Needle threading and soaking equipment for triangular string hammer handle shaft bracket

By designing automation equipment, the automatic needle threading and soaking of the triangular hammer handle shaft frame is solved, and the inefficiency problem caused by manual intervention in the existing technology is improved by automatically controlling the expansion of the bushing, the installation quality of the bearing is improved .

CN118887930APending Publication Date: 2024-11-01GUANGZHOU PEARL RIVER KAYSERBURG PIANO CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411291051.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-14
Publication Date
2024-11-01

AI Technical Summary

Technical Problem

In the prior art, the needle threading and soaking process of the triangular hammer handle shaft frame requires a lot of manual intervention, resulting in low production efficiency, and the expansion of the bushing during the emulsion immersion process affects the bearing installation.

Method used

An automated equipment including a workbench, feeding mechanism, needle threading mechanism, transfer mechanism and immersion mechanism is designed, through needle threading tooling, needle supply device, injection device, limiting device, conveying device, immersion bucket and belt-type transmission belt and other components to realize the automatic needle threading and emulsion soaking of the shaft frame, and control the movement and soaking process of the shaft frame.

Benefits of technology

The needle threading and soaking process of the triangular hammer handle frame is automated, which reduces manual investment, improves production efficiency, and effectively controls the expansion of the bushing, ensuring the installation quality of the bearing.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118887930A_ABST
    Figure CN118887930A_ABST
Patent Text Reader

Abstract

The invention discloses needle threading and soaking equipment for a triangular string hammer handle shaft bracket (hereinafter referred to as shaft bracket). The needle threading and soaking equipment comprises a workbench, and a feeding mechanism, a needle threading mechanism, a transfer mechanism and a soaking mechanism which are sequentially arranged in the transmission direction, the shaft brackets are output from the feeding mechanism one by one, the shaft brackets pass through the needle threading mechanism to drive needle heads into needle holes in the head ends of the shaft brackets, then the shaft brackets are transferred to the soaking mechanism through the transferring mechanism, the soaking mechanism is used for soaking upper shaft lining nylon of the shaft brackets in emulsion, automation of the machining process of the shaft brackets can be achieved, and the machining efficiency of the shaft brackets is improved. The production efficiency is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of piano manufacturing and processing, in particular to a needle threading and soaking device for a grand piano string hammer handle shaft frame. Background Art

[0002] like Figure 1 As shown, the shaft frame of the grand piano hammer handle has a pinhole at the head end of the shaft frame, and the pinhole is used for installing the shaft pin. Nylon (called: shaft lining nylon) adapted to the pinhole is arranged in the pinhole to facilitate the connection between the shaft pin and the shaft frame.

[0003] In order to improve the durability of the shaft lining nylon, it needs to be soaked in emulsion and then dried before installing the bearing. However, during this process, the shaft lining nylon will expand, which will affect the later installation of the bearing. Therefore, a needle needs to be inserted into the pinhole in advance to limit the expansion of the shaft lining nylon, and then the needle can be removed after drying.

[0004] In the past, people usually threaded the needle into the shaft frame manually, and then picked up the shaft frame and immersed it. This not only increased the labor input, but also made it difficult to improve production efficiency. Summary of the invention

[0005] In order to overcome the deficiencies of the above-mentioned prior art, the object of the present invention is to provide a needle threading and soaking device for a grand piano hammer handle shaft frame, so as to realize the automation of needle threading and soaking, reduce labor input and improve production efficiency.

[0006] The first technical solution of the present invention is as follows: A needle threading and soaking device for a grand piano hammer handle shaft frame, comprising: Workbench; The feeding mechanism comprises: a first track, a material discharging rack, and a material pushing device; the first track is arranged on the workbench, the material discharging rack is arranged above the first track, and the material pushing device is arranged at one end of the first track; The needle threading mechanism comprises: a needle threading tool, a needle supply device, an injection device, a through-hole device, and a limit device; the input end of the needle threading tool is connected to the output end of the first track, the needle supply device is connected to the needle threading tool, the needle threading tool is provided with a needle threading channel running through both sides thereof, the injection device and the through-hole device are arranged on both sides of the needle threading tool relatively, and the limit device is arranged above the needle threading tool; The transfer mechanism comprises: a conveying device, a steering device, and a translation device; the input end of the conveying device is connected to the output end of the needle threading tool, the steering device is arranged at one side of the output end of the conveying device, and the translation device is arranged between the steering device and the soaking mechanism; The soaking mechanism comprises: a soaking bucket and two belt-type transmission belts; the soaking bucket is filled with emulsion, the two belt-type transmission belts are horizontally arranged above the soaking bucket, the adjacent sides of the two belt-type transmission belts are clamping surfaces, the spacing distance between the two clamping surfaces is smaller than the outer diameter of the rear end of the shaft frame, and the two belt-type transmission belts rotate in opposite directions.

