraying needs; the water flow pressure can also be adjusted by rotating or turning the configured regulating valve to achieve a variety of spraying modes from gentle flushing to strong impact.

[0058] In this embodiment, the high pressure spray gun 7 can also automatically adjust various parameters of the water flow according to the preset program or the input of the sensor 14, and easily set the cleaning parameters through the touch screen or the control panel. And when an abnormal situation is detected, the water flow can be quickly cut off, for example, by automatically releasing the pressure when stopping the operation, to ensure safe operation.

[0059] The suction force of the vacuum cleaner 8 can be automatically adjusted according to the amount of dust generated by the chiseling, and the dust concentration can be monitored by the sensor 14 to adjust the suction force in real time. Among them, the suction nozzle 9 adopts a retractable structure and is funnel-shaped, which can be adjusted according to the height of the chiseling point working surface to ensure close contact and improve dust collection efficiency.

[0060] The dust nozzle 9 can also adopt a multi-stage filter structure, and a pre-filter layer and a main filter layer are arranged in the funnel-shaped dust nozzle 9. The pre-filter layer is usually made of a metal mesh or a coarse fiber material, which is used to filter out larger debris and particles to prevent the main filter layer from being blocked prematurely. The main filter layer usually adopts HEPA or similar high-efficiency filter materials, which can filter out more than 99.97% of particles with a diameter of 0.3 microns and above.

[0061] In addition, the operating status of the vacuum cleaner 8 can be viewed in real time through a remote external control terminal, so that maintenance personnel can understand the equipment status in a timely manner.

[0062] The cleaning and collecting mechanism 10 is installed on the walking and moving assembly 4, and is equipped with a layered screening part and a slag liquid collection port 11 in the shape of an open strip connected to the layered screening part. The slag liquid collection port 11 is arranged on the multi-degree-of-freedom mechanical arm 6 and is located directly below the roughening machine 13. Among them, the slag liquid collection port 11 can adopt a variety of shapes and structures, and can be quickly disassembled and replaced according to actual operation requirements, so as to adapt to the roughening construction of joints of different sizes. Its material is corrosion-resistant materials such as stainless steel or high-density polyethylene to ensure stability when in long-term contact with concrete waste and chemical cleaning agents.

[0063] Furthermore, the layered screening part of the cleaning and collecting mechanism 10 is a spiral multi-layer filtering structure, the interior of which is divided into multiple discharge channels by multiple sieves of different diameters and mesh sizes for screening and separating waste residues and wastewater. Different discharge channels are respectively connected to different external recycling boxes, so that the collected concrete debris and wastewater can be classified and can be used to manufacture recycled building materials, which is energy-saving and environmentally friendly.

[0064] In this embodiment, the multi-layer filter structure includes a three-layer structure of a coarse filter, a medium filter and a fine filter, which is used to achieve the gradual separation of waste residue and wastewater. In addition, the multi-layer filter structure is equipped with an automatic cleaning device, such as a backwashing system, to maintain the filtration efficiency and reduce the frequency of manual cleaning. After the wastewater is collected, it is filtered and precipitated to remove suspended matter and impurities to meet the discharge standards or recycling conditions. For example, it can be used for dust reduction at the construction site, green irrigation or reused for cleaning operations to reduce the consumption of water resources.

[0065] The central control mechanism adopts a PLC control system, which is the core of the entire control system with its high reliability and flexibility, and can handle complex logic control and real-time tasks. It is installed on the track positioning mobile mechanism, and is respectively connected to the walking mobile component 4, the multifunctional sensor 14 of the chiseling and spraying mechanism, the vacuum cleaner 8, the high-pressure spray gun 7 and the chiseling machine 13, and is wirelessly connected to the external control terminal. Among them, the external control terminal is equipped with an intuitive user interface, and the operator can preset the chiseling points and paths through the touch screen or computer software, and can easily view the equipment status and fault reports.

