A shallow trench assembly module structure for severe cold regions
Through modular structure and intelligent monitoring, the problems of insufficient bearing capacity, poor insulation effect and complex construction in shallow trench construction in severe cold areas are solved, and efficient maintenance and safe trench construction are achieved.
Patent Information
- Application Number
- CN202411328796.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-24
- Publication Date
- 2024-12-03
- Estimated Expiration
- 2044-09-24
AI Technical Summary
Traditional trench construction technology has insufficient bearing capacity, poor insulation effect, poor waterproofing performance, complex construction and difficult maintenance in shallow trench construction in severe cold areas, especially for safety hazards and waste of materials for the construction of bridge pipes. question.
Adopting a modular structure, the modular first and second filling modules are filled by setting the bottom holding layer, the middle pipe laying layer and the top pavement bearing layer in the pipe trench, and the filling space is separated by horizontal and vertical insulation boards. It includes the shell filled with graded sand and gravel, and the anti-seepage partition and monitoring sensor for intelligent monitoring.
It improves the bearing capacity and insulation effect of the pipe trench, facilitates rapid maintenance, reduces material waste and construction difficulty, reduces the risk of freezing cracks, and promptly detects leakage through intelligent monitoring, reducing losses.
Smart Images

Figure CN118854987B_ABST
Abstract
Description
Technical Field
[0001] The present application belongs to the technical field of ground pipe trench construction, and specifically relates to an assembled module structure of a shallow pipe trench in severely cold regions. Background Art
[0002] Shallow ground trenches are an important part of the renovation and upgrading of pipeline networks in old residential areas and neighborhoods, and are an important technical measure for urban renewal. Equipment pipelines also need to be laid in historical and cultural heritage sites. Due to the complex underground situation and cultural relics, it is generally not possible to make deep trenches. Shallow ground trenches located in severe cold climates, whether located above or below the permafrost layer, often suffer from frost heave and frost damage, and have to be frequently inspected.
[0003] However, since the surface layer of the trench needs to meet the requirements of vehicle traffic, it needs to be reinforced, but the maintenance process will cause overall damage to the surface layer. Repairs require re-reinforcing and pouring, which wastes resources, is time-consuming and labor-intensive, and after pouring, the formwork is buried and difficult to remove. In addition, if concrete or graded sand and gravel are used as backfill materials around the trench, the ground bearing capacity requirements can be met, but maintenance is labor-intensive and there is a large waste of building materials. If coarse sand or medium sand is used for backfilling, a certain thermal insulation capacity can be obtained, but the bearing capacity is insufficient, and a concrete slope layer must be set on the coarse sand or medium sand. The interface between the two has major problems, mainly reflected in: In terms of construction, the concrete slope layer needs to be compacted, so the unsolidified concrete in the slope layer will pressurize the pipeline layer downward, which may cause damage to the pipeline; moreover, for water supply and drainage pipelines, thermal pipelines, and gas pipelines, they are self-compacting, and the concrete that penetrates the slope layer will not affect the self-compacting pipelines, but for bridge-type pipelines, they are not sealed. Once the concrete seeps down, it will damage the internal pipelines of the bridge, posing a safety hazard. This construction process cannot be used to lay bridge-type pipelines; in addition, since the concrete seeps down to seal the sand and gravel, once a leakage occurs, it is difficult to find, or it is difficult to accurately find the specific location of the leakage, causing inconvenience to maintenance. Even if the leak is found, a long section of solidified hard concrete needs to be broken, which is difficult to construct and difficult to dismantle after construction, further increasing material waste and structural complexity. In addition, in traditional trench construction, there are no barriers between multiple pipes. If there is a leak in a corrosive pipe, the leaked liquid will have a certain degree of corrosiveness on the inner wall of the trench, which will further amplify the destructive effect under the freeze-thaw cycle in winter and reduce the durability of the trench.