[0007] Furthermore, the discharge rack includes an inclined section and a bending section, one end of the bending section is connected to the inclined section, and the other end of the bending section faces the first track from directly above, the transmission path of the inclined section is a straight line, and the transmission path of the bending section is an arc.

[0008] Furthermore, the inclined section includes two first limit bars and a first connecting plate, the two first limit bars are opposite to each other and spaced apart, and the first limit bar has a groove; the two ends of the first connecting plate are respectively connected to a corresponding first limit bar, and a plurality of first connecting plates are spaced apart along the path along which the axis frame slides down.

[0009] Furthermore, an input port is formed at the input end of the first limiting strip, and a cross section of the input port is L-shaped.

[0010] Furthermore, the needle supply device includes a vibration plate and a descending track, the output end of the vibration plate is located above the needle threading tooling, and the descending track connects the vibration plate and the needle threading tooling; a transmission channel is provided in the descending track, and the transmission channel is connected to the needle threading channel.

[0011] Furthermore, the path of the transmission channel is a zigzag downward path.

[0012] Furthermore, the steering device includes a first clamping member and a rotating assembly, the first clamping member is used to clamp the head end of the shaft frame, and the rotating assembly is drivingly connected to the first clamping member.

[0013] Furthermore, the rotating assembly includes a fifth cylinder, a rack and a gear, the rack is arranged at the output end of the fifth cylinder, the rack and the gear are meshed, and the first clamping member is fixedly arranged on one side of the gear; the stroke of the rack is one quarter of the stroke of the gear.

[0014] Furthermore, the rotation speeds of the two belt-type transmission belts are not equal.

[0015] Furthermore, the soaking bucket includes a foaming section and a recovery section, and the foaming section and the recovery section are connected and arranged in sequence along the conveying direction.

[0016] Compared with the prior art, the present invention has the following beneficial effects: The shaft racks are output one by one from the feeding mechanism, first pass through the needle threading mechanism to insert the needle into the needle hole at the head end of the shaft rack, and then pass through the transfer mechanism to transfer the shaft rack to the soaking mechanism. The upper shaft lining of the shaft rack is soaked in emulsion through the soaking mechanism, which can realize the automation of its processing process and improve production efficiency. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on the structures shown in these drawings without paying creative work.

[0018] Figure 1 It is a three-dimensional diagram of the shaft frame in the background technology; Figure 2 is a stereoscopic diagram of the needle threading and soaking device of the present invention; Figure 3 It is a top view of the needle threading part of the present invention; Figure 4 It is a stereoscopic diagram of the needle threading part of the present invention; Figure 5 It is a three-dimensional diagram of the needle threading part of the present invention from another perspective (excluding the discharge rack); Figure 6 It is a three-dimensional diagram of the material discharging rack in the present invention; Figure 7 It is a cross-sectional view of the lower slide track and the needle threading seat in the present invention; Figure 8 It is a partial schematic diagram of the limiting device in the present invention; Fig. 9 is a side view of the soaking part of the present invention; Fig.10 It is a stereogram of the soaking part in the present invention; Fig.11 is a stereogram of a conveying device and a steering device in the present invention; Fig.12 It is a three-dimensional diagram of the soaking bucket in the present invention; Description of Figure Numbers: 1- Workbench; 2-feeding mechanism; 21-first track; 22-discharging rack; 2201-input port; 221-inclined section; 2211-guide bar; 2212-limiting piece; 2213-connecting plate; 222-bending section; 23-pushing device; 231-first cylinder; 232-pushing block; 3-needle threading mechanism; 31-needle threading tool; 301-needle threading channel; 311-second track; 312-needle threading seat; 32-needle supply device; 321-vibration plate; 322-sliding track; 302-transmission channel; 33-injection device; 331-second cylinder; 332-push rod; 34-through hole device; 341-third cylinder; 342-motor; 343-cone head; 35-limiting device; 351-fourth cylinder; 352-pressing block; 353-limiting plate; 354-elastic extrusion member; 4-transport mechanism; 41-conveying device; 411-conveying belt; 412-block; 42-steering device; 421-first clamping member; 422-rotating assembly; 4221-fifth cylinder; 4222-rack; 4223-gear; 43-translation device; 431-second clamping member; 432-linear drive device; 5-soaking mechanism; 51-soaking bucket; 501-soaking section; 502-recovery section; 511-first inclined plate; 512-second inclined plate; 52-belt transmission belt; 53-hammering device; 531-sixth cylinder; 532-hammer head; 6-shaft frame; 61-shaft lining; 7-needle. DETAILED DESCRIPTION

