Arch type structure for protecting current underground traffic structures and construction method
By adopting an arch structure in the current underground transportation structure, combined with the design of plate arches, ground beams and tensioners, the problems of high transportation costs and difficulty in maintenance of traditional prefabricated beam structures are solved, and the high durability and convenience of the structure are achieved Maintenance, adapt to various span changes, and improves the entire life cycle.
Patent Information
- Application Number
- CN202411002489.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-25
- Publication Date
- 2024-11-05
AI Technical Summary
Current situation: underground transportation structures lack effective protection facilities during operation, traditional prefabricated beam structures are costly and difficult to maintain, and due to the influence of soil, they do not have the conditions to erect a bracket, which makes the structure durability difficult to ensure.
The arch structure is adopted, including plate arches, ground beams, tensioning parts and pile foundations. By constructing pile foundations in parallel underground, installing embedded plates and steel bars, pouring concrete, combining tensioning technology to form an arch structure to provide maintenance channels. , optimize internal force and bending moment to improve structural durability.
It realizes high durability and convenient maintenance of the structure, reduces transportation and construction costs, adapts to various span changes, and improves the entire life cycle.
Smart Images

Figure CN118895786A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of building structures, and relates to an arch structure and a construction method for protecting existing underground traffic structures. Background Art
[0002] With the demand for transportation in urban development, a large number of subways and underground tunnels have been put into construction and operation. Due to the continuous updating and improvement of urban planning, many existing subways and underground tunnels overlap with new projects. The design of the existing traffic structure did not take into account the impact of the new project above on its structural safety during operation. In order to reduce the impact on the existing traffic structures, it is necessary to set up protection facilities for the existing underground structures. When the protection facilities are located below the ground, piles, ground beams and beam-consolidated frame structures are often used. However, they do not have the conditions for maintenance and overhaul during the operation stage, which has a great impact on the entire life cycle. In addition, due to the influence of the soil, the conditions for setting up scaffolding are not available, so bored piles + prefabricated beams are often used.
[0003] The use of traditional prefabricated beam structures not only has high transportation costs, but also has no conditions for maintenance after completion, and its durability is difficult to guarantee. Summary of the invention
[0004] The purpose of the present invention is to provide an arch structure and construction method for protecting existing underground transportation structures, which can be flexibly applied to various underground structure protection structures, has a simple structure, and can adapt to a variety of span changes.
[0005] The purpose of the present invention can be achieved by the following technical solutions:
[0006] The first aspect of the present invention provides an arch structure for protecting existing underground transportation structures, which is buried underground and located between existing underground facilities and planned ground facilities.
[0007] The arch structure includes a plate arch, ground tie beams respectively arranged at both ends of the plate arch, tension members connected between the ground tie beams on both sides, and pile foundations respectively arranged under the ground tie beams on both sides; the tension members are plate arch steel tie beams or cable tie rods.
[0008] Furthermore, when the tensioning member is a plate-arch steel tie beam, a connecting plate and an embedded plate are provided at both ends of the plate-arch steel tie beam in sequence, and the embedded plate is embedded in the ground tie beam.
[0009] Furthermore, when the tensioning member is a cable tie rod, the cable tie rod includes a cable and a connecting rod and an embedded ear plate which are respectively arranged at both ends of the cable in sequence, and the embedded ear plate is embedded in the ground tie beam.
[0010] Furthermore, there are a plurality of pile foundations, which are arranged in parallel along the length direction of the ground tie beam; there are a plurality of tension members, which are arranged in parallel along the length direction of the ground tie beam.
[0011] Furthermore, the inner side of the ground tie beam is connected to the end of the plate arch, and a slat is provided on the outer side.
[0012] Furthermore, the pile foundations are arranged on both sides of the existing underground facilities.
[0013] Furthermore, a cavity is provided below the plate arch, and the tensioning member is provided in the cavity.
[0014] The second aspect of the present invention provides a construction method for an arch structure for protecting an existing underground transportation structure.
