System and method for reducing turbidity of disturbed muddy water in upstream river dredging construction
By adopting a combination system of natural precipitation, drug addition, agent turbulence and rubber dam type non-disturbation settlement in environmentally friendly dredging construction, the turbid water caused by construction disturbance is used to treat the turbid water caused by construction disturbances, the turbid water purification effect in the prior art is solved. The poor problem has achieved significant turbid reduction effect and low-cost construction convenience.
Patent Information
- Application Number
- CN202411022941.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-29
- Publication Date
- 2024-11-08
AI Technical Summary
In existing environmental dredging projects, turbid water caused by construction disturbances is difficult to effectively reduce, and the existing purification system is high in cost, low efficiency and poor constructionability, which affects the quality of the downstream water environment.
Using a combination system of natural precipitation, dosing, agent turbulence and rubber dam type non-disturbulence settlement, flocculants are used by setting up natural precipitation units, dosing units, agent turbulence units and rubber dam type non-disturbulence settlement units in the river channel, and flocculants are used. The turbid water purification is carried out with the photocatalyst to achieve the settlement of suspended substances and the photodegradation of organic pollutants.
It significantly reduces the pollution load of suspended objects and turbidity, has significant turbidity reduction effect, is simple to construct, is cheap to cost, and is highly applicable. It does not affect the normal water flow and flood flow of the river, and realizes the resource utilization of waste mud.
Smart Images

Figure CN118911062A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the field of environmental protection dredging engineering, and in particular relates to a system and method for disturbing turbid water and reducing turbidity during dredging construction of an upstream river channel. Background Art
[0002] With the continuous promotion of my country's comprehensive promotion of river basin comprehensive management to improve quality and efficiency and help restore the ecological environment of rivers and lakes, higher requirements have been put forward for river water quality, landscape, navigation and flood control. The number of environmental protection dredging projects for river comprehensive management has increased rapidly across the country. Environmental protection dredging projects mainly use equipment such as suction vessels to achieve the goals of river channel excavation and deepening, pollution sludge absorption, and obstacle shoal removal.
[0003] During the implementation of environmental dredging projects, the river channel in the construction section is subject to mechanical disturbance, and the lightly polluted floating mud and sediment on the riverbed surface are easily disturbed and suspended, resulting in increased turbidity in the water environment of the construction section, and seriously affecting the water quality of the downstream non-construction section through water diffusion. Especially for the river channel at the water source, the huge changes in the suspended matter and turbidity indicators of the incoming water will impact the normal operation of the water plant. At present, the purification systems used in rivers are mostly adsorption and filtration systems designed for pollutants such as heavy metals and organic matter in the river channel. They have the characteristics of high cost, low efficiency, poor constructability, etc., and are poorly applicable to turbidity reduction of construction-disturbed turbid water.
[0004] Therefore, in response to the turbid water disturbed by the environmental dredging construction in the upstream river, it is necessary to propose a system and method with significant turbidity reduction effect, strong constructability and low cost to ensure the water environment quality of the non-construction section of the downstream river. Summary of the invention
[0005] In view of the deficiencies in the above-mentioned prior art, the present invention proposes a system and method for reducing turbidity in disturbed turbid water during upstream river dredging construction, which adopts the method of "natural sedimentation + coagulation + rubber dam type undisturbed sedimentation" to carry out turbidity reduction treatment. The process is simple, the turbidity reduction effect is good, the cost is low, and the construction is convenient. The system and method can be disassembled, moved, installed and constructed along with the construction section.
[0006] The technical solution adopted by the present invention is as follows:
[0007] The first aspect of the present invention is to provide a system for dredging turbid water in an upstream river channel, comprising a natural sedimentation unit, a dosing unit, a turbulent mixing unit and a rubber dam type non-disturbance sedimentation unit which are sequentially arranged in the river channel along the water flow direction downstream of the construction point, wherein:
[0008] The dosing unit includes a dosing pipeline for adding a water purifier;
[0009] The natural sedimentation unit includes the river area between the construction site and the dosing pipeline;
[0010] The reagent turbulent flow unit comprises two cofferdams respectively arranged on both sides of the river channel, and a dragon mouth area formed between the cofferdams;
[0011] The rubber dam type disturbance-free sedimentation unit comprises a first rubber dam using overflow water inlet and a second rubber dam using overflow water outlet, which are sequentially arranged along the water flow direction, and a horizontal flow sedimentation tank formed between the first rubber dam and the second rubber dam;
[0012] Furthermore, the system for disturbing turbid water and reducing turbidity during upstream river dredging construction also includes a slurry pump arranged at the tail end of the horizontal flow sedimentation tank.
