Anti-floating anchor rod construction method

In the construction of anti-floating anchor rods, the prestressing application and anchoring ends are arranged concealedly after the raft foundation is completed, the problem of long construction cycle is solved and the effect of rapid construction is achieved.

CN118895789AActive Publication Date: 2024-11-05SHANGHAI CONSTRUCTION FIRST CONSTRUCTION (GROUP) CO LTD

Patent Information

Application Number
CN202411197014.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-29
Publication Date
2024-11-05
Estimated Expiration
2044-08-29

AI Technical Summary

Technical Problem

The existing anti-floating anchor bolt construction methods have a long construction cycle and are not suitable for projects with tight construction periods or rapid construction.

Method used

The prestressing application of the anti-floating anchor rod and the anchor end are arranged concealed after the raft foundation is completed and the underground structure is demolded to avoid occupying key lines and shorten the construction cycle.

Benefits of technology

It effectively shortens the construction cycle of anti-floating anchor rods and is suitable for projects where the construction period is tight or the raft foundation needs to be formed quickly.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118895789A_ABST
    Figure CN118895789A_ABST
Patent Text Reader

Abstract

According to the anti-floating anchor rod construction method, prestress application of the anti-floating anchor rod and the anchoring end of the anti-floating anchor rod are arranged in a hidden mode after raft foundation construction is completed and an underground structure is demoulded, and key lines are not occupied; and anchor rod pile body maintenance and prestress application are transferred from a key line to a non-key line), so that the construction speed is effectively increased, and the method is suitable for projects which are tight in construction period or need to rapidly form raft foundations.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of building construction, and in particular to an anti-floating anchor rod construction method. Background Art

[0002] In order to save costs, construction projects usually use anti-floating anchor rods to replace conventional anti-pull engineering piles in underground structures. Anti-floating anchor rods are a kind of anti-floating measure for underground structures in construction projects. The implementation is economical, but the use of anti-floating anchor rods also has certain disadvantages. Improper construction can easily cause leakage of the raft foundation. Therefore, designers usually arrange the anchor end of the anti-floating anchor rod in the cushion layer position, and use the raft foundation concrete to conceal the prestressed rod body and steel bar matching high-strength nuts (for locking prestress), thereby reducing the risk of leakage. The construction process of conventional anti-floating anchor rods is as follows: anchor rod drilling construction → lowering the rod body steel bar → hole grouting, cushion layer pouring → maintenance → anchor rod prestressing → raft foundation concrete pouring → underground structure construction.

[0003] The anti-floating anchor rods completed based on the above method can greatly reduce the leakage risk of the raft foundation, but have a long construction period and are not suitable for projects with tight construction schedules and where the raft foundation needs to be constructed quickly.

[0004] Therefore, how to reduce the leakage risk of the raft foundation while shortening the construction period of the anti-floating anchor rod is a technical problem that technical personnel in this field need to solve urgently. Summary of the invention

[0005] The object of the present invention is to provide an anti-floating anchor rod construction method, so as to reduce the leakage risk of the raft foundation and shorten the construction period of the anti-floating anchor rod.

[0006] In order to solve the above technical problems, the present invention provides an anti-floating anchor rod construction method, the anti-floating anchor rod construction method comprising:

[0007] S1: Drill holes for anti-floating anchor rods according to the design documents to form holes for anti-floating anchor rods;

[0008] S2: hoisting the finely rolled threaded steel with a PE tube into the hole of the anti-floating anchor rod, lowering it to the designed elevation, and extending the top of the PE tube into the underground foundation raft foundation by a first predetermined length;

[0009] S3: A fixed steel casing is connected to the finished rolled threaded steel outer shell, the bottom end of the steel casing extends into the second predetermined length below the cushion layer, and the top end of the steel casing is flush with the steel raft foundation surface;

[0010] S4: Grouting construction is carried out on the holes of the anti-floating anchor rods located below the bottom elevation of the cushion layer;

[0011] S5: pouring cushion concrete to form a cushion layer;

[0012] S6: Construct a waterproof layer on the cushion layer, and install a water-swelling waterstop strip at the junction of the steel casing and the cushion layer;

[0013] S7: tying the raft foundation steel bars and pouring the raft foundation concrete to form the raft foundation;

[0014] S8: Conduct underground structure construction, and apply prestress to the precision-rolled threaded steel bars after the underground structure is demoulded;

[0015] S9: Cut the prestressed finished rolled rebar so that the top elevation of the cut finished rolled rebar is at least 50mm lower than the building floor surface;

[0016] S10: Pouring building floor.