[0015] When the tension member is a plate-arch steel tie beam, and the two ends of the plate-arch steel tie beam are respectively provided with a connecting plate and an embedded plate,
[0016] The construction method includes the following steps:
[0017] S1: construct pile foundations in parallel underground;
[0018] S2: Install the embedded plates at both ends of the plate arch steel tie beam on the top of the pile foundation;
[0019] S3: Set up plate arch supports and ground tie beam supports on the top of the pile foundation;
[0020] S4: tying the plate arch steel bars and the ground tie beam steel bars in the plate arch support and the ground tie beam support, and connecting the plate arch steel bars and the ground tie beam steel bars with the embedded plate, and then integrally casting in situ to obtain the plate arch and the ground tie beam connected with the pile foundation and the plate arch steel tie beam;
[0021] S5: tensioning the plate-arch steel tie beam, removing the plate-arch support and the ground tie beam support, and obtaining the arch structure.
[0022] A third aspect of the present invention provides a construction method for an arch structure for protecting existing underground transportation structures.
[0023] When the tension member is a plate-arch steel tie beam, and the two ends of the plate-arch steel tie beam are respectively provided with a connecting plate and an embedded plate,
[0024] The construction method includes the following steps:
[0025] S1: construct pile foundations in parallel underground;
[0026] S2: Install the embedded plates at both ends of the plate arch steel tie beam on the top of the pile foundation;
[0027] S3: Set up plate arch supports and ground tie beam supports on the top of the pile foundation;
[0028] S4: In the plate arch support, the prefabricated plate arch is installed on the pile foundation;
[0029] S5: tying the ground tie beam steel bars in the ground tie beam bracket, and connecting the ground tie beam steel bars with the embedded slab, and then casting the wet joints between the ground tie beam steel bars and the slab arch and pile foundation, so as to obtain the ground tie beam that is installed and connected with the pile foundation, the slab arch, and the slab arch steel tie beam;
[0030] S6: tensioning the plate-arch steel tie beam, removing the plate-arch support and the ground tie beam support, and obtaining the arch structure.
[0031] A fourth aspect of the present invention provides a construction method for an arch structure for protecting existing underground transportation structures.
[0032] When the tensioning member is a cable tie rod, and the two ends of the cable tie rod are respectively provided with a connecting rod and a pre-buried ear plate,
[0033] The construction method includes the following steps:
[0034] S1: construct pile foundations in parallel underground;
[0035] S2: Install the embedded lugs at both ends of the cable tie rod on the top of the pile foundation;
[0036] S3: Set up plate arch supports and ground tie beam supports on the top of the pile foundation;
[0037] S4: tying the plate arch steel bars and the ground tie beam steel bars in the plate arch support and the ground tie beam support, and connecting the plate arch steel bars and the ground tie beam steel bars with the embedded ear plates, and then casting to obtain the plate arch steel tie beam and the ground tie beam which are installed and connected with the pile foundation and the cable tie rod;
[0038] S6: tensioning the cable tie rods, removing the plate arch support and the ground tie beam support, and obtaining the arch structure.
[0039] Compared with the prior art, the present invention has the following beneficial effects:
[0040] 1) The present invention has a simple structure and is easy to construct. It can be cast in situ as a whole, or a cast-in-situ + prefabricated construction scheme can be adopted, which is more adaptable to various scenarios;
[0041] 2) The present invention can optimize the bending moment of the pile top and the arch foot by controlling the internal force of the slab arch tie beam, ensure that the entire cross-section of the concrete is compressed under constant load, and improve the durability of the structure.
