Suspension bridge anchor cup dehumidification / fireproof construction structure and construction method thereof
By using annular support plate and isolation sleeve assembly technology on the outside of the suspension bridge anchor cup, combined with sealant and screw tightening, the problem of rapid construction and installation on the outside of the suspension bridge anchor cup is solved, good fire protection and dehumidification effects are achieved, and construction is improved simplicity and stability.
Patent Information
- Application Number
- CN202411003998.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-25
- Publication Date
- 2024-11-08
AI Technical Summary
The prior art is difficult to quickly construct and install a fire-resistant cover on the outside of the suspension bridge anchor cup to achieve dehumidification and fire prevention effects, and the construction simplicity is insufficient.
The annular support plate and isolation sleeve are used to assemble the outside of the anchor cup body, fill the gaps with sealant, combine glue processing and assembly to achieve rapid construction and installation, and be tightened by the adhesive bonding and screws with the annular slot. Improve structural stability.
It realizes the fast, stable and reliable fireproof and sealing effect of the suspension bridge anchor cup, meets the dehumidification needs, has a simple structure, is convenient for on-site application, and improves the efficiency and safety of construction.
Smart Images

Figure CN118910998A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of suspension bridge anchor cups, and more particularly to a suspension bridge anchor cup dehumidification / fireproof construction structure and a construction method thereof. Background Art
[0002] The cable system (main cable, slings, etc.) of a suspension bridge is the key load-bearing structure of a cable system bridge, commonly known as the "lifeline" of the bridge. Ensuring the safety and durability of the cable system is the top priority in the construction and operation of a cable system bridge. Most of the main cables and slings of suspension bridges have been subjected to relevant fire-resistant, heat-insulating and sealing protection. Since the anchor cup of the sling is poured with a zinc-copper alloy with a melting point of about 400°C and the anchor cup of this sling has not yet been subjected to fire-resistant, heat-insulating and sealing protection.
[0003] Therefore, in order to significantly improve the disaster prevention and corrosion resistance of cable system bridges, ensure the safety and stability of cable system bridges, extend the safe operation life of bridges, and ensure the safe and efficient operation of bridges during the operation period, the protection of the cable anchor cup is of great significance. Therefore, in order to solve this problem, a fire-resistant cover can be set on the outside of the cable anchor cup.
[0004] However, during the experimental trial, it was found that although the fireproof and fire-resistant cover body arranged on the outside of the sling anchor cup can play a fire-resistant role, how to realize the rapid construction and installation of the cover body, meet the effective dehumidification / fireproofing effect, and realize the simplicity of construction are still problems existing in the prior art.
[0005] Therefore, how to provide a suspension bridge anchor cup dehumidification / fireproof construction structure with a simple structure and easy construction and a construction method thereof is a problem that technical personnel in this field urgently need to solve. Summary of the invention
[0006] In view of this, the present invention provides a suspension bridge anchor cup dehumidification / fireproof construction structure and a construction method thereof, aiming to solve the above-mentioned technical problems.
[0007] In order to achieve the above object, the present invention adopts the following technical solution:
[0008] A suspension bridge anchor cup dehumidification / fireproof construction structure, comprising an anchor cup body; and further comprising:
[0009] An annular support plate, wherein the number of the annular support plates is two, and the two annular support plates are respectively sleeved on the outer side of the top and the outer side of the bottom of the anchor cup body, an isolation layer is provided between the inner edge of the annular support plate and the outer wall of the anchor cup body, and an annular slot is provided on the outer edge of the annular support plate;
[0010] An isolation sleeve, the isolation sleeve is sleeved on the outside of the anchor cup body, and the top edge and the bottom edge of the isolation sleeve both have a radially inwardly protruding clamping edge, the upper and lower clamping edges of the isolation sleeve are respectively inserted into the annular slots of the two annular support plates, and the clamping edges are bonded to the annular slots by an isolation sealant.
