River channel slope protection construction device and construction method

By designing construction components, cutting components and vibration components in the river slope protection construction device, combining distance sensors and hydraulic adjustment systems, the problem of concrete drop volume and casting thickness control is solved, and the efficiency and uniformity of river slope protection construction is achieved, improving the efficiency and improvement of river slope protection construction Construction quality.

CN118895732APending Publication Date: 2024-11-05HENAN RIVER ENG SUPERVISION CO LTD
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202411074466.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-07
Publication Date
2024-11-05

AI Technical Summary

Technical Problem

The existing river slope protection construction device cannot effectively control the drop and pouring thickness of concrete materials, resulting in poor paving surface quality and affecting the normal progress of slope protection construction.

Method used

A river slope protection construction device including construction components, cutting components, auxiliary adjustment components and vibration components was designed. By setting up a distance sensor, screen plate, feeding plate, cylinder and hydraulic rod, the uniformity of concrete materials is achieved. Disperse and adjust the drop volume to ensure paving quality and increase the compactness of the concrete by vibrating the assembly.

Benefits of technology

The uniform paving and pouring of concrete materials is achieved, the construction efficiency and the quality of slope protection construction are improved, and the problems of material slippage and uneven paving are avoided.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118895732A_ABST
    Figure CN118895732A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of river channel slope protection building, and discloses a river channel slope protection building device and method.The device comprises a building assembly, a plurality of discharging assemblies, a vibrating assembly and a feeding assembly, the building assembly comprises a rack, the multiple discharging assemblies are arranged above the rack, auxiliary adjusting assemblies are arranged below the discharging assemblies, and the vibrating assembly is arranged above the rack; the auxiliary adjusting assembly is arranged in the machine frame, the feeding assembly is arranged above the discharging assembly, and the vibrating assembly is arranged in the machine frame. Through the integrated design of the building assembly, the discharging assembly, the auxiliary adjusting assembly and the vibrating assembly, laying, vibrating compaction and preliminary trowelling are achieved, the high efficiency of the construction process is improved, and through cooperation of the discharging assembly and the auxiliary adjusting assembly, concrete materials are evenly dispersed and fall down so that the concrete materials can be evenly laid.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention belongs to the technical field of river channel slope protection construction, in particular to a river channel slope protection construction device and a construction method. Background Art

[0002] River bank protection construction refers to the engineering measures for reinforcing, protecting and improving the slopes of rivers, lakes and other water bodies. Generally, cement concrete and other materials are poured on a slope. After it solidifies, a protective layer will be formed. It can not only effectively protect the roads, trees and buildings on the shore, but also effectively prevent soil erosion. Its main purpose is to maintain the stability of the river channel, prevent water scouring and erosion from causing slope collapse, and protect the surrounding environment and ecology. The current construction method mostly uses a slope bracket, and then fixes the feed pipe on the bracket. It spreads longitudinally with the movement of the feed pipe and moves horizontally with the movement of the wheels.

[0003] For example, the Chinese patent application number 2023104191115 discloses a river bank protection and construction device, which includes a trough-type adaptive opening flow channel mechanism, a negative feedback residual pressure sensing mechanism, a top walking component and a bottom walking component. The device can sense the pressure sensing component of the amount of material accumulated at the bottom, so that the opening amplitude of the transmission belt can be adaptively adjusted and matched. However, when the material falls, it is easy to cause more material in the middle and less material on both sides, resulting in poor paving surface quality.

[0004] For example, Chinese patent application number 2017101332506 discloses a slope protection construction machine for gardens, roads, and rivers, which includes a walking device, a stirring device, an adjusting device, a vibrating bracket, and a pouring device. The device integrates mobile walking, mud stirring, mud conveying, and vibrating pouring. The slope protection pouring speed is fast, but it is not convenient to adjust the falling amount of materials at different positions of the slope protection in real time.

[0005] Based on the above scheme, the existing device generally uses gravity to make the concrete material flow naturally to the paving position, but it is unable to control the falling amount of the material. Due to different slopes, the discharge speed of the concrete material is also different, and the efficiency is low; and due to the inclined setting of the frame, the concrete material on the slope surface is easily caused to slide down under the action of gravity and the fluidity of the concrete material itself during discharge, and the material at high places is easy to slide down, resulting in inconsistent thickness of pouring on the slope surface; and when the material falls, it is easy to cause more material in the middle and less material on both sides, thereby causing material separation, and gaps are easily generated between the materials. After solidification for a period of time, the material is unevenly spread, resulting in poor paving surface quality, affecting the normal progress of slope protection construction. Summary of the Invention

[0006] In view of the above problems, the present invention provides a river bank protection construction device and a construction method to solve the problems raised in the above background technology.