[0013] Furthermore, the distance between the dosing pipeline and the construction point, that is, the length of the natural sedimentation unit, is 10 to 20 meters.
[0014] Furthermore, a plurality of drug outlets are evenly arranged on the drug adding pipeline, and the interval between the drug outlets is 10 to 15 cm.
[0015] Furthermore, the cofferdam is a homogeneous soil cofferdam prepared by dredging and desilting the bottom mud, and the permeability coefficient of the cofferdam is not greater than 1×10 -4 cm / s, the distance between the cofferdam and the upstream dosing pipeline is 2.0-5.0m, the distance between the cofferdam and the downstream first rubber dam is 2.0-5.0m, and the width of the dragon mouth area is 30%-50% of the river width.
[0016] Furthermore, the backwater height of the first rubber dam and the second rubber dam is 1.0-1.5 m.
[0017] Furthermore, the arrangement spacing L (m) between the first rubber plate and the second rubber dam is L1 + L2, L1 is 1.0-3.0 m long, and L2 is determined by the field working data of water depth H (m), water flow velocity V (m / s) and gravity acceleration g (m / s 2 ) is calculated by simulation, and the formula is as follows:
[0018]
[0019] A second aspect of the present invention is to provide a method for reducing turbidity in disturbed turbid water during upstream river dredging construction, comprising the following steps:
[0020] (1) Natural sedimentation: In the natural sedimentation unit downstream of the construction site, a small portion of suspended sediment in the turbid water generated by the construction disturbance settles to the bottom of the river channel under the action of gravity;
[0021] (2) Coagulation: After natural sedimentation, the turbid water flows through the dragon mouth area of the reagent turbulent flow unit, where the flow rate increases and turbulence is formed. The water purifier injected from the dosing pipe mixes rapidly with the turbid water in the turbid flow area and reacts with the suspended particles in the turbid water to form flocs.
[0022] (3) Rubber dam type undisturbed sedimentation: After the turbid water containing floccules flows through the first rubber dam, it enters the horizontal flow sedimentation tank without construction disturbance, where the floccules settle and migrate to the tail end of the horizontal flow sedimentation tank with the water flow.
[0023] Furthermore, the water purifier includes a flocculant and a photocatalyst, the flocculant is selected from two or more of terminal amino branched cationic polymers, cationic starch, chitosan, polyaluminum chloride, polyferric sulfate and polyaluminum ferric sulfate, and the photocatalyst is selected from one or two of nano titanium dioxide and nano zinc oxide titanium dioxide composite materials.
[0024] Furthermore, the dosage of the water purifier is 30 to 120 mg / L.
[0025] The beneficial effects of the present invention are as follows:
[0026] 1. The turbidity reduction system of the present invention adopts a combination of a natural sedimentation unit, a dosing unit, a turbulent flow unit and a rubber dam type disturbance-free sedimentation unit, which can effectively reduce the pollution load such as suspended matter and turbidity generated by environmental dredging construction, and has a significant turbidity reduction effect; in addition, the turbidity reduction system is easy to construct and can be moved and installed as the construction site changes, which is low-cost and does not affect the normal water flow and flood discharge of the river.
[0027] 2. In the agent turbulent unit of the present invention, the dredged sludge generated by upstream environmental dredging is used to fill the homogeneous earth cofferdam, thereby forming a dragon mouth area, promoting the turbulent mixing of the agent, realizing the resource utilization of the waste mud, reducing the disposal cost, and reducing the use of mixing equipment, reducing the project cost, while using local materials to improve the convenience of construction.
[0028] 3. In the rubber dam type disturbance-free sedimentation unit of the present invention, the arrangement of two rubber dams forms a "horizontal flow sedimentation tank" without construction disturbance, which reduces the disturbance of construction to the flocs and ensures the turbidity reduction effect; in addition, the height of the rubber dam increases the hydraulic retention time, prolongs the sedimentation time of the flocs and effectively reduces construction disturbance, further improving the turbidity reduction effect.
[0029] 4. The water purifier used in the present invention includes a flocculant and a photocatalyst. First, the flocculant in the water purifier is cheap compared to polyacrylamide, and can form larger flocs with suspended matter, making it easier to settle in the rubber dam type undisturbed sedimentation unit, and has a better sedimentation effect; at the same time, a stable, cheap, easily available, non-toxic and harmless photocatalyst is introduced to photodegrade organic pollutants, which can not only reduce turbidity, but also play a role in water purification. BRIEF DESCRIPTION OF THE DRAWINGS
[0030] Figure 1 It is a schematic diagram of a system for disturbing turbid water and reducing turbidity during upstream river dredging construction according to the present invention.