[0004] To sum up, the traditional trench construction technology has poor integrity. Insulation, waterproofing, load-bearing and backfilling cannot form a unified system. The roles played by each structural layer are independent of each other and even have adverse effects on each other, which is not conducive to durability and maintenance, and cannot meet the construction needs of shallow trenches in cold regions. Summary of the invention
[0005] In view of the above analysis, an embodiment of the present invention aims to provide an assembled module structure for shallow pipe trenches in severely cold regions, so as to solve the problem that traditional pipe trench construction technology cannot meet the construction needs of shallow pipe trenches in severely cold regions.
[0006] The object of the present invention is achieved in that:
[0007] A shallow trench assembly module structure for severely cold regions, comprising a bottom bearing layer, a middle pipe laying layer and a top road surface bearing layer arranged in sequence from bottom to top in the trench;
[0008] The pipe trench is divided into a first filling space and a second filling space from top to bottom, and the first filling space and the second filling space are separated by a first horizontal insulation board arranged horizontally;
[0009] The top road surface bearing layer is filled in the first filling space, and the bottom bearing layer and the middle pipeline laying layer are filled in the second filling space;
[0010] Wherein, the bottom bearing layer is formed by filling a plurality of first filling modules; the middle pipeline laying layer is formed by filling a pipeline and a plurality of second filling modules;
[0011] The first filling module and the second filling module both include an outer shell filled with graded sand and gravel.
[0012] Furthermore, a vertical insulation board is laid on the vertical side surface of the pipe trench, and a second transverse insulation board is laid on the bottom surface of the pipe trench; the first transverse insulation board, the second transverse insulation board and the vertical insulation board enclose the second relatively closed filling space.
[0013] Furthermore, the trench has a stepped surface, and the plane where the stepped surface is located serves as a dividing surface between the first filling space and the second filling space; both ends of the first transverse insulation board are overlapped on the stepped surface, and the top end surface of the vertical insulation board is in extrusion contact with the bottom end surface of the first transverse insulation board.
[0014] Furthermore, the overlap length of the end portion of the first transverse insulation board overlapped on the step surface is ≥200 mm.
[0015] Furthermore, the pipelines in the middle pipeline laying layer include at least one of corrosive pipelines, thermal pipelines, water supply and drainage pipelines, and power bridges.
[0016] Furthermore, an impermeable partition is provided in the second filling space, and the impermeable partition is used to separate the second filling space into a plurality of compartments which are not connected to each other; and the pipeline is installed in the compartment.
[0017] Furthermore, a plurality of the anti-seepage partitions are arranged vertically in parallel, the top end surface of the anti-seepage partition is in compression contact with the bottom end surface of the first transverse thermal insulation board, and the bottom end surface of the anti-seepage partition is in compression contact with the top end surface of the second transverse thermal insulation board.
[0018] Furthermore, the horizontal distance between two adjacent anti-seepage partitions is W, the length of the outer shell is L, W=N*L, and N is a positive integer.
[0019] Furthermore, only one type of pipeline is laid in each of the cabins; or, in the cabin where the power bridge is laid, water supply and drainage pipelines are also laid, and the power bridge is located above the water supply and drainage pipelines.
[0020] Furthermore, a monitoring sensor is provided in the cabin, and the monitoring sensor is used to monitor whether the pipeline is working normally; when the monitoring sensor detects that the pipeline is working abnormally, the abnormal signal detected will be immediately transmitted to the monitoring end to remind the staff to go to the site for maintenance.
[0021] Furthermore, the first transverse insulation board, the second transverse insulation board, the vertical insulation board and the anti-seepage partition board are all polystyrene boards.
[0022] Furthermore, the thickness of the polystyrene board is 40-80 mm.
[0023] Furthermore, the shell is made of one or more of stainless steel, PVC, aluminum alloy, cast iron or wood board.
[0024] Furthermore, the shell is a rectangular parallelepiped structure, and the dimensions of width*height*length are 800mm*400mm*1000mm.
[0025] Furthermore, the particle sizes of graded sand and gravel filled in the first filling module are 10-20mm, 5mm-10mm crushed stone, and 0-5mm; the particle sizes of graded sand and gravel filled in the second filling module are 20-30mm, 10-20mm, and 5mm-10mm.
[0026] Furthermore, the top road surface bearing layer includes a surface layer and a pressure-bearing layer located below the surface layer.
