Reinforcing and damping device for steel tube tower main material and working method

By installing adjustable axial reinforcement components, transverse vibration damping components and oblique vibration damping components on the steel pipe tower, the problems of insufficient structural strength and lack of vibration damping functions of the steel pipe tower under high loads are solved, and reinforcement and Vibration reduction flexibility and reusability.

CN118911464AActive Publication Date: 2024-11-08NORTHEAST DIANLI UNIVERSITY

Patent Information

Application Number
CN202410974534.8
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-19
Publication Date
2024-11-08
Estimated Expiration
2044-07-19

AI Technical Summary

Technical Problem

The existing steel pipe tower reinforcement methods have problems such as insufficient structural strength, fixed reinforcement position, inability to disassemble and reinstall, and inability to provide vibration damping function under high load conditions.

Method used

Design a reinforcement and vibration-absorbing device including an axial reinforcement assembly, a transverse vibration-absorbing assembly and an oblique vibration-absorbing assembly. Through an adjustable connecting rod and a damper, the structural strength and vibration-absorbing capacity of the steel pipe tower are enhanced, and the device can be detached and repeated. use.

Benefits of technology

It effectively improves the structural strength and vibration damping performance of the steel pipe tower, avoids the redistribution of the original structural stress, and realizes the flexibility of reinforcement and vibration damping and reusability.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118911464A_ABST
    Figure CN118911464A_ABST
Patent Text Reader

Abstract

The invention discloses a reinforcing and damping device for a main material of a steel tube tower and a working method, solves the problem that the reinforcing mode of the steel tube tower in the prior art affects the strength of the main material, and has the beneficial effects that the strength of the main material is not affected, and the structural strength of the steel tube tower can be effectively improved. According to the specific scheme, the reinforcing and damping device for the main material of the steel tube tower comprises at least one side face installed on a set section of the steel tube tower, the reinforcing and damping device comprises at least two sets of axial reinforcing assemblies, and the axial reinforcing assemblies are installed in the annular direction of a steel tube in the set section of the steel tube tower. The axial reinforcing assembly comprises a first reinforcing clamp and a second reinforcing clamp which are arranged up and down, at least one connecting rod is connected between the first reinforcing clamp and the second reinforcing clamp, the length of the connecting rod is adjustable, and the supporting piece is located on one side of the steel pipe; a transverse vibration reduction assembly is arranged between the two first reinforcing clamps of every two adjacent axial reinforcing assemblies, and the supporting pieces are movably connected with the transverse vibration reduction assemblies at the positions of the first reinforcing clamps.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of electric power equipment, and in particular to a reinforcement and vibration reduction device for a main material of a steel pipe tower and a working method. Background Art

[0002] The statements in this section merely provide background information related to the present invention and do not necessarily constitute prior art.

[0003] With the advent of the information society, communication technology is affecting every aspect of our lives, and steel tube towers play an important role in the installation of power transmission lines. Steel tube towers are lattice towers composed of steel tubes for the main components and steel tubes or steel sections for other components. They are the supporting structures for overhead power transmission lines to support conductors and lightning conductors, so that the conductors meet the distance requirements to the ground and objects, and can withstand the loads of the conductors, lightning conductors, and themselves, as well as external loads.

[0004] At present, with the development of communication technology and the expansion and sharing needs of operators' network systems, there is an increasing demand for adding roof systems on the basis of the original design load-bearing capacity of steel tube towers. However, the existing steel tube towers have limited bearing capacity and cannot withstand high loads. For this reason, it is necessary to reinforce the steel tube tower, which can ensure that the steel tube tower is more stable and extend the service life of the steel tube tower. In the prior art, the reinforcement measures for the main material in view of the problem of insufficient bearing capacity of the main material have the following problems:

[0005] Drilling holes and welding in the original tower body, such reinforcement methods are not only limited by the difficulty of high-altitude operations, but may even weaken the cross-section of the original main material, thus affecting the structural strength of the main material;

[0006] The welding method adds internal stress, and this method is relatively complicated and cannot provide vibration reduction function for the structure;

[0007] In addition, the reinforcement position is relatively fixed, the device cannot be disassembled and reinstalled, and its applicability is not ideal. Summary of the invention

[0008] In view of the shortcomings of the prior art, the purpose of the present invention is to provide a reinforcement and vibration reduction device for the main material of a steel pipe tower, which can be adjusted according to the actual tower size and needs, and will not be abandoned due to changes in reinforcement requirements or cause damage to the original structure due to re-reinforcement.