[0031] In the figure:
[0032] 1-natural sedimentation unit; 2-dosing unit; 21-dosing pipeline; 22-drug outlet; 3-drug turbulence unit; 31-cofferdam; 32-longkou area; 4-rubber dam type undisturbed sedimentation unit; 41-first rubber dam; 42-second rubber dam; 43-advection sedimentation tank; 44-slurry pump. DETAILED DESCRIPTION
[0033] The technical solution of the present invention is clearly and in detail described below through specific embodiments in conjunction with the accompanying drawings. It should be understood that the following embodiments are only part of the embodiments of the present invention and are not intended to limit the protection scope of the present invention.
[0034] Unless otherwise specified, the equipment used in the following examples, such as a slurry pump, are all conventional equipment, and the reagents used are all commercially available.
[0035] like Figure 1 As shown, a system for dredging turbid water in upstream river channel is provided, comprising a natural sedimentation unit 1, a dosing unit 2, a turbulent mixing unit 3 and a rubber dam type non-disturbance sedimentation unit 4 which are sequentially arranged in the river channel along the water flow direction downstream of the construction point, wherein:
[0036] The dosing unit 2 includes a dosing pipeline 21 for adding a water purifier;
[0037] The natural sedimentation unit 1 includes a river channel area between a construction site and a dosing pipeline 21; turbid river water generated by construction disturbances such as excavation and dredging at the construction site of the upstream river channel affects the downstream through water flow diffusion, and in the natural sedimentation section unit 1, a small portion of suspended sediment in the turbid water settles to the bottom of the river channel under the action of gravity.
[0038] The reagent turbulent flow unit 3 includes two cofferdams 31 respectively arranged on both sides of the river channel, and a dragon mouth area 32 formed between the cofferdams 31; when turbid water flows through the dragon mouth area 32, due to the narrowing of the river channel, the flow velocity increases, turbulence is formed, and the water purifier injected by the dosing pipe 21 is quickly mixed with the turbid water in the turbid flow area, and a coagulation reaction occurs with the suspended particles in the turbid water to form large-sized flocs.
[0039] The rubber dam type undisturbed sedimentation unit 4 includes a first rubber dam 41 and a second rubber dam 42 which are arranged in sequence along the water flow direction and use overflow water inlet, and a horizontal flow sedimentation tank 43 formed between the first rubber dam 41 and the second rubber dam 42; after the turbid water containing floccules flows through the first rubber dam 41, it enters the horizontal flow sedimentation tank 43 without construction disturbance, and the floccules settle here and migrate to the tail end of the horizontal flow sedimentation tank 43 with the water flow.
[0040] Furthermore, the system for reducing turbidity in disturbed turbid water during upstream river dredging construction also includes a slurry pump 44 disposed at the tail end of the horizontal flow sedimentation tank 43, and the slurry pump 44 is used to absorb the precipitated flocs.
[0041] Furthermore, the distance between the dosing pipeline 21 and the construction point, that is, the length of the natural sedimentation unit 1, is 10 to 20 meters.
[0042] Furthermore, the drug adding pipeline 21 is evenly provided with drug outlets 22 , and the interval between the drug outlets 22 is 10 to 15 cm.
[0043] Furthermore, the cofferdam 31 is a homogeneous soil cofferdam prepared by dredging and clearing the bottom mud, and the permeability coefficient of the cofferdam 31 is not greater than 1×10 -4 cm / s, the distance between the cofferdam 31 and the upstream dosing pipeline 21 is 2.0-5.0 m, the distance between the cofferdam 31 and the downstream first rubber dam 41 is 2.0-5.0 m, and the width of the dragon mouth area 32 is 30%-50% of the river width.
[0044] Furthermore, the backwater height of the first rubber dam 41 and the second rubber dam 42 is 1.0-1.5m. The height of the first rubber dam 41 and the second rubber dam 42 increases the hydraulic retention time, prolongs the sedimentation time of the flocculants, and further improves the turbidity reduction effect. The arrangement spacing L (m) between the first rubber plate and the second rubber dam is L1 + L2, L1 is 1.0-3.0m long, and L2 is calculated by the field working data water depth H (m), water flow velocity V (m / s) and gravity acceleration g (m / s 2 ) is calculated by simulation, and the formula is as follows:
[0045]
[0046] A method for reducing turbidity in disturbed turbid water during upstream river dredging construction, comprising the following steps:
[0047] (1) Natural sedimentation: In the natural sedimentation unit 1 downstream of the construction site, a small portion of suspended sediment in the turbid water generated by the construction disturbance settles to the bottom of the river channel under the action of gravity;
[0048] (2) Coagulation: After natural sedimentation, the turbid water flows through the dragon mouth area 32 of the reagent turbulent flow unit 3, and the flow rate increases, forming turbulence. The water purifier added by the dosing pipe 21 mixes rapidly with the turbid water in the turbid flow area and reacts with the suspended particles in the turbid water to form flocs.