[0042] 3) After the structure of the present invention is completed, the interior is a hollow structure, which can be used as a maintenance passage during the operation period, thereby improving the entire life cycle of the structure. BRIEF DESCRIPTION OF THE DRAWINGS
[0043] Figure 1 It is a structural schematic diagram of an arch structure for protecting an existing underground transportation structure in Example 1;
[0044] Figure 2It is a schematic diagram of underground assembly of an arch structure for protecting existing underground transportation structures in Example 1;
[0045] Figure 3 It is a structural diagram of a plate-arch steel tie beam;
[0046] Figure 4 It is a schematic diagram of underground assembly of an arch structure for protecting existing underground transportation structures in Example 3;
[0047] Figure 5 It is a structural schematic diagram of the embedded ear plate;
[0048] Figure 6 It is a schematic diagram of the structure of the cable tie;
[0049] Description of the markings in the figure:
[0050] 1. Plate arch; 2. Plate arch steel tie beam; 3. Pile foundation; 4. Ground tie beam; 5. Ladder plate; 6. Plate arch cable tie rod; 7. Embedded ear plate; 8. Existing underground facilities; 9. Ground facilities. DETAILED DESCRIPTION
[0051] The present invention is described in detail below in conjunction with the accompanying drawings and specific embodiments. The following embodiments are implemented based on the above technical solution of the present invention, and provide detailed implementation methods and specific operation processes, but the protection scope of the present invention is not limited to the following embodiments.
[0052] It should be noted that similar reference numerals and letters denote similar items in the following drawings, and therefore, once an item is defined in one drawing, further definition and explanation thereof is not required in subsequent drawings.
[0053] In conjunction with the accompanying drawings, some embodiments of the present invention are described in detail below. In the absence of conflict, the following embodiments and features in the embodiments may be combined with each other.
[0054] Embodiment 1:
[0055] An arch structure for protecting existing underground transportation structures is buried underground and located between existing underground facilities 8 and ground facilities 9; the arch structure includes a plate arch 1, ground tie beams 4 respectively arranged at both ends of the plate arch 1, tension members connected between the ground tie beams 4 on both sides, and pile foundations 3 respectively arranged under the ground tie beams 4 on both sides.
[0056] In this embodiment, the tensioning member is a plate-arch steel tie beam 2 , and a connecting plate and an embedded plate are provided at both ends of the plate-arch steel tie beam 2 in sequence, and the embedded plate is buried in the ground tie beam 4 .
[0057] There are multiple pile foundations 3 and tension members, respectively, and they are arranged in parallel along the length direction of the ground tie beam 4. Preferably, the pile foundation 3 and the tension member are arranged correspondingly, that is, a pile foundation 3 is respectively arranged at both ends of the tension member. The inner side of the ground tie beam 4 is connected to the end of the plate arch 1, and a slat 5 is arranged on the outer side.
[0058] The pile foundations 3 are arranged on both sides of the existing underground facilities 8 .
[0059] A cavity is provided under the plate arch 1, and the tensioning member is arranged in the cavity. At the same time, the cavity can be used as a maintenance passage during operation, realizing a full-life design that is accessible, inspectable, and repairable, thereby improving the full life cycle of the structure.
[0060] An integral cast-in-place construction method for an arch structure for protecting an existing underground transportation structure comprises the following steps:
[0061] S1: construct pile foundation 3 in parallel underground;
[0062] S2: Install the embedded plates at both ends of the plate-arch steel tie beam 2 on the top of the pile foundation 3; wherein the plate-arch steel tie beam 2 is processed in the factory and transported to the site as a whole;
[0063] S3: Set up a plate arch support and a ground tie beam support at the top of pile foundation 3;
[0064] S4: tying the plate arch steel bars and the ground tie beam steel bars in the plate arch support and the ground tie beam support, and connecting the plate arch steel bars and the ground tie beam steel bars with the embedded plate, and then integrally casting in situ to obtain the plate arch 1 and the ground tie beam 4 which are installed and connected with the pile foundation 3 and the plate arch steel tie beam 2;
[0065] S5: Tensioned plate arch steel tie beam 2, optimizes the bending moment at the pile top and arch foot, ensures that the entire concrete section is compressed under constant load, and improves the durability of the structure;
[0066] S6: Remove the plate-arch support and the ground-beam support to obtain the arch structure, and construct the slab 5 and the soil covering on the arch and the ground facilities 9.
[0067] Embodiment 2:
[0068] An arch structure for protecting existing underground transportation structures, same as Example 1.