[0009] In order to achieve the above object, the present invention is implemented through the following technical solutions:

[0010] A reinforcement and vibration reduction device for a main material of a steel pipe tower, comprising at least one side surface installed at a setting section of the steel pipe tower, the reinforcement and vibration reduction device comprising at least two groups of axial reinforcement components, each axial reinforcement component being respectively installed in the circumferential direction of a steel pipe in the setting section of the steel pipe tower, the axial reinforcement component comprising a first reinforcement fixture and a second reinforcement fixture arranged up and down, at least one connecting rod being connected between the first reinforcement fixture and the second reinforcement fixture, the length of the connecting rod being adjustable, the first reinforcement fixture and the second reinforcement fixture being both connected to a support member to play a reinforcement role, the support member being located at one side of the steel pipe;

[0011] A lateral vibration damping assembly is arranged between the two first reinforcement clamps of two adjacent axial reinforcement assemblies. The support member is movably connected to the lateral vibration damping assembly at the first reinforcement clamp. The support member is movably connected to one end of the oblique vibration damping assembly at the second reinforcement clamp, and the other end of the oblique vibration damping assembly is connected to the lateral vibration damping assembly.

[0012] As described above, a reinforcement and vibration reduction device for the main material of a steel tube tower is provided with the axial reinforcement assembly at all steel tubes at the set nodes of the steel tube tower, and the lateral vibration reduction assembly and the oblique vibration reduction assembly are provided on each side of the steel tube tower.

[0013] In the above-mentioned reinforcement and vibration reduction device for the main material of the steel tube tower, the first reinforcement fixtures of all the axial reinforcement components are arranged at the same height to ensure the balance of force on the steel tube tower;

[0014] The second reinforcement fixtures of all the axial reinforcement components are arranged at the same height.

[0015] A reinforcement and vibration reduction device for the main material of a steel pipe tower as described above, the reinforcement and vibration reduction device comprises two oblique vibration reduction assemblies as described above, and the top ends of the two oblique vibration reduction assemblies are connected to the middle part of the lateral vibration reduction assembly;

[0016] The support member is a reinforcing angle steel with an L-shaped cross section. The setting of the reinforcing angle steel facilitates the connection with the fixing plates of the segmented members on both sides, and is also conducive to cooperating with the first reinforcing clamp and the second reinforcing clamp to increase the stress-bearing area of ​​the steel pipe.

[0017] In the above-mentioned reinforcement and vibration reduction device for the main material of a steel pipe tower, the first reinforcement fixture and the second reinforcement fixture have the same structure;

[0018] The first reinforcement clamp includes two segmented parts, which can be assembled into a cylinder surrounding the steel pipe. Fixed plates are respectively arranged on the end sides of one of the assembly locations of the two segmented parts. The fixed plates can be located on the outside of the support member so that the first reinforcement clamp fits the support member. The fixed plates are fixedly connected to the side of the support member, and the two segmented parts are fixedly connected at another assembly location.

[0019] A reinforcement and vibration reduction device for the main material of a steel pipe tower as described above, wherein conformal end plates are respectively arranged at both ends of the segmented member, and a plurality of axial dampers are arranged between the two conformal end plates, and an axial spring is annularly sleeved on the axial damper, and the axial damper is arranged parallel to the central axis of the cylinder body composed of the segmented members;

[0020] The cylinder body of the axial damper is fixed between the two conformal end plates, and the piston rod of the axial damper is a part of the connecting rod.

[0021] In the reinforcement and vibration reduction device for the main material of a steel pipe tower as described above, the piston rod of the axial damper installed at the first reinforcement fixture is the first piston rod, and the piston rod of the axial damper installed at the second reinforcement fixture is the second piston rod;

[0022] The connecting rod comprises a threaded sleeve, a first piston rod and a second piston rod, and both ends of the threaded sleeve are connected to the first piston rod and the second piston rod connecting rod respectively through a threaded structure, so that the length of the connecting rod can be adjusted, and the length of the control section can be adjusted according to the vibration reduction requirements;

[0023] As described above, a reinforcement and vibration reduction device for the main material of a steel pipe tower, the lateral vibration reduction assembly includes a middle connecting member, lateral dampers are respectively arranged on both sides of the middle connecting member, a lateral spring is circumferentially arranged on the cylinder body of the lateral damper, and one end of the lateral damper is connected to the support member through a first universal joint.

