Road and bridge waterproof paint spraying equipment capable of accelerating solidification

By adding gel agent to the waterproof coating spraying equipment of road and bridges and blowing hot air with a heating box, the problem of long solidification time of waterproof coating is solved, rapid solidification and efficient construction are achieved, and the portability of the equipment is improved through magnetic adsorption and folding design. sex.

CN118904615APending Publication Date: 2024-11-08QINGDAO ZHONGJIAN COMBINATION CONSTR ENG CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411203407.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-30
Publication Date
2024-11-08

AI Technical Summary

Technical Problem

The natural drying and curing process of spraying waterproof coatings on road bridges takes a long time and is less efficient, resulting in low construction efficiency.

Method used

A road bridge waterproof coating spraying equipment is designed to accelerate solidification. By adding gel agent to the spraying equipment and blowing hot air with a heating box, the moisture can be rapidly evaporated and the paint solidification is promoted. The equipment includes a storage tank, spray pipe, heating box, pump body and solenoid valve. It automatically mixes gel agent and waterproof coating, and uses electric heating tubes and fans to heat air to blow to the paint surface, speeding up the solidification process.

Benefits of technology

It significantly shortens the solidification time of waterproof coatings, improves construction efficiency, and achieves portability and space savings of the equipment through magnetic adsorption and folding design.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118904615A_ABST
    Figure CN118904615A_ABST
Patent Text Reader

Abstract

The invention discloses road and bridge waterproof paint spraying equipment capable of accelerating solidification, which comprises an equipment bottom plate, a material storage tank, a spraying pipe and a heating box, the material storage tank is fixed at the top end of the equipment bottom plate, a vertical frame is fixed at the top end of the equipment bottom plate on one side of the material storage tank, a cross arm is arranged on one side of the vertical frame, and the spraying pipe is mounted at the bottom end of the cross arm; the heating box is fixed to one side of the cross arm, fans are installed on the top of the heating box, electric heating pipes are installed in the positions, below the fans, of the heating box, a pump body is installed at the position, on one side of the vertical frame, of the top end of the equipment bottom plate, and a material barrel is fixed to one side of the top end of the material storage tank. The waterproof coating can be subjected to hot air drying, so that moisture is rapidly evaporated, solidification of the waterproof coating is accelerated, solidification time is shortened, and working efficiency is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of road and bridge construction, in particular to a road and bridge waterproof coating spraying device that accelerates solidification. Background Art

[0002] The role of road and bridge waterproof coatings in bridge and road projects is mainly to prevent moisture from penetrating into the structures of bridges and roads, thereby protecting the structures from erosion and damage by moisture.

[0003] After spraying waterproof coating on roads and bridges, it is generally necessary to wait for it to dry and solidify naturally. This process is time-consuming and inefficient. Therefore, we propose a road and bridge waterproof coating spraying equipment that accelerates solidification. Summary of the invention

[0004] The purpose of the present invention is to provide a road and bridge waterproof coating spraying equipment with accelerated solidification to solve the problems raised in the above-mentioned background technology.

[0005] To achieve the above-mentioned purpose, the present invention provides the following technical solutions: an accelerated solidification road and bridge waterproof coating spraying equipment, comprising an equipment base plate, a storage tank, a spray pipe and a heating box, the storage tank is fixed to the top of the equipment base plate, a stand is fixed to the top of the equipment base plate on one side of the storage tank, a cross arm is arranged on one side of the stand, the spray pipe is installed at the bottom end of the cross arm, and nozzles with equal spacing are installed at the bottom end of the spray pipe, the heating box is fixed to one side of the cross arm, and a fan is installed on the top of the heating box, and An electric heating tube is installed inside the heating box below the fan, a pump body is installed on the top of the equipment bottom plate on one side of the stand, a material barrel is fixed on one side of the top of the storage tank, and a feeding pipe is installed at the bottom end of the material barrel, and a first solenoid valve is installed at the connection between the feeding pipe and the material barrel, a feeding cylinder is installed at the bottom end of the feeding pipe, and a feeding pipe is installed at the bottom end of the feeding cylinder, and the feeding pipe passes through the weighing device at the top of the storage tank and extends to the interior of the storage tank, and a second solenoid valve is installed at the connection between the feeding pipe and the feeding cylinder.

[0006] Preferably, walking wheels are installed at the corner positions of the bottom end of the bottom plate of the equipment, so that the equipment can move.