[0017] Optionally, in the anti-floating anchor construction method, in step S2, before lowering the fine-rolled threaded steel with the PE tube jacket to the designed elevation through the anti-floating anchor hole, the method further includes:

[0018] Fill anti-corrosion grease between the PE pipe and the finished rolled threaded steel;

[0019] The joint ends of the PE pipe and the finished rolled threaded steel are sealed with sealing strips.

[0020] Optionally, in the anti-floating anchor construction method, step S3 further includes:

[0021] Fill the bottom gap between the steel casing and the finished rolled threaded steel with a water-expandable water stop strip;

[0022] A water stop ring is welded on the outer wall of the steel casing located in the middle of the raft foundation.

[0023] Optionally, in the anti-floating anchor construction method, in step S8, the process of applying prestress to the finished rolled threaded steel bar includes the following steps:

[0024] Carry out grouting construction on steel casing;

[0025] Before the grouting material begins to set, the fine-rolled threaded steel is inserted into the steel pad matching the rod body reinforcement and prestressed. After being tensioned to the design value, it is fixed with the high-strength nut matching the rod body reinforcement to complete the prestressing of the fine-rolled threaded steel.

[0026] Optionally, in the anti-floating anchor construction method, in step S9, the process of cutting the prestressed fine-rolled threaded steel bar comprises:

[0027] Cut the exposed rod body steel bars and match them with high-strength nuts.

[0028] Optionally, in the anti-floating anchor construction method, in step S6, the process of constructing a waterproof layer on the cushion layer includes:

[0029] A flexible waterproof membrane is laid on the cushion layer to form a waterproof layer.

[0030] Optionally, in the anti-floating anchor construction method, the first predetermined length is 200 mm.

[0031] Optionally, in the anti-floating anchor construction method, the second predetermined length is 200 mm.

[0032] In the anti-floating anchor construction method provided by the present invention, the anti-floating anchor construction method comprises: S1: drilling the anti-floating anchor according to the design documents to form the anti-floating anchor hole; S2: hoisting the fine-rolled threaded steel with a PE tube in the outer sleeve into the anti-floating anchor hole, lowering it to the design elevation, and the top of the PE tube extends into the underground foundation raft foundation by a first predetermined length; S3: connecting and fixing a steel casing outside the fine-rolled threaded steel, the bottom end of the steel casing extends into the second predetermined length below the cushion layer, and the top end of the steel casing is flush with the steel raft foundation surface; S4: grouting the anti-floating anchor hole located below the cushion bottom elevation; S5: pouring cushion concrete to form a cushion layer;

[0033] S6: construct a waterproof layer on the cushion layer, and set a water-swelling water stop strip at the junction of the steel casing and the cushion layer; S7: tie the raft foundation steel bars and pour the raft foundation concrete to form the raft foundation; S8: construct the underground structure, and apply prestress to the fine-rolled threaded steel after the underground structure is demolded; S9: cut the fine-rolled threaded steel after prestressing, so that the top elevation of the fine-rolled threaded steel after cutting is at least 50mm lower than the building floor surface; S10: pour the building floor. By concealing the application of prestress to the anti-floating anchor rod and the anchoring end of the anti-floating anchor rod after the raft foundation construction is completed and the underground structure is demolded, it does not occupy the key line (that is, compared with the existing construction method, the anchor pile body maintenance and prestressing are transferred from the key line to the non-key line), thereby effectively speeding up the construction speed, which is suitable for projects with tight construction period or raft foundation that need to be formed quickly. BRIEF DESCRIPTION OF THE DRAWINGS

[0034] The above and other objects, features and advantages of the present disclosure will become more apparent through a more detailed description of exemplary embodiments of the present disclosure in conjunction with the accompanying drawings, wherein like reference numerals generally represent like components throughout the exemplary embodiments of the present disclosure.

[0035] Figure 1 is a flow chart of an anti-floating anchor construction method in one embodiment of the present invention;

[0036] Figure 2 It is a schematic elevation diagram after construction based on the anti-floating anchor rod construction method in one embodiment of the present invention.