[0024] As described above, a reinforcement and vibration reduction device for the main material of a steel pipe tower, the oblique vibration reduction assembly includes an oblique damper, a second universal joint is arranged at one end of the oblique damper, an oblique spring is arranged between the cylinder body of the oblique damper and the second universal joint, and the other end of the oblique damper is connected to the middle connecting piece.

[0025] In a second aspect, the present invention also provides a working method for a reinforcement and vibration reduction device for a main material of a steel tube tower, comprising the following contents:

[0026] Axial reinforcement components are respectively installed in the circumferential direction of the steel pipes on both sides of at least one side of the steel pipe tower setting section, and a support member is arranged on one side of the steel pipe, and the support member is respectively connected to the first reinforcement fixture and the second reinforcement fixture;

[0027] Two first reinforcement fixtures connecting the two axial reinforcement components via a lateral vibration reduction component;

[0028] The oblique vibration reduction assembly connects the lateral vibration reduction assembly and the second reinforcement fixture;

[0029] The axial reinforcement assembly is located in the annular direction of the steel pipe and connected to the support, which increases the force-bearing area of ​​the steel pipe and improves the structural strength of the steel pipe tower. Under the action of load, the steel pipe tower effectively reduces its own vibration through the axial vibration reduction assembly, the lateral vibration reduction assembly and the oblique vibration reduction assembly.

[0030] The beneficial effects of the present invention are as follows:

[0031] 1) The reinforcement and vibration reduction device of the present invention is arranged such that the axial reinforcement component is located in the annular direction of the steel pipe and is connected to the support member, and cooperates with the original structure to increase the force-bearing area of ​​the steel pipe, thereby improving the structural strength of the steel pipe tower and will not affect the structural strength of the original main material; the axial vibration reduction component provides damping in the axial direction to the steel pipe, and the lateral vibration reduction component connects the axial vibration reduction components on both sides to effectively improve the structural stiffness of the steel pipe tower and reduce its own deformation; the lateral vibration reduction component provides damping in the lateral direction, and the oblique vibration reduction component provides damping in the oblique direction; under the action of load, the axial vibration reduction component, the lateral vibration reduction component and the oblique vibration reduction component can effectively reduce its own vibration and avoid its own deformation and changes in relative position.

[0032] 2) In the present invention, the support member is located on one side of the steel pipe, and the support member and the axial vibration reduction assembly cooperate in force. There is no need to drill holes and weld on the original structural steel pipe, which can avoid the redistribution of stress on the original structural steel pipe due to the installation of the reinforced vibration reduction device, and will not affect the safety performance of the original structural steel pipe.

[0033] 3) The structures of the first reinforcement clamp and the second reinforcement clamp in the present invention are reasonably arranged. They are respectively assembled into a cylindrical arrangement through two segmented parts, which is convenient for installation around the steel pipe. A fixing plate is arranged on the end side of the segmented part, and the fixing plate can be connected to the support part to ensure the reliable connection between the first reinforcement clamp, the second reinforcement clamp and the support part.

[0034] 4) The first reinforcement clamp and the second reinforcement clamp in the present invention can be disassembled and reused, and the installation position is highly flexible. They can be used at different main material positions of the steel tower and the angle and position can be adjusted according to the size of the tower section. A length-adjustable connecting rod is connected between the first reinforcement clamp and the second reinforcement clamp. The length of the connecting rod can be adjusted according to the positions of the first reinforcement clamp and the second reinforcement clamp to meet different vibration reduction requirements.

[0035] 5) In the present invention, the axial vibration reduction assembly is provided with an axial damper and an axial spring, the lateral vibration reduction assembly is provided with a lateral damper and a lateral spring, and the diagonal vibration reduction assembly is provided with a diagonal damper and a diagonal spring. Each damper provides a reaction force when the structure vibrates and deforms. Each damper works together with the corresponding spring to achieve vibration reduction in all directions, and works in conjunction with the corresponding spring to reduce the impact and damage of accidental loads on the structure. BRIEF DESCRIPTION OF THE DRAWINGS

[0036] The accompanying drawings in the specification, which constitute a part of the present invention, are used to provide a further understanding of the present invention. The exemplary embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute improper limitations on the present invention.

