Small ship lifting device capable of saving civil engineering quantity and ship lifting method of small ship lifting device
By designing a small ship lifting device, using water level difference monitoring and nonlinear flow control of navigation mechanisms and gate mechanisms, the complexity and cost of traditional ship lifting machines are solved, and efficient ship lifting and passing tasks in small drop channels are achieved. , simplifies operations and saves civil engineering volume.
Patent Information
- Application Number
- CN202410958740.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-17
- Publication Date
- 2024-11-08
AI Technical Summary
Traditional ship lifts have complex structures, many equipment and complex operation, which is a waste of waterways with small drops. A small ship lift system that can save civil engineering volume is needed to meet functional needs while maximizing cost savings and simplifying operation operations.
A small ship lifting device is designed, including a navigation mechanism and a gate mechanism. The opening and closing components and gate components are controlled through a water level difference monitor. The water level is adjusted using a nonlinear flow control formula to realize the ship lifting and passing tasks of ships.
It realizes a simple structure, simplified operation process and low cost to lift and pass the ship, meets the needs of small drop channels and maximizes the saving of civil engineering projects.
Smart Images

Figure CN118911103A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of ship-passing and shipping facilities in water conservancy projects, and in particular to a small ship-lifting device and a ship-lifting method thereof that saves civil engineering work. Background Art
[0002] With the rapid development of water conservancy, more and more river management and river landscape projects have emerged. In order to solve the contradiction between blocking the river and river navigation, the research on small ship lifts is imperative. The traditional ship lift has a cumbersome structure, more equipment, and more complicated operation, which is a waste for waterways with small drop. Therefore, if there is a practical small ship lift system to replace the traditional ship lift, it can maximize cost savings and simplify operation while meeting functional requirements, which will be of great significance to the construction of a large number of emerging river management and river landscape projects. Summary of the invention
[0003] In view of the above-mentioned problems existing in the existing small-sized ship lift device for saving civil engineering work, the present invention is proposed.
[0004] Therefore, the object of the present invention is to provide a small ship lift device that saves civil engineering work, and its purpose is to save civil engineering work to meet the task of lifting and passing ships in a small drop channel.
[0005] In order to solve the above technical problems, the present invention provides the following technical solutions: comprising a navigation mechanism, which is used to load a gate mechanism, and the gate mechanism is controlled by a control mechanism to lift the ship;
[0006] The gate mechanism includes an opening and closing component arranged on the navigation mechanism and the lower gate component and the upper gate component are controlled to open by the opening and closing component, and a water level difference monitor is arranged in the navigation mechanism, and the opening and closing of the navigation mechanism is controlled by the lower gate component and the upper gate component.
[0007] As a preferred solution of the small ship lift device for saving civil engineering work amount described in the present invention, the navigation mechanism includes a waterway, side retaining walls arranged on both sides of the waterway, a first step sill and a second step sill arranged at one end of the waterway, and a gate frame arranged on the side retaining walls.
[0008] As a preferred solution of the small ship lift device for saving civil engineering work volume described in the present invention, the waterway between the first step sill and the second step sill is the midstream area, one end of the first step sill is the downstream area, and one end of the second step sill is the upstream area.
[0009] As a preferred solution of the small ship lift device for saving civil engineering work amount of the present invention, wherein: the lower gate assembly and the upper gate assembly are arranged in the gate groove of the waterway;
[0010] The gate door frame includes a door frame seat arranged on the side retaining wall, a bottom support seat arranged on the waterway through anchor bolts, a tie rod connected to the bottom support seat, and a bolt seat arranged on the tie rod.
[0011] As a preferred solution of the small ship lift device for saving civil engineering work amount described in the present invention, the opening and closing assembly includes a hoist arranged on the side retaining wall and a piston rod arranged at the output end of the hoist to drive the lower gate assembly and the upper gate assembly to open and close.
[0012] As a preferred solution of the small ship lifting device for saving civil engineering work amount described in the present invention, the lower gate assembly includes a gate body with a beam structure, a bolt body connected to one side of the gate body and connected to the bolt seat, a bottom support arranged on one side of the gate body and connected to the bottom support seat, a water guide assembly arranged in the gate body, a lifting ear arranged at one end of the gate body and connected to the piston rod, and a first water stop member and a second water stop member arranged on the outer surface of the gate body for stopping water.
