Fabricated integrated pipeline partition wall system and construction technology

By adopting a combined design of concrete slabs, wire mesh and steel in the prefabricated partition wall system, combined with dry construction technology, the problems of complex construction and low integration in the existing technology are solved, and high integration and convenient installation are achieved effect.

CN118911319AInactive Publication Date: 2024-11-08ZHU CHENG JIAN ZHU KE JI (NAN TONG) YOU XIAN GONG SI
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411136300.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-19
Publication Date
2024-11-08
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

The existing prefabricated partition wall systems require grooves and pipelines to be laid out during construction, resulting in complex processes and low overall integration. In particular, the ALC partition wall has high hardness and easy to break, and there are many light steel keel partition wall components, and the on-site installation is complicated.

Method used

A prefabricated integrated pipeline partition system is adopted, including concrete slabs, wire mesh, steel and decorative panels. The steel has an oblong hole inside to pass through the water and electricity pipelines, and hanging strips are set on the outside for easy installation and connection. Construction technology Through modular design and dry operation, avoid grooved and laid pipelines.

Benefits of technology

It realizes a convenient and highly integrated partition wall system, improves installation speed and safety, reduces construction costs, and avoids deformation and cracks of the wall structure.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118911319A_ABST
    Figure CN118911319A_ABST
Patent Text Reader

Abstract

The fabricated integrated pipeline partition wall system comprises a concrete plate, a steel wire mesh, profile steel, a water and electricity pipeline and a decoration panel, the steel wire mesh is embedded in the concrete plate and located at the thickness center line, one side of the profile steel is embedded in the concrete plate, and the end, located in the concrete plate, of the profile steel is welded to the steel wire mesh; the section steel is provided with a plurality of long circular holes, water and electricity pipelines are arranged in the through holes of the section steel in a penetrating mode, a plurality of hanging strips are transversely arranged on the outer side surface of the section steel, and the decoration panel is connected with the hanging strips in a matched mode. Various components are produced and manufactured in a standardized mode, and the purposes of being high in integration level, safe, reliable, capable of achieving good lateral stiffness, capable of being installed through connecting pieces on site, high in installation speed, convenient to construct and reasonable in manufacturing cost are achieved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of building partition wall construction, and in particular to an assembled integrated pipeline partition wall system and a construction process. Background Art

[0002] Affected by factors such as technological and economic development and labor shortage, prefabricated buildings have become an important direction for the development of the construction industry. Prefabricated interior decoration is an important part of prefabricated buildings, including prefabricated partition systems, prefabricated floor systems, prefabricated ceiling systems, prefabricated kitchens and prefabricated bathrooms. Among them, the prefabricated partition system is composed of multiple components, including decorative surface layers, substrates, functional modules, and various auxiliary components, such as keels, connectors, and filling materials. Its manufacturing process adopts a dry method, that is, production is carried out in the factory and assembly and installation are carried out on site to form an integrated wall product.

[0003] In the current prefabricated interior partition wall projects, they can be mainly divided into two categories: one is the prefabricated lightweight concrete partition wall, such as the prefabricated partition wall using ALC strips, which has the advantages of light weight, high strength, good sound insulation, and convenient construction. The profile is fixed to the partition wall through the leveling component, and then the wall panel is hung on the profile. The core feature of this system is that the wall components are isolated from the main wall of the building by certain components, and there is no direct contact, but it is fixed in a way of "hanging" on the main wall. This isolation design allows the wall components to move independently, thereby effectively avoiding deformation and cracks in the wall structure, and improving the overall stability and durability; the other type mainly relies on the combination of horizontal and vertical light steel keels to form the load-bearing system of the partition wall, and the wall panels are hung through the combination of horizontal light steel keels and connectors.

[0004] The existing ALC partition wall (autoclaved lightweight aerated concrete partition board) has high hardness and is easy to break. The pipelines need to be grooved at the construction site. There are many light steel keel partition wall components, the on-site installation process is complicated, and the overall integration is not high. Therefore, an improved technology is urgently needed to solve the problems existing in the prior art. Summary of the invention

[0005] The purpose of the present invention is to provide an assembled integrated pipeline partition wall system and construction process, which adopts dry operation, does not require on-site grooving, is convenient to construct, and has high product integration, so as to solve the problems raised in the above background technology.