[0037] Figure 1 It is a front view of a reinforcement and vibration reduction device for a main material of a steel tube tower according to one or more embodiments of the present invention.

[0038] Figure 2 It is a schematic diagram of an axial reinforcement assembly and a support member in a reinforcement and vibration reduction device for a main material of a steel tube tower according to one or more embodiments of the present invention.

[0039] Figure 3 It is a schematic diagram of a first reinforcement fixture in a reinforcement and vibration reduction device for a main material of a steel tube tower according to one or more embodiments of the present invention.

[0040] Figure 4 The present invention is a top view of a first reinforcement fixture in a reinforcement and vibration reduction device for a main material of a steel tube tower according to one or more embodiments.

[0041] Figure 5 It is a schematic diagram of a lateral vibration reduction assembly and an oblique vibration reduction assembly in a reinforcement and vibration reduction device for a main material of a steel tube tower according to one or more embodiments of the present invention.

[0042] Figure 6 It is an enlarged schematic diagram of the connection between the oblique vibration reduction assembly and the support member in a reinforcement and vibration reduction device for the main material of a steel tube tower according to one or more embodiments of the present invention.

[0043] In the figure: the distances or sizes between parts are exaggerated to show the positions of various parts, and the schematic diagram is for reference only.

[0044] Among them: 1. Axial reinforcement components: 1-1. Steel pipe; 1-2. First reinforcement fixture; 1-2-1. Conformal end plate; 1-2-2. Sealing pad layer; 1-2-3. Stiffening rib; 1-2-4. Ear piece; 1-2-5. Axial damper; 1-2-6. Axial spring; 1-2-7. Fixing plate; 1-3. First piston rod; 1-4. Support member; 1-5. Threaded sleeve; 1-6. Second piston rod; 1-7. Second reinforcement fixture;

[0045] 2. Transverse vibration reduction assembly; 2-1. Transverse hydraulic cylinder; 2-2. Transverse spring; 2-3. Ball cage universal joint; 2-4. Transverse piston connecting rod; 2-5. Universal joint fork;

[0046] 3. Oblique vibration reduction assembly; 3-1. Ball cage universal joint chassis; 3-2. Oblique piston connecting rod; 3-3. Oblique hydraulic cylinder; 3-4. Oblique spring;

[0047] 4-1, first universal joint fork; 4-2, cross bearing; 4-3, second universal joint fork; 4-4, rotating shaft base; 4-5, first shaft pin; 4-6, second shaft pin. DETAILED DESCRIPTION

[0048] It should be noted that the following detailed descriptions are illustrative and intended to provide further explanation of the present invention. Unless otherwise specified, all technical and scientific terms used in the present invention have the same meanings as those commonly understood by those skilled in the art to which the present invention belongs.

[0049] It should be noted that the terms used herein are only for describing specific embodiments and are not intended to limit the exemplary embodiments according to the present invention. As used herein, unless otherwise explicitly stated in the present invention, the singular form is also intended to include the plural form. In addition, it should be understood that when the terms "include" and / or "include" are used in this specification, it indicates the presence of features, steps, operations, devices, components and / or combinations thereof;

[0050] As introduced in the background technology, the problems in the prior art, in order to solve the above technical problems, the present invention proposes a reinforcement and vibration reduction device for the main material of the steel tube tower.

[0051] Embodiment 1

[0052] In a typical embodiment of the present invention, reference is made to Figure 1 As shown, a reinforcement and vibration reduction device for the main material of a steel pipe tower includes at least one side surface installed on a setting section of the steel pipe tower, the reinforcement and vibration reduction device includes at least two groups of axial reinforcement components 1, each axial reinforcement component 1 is respectively installed in the circumferential direction of a steel pipe 1-1 in the setting section of the steel pipe tower, the axial reinforcement component 1 includes a first reinforcement fixture 1-2 and a second reinforcement fixture 1-7 arranged up and down, at least one connecting rod is connected between the first reinforcement fixture and the second reinforcement fixture, the length of the connecting rod is adjustable, the first reinforcement fixture and the second reinforcement fixture are both connected to a support member to play a reinforcement role, and the support member is located on one side of the steel pipe;

[0053] A lateral vibration damping assembly 2 is arranged between the two first reinforcement clamps of two adjacent axial reinforcement assemblies. The support member is movably connected to the lateral vibration damping assembly at the first reinforcement clamp. The support member is movably connected to one end of the oblique vibration damping assembly at the second reinforcement clamp, and the other end of the oblique vibration damping assembly is connected to the lateral vibration damping assembly.