[0013] As a preferred solution of the small ship lift device for saving civil engineering work volume described in the present invention, the water guide assembly includes an electric valve arranged in the gate body, an expansion joint arranged at one end of the electric valve and a water filling pipe on the expansion joint, and the electric valve and the water filling pipe are connected through the expansion joint.
[0014] As a preferred solution of the small ship lift device for saving civil engineering work amount described in the present invention, the structure of the lower gate assembly is the same as that of the upper gate assembly.
[0015] In view of the problems existing in the above-mentioned existing ship lifting methods, the present invention is proposed.
[0016] Therefore, the object of the present invention is to provide a ship lifting method, and its purpose is to utilize the method to perform ship lifting and passing tasks in a small drop channel.
[0017] In order to solve the above technical problems, the present invention provides the following technical solutions: when a ship approaches, by opening the water guiding component of the lower gate assembly, when the water level difference monitor before and after the lower gate assembly detects that the water level difference is 0, the lower gate assembly is opened to wait for the ship to enter the lock chamber; after the ship enters the lock chamber, the water guiding component of the upper gate assembly is opened, when the water level difference monitor before and after the upper gate assembly detects that the water level difference is 0, the upper gate assembly is opened, and after the ship leaves the lock chamber, the upper gate assembly is closed to cut off the water, thereby achieving the task of lifting the ship to pass.
[0018] As a preferred embodiment of the ship lifting method of the present invention, when the ship approaches, it is ensured that the parameters are correctly initialized, including setting h targeth, ensure that the upper gate assembly and the lower gate assembly are both in the closed state;
[0019] The drainage flow is calculated by opening the water guide component (202d) inside the lower gate component (202) using a nonlinear flow control formula:
[0020]
[0021] Among them, Q out (t) is the drainage flow at time t, that is, the volume of water discharged from the gate per unit time; C out is the flow coefficient of the drainage valve; h(t) represents the current water level, which refers to the water level in the gate chamber at a specific time t; β is the introduced nonlinear index used to adjust the nonlinear response of the drainage flow rate with the change of water level; g is the gravitational acceleration; h u is the height of the upstream water surface relative to the gate;
[0022] Simultaneously monitor and adjust water level changes:
[0023]
[0024] Where h is the horizontal height in the lock chamber; t is the time dependence of the process; is the second-order derivative of the water level with respect to time, indicating the acceleration of the water level change; ζ is the damping coefficient, used to describe the damping effect of the water flow; A is the cross-sectional area of the lock chamber, which affects the relationship between the water flow and the water level change; ρ is the density of water, used to convert the mass flow rate into the volume flow rate; P is the water pressure in the lock chamber; is the response function of pressure to water level, describing how water pressure changes with water level; Q in (t) is the water inflow rate, which means the amount of water flowing into the lock chamber per unit time; Q out (t) is the outflow rate, which means the amount of water flowing out of the lock chamber per unit time; σ is another damping coefficient that describes the dynamic behavior of the water flow;
[0025] Then monitor and balance the water level difference of the lower gate assembly. After the water level is balanced, open the lower gate assembly. When the water level is close to the target water level and stable, determine whether to open the gate:
[0026] Open the gates
[0027] Among them, h target is the target water level; ∈ is the allowable error range; To make the water level change rate approach zero and ensure the water level is stable;
[0028] After waiting for the ship to pass safely, use the conditional judgment again to close the gate;
[0029] Repeat this step to perform water level monitoring, opening and closing of the gate on the upper gate assembly.
[0030] The beneficial effects of the present invention are as follows: the overall structure is simple, the amount of civil engineering work can be saved to the greatest extent, the operation process is simple, the technology is mature and reliable, the construction cost is relatively low, and the ship lifting and passing task in a small drop channel can be met. BRIEF DESCRIPTION OF THE DRAWINGS
[0031] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the following briefly introduces the drawings required for describing the embodiments. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work. Among them:
[0032] Figure 1 This is a schematic diagram of the overall longitudinal section structure of a small ship lifting device and a ship lifting method thereof that saves civil engineering work in the present invention.