[0007] To achieve the above-mentioned object, the present invention provides the following technical solution: a river bank protection construction device, comprising a construction assembly, a blanking assembly, a vibrating assembly, and a feeding assembly, wherein the construction assembly comprises a frame, a plurality of blanking assemblies are arranged above the frame, an auxiliary adjustment assembly is arranged below the blanking assembly, the auxiliary adjustment assembly is arranged inside the frame, a feeding assembly is arranged above the blanking assembly, and a vibrating assembly is arranged inside the frame; The unloading assembly includes a storage bin, which is arranged above the frame, with rotating racks on both sides of the storage bin, and a discharge plate at one end of the storage bin away from the rotating rack; The auxiliary adjustment assembly includes a sieve plate, which is arranged below the storage bin, a cylinder is provided on one side of the sieve plate, a limit slide rod is provided on the sieve plate, and auxiliary frames are provided at both ends of the limit slide rod, a mounting seat is hingedly connected to the surface of the auxiliary frame, and a connecting rod is hingedly connected to the end of the mounting seat away from the auxiliary frame, and the end of the connecting rod away from the mounting seat is hinged to the discharge plate; A distance sensor is arranged inside the frame.

[0008] Preferably, a stirring paddle is provided inside the storage bin, a stirring motor is provided on one side of the storage bin, the output shaft of the stirring motor is connected to the stirring paddle, and a rotating groove is provided at the position where the stirring motor is connected to the storage bin.

[0009] Preferably, a material dividing plate is provided in the middle of the surface of the sieve plate, and a plurality of material discharge troughs are provided on the surface of the sieve plate; There are two limiting slide bars, and the two limiting slide bars are respectively arranged at both ends of the sieve plate. The limiting slide bars penetrate the sieve plate and extend to the interior of the auxiliary frame.

[0010] Preferably, a positioning plate is provided on the inner wall of the frame, and the positioning plate is provided between the auxiliary frame and the frame. Hydraulic rods are provided at both ends of the positioning plate, and one end of the hydraulic rod away from the positioning plate is hinged to the auxiliary frame.

[0011] Preferably, mounting frames are provided at both ends of the frame, a slope adjustment mechanism is provided at one end of the mounting frame away from the frame, a support plate is provided at one end of the slope adjustment mechanism away from the mounting frame, and a crawler walking mechanism is provided below the support plate.

[0012] Preferably, the vibrating assembly includes a fixed plate, a first hydraulic lifting column is provided below the fixed plate, a vibrating frame is provided at the end of the first hydraulic lifting column away from the fixed plate, a vibrating rod and a vibrating motor are provided on both sides of the vibrating frame, and the output end of the vibrating motor is connected to the vibrating rod through a hose.

[0013] Preferably, a vibrating scraper is provided on one side of the vibrating frame, a second hydraulic lifting column is provided at one end of the vibrating scraper close to the fixed plate, and an end of the second hydraulic lifting column away from the vibrating scraper is connected to the fixed plate.

[0014] Preferably, tracks are provided on both sides of the fixed plate, a ball screw is provided inside the track, a nut seat is provided on the surface of the ball screw, the end of the nut seat away from the track is connected to the fixed plate, a rotating motor is provided at one end of the track, and the output shaft of the rotating motor is connected to the ball screw.

[0015] Preferably, the feeding assembly includes a screw conveyor body, which is arranged at the top of the storage bin through a support frame, a hopper is provided at one end of the screw conveyor body, a feeding pipe is provided on the surface of the screw conveyor body, and the feeding pipe is connected to the storage bin at one end away from the screw conveyor body.

[0016] The construction method of river bank protection is as follows: S1. First, the construction components are moved to the construction site and adjusted according to the slope of the slope to be built to ensure that the concrete material can be evenly spread on the slope surface. Preparations before construction are completed; S2. The concrete material is then transported to the storage bin on the unloading component through the feeding assembly, and the concrete material in the storage bin is transported to the frame through the discharge plate for paving; S3. Finally, the paved concrete material is vibrated by the vibrating assembly to make the concrete densely combined and improve the construction strength of the slope protection.

[0017] Compared with the prior art, the present invention has the following beneficial effects: 1. The present invention realizes laying, vibration compaction and preliminary leveling through the integrated design of construction components, blanking components, auxiliary adjustment components and vibration components, thereby improving the efficiency of the construction process. Through the cooperation of the blanking components and the auxiliary adjustment components, the concrete material is evenly dispersed and falls, so that it is evenly spread.

[0018] 2. The present invention uses structures such as screen plates, dividing plates, and cylinders to collide and break up the concrete materials falling from the storage bin, so that the materials are evenly poured on the slope surface, improving the pouring quality. In addition, the falling materials are buffered to prevent the gravity impact force of the materials on the slope surface from accelerating the decline of the concrete materials.