[0066] The embodiment of the present invention provides an automated construction method for roughening the concrete interface of a new-old bridge joint, wherein the roughening process is performed at the concrete interface of the new-old bridge joint using the automated device for roughening the concrete interface of the new-old bridge joint. Specifically, the method comprises the following steps:

[0067] Step S1: Check and prepare the track positioning moving mechanism, the roughening spraying mechanism, the cleaning and collecting mechanism 10 and the central control mechanism of the automatic device for roughening the concrete interface of the new and old widened bridge joints;

[0068] Step S2: Fix the track positioning moving mechanism at appropriate positions on both sides of the joint between the new and old widened bridges to ensure that the track 3 is parallel to the joint and firmly installed; install the walking moving assembly 4 on the track 3, and ensure that the lifting frame 5 can be lifted and lowered smoothly to adapt to the roughening points at different heights;

[0069] Step S3: Calibrate and test all sensors 14 including the photoelectric sensor 14, proximity sensor 14, laser distance sensor 14, speed sensor 14 and torque sensor 14 of the multifunctional sensor 14 in the roughening and spraying mechanism; and select and install a drill head of appropriate diameter and shape on the roughening machine 13 according to construction requirements such as different concrete interface strength and roughening depth;

[0070] Step S4: Start the automation device through the central control mechanism and establish a wireless communication connection with the external control terminal to ensure that the operator can monitor and control in real time;

[0071] Step S5: operate the walking moving assembly 4 to move along the track 3, fix the roughening points according to the internal preset walking route, use the lifting frame 5 to adjust the roughening machine 13 to an appropriate height, and use the four-degree-of-freedom mechanical arm to adjust the roughening machine 13 to a preset angle relative to the end faces of the joints on both sides. The central control mechanism starts the roughening machine 13, the vacuum cleaner 8, the high-pressure spray gun 7 and the multi-function sensor 14 according to the preset instructions and starts the roughening and cleaning operations on the joints of the new and old bridges one by one;

[0072] Step S6: During the roughing process, the roughing waste residue and the waste liquid sprayed by the high-pressure water flow are collected through the open strip-shaped residue liquid collection port 11 of the cleaning collection mechanism 10, and the waste residue and waste water are collected and separated through the connected layered screening part, and at the same time, the dust suction nozzle 9 of the vacuum cleaner 8 is used to absorb the dust at high pressure above the roughing point to ensure the cleanliness of the construction site;

[0073] Step S7: Use the multifunctional sensor 14 to monitor the chiseling status of the chiseling points in real time, obtain the data parameters such as the force of the chiseling machine 13, the speed of the chiseling drill bit, the chiseling depth, the abnormality of the interface points, the dust concentration, etc., and transmit them to the central control mechanism in real time to conduct deep learning analysis and judgment in combination with the historical chiseling data, and monitor and adjust the chiseling construction of the points in real time according to the judgment results;

[0074] Step S8: After the roughening operation of the current point is completed, the roughening process of the next point is carried out according to the preset route; after the roughening of the entire joint end surface is completed, the automatic device is turned off, and the equipment is cleaned and maintained;

[0075] Step S9: Perform a quality inspection on the roughened bridge joints to ensure that they meet relevant construction standards and requirements.

[0076] In this embodiment, the central control mechanism can use a path planning algorithm in the prior art, such as an A* algorithm or a Dijkstra algorithm, to select the optimal path at the end surface of the joint and control the multi-degree-of-freedom robot arm 6 to dynamically avoid obstacles.

[0077] The central control mechanism monitors the dust amount and dust concentration generated by the chiseling through the sensor 14 to adjust the suction force of the vacuum cleaner 8 in real time, and monitors and adjusts the water flow and water speed of the high-pressure spray gun through the sensor 14.

[0078] The central control mechanism uses the multifunctional sensor 14 to monitor the real-time data of the chiseling status of the chiseling points. The specific operation steps are as follows:

[0079] At a preset roughening point, the distance between the roughening machine 13 and the end surface is monitored in real time by the proximity sensor 14 and the distance sensor 14. When the monitoring is at the first distance or when the end surface is in contact, the movement of the four-degree-of-freedom mechanical arm is stopped and the roughening machine 13 is started to perform roughening and drilling at the roughening point, and at the same time, the vacuum cleaner 8 is started to absorb dust directly above and the high-pressure spray gun 7 is started to spray with high-pressure water;

[0080] The image sensor 14 is used to monitor the interface status of the roughening point. If a crack exceeding the threshold length or a fall-off of the threshold area is detected at the joint end face or the roughening point at the adjacent monitoring moments, the device will stop and issue an alarm. The emergency stop function not only stops the movement of the device, but also automatically cuts off the power supply to prevent the device from accidentally starting in a faulty state. Otherwise, the monitoring is normal and the roughening operation continues;