[0033] Figure 2 The present invention is a schematic diagram of the overall side cross-sectional structure of a small ship lifting device and a ship lifting method thereof that saves civil engineering work.
[0034] Figure 3 The present invention is a structural schematic diagram of the process of closing, opening and closing of the upper gate assembly and the lower gate assembly of the small-sized ship lifting device and the ship lifting method thereof for saving civil engineering work.
[0035] Figure 4 The present invention is a schematic diagram of the side section structure of the lower gate assembly of a small ship lifting device and a ship lifting method thereof that saves civil engineering work.
[0036] Figure 5 The present invention is a schematic diagram of the longitudinal section structure of the lower gate assembly of a small ship lifting device and a ship lifting method thereof that saves civil engineering work.
[0037] Figure 6 The present invention is a schematic diagram of the cross-sectional structure of the lower gate assembly of a small ship lifting device and a ship lifting method thereof that saves civil engineering work.
[0038] Figure 7 The present invention is a schematic diagram of the top-down structure of the installation of the lower gate assembly of the small-sized ship lifting device and the ship lifting method thereof for saving civil engineering work.
[0039] Figure 8 The present invention is a schematic diagram of the side section structure of a door frame seat in a gate frame of a small-sized ship lifting device and a ship lifting method thereof that saves civil engineering work. DETAILED DESCRIPTION
[0040] In order to make the above-mentioned objects, features and advantages of the present invention more obvious and easy to understand, the specific implementation methods of the present invention are described in detail below in conjunction with the accompanying drawings.
[0041] In the following description, many specific details are set forth to facilitate a full understanding of the present invention, but the present invention may also be implemented in other ways different from those described herein, and those skilled in the art may make similar generalizations without violating the connotation of the present invention. Therefore, the present invention is not limited to the specific embodiments disclosed below.
[0042] Secondly, the term "one embodiment" or "embodiment" as used herein refers to a specific feature, structure, or characteristic that may be included in at least one implementation of the present invention. The term "in one embodiment" that appears in different places in this specification does not necessarily refer to the same embodiment, nor does it refer to a separate or selective embodiment that is mutually exclusive with other embodiments.
[0043] Secondly, the present invention is described in detail with reference to the schematic diagram. When describing the embodiments of the present invention in detail, for the sake of convenience, the cross-sectional diagrams showing the device structure will not be partially enlarged according to the general scale, and the schematic diagrams are only examples, which should not limit the scope of protection of the present invention. In addition, in actual production, the three-dimensional dimensions of length, width and depth should be included.
[0044] Example 1
[0045] Reference Figures 1 to 4 , which is the first embodiment of the present invention, provides a small ship lifting device that saves civil engineering work, the device includes a navigation mechanism 100 and a gate mechanism 200, the navigation mechanism 100 is used to load the gate mechanism 200, and the gate mechanism 200 is controlled by the control mechanism 300 to lift the ship; the gate mechanism 200 includes an opening and closing component 203 arranged in the navigation mechanism 100 and the lower gate component 202 and the upper gate component 201 are controlled to open by the opening and closing component 203, and a water level difference monitor 204 is arranged in the navigation mechanism 100, and the navigation mechanism 100 is opened and closed by the lower gate component 202 and the upper gate component 201.
[0046] The water level in the navigation mechanism 100 can be observed through the water level difference monitor 204. The worker is in the control mechanism 300 for a long time and can use the equipment control console 302 in the hoisting machine room 301 to control the opening of the lower gate assembly 202 and the upper gate assembly 201 respectively to facilitate the ship lifting.
[0047] The navigation mechanism 100 includes a waterway 101 , side retaining walls 102 arranged on both sides of the waterway 101 , a first step sill 103 and a second step sill 104 arranged at one end of the waterway 101 , and a gate frame 105 arranged on the side retaining walls 102 .
[0048] A ship lift passage is formed by the channel 101 and the side retaining wall 102, and the lower gate assembly 202 and the upper gate assembly 201 are both arranged in the gate frame 105 for easy opening. When the ship enters the first step sill 103, the lower gate assembly 202 is opened until the ship enters between the first step sill 103 and the second step sill 104 and stays in front of the upper gate assembly 201. At this time, the lower gate assembly 202 is closed and the upper gate assembly 201 is opened, so that the ship moves out of the second step sill 104 to realize the ship lift.