[0054] In this embodiment, a reinforcement and vibration reduction device is set on one side surface (main pressure surface) of the steel tube tower; the first reinforcement clamps of all axial reinforcement components are set at the same height to ensure the balance of force on the steel tube tower; the second reinforcement clamps of all axial reinforcement components are set at the same height.

[0055] The reinforcement vibration reduction device comprises two oblique vibration reduction components 3, and the top ends of the two oblique vibration reduction components 3 are connected to the middle part of the lateral vibration reduction component 2;

[0056] The support member 1-4 is a reinforcing angle steel with an L-shaped cross section. The width of the two sides of the reinforcing angle steel is the same. The setting of the reinforcing angle steel facilitates the connection with the fixed plates of the segmented members on both sides. The equilateral reinforcing angle steel is connected and fastened to the steel pipe 1-1 through the first reinforcing clamp or the second reinforcing clamp to form a Figure 4 The cross-section shown increases the stress-bearing area compared to the steel pipe 1-1, thereby improving the overall structural strength. At the same time, due to the support of the support member 1-4, the structural stiffness of the original structural steel pipe 1-1 is improved to avoid its own deformation and changes in relative position.

[0057] In this embodiment, the first reinforcement clamp and the second reinforcement clamp have the same structure, and the first reinforcement clamp and the second reinforcement clamp can be disassembled and reused; Figure 3 As shown, the first reinforcement clamp includes two segmented parts, which can be assembled into a cylinder surrounding the steel pipe. Fixed plates 1-2-7 are respectively arranged on the end sides of one of the assembly locations of the two segmented parts. The fixed plates can be located on the outside of the support member so that the first reinforcement clamp fits the support member. The fixed plates are fixedly connected to the side of the support member, and the two segmented parts are fixedly connected at another assembly location.

[0058] Specifically, the segmented parts are semicircular parts. After the segmented parts are assembled into a cylinder, the inner diameter is greater than or equal to the outer diameter of the steel pipe. The segmented parts have a set length. The free end of the segmented parts is provided with an ear piece 1-2-4. The ear piece has a set width. The length of the ear piece is the same as the length of the segmented parts. When the two segmented parts are assembled, the ear pieces fit together and are fastened by bolts arranged on the ear pieces. A fixing plate 1-2-7 is arranged at the other end of the two segmented parts. After the two segmented parts are assembled, the fixing plates on both sides are arranged at 90°. The side of the support member is fastened to the fixing plate by bolts, so that the support member and the steel pipe 1-1 are fastened together and bear force synergistically. There is no need to drill holes and weld on the steel pipe 1-1, which can avoid stress redistribution in the steel pipe due to the installation of the reinforcement and vibration reduction device, and will not affect the safety performance of the original structural steel pipe.

[0059] Among them, stiffening ribs 1-2-3 are arranged between the ear pieces 1-2-4 of the clamp, the fixing plates 1-2-7 and the semicircular segmented parts to reduce the deformation of the structure, improve the coordination between the supporting parts 1-4 and the original round steel 1-1, and improve the stability of the overall structure.

[0060] In this embodiment, conformable end plates 1-2-1 are respectively arranged at both ends of the segmented member, the conformable end plates have a set width, one side of the conformable end plates is connected to the fixed plate, multiple axial dampers 1-2-5 are arranged between the two conformable end plates, specifically 8 axial dampers can be arranged, the axial dampers are annularly sleeved with axial springs, and the axial dampers are arranged parallel to the central axis of the cylinder body formed by the segmented members;

[0061] The cylinder of the axial damper is fixed between the two conformal end plates, the piston rod of the axial damper is a part of the connecting rod, the piston rod of the axial damper installed at the first reinforcement fixture is the first piston rod, and the piston rod of the axial damper installed at the second reinforcement fixture is the second piston rod;

[0062] In this embodiment, reference Figure 2 As shown, the connecting rod includes a threaded sleeve 1-5, a first piston rod and a second piston rod. The two ends of the threaded sleeve are connected to the first piston rod and the second piston rod connecting rod respectively through a threaded structure, so that the length of the connecting rod can be adjusted. The length of the control section can be adjusted according to the vibration reduction requirements. Through the setting of the connecting rod, the vibration of the original structural steel pipe under wind load or other forms of load can be reduced.