[0006] To achieve the above-mentioned purpose, the present invention provides the following technical solutions: an assembled integrated pipeline partition wall system, comprising a concrete slab, a steel mesh, a steel section, water and electricity pipelines and a decorative panel, wherein a steel mesh is buried inside the concrete slab and at the midline of the thickness, one side of the steel section is buried in the concrete slab, one end of the steel section located inside the concrete slab is welded to the steel mesh, a plurality of oblong holes are opened in the steel section, water and electricity pipelines are passed through the through holes of the steel section, a plurality of hanging strips are transversely arranged on the outer surface of the steel section, and the decorative panel is connected with the hanging strips in coordination;

[0007] A construction process of an assembled integrated pipeline partition wall system comprises the following steps:

[0008] Step 1: Clean the ground to ensure there is no dust or debris on the ground;

[0009] Step 2: Position and lay out the lines, pop up the partition wall to complete the surface lines and channel steel fixing points;

[0010] Step 3: Use L-shaped angle brackets to install the channel steel at fixed points. One side of the angle bracket is fixed to the floor and top surface with expansion bolts, and the other side is connected to the channel steel with bolts to ensure that the channel steel is vertical and the concrete slab is in a vertical plane.

[0011] Step 4: When the top of the vertical keel encounters equipment or beams, it should be disconnected and a top transverse keel should be added. Both ends of the transverse keel should be fixed to the vertical keel to ensure its overall firmness;

[0012] Step 5: Add a 5mm rubber pad between the vertical keel installed along the wall and the wall surface, and fix it with expansion bolts;

[0013] Step 6: Install the transverse through-core keel or reinforced square tube, and fix the through-core keel overlap with two rivets;

[0014] Step 7: Vertical and horizontal keels should be separately set up at the door and window openings to enhance the overall firmness;

[0015] Step 8: Arrange various water and electricity pipelines through the oblong holes of the channel steel;

[0016] Step 9: If there is a wire box or wire tube in the partition wall, make holes on the keel for installation during layout, and install the wire box according to the positioning center;

[0017] Step 10: Install the horizontal hanging strips;

[0018] Step 11: Fill the gaps with rock wool. The rock wool must be dense and flat;

[0019] Step 12: Perform hidden inspection and install decorative panels after passing the acceptance inspection.

[0020] Preferably, the present invention provides an assembled integrated pipeline partition wall system and construction process, wherein the concrete slab is a strip board made of any one of ALC, GRG, and UHPC.

[0021] Preferably, the present invention provides an assembled integrated pipeline partition wall system and construction process, wherein the hanging bars are connected to the steel sections by bolts.

[0022] Preferably, the present invention provides an assembled integrated pipeline partition wall system and construction process, wherein a support bar is provided on the rear end face of the decorative panel, a groove is provided on the outer side of the lower surface of the support bar, a boss is provided on the outer side of the upper surface of the hanging bar, and the boss is cooperatively connected with the groove.

[0023] Compared with the prior art, the present invention has the following beneficial effects:

[0024] The partition wall system is modularly designed by adopting prefabricated integration technology, which makes it easy to lay pipelines without grooving. All kinds of components are manufactured in a standardized manner, with high integration, safety and reliability, and good lateral stiffness. Dry operation is adopted and the system is installed on site through connectors, which ensures fast installation, convenient construction and reasonable cost. BRIEF DESCRIPTION OF THE DRAWINGS

[0025] Figure 1 It is a schematic diagram of the structure of the present invention;

[0026] Figure 2 For attachment Figure 1 The enlarged structural diagram at the mark A in the middle;

[0027] Figure 3 It is a structural diagram when the steel section is located on the side of the concrete slab;

[0028] Figure 4 This is a structural diagram when the steel section is located in the middle of the concrete slab;

[0029] Figure 5 It is a schematic diagram of the structure of the present invention (when the steel section is located in the middle of the concrete slab).