[0027] Compared with the prior art, the present invention provides an assembled modular structure for shallow trenches in severe cold regions. By filling the modular first filling module and the second filling module in the second filling space of the trench, it can not only ensure sufficient bearing capacity and facilitate construction, but also enable quick maintenance with fewer personnel, especially during maintenance work. The modular filling combined with the construction scheme of the first horizontal insulation board laid above can also be used to spread non-sealed pipes in the trench, such as bridge-type pipes. In addition, since the filling module is filled with graded sand and gravel, it can play an absorbing and buffering role in the event of pipeline leakage, avoiding the direct impact of leakage on the remaining pipeline modules. It is also convenient to arrange sensors, which helps to detect leakage risks in time and reduce losses. The shell material of the filling module and the polystyrene board material used are relatively cheap, easy to construct, and can be replaced at any time after the leakage risk is dealt with. BRIEF DESCRIPTION OF THE DRAWINGS
[0028] In order to more clearly illustrate the embodiments of this specification or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments recorded in the embodiments of this specification. For ordinary technicians in this field, other drawings can also be obtained based on these drawings.
[0029] Figure 1 A schematic diagram of a shallow trench in a severely cold region provided by the present invention;
[0030] Figure 2 This is a schematic structural diagram of the shallow trench assembly module structure for severely cold regions provided by the present invention.
[0031] Reference numerals:
[0032] 100, first filling space; 200, second filling space; 300, stepped surface;
[0033] 1. Bottom bearing layer; 2. Middle pipe laying layer; 3. Top pavement bearing layer; 3-1. Surface layer; 3-2. Pressure-bearing layer; 4. First transverse insulation board; 5. First filling module; 6. Second filling module; 7. Vertical insulation board; 8. Second transverse insulation board; 9. Corrosive pipeline; 10. Thermal pipeline; 11. Water supply and drainage pipeline; 12. Power bridge; 13. Monitoring sensor; 14. Waterproof system layer. DETAILED DESCRIPTION
[0034] In order to make the purpose, technical scheme and advantages of the embodiments of the present application clearer, the technical scheme in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are part of the embodiments of the present application, rather than all of the embodiments. It should be noted that, in the absence of conflict, the embodiments in the present application and the features in the embodiments can be combined, separated, interchanged and / or rearranged with each other. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of this application.
[0035] In the accompanying drawings, the size and relative size of components may be exaggerated for clarity and / or descriptive purposes. When the exemplary embodiments may be implemented differently, a specific process sequence may be performed in a different order than described. For example, two successively described processes may be performed substantially simultaneously or in an order opposite to the order described. In addition, the same reference numerals represent the same components.
[0036] The terms used here are for the purpose of describing specific embodiments, and are not intended to be restrictive. As used here, unless the context clearly indicates otherwise, the singular forms "one (kind, person)" and "said (the)" are also intended to include plural forms. In addition, when the terms "comprise" and / or "include" and their variations are used in this specification, it is explained that there are stated features, integral bodies, steps, operations, parts, assemblies and / or their groups, but it is not excluded that there are or add one or more other features, integral bodies, steps, operations, parts, assemblies and / or their groups. It should also be noted that, as used here, the terms "substantially", "approximately" and other similar terms are used as approximate terms and not as degree terms, so that they are used to explain the inherent deviations of the measured values, calculated values and / or the values provided that will be recognized by those of ordinary skill in the art.
[0037] Example 1
[0038] A specific embodiment of the present invention, as Figure 1 to Figure 2 As shown,
[0039] Disclosed is an assembled module structure of a shallow trench in a severely cold region, comprising a bottom bearing layer 1, a middle pipe laying layer 2 and a top road surface bearing layer 3 arranged in sequence from bottom to top in the trench; the trench is divided into a first filling space 100 and a second filling space 200 from top to bottom, the first filling space 100 and the second filling space 200 are separated by a first horizontally arranged transverse insulation board 4, a first transverse insulation board 4 is arranged between the middle pipe laying layer 2 and the top road surface bearing layer 3, and the top surface of the first transverse insulation board 4 It contacts the bottom end surface of the top pavement bearing layer 3, and the bottom end surface of the first transverse insulation board 4 contacts the top end surface of the middle pipe laying layer 2; the top pavement bearing layer 3 is filled in the first filling space 100, and the bottom bearing layer 1 and the middle pipe laying layer 2 are filled in the second filling space 200; wherein, the bottom bearing layer 1 is filled with multiple first filling modules 5; the middle pipe laying layer 2 is filled with pipes and multiple second filling modules 6; the first filling module 5 and the second filling module 6 both adopt a modular structure.
