Gas curtain device for nuclear facility retired construction and installation method thereof

Through the combined device of gas ribs, counterweights and connectors, the problems of low disassembly efficiency and waste generation during nuclear facilities' decommissioning construction are solved, and efficient installation and recycling of gas bills are achieved.

CN118911516APending Publication Date: 2024-11-08CHINA NUCLEAR IND 23 CONSTR
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411333173.5
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-24
Publication Date
2024-11-08

AI Technical Summary

Technical Problem

During the decommissioning of existing nuclear facilities, the dismantling efficiency of the air bill is low, resulting in concrete waste and garbage, and the gas ribs are easily damaged, making it difficult to recycle the air bill.

Method used

A combination device of air ribs, counterweights and connectors is adopted. The two ends of the air ribs are abutted to the ground, and the counterweights are placed on the ground, and connected to the ends of the air ribs through the connectors to form a stable triangular structure to avoid pouring concrete foundations. The air tent film covers the gas ribs to form a closed structure, and the gas ribs can be removed when disassembled.

Benefits of technology

It improves the installation and dismantling efficiency of the gas ribs, avoids the generation of concrete waste, and is not easy to damage during dismantling, and promotes the recycling of the air bill.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118911516A_ABST
    Figure CN118911516A_ABST
Patent Text Reader

Abstract

The invention provides an air curtain device for nuclear facility decommissioning construction and a mounting method thereof, and relates to the technical field of nuclear facility decommissioning construction. The air curtain device for nuclear facility retired construction comprises an air rib, a counterweight piece and a connecting piece, the two ends of the air rib are used for abutting against the ground, the balance weight pieces are used for being placed on the ground, and the balance weight pieces are arranged on one sides of the two ends of the air rib respectively. Each counterweight piece is connected with the corresponding air rib through a connecting piece, one end of each connecting piece is connected with the corresponding counterweight piece, and the other end of each connecting piece is connected with the position, close to the end, of the corresponding air rib. According to the air curtain device for nuclear facility retired construction, through mutual cooperation of the counter weight pieces and the connecting pieces, the two ends of the air rib can be fixed on the ground in a counter weight mode, concrete foundations do not need to be poured around the ends of the air rib, when the air rib is disassembled, the air rib can be removed by separating the connecting pieces from the air rib, and the concrete foundations do not need to be disassembled; and new concrete waste garbage cannot be generated, the disassembly efficiency is high, the air ribs are not prone to being damaged, and cyclic utilization of the air curtain is facilitated.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of nuclear facility decommissioning construction, and in particular to a gas tent device for nuclear facility decommissioning construction and an installation method thereof. Background Art

[0002] Nuclear facility decommissioning construction refers to the construction process of dismantling and cleaning nuclear facilities that have been or are about to be decommissioned. During the nuclear facility decommissioning construction process, it is necessary to build an air tent on the surface of the waste ditch to control the spread of radioactive dust and protect the workplace and equipment under abnormal meteorological conditions.

[0003] In the existing decommissioning and cleaning process of decommissioned nuclear facilities, multiple arched air ribs in the air tent are usually arranged in sequence along the extension direction of the waste trench, and then concrete is poured around the ends of the air ribs on both sides of the waste trench to form a concrete foundation. After the concrete foundation solidifies, the ends of the multiple air ribs can be fixed. Then, the air ribs can be inflated to keep the air ribs in an arched shape above the waste trench, and then the air tent membrane is covered on the multiple air ribs. At this time, the multiple air ribs can support the air tent membrane to form a closed shed-like air tent.

[0004] However, since the ends of the air ribs in the air tent are anchored by pouring a concrete foundation around the ends of the air ribs, after the waste is cleaned up, the concrete foundation needs to be removed before the air tent can be dismantled. This not only has low dismantling efficiency and generates new concrete waste, but also is easy to damage the air ribs, making it difficult to recycle the air tent. Summary of the invention

[0005] The purpose of the present invention is to provide a gas tent device for nuclear facility decommissioning construction and a method for installing the gas tent device for nuclear facility decommissioning construction, so as to alleviate the technical problem that in the prior art, during the nuclear facility decommissioning construction process, the gas rib ends of the gas tent are anchored by pouring a concrete foundation around the gas rib ends, resulting in the need to remove the concrete foundation before the gas tent can be dismantled after the waste is cleaned up. Not only is the dismantling efficiency low and new concrete waste garbage is generated, but the gas ribs are easily damaged, making it difficult to achieve multiple recycling of the gas tent.