[0019] In order to better understand the purpose, structure, features and effects of the present invention, the present invention is further described in conjunction with the accompanying drawings and specific embodiments. It should be noted that the features shown in the drawings are not necessarily drawn to scale. In addition, the described embodiments are part of the embodiments of the present invention, rather than all of the embodiments. Based on the described embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0020] Unless otherwise defined, the technical terms or scientific terms used in the present disclosure should be understood by people with ordinary skills in the field to which the present disclosure belongs. The "first", "second" and similar words used in the present disclosure do not indicate any order, quantity or importance, but are only used to distinguish different components. "Connect" or "connected" and similar words are not limited to physical or mechanical connections, but may include electrical connections, whether direct or indirect. "Up", "down", "left", "right", "front", "back" and the like are only used to indicate relative positional relationships. When the absolute position of the described object changes, the relative positional relationship may also change accordingly. In addition, in the description of the present invention, unless otherwise specified, "multiple" means two or more.

[0021] like Figure 2As shown, the present embodiment provides a needle threading and soaking device for a grand piano hammer handle shaft frame 6 (hereinafter referred to as: shaft frame 6), comprising: a workbench 1, and a feeding mechanism 2, a needle threading mechanism 3, a transfer mechanism 4, and a soaking mechanism 5 arranged in sequence along the transmission direction; the shaft frames 6 are output one by one from the feeding mechanism 2, first pass through the needle threading mechanism 3 to drive the needle head 7 into the needle hole at the head end of the shaft frame 6, and then pass through the transfer mechanism 4 to transfer the shaft frame 6 to the soaking mechanism 5, and the upper shaft lining 61 of the shaft frame 6 is soaked in emulsion through the soaking mechanism 5, so that the automation of its processing process can be realized and the production efficiency can be improved.

[0022] like Figure 3-4 As shown, the feeding mechanism 2 includes: a first track 21, a discharge rack 22, and a pushing device 23; the first track 21 is arranged on the workbench 1, the discharge rack 22 is arranged above the first track 21, and the pushing device 23 is arranged at one end of the first track 21; the shaft frames 6 are arranged in the discharge rack 22, and under the action of gravity, the shaft frames 6 fall one by one from the discharge rack 22 onto the first track 21, and the pushing device 23 is used to push the shaft frames 6 that fall into the first track 21 forward.

[0023] Conventional discharge racks 22 generally adopt a vertical structure (i.e., materials are stacked up and down and fall vertically), but this structure is prone to material tilting and resulting in material jamming, thereby causing equipment failure and shutdown, especially for long strips of materials with irregular shapes such as the shaft frame 6; in addition, when workers put materials into the vertical structure, they need to put them at the highest point of the discharge rack 22. If the entrance end of the discharge rack 22 is set higher, it will cause inconvenience to the workers' operation. If the entrance end of the discharge rack 22 is set lower, the capacity will be reduced.