[0049] During use, the channel 101 between the first step sill 103 and the second step sill 104 is a midstream area, one end of the first step sill 103 is a downstream area, and one end of the second step sill 104 is an upstream area;
[0050] When the ship enters the downstream area of the first step sill 103, the lower gate assembly 202 is opened until the ship enters the midstream area between the first step sill 103 and the second step sill 104, and the ship stays in front of the upper gate assembly 201. At this time, the lower gate assembly 202 is closed and the upper gate assembly 201 is opened, so that the ship moves out of the second step sill 104, and when it moves to the upstream area, the upper gate assembly 201 is closed to achieve the ship lifting.
[0051] Example 2
[0052] Reference Figures 1 to 8 , which is the second embodiment of the present invention. This embodiment is different from the first embodiment in that: the lower gate assembly 202 and the upper gate assembly 201 are arranged in the gate groove of the waterway 101; the gate door frame 105 includes a door frame seat 105a arranged on the side retaining wall 102, a bottom support seat 105d arranged on the waterway 101 through an anchor bolt 105e, a tie rod 105b connected to the bottom support seat 105d, and a bolt seat 105c arranged on the tie rod 105b.
[0053] Compared with Example 1, further, the opening and closing assembly 203 includes a hoist 203a arranged on the side retaining wall 102 and a piston rod 203b arranged at the output end of the hoist 203a for driving the lower gate assembly 202 and the upper gate assembly 201 to open and close.
[0054] The lower gate assembly 202 and the upper gate assembly 201 can be supported and restricted by the door frame seat 105a and the tie rod 105b. The tie rod 105b is arranged on the door frame seat 105a to fix the gate frame 105 in the channel 101 and the side retaining wall 102.
[0055] The lower gate assembly 202 includes a gate body 202a provided with a beam structure, a bolt body 202b connected to one side of the gate body 202a and connected to the bolt seat 105c, a bottom support 202c arranged on one side of the gate body 202a and connected to the bottom support seat 105d, a water guide assembly 202d arranged in the gate body 202a, a lifting ear 202e arranged at one end of the gate body 202a and connected to the piston rod 203b, and a first water stop 202f and a second water stop 202g arranged on the outer surface of the gate body 202a for stopping water. The structure of the lower gate assembly 202 is the same as that of the upper gate assembly 201.
[0056] Since the structure of the lower gate assembly 202 is the same as that of the upper gate assembly 201, the opening and closing steps of the lower gate assembly 202 and the upper gate assembly 201 are also the same. By starting the opening and closing machine 203a, the piston rod 203b can be moved. Since the piston rod 203b is assembled with the lifting ear 202e, the reciprocating motion of the piston rod 203b drives the gate body 202a to rotate on the bolt seat 105c through the bolt body 202b, and rotates on the bottom support seat 105d through the bottom support 202c to open and close.
[0057] The gate body 202a is composed of an upstream panel, a downstream panel and a beam structure, and a cavity with only the top open is formed in the middle of the gate body 202a. A first water stop 202f and a second water stop 202g are respectively arranged at the bottom and both sides of the gate body 202a for sealing water upstream and downstream of the gate body 202a.
[0058] The water guide assembly 202d includes an electric valve 202d-1 disposed in the gate body 202a, an expansion joint 202d-2 disposed at one end of the electric valve 202d-1, and a water filling pipe 202d-3 on the expansion joint 202d-2. The electric valve 202d-1 and the water filling pipe 202d-3 are connected via the expansion joint 202d-2.
[0059] Since the gate body 202a is composed of an upstream panel, a downstream panel and a beam structure, a cavity with only the top open is formed in the middle of the gate body 202a. An electric valve 202d-1 and a water filling pipe 202d-3 are arranged inside the cavity of the gate body 202a. The electric valve 202d-1 and the water filling pipe 202d-3 are connected by a telescopic joint 202d-2.