[0011] Through the above technical scheme, the present invention provides a quickly assembled suspension bridge anchor cup dehumidification / fireproof construction structure, which is assembled on the outside of the anchor cup body through an annular support plate and an isolation sleeve, and the assembled gap is filled with glue, so that the structure can be quickly constructed and installed. In this structure, the gluing treatment and the assembly treatment are combined, so that the structure after construction has good fire prevention and sealing effects, can meet the fire prevention and dehumidification requirements, and has a simple structure, stable and reliable construction, easy to apply on site, and convenient for promotion and use.
[0012] Preferably, in the above-mentioned suspension bridge anchor cup dehumidification / fireproof construction structure, a connection hole is provided on the clamp edge, a threaded hole corresponding to the connection hole is provided on the annular support plate, the threaded hole passes through the annular slot, and the connection hole and the threaded hole are passed through and fastened by a fastening screw. In order to improve the structural stability and reliability of the connection, the present invention first utilizes the adhesive plugging of the clamp edge and the annular slot, and then fastens the clamp edge and the annular slot by screws, which can ensure a stable and reliable connection structure.
[0013] Preferably, in the above-mentioned suspension bridge anchor cup dehumidification / fireproof construction structure, the annular support plate is formed by two semicircular arc plates connected by clamping, and the joint between the two semicircular arc plates is filled with sealant. The two semicircular arc plates are connected by clamping, which can meet the needs of rapid installation, rapid fixing, and rapid construction.
[0014] Preferably, in the above-mentioned suspension bridge anchor cup dehumidification / fireproof construction structure, the isolation sleeve is formed by two semi-cylindrical tubes connected together, and the joint seam between the two semi-cylindrical tubes is filled with sealant. The two semi-cylindrical tubes are connected together to meet the needs of rapid installation, rapid fixation, and rapid construction.
[0015] Preferably, in the above suspension bridge anchor cup dehumidification / fireproof construction structure, the butt joints of the two semicircular arc plates and the butt joints of the two semi-cylinders are staggered. The staggered arrangement can prevent structural damage caused by forces in the same direction and avoid damage to the sealing.
[0016] Preferably, in the above-mentioned suspension bridge anchor cup dehumidification / fireproof construction structure, the lower annular support plate is provided with air inlet holes and exhaust holes. The air inlet holes and exhaust holes can meet the dehumidification requirements, and the dry air pipeline is connected to the air inlet holes to dehumidify the interior.
[0017] Preferably, in the above-mentioned suspension bridge anchor cup dehumidification / fireproof construction structure, the air inlet and the air outlet are provided with filter screens, which can prevent dust from entering the interior of the protective structure.
[0018] Preferably, in the above-mentioned suspension bridge anchor cup dehumidification / fireproof construction structure, a desiccant is fixedly connected to the inner wall of the isolation sleeve. The desiccant can assist in dehumidifying the interior of the protective structure.
[0019] Preferably, in the above-mentioned suspension bridge anchor cup dehumidification / fireproofing construction structure, the upper annular support plate is limited to the top edge of the anchor cup body, and the lower annular support plate is limited to the bottom edge of the anchor cup body. In the dehumidification / fireproofing construction structure provided by the present invention, although only a combination of an annular support plate and an isolation sleeve is used, the upper and lower limit designs, as well as the snap-fit design, make the simple structure have strong structural stability, and the construction is convenient and reliable.
[0020] The present invention also provides a construction method of a suspension bridge anchor cup dehumidification / fireproof construction structure, which specifically comprises the following steps:
[0021] S1. Treat the surface of the anchor cup body before construction to remove oil stains and impurities;
[0022] S2. Apply fire retardant coating to the surface of the anchor cup body;
[0023] S3, applying sealant to the connection position of the upper and lower annular support plates, and installing the upper and lower annular support plates;
[0024] S4. Install the isolation sleeve to complete the construction.