[0024] Therefore, if Figure 6 As shown, as a preferred solution, the discharge rack 22 is designed as a curved bridge structure, which includes an inclined section 221 and a bending section 222, one end of the bending section 222 is connected to the inclined section 221, and the other end faces the first track 21 from directly above, the transmission path of the inclined section 221 is a straight line, and the transmission path of the bending section 222 is an arc, the input end of the bending section 222 is tangent to the output end of the inclined section 221, and the output end of the bending section 222 is perpendicular to the first track 21, and the shaft frame 6 slides on the inclined section 221, and falls vertically onto the first track 21 after passing through the bending section 222; In this way, the shaft frame 6 will receive a supporting force during the sliding process to alleviate the speed difference at both ends of the shaft frame 6 when it slides down and causes it to tilt, so that the axis of the shaft frame 6 remains horizontal during the falling process, reducing the occurrence of material jamming; in addition, this structure reduces the height of the entrance end of the discharge rack 22, that is, under the same loading capacity, the entrance height of the discharge rack 22 is lower, which makes it easier for workers to put in the shaft frame 6, thereby improving the convenience of discharging materials on the discharge rack.

[0025] The curvature of the bending section 222 in this embodiment is 160 degrees.

[0026] like Figure 6 As shown, further, the inclined section 221 includes two first limit bars and a first connecting plate 2213, the two first limit bars are opposite and spaced apart, the first limit bar has a groove, and the two grooves respectively limit one end of the shaft frame 6 to form a path for the shaft frame 6 to slide down; the two ends of the first connecting plate 2213 are respectively connected to a corresponding first limit bar, and a plurality of first connecting plates 2213 are spaced apart along the path for the shaft frame 6 to slide down, and the first connecting plate 2213 connects and fixes the two first limit bars while exposing the middle part of the shaft frame 6, which is beneficial for observing the arrangement and falling of the shaft frame 6, and is also convenient for performing some basic operations on the shaft frame 6 in the discharge frame 22, such as pushing the shaft frame 6 out of the discharge frame 22 or adjusting the arrangement state when the material is stuck.

[0027] like Figure 6 As shown, specifically, the first limiting strip includes a first guide strip 2211 and a first limiting plate 2212, the first guide strip 2211 is L-shaped, and includes a first supporting surface and a first axial limiting surface vertically connected, the first limiting plate 2212 and the first supporting surface are parallel and spaced apart, and the first limiting plate 2212 is connected to the first axial limiting surface, so as to form the groove.

[0028] like Figure 6 As shown above, the structure of the bending section 222 is substantially the same as the structure of the inclined section 221 , the difference being that the path of the inclined section 221 is a straight line, while the path of the bending section 222 is an arc.

[0029] The slot at the input end of the general discharge rack 22 is small, and can only accommodate the shaft rack 6. The operation of placing the shaft rack 6 into the discharge rack 22 is relatively troublesome, and the shaft racks 6 need to be placed one by one, which is difficult to operate in large quantities. Figure 5As shown, further, an input port 2201 is formed at the input end of the first limiting strip, and the cross-section of the input port 2201 is L-shaped; specifically, the length of the first guide strip 2211 is greater than the length of the first limiting piece 2212, and the first limiting piece 2212 and the first guide strip 2211 are aligned at one end close to the bending section 222, so that the first guide strip 2211 extends out relative to the first limiting piece 2212 at the input end of the inclined section 221, and the extended part forms the input port 2201; in this way, workers can pick up multiple shaft racks 6 at a time and place them on the input port 2201 first, and the shaft rack 6 slides into the groove along the first supporting surface, which can save the difficulty of aligning the shaft rack 6 with the groove when placing it, and multiple shaft racks 6 can be placed at one time, thereby improving the convenience and efficiency of material discharge.

[0030] like Figure 4-5 As shown, further, the pushing device 23 includes a first cylinder 231 and a pushing block 232. The driving direction of the first cylinder 231 is parallel to the path of the first track 21. The pushing block 232 is slidably set on the first track 21 and is drivingly connected to the first cylinder 231; when an axle frame 6 falls onto the first track 21, the pushing block 232 pushes the axle frame 6 forward from the tail end. After the pushing block 232 is reset, the next axle frame 6 falls onto the first track 21 again, and the pushing block 232 continues to push the axle frame 6 forward; on the first track 21, under the push of the pushing device 23, the rear axle frame 6 pushes the front axle frame 6 forward, thereby realizing the transportation of materials.