[0063] One end of the axial damper is fixed to the conformal end plate 1-2-1 on one side, and the other end passes through the conformal end plate on the other side and is connected to the connecting rod. The axial damper is specifically an axial hydraulic rod. The one passing through the conformal end plate on one side of the first reinforcement fixture is the first axial hydraulic cylinder, and the one passing through the conformal end plate on one side of the second reinforcement fixture is the second axial hydraulic cylinder.

[0064] Specifically, the second piston rod 1-6 is connected to the threaded connecting sleeve 1-5 at one end away from the second axial hydraulic cylinder body, and the first piston rod 1-3 and the second piston rod 1-6 move along the length direction of the first axial hydraulic cylinder and the second axial hydraulic cylinder (that is, the length direction of the steel pipe) to adjust the inner cavity oil pressure of the first axial hydraulic cylinder and the second axial hydraulic cylinder.

[0065] The cylinder bodies of the first axial hydraulic cylinder and the second axial hydraulic cylinder are provided with axial springs 1-2-6 of equal height in the circumferential direction, which are spirally arranged around the outer sides of the cylinder bodies of the first axial hydraulic cylinder and the second axial hydraulic cylinder. One end of the axial spring is connected to the outer ring of the corresponding hydraulic cylinder body, forming a vibration reduction device in the axial direction of the steel pipe with the combined action of hydraulic pressure and spring. The two axial hydraulic cylinders are fixed to the first reinforcement clamp and the second reinforcement clamp, and the base part is provided with a sealing pad layer 1-2-2 to ensure airtightness. The connecting rod also serves as the piston rod of the axial hydraulic cylinder, providing reaction force when the structure vibrates and deforms, and working in conjunction with the spring to reduce the impact and damage of accidental loads on the structure.

[0066] It should be noted that in order to achieve the connection between the lateral vibration damping assembly 2 and the support member, the support member is provided with a fixed seat on the first reinforcement clamp, and the fixed seat is connected to the end of the lateral vibration damping assembly 2 through a first universal joint; the support member is also provided with a chassis at the second reinforcement clamp, and a fixed seat is connected between the two sides of the support member, and the fixed seat is connected to the end of the oblique vibration damping assembly through a second universal joint.

[0067] refer to Figure 5As shown, the lateral vibration damping assembly 2 includes a middle connecting member, which is cylindrical. Transverse dampers are respectively arranged on both sides of the middle connecting member. Transverse springs 2-2 are circumferentially arranged on the cylinder of the lateral damper. End plates with increased diameters are respectively arranged on both sides of the middle connecting member to limit the transverse springs. An end plate is also arranged at the other end of the cylinder of the lateral damper to limit the other end of the transverse spring. One end of the lateral damper is connected to the support member through a first universal joint; a ball cage universal joint 2-3 is arranged on one side of the middle connecting member to achieve connection with the oblique vibration damping assembly.

[0068] Specifically, the lateral damper includes a lateral hydraulic cylinder 2-1, which is provided with a lateral piston connecting rod 2-4. A universal joint fork 2-5 is provided at one end of the lateral piston connecting rod 2-4 away from the cylinder body of the lateral hydraulic cylinder. A fixed seat is provided between the two sides of the support member, and the fixed seat supports a rotating shaft base 4-4. Another universal joint fork is supported by the rotating shaft base 4-4, and a pin shaft connects the two universal joint forks to form a first universal joint.

[0069] The oblique vibration reduction assembly 3 includes an oblique damper, a second universal joint is arranged at one end of the oblique damper, an oblique spring 3-4 is arranged between the cylinder body of the oblique damper and the second universal joint, and the other end of the oblique damper is connected to the middle connecting piece; the oblique damper is specifically an oblique hydraulic cylinder 3-3, a support rod is arranged on one side of the oblique hydraulic cylinder, the oblique spring is sleeved on the support rod and is located between the cylinder body of the oblique hydraulic cylinder and the first universal joint fork 4-1, and a ball cage universal joint chassis 3-1 is arranged at the end of the oblique piston connecting rod 3-2 arranged in the oblique hydraulic cylinder away from its cylinder body for connection with the ball cage universal joint.