[0019] 3. The present invention sets a distance sensor inside the frame to detect the pouring thickness of concrete materials on the slope section corresponding to the silo. The pouring thickness calculated according to the discharge amount of the storage silo in different time periods is called the standard value. Then, the thickness of the slope after pouring detected in real time by the distance sensor is called the detection value. By comparing the detection value with the corresponding standard value, it is determined whether the slope section has slipped, and it is adjusted according to different situations through the discharge component and the auxiliary adjustment component. BRIEF DESCRIPTION OF THE DRAWINGS

[0020] Figure 1 This is a schematic diagram of the overall structure of the present invention from a first viewing angle; Figure 2 This is a schematic diagram of the overall structure of the present invention from a second viewing angle; Figure 3 It is a schematic diagram of a partial cross-section of the frame structure of the present invention from a first viewing angle; Figure 4 A schematic diagram of a partial cross-section of the frame structure of the present invention from a second viewing angle; Figure 5 For the present invention Figure 4 A magnified view of point A; Figure 6 This is an exploded schematic diagram of the vibrating assembly structure of the present invention; Figure 7 For the present invention Figure 6 Enlarged view of point B; Figure 8 This is a schematic diagram of the assembly structure of the blanking component and the feeding component of the present invention; Figure 9 It is a partial cross-sectional schematic diagram of the storage bin structure of the present invention; Figure 10 This is a schematic diagram of the assembly structure of the blanking component and the auxiliary adjustment component of the present invention; Figure 11 It is a schematic side view of the auxiliary adjustment component structure of the present invention.

[0021] In the figure: 1. Construction assembly; 101. Frame; 102. Mounting frame; 103. Slope adjustment mechanism; 104. Support plate; 105. Track mechanism; 106. Positioning plate; 2. Unloading assembly; 201. Storage bin; 202. Stirring paddle; 203. Stirring motor; 204. Rotating frame; 205. Discharging plate; 3. Auxiliary adjustment assembly; 301. Screen plate; 3011. Distributing plate; 302. Limiting slide; 303. Auxiliary frame; 304. Cylinder; 3 05. Hydraulic rod; 306. Mounting seat; 307. Connecting rod; 4. Vibrating assembly; 401. Fixing plate; 402. First hydraulic lifting column; 403. Vibrating frame; 404. Vibrating rod; 405. Vibrating motor; 406. Second hydraulic lifting column; 407. Vibrating scraper; 408. Nut seat; 409. Ball screw; 410. Track; 411. Rotating motor; 5. Feeding assembly; 501. Screw conveyor body; 502. Hopper; 503. Feeding pipe. DETAILED DESCRIPTION

[0022] The following will clearly and completely describe the technical solutions in the embodiments of the present invention in conjunction with the accompanying drawings. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without making creative efforts are within the scope of protection of the present invention.

[0023] like Figures 1 to 11 As shown, the river bank protection construction device of the present invention includes a construction component 1, a material discharge component 2, a vibration component 4 and a feeding component 5. The construction component 1 includes a frame 101, a plurality of material discharge components 2 are arranged above the frame 101, an auxiliary adjustment component 3 is arranged below the material discharge component 2, the auxiliary adjustment component 3 is arranged inside the frame 101, a feeding component 5 is arranged above the material discharge component 2, and a vibration component 4 is arranged inside the frame 101.

[0024] like Figure 2 As shown, mounting frames 102 are provided at both ends of the frame 101, a slope adjustment mechanism 103 is provided at the end of the mounting frame 102 away from the frame 101, a support plate 104 is provided at the end of the slope adjustment mechanism 103 away from the mounting frame 102, and a crawler walking mechanism 105 is provided below the support plate 104.

[0025] When in use, by setting up a crawler walking mechanism 105, the frame 101 can be driven to move horizontally, which is convenient for paving concrete materials for the entire slope protection. By setting up a slope adjustment mechanism 103, the inclination angle of the frame 101 can be adjusted according to the different slope protection slopes under construction, so that the frame 101 can adapt to different slope operations.

[0026] like Figure 9As shown, the unloading component 2 includes a storage bin 201, which is arranged above the frame 101, and a rotating frame 204 is provided on both sides of the storage bin 201. A discharge plate 205 is provided at one end of the storage bin 201 away from the rotating frame 204, and a stirring paddle 202 is provided inside the storage bin 201. A stirring motor 203 is provided on one side of the storage bin 201, and the output shaft of the stirring motor 203 is connected to the stirring paddle 202. A rotating groove is provided at the position where the stirring motor 203 is connected to the storage bin 201.