[0069] The equal-thickness prefabrication construction method of the arch structure comprises the following steps:
[0070] S1: construct pile foundation 3 in parallel underground;
[0071] S2: Install the embedded plates at both ends of the plate-arch steel tie beam 2 on the top of the pile foundation 3; wherein the plate-arch steel tie beam 2 is processed in the factory and transported to the site as a whole;
[0072] S3: Set up a plate arch support and a ground tie beam support at the top of pile foundation 3;
[0073] S4: In the plate arch support, the prefabricated plate arch 1 is installed on the pile foundation 3;
[0074] S5: tying the ground tie beam steel bars in the ground tie beam bracket, and connecting the ground tie beam steel bars with the embedded plate, and then casting the wet joints between the ground tie beam steel bars and the plate arch 1 and the pile foundation 3, so as to obtain the ground tie beam 4 which is installed and connected with the pile foundation 3, the plate arch 1 and the plate arch steel tie beam 2;
[0075] S6: Tensioned plate-arch steel tie beam 2 optimizes the bending moment at the pile top and arch foot, ensures that the entire concrete section is compressed under constant load, and improves the durability of the structure.
[0076] S7: Remove the plate-arch support and the ground-beam support to obtain the arch structure, and construct the slab 5 and the soil covering on the arch and the ground facilities 9.
[0077] Embodiment 3:
[0078] An arch structure for protecting existing underground traffic structures, which differs from Example 1 only in that the tensioning member is a cable tie rod 6, which includes a cable and a connecting rod and an embedded ear plate 7 respectively arranged at both ends of the cable, and the embedded ear plate 7 is buried in the ground tie beam 4.
[0079] The rest is the same as in Example 1.
[0080] A construction method for protecting an arch structure of an existing underground transportation structure comprises the following steps:
[0081] S1: construct pile foundation 3 in parallel underground;
[0082] S2: Install the embedded ear plates 7 at both ends of the cable tie rod 6 on the top of the pile foundation 3;
[0083] S3: Set up a plate arch support and a ground tie beam support at the top of pile foundation 3;
[0084] S4: tying the plate arch steel bars and the ground tie beam steel bars in the plate arch support and the ground tie beam support, and connecting the plate arch steel bars and the ground tie beam steel bars with the embedded ear plates 7, and then casting the plate arch steel tie beam 2 and the ground tie beam 4 which are installed and connected with the pile foundation 3 and the cable tie rod 6;
[0085] S6: tensioning cable tie rod 6, optimizing the bending moment at the pile top and arch foot, ensuring that the entire concrete section is compressed under constant load, and improving the durability of the structure;
[0086] S7: Remove the plate-arch support and the ground-beam support to obtain the arch structure, and construct the slab 5 and the soil covering on the arch and the ground facilities 9.
[0087] The above description of the embodiments is to facilitate the understanding and use of the invention by those skilled in the art. It is obvious that those skilled in the art can easily make various modifications to these embodiments and apply the general principles described herein to other embodiments without creative work. Therefore, the present invention is not limited to the above embodiments, and improvements and modifications made by those skilled in the art based on the disclosure of the present invention without departing from the scope of the present invention should be within the scope of protection of the present invention.
Claims
1. An arch structure for protecting existing underground transportation structures, characterized in that: The arch structure is buried underground and is located between the existing underground facilities (8) and the planned ground facilities (9); The arch structure comprises a plate arch (1), ground tie beams (4) respectively arranged at both ends of the plate arch (1), tension members connected between the ground tie beams (4) on both sides, and pile foundations (3) respectively arranged below the ground tie beams (4) on both sides; the tension members are plate arch steel tie beams (2) or cable tie rods (6).
2. The arch structure for protecting the existing underground transportation structure according to claim 1 is characterized in that: When the tensioning member is a plate-arch steel tie beam (2), a connecting plate and an embedded plate are respectively provided at both ends of the plate-arch steel tie beam (2), and the embedded plate is embedded in the ground tie beam (4).
3. The arch structure for protecting the existing underground transportation structure according to claim 1, characterized in that: When the tensioning member is a cable tie rod (6), the cable tie rod (6) comprises a cable and a connecting rod and a pre-embedded ear plate (7) respectively arranged at both ends of the cable, and the pre-embedded ear plate (7) is embedded in the ground tie beam (4).