[0006] In a first aspect, the present invention provides an air tent device for nuclear facility decommissioning construction, comprising air ribs, a counterweight, and a connecting member;

[0007] The two ends of the gas rib are respectively used to abut against the ground, and the counterweight is used to be placed on the ground. The counterweight is respectively provided on one side of the two ends of the gas rib;

[0008] Each of the counterweights is connected to the air rib via the connecting piece, and one end of the connecting piece is connected to the counterweight, and the other end is connected to a position of the air rib close to the end thereof.

[0009] In an optional embodiment, the counterweight is disposed on a side of the end of the air rib away from the center of the air rib.

[0010] In an optional embodiment, the counterweight is a sandbag.

[0011] In an optional embodiment, the connecting member is a tightening belt, and the connecting member is obliquely stretched between the counterweight and the air rib.

[0012] In an optional embodiment, there are two connecting members between each of the counterweight members and the air ribs, and the two connecting members are arranged between the counterweight member and the air rib at an angle.

[0013] In an optional embodiment, a cushion layer is further included, and the cushion layer is fixed on the ground, and the end of the air rib abuts against the cushion layer.

[0014] In an optional embodiment, the number of the air ribs is n, where n is an integer multiple of three and n is greater than three; the n air ribs are distributed in sequence, and three adjacent air ribs form an air rib group;

[0015] The air tent device for nuclear facility decommissioning construction also includes fans, the number of which is equal to the number of the air rib groups, and the air rib groups are connected to the fans in a one-to-one correspondence.

[0016] In an optional embodiment, it also includes an air tent membrane, a connecting belt and a fixing rope;

[0017] The air tent film covers the n air ribs, and the inner wall of the air tent film is connected to the air ribs via the connecting belt;

[0018] The fixing rope is installed on the air tent membrane, and the end of the fixing rope is connected to the counterweight or a ground anchor on the ground.

[0019] In a second aspect, the present invention provides a method for installing a gas tent device for nuclear facility decommissioning construction, using the gas tent device for nuclear facility decommissioning construction as described in any one of the above embodiments, comprising:

[0020] At a waste trench at a nuclear facility decommissioning construction site, a plurality of the gas ribs are sequentially laid along the length direction of the waste trench, and two ends of each gas rib are respectively located on two sides of the waste trench;

[0021] A plurality of the counterweights are placed on both sides of the waste trench, and one side of the end of each of the gas ribs is provided with the counterweight;

[0022] Inflate each of the air ribs, and when the air ribs are inflated until the tops thereof are flush with the tops of the counterweights, suspend inflation and connect the connecting piece between each of the counterweights and the air ribs;

[0023] Continue to inflate each of the air ribs until the air ribs are distributed in an arch shape above the waste trench.

[0024] In an optional embodiment, before the step of continuing to inflate each of the air ribs until the air ribs are distributed in an arch shape above the waste trench, the method further includes:

[0025] Covering and connecting the air tent membrane outside the plurality of air ribs;

[0026] After the step of continuing to inflate each of the air ribs until the air ribs are distributed in an arch shape above the waste trench, the method further includes:

[0027] A fixing rope is installed on the air tent membrane, and two ends of the fixing rope are respectively fixedly connected to the counterweights or ground anchors on both sides of the waste ditch.