[0060] When the ship is actually passing through, Figure 3As shown, at the beginning, both the lower gate assembly 202 and the upper gate assembly 201 are closed. First, the electric valve 202d-1 inside the lower gate assembly 202 is opened through the equipment control console 302 in the hoist room 301, and the water in the lock chamber is discharged into the midstream channel behind the lower gate assembly 202 through the water filling pipe 202d-3 inside the lower gate assembly 202. The water level difference is monitored by the water level difference monitor 204 before and after the lower gate assembly 202. After the water level difference before and after the lower gate assembly 202 is 0, the lower gate assembly 202 is first opened by the hydraulic hoist 203a. After the ship enters the midstream lock chamber, the hoist 203a is used to open the lower gate assembly 202. The lower gate assembly 202 is closed to cut off the water supply, and then the electric valve 202d-1 inside the upper gate assembly 201 is opened through the equipment control console 302, and the accumulated water in the channel in front of the upper gate assembly 201 is released into the lock chamber through the water filling pipe 202d-3 inside the upper gate assembly 201. The water level difference is monitored by the water level difference monitor 204 before and after the upper gate assembly 201. After the water level difference before and after the upper gate assembly 201 is 0, the upper gate assembly 201 is first opened by the hydraulic hoist 203a. After the ship leaves the lock chamber, the upper gate assembly 201 is closed and the water supply is cut off by the hoist 203a. This reciprocating process can achieve the task of lifting and passing ships.
[0061] The remaining structures are the same as those of Example 1.
[0062] Example 3
[0063] Reference Figures 1 to 8 , which is the third embodiment of the present invention, and this embodiment is different from the second embodiment in that: when the ship approaches, by opening the water guide component 202d of the lower gate component 202, when the water level difference monitor 204 before and after the lower gate component 202 monitors the water level difference to be 0, the lower gate component 202 is opened to wait for the ship to enter the lock chamber; after the ship enters the lock chamber, the water guide component 202d of the upper gate component 201 is opened, when the water level difference monitor 204 before and after the upper gate component 201 monitors the water level difference to be 0, the upper gate component 201 is opened, and after the ship leaves the lock chamber, the upper gate component 201 is closed to cut off the water, thereby achieving the task of lifting the ship to pass the ship.
[0064] Compared to Example 2, further, when the ship approaches, it is ensured that the parameters are initialized correctly, the water level difference monitor 204 is calibrated and the electric valve 202d-1 is tested for operation, including setting h targeth , ensuring that both the upper gate assembly 201 and the lower gate assembly 202 are in a closed state.
[0065] Drainage phase:
[0066] The operator opens the water guide assembly 202d inside the lower gate assembly 202 through the equipment console 302 to drain water;
[0067] The drainage process uses a nonlinear flow control formula to calculate the drainage flow:
[0068]
[0069] Among them, Q out (t) is the drainage flow at time t, that is, the volume of water discharged from the gate per unit time; C out is the flow coefficient of the drainage valve, dimensionless, describing the relationship between the valve opening and the flow; h(t) represents the current water level, which refers to the water surface height in the gate chamber at a specific time t, usually in meters / m; β is the introduced nonlinear index used to adjust the nonlinear response of the drainage flow with the change of water level; g is the gravitational acceleration, and the value on the normal earth's surface is about 9.81m / s 2 ;h u It is the height of the upstream water surface relative to the gate, usually in meters.
[0070] Water level monitoring and adjustment stage:
[0071] Operators simultaneously monitor and adjust water level changes:
[0072]
[0073] Where h is the horizontal height in the lock chamber; t is the time dependence of the process; is the second-order derivative of the water level with respect to time, indicating the acceleration of the water level change; ζ is the damping coefficient, which is used to describe the damping effect of the water flow; A is the cross-sectional area of the lock chamber, which affects the relationship between the water flow and the water level change, usually square meters / m 2 ; ρ is the density of water, which is used to convert mass flow rate into volume flow rate, a constant, about 1000kg / m3; P is the water pressure in the lock chamber, the unit is Pascal (Pa); Q is the response function of pressure to water level, describing how water pressure changes with water level, and its unit is Pa / m; in (t) is the water inflow rate, which means the amount of water flowing into the lock chamber per unit time; Q out (t) is the outflow rate, which means the amount of water flowing out of the lock chamber per unit time; σ is another damping coefficient that describes the dynamic behavior of the water flow;
[0074] After that, the water level difference of the lower gate assembly 202 is monitored and balanced. After the water level is balanced, the lower gate assembly 202 is opened. When the water level is close to the target water level and stable, the gate operation is performed:
[0075] Open the gates
[0076] Among them, h target is the target water level; ∈ is the allowable error range; To make the water level change rate approach zero and ensure the water level is stable;
[0077] If the difference between the water level and the target water level is less than a preset error limit and the rate of change of the water level is close to zero (i.e. the water level tends to be stable), the gate opening operation is performed.