4. The arch structure for protecting the existing underground transportation structure according to claim 1, characterized in that: A plurality of pile foundations (3) are provided and arranged in parallel along the length direction of the ground tie beam (4); a plurality of tensioning members are provided and arranged in parallel along the length direction of the ground tie beam (4).
5. The arch structure for protecting the existing underground transportation structure according to claim 1, characterized in that: The inner side of the ground tie beam (4) is connected to the end of the plate arch (1), and a buttress plate (5) is provided on the outer side.
6. The arch structure for protecting the existing underground transportation structure according to claim 1, characterized in that: The pile foundations (3) are arranged on both sides of the existing underground facilities (8).
7. The arch structure for protecting existing underground transportation structures according to claim 1, characterized in that: A cavity is provided below the plate arch (1), and the tensioning member is arranged in the cavity.
8. A construction method of the arch structure according to any one of claims 1 to 7, characterized in that: When the tensioning member is a plate-arch steel tie beam (2), and the two ends of the plate-arch steel tie beam (2) are respectively provided with a connecting plate and an embedded plate in sequence, The construction method includes the following steps: S1: construct pile foundations (3) in parallel underground; S2: Install the embedded plates at both ends of the plate arch steel tie beam (2) on the top of the pile foundation (3); S3: erecting a plate arch support and a ground tie beam support at the top of the pile foundation (3); S4: tying the plate arch steel bars and the ground tie beam steel bars in the plate arch support and the ground tie beam support, and connecting the plate arch steel bars and the ground tie beam steel bars with the embedded plate, and then integrally casting in situ to obtain the plate arch (1) and the ground tie beam (4) which are installed and connected with the pile foundation (3) and the plate arch steel tie beam (2); S5: tensioning the plate arch steel tie beam (2), removing the plate arch support and the ground tie beam support, and obtaining the arch structure.
9. A construction method of the arch structure according to any one of claims 1 to 7, characterized in that: When the tensioning member is a plate-arch steel tie beam (2), and the two ends of the plate-arch steel tie beam (2) are respectively provided with a connecting plate and an embedded plate in sequence, The construction method includes the following steps: S1: construct pile foundations (3) in parallel underground; S2: Install the embedded plates at both ends of the plate arch steel tie beam (2) on the top of the pile foundation (3); S3: erecting a plate arch support and a ground tie beam support at the top of the pile foundation (3); S4: In the plate arch support, the prefabricated plate arch (1) is installed on the pile foundation (3); S5: tying the ground tie beam steel bars in the ground tie beam bracket and connecting the ground tie beam steel bars with the embedded slab, then casting the wet joints between the ground tie beam steel bars and the slab arch (1) and the pile foundation (3), thereby obtaining a ground tie beam (4) that is installed and connected with the pile foundation (3), the slab arch (1) and the slab arch steel tie beam (2); S6: tensioning the plate arch steel tie beam (2), removing the plate arch support and the ground tie beam support, and obtaining the arch structure.
10. A construction method of the arch structure according to any one of claims 1 to 7, characterized in that: When the tensioning member is a cable tie rod (6), and the two ends of the cable tie rod (6) are respectively provided with a connecting rod and a pre-buried ear plate (7), The construction method includes the following steps: S1: construct pile foundations (3) in parallel underground; S2: Install the embedded ear plates (7) at both ends of the cable tie rod (6) on the top of the pile foundation (3); S3: erecting a plate arch support and a ground tie beam support at the top of the pile foundation (3); S4: tying the plate arch steel bars and the ground tie beam steel bars in the plate arch support and the ground tie beam support, and connecting the plate arch steel bars and the ground tie beam steel bars with the embedded ear plates (7), and then casting to obtain the plate arch steel tie beam (2) and the ground tie beam (4) which are installed and connected with the pile foundation (3) and the cable tie rod (6); S6: tensioning the cable tie rod (6), removing the plate arch support and the ground tie beam support, and obtaining the arch structure.