[0031] like Figure 3-4As shown, the needle threading mechanism 3 includes: a needle threading tool 31, a needle supply device 32, an injection device 33, a through-hole device 34, and a limit device 35; the input end of the needle threading tool 31 is connected to the output end of the first track 21, the needle supply device 32 is connected to the needle threading tool 31, the needle threading tool 31 is provided with a needle threading channel 301 running through both sides thereof, the injection device 33 and the through-hole device 34 are relatively arranged on both sides of the needle threading tool 31, and are aligned with the needle threading channel 301, and the limit device 35 is arranged above the needle threading tool 31; specifically, the length of each shaft frame 6 is the same, and the The pushing stroke of the pushing device 23 is fixed, and the position of each shaft frame 6 entering the needle threading tooling 31 is also fixed. Based on this, the needle threading channel 301 is opened. The needle hole of the shaft frame 6 after entering the needle threading tooling 31 and the needle threading channel 301 are on the same axis. The needle supply device 32 inputs the needles 7 one by one into the needle hole of the needle threading tooling 31. The limiting device 35 is used to press and fix the shaft frame 6 on the needle threading tooling 31. The through-hole device 34 is used to clear the blockage in the needle hole of the shaft frame 6; the injection device 33 is used to inject the needle 7 on the needle threading channel 301 into the needle hole of the shaft frame 6.

[0032] like Figure 4 , 5 As shown in Figure 7, further, the needle threading tool 31 includes a second track 311 and a needle threading seat 312, the input end of the second track 311 is connected to the output end of the first track 21, the needle threading seat 312 is connected to the second track 311, and is located on the side close to the injection device 33, the needle threading channel 301 passes through the second track 311 and the needle threading seat 312, and the needle supply device 32 is connected to the needle threading seat 312; the needle supply device 32 inputs the needles 7 one by one into the needle threading channel 301 located at the needle threading seat 312.

[0033] like Figure 4 , 5 As shown in Figure 7, further, the needle supply device 32 includes a vibration disk 321 and a lower slide track 322, the output end of the vibration disk 321 is located above the needle threading seat 312, and the lower slide track 322 connects the vibration disk 321 and the needle threading seat 312; the lower slide track 322 has a transmission channel 302, the transmission channel 302 is connected to the needle threading channel 301, the transmission channel 302 is inclined, and the extension direction of the transmission channel 302 is perpendicular to the axis of the needle 7, and the needle 7 slides along the transmission channel 302 to the needle threading channel 301.

[0034] like Figure 7As shown, preferably, the path of the transmission channel 302 is a zigzag downward path, so that the transmission channel 302 is divided into multiple levels, so that the needle 7 slides down step by step to buffer the descending speed of the needle 7 and prevent the needle 7 from axially tilting and jamming.

[0035] like Figure 3-5 As shown, further, the injection device 33 includes a second cylinder 331 and a push rod 332; the push rod 332 is arranged at the output end of the second cylinder 331, and the diameter of the push rod 332 is adapted to the inner diameter of the needle threading channel 301. The second cylinder 331 drives the push rod 332 to slide in the needle threading channel 301 to push the needle 7 into the needle hole of the shaft frame 6.

[0036] like Figure 3-5 As shown, further, the through-hole device 34 includes a third cylinder 341, a motor 342 and a cone head 343, the motor 342 is arranged on the workbench 1, the motor 342 is slidably arranged on the workbench 1, and the motor 342 is connected to the output end of the third cylinder 341, and the cone head 343 is arranged at the output end of the motor 342; the third cylinder 341 drives the cone head 343 to pass through the needle transmission channel 301 and penetrate into the needle hole of the shaft frame 6, and the motor 342 drives the cone head 343 to rotate in the needle hole of the shaft frame 6 to clear the blockage in the needle hole.

[0037] like Figure 3 , 4 As shown in Figure 8, further, the limiting device 35 includes a limiting plate 353, a fourth cylinder 351 and a pressure block 352. The limiting plate 353 is fixed on the top surface of the second track 311 and is located on the side close to the input end of the second track 311. The fourth cylinder 351 is arranged above the second track 311, and its output direction is vertically downward. The pressure block 352 is arranged at the output end of the fourth cylinder 351 and is located above the head end of the shaft frame 6. The bottom end of the pressure block 352 is convex to adapt to the shape of the head end of the shaft frame 6. The pressure block 352 is provided with a through groove for the needle 7 to pass through. Through the cooperation of the pressure block 352 and the limiting plate 353, the two ends of the shaft frame 6 are pressed down and positioned.