[0037] In the figure:

[0038] 1-high-quality rolled rebar; 2-PE pipe; 3-sealing rubber strip; 4-steel casing; 5, 10-water-swelling waterstop strip; 6-waterstop ring; 7, 12-grouting material; 8-cushion; 9-waterproof layer; 11-raft foundation; 13-steel pad for rod reinforcement; 14-high-strength nut for rod reinforcement; 15-building floor. DETAILED DESCRIPTION

[0039] The anti-floating anchor construction method proposed by the present invention is further described in detail below in conjunction with the accompanying drawings and specific embodiments. The advantages and features of the present invention will become clearer according to the following description and claims. It should be noted that the accompanying drawings are all in a very simplified form and are not in precise proportions, and are only used to conveniently and clearly assist in explaining the purpose of the embodiments of the present invention.

[0040] The present invention will now be described in further detail with reference to the accompanying drawings. These drawings are simplified schematic diagrams, which only illustrate the basic structure of the present invention in a schematic manner, and therefore only show the components related to the present invention.

[0041] In the description of the invention, it is necessary to understand that the terms “center”, “longitudinal”, “lateral”, “length”, “width”, “thickness”, “up”, “down”, “front”, “back”, “left”, “right”, “vertical”, “horizontal”, “top”, “bottom”, “inside”, “outside”, “clockwise”, “counterclockwise”, etc., indicating the orientation or position relationship, are based on the orientation or position relationship shown in the drawings, and are only for the convenience of describing the invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the invention.

[0042] In addition, the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Therefore, a feature defined as "first" or "second" may explicitly or implicitly include one or more of the features. In the description of the invention, the meaning of "plurality" is two or more, unless otherwise clearly and specifically defined.

[0043] In the invention, unless otherwise clearly specified and limited, the terms "installed", "connected", "connected", "fixed" and the like should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be an indirect connection through an intermediate medium, or it can be the internal communication of two elements. For ordinary technicians in this field, the specific meanings of the above terms in the invention can be understood according to the specific circumstances.

[0044] The inventors have found through long-term research that the reason why the construction period of conventional anti-floating anchor rod construction methods is long is that the maintenance and prestressing of the anti-floating anchor rod pile body are located on the key line, which seriously affects the construction period.

[0045] The principle of the anti-floating anchor construction method of the present invention for solving the above problems is: construct the raft foundation first, and after the raft foundation construction is completed and the underground structure formwork system is dismantled, the anti-floating anchor prestressing is implemented and the anti-floating anchor anchor end is concealed, that is, the maintenance of the anti-floating anchor pile body and the prestressing steps are transferred from the original critical line to the non-critical line, thereby effectively speeding up the construction speed, making the anti-floating anchor construction method suitable for projects with tight construction period or raft foundation that needs to be formed quickly.

[0046] Please refer to Figure 1 and Figure 2 , the anti-floating anchor construction method comprises:

[0047] S1: Drill holes for anti-floating anchor rods according to the design documents to form holes for anti-floating anchor rods. The diameter and depth of the holes for anti-floating anchor rods shall be constructed in accordance with the requirements of the design documents.

[0048] S2: hoist the finely rolled threaded steel bar 1 with the PE tube 2 into the hole of the anti-floating anchor rod, lower it to the designed elevation, and extend the top of the PE tube 2 into the underground raft foundation 11 by a first predetermined length. In this embodiment, the first predetermined length is preferably 200 mm.

[0049] Specifically, before lowering the fine-rolled threaded steel bar 1 with the PE pipe 2 in the outer jacket to the designed elevation through the anti-floating anchor hole, the method further includes:

[0050] Anti-corrosion grease is filled between the PE pipe 2 and the fine-rolled threaded steel bar 1; the anti-corrosion grease has good anti-corrosion performance and can isolate corrosion factors such as air and moisture. Therefore, filling the anti-corrosion grease between the PE pipe 2 and the fine-rolled threaded steel bar 1 can prevent corrosion problems caused by direct contact between the metal and plastic materials therebetween, thereby extending the service life of the components.