[0040] It should be noted that the upper and lower and left and right spatial layout of pipelines in the trench should be arranged according to the municipal pipeline layout specifications. For example, pipelines that are relatively frequently inspected should be arranged higher.
[0041] During the construction process, filling modules filled with graded sand and gravel are stacked in the trench according to the upper and lower and left and right spatial layout of the pipeline in the trench to ensure the density and integrity of the entire trench to ensure a certain insulation effect and facilitate disassembly and maintenance to avoid further damage to the pipeline caused by the maintenance operation. The pipeline can be recycled and backfilled for use after maintenance.
[0042] Sometimes, due to the shape of the trench or the size of the filling module, there will be some gaps between adjacent filling modules and between the filling module and the inner wall of the second filling space 200. During the construction and filling process, it is necessary to fill these gaps with scattered graded sand and gravel to fill the second filling space 200 as much as possible to avoid affecting the bearing stability due to the gaps around the modules, so that the top surface of the middle pipe laying layer 2 remains horizontal or approximately horizontal, thereby ensuring that the first transverse insulation board 4 is always in a horizontal or approximately horizontal state to ensure the insulation effect.
[0043] In this embodiment, the material, particle size and other parameters of the graded sand and gravel are determined according to the spacing between the laid pipelines. In principle, it should be ensured that the pipelines are filled densely to ensure that the ground pressure can be transmitted through the sand and gravel part, protect the pipelines from being crushed, and facilitate excavation and maintenance.
[0044] In one optional embodiment, the material of the shell can be one or a combination of stainless steel, PVC, aluminum alloy, cast iron or wood board.
[0045] In one optional embodiment, the first filling module 5 and the second filling module 6 both include an outer shell filled with graded sand and gravel. The outer shell is a rectangular parallelepiped structure, and specific size parameters can be selected according to actual conditions. For example, the width*height*length size of the outer shell is 800mm*400mm*1000mm, which is the larger size of commonly used pipes, such as sewage drainage pipes, thermal pipes 10, etc. Smaller pipes can be supported by brackets and peripheral frames.
[0046] In this embodiment, the pavement bearing layer includes a surface layer 3-1 and a pressure-bearing layer 3-2 located below the surface layer 3-1, which functions to uniformly transfer the pavement load and avoid local load concentrated crushing. Among them, the pressure-bearing layer 3-2 can be understood as a concrete slope layer. When pouring concrete, the shape of the aggregate particles in the concrete is controlled to avoid damaging the first transverse insulation board 4. 20-30mm and 10-20mm crushed stones are used. The quality control requires that the crushing value of the coarse aggregate is not more than 30%, and the content of needle-like particles is not more than 20%. In this embodiment, the middle pipeline laying layer 2 is used to ensure that the surrounding area of the pipeline is full and the force is uniform, avoiding local crushing, and facilitating excavation and replacement. Preferably, the particle size of the graded sand and gravel filled in the first filling module 5 is 10-20mm, 5mm-10mm crushed stone, and 0-5mm.
[0047] In this embodiment, the bottom bearing layer 1 is directly arranged below the middle pipeline laying layer 2, serving as the internal base of the pipeline, supporting the bottom of the pipeline, bearing the weight of the pipeline, the weight of the material in the pipeline, the weight of the remaining filling layers, and transmitting the force to avoid damaging the second transverse insulation board 8. Preferably, the particle size of the graded sand and gravel filled in the second filling module 6 is 20-30mm, 10-20mm, or 5mm-10mm.