[0038] like Figure 3 , 4As shown in Figure 8, preferably, the limiting device 35 also includes an elastic extrusion member 354, and the elastic extrusion member 354 is arranged on the second rail 311. The elastic extrusion member 354 is used to extrude the shaft frame 6 from the horizontal side to limit the horizontal displacement of the shaft frame 6; specifically, the elastic extrusion member 354 includes a spring and a push block, and the push block can be horizontally slidably arranged on the second rail 311, and its sliding direction is horizontal and perpendicular to the axis of the shaft frame 6, and the spring is arranged on the push block and the second rail 311.

[0039] like Figure 9-10 As shown, the transfer mechanism 4 includes: a conveying device 41, a steering device 42, and a translation device 43; the input end of the conveying device 41 is connected to the second track 311, and the shaft frame 6 is horizontally transmitted to the conveying device 41 with the head end in front and the tail end in the back, and the steering device 42 is arranged on one side of the output end of the conveying device 41, and the steering device 42 clamps the head end of the shaft frame 6 and flips the shaft frame 6 90 degrees to stand up the shaft frame 6 with the head end facing downward; the translation device 43 is arranged between the steering device 42 and the immersion mechanism 5, and the translation device 43 clamps the tail end of the shaft frame 6 and transfers the shaft frame 6 to the immersion mechanism 5.

[0040] like Figure 9-11 As shown, further, the conveying device 41 includes a conveying belt 411 and a stopper 412, the input end of the conveying belt 411 is connected to the output end of the second track 311, and the stopper 412 is arranged at the output end of the conveying belt 411, for abutting against the axle frame 6 to achieve axial positioning of the axle frame 6, which is beneficial for the steering device 42 to accurately clamp the axle frame 6.

[0041] like Figure 9-11 As shown, further, the steering device 42 includes a first clamping member 421 and a rotating assembly 422, the first clamping member 421 is used to clamp the head end of the shaft frame 6, the rotating assembly 422 and the first clamping member 421 are drivingly connected, and the rotating assembly 422 drives the first clamping member 421 to rotate back and forth between the horizontal and vertical states.

[0042] like Figure 9-11As shown, preferably, the rotating component 422 includes a fifth cylinder 4221, a rack 4222 and a gear 4223, the rack 4222 is arranged at the output end of the fifth cylinder 4221, the rack 4222 and the gear 4223 are meshed, and the first clamping member 421 is fixedly arranged on one side of the gear 4223; the stroke of the rack 4222 is one quarter of the stroke of the gear 4223, so that the rotation angle of the gear 4223 is fixed to 90 degrees. Compared with the use of a rotation drive device such as a servo motor 342, the rotation structure of this case sets its rotation angle through the original mechanical structure, which eliminates the need for program debugging and the like, and its structural principle is simpler, more reliable and durable.

[0043] like Figure 9-10 As shown, further, the translation device 43 includes a second clamping member 431 and a linear driving device 432, the second clamping member 431 and the linear driving device 432 are drivingly connected, the second clamping member 431 clamps the tail end of the shaft frame 6, and the linear driving device 432 drives the second clamping member 431 to translate into the immersion mechanism 5.

[0044] In this embodiment, the linear drive device 432 is a component composed of a slide rail and a cylinder.

[0045] like Figure 9-11 As shown, the soaking mechanism 5 includes: a soaking bucket 51 and two belt-type transmission belts 52; the soaking bucket 51 is filled with emulsion, and the two belt-type transmission belts 52 are horizontally spaced apart above the soaking bucket 51, and the adjacent sides of the two belt-type transmission belts 52 are clamping surfaces, and the spacing distance between the two clamping surfaces is smaller than the outer diameter of the tail end of the shaft frame 6. The two belt-type transmission belts 52 rotate in opposite directions, so that the transmission directions of the two clamping surfaces are the same, and the shaft frame 6 is clamped under the action of the elasticity of the belt, and through the cooperation of the two clamping surfaces, the shaft frame 6 is driven to move forward under the action of friction.