[0051] The sealing strip 3 is used to seal the joint end of the PE pipe 2 and the finished rolled threaded steel bar 1. The sealing strip has good elasticity and sealing performance, and can fit tightly on the connection surface to prevent external moisture, dust and other impurities from entering the connection part, thereby keeping the connection clean and dry, and effectively maintaining the sealing between the joint end of the PE pipe 2 and the finished rolled threaded steel bar 1.

[0052] S3: A steel casing 4 is fixedly connected to the outer surface of the finely rolled threaded steel bar 1, the bottom end of the steel casing 4 extends into the second predetermined length below the cushion layer 8, and the top end of the steel casing 4 is flush with the steel raft foundation 11. In this embodiment, the second predetermined length is preferably 200 mm.

[0053] In other words, the length of the steel casing=the thickness of the raft foundation+the thickness of the cushion layer 8+the second predetermined length.

[0054] Preferably, in order to improve the stability of the anti-floating anchor structure, step S3 further includes the following water stopping step:

[0055] The bottom gap between the steel casing 4 and the fine-rolled threaded steel bar 1 is filled with a water-swellable waterstop strip 5; the water-swellable waterstop strip is a new waterproof sealing material that expands after absorbing water to fill the gap between the two, thereby achieving a water-stopping effect.

[0056] A water stop ring 6 is welded on the outer wall of the steel casing 4 located in the middle of the raft foundation 11 .

[0057] S4: Grouting construction is performed on the anti-floating anchor holes located below the bottom elevation of the cushion layer 8; after the grouting construction, the anti-floating anchor holes below the bottom elevation of the cushion layer 8 are filled with grouting material 7.

[0058] S5: pouring cushion layer concrete to form a cushion layer 8.

[0059] S6: constructing a waterproof layer 9 on the cushion layer 8, and setting a water-swellable water stop strip 10 at the junction of the steel casing 4 and the cushion layer 8. Specifically, the waterproof layer is formed by laying a flexible waterproof roll on the cushion layer 8.

[0060] S7: tying the raft foundation steel bars and pouring the raft foundation concrete to form the raft foundation 11.

[0061] S8: Perform underground structure construction, and apply prestress to the fine-rolled threaded steel bar 1 after the underground structure is demoulded.

[0062] The process of applying prestress to the finished rolled threaded steel bar 1 comprises the following steps:

[0063] Carry out grouting construction on the steel casing 4;

[0064] Before the grouting material 12 initially sets, the fine-rolled threaded steel bar 1 is inserted into the steel plate 13 supporting the rod body reinforcement and prestressed. After being tensioned to the design value, the rod body reinforcement supporting high-strength nut 14 is used to fix it (i.e., prestress locking is performed) to complete the prestressing of the fine-rolled threaded steel bar 1.

[0065] S9: Cut the prestressed fine-rolled threaded steel bar 1 so that the top elevation of the fine-rolled threaded steel bar 1 after cutting is at least 50mm lower than the building floor surface. Specifically, the fine-rolled threaded steel bar 1 with the high-strength nut 14 of the exposed rod body reinforcement is cut, and the cutting length is based on the standard that the top elevation of the fine-rolled threaded steel bar 1 after cutting is at least 50mm lower than the building floor surface, so as to facilitate the subsequent pouring of the building floor 15 process to conceal the high-strength nut 14 of the rod body reinforcement and the fine-rolled threaded steel bar 1 exposed outside (i.e., the anchoring end of the anti-floating anchor rod).

[0066] S10: Pouring building floor.

[0067] The anti-floating anchor construction method of the present invention can ensure that the underground structure of the project is implemented in sequence according to the following processes: cushion layer → raft foundation → underground structure construction, etc. Here, the raft foundation is constructed first, and after the raft foundation construction is completed and the underground structure formwork system is dismantled, the anti-floating anchor prestressing is applied and the anchoring end of the anti-floating anchor is concealed. The whole process does not occupy a critical line, and can effectively speed up the construction speed. It is suitable for projects with tight construction period or where the raft foundation needs to be formed quickly.

[0068] It should be noted that, for the aforementioned method embodiments, for the sake of simplicity, they are all expressed as a series of action combinations, but those skilled in the art should be aware that the present application is not limited by the described order of actions, because according to the present application, certain steps can be performed in other orders or simultaneously. Secondly, those skilled in the art should also be aware that the embodiments described in the specification are all preferred embodiments, and the actions and modules involved are not necessarily required by the present application.