[0028] The air tent device for nuclear facility decommissioning construction provided by the present invention comprises an air rib, a counterweight and a connecting piece; the two ends of the air rib are respectively used to abut against the ground, the counterweight is used to be placed on the ground, and a counterweight is provided on one side of each end of the air rib; each counterweight is connected to the air rib by a connecting piece, and one end of the connecting piece is connected to the counterweight, and the other end is connected to a position of the air rib close to its end. The air tent device for nuclear facility decommissioning construction provided by the present invention is used to cover above the waste ditch to prevent the dust generated during the disassembly and cleaning of the decommissioned nuclear facility at the waste ditch from spreading, and to protect the work site and equipment. Before disassembling and cleaning the decommissioned nuclear facility, the two ends of the air rib in the air tent device for nuclear facility decommissioning construction can be placed on both sides of the waste ditch respectively, and a counterweight is placed on one side of each end of the air rib, and then the end of the air rib and the counterweight located on one side thereof are connected by a connecting piece. When connecting the connecting piece to the air rib, one end of the connecting piece needs to be connected to the position of the air rib near its end. Based on this, the counterweight can fix the position of the air rib near its end through the connecting piece, so that the end of the air rib can be stably abutted against the ground. It should be noted that the air rib is usually a hollow membrane structure. When inflated, the air rib can form a stable arched structure. In order to facilitate the fixing of the air rib ends on both sides of the waste ditch, the air rib is in an uninflated state during the installation process. After the air rib ends are fixed, the air rib is inflated. In order to prevent the air rib from collapsing after inflation, multiple connecting pieces in a diagonal state can be connected between each air rib end and the counterweight, so that a triangular stable connection structure is formed between the air rib, the connecting piece and the counterweight to prevent the air rib from collapsing. Alternatively, a diagonal brace can be abutted between the air rib and the ground to prevent the air rib from collapsing. After the air rib remains stable, the air rib installation process is repeated to install multiple air ribs above the waste ditch along the extension direction of the waste ditch, and then the air tent film is covered outside the multiple air ribs to form an air tent. When disassembling the air tent, the air tent membrane is removed from the plurality of air ribs, and the connecting pieces are separated from the air ribs, and the air ribs can be removed from both sides of the waste trench for recycling or reuse.

[0029] Compared with the prior art, the gas tent device for nuclear facility decommissioning construction provided by the present invention cooperates with the counterweight and the connecting piece, and can fix the two ends of the gas rib on the ground by means of a counterweight. There is no need to cast a concrete foundation around the ends of the gas rib. When dismantling the gas rib, the connecting piece can be separated from the gas rib to remove the gas rib, and there is no need to dismantle the concrete foundation. This can effectively improve the installation and removal efficiency of the gas rib and avoid generating new concrete waste. In addition, the gas rib is not easily damaged during the dismantling process, which is beneficial to the recycling of the gas tent.

[0030] The method for installing a gas tent device for nuclear facility decommissioning construction provided by the present invention applies the above-mentioned gas tent device for nuclear facility decommissioning construction, including: at the waste ditch at the nuclear facility decommissioning construction site, a plurality of gas ribs are laid in sequence along the length direction of the waste ditch, and the two ends of each gas rib are respectively located on both sides of the waste ditch; a plurality of counterweights are placed on both sides of the waste ditch, and a counterweight is provided on one side of the end of each gas rib; each gas rib is inflated, and when the gas rib is inflated to the point where its top is flush with the top of the counterweight, the inflation is stopped and a connecting piece is connected between each counterweight and the gas rib; each gas rib is continuously inflated until the gas rib is distributed in an arch shape above the waste ditch. The method for installing a gas tent device for nuclear facility decommissioning construction applies the above-mentioned gas tent device for nuclear facility decommissioning construction, and thus the method for installing a gas tent device for nuclear facility decommissioning construction has the same beneficial effects as the above-mentioned gas tent device for nuclear facility decommissioning construction. BRIEF DESCRIPTION OF THE DRAWINGS

[0031] In order to more clearly illustrate the specific implementation methods of the present invention or the technical solutions in the prior art, the drawings required for use in the specific implementation methods or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are some implementation methods of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0032] Figure 1 A top perspective view of an air tent device for nuclear facility decommissioning construction provided by an embodiment of the present invention;

[0033] Figure 2 A partial cross-sectional view of a gas tent device for nuclear facility decommissioning construction provided by an embodiment of the present invention;

[0034] Figure 3 A partial side view of a gas tent device for nuclear facility decommissioning construction provided by an embodiment of the present invention;

[0035] Figure 4 A flow chart of a method for installing a gas tent device for nuclear facility decommissioning construction provided by an embodiment of the present invention.