[0046] like Fig. 9 As shown, specifically, the height of the belt-type transmission belt 52 is lower than the height of the second clamping member 431, the running speed of the belt-type transmission belt 52 is the same as the transmission speed of the linear drive device 432, and the starting position of the stroke of the belt-type transmission belt 52 coincides with the end position of the stroke of the linear drive device 432, which is beneficial to the connection of the transfer of the shaft frame 6 between the second clamping member 431 and the belt-type transmission belt 52.

[0047] like Fig. 9As shown, when the shaft frame 6 enters the vertical range of the soaking bucket 51, the height of the head end of the shaft frame 6 is higher than the soaking bucket 51 to prevent the shaft frame 6 from colliding with the soaking bucket 51 during the movement, which may cause the shaft frame 6 to fall or shift; therefore, the soaking mechanism 5 further includes a hammer device 53, which is located above the belt drive belt 52 and the soaking bucket 51, and the hammer device 53 is used to hammer the shaft frame 6 downward to make the shaft frame 6 move vertically downward during the movement, so that after the shaft frame 6 enters the range of the soaking bucket 51, the head end of the shaft frame 6 is immersed in the emulsion in the soaking bucket 51.

[0048] like Figure 9-11 As shown, further, the hammer device 53 includes a sixth cylinder 531 and a hammer head 532 , the output end of the sixth cylinder 531 is vertically downward, and the hammer head 532 is arranged at the output end of the sixth cylinder 531 .

[0049] Furthermore, the rotation speeds of the two belt-type transmission belts 52 are not equal. Thus, in the process of advancing the clamped shaft frame 6, in the case of a rotation speed difference between the two belt-type transmission belts 52, the shaft frame 6 rotates along its axis during the forward movement, and the emulsion and the shaft lining 61 in the pinhole of the shaft frame 6 are better immersed.

[0050] When the shaft frame 6 leaves the emulsion after soaking, more liquid will adhere to the surface of the shaft frame 6 and drip during the subsequent movement. The dripping emulsion will remain on the workbench 1, the ground or other equipment, causing pollution to the workshop environment and causing waste of emulsion. Figure 5 As shown, further, the immersion bucket 51 includes a foaming material section 501 and a recovery section 502, the foaming material section 501 and the recovery section 502 are connected and arranged in sequence along the conveying direction, the foaming material section 501 is filled with emulsion, and the recovery section 502 is not filled with emulsion, after the shaft frame 6 leaves the area of ​​the foaming material section 501, the liquid adhered to the shaft frame 6 will drip onto the recovery section 502, so that the emulsion can be recovered without causing pollution to the surrounding area.

[0051] like Fig.12 As shown, specifically, the soaking bucket 51 includes: a bottom plate, three side plates, a first inclined plate 511 and a second inclined plate 512. The three side plates and the first inclined plate 511 are connected end to end in sequence and are arranged on the bottom plate to form the soaking bucket 51; the second inclined plate 512 and the first inclined plate 511 are arranged on the bottom plate at intervals, and the two ends of the second inclined plate 512 are respectively connected to the corresponding side plates, so that the soaking bucket 51 is separated into the foaming material section 501 and the recovery section 502.

[0052] like Fig.12As shown, preferably, the first inclined plate 511 and the second inclined plate 512 are arranged to be inclined, so as to reduce the collision of the shaft frame 6 with the edge of the shaft frame 6 when leaving the soaking bucket 51, so that the shaft frame 6 is slowly inclined.

[0053] Preferably, a receiving tray is provided on the side of the soaking bucket 51, and the receiving tray is located below the end of the belt-type transmission belt 52. When the shaft frame 6 is transmitted to the end of the belt-type transmission belt 52, it will naturally fall onto the receiving tray.

[0054] Finally, it should be noted that the above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art can still modify the technical solutions described in the aforementioned embodiments or replace some of the technical features therein by equivalents. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.