[0025] Through the above technical scheme, the construction method provided by the present invention can quickly dehumidify and fireproof the outside of the anchor cup body, and use the cooperation of sealant, annular support plate and isolation sleeve to fill the sealant in the joints, and then quickly assemble them, so that the overall construction is simple and convenient, and can meet the construction progress and fireproof sealing effect at the same time.
[0026] It can be seen from the above technical solutions that, compared with the prior art, the present invention discloses a suspension bridge anchor cup dehumidification / fireproof construction structure and a construction method thereof, which have the following beneficial effects:
[0027] 1. The present invention provides a fast-assembled suspension bridge anchor cup dehumidification / fireproof construction structure, which is assembled on the outside of the anchor cup body through an annular support plate and an isolation sleeve, and the assembled gap is filled with glue to achieve fast construction and installation of the structure. In this structure, the gluing treatment and the assembly treatment are combined, so that the constructed structure has good fire prevention and sealing effects, can meet the fire prevention and dehumidification requirements, and has a simple structure, stable and reliable construction, is easy to apply on site, and is convenient for promotion and use.
[0028] 2. In order to improve the structural stability and reliability of the connection, the present invention first utilizes adhesive insertion between the card edge and the annular slot, and then fastens the card edge and the annular slot with screws, thereby ensuring a stable and reliable connection structure.
[0029] 3. The present invention can meet the needs of rapid installation, rapid fixation, and rapid construction by butting and locking two semicircular arc plates and two semi-cylindrical tubes.
[0030] 4. In the dehumidification / fireproof construction structure provided by the present invention, although only a combination of an annular support plate and an isolation sleeve is used, the upper and lower limit designs and the snap-fit design make the simple structure have strong structural stability and the construction is convenient and reliable.
[0031] 5. The construction method provided by the present invention can quickly perform dehumidification and fireproofing construction on the outside of the anchor cup body, and utilizes the cooperation of sealant, annular support plate and isolation sleeve to fill the sealant in the joints, and then quickly assemble and combine them, so that the overall construction is simple and convenient, and can meet the construction progress and fireproof sealing effect at the same time. BRIEF DESCRIPTION OF THE DRAWINGS
[0032] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on the provided drawings without paying creative work.
[0033] Figure 1 The accompanying drawing is a schematic structural diagram of the anchor cup body provided by the present invention;
[0034] Figure 2 The accompanying drawing is a front view of the installation annular support plate provided by the present invention;
[0035] Figure 3 The accompanying drawing is a cross-sectional view of the installation of the annular support plate provided by the present invention;
[0036] Figure 4 The accompanying drawing is a top view of the annular support plate provided by the present invention;
[0037] Figure 5 The accompanying drawing is a front view of the installation isolation sleeve provided by the present invention;
[0038] Figure 6 The accompanying drawing is a cross-sectional view of the installation isolation sleeve provided by the present invention;
[0039] Figure 7 The accompanying drawing is a top view of the isolation sleeve provided by the present invention.
[0040] in:
[0041] 1-Anchor cup body;
[0042] 2- annular support plate;
[0043] 21-annular slot; 22-threaded hole; 23-semicircular arc plate; 24-air inlet; 25-exhaust hole;
[0044] 3-Isolation sleeve;
[0045] 31-card edge; 311-connection hole; 32-semi-cylindrical tube;
[0046] 4-Isolation layer;
[0047] 5- Fasten the screws;
[0048] 6- Desiccant. DETAILED DESCRIPTION
[0049] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0050] See attached Figure 2 To Attachment Figure 7 The embodiment of the present invention discloses a suspension bridge anchor cup dehumidification / fireproof construction structure, including an anchor cup body 1; and also includes:
[0051] An annular support plate 2, the number of the annular support plates 2 is two, the two annular support plates 2 are respectively sleeved on the top outer side and the bottom outer side of the anchor cup body 1, an isolation layer 4 is provided between the inner edge of the annular support plate 2 and the outer wall of the anchor cup body 1, and an annular slot 21 is provided on the outer edge of the annular support plate 2;
[0052] The isolation sleeve 3 is sleeved on the outside of the anchor cup body 1, and the top and bottom edges of the isolation sleeve 3 both have radially inwardly protruding clamping edges 31, the upper and lower clamping edges 31 of the isolation sleeve 3 are respectively inserted into the annular slots 21 of the two annular support plates 2, and the clamping edges 31 and the annular slots 21 are bonded by isolation sealant.