[0027] During use, by starting the stirring motor 203, the stirring motor 203 drives the stirring paddle 202 to stir the concrete material in the storage bin 201, thereby preventing the concrete material from segregating for a long time or uneven feeding. At the same time, the concrete material in the storage bin 201 stirred by the stirring paddle 202 flows out through the discharge plate 205.

[0028] like Figure 8 As shown, the feeding assembly 5 includes a screw conveyor body 501, which is arranged at the top of the storage bin 201 through a support frame, a hopper 502 is provided at one end of the screw conveyor body 501, and a feeding pipe 503 is provided on the surface of the screw conveyor body 501, and the end of the feeding pipe 503 away from the screw conveyor body 501 is connected to the storage bin 201.

[0029] During use, the mixed material is transported to the hopper 502 on the screw conveyor body 501 through the concrete mixing equipment. Under the action of the screw conveyor body 501 , the concrete material is transported to the corresponding storage bin 201 through the feeding pipe 503 .

[0030] When in use, first, the frame 101 is moved to the construction position through the crawler walking mechanism 105, and then the inclination angle of the frame 101 is adjusted through the slope adjustment mechanism 103 according to the different slope protection slopes of the construction, so that the frame 101 is parallel to the slope surface, ensuring that the concrete material can be evenly spread on the slope surface. After the preparation work is completed, the paving operation begins. During the paving process, the mixed material is transported to the hopper 502 on the screw conveyor body 501 through the concrete mixing equipment, and the screw conveyor body 502 is used for the concrete mixing equipment. Under the action of the machine body 501, the concrete material is transported to the corresponding storage bin 201 through the feeding pipe 503, and the stirring motor 203 is started at the same time, so that the stirring motor 203 drives the stirring paddle 202 to stir the concrete material in the storage bin 201. At the same time, the concrete material in the storage bin 201 stirred by the stirring paddle 202 flows along the discharge plate 205 to the slope surface in the frame 101. After the material pouring is completed, the crawler walking mechanism 105 is used to make the frame 101 move horizontally to carry out the paving operation.

[0031] In the process of building slope protection, existing devices generally use gravity to make concrete materials flow naturally to the paving position, but cannot control the falling amount of materials. Due to different slopes, the feeding speed of the concrete materials is also different, and the efficiency is low. Moreover, since the frame 101 is tilted, the concrete materials on the slope surface are easily caused to slide down under the action of gravity and the fluidity of the concrete materials themselves during feeding. The materials at high places are easy to slide down, resulting in inconsistent thickness of the pouring on the slope surface. Moreover, when the materials fall, it is easy to cause more materials in the middle and less materials on both sides, thereby causing material separation and easily generating gaps between the materials. After solidifying for a period of time, the materials are unevenly spread, resulting in poor quality of the paving surface, affecting the normal progress of slope protection construction.

[0032] In order to solve the above problems, the river bank protection and construction device also includes: like Figure 10 、 Figure 11 As shown, the auxiliary adjustment component 3 includes a sieve plate 301, a dividing plate 3011 is provided in the middle position of the surface of the sieve plate 301, a plurality of material discharge troughs are opened on the surface of the sieve plate 301, the sieve plate 301 is arranged below the storage bin 201, a cylinder 304 is provided on one side of the sieve plate 301, a limiting slide 302 is provided on the sieve plate 301, and auxiliary frames 303 are provided at both ends of the limiting slide 302. There are two limiting slides 302, and the two limiting slides 302 are respectively provided on both sides of the sieve plate 301. The limiting slide 302 passes through the sieve plate 301 and extends to the inside of the auxiliary frame 303.

[0033] During use, the cylinder 304 is controlled to reciprocate by the controller, and the cylinder 304 drives the sieve plate 301 to slide back and forth on the limiting slide bar 302, thereby achieving the purpose of dispersing the materials in the process.

[0034] like Figure 4 、 Figure 5 、 Figure 10 As shown, a positioning plate 106 is provided on the inner wall of the frame 101, and the positioning plate 106 is provided between the auxiliary frame 303 and the frame 101. Hydraulic rods 305 are provided at both ends of the positioning plate 106. The end of the hydraulic rod 305 away from the positioning plate 106 is hinged to the auxiliary frame 303, and a distance sensor is provided inside the frame 101.

[0035] A mounting seat 306 is hinged on the surface of the auxiliary frame 303 , and a connecting rod 307 is hinged on one end of the mounting seat 306 away from the auxiliary frame 303 . An end of the connecting rod 307 away from the mounting seat 306 is hinged to the discharge plate 205 .