[0049] (3) Rubber dam type undisturbed sedimentation: After the turbid water containing floccules flows through the first rubber dam 41, it enters the horizontal flow sedimentation tank 43 without construction disturbance, where the floccules settle and migrate to the tail end of the horizontal flow sedimentation tank 43 with the water flow.
[0050] Furthermore, the water purifier includes a flocculant and a photocatalyst, the flocculant is selected from two or more of terminal amino branched cationic polymers, cationic starch, chitosan, polyaluminum chloride, polyferric sulfate and polyaluminum ferric sulfate, and the photocatalyst is selected from one or two of nano titanium dioxide and nano zinc oxide titanium dioxide composite materials.
[0051] Furthermore, the dosage of the water purifier is 30 to 120 mg / L.
[0052] The water purifier used in the present invention includes a flocculant and a photocatalyst. First, the flocculant in the water purifier can form a larger floc with the suspended matter, so that it is easier to settle in the rubber dam type disturbance-free sedimentation unit and has a better sedimentation effect; at the same time, a photocatalyst with stable performance, low price, easy to obtain, non-toxic and harmless is introduced to photodegrade organic pollutants, which can not only reduce turbidity but also play a water purification role.
[0053] Example 1
[0054] The water quality of a river upstream is turbid due to environmental dredging construction. The turbidity is detected to be 300 NTU. The system described in Example 1 is used for turbidity reduction treatment. The treatment steps are as follows:
[0055] (1) Natural sedimentation: In the natural sedimentation unit 1 downstream of the construction site, a small portion of suspended sediment in the turbid water generated by the construction disturbance settles to the bottom of the river channel under the action of gravity.
[0056] (2) Coagulation: A dosing pipeline 21 is set 12 meters downstream of the construction site. The water purifier transported in the pipeline includes, by mass fraction, 1.5 parts of amino-terminated branched cationic polymer, 0.3 parts of cationic modified starch, 4 parts of polyferric sulfate, 1 part of nano zinc oxide titanium dioxide composite material and 1 part of nano titanium dioxide; the dosing amount of the water purifier is 30 mg / L.
[0057] The turbid water after natural sedimentation flows through the dragon mouth area 32 of the reagent turbulent flow unit 3, the flow velocity increases, and turbulence is formed. The water purifier injected from the dosing pipe 21 mixes rapidly with the turbid water in the turbid flow area, and reacts with the suspended particles in the turbid water to form flocs.
[0058] (3) Rubber dam type undisturbed sedimentation: The water holding height of the first rubber plate and the second rubber dam is set at 1.0 m, and the spacing between the two is 20 m. After the turbid water containing floccules flows through the first rubber dam 41, it enters the horizontal flow sedimentation tank 43 without construction disturbance. The floccules settle here and migrate to the tail end of the horizontal flow sedimentation tank 43 with the water flow. The slurry pump 7 at the tail end of the horizontal flow sedimentation tank 43 is turned on to absorb the precipitated floccules.
[0059] The turbidity of the turbid water treated by the system used to reduce the turbidity of disturbed turbid water during upstream river dredging construction was reduced to 5.7 NTU after testing.
[0060] Example 2
[0061] This embodiment is basically the same as the embodiment 1, except that the water purifier includes 2 parts of cationic modified starch, 1 part of chitosan, 5 parts of polyaluminium chloride and 4 parts of nano-titanium dioxide; the dosage of the water purifier is 80 mg / L.
[0062] The turbidity of the turbid water treated by the system used to reduce the turbidity of disturbed turbid water during upstream river dredging construction was reduced to 12.7 NTU after testing.
[0063] Example 3
[0064] This embodiment is basically the same as Embodiment 1, except that the water purifier comprises, by mass fraction, 2 parts of amino-terminated branched cationic polymer, 2 parts of chitosan, 9 parts of polyaluminum ferric sulfate and 3 parts of nano zinc oxide titanium dioxide composite material; and the dosage of the water purifier is 120 mg / L.
[0065] The turbidity of the turbid water treated by the above turbidity reduction system was reduced to 8.5 NTU after testing.