[0078] Close / Do not open the gate
[0079] After the ship passes safely, if the difference between the water level and the target water level is greater than the error limit, or the water level change rate is not zero (i.e. the water level is not stable), the gate can be closed or not opened;
[0080] The above steps are repeated to monitor the water level of the upper gate assembly 201, and to open and close the gate, and this cycle can be repeated to achieve the task of lifting and passing ships.
[0081] The remaining structure is the same as that of Example 2.
[0082] Importantly, it should be noted that the construction and arrangement of the present application shown in a plurality of different exemplary embodiments are only exemplary. Although only a few embodiments are described in detail in this disclosure, it should be readily understood by those who refer to this disclosure that many modifications are possible (e.g., the size, scale, structure, shape and proportion of various elements, and parameter values (e.g., temperature, pressure, etc.), installation arrangement, use of materials, color, directional changes, etc.) without substantially departing from the novel teachings and advantages of the subject matter described in the application. For example, the element shown as integrally formed can be composed of multiple parts or elements, the position of the element can be inverted or otherwise changed, and the nature or number or position of the discrete element can be changed or changed. Therefore, all such modifications are intended to be included in the scope of the present invention. The order or sequence of any process or method steps can be changed or reordered according to alternative embodiments. In the claims, any "device plus function" clause is intended to cover the structure of performing the function described herein, and is not only structurally equivalent but also equivalent structure. Without departing from the scope of the present invention, other replacements, modifications, changes and omissions can be made in the design, operating conditions and arrangement of the exemplary embodiments. Therefore, the invention is not limited to a specific embodiment, but extends to numerous modifications still falling within the scope of the appended claims.
[0083] Additionally, in order to provide a concise description of exemplary embodiments, all features of an actual embodiment (ie, those features that are not relevant to the best mode presently contemplated for carrying out the invention or those that are not relevant to implementing the invention) may not be described.
[0084] It should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the preferred embodiments, those skilled in the art should understand that the technical solutions of the present invention may be modified or replaced by equivalents without departing from the spirit and scope of the technical solutions of the present invention, which should all be included in the scope of the claims of the present invention.
Claims
1. A small ship lift device that saves civil engineering work, characterized by: include, A navigation mechanism (100) is used to load a gate mechanism (200) and to control the gate mechanism (200) to lift the ship through a control mechanism (300); The gate mechanism (200) comprises an opening and closing component (203) arranged on the navigation mechanism (100) and controlling the opening of the lower gate component (202) and the upper gate component (201) through the opening and closing component (203), and a water level difference monitor (204) arranged in the navigation mechanism (100) and controlling the opening and closing of the navigation mechanism (100) through the lower gate component (202) and the upper gate component (201).
2. The small ship lift device for saving civil engineering work according to claim 1 is characterized in that: The navigation mechanism (100) comprises a waterway (101), side retaining walls (102) arranged on both sides of the waterway (101), a first step sill (103) and a second step sill (104) arranged at one end of the waterway (101), and a gate frame (105) arranged on the side retaining walls (102).
3. The small ship lift device for saving civil engineering work according to claim 2 is characterized in that: The waterway (101) between the first step sill (103) and the second step sill (104) is a midstream area, one end of the first step sill (103) is a downstream area, and one end of the second step sill (104) is an upstream area.
4. The small ship lift device for saving civil engineering work according to claim 2 or 3, characterized in that: The lower gate assembly (202) and the upper gate assembly (201) are arranged in a gate groove of the waterway (101); The gate door frame (105) comprises a door frame seat (105a) arranged on the side retaining wall (102), a bottom support seat (105d) arranged on the waterway (101) via an anchor bolt (105e), a tie rod (105b) connected to the bottom support seat (105d), and a bolt seat (105c) arranged on the tie rod (105b).