[0036] When in use, the controller controls the two hydraulic rods 305 on the positioning plate 106 to retract, and the hydraulic rods 305 drive the auxiliary frame 303, the mounting seat 306 and the connecting rod 307 to move in the direction away from the storage bin 201. During this process, the connecting rod 307 is deflected under the action of the auxiliary frame 303, and under the action of the connecting rod 307, the degree of opening of the discharge plate 205 is increased. At the same time, the controller controls the two hydraulic rods 305 on the positioning plate 106 on the other side to retract. Similarly, without further elaboration here, the degree of opening of the discharge plate 205 on the other side of the storage bin 201 is increased, thereby increasing the opening of the discharge plates 205 on both sides of the storage bin 201, that is, the amount of material falling increases.

[0037] like Figures 4 to 7 As shown, the vibrating assembly 4 includes a fixed plate 401, and a first hydraulic lifting column 402 is arranged below the fixed plate 401. The first hydraulic lifting column 402 is arranged to adjust the distance between the vibrating frame 403 and the slope surface. The vibrating frame 403 is arranged at the end of the first hydraulic lifting column 402 away from the fixed plate 401, and a vibrating rod 404 and a vibrating motor 405 are respectively arranged on both sides of the vibrating frame 403. The output end of the vibrating motor 405 is connected to the vibrating rod 404 through a hose. A vibrating scraper 407 is arranged on one side of the vibrating frame 403, and a second hydraulic lifting column 406 is arranged at the end of the vibrating scraper 407 close to the fixed plate 401. The second hydraulic lifting column 406 is arranged to adjust the distance between the vibrating scraper 407 and the slope surface, and the end of the second hydraulic lifting column 406 away from the vibrating scraper 407 is connected to the fixed plate 401.

[0038] Tracks 410 are provided on both sides of the fixed plate 401, and a ball screw 409 is provided inside the track 410. A nut seat 408 is provided on the surface of the ball screw 409, and the end of the nut seat 408 away from the track 410 is connected to the fixed plate 401. A rotating motor 411 is provided at one end of the track 410, and the output shaft of the rotating motor 411 is connected to the ball screw 409.

[0039] During the paving process, the two discharge plates 205 of the storage bin 201 are in a closed state in the initial state. Then, due to different slopes, the pouring speed of the concrete material is also different. If the pouring speed of the concrete material is too fast, it will lead to excessive bubbles in the concrete, uneven distribution of cement particles and other problems. If the pouring speed of the concrete material is too slow, it will lead to concrete stratification, cracking and other problems. In order to ensure the quality of concrete pouring, the opening size of the two discharge plates 205 on the storage bin 201 is adjusted according to the different slopes of the slope protection, thereby adjusting the pouring speed. In addition, since the material is easily accumulated in the middle position during discharge and less on both sides, the material falls unevenly, causing material separation and easily generating gaps between the materials. After solidification for a period of time, the material is unevenly spread, resulting in poor paving surface quality, affecting the normal progress of slope protection construction, specifically: First, the opening size between the two discharge plates 205 on the storage bin 201 is adjusted according to different slopes, that is, the controller controls the two hydraulic rods 305 on the positioning plate 106 to retract, and the hydraulic rods 305 drive the auxiliary frame 303, the mounting seat 306 and the connecting rod 307 to move in the direction away from the storage bin 201. During this process, the connecting rod 307 is deflected under the action of the auxiliary frame 303, and under the action of the connecting rod 307, the opening degree of the discharge plate 205 is increased. At the same time, the controller controls the two hydraulic rods 305 on the positioning plate 106 on the other side to retract. Similarly, no further details will be given here, so that the opening degree of the discharge plate 205 on the other side of the storage bin 201 is increased, thereby enlarging the opening of the discharge plates 205 on both sides of the storage bin 201, thereby realizing the adjustment of the opening size of the two discharge plates 205, thereby adjusting the pouring speed.

[0040] At the same time, when the auxiliary frame 303 moves in the direction away from the storage bin 201, the auxiliary frame 303 drives the limiting slide bar 302 and the sieve plate 301 to move together, thereby changing the position of the sieve plate 301 and shortening the distance between the sieve plate 301 and the slope surface. That is, the impact force of the concrete material on the slope surface is reduced after being buffered by the sieve plate 301, thereby preventing the concrete material on the slope surface from sliding downward along the slope surface and causing accumulation.

[0041] During the paving and discharging process, the concrete material in the storage bin 201 stirred by the stirring paddle 202 flows out through the discharge plate 205, and the controller controls the reciprocating motion of the cylinder 304, and the cylinder 304 drives the screen plate 301 to slide back and forth on the limit slide bar 302. During this process, the dividing plate 3011 on the screen plate 301 collides with the falling material to disperse the concrete material, so that the concrete material is evenly poured on the slope surface, which effectively solves the problem that the material is easily accumulated in the middle position during discharging, with less on both sides, and the material falls unevenly, thereby causing material separation and easy gaps between the materials. After solidification for a period of time, the material is unevenly spread, resulting in poor paving surface quality and affecting the normal progress of slope protection construction.