[0081] If it is detected that the chiseling point is where the steel mesh is laid, a single adjustment is made in the vertical or horizontal direction at a first preset spacing; if after a single adjustment, multiple consecutive points in the same horizontal or vertical direction have abnormalities, the preset route at the end face of the joint is uniformly adjusted in the vertical or horizontal direction at a second preset spacing; otherwise, the chiseling monitoring is normal and the chiseling operation continues;

[0082] The laser rangefinder 14 is used to monitor the chiseling depth in real time, and compared with the preset value of the chiseling depth to determine whether the chiseling depth is consistent: if the preset value of the chiseling depth is not reached within the preset time, the angle, chiseling force and speed of the chiseling machine 13 are adjusted by the central control mechanism until the preset value of the chiseling depth is restored within the predetermined time; otherwise, the chiseling monitoring is normal, and the chiseling operation is continued;

[0083] When the chiseling machine 13 is at a second distance relative to the joint end surface or the chiseling depth is reached, the chiseling operation is stopped.

[0084] In this embodiment, the historical roughening data includes various data contents such as roughening depth, roughening force, roughening speed, concrete strength, roughening angle, dust monitoring, dust concentration, waste residue amount, wastewater amount, type of roughening machine 13, roughening quality feedback, abnormal situation record, equipment status monitoring, operator feedback, timestamp and date record, etc. Among them, in this embodiment, at least the roughening depth, roughening force, roughening speed, concrete strength, roughening angle, dust monitoring, dust concentration, and type of roughening machine 13 are required.

[0085] The data is transmitted to the central control organization in real time for deep learning analysis and judgment based on historical roughening data, and the roughening construction of the points is monitored and adjusted in real time according to the judgment results. The specific operation steps are as follows:

[0086] The parameters such as the concrete strength grade of the joint end face to be roughened, the roughening route, the roughening depth, the type of the drill head, the preset time of roughening, etc. are pre-set and input in the central control mechanism;

[0087] At the beginning of the chiseling, the multifunctional sensor 14 is used to monitor and collect the chiseling status data of the chiseling points in real time, and the real-time collected data is integrated with the historical chiseling data. Based on the RNN recurrent neural network model pre-trained with the historical chiseling data, the chiseling data set is subjected to deep learning analysis to automatically match the best chiseling machine 13 parameters such as angle, chiseling force, speed, etc.

[0088] The central control mechanism monitors the chiseling process in real time to ensure that the chiseling operation is carried out according to the preset chiseling depth and route, and performs model deep learning analysis results based on the real-time collected chiseling data. The central control mechanism automatically adjusts the angle, force and speed of the chiseling machine 13;

[0089] During the chiseling process, if the sensor 14 detects an abnormal situation as claimed in claim 8, the central control mechanism will immediately adjust the chiseling parameters or sound an alarm;

[0090] After the roughening is completed, the central control mechanism records the roughening data and feeds it back to the RNN recurrent neural network model for model training and optimization.

[0091] The above is only a preferred embodiment of the present invention. It should be pointed out that for ordinary technicians in this technical field, several improvements and modifications can be made without departing from the technical principles of the present invention. These improvements and modifications should also be regarded as the scope of protection of the present invention.

Claims

1. An automated device for roughening the concrete interface of a new and old bridge joint, characterized in that: It includes a track positioning and moving mechanism, a chiseling and spraying mechanism, a cleaning and collecting mechanism, and a central control mechanism; The track positioning moving mechanism is equipped with a track arranged parallel to the longitudinal direction of the joint between the new and old widened bridges and a walking moving assembly reciprocating along the track and equipped with a lifting frame; The chiseling and spraying mechanism is installed on a lifting frame and is equipped with a multi-function sensor, a vacuum cleaner, a high-pressure spray gun and a chiseling machine. The chiseling machine is non-vertically facing the joint end face of the new and old bridges at a preset angle through a multi-degree-of-freedom mechanical arm. The vacuum nozzle of the vacuum cleaner is arranged on the multi-degree-of-freedom mechanical arm and is located directly above the chiseling machine. The spray gun of the high-pressure spray gun is arranged on the multi-degree-of-freedom mechanical arm and is located above the side of the chiseling machine. The multi-function sensor is arranged at the free end of the multi-degree-of-freedom mechanical arm and faces the chiseling machine. The cleaning and collecting mechanism is installed on the walking and moving assembly, and is provided with a layered screening part and a slag and liquid collecting port in the shape of an open strip which is connected to the layered screening part. The slag and liquid collecting port is arranged on the multi-degree-of-freedom mechanical arm and is located directly below the haircutting machine. The central control mechanism is installed on the track positioning mobile mechanism, and is respectively connected to the walking mobile component, the multifunctional sensor of the chiseling and spraying mechanism, the vacuum cleaner, the high-pressure spray gun and the chiseling machine, and is wirelessly connected to the external control terminal.