Claims

1. A needle threading and soaking device for a grand piano hammer handle shaft frame, characterized in that: include: Workbench (1); The feeding mechanism (2) comprises: a first track (21), a material discharging rack (22), and a material pushing device (23); the first track (21) is arranged on the workbench (1), the material discharging rack (22) is arranged above the first track (21), and the material pushing device (23) is arranged at one end of the first track (21); The needle threading mechanism (3) comprises: a needle threading tool (31), a needle supply device (32), an injection device (33), a through-hole device (34), and a limit device (35); the input end of the needle threading tool (31) is connected to the output end of the first track (21), the needle supply device (32) is connected to the needle threading tool (31), the needle threading tool (31) is provided with a needle threading channel (301) running through both sides thereof, the injection device (33) and the through-hole device (34) are arranged on both sides of the needle threading tool (31) relative to each other, and the limit device (35) is arranged above the needle threading tool (31); The transfer mechanism (4) comprises: a conveying device (41), a steering device (42), and a translation device (43); the input end of the conveying device (41) is connected to the output end of the needle threading tool (31), the steering device (42) is arranged on one side of the output end of the conveying device (41), and the translation device (43) is arranged between the steering device (42) and the soaking mechanism (5); The soaking mechanism (5) comprises: a soaking bucket (51) and two belt-type transmission belts (52); the soaking bucket (51) is filled with emulsion; the two belt-type transmission belts (52) are horizontally arranged above the soaking bucket (51) at intervals; the adjacent sides of the two belt-type transmission belts (52) are clamping surfaces; the spacing between the two clamping surfaces is smaller than the outer diameter of the rear end of the shaft frame (6); and the two belt-type transmission belts (52) rotate in opposite directions.

2. The needle threading and soaking device for a grand piano hammer shank according to claim 1, characterized in that: The discharge rack (22) comprises an inclined section (221) and a bent section (222), one end of the bent section (222) is connected to the inclined section (221), and the other end of the bent section (222) faces the first track (21) from directly above, the transmission path of the inclined section (221) is a straight line, and the transmission path of the bent section (222) is an arc.

3. The needle threading and soaking device for a grand piano hammer shank according to claim 2, characterized in that: The inclined section (221) comprises two first limit bars and a first connecting plate (2213), the two first limit bars being arranged opposite to each other and spaced apart, the first limit bar having a groove; the two ends of the first connecting plate (2213) are respectively connected to a corresponding first limit bar, and the plurality of first connecting plates (2213) are spaced apart along the path along which the shaft frame (6) slides down.

4. The needle threading and soaking device for a grand piano hammer shank according to claim 3, characterized in that: An input port (2201) is formed at the input end of the first limiting strip, and the cross section of the input port (2201) is L-shaped.

5. The needle threading and soaking device for a grand piano hammer shank according to claim 1, characterized in that: The needle supply device (32) comprises a vibration disk (321) and a lower slide track (322); the output end of the vibration disk (321) is located above the needle threading tool (31); the lower slide track (322) connects the vibration disk (321) and the needle threading tool (31); a transmission channel (302) is provided in the lower slide track (322); the transmission channel (302) is connected to the needle threading channel (301).

6. The needle threading and soaking device for a grand piano hammer shank according to claim 5, characterized in that: The path of the transmission channel (302) is a zigzag downward path.

7. The needle threading and soaking device for a grand piano hammer shank according to claim 1, characterized in that: The steering device (42) comprises a first clamping member (421) and a rotating assembly (422), wherein the first clamping member (421) is used to clamp the head end of the shaft frame (6), and the rotating assembly (422) and the first clamping member (421) are drivingly connected.

8. The needle threading and soaking device for a grand piano hammer shank according to claim 7, characterized in that: The rotating assembly (422) includes a fifth cylinder (4221), a rack (4222) and a gear (4223); the rack (4222) is arranged at the output end of the fifth cylinder (4221); the rack (4222) and the gear (4223) are meshed; the first clamping member (421) is fixedly arranged on one side of the gear (4223); the stroke of the rack (4222) is one quarter of the stroke of the gear (4223) per revolution.

9. The needle threading and soaking device for a grand piano hammer shank according to claim 1, characterized in that: The rotation speeds of the two belt-type transmission belts (52) are not equal.

10. The needle threading and soaking device for a grand piano hammer shank shaft frame according to claim 1, characterized in that: The soaking bucket (51) comprises a foaming material section (501) and a recovery section (502), wherein the foaming material section (501) and the recovery section (502) are connected and arranged in sequence along the conveying direction.