[0053] In order to further optimize the above technical solution, a connecting hole 311 is opened on the clamping edge 31, and a threaded hole 22 corresponding to the connecting hole 311 is opened on the annular support plate 2. The threaded hole 22 passes through the annular slot 21, and the connecting hole 311 and the threaded hole 22 are passed through and fastened by fastening screws 5.
[0054] In this embodiment, fireproof sealant is injected into the annular slot 21 , and then the clamping edge 31 is inserted into the annular slot 21 , and then fastened by the fastening screws 5 .
[0055] In order to further optimize the above technical solution, the annular support plate 2 is formed by two semi-circular arc plates 23 being clamped together, and the joint between the two semi-circular arc plates 23 is filled with sealant.
[0056] In this embodiment, a snap groove and a snap-fit structure are formed on the butt joint surfaces of the two semicircular arc plates 23, so that they can be directly snap-fitted and fixed.
[0057] In order to further optimize the above technical solution, the isolation sleeve 3 is composed of two semi-cylindrical tubes 32 that are snap-connected and assembled, and the joint between the two semi-cylindrical tubes 32 is filled with sealant.
[0058] In this embodiment, a snap groove and a snap-fit structure are formed on the butt joint surfaces of the two semi-cylindrical tubes 32, so that they can be directly snap-fitted and fixed.
[0059] In order to further optimize the above technical solution, the butt joints of the two semicircular arc plates 23 and the butt joints of the two semi-cylindrical tubes 32 are staggered.
[0060] In order to further optimize the above technical solution, an air inlet 24 and an air outlet 25 are provided on the lower annular support plate 2 .
[0061] In order to further optimize the above technical solution, filters are provided on the air inlet 24 and the air outlet 25 .
[0062] In order to further optimize the above technical solution, a desiccant 6 is fixedly connected to the inner wall of the isolation sleeve 3 .
[0063] In this embodiment, the desiccant 6 is activated carbon.
[0064] In order to further optimize the above technical solution, the upper annular support plate 2 is limited to the top edge of the anchor cup body 1, and the lower annular support plate 2 is limited to the bottom edge of the anchor cup body 1.
[0065] In this embodiment, the annular support plate 2 and the isolation sleeve 3 are both made of stainless steel, and are coated with fire-resistant and flame-retardant adhesive layers on the inner and outer surfaces.
[0066] The construction method of the suspension bridge anchor cup dehumidification / fireproof construction structure provided in this embodiment specifically includes the following steps:
[0067] S1. See Appendix Figure 1 , before construction, the surface of the anchor cup body 1 is treated to remove oil stains and impurities;
[0068] S2, coating the surface of the anchor cup body 1 with fire retardant coating;
[0069] S3. See Appendix Figure 2 To Attachment Figure 4 , apply sealant at the connection position of the upper and lower annular support plates 2 to form an isolation layer 4, and install the upper and lower annular support plates 2;
[0070] S4. See Appendix Figure 5 To Attachment Figure 7 , install the isolation sleeve 3 and the construction is completed.
[0071] In the construction method provided in this embodiment, all positions involving joints need to be filled with fireproof sealant.
[0072] In this specification, each embodiment is described in a progressive manner, and each embodiment focuses on the differences from other embodiments. The same or similar parts between the embodiments can be referred to each other. For the device disclosed in the embodiment, since it corresponds to the method disclosed in the embodiment, the description is relatively simple, and the relevant parts can be referred to the method part.