[0048] In order to further improve the thermal insulation effect, a vertical thermal insulation board 7 is laid on the vertical side of the trench, and a second horizontal thermal insulation board 8 is laid on the bottom of the trench to obtain the thermal insulation effect of the bottom and the side; the first horizontal thermal insulation board 4, the second horizontal thermal insulation board 8 and the vertical thermal insulation board 7 enclose the relatively closed second filling space 200, so that the second filling space 200 has a good thermal insulation effect. Optionally, the thickness of the vertical thermal insulation board 7 and the second horizontal thermal insulation board 8 is 40mm-80mm. For example, in general, the vertical thermal insulation board 7 and the second horizontal thermal insulation board 8 can be 60mm thick. If the pipeline is a heat main line, the vertical thermal insulation board 7 and the second horizontal thermal insulation board 8 can be thickened to 80mm. If the pipeline is a heat dissipation pipeline such as electricity, telecommunications, etc., filling graded sand and gravel can play a role in cooling and heat dissipation. The vertical thermal insulation board 7 and the second horizontal thermal insulation board 8 can be thinned to 40mm. The above measures can be further optimized and adjusted according to the buried depth of the trench and the local climate.
[0049] In this embodiment, the size of the first filling space 100 in the pipe trench is larger than the size of the second filling space 200, which is specifically reflected in: there is a step surface 300 in the pipe trench, and the purpose of setting the step surface 300 is to make the end of the first transverse insulation board 4 overlap on the step surface 300. The plane where the step surface 300 is located serves as the dividing surface between the first filling space 100 and the second filling space 200; both ends of the first transverse insulation board 4 overlap on the step surface 300, and the top end surface of the vertical insulation board 7 is in compression contact with the bottom end surface of the first transverse insulation board 4. Optionally, the thickness of the first transverse insulation board 4 is 60 mm, and the overlap length of the end of the first transverse insulation board 4 overlapped on the step surface 300 is ≥200 mm. After the first transverse insulation board 4 is laid, it serves as the bottom template of the concrete slope layer and does not need to be removed after the upper concrete slope layer is constructed. The first transverse insulation board 4 and the vertical insulation board 7 on the side and the second transverse insulation board 8 on the bottom form a complete closed insulation system.
[0050] In this embodiment, the pipelines in the middle pipeline laying layer 2 include at least one of a corrosive pipeline 9 , a thermal pipeline 10 , a water supply and drainage pipeline 11 , and an electric power bridge 12 .
[0051] According to the type of pipelines in the trench, the second filling space 200 in the trench can be divided into multiple compartments by using an impermeable partition to avoid mutual influence caused by leakage, such as sewage pipelines on water supply pipelines, drainage pipelines on power and telecommunications pipelines, corrosive liquid pipelines on metal pipelines, etc. Specifically, an impermeable partition is provided in the second filling space 200, and the impermeable partition is used to separate the second filling space 200 into multiple compartments that are not connected to each other; the pipeline is installed in the compartment. Among them, multiple impermeable partitions are arranged vertically and in parallel, and the top end surface of the impermeable partition is in compression contact with the bottom end surface of the first transverse insulation board 4, and the bottom end surface of the impermeable partition is in compression contact with the top end surface of the second transverse insulation board 8. In this way, each compartment can be in a relatively closed state. Furthermore, sealant can be applied or a sealing gasket can be installed at the end surface contact position to improve the sealing effect.
[0052] The horizontal distance between two adjacent anti-seepage partitions is W, the length of the shell is L, W=N*L, and N is a positive integer. Such a size design facilitates directly filling each compartment with a modular filling module without the need to fill additional scattered gravel.
[0053] In this embodiment, only one type of pipeline is laid in each of the cabins; alternatively, in the cabin where the power bridge 12 is laid, a water supply and drainage pipeline 11 is also laid, and the power bridge 12 is located above the water supply and drainage pipeline 11 .
[0054] In this embodiment, the trench assembly module structure can be equipped with various types of sensors as needed to directly link the alarm facilities with the nearest relevant units. In one of the optional implementations, a monitoring sensor 13 is provided in the cabin, and the monitoring sensor 13 is used to monitor whether the pipeline is working normally; when the monitoring sensor 13 detects that the pipeline is working abnormally, it will immediately transmit the monitored abnormal signal to the monitoring end to remind the staff to go to the site for maintenance. Exemplarily, the sensor assembly options are: heat-temperature, gas-gas leakage, corrosive liquid, water supply, drainage, rainwater, sewage, grey water-liquid leakage, electricity, weak current-leakage. By setting the monitoring sensor 13, the leakage type can be directly and accurately monitored without the need for workers of various types to be on site at the same time, saving social resources.