[0007] Preferably, a stirring paddle is installed inside the storage tank, and a rotating drive component is installed at the top of the storage tank, and the output end of the rotating drive component is fixedly connected to the top of the stirring paddle, so as to facilitate stirring of the waterproof coating in the storage tank and mix it evenly.

[0008] Preferably, a first magnet block is adhered to the inner wall of the stand to facilitate magnetic adsorption of the second magnet block.

[0009] Preferably, one end of the cross arm extends to the interior of the stand and is connected to the stand via a damping shaft.

[0010] Preferably, a second magnet block is adhered to the top of the cross arm, and the second magnet block is magnetically attracted to the first magnet block, so as to facilitate magnetically fixing the cross arm in the stand.

[0011] Preferably, one side of the top end of the cross arm is connected to the top end of the stand by a pull rope, thereby improving the stability of the cross arm when it is unfolded.

[0012] Preferably, the input end of the pump body is connected to the material storage tank, and the output end of the pump body is connected to the spray pipe.

[0013] Compared with the prior art, the present invention has the following beneficial effects: (1) Open the first solenoid valve to allow the gel inside the barrel to flow into the feeding cylinder through the feeding pipe, and the weighing device is used for weighing. When the preset weight is reached, the first solenoid valve is controlled to close, and then the second solenoid valve is controlled to open, so that the gel inside the feeding cylinder flows into the storage tank through the feeding pipe and mixes with the waterproof coating inside the storage tank. By automatically adding the gel to the waterproof coating, the solidification of the waterproof coating is accelerated; start the pump body to extract the waterproof coating inside the storage tank and transport it to the spray pipe. The coating is sprayed out through the nozzle and pushes the The equipment can be moved to spray waterproof coatings on roads and bridges. Since one end of the cross arm is connected to the stand by a pull rope, the cross arm remains stable. After spraying, the equipment is moved back. At this time, the heating box passes over the road and bridge, and the fan is started to allow external air to enter the heating box. The electric heating pipe heats the air, and the fan blows the hot air out and blows it to the waterproof coating on the surface of the road and bridge. By blowing hot air to the waterproof coating, the water evaporates quickly, and the solidification of the waterproof coating is accelerated, thereby shortening the solidification time and improving work efficiency. (2) The horizontal arm is folded upward to rotate around the damping shaft and put into the stand. The pull rope is bent and retracted. The horizontal arm is magnetically attracted to the first magnet block through the second magnet block, and the horizontal arm can be fixed in the stand. This makes the device foldable and retractable, reducing its size. BRIEF DESCRIPTION OF THE DRAWINGS

[0014] Figure 1 It is a cross-sectional structural schematic diagram of the present invention; Figure 2 It is a schematic diagram of the enlarged structure of the cross arm of the present invention; Figure 3 It is a schematic diagram of the cross arm side cross-sectional structure of the present invention; Figure 4 It is a bottom view structural schematic diagram of the heating box of the present invention; Figure 5 It is a schematic diagram of the folded state structure of the present invention; Figure 6 It is a schematic diagram of the enlarged cross-sectional structure of the material barrel of the present invention.

[0015] In the figure: 1. Equipment bottom plate; 101. Traveling wheel; 2. Storage tank; 3. Agitator; 4. Rotating drive member; 5. Stand; 6. Pull rope; 7. First magnet block; 8. Cross arm; 801. Damping shaft; 9. Spray pipe; 10. Spray head; 11. Pump body; 12. Second magnet block; 13. Heating box; 14. Fan; 15. Electric heating pipe; 16. Material barrel; 17. Feeding pipe; 1701. First solenoid valve; 18. Feeding barrel; 19. Feeding pipe; 1901. Second solenoid valve; 20. Weighing device.

[0016] The technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. All other embodiments obtained by ordinary technicians in the field without making creative work based on the embodiments of the present invention shall fall within the scope of protection of the present invention.