2. The automatic device for roughening the concrete interface of the joint between the new and old bridges according to claim 1 is characterized in that: The chiseling machine is detachably equipped with chiseling bits of various diameters and shapes, including standard straight-edge, tapered, and corrugated shapes.

3. The automatic device for roughening the concrete interface of the joint between the new and old bridges according to claim 2 is characterized in that: The multifunctional sensor includes a photoelectric sensor, a proximity sensor, a laser ranging sensor, a speed sensor and a torque sensor.

4. The automatic device for roughening the concrete interface of the joint between the new and old bridges according to claim 3 is characterized in that: The layered screening part of the cleaning and collecting mechanism is a spiral multi-layer filtering structure, and its interior is divided into multiple discharge channels up and down by multiple screens of different diameters and mesh sizes for screening and separating waste residues and wastewater. Different discharge channels are respectively connected to different external recovery boxes.

5. The automatic device for roughening the concrete interface of the joint between the new and old bridges according to claim 4 is characterized in that: The multi-degree-of-freedom robotic arm adopts four degrees of freedom, five degrees of freedom or six degrees of freedom.

6. The automatic device for roughening the concrete interface of the joint between the new and old bridges according to claim 5 is characterized in that: The detachable nozzle of the high-pressure spray gun is a fan-shaped nozzle, a straight nozzle or a variable-angle nozzle.

7. An automated construction method for roughening the concrete interface of a new and old bridge joint, characterized in that: The chiseling process is performed at the concrete interface of the new and old widened bridge joints by using the automatic chiseling device for the concrete interface of the new and old widened bridge joints as described in any one of claims 1 to 6, specifically comprising the following steps: Step S1: Check and prepare the track positioning moving mechanism, the roughening spraying mechanism, the cleaning and collecting mechanism and the central control mechanism of the automatic device for roughening the concrete interface of the joint between the new and old bridges; Step S2: Fix the track positioning moving mechanism at appropriate positions on both sides of the joint between the new and old widened bridges to ensure that the track is parallel to the joint and firmly installed; install the walking moving assembly on the track, and ensure that the lifting frame can be lifted and lowered smoothly to adapt to the roughening points at different heights; Step S3: Calibrate and test all sensors including the photoelectric sensor, proximity sensor, laser distance sensor, speed sensor and torque sensor of the multifunctional sensor in the roughening and spraying mechanism; and select and install a drill head of appropriate diameter and shape on the roughening machine according to construction requirements such as different concrete interface strength and roughening depth; Step S4: Start the automation device through the central control mechanism and establish a wireless communication connection with the external control terminal to ensure that the operator can monitor and control in real time; Step S5: operate the walking moving assembly to move along the track, fix the roughening points according to the internal preset walking route, use the lifting frame to adjust the roughening machine to an appropriate height, and use the four-degree-of-freedom mechanical arm to adjust the roughening machine to a preset angle relative to the end faces of the joints on both sides. The central control mechanism starts the roughening machine, vacuum cleaner, high-pressure spray gun and multi-function sensor according to the preset instructions and starts the roughening and cleaning operations on the joints of the new and old widened bridges point by point; Step S6: During the roughening process, the roughening waste residue and the waste liquid sprayed by the high-pressure water flow are collected through the open strip-shaped residue liquid collection port of the cleaning collection mechanism, and the waste residue and waste water are collected and separated through the connected layered screening part, and at the same time, the dust suction nozzle of the vacuum cleaner is used to absorb the dust at high pressure above the roughening point to ensure the cleanliness of the construction site; Step S7: Use a multifunctional sensor to monitor the chiseling status of the chiseling points in real time, obtain data parameters such as the chiseling machine force, chiseling bit speed, chiseling depth, interface point abnormality, dust concentration, etc., and transmit them to the central control mechanism in real time for deep learning analysis and judgment based on historical chiseling data, and monitor and adjust the chiseling construction of the points in real time according to the judgment results; Step S8: After the roughening operation of the current point is completed, the roughening process of the next point is carried out according to the preset route; after the roughening of the entire joint end surface is completed, the automatic device is turned off, and the equipment is cleaned and maintained; Step S9: Perform a quality inspection on the roughened bridge joints to ensure that they meet relevant construction standards and requirements.