[0070] refer to Figure 6 As shown, the support member is provided with a fixed seat, a rotating shaft base 4-4 is provided at the fixed seat, the rotating shaft base supports the second universal joint fork 4-3, the first universal joint fork and the second universal joint fork provided at the end of the support rod in the oblique vibration reduction assembly form a cross-type universal joint, a cross bearing 4-2 is provided between the two, and the connection is achieved through the first pin shaft 4-5 and the second pin shaft 4-6.

[0071] Specifically, a working method of a reinforcement and vibration reduction device for a main material of a steel tube tower comprises the following steps:

[0072] The lateral vibration reduction assembly and the oblique vibration reduction assembly are respectively installed at the fixed base of the reinforced angle steel through universal joints. The segmented parts and the reinforced angle steel are fixed to the circumference of the steel pipe through the segmented parts. The length is adjusted by rotating the connecting rod. The reinforced angle steel, the segmented parts and the steel pipe form a new cross-section, which increases the bearing area of ​​the original steel pipe and improves the ultimate bearing capacity and stability of the structure.

[0073] Two reinforcing angle steels are respectively installed on the back sides of the four original structural steel pipes with the help of corresponding reinforcement clamps. The support is provided with a universal joint, which is linked with the lateral vibration reduction assembly and the oblique vibration reduction assembly. Axial dampers are arranged at the first reinforcement clamp and the second reinforcement clamp. One end of the first piston rod is connected to the threaded sleeve, and one end of the second piston rod is connected to the threaded sleeve.

[0074] The threaded sleeve is rotated to adjust the vibration reduction adjustment range of the connecting rod in the axial length direction. The piston rod corresponding to the axial damper moves along its length direction to adjust the inner cavity oil pressure of the axial damper to change the damping force in the axial direction.

[0075] Moreover, the axial reinforcement assembly is located in the annular direction of the steel pipe and connected to the support, which increases the force-bearing area of ​​the steel pipe and improves the structural strength of the steel pipe tower. Under the action of load, the steel pipe tower effectively reduces its own vibration through the axial vibration reduction assembly, the lateral vibration reduction assembly and the oblique vibration reduction assembly.

[0076] Embodiment 2

[0077] The difference between this embodiment and the first embodiment is that:

[0078] Axial reinforcement components are provided at all steel pipes at set nodes of the steel pipe tower, and lateral vibration reduction components and oblique vibration reduction components are provided on each side of the steel pipe tower.

[0079] It is easy to understand that multiple reinforcement and vibration reduction devices can be set along the steel pipe tower.

[0080] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. For those skilled in the art, the present invention may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.

Claims

1. A reinforcement and vibration reduction device for the main material of a steel tube tower, characterized in that: Installed on at least one side of the steel pipe tower setting section, the reinforcement and vibration reduction device includes at least two groups of axial reinforcement components, each axial reinforcement component is respectively installed in the circumferential direction of the steel pipe in the steel pipe tower setting section, and the axial reinforcement component includes a first reinforcement clamp and a second reinforcement clamp arranged up and down, and at least one connecting rod is connected between the first reinforcement clamp and the second reinforcement clamp, and the length of the connecting rod is adjustable. The first reinforcement clamp and the second reinforcement clamp are both connected to the support member to play a reinforcement role, and the support member is located on one side of the steel pipe; A lateral vibration damping assembly is arranged between the two first reinforcement clamps of two adjacent axial reinforcement assemblies. The support member is movably connected to the lateral vibration damping assembly at the first reinforcement clamp. The support member is movably connected to one end of the oblique vibration damping assembly at the second reinforcement clamp, and the other end of the oblique vibration damping assembly is connected to the lateral vibration damping assembly.

2. A reinforcement and vibration reduction device for the main material of a steel tube tower according to claim 1, characterized in that: The axial reinforcement components are arranged at all the steel pipes at the set nodes of the steel pipe tower, and the lateral vibration reduction components and the oblique vibration reduction components are arranged on each side of the steel pipe tower.

3. The reinforcement and vibration reduction device for the main material of the steel tube tower according to claim 1 is characterized in that: The first reinforcement fixtures of all the axial reinforcement components are arranged at the same height; The second reinforcement fixtures of all the axial reinforcement components are arranged at the same height.