[0036] Icon: 1-air rib; 2-counterweight; 3-connecting piece; 4-cushion; 5-fan; 6-air tent membrane. DETAILED DESCRIPTION

[0037] In order to make the purpose, technical solutions and advantages of the embodiments of the present invention clearer, the technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Generally, the components of the embodiments of the present invention described and shown in the drawings here can be arranged and designed in various different configurations.

[0038] Therefore, the following detailed description of the embodiments of the present invention provided in the accompanying drawings is not intended to limit the scope of the invention claimed for protection, but merely represents selected embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0039] Some embodiments of the present invention are described in detail below in conjunction with the accompanying drawings. In the absence of conflict, the following embodiments and features in the embodiments can be combined with each other.

[0040] Example:

[0041] like Figure 1 , Figure 2 and Figure 3 As shown, the air tent device for nuclear facility decommissioning construction provided in this embodiment includes an air rib 1, a counterweight 2 and a connecting member 3; the two ends of the air rib 1 are respectively used to abut against the ground, the counterweight 2 is used to be placed on the ground, and a counterweight 2 is respectively provided on one side of the two ends of the air rib 1; each counterweight 2 is connected to the air rib 1 through a connecting member 3, and one end of the connecting member 3 is connected to the counterweight 2, and the other end is connected to a position of the air rib 1 close to its end.

[0042] The gas tent device for nuclear facility decommissioning construction provided in this embodiment is used to cover the waste ditch to prevent the spread of dust generated during the dismantling and cleaning of the decommissioned nuclear facility at the waste ditch, and to protect the work site and equipment.

[0043] Before dismantling and cleaning the decommissioned nuclear facility, the two ends of the gas rib 1 in the gas tent device for decommissioning the nuclear facility can be placed on both sides of the waste trench respectively, and a counterweight 2 is placed on one side of each end of the gas rib 1, and then the end of the gas rib 1 and the counterweight 2 located on one side are connected through the connecting piece 3. When connecting the connecting piece 3 to the gas rib 1, one end of the connecting piece 3 needs to be connected to the position of the gas rib 1 near its end, based on which, the counterweight 2 can fix the position of the gas rib 1 near its end through the connecting piece 3, and then the end of the gas rib 1 can be stably abutted against the ground.

[0044] It should be noted that the air rib 1 is usually a hollow membrane structure. When inflated, the air rib 1 can form a stable arch structure. In order to facilitate the fixation of the ends of the air rib 1 on both sides of the waste ditch, the air rib 1 is in an uninflated state during the installation process. After the ends of the air rib 1 are fixed, the air rib 1 is inflated.

[0045] In order to prevent the air rib 1 from collapsing after being inflated, a plurality of connecting members 3 in an oblique tension state may be connected between each end of the air rib 1 and the counterweight 2, so that the connecting members 3 form a triangular connection structure between the air rib 1 and the counterweight 2 to prevent the air rib 1 from collapsing. Alternatively, a diagonal brace may be provided between the air rib 1 and the ground to prevent the air rib 1 from collapsing.

[0046] After the air ribs 1 remain stable, the air rib 1 installation process is repeated to install multiple air ribs 1 above the waste ditch along the extension direction of the waste ditch, and then the air tent film 6 is covered outside the multiple air ribs 1 to form an air tent. When disassembling the air tent, the air tent film 6 is removed from the multiple air ribs 1, and the connecting member 3 is separated from the air ribs 1, and the air ribs 1 can be removed from both sides of the waste ditch for recycling or reuse.

[0047] Compared with the prior art, the gas tent device for nuclear facility decommissioning construction provided in this embodiment cooperates with the counterweight 2 and the connecting member 3 to fix the two ends of the gas rib 1 on the ground in a counterweight manner, without pouring a concrete foundation around the end of the gas rib 1. When dismantling the gas rib 1, the connecting member 3 can be separated from the gas rib 1 to remove the gas rib 1 without dismantling the concrete foundation. This can effectively improve the installation efficiency of the gas rib 1 and avoid generating new concrete waste. In addition, the gas rib 1 is not easily damaged during the dismantling process, which is beneficial to the recycling of the gas tent and effectively saves costs.

[0048] like Figure 2 As shown, the counterweight 2 is arranged on a side of the end of the air rib 1 away from the center of the air rib 1 .