[0073] The above description of the disclosed embodiments enables one skilled in the art to implement or use the present invention. Various modifications to these embodiments will be apparent to one skilled in the art, and the general principles defined herein may be implemented in other embodiments without departing from the spirit or scope of the present invention. Therefore, the present invention will not be limited to the embodiments shown herein, but rather to the widest scope consistent with the principles and novel features disclosed herein.
Claims
1. A suspension bridge anchor cup dehumidification / fireproof construction structure, comprising an anchor cup body (1); characterized in that: Also includes: an annular support plate (2), wherein the number of the annular support plates (2) is two, and the two annular support plates (2) are respectively sleeved on the top outer side and the bottom outer side of the anchor cup body (1), an isolation layer (4) is provided between the inner edge of the annular support plate (2) and the outer wall of the anchor cup body (1), and an annular slot (21) is provided on the outer edge of the annular support plate (2); An isolation sleeve (3), wherein the isolation sleeve (3) is sleeved on the outside of the anchor cup body (1), and the top edge and the bottom edge of the isolation sleeve (3) both have a clamping edge (31) protruding radially inward, and the upper and lower clamping edges (31) of the isolation sleeve (3) are respectively inserted into the annular slots (21) of the two annular support plates (2), and the clamping edges (31) and the annular slots (21) are bonded by an isolation sealant.
2. A suspension bridge anchor cup dehumidification / fireproof construction structure according to claim 1, characterized in that: The clamping edge (31) is provided with a connection hole (311), the annular support plate (2) is provided with a threaded hole (22) corresponding to the connection hole (311), the threaded hole (22) passes through the annular slot (21), and the connection hole (311) and the threaded hole (22) are passed through and fastened to each other by a fastening screw (5).
3. A suspension bridge anchor cup dehumidification / fireproof construction structure according to claim 2, characterized in that: The annular support plate (2) is formed by two semi-circular arc plates (23) being clamped together, and the joint between the two semi-circular arc plates (23) is filled with sealant.
4. A suspension bridge anchor cup dehumidification / fireproof construction structure according to claim 3, characterized in that: The isolation sleeve (3) is formed by two semi-cylindrical tubes (32) being snap-fitted together, and the joint between the two semi-cylindrical tubes (32) is filled with sealant.
5. A suspension bridge anchor cup dehumidification / fireproof construction structure according to claim 4, characterized in that: The butt joints of the two semicircular arc plates (23) and the butt joints of the two semi-cylindrical barrels (32) are arranged in a staggered manner.
6. A suspension bridge anchor cup dehumidification / fireproof construction structure according to claim 1, characterized in that: An air inlet (24) and an air outlet (25) are provided on the annular support plate (2) below.
7. A suspension bridge anchor cup dehumidification / fireproof construction structure according to claim 6, characterized in that: The air inlet (24) and the air outlet (25) are provided with filter screens.
8. The suspension bridge anchor cup dehumidification / fireproof construction structure according to claim 1, characterized in that: A desiccant (6) is fixedly connected to the inner wall of the isolation sleeve (3).
9. A suspension bridge anchor cup dehumidification / fireproof construction structure according to any one of claims 1 to 8, characterized in that: The upper annular support plate (2) is limited at the top edge of the anchor cup body (1), and the lower annular support plate (2) is limited at the bottom edge of the anchor cup body (1).
10. A construction method for the suspension bridge anchor cup dehumidification / fireproof construction structure according to any one of claims 1 to 9, characterized in that: The specific steps include: S1. Before construction, the surface of the anchor cup body (1) is treated to remove oil stains and impurities; S2, coating the surface of the anchor cup body (1) with a fire retardant coating; S3, applying sealant to the connection position of the upper and lower annular support plates (2), and installing the upper and lower annular support plates (2); S4, install the isolation sleeve (3), and the construction is completed.