[0042] Since the rack 101 is tilted, the material on the slope is easily caused to slide down due to the action of gravity and the fluidity of the concrete material itself during unloading. The material at the high place is easy to slide down to the low place, causing material accumulation at one end of the rack 101, resulting in inconsistent thickness of the poured concrete on the slope. To solve this problem, a distance sensor is set inside the rack 101 to detect the thickness of the poured concrete on the slope. The position of the distance sensor corresponds to the position of the storage bin 201, that is, each storage bin 201 has a separate distance sensor for detection. For example, there are three storage bins 201 on the rack 101, thereby dividing the rack 101 into three areas. Each storage bin 201 has a corresponding pouring slope section, and a distance sensor is set up separately to detect the pouring thickness of the concrete material on the slope section. The pouring thickness calculated according to the discharge amount of the storage bin 201 in different time periods is called the standard value. The thickness of the slope after pouring detected by the distance sensor in real time is called the detection value. By comparing the detection value with the corresponding standard value, it is determined whether the slope section has slumped.

[0043] For the convenience of description, the slope sections from the lowest point to the highest point of the frame 101 are respectively referred to as the bottom slope section, the middle slope section, and the top slope section. During the pouring process, the pouring thickness of the concrete material on these three slope sections is compared in real time. For example, the following is provided: When the detection value of the middle slope section is greater than the corresponding standard value, and the detection value of the top slope section is less than the corresponding standard value, it means that the concrete material on the top slope section slides down due to gravity, causing the material to accumulate in the middle slope section. At this time, the controller controls the cylinder 304 and accelerates the reciprocating speed of the sieve plate 301 driven by the cylinder 304. The dividing plate 3011 on the sieve plate 301 collides with the falling material to disperse the concrete material, thereby accelerating the sieve plate 301 to disperse the falling material, thereby dispersing the impact force of the material on the slope surface, avoiding the large gravity impact force in the middle of the slope surface, aggravating the concrete material on the slope surface to slide down along the slope surface, thereby causing accumulation and affecting the paving quality. At the same time, the sieve plate 301 cushions the falling material, thereby reducing the impact force of the concrete material on the slope surface, thereby reducing the degree of sliding of the concrete material on the top slope section, and improving the uniformity of pouring.

[0044] In order to improve the effect, the controller controls the extension of the hydraulic rod 305 located on the left side of the positioning plate 106 in the top slope area (see Figure 11), and at the same time, the controller controls the hydraulic rod 305 on the right side of the positioning plate 106 to contract, so that the auxiliary frame 303 rotates around the position where it is hinged to the mounting seat 306. At this time, the tilting direction of the auxiliary frame 303 is opposite to the tilting direction of the frame 101, that is, the left side of the auxiliary frame 303 is higher than the right side, that is, the tilting state of the sieve plate 301 is consistent with that of the auxiliary frame 303, so that part of the material falls along the sieve plate 301 when falling, thereby slowing down the sliding degree of the material in the top slope section and avoiding too little pouring thickness of the material in the top slope section.

[0045] In addition, the controller can also control the cylinder 304 so that the movement direction of the sieve plate 301 in the top slope section area is opposite to the movement direction of the sieve plate 301 in the middle slope section area, so that the impact areas of the concrete materials in the top slope section and the middle slope section on the slope surface are staggered, thereby reducing the gravitational impact of the materials on the slope surface and slowing down the degree of decline of the materials in the top slope section.

[0046] At this time, in order to avoid the pouring thickness of the middle slope section being too high or the middle slope section sliding down, the controller controls and reduces the opening size between the two discharge plates 205 on the storage bin 201 in the middle slope section area. Specifically, the controller controls the two hydraulic rods 305 on the positioning plate 106 to extend, and the hydraulic rods 305 drive the auxiliary frame 303, the mounting seat 306 and the connecting rod 307 to move in the direction close to the storage bin 201. In this process, the connecting rod 307 is deflected under the action of the auxiliary frame 303, and under the action of the connecting rod 307, the opening degree of the discharge plate 205 is reduced. At the same time, the controller controls the two hydraulic rods 305 on the positioning plate 106 on the other side to extend. Similarly, without going into details here, the opening degree of the discharge plate 205 on the other side of the storage bin 201 is reduced, thereby reducing the opening of the discharge plates 205 on both sides of the storage bin 201, reducing the amount of material discharged, and realizing thickness compensation for the middle slope section.