[0049] Providing the counterweight 2 on the side of the end of the air rib 1 away from the center of the air rib 1 can not only provide a wider placement space for the counterweight 2, improve the stability and placement convenience of the counterweight 2, but also improve the oblique pulling effect of the counterweight 2 and the connecting member 3 on the air rib 1, thereby effectively improving the fixing stability of the connecting member 3 on the end of the air rib 1.

[0050] When the counterweight 2 is arranged on the side of the end of the air rib 1 away from the center of the air rib 1, the side of the air rib 1 facing the counterweight 2 can also be abutted against the counterweight 2, so that the counterweight 2 supports the air rib 1 and further improves the installation stability of the air rib 1.

[0051] Among them, the counterweight 2 can be a block structure made of materials such as metal, alloy or stone. Since the counterweight 2 is a block structure made of the above materials, the cost is relatively high and it is difficult to transport and carry. Therefore, in this embodiment, the counterweight 2 is preferably a sandbag. The sandbag can also play the role of fixing the connecting piece 3 and then fixing the air rib 1. The sandbag can realize the counterweight and disassembly of the counterweight 2 by loading and unloading sand at the construction site, which is not only low-cost but also easy to transport and construct.

[0052] During the construction process, the size of the sandbag can be selected according to the size of the air rib 1. For example, when the diameter of the inflated arched air rib 1 is 1.75 meters, in order to ensure that the sandbag has sufficient weight to fix the air rib 1, the length and width of the sandbag filled with sand in this embodiment are preferably 1.2 meters and the height is 1 meter.

[0053] In this embodiment, the connecting member 3 may be a tightening belt, and the connecting member 3 is obliquely stretched between the counterweight 2 and the gas rib 1 .

[0054] Since the tightening belt structure is usually made of elastic material, compared with connecting structures such as steel cables, the tightening belt not only has lower cost, but also can effectively improve its tensioning effect on the air rib 1 by utilizing its own elasticity.

[0055] The oblique-stayed connection method can form a triangular connection structure between the air rib 1, the connecting member 3 and the counterweight member 2, thereby effectively improving the connection stability between the air rib 1 and the counterweight member 2.

[0056] like Figure 3 As shown, there are two connecting members 3 between each counterweight 2 and the air rib 1, and the two connecting members 3 are arranged between the counterweight 2 and the air rib 1 at an angle.

[0057] This arrangement allows the connector 3 to form a triangular connection structure between the counterweight 2 and the air rib 1, which can effectively improve the installation stability of the air rib 1 and prevent the inflated air rib 1 from tilting and collapsing toward its front or rear side.

[0058] In order to further effectively prevent the gas rib 1 from tilting and collapsing, Figure 3 As shown, among the two connecting members 3 between the counterweight 2 and the air rib 1, the spacing between the ends of the two connecting members 3 connected to the air rib 1 is greater than the spacing between the ends of the two connecting members 3 connected to the counterweight 2. At this time, the two connecting members 3 are respectively connected to the positions of the air rib 1 close to the front and rear sides thereof, which can effectively prevent the air rib 1 from tilting and collapsing toward the front or rear side thereof after being inflated.

[0059] like Figure 2 As shown, the air tent device for nuclear facility decommissioning construction provided in this embodiment may further include a cushion layer 4 , which is fixed on the ground, and the end of the air rib 1 abuts against the cushion layer 4 .

[0060] The cushion layer 4 can play the role of raising the end of the air rib 1, and can effectively prevent liquids such as rainwater on the ground from flowing into the interior of the air tent.

[0061] The cushion layer 4 can be formed by casting building materials commonly used in existing construction projects, such as cement and Panax notoginseng ash.

[0062] It should be noted that even if the cushion layer 4 is formed by casting building materials, since the cushion layer 4 only needs to raise the end of the air rib 1, compared with the concrete structure cast around the existing air rib end, the cushion layer 4 has a smaller structural size and lower structural strength requirements. At this time, the air tent device used in nuclear facility decommissioning construction can still improve the installation efficiency and reduce the waste generated after the air tent is dismantled.

[0063] Furthermore, in order to prevent dust and impurities on the ground or the cushion layer 4 from contaminating the air ribs 1 , a protective layer such as a polyethylene film may be laid at the construction site before installing the air ribs 1 .