4. The reinforcement and vibration reduction device for the main material of a steel tube tower according to claim 1 is characterized in that: The reinforcement vibration reduction device comprises two oblique vibration reduction components, and the top ends of the two oblique vibration reduction components are connected to the middle part of the lateral vibration reduction component; The support member is a reinforced angle steel with an L-shaped cross section.

5. The reinforcement and vibration reduction device for the main material of a steel tube tower according to claim 1 is characterized in that: The first reinforcement clamp and the second reinforcement clamp have the same structure; The first reinforcement clamp includes two segmented parts, which can be assembled into a cylinder surrounding the steel pipe. Fixed plates are respectively arranged on the end sides of one of the assembly locations of the two segmented parts. The fixed plates can be located on the outside of the support member so that the first reinforcement clamp fits the support member. The fixed plates are fixedly connected to the side of the support member, and the two segmented parts are fixedly connected at another assembly location.

6. A reinforcement and vibration reduction device for the main material of a steel tube tower according to claim 5, characterized in that: Conformal end plates are respectively arranged at both ends of the segmented member, and a plurality of axial dampers are arranged between the two conformal end plates, and the axial dampers are arranged parallel to the central axis of the cylinder formed by the segmented members; The cylinder body of the axial damper is fixed between the two conformal end plates, and the piston rod of the axial damper is a part of the connecting rod.

7. A reinforcement and vibration reduction device for the main material of a steel tube tower according to claim 6, characterized in that: The piston rod of the axial damper installed at the first reinforcement fixture is a first piston rod, and the piston rod of the axial damper installed at the second reinforcement fixture is a second piston rod; The connecting rod comprises a threaded sleeve, a first piston rod and a second piston rod, and both ends of the threaded sleeve are connected to the first piston rod and the second piston rod connecting rod respectively through threaded structures.

8. The reinforcement and vibration reduction device for the main material of a steel tube tower according to claim 1 is characterized in that: The lateral vibration reduction assembly includes a middle connecting member, lateral dampers are respectively arranged on both sides of the middle connecting member, a lateral spring is arranged in the circumferential direction of the cylinder body of the lateral damper, and one end of the lateral damper is connected to the supporting member through a first universal joint.

9. A reinforcement and vibration reduction device for a steel tube tower main material according to claim 8, characterized in that: The oblique vibration reduction assembly includes an oblique damper, a second universal joint is arranged at one end of the oblique damper, an oblique spring is arranged between the cylinder body of the oblique damper and the second universal joint, and the other end of the oblique damper is connected to the middle connecting piece.

10. A working method for a reinforcement and vibration reduction device for a main material of a steel tube tower according to any one of claims 1 to 9, characterized in that: It includes the following: Axial reinforcement components are respectively installed in the circumferential direction of the steel pipes on both sides of at least one side of the steel pipe tower setting section, and a support member is arranged on one side of the steel pipe, and the support member is respectively connected to the first reinforcement fixture and the second reinforcement fixture; Two first reinforcement fixtures connecting the two axial reinforcement components via a lateral vibration reduction component; The oblique vibration reduction assembly connects the lateral vibration reduction assembly and the second reinforcement fixture; The axial reinforcement assembly is located in the annular direction of the steel pipe and connected to the support, which increases the force-bearing area of ​​the steel pipe and improves the structural strength of the steel pipe tower. Under the action of load, the steel pipe tower effectively reduces its own vibration through the axial vibration reduction assembly, the lateral vibration reduction assembly and the oblique vibration reduction assembly.

Citation Information

Patent Citations

  • Reinforcing device for angle steel power transmission tower main material

    CN108612384A

  • Bolt pressure-bearing embracing type steel angle reinforcing and correcting device for power transmission tower

    CN113789973A

  • Power transmission tower buckling-restrained brace main material reinforcement and cooperative vibration reduction energy consumption device

    CN116556721A

  • Power transmission tower diagonal member reinforcing and damping structure and power transmission tower

    CN117211552A

  • Ground wire cross arm reinforcement adjusting device and adjusting method

    CN117627442A

Cited By

  • Large thin-wall workpiece turning vibration reduction tool

    CN119635340A

  • Inerter-particle composite damping device with structure reinforcing function

    CN122148112A