5. The small ship lift device for saving civil engineering work according to claim 4 is characterized in that: The opening and closing assembly (203) comprises a hoist (203a) arranged on the side retaining wall (102) and a piston rod (203b) arranged at the output end of the hoist (203a) for driving the lower gate assembly (202) and the upper gate assembly (201) to open and close.
6. The small ship lift device for saving civil engineering work according to claim 5 is characterized in that: The lower gate assembly (202) comprises a gate body (202a) provided with a beam structure, a bolt body (202b) connected to one side of the gate body (202a) and connected to the bolt seat (105c), a bottom support (202c) provided at one side of the gate body (202a) and connected to the bottom support seat (105d), a water guide assembly (202d) provided in the gate body (202a), a lifting ear (202e) provided at one end of the gate body (202a) and connected to the piston rod (203b), and a first water stop member (202f) and a second water stop member (202g) provided on the outer surface of the gate body (202a) for stopping water.
7. The small ship lift device for saving civil engineering work according to claim 6 is characterized in that: The water guide component (202d) comprises an electric valve (202d-1) arranged in the gate body (202a), an expansion joint (202d-2) arranged at one end of the electric valve (202d-1), and a water filling pipe (202d-3) on the expansion joint (202d-2); the electric valve (202d-1) and the water filling pipe (202d-3) are connected via the expansion joint (202d-2).
8. The small ship lift device for saving civil engineering work according to claim 7 is characterized in that: The lower gate assembly (202) has the same structure as the upper gate assembly (201).
9. A ship lifting method, characterized in that: The small ship lift device for saving civil engineering work amount according to any one of claims 5 to 8 further comprises: When a ship approaches, the water guide assembly (202d) of the lower gate assembly (202) is opened, so that when the water level difference monitor (204) before and after the lower gate assembly (202) detects that the water level difference is 0, the lower gate assembly (202) is opened to allow the ship to enter the lock chamber; After the ship enters the lock chamber, the water guide assembly (202d) of the upper gate assembly (201) is opened, so that when the water level difference monitor (204) before and after the upper gate assembly (201) detects that the water level difference is 0, the upper gate assembly (201) is opened, and after the ship leaves the lock chamber, the upper gate assembly (201) is closed to cut off the water, thereby achieving the task of lifting and passing the ship.
10. The ship lifting method according to claim 9, characterized in that: When the boat approaches, make sure the parameters are initialized correctly, including setting h targeth , ensuring that the upper gate assembly (201) and the lower gate assembly (202) are both in a closed state; The drainage flow is calculated by opening the water guide component (202d) inside the lower gate component (202) using a nonlinear flow control formula: Among them, Q out (t) is the drainage flow at time t, that is, the volume of water discharged from the gate per unit time; C out is the flow coefficient of the drainage valve; h(t) represents the current water level, which refers to the water level in the gate chamber at a specific time t; β is the introduced nonlinear index used to adjust the nonlinear response of the drainage flow rate with the change of water level; g is the gravitational acceleration; h u is the height of the upstream water surface relative to the gate; Simultaneously monitor and adjust water level changes: Where h is the horizontal height in the lock chamber; t is the time dependence of the process; is the second-order derivative of the water level with respect to time, indicating the acceleration of the water level change; ζ is the damping coefficient, used to describe the damping effect of the water flow; A is the cross-sectional area of the lock chamber, which affects the relationship between the water flow and the water level change; ρ is the density of water, used to convert the mass flow rate into the volume flow rate; P is the water pressure in the lock chamber; is the response function of pressure to water level, describing how water pressure changes with water level; Q in (t) is the water inflow rate, which means the amount of water flowing into the lock chamber per unit time; Q out (t) is the outflow rate, which means the amount of water flowing out of the lock chamber per unit time; σ is another damping coefficient that describes the dynamic behavior of the water flow; Then monitor and balance the water level difference of the lower gate assembly (202), open the lower gate assembly (202) after the water level is balanced. When the water level approaches the target water level and is stable, determine whether to open the gate: Open the gates Among them, h target is the target water level; ∈ is the allowable error range; To make the water level change rate approach zero and ensure the water level is stable; After waiting for the ship to pass safely, use the conditional judgment again to close the gate; Repeat this step to perform water level monitoring, opening and closing of the gate on the upper gate assembly (201).