[0055] In this embodiment, the first transverse insulation board 4, the second transverse insulation board 8, the vertical insulation board 7, and the anti-seepage partition are all polystyrene boards. The polystyrene board has low cost and stable chemical properties. Even if corrosive leakage occurs, it can play a sealing and protective role for a long time, effectively avoiding corrosion to other pipelines before the maintenance personnel arrive. Optionally, the thickness of the polystyrene board is 40-80 mm, and the specific thickness can be selected according to actual conditions, and can be appropriately thickened or thinned.
[0056] In one optional embodiment, a waterproof system layer 14 is provided on the bottom wall and the inner wall of the pipe trench, and the waterproof system layer 14 of the inner wall extends all the way to the stepped surface 300. A second transverse insulation board 8, a vertical insulation board 7 and a first transverse insulation board 4 are laid on the basis of the waterproof system layer 14. The waterproof system layer 14 forms a complete and smooth inner wall of the pipe trench, ensuring that the leakage of liquid and the construction process will not reduce the durability of the pipe trench, reduce damage to the inside of the pipe trench, and increase the service life. Among them, the waterproof system layer 14 can include a leveling layer, a waterproof layer and a protective layer; the leveling layer is determined according to the surrounding conditions of the pipe trench, the waterproof layer uses waterproof roll material or waterproof mortar, and the protective layer uses low-grade mortar.
[0057] In this embodiment, the pipe trench can be expanded into a comprehensive pipe gallery according to actual conditions, the graded sand and gravel filled can be replaced with steel frames, and a maintenance space through which workers can pass can be set up.
[0058] Compared with the prior art, the shallow trench assembly module structure for severe cold regions provided in this embodiment has at least one of the following beneficial effects:
[0059] 1. By filling the modular first filling module and the second filling module in the second filling space of the trench, it can not only ensure sufficient bearing capacity, facilitate the laying of multiple pipelines, and avoid mutual influence, but also facilitate maintenance and replacement, especially during maintenance work, it can complete rapid maintenance with fewer personnel. The filling modules support each other to form an integral structural system to improve the compressive strength. If the surface is a special heavy-load road surface, the top module does not need to lay pipelines, but only serves as a pressure-bearing layer, which can be replaced after damage.
[0060] 2. The modular filling combined with the construction scheme of the first horizontal insulation board laid on top is adopted to improve the insulation effect of the trench and reduce the probability of freezing and cracking of the shallow trench; when the top pavement bearing layer begins to be constructed, the bottom bearing layer and the middle pipe laying layer in the trench have been implemented, and the top surface of the middle pipe laying layer has also completed the laying of the first horizontal insulation layer, and the surface treatment has been completed, which can avoid the adverse effects of the vibration and compaction of the concrete during the construction of the top pavement bearing layer on the trench. Therefore, this application can lay non-sealed pipes in the trench, such as bridge-type pipes.
[0061] 3. Since the filling module is filled with graded sand and gravel, it can play an absorbing and buffering role in the event of pipeline leakage, avoiding the direct impact of leakage on other pipeline modules; the filled sand and gravel can be reused to reduce material waste.
[0062] 4. The modular filling construction method also facilitates the arrangement of sensors and realizes intelligent monitoring, which helps to detect leakage risks in time and reduce losses.
[0063] 5. The shell material of the filling module and the polystyrene board used are relatively cheap, easy to construct, and can be replaced at any time after the leakage risk is dealt with.
[0064] The specific implementation methods described above further illustrate the purpose, technical solutions and beneficial effects of the present application in detail. It should be understood that the above description is only the specific implementation method of the present application and is not intended to limit the scope of protection of the present application. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present application should be included in the scope of protection of the present application.