[0066] The above embodiments provide a detailed description of the technical solution of the present application, and their purpose is to enable technical personnel familiar with the art to understand the content of the present application and implement it, and it cannot be used to limit the scope of protection of the present application. Any equivalent changes, substitutions or modifications made according to the spirit and inventive concept of the present application should be included in the scope of protection of the present application.
Claims
1. A system for reducing turbidity in disturbed turbid water during dredging construction in an upstream river, characterized in that: It includes a natural sedimentation unit, a dosing unit, a turbulent mixing unit and a rubber dam type undisturbed sedimentation unit which are sequentially arranged in the river channel along the water flow direction downstream of the construction site, wherein: The dosing unit includes a dosing pipeline for adding a water purifier; The natural sedimentation unit includes the river area between the construction site and the dosing pipeline; The reagent turbulent flow unit comprises two cofferdams respectively arranged on both sides of the river channel, and a dragon mouth area formed between the cofferdams; The rubber dam type disturbance-free sedimentation unit comprises a first rubber dam with overflow water inlet and a second rubber dam with overflow water outlet which are sequentially arranged along the water flow direction, and a horizontal flow sedimentation tank formed between the first rubber dam and the second rubber dam.
2. The system for reducing turbidity in disturbed turbid water during upstream river dredging construction according to claim 1, characterized in that: The system for disturbing turbid water and reducing turbidity during upstream river dredging construction also includes a slurry pump arranged at the tail end of the horizontal flow sedimentation tank.
3. The system for reducing turbidity in disturbed turbid water during upstream river dredging construction according to claim 1, characterized in that: The distance between the dosing pipeline and the construction point, that is, the length of the natural sedimentation unit, is 10 to 20 meters.
4. The system for reducing turbidity in disturbed turbid water during upstream river dredging construction according to claim 1, characterized in that: The drug adding pipeline is evenly provided with a plurality of drug outlets, and the interval between the drug outlets is 10 to 15 cm.
5. The system for reducing turbidity in disturbed turbid water during upstream river dredging construction according to claim 1, characterized in that: The cofferdam is a homogeneous soil cofferdam made by dredging and clearing the bottom mud, and the permeability coefficient of the cofferdam is not greater than 1×10 -4 cm / s, the distance between the cofferdam and the upstream dosing pipeline is 2.0-5.0m, the distance between the cofferdam and the downstream first rubber dam is 2.0-5.0m, and the width of the dragon mouth area is 30%-50% of the river width.
6. The system for reducing turbidity in disturbed turbid water during upstream river dredging construction according to claim 1, characterized in that: The backwater height of the first rubber dam and the second rubber dam is 1.0-1.5 m.
7. The system for reducing turbidity in disturbed turbid water during upstream river dredging construction according to claim 1, characterized in that: The arrangement spacing L (m) between the first rubber plate and the second rubber dam is L1 + L2, where L1 is 1.0-3.0 m long and L2 is determined by the field working data of water depth H (m), water flow velocity V (m / s) and gravity acceleration g (m / s 2 ) is calculated by simulation, and the formula is as follows:
8. A method for reducing turbidity in disturbed turbid water during upstream river dredging construction, characterized in that: The system for reducing turbidity in disturbed turbid water during dredging construction in an upstream river according to any one of claims 1 to 7 comprises the following steps: (1) Natural sedimentation: In the natural sedimentation unit downstream of the construction site, a small portion of suspended sediment in the turbid water generated by the construction disturbance settles to the bottom of the river channel under the action of gravity; (2) Coagulation: After natural sedimentation, the turbid water flows through the dragon mouth area of the reagent turbulent flow unit, where the flow rate increases and turbulence is formed. The water purifier injected from the dosing pipe mixes rapidly with the turbid water in the turbid flow area and reacts with the suspended particles in the turbid water to form flocs. (3) Rubber dam type undisturbed sedimentation: After the turbid water containing floccules flows through the first rubber dam, it enters the horizontal flow sedimentation tank without construction disturbance, where the floccules settle and migrate to the tail end of the horizontal flow sedimentation tank with the water flow.
9. The method for reducing turbidity in disturbed turbid water during upstream river dredging construction according to claim 8, characterized in that: The water purifier comprises a flocculant and a photocatalyst, wherein the flocculant is selected from two or more of terminal amino branched cationic polymers, cationic starch, chitosan, polyaluminium chloride, polyferric sulfate and polyaluminium ferric sulfate, and the photocatalyst is selected from one or two of nano titanium dioxide and nano zinc oxide titanium dioxide composite materials.
10. The method for reducing turbidity in disturbed turbid water during upstream river dredging construction according to claim 8, characterized in that: The dosage of the water purifier is 30-120 mg / L.