[0017] See also Figure 1-6 , an embodiment provided by the present invention: a spraying device for accelerating the solidification of waterproof coatings for roads and bridges, comprising a device bottom plate 1, a material storage tank 2, a spraying pipe 9 and a heating box 13, the material storage tank 2 is fixed to the top of the device bottom plate 1, a stand 5 is fixed to the top of the device bottom plate 1 on one side of the material storage tank 2, a cross arm 8 is arranged on one side of the stand 5, the spraying pipe 9 is installed at the bottom end of the cross arm 8, and the bottom end of the spraying pipe 9 is installed with nozzles 10 with equal spacing; Specifically, the pump body 11 is started to extract the waterproof coating inside the storage tank 2 and transport it to the spray pipe 9, the coating is sprayed through the nozzle 10, and the equipment is pushed to move, so that the road and bridge can be sprayed with waterproof coating. Since one end of the cross arm 8 is connected to the stand 5 through the pull rope 6, the cross arm 8 remains stable. The heating box 13 is fixed to one side of the cross arm 8, and a fan 14 is installed on the top of the heating box 13, and an electric heating pipe 15 is installed inside the heating box 13 below the fan 14; Specifically, the equipment is moved back. At this time, the heating box 13 passes over the road bridge, and the fan 14 is started to allow external air to enter the heating box 13. The electric heating pipe 15 heats the air, and the fan 14 blows the hot air out and blows it to the waterproof coating on the surface of the road bridge. By blowing hot air to the waterproof coating, the moisture evaporates quickly, and the solidification of the waterproof coating is accelerated, thereby shortening the solidification time and improving the work efficiency. A pump body 11 is installed on the top of the equipment bottom plate 1 on one side of the stand 5; A material barrel 16 is fixed to one side of the top of the storage tank 2, and a feeding pipe 17 is installed at the bottom of the material barrel 16, and a first solenoid valve 1701 is installed at the connection between the feeding pipe 17 and the material barrel 16, a feeding cylinder 18 is installed at the bottom of the feeding pipe 17, and a feeding pipe 19 is installed at the bottom of the feeding cylinder 18, and the feeding pipe 19 passes through the weighing device 20 at the top of the storage tank 2 and extends to the interior of the storage tank 2, and a second solenoid valve 1901 is installed at the connection between the feeding pipe 19 and the feeding cylinder 18; Specifically, the first solenoid valve 1701 is opened, so that the gelling agent inside the barrel 16 flows into the feeding cylinder 18 through the feeding pipe 17, and the weighing device 20 is weighed. When the preset weight is reached, the first solenoid valve 1701 is controlled to be closed, and then the second solenoid valve 1901 is controlled to be opened, so that the gelling agent inside the feeding cylinder 18 flows into the storage tank 2 through the feeding pipe 19, and is mixed with the waterproof coating inside the storage tank 2. By automatically adding the gelling agent to the waterproof coating, the solidification of the waterproof coating is accelerated. Travel wheels 101 are installed at the corners of the bottom end of the equipment base plate 1; A stirring paddle 3 is installed inside the storage tank 2, and a rotating driving member 4 is installed at the top of the storage tank 2, and the output end of the rotating driving member 4 is fixedly connected to the top of the stirring paddle 3; Specifically, the rotary drive member 4 is started to drive the stirring paddle 3 to rotate, so as to stir the waterproof coating inside the storage tank 2 so as to make it evenly mixed; A first magnet block 7 is adhered to the inner wall of the stand 5; One end of the cross arm 8 extends to the interior of the stand 5 and is connected to the stand 5 via the damping shaft 801; A second magnet block 12 is adhered to the top of the cross arm 8, and the second magnet block 12 is magnetically attracted to the first magnet block 7; Specifically, after the construction is completed, the cross arm 8 is folded upward to rotate around the damping shaft 801 and put into the stand 5, the pull rope 6 is bent and retracted, and the cross arm 8 is magnetically attracted to the first magnet block 7 through the second magnet block 12, so that the cross arm 8 can be fixed in the stand 5, so that the device can be folded and stored, reducing the volume; One side of the top of the cross arm 8 is connected to the top of the stand 5 through a drawstring 6; The input end of the pump body 11 is communicated with the material storage tank 2 , and the output end of the pump body 11 is communicated with the spray pipe 9 .