[0030] In the figure: concrete slab 1, wire mesh 2, steel section 3, water and electricity pipelines 4, decorative panel 5, oblong holes 6, hanging strips 7, support strips 8, support strips 8, bosses 9. DETAILED DESCRIPTION

[0031] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solution of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention;

[0032] It should be noted that, in the description of the present invention, it should be noted that the terms "inside", "outside", "up", "down", "both sides", "one end", "the other end", "left", "right", etc., indicating the orientation or position relationship are based on the orientation or position relationship shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present invention.

[0033] See also Figure 1-5 The present invention provides a technical solution: an assembled integrated pipeline partition wall system, comprising a concrete slab 1, a steel mesh 2, a steel section 3, a water and electricity pipeline 4 and a decorative panel 5. The steel mesh 2 is buried inside the concrete slab 1 and at the midline of the thickness to enhance the stress performance of the concrete strip. The concrete slab 1 can be made of strips made of ALC, GRG, UHPC and other materials. When the ALC strip is used, a decorative panel can be hung on the outside. The GRG and UHPC strips can be directly used as decorative surfaces. The strip thickness is 40-100mm, the width is 600-1000mm, and the standard length is 3m, 3.6m, 4m, 4.5m, 5m and other specifications. One side of the steel section 3 is buried in the concrete slab 1. The steel section 3 usually adopts No. 10 channel steel 100mm*48mm*5.3mm, which can be placed on the side of the concrete slab 1, such as Figure 3 As shown, it can also be placed in the middle of the concrete slab 1, such as Figure 4-5 As shown, the steel section 3 is located inside the concrete slab 1 and one end is welded to the steel mesh 2. When located at the side, the limbs of the steel section 3 face inward, and one limb is welded and fixed to the steel mesh 2. When the strip board is prefabricated, the steel mesh 2 and the steel section 3 should be placed in the corresponding position. The steel section 3 is provided with a plurality of oblong holes 6. The through holes of the steel section 3 are penetrated with water and electricity pipelines 4 to avoid grooving and pipe laying in the later stage. A plurality of hanging strips 7 are transversely arranged on the outer surface of the steel section 3. The hanging strips 7 are connected to the steel section 3 by bolts to facilitate the selective installation of the hanging strips 7. The decorative panel 5 is connected with the hanging strips 7 in cooperation. The rear end surface of the decorative panel 5 is provided with a support strip 8. A groove is provided on the outer side of the lower surface of the support strip 8. A boss 9 is provided on the outer side of the upper surface of the hanging strip 7. The boss 9 is connected with the groove in cooperation. The support strip 8 using this structure does not need to be punched to realize the assembly and disassembly with the hanging strip 7. The decorative panel 5 can be made of different materials such as wood, stone, metal, tile, PVC, etc., which can be determined comprehensively according to the design, cost, actual needs, etc.

[0034] A construction process of an assembled integrated pipeline partition wall system comprises the following steps:

[0035] Step 1: Clean the ground to ensure there is no dust or debris on the ground;

[0036] Step 2: Position and lay out the lines, pop up the partition wall to complete the surface lines and channel steel fixing points;

[0037] Step 3: Use L-shaped angle brackets to install the channel steel at fixed points. One side of the angle bracket is fixed to the floor and the top surface with expansion bolts, and the other side is connected to the channel steel with bolts to ensure that the channel steel is vertical and the concrete slab 1 is in a vertical plane;

[0038] Step 4: When the top of the vertical keel encounters equipment or beams, it should be disconnected and a top transverse keel should be added. Both ends of the transverse keel should be fixed to the vertical keel to ensure its overall firmness;

[0039] Step 5: Add a 5mm rubber pad between the vertical keel installed along the wall and the wall surface, and fix it with expansion bolts;

[0040] Step 6: Install the transverse through-core keel or reinforced square tube, and fix the through-core keel overlap with two rivets;

[0041] Step 7: Vertical and horizontal keels should be separately set up at the door and window openings to enhance the overall firmness;

[0042] Step 8: Arrange various water and electricity pipelines 4 through the oblong holes 6 of the channel steel;

[0043] Step 9: If there is a wire box or wire tube in the partition wall, make holes on the keel for installation during layout, and install the wire box according to the positioning center;

[0044] Step 10: Install the horizontal hanging strip 7;

[0045] Step 11: Fill the gaps with rock wool. The rock wool must be dense and flat;

[0046] Step 12: Perform a hidden inspection and install the decorative panel 5 after passing the inspection.