[0047] After the above operations, when the paving thickness reaches the slope protection construction requirement, the vibration operation is then carried out. First, the rotating motor 411 is started, and the rotating motor 411 drives the ball screw 409 to rotate together. Under the action of the ball screw 409, the nut seat 408 moves along the track groove on the track 410. During this process, the nut seat 408 drives the fixed plate 401 to move to the initial vibration position, and then the controller controls the first hydraulic lifting column 402 to extend, and the first hydraulic lifting column 402 pushes the vibration frame 403 to move toward the direction close to the slope surface. At the same time, the controller starts the vibration motor 405, so that the vibration rod 404 is inserted into the concrete material and vibrates it, reducing bubbles in the concrete and avoiding honeycomb surface when the concrete solidifies, so as to realize timely vibration of the poured concrete and ensure the density inside the concrete. After the vibration of this position is completed, the controller controls the first hydraulic lifting column 402 to retract, and the first hydraulic lifting column 402 retracts. The lifting column 402 drives the vibrating frame 403 to move away from the slope, thereby separating the vibrating rod 404 from the concrete surface, and then by starting the rotating motor 411, the rotating motor 411 drives the ball screw 409 to rotate together. Under the action of the ball screw 409, the nut seat 408 drives the fixing plate 401 to move to the next position. At this time, the vibrating scraper 407 is above the position where the vibrating rod 404 has completed vibration. Then the controller controls the second hydraulic lifting column to extend 406, and the second hydraulic lifting column extends 406 to push the vibrating scraper 407 to move towards the slope and contact the vibrated concrete surface, and then vibrate the surface concrete, thereby improving the flatness of the slope surface and improving the density of the concrete surface. Repeat the above operation, with the cooperation of the vibrating rod 404 and the vibrating scraper 407, the overall density and strength of the poured concrete are enhanced, thereby ensuring the quality of the slope protection construction.

[0048] By arranging multiple storage bins 201 on the frame 101, it is possible to simultaneously discharge and spread materials at different positions on the frame 101. By arranging the auxiliary adjustment component 3, the discharge amount of concrete materials in the storage bin 201 can be adjusted, and the concrete materials can be dispersed so that they are evenly spread. The feeding component 5 can provide materials to the corresponding storage bin 201 in a timely manner, thereby improving the spreading efficiency. After the spreading is completed, the surface of the slope protection is vibrated, compacted and leveled in time with the cooperation of the vibrating rod 404 and the vibrating scraper 407, thereby enhancing the overall density and strength of the poured concrete and ensuring the quality of the slope protection construction. Through the integrated design of the construction component 1, the discharge component 2, the auxiliary adjustment component 3 and the vibrating component 4, laying, vibration compaction and preliminary leveling are realized, thereby improving the efficiency of the construction process.

[0049] The present invention also provides a method for constructing a river bank protection, and the specific construction method steps are as follows: S1. First, the construction component 1 is moved to the construction location and adjusted according to the slope of the slope to be built to ensure that the concrete material can be evenly spread on the slope surface. Preparations before construction are completed; S2, then the concrete material is transported to the storage bin 201 on the unloading component 2 by the feeding component 5, and the concrete material in the storage bin 201 is transported to the frame 101 through the discharge plate 205 for paving; S3. Finally, the paved concrete material is vibrated by the vibrating assembly 4 to make the concrete densely combined and improve the construction strength of the slope protection.

[0050] It should be noted that, in this document, relational terms such as first and second, etc., are used only to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any actual relationship or order between these entities or operations. Moreover, the terms "comprises," "comprising," or any other variations thereof are intended to cover non-exclusive inclusion, such that a process, method, article, or apparatus that includes a list of elements includes not only those elements but also other elements not explicitly listed, or elements inherent to such process, method, article, or apparatus.

[0051] While embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions, and variations may be made to these embodiments without departing from the principles and spirit of the invention, and that the scope of the invention is defined by the appended claims and their equivalents.

Claims

1. A river bank protection construction device, comprising a construction component (1), a material discharge component (2), a vibration component (4) and a material feeding component (5), characterized in that: The construction component (1) comprises a frame (101), a plurality of material discharge components (2) are arranged above the frame (101), an auxiliary adjustment component (3) is arranged below the material discharge component (2), the auxiliary adjustment component (3) is arranged inside the frame (101), a material feeding component (5) is arranged above the material discharge component (2), and a vibrating component (4) is arranged inside the frame (101); The material unloading assembly (2) comprises a material storage bin (201), the material storage bin (201) being arranged above the frame (101), a rotating frame (204) being arranged on both sides of the material storage bin (201), and a discharge plate (205) being arranged at one end of the material storage bin (201) away from the rotating frame (204); The auxiliary adjustment component (3) comprises a sieve plate (301), the sieve plate (301) is arranged below the storage bin (201), a cylinder (304) is arranged on one side of the sieve plate (301), a limit slide bar (302) is arranged on the sieve plate (301), both ends of the limit slide bar (302) are provided with auxiliary frames (303), a mounting seat (306) is hingedly connected to the surface of the auxiliary frame (303), a connecting rod (307) is hingedly connected to one end of the mounting seat (306) away from the auxiliary frame (303), and one end of the connecting rod (307) away from the mounting seat (306) is hingedly connected to the discharge plate (205); A distance sensor is arranged inside the frame (101).