Claims
1. A shallow trench assembly module structure for severe cold regions, characterized in that: It comprises a bottom bearing layer (1), a middle pipe laying layer (2) and a top road surface bearing layer (3) which are arranged in sequence from bottom to top in the pipe trench; The pipe trench is divided from top to bottom into a first filling space (100) and a second filling space (200), the first filling space (100) and the second filling space (200) being separated by a first horizontally arranged transverse insulation board (4); the first horizontal insulation board (4) serves as a bottom formwork for the concrete slope layer; The top road surface bearing layer (3) is filled in the first filling space (100), and the bottom bearing layer (1) and the middle pipeline laying layer (2) are filled in the second filling space (200); The bottom bearing layer (1) is formed by filling a plurality of first filling modules (5); the middle pipe laying layer (2) is formed by filling pipes and a plurality of second filling modules (6); The first filling module (5) and the second filling module (6) both comprise an outer shell, wherein the inner shell is filled with graded sand and gravel; The first transverse insulation board (4) is arranged between the middle pipe laying layer (2) and the top road surface bearing layer (3), and the top end surface of the first transverse insulation board (4) contacts the bottom end surface of the top road surface bearing layer (3), and the bottom end surface of the first transverse insulation board (4) contacts the top end surface of the middle pipe laying layer (2); the top surface of the middle pipe laying layer (2) maintains a horizontal state; A vertical insulation board (7) is laid on the vertical side surface of the pipe trench, and a second horizontal insulation board (8) is laid on the bottom surface of the pipe trench; The first transverse thermal insulation board (4), the second transverse thermal insulation board (8) and the vertical thermal insulation board (7) enclose a relatively closed second filling space (200); the first transverse thermal insulation board (4), the second transverse thermal insulation board (8) and the vertical thermal insulation board (7) are all polystyrene boards; The size of the first filling space (100) is greater than that of the second filling space (200); a stepped surface (300) is provided in the pipe trench, and the plane where the stepped surface (300) is located serves as a dividing surface between the first filling space (100) and the second filling space (200); both ends of the first transverse insulation board (4) are overlapped on the stepped surface (300), and the top end surface of the vertical insulation board (7) is in compression contact with the bottom end surface of the first transverse insulation board (4).
2. The shallow trench assembly module structure for severe cold regions according to claim 1 is characterized in that: The overlap length of the end portion of the first transverse thermal insulation board (4) on the stepped surface (300) is ≥200 mm.
3. The shallow trench assembly module structure for severe cold regions according to claim 1 or 2 is characterized in that: The pipelines in the middle pipeline laying layer (2) include at least one of a corrosive pipeline (9), a thermal pipeline (10), a water supply and drainage pipeline (11), and an electric power bridge (12).
4. The shallow trench assembly module structure for severe cold regions according to claim 3 is characterized in that: An impermeable partition is provided in the second filling space (200), and the impermeable partition is used to separate the second filling space (200) into a plurality of compartments that are not interconnected; the pipeline is installed in the compartments.
5. The shallow trench assembly module structure for severe cold regions according to claim 4 is characterized in that: The plurality of anti-seepage partitions are arranged vertically in parallel, the top end surface of the anti-seepage partition is in compression contact with the bottom end surface of the first transverse thermal insulation board (4), and the bottom end surface of the anti-seepage partition is in compression contact with the top end surface of the second transverse thermal insulation board (8).
6. The shallow trench assembly module structure for severe cold regions according to claim 4 or 5, characterized in that: A monitoring sensor (13) is provided in the cabin, and the monitoring sensor (13) is used to monitor whether the pipeline is operating normally; When the monitoring sensor (13) detects that the pipeline is working abnormally, it will immediately transmit the detected abnormal signal to the monitoring end to remind the staff to go to the site for maintenance.
7. The shallow trench assembly module structure for severe cold regions according to claim 6 is characterized in that: The anti-seepage partitions are all polystyrene boards; The thickness of the polystyrene board is 40-80 mm.
8. The shallow trench assembly module structure for severe cold regions according to claim 1 is characterized in that: The top road surface bearing layer (3) comprises a surface layer (3-1) and a pressure-bearing layer (3-2) located below the surface layer (3-1).