[0018] When the embodiment of the present application is in use: first, start the rotary drive member 4 to drive the stirring paddle 3 to rotate, stir the waterproof coating inside the storage tank 2 to make it evenly mixed, and open the first solenoid valve 1701 by operating the control panel on the outer wall of the bottom plate 1 of the equipment, so that the gel inside the barrel 16 flows into the feeding cylinder 18 through the discharge pipe 17, and the weighing device 20 is weighed. When the preset weight is reached, the first solenoid valve 1701 is controlled to be closed, and then the second solenoid valve 1901 is controlled to be opened, so that the gel inside the feeding cylinder 18 flows into the storage tank 2 through the feeding pipe 19 and mixes with the waterproof coating inside the storage tank 2. By automatically adding the gel to the waterproof coating, the solidification of the waterproof coating is accelerated. Secondly, start the pump body 11 to extract the waterproof coating inside the storage tank 2 and transport it to the spray pipe 9. The coating is sprayed through the nozzle 10 and the equipment is driven to move. That is, Waterproof coating can be sprayed on roads and bridges. Since one end of the cross arm 8 is connected to the stand 5 by the pull rope 6, the cross arm 8 remains stable. Then, after spraying is completed, the equipment is moved back. At this time, the heating box 13 passes over the road bridge, and the fan 14 is started to allow external air to enter the heating box 13. The electric heating tube 15 heats the air, and the fan 14 blows the hot air out and blows it to the waterproof coating on the surface of the road bridge. By blowing hot air to the waterproof coating, the moisture evaporates quickly, and the solidification of the waterproof coating is accelerated, thereby shortening the solidification time and improving work efficiency. Finally, after the construction is completed, the cross arm 8 is folded upward to rotate around the damping shaft 801 and put into the stand 5, the pull rope 6 is bent and retracted, and the cross arm 8 is magnetically attracted to the first magnet block 7 by the second magnet block 12, so that the cross arm 8 can be fixed in the stand 5, so that the device can be folded and stored, and the volume is reduced.

[0019] Obviously, the above-described embodiments are only a part of the embodiments of the present invention, rather than all the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work should fall within the scope of protection of the present invention.

Claims

1. A road and bridge waterproof coating spraying equipment for accelerating solidification, characterized in that: The invention comprises an equipment base plate (1), a material storage tank (2), a spray pipe (9) and a heating box (13), wherein the material storage tank (2) is fixed on the top of the equipment base plate (1), a stand (5) is fixed on the top of the equipment base plate (1) on one side of the material storage tank (2), a cross arm (8) is arranged on one side of the stand (5), the spray pipe (9) is installed on the bottom end of the cross arm (8), and the bottom end of each of the spray pipes (9) is installed with nozzles (10) at equal intervals, the heating box (13) is fixed on one side of the cross arm (8), a fan (14) is installed on the top of each of the heating boxes (13), and an electric heating pipe (15) is installed inside the heating box (13) below the fan (14), the stand (5) ) is provided with a pump body (11) at the top of the equipment bottom plate (1) on one side, a material barrel (16) is fixed on one side of the top of the material storage tank (2), a feeding pipe (17) is provided at the bottom end of the material barrel (16), and a first solenoid valve (1701) is provided at the connection between the feeding pipe (17) and the material barrel (16), a feeding cylinder (18) is provided at the bottom end of the feeding cylinder (18), a feeding pipe (19) is provided at the bottom end of the feeding cylinder (18), and the feeding pipe (19) passes through the weighing device (20) at the top of the material storage tank (2) and extends into the interior of the material storage tank (2), and a second solenoid valve (1901) is provided at the connection between the feeding pipe (19) and the feeding cylinder (18).

2. The accelerated solidification road and bridge waterproof coating spraying equipment according to claim 1 is characterized by: Travel wheels (101) are installed at the corner positions at the bottom end of the equipment base plate (1).

3. The accelerated solidification road and bridge waterproof coating spraying equipment according to claim 1 is characterized by: A stirring paddle (3) is installed inside the material storage tank (2), and a rotating drive component (4) is installed at the top of the material storage tank (2), and the output end of the rotating drive component (4) is fixedly connected to the top of the stirring paddle (3).

4. The accelerated solidification road and bridge waterproof coating spraying equipment according to claim 1 is characterized by: A first magnet block (7) is adhered to the inner wall of the stand (5).

5. The accelerated solidification road and bridge waterproof coating spraying equipment according to claim 1 is characterized by: One end of the cross arm (8) extends to the interior of the stand (5) and is connected to the stand (5) via a damping shaft (801).

6. The accelerated solidification road and bridge waterproof coating spraying equipment according to claim 1 is characterized by: A second magnet block (12) is adhered to the top end of the cross arm (8), and the second magnet block (12) is magnetically attracted to the first magnet block (7).

7. The accelerated solidification road and bridge waterproof coating spraying equipment according to claim 1 is characterized by: One side of the top end of the cross arm (8) is connected to the top end of the stand (5) via a drawstring (6).

8. The accelerated solidification road and bridge waterproof coating spraying equipment according to claim 1 is characterized by: The input end of the pump body (11) is connected to the material storage tank (2), and the output end of the pump body (11) is connected to the spray pipe (9).