8. The automated construction method for roughening the concrete interface of the new and old bridge joints as described in claim 7 is characterized in that: Use a multifunctional sensor to monitor the chiseling status of the chiseling points in real time. The specific operation steps are as follows: At a preset chiseling point, the distance between the chiseling mechanism and the end face is monitored in real time through the proximity sensor and the distance sensor. When the chiseling mechanism is at the first distance or contacts the end face, the four-degree-of-freedom mechanical arm is stopped from moving and the chiseling machine is started to chisel and drill holes at the chiseling point. At the same time, the vacuum cleaner is started to absorb dust directly above and the high-pressure spray gun is started to spray with high-pressure water. The interface status of the chiseling points is monitored by an image sensor. If cracks exceeding the threshold length and falling-off of the threshold area are detected at the joint end face or the chiseling point at the adjacent monitoring moments, the operation is stopped and an alarm is issued; otherwise, the monitoring is normal and the chiseling operation continues; If it is detected that the roughening point is where the steel mesh is laid, a single adjustment is performed vertically or horizontally at a first preset spacing; If after a single adjustment, multiple points in the same horizontal or vertical direction are abnormal, the preset route at the end face of the joint is uniformly adjusted vertically or horizontally at a second preset spacing; otherwise, the roughening monitoring is normal and the roughening operation is continued; The chiseling depth is monitored in real time using a laser rangefinder sensor and compared with the preset value of the chiseling depth to determine whether the chiseling depth is consistent: if the preset value of the chiseling depth is not reached within the preset time, the chiseling machine angle, chiseling force and speed are adjusted through the central control mechanism until the preset value of the chiseling depth is restored within the preset time; otherwise, the chiseling monitoring is normal and the chiseling operation continues; When the chiseling machine is at a second distance relative to the joint end surface or the chiseling depth is reached, the chiseling operation is stopped.

9. The automated construction method for roughening the concrete interface of the new and old widened bridge joints according to claim 8 is characterized in that: The data is transmitted to the central control organization in real time for deep learning analysis and judgment based on historical roughening data, and the roughening construction of the points is monitored and adjusted in real time according to the judgment results. The specific operation steps are as follows: The parameters such as the concrete strength grade of the joint end face to be roughened, the roughening route, the roughening depth, the type of the drill head, the preset time of roughening, etc. are pre-set and input in the central control mechanism; At the beginning of the roughening, a multifunctional sensor is used to monitor and collect the roughening status data of the roughening points in real time, and the real-time collected data is integrated with the historical roughening data. Based on the RNN recurrent neural network model pre-trained with the historical roughening data, a deep learning analysis is performed on the roughening data set to automatically match the best roughening machine angle, roughening force, speed and other parameters; wherein the historical roughening data includes the roughening depth, the roughening force, the roughening speed, the concrete strength, the roughening angle, the dust amount monitoring, the dust concentration, and the type of the roughening machine head; The central control mechanism monitors the chiseling process in real time to ensure that the chiseling operation is carried out according to the preset chiseling depth and route, and automatically adjusts the angle, force and speed of the chiseling machine based on the model deep learning analysis results of the real-time chiseling data; During the chiseling process, if the sensor detects an abnormal situation as described in claim 8, the central control mechanism will immediately adjust the chiseling parameters or issue an alarm; After the roughening is completed, the central control mechanism records the roughening data and feeds it back to the RNN recurrent neural network model for model training and optimization.

10. The automated construction method for roughening the concrete interface of the new and old widened bridge joints according to claim 9 is characterized in that: The method also includes the following steps: a central control mechanism monitors the amount of dust and dust concentration generated by the chiseling through sensors to adjust the suction force of the vacuum cleaner in real time, and monitors and adjusts the water flow and water speed of the high-pressure spray gun through sensors.

Citation Information

Patent Citations

  • Self-propelled concrete dabbing machine and dabbing method thereof

    CN106120528A

  • Self-propelled box girder scabbling integrated machine

    CN109972521A

  • Anchor recess scabbling control processing method

    CN115476276A

  • Self-adaptive tunnel bush hammer capable of collecting dust

    CN116752993A

  • Comprehensive treatment device for new and old junction surfaces of concrete

    CN220840957U

Cited By

  • Building building machine with intelligent scabbling robot

    CN119795396A

  • Chiseling and high-pressure water cleaning integrated device for bridge prefabricated abutment hole wall

    CN120461606A