2. The river bank protection construction device according to claim 1 is characterized in that: A stirring paddle (202) is arranged inside the material storage bin (201), a stirring motor (203) is arranged on one side of the material storage bin (201), an output shaft of the stirring motor (203) is connected to the stirring paddle (202), and a rotating groove is provided at a position where the stirring motor (203) is connected to the material storage bin (201).

3. The river bank protection construction device according to claim 1 is characterized in that: A material dividing plate (3011) is provided in the middle of the surface of the sieve plate (301), and a plurality of material discharge grooves are provided on the surface of the sieve plate (301); There are two limit sliding bars (302), and the two limit sliding bars (302) are respectively arranged on both sides of the sieve plate (301). The limit sliding bars (302) penetrate the sieve plate (301) and extend to the inside of the auxiliary frame (303).

4. The river bank protection construction device according to claim 1 is characterized in that: A positioning plate (106) is provided on the inner wall of the frame (101), and the positioning plate (106) is arranged between the auxiliary frame (303) and the frame (101). Hydraulic rods (305) are provided at both ends of the positioning plate (106), and one end of the hydraulic rod (305) away from the positioning plate (106) is hinged to the auxiliary frame (303).

5. The river bank protection construction device according to claim 1 is characterized in that: Both ends of the frame (101) are provided with mounting frames (102); one end of the mounting frame (102) away from the frame (101) is provided with a slope adjustment mechanism (103); one end of the slope adjustment mechanism (103) away from the mounting frame (102) is provided with a support plate (104); and a crawler walking mechanism (105) is provided below the support plate (104).

6. The river bank protection construction device according to claim 1, characterized in that: The vibrating assembly (4) comprises a fixed plate (401), a first hydraulic lifting column (402) is arranged below the fixed plate (401), a vibrating frame (403) is arranged at one end of the first hydraulic lifting column (402) away from the fixed plate (401), a vibrating rod (404) and a vibrating motor (405) are respectively arranged on both sides of the vibrating frame (403), and an output end of the vibrating motor (405) is connected to the vibrating rod (404) via a hose.

7. The river bank protection construction device according to claim 6 is characterized in that: A vibrating scraper (407) is provided on one side of the vibrating frame (403); a second hydraulic lifting column (406) is provided at one end of the vibrating scraper (407) close to the fixed plate (401); and an end of the second hydraulic lifting column (406) away from the vibrating scraper (407) is connected to the fixed plate (401).

8. The river bank protection and construction device according to claim 6, characterized in that: Tracks (410) are arranged on both sides of the fixed plate (401), a ball screw (409) is arranged inside the track (410), a nut seat (408) is arranged on the surface of the ball screw (409), one end of the nut seat (408) away from the track (410) is connected to the fixed plate (401), and a rotating motor (411) is arranged at one end of the track (410), and an output shaft of the rotating motor (411) is connected to the ball screw (409).

9. The river bank protection construction device according to claim 1, characterized in that: The feeding assembly (5) comprises a screw conveyor body (501), wherein the screw conveyor body (501) is arranged at the top of the storage bin (201) via a support frame, a hopper (502) is arranged at one end of the screw conveyor body (501), a feeding pipe (503) is arranged on the surface of the screw conveyor body (501), and an end of the feeding pipe (503) away from the screw conveyor body (501) is connected to the storage bin (201).

10. A method for constructing a river bank protection, the method being implemented by using the river bank protection construction device according to claim 1, characterized in that: The specific construction steps are as follows: S1. First, the construction component (1) is moved to the construction location and adjusted according to the slope of the slope to be constructed to ensure that the concrete material can be evenly spread on the slope surface. The preparation before construction is completed; S2, then the concrete material is transported to the storage bin (201) on the unloading component (2) through the feeding component (5), and the concrete material in the storage bin (201) is transported to the frame (101) through the discharge plate (205) for paving; S3. Finally, the paved concrete material is vibrated by a vibrating assembly (4) to make the concrete densely bonded and improve the construction strength of the slope protection.

Citation Information

Patent Citations

  • Slope protection building machinery for gardens, roads and river channels

    CN106677130A

  • River channel slope protection building device

    CN116122222A