[0064] In addition, in order to improve the installation stability of the air rib 1, the ground at the construction site may be leveled before laying the protective layer.

[0065] In this embodiment, the number of air ribs 1 can be n, where n is an integer multiple of three and n is greater than three; the n air ribs 1 are distributed in sequence, and three adjacent air ribs 1 form an air rib group; the air tent device for nuclear facility decommissioning construction provided in this embodiment also includes fans 5, the number of fans 5 is equal to the number of air rib groups, and the air rib groups are connected to the fans 5 in a one-to-one correspondence.

[0066] The fan 5 is used to inflate the air rib 1 to keep the air rib 1 in an arched state. It should be noted that all the air ribs in the existing air tent are usually supplied with air by only one fan. Therefore, when an air rib leaks, the air ribs behind it are also difficult to remain inflated, which leads to the collapse of the air tent. It is necessary to dismantle the air tent and the concrete structure and then re-install the air tent. This not only requires a large amount of construction and high cost, but also greatly delays the construction time.

[0067] In this embodiment, n air ribs are divided into a plurality of air rib groups, and each air rib group is connected to a fan 5, so that when an air rib 1 in a certain air rib group leaks, the leak point can be promptly identified without affecting the inflation state of other air rib groups, and the stability of the air tent can be effectively maintained. More importantly, the air rib 1 in this embodiment is fixed by the counterweight 2 and the connecting member 3, so even if the air rib 1 leaks, it is easy to install and disassemble the air rib 1 to replace it with a new one.

[0068] In addition, it should be noted that since one fan 5 in this embodiment is only used to supply air to three air ribs 1, the power of each fan 5 in this embodiment is smaller than that of the fans used in the existing air tent. Even if the number of fans 5 used in this embodiment is increased, the power used by each fan 5 is small and the energy consumption will not increase.

[0069] like Figure 2As shown, the air tent device for nuclear facility decommissioning construction provided in this embodiment also includes an air tent membrane 6, a connecting belt and a fixing rope; the air tent membrane 6 covers the outside of n air ribs 1, and the inner wall of the air tent membrane 6 is connected to the air ribs 1 by a connecting belt; the fixing rope is installed on the air tent membrane 6, and the end of the fixing rope is connected to the counterweight 2 or the anchor on the ground.

[0070] The air tent film 6 is used to cover the outside of the plurality of air ribs 1 to form an air tent. The connecting belt is used to fix the air tent film 6 on the air ribs 1 to prevent the air tent film 6 from sliding off. The fixing rope can further fix the air tent film 6.

[0071] When the air rib 1 is covered with an air tent film 6, Figure 2 As shown, both sides of the air tent membrane 6 can be extended and laid on the ground on both sides of the waste ditch, and the counterweight 2 can be placed on the air tent membrane 6 on the ground to fix the air tent membrane 6 by using the deadweight of the counterweight 2, further improving the installation stability of the air tent membrane 6.

[0072] At this time, in order to prevent the connecting member 3 from affecting the laying process of the air tent membrane 6, Figure 3 As shown, a perforation can be opened at the position corresponding to the air tent film 6 and the connecting piece 3. When the air tent film 6 is covered on the outside of the air rib 1, the end of the connecting piece 3 can be temporarily separated from the air rib 1, and then the end of the connecting piece 3 can be passed through the above-mentioned perforation and then connected to the air rib 1.

[0073] The connection belt and the fixing rope can both adopt existing connection structures, such as the connection belt adopts a lanyard, and the fixing rope adopts a steel rope with a hook.

[0074] like Figure 4 As shown, this embodiment also provides a method for installing a gas tent device for nuclear facility decommissioning construction, using the above-mentioned gas tent device for nuclear facility decommissioning construction, including:

[0075] Step S1: at a waste trench at a nuclear facility decommissioning construction site, a plurality of gas ribs 1 are sequentially laid along the length direction of the waste trench, and two ends of each gas rib 1 are respectively located on two sides of the waste trench;

[0076] Step S2: placing a plurality of counterweights 2 on both sides of the waste trench, and providing a counterweight 2 on one side of the end of each gas rib 1;

[0077] Step S3: Inflate