[0069] The above description is only a description of the preferred embodiments of the present invention, and is not intended to limit the scope of the present invention. Any changes or modifications made by a person skilled in the art in the field of the present invention based on the above disclosure shall fall within the scope of protection of the claims.

Claims

1. A method for constructing an anti-floating anchor, characterized in that: include: S1: Drill holes for anti-floating anchor rods according to the design documents to form holes for anti-floating anchor rods; S2: hoisting the finely rolled threaded steel bar (1) covered with a PE tube (2) into the hole of the anti-floating anchor rod, lowering it to the designed elevation, and extending the top end of the PE tube (2) into the underground raft foundation (11) by a first predetermined length; S3: A steel casing (4) is fixedly connected to the outer surface of the finely rolled threaded steel bar (1), the bottom end of the steel casing (4) extends into the lower part of the cushion layer (8) by a second predetermined length, and the top end of the steel casing (4) is flush with the surface of the steel raft foundation (11); S4: grouting the anti-floating anchor holes located below the bottom elevation of the cushion layer (8); S5: pouring cushion layer concrete to form a cushion layer (8); S6: constructing a waterproof layer (9) on the cushion layer (8), and providing a water-swellable water stop strip (10) at the junction of the steel casing (4) and the cushion layer (8); S7: tying the raft foundation steel bars and pouring the raft foundation concrete to form the raft foundation (11); S8: Conducting underground structure construction, and applying prestress to the precision-rolled threaded steel bar (1) after the underground structure is demoulded; S9: cutting the prestressed fine-rolled threaded steel bar (1) so that the top elevation of the cut fine-rolled threaded steel bar (1) is at least 50 mm lower than the building floor surface; S10: pouring the building floor (15).

2. The anti-floating anchor construction method according to claim 1, characterized in that: In step S2, before lowering the fine-rolled threaded steel bar (1) covered with the PE tube (2) through the anti-floating anchor hole to the designed elevation, the step further includes: Filling anti-corrosion grease between the PE pipe (2) and the finished rolled threaded steel bar (1); A sealing strip (3) is used to seal the joint end of the PE pipe (2) and the finished rolled threaded steel bar (1).

3. The anti-floating anchor construction method according to claim 1, characterized in that: Step S3 also includes: A water-swellable water stop strip (5) is filled in the bottom gap between the steel casing (4) and the finished rolled threaded steel bar (1); A water stop ring (6) is welded on the outer wall of the steel casing (4) located in the middle of the raft foundation (11).

4. The anti-floating anchor construction method according to claim 1, characterized in that: In step S8, the process of applying prestress to the finished rolled threaded steel bar (1) comprises the following steps: Performing grouting construction on the steel casing (4); Before the grouting material (12) initially sets, the fine-rolled threaded steel (1) is inserted into the steel backing plate (13) matching the rod body reinforcement and then prestressed. After being tensioned to the design value, it is fixed with the high-strength nut (14) matching the rod body reinforcement to complete the prestressing of the fine-rolled threaded steel (1).

5. The anti-floating anchor construction method according to claim 4, characterized in that: In step S9, the process of cutting the prestressed finished rolled threaded steel bar (1) comprises: The finely rolled threaded steel bar (1) is cut to form a matching high-strength nut (14) for the exposed rod body reinforcement.

6. The anti-floating anchor construction method according to any one of claims 1 to 5, characterized in that: In step S6, the process of constructing a waterproof layer on the cushion layer (8) includes: A flexible waterproof roll is laid on the cushion layer (8) to form a waterproof layer.

7. The anti-floating anchor construction method according to any one of claims 1 to 5, characterized in that: The first predetermined length is 200 mm.

8. The anti-floating anchor construction method according to any one of claims 1 to 5, characterized in that: The second predetermined length is 200 mm.

Citation Information

Patent Citations

  • Anti-floating anchor rod structure and construction method thereof

    CN104674809A

  • Anti-floating anchor rod of foundation raft and construction method of anti-floating anchor rod

    CN115680038A

  • Anti -floating anchor rod post -construction device

    CN206986887U

  • Rear anchor rod construction structure

    CN218437022U

  • Edge extension type rock bolt and construction method of the same

    KR101039201B1

Cited By

  • Pressure type PSB pre-stressed anchor rod

    CN120739108A