[0047] The present invention adopts prefabricated integration technology and modularizes the partition wall system. It is convenient to lay pipelines without grooving. Various components are manufactured in a standardized manner. It has high integration, safety and reliability, can achieve good lateral stiffness, adopts dry operation, and is installed on site through connectors. It has the purposes of fast installation speed, convenient construction, and reasonable cost.

[0048] The matters not described in detail in the present invention are all known technologies to those skilled in the art.

[0049] Finally, it should be noted that the above specific implementation methods are only used to illustrate the technical solution of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the embodiments, those skilled in the art should understand that the technical solution of the present invention can be modified and replaced by equivalents without departing from the spirit and scope of the technical solution of the present invention, which should be included in the scope of the claims of the present invention.

Claims

1. An assembled integrated pipeline partition wall system, characterized in that: The invention comprises a concrete slab (1), a steel mesh (2), a steel section (3), water and electricity pipelines (4) and a decorative panel (5), wherein the steel mesh (2) is buried inside the concrete slab (1) and at the midline of the thickness, one side of the steel section (3) is buried in the concrete slab (1), one end of the steel section (3) located inside the concrete slab (1) is welded to the steel mesh (2), the steel section (3) is provided with a plurality of oblong holes (6), the water and electricity pipelines (4) are penetrated through the through holes of the steel section (3), a plurality of hanging strips (7) are transversely arranged on the outer surface of the steel section (3), and the decorative panel (5) is connected to the hanging strips (7) in a coordinated manner; A construction process of an assembled integrated pipeline partition wall system comprises the following steps: Step 1: Clean the ground to ensure there is no dust or debris on the ground; Step 2: Position and lay out the lines, pop up the partition wall to complete the surface lines and channel steel fixing points; Step 3: Use L-shaped angle brackets to install the channel steel at the fixed point. One side of the angle bracket is fixed to the floor and the top surface with expansion bolts, and the other side is connected to the channel steel with bolts to ensure that the channel steel is vertical and the concrete slab (1) is in a vertical plane. Step 4: When the top of the vertical keel encounters equipment or beams, it should be disconnected and a top transverse keel should be added. Both ends of the transverse keel should be fixed to the vertical keel to ensure its overall firmness; Step 5: Add a 5mm rubber pad between the vertical keel installed along the wall and the wall surface, and fix it with expansion bolts; Step 6: Install the transverse through-core keel or reinforced square tube, and fix the through-core keel overlap with two rivets; Step 7: Vertical and horizontal keels should be separately set up at the door and window openings to enhance the overall firmness; Step 8: Arrange various water and electricity pipelines (4) through the oblong holes (6) of the channel steel; Step 9: If there is a wire box or wire tube in the partition wall, make holes on the keel for installation during layout, and install the wire box according to the positioning center; Step 10: Install the horizontal hanging strip (7); Step 11: Fill the gaps with rock wool. The rock wool must be dense and flat; Step 12: Perform a hidden inspection and install the decorative panel (5) after passing the inspection.

2. The assembled integrated pipeline partition wall system and construction process according to claim 1 is characterized by: The concrete slab (1) is a strip slab made of any one of ALC, GRG and UHPC.

3. The assembled integrated pipeline partition wall system and construction process according to claim 1 is characterized by: The hanging bar (7) is connected to the steel section (3) via bolts.

4. The assembled integrated pipeline partition wall system and construction process according to claim 1 is characterized by: A support strip (8) is provided on the rear end face of the decorative panel (5), a groove is provided on the outer side of the lower surface of the support strip (8), and a boss (9) is provided on the outer side of the upper surface of the hanging strip (7), and the boss (9) is connected in a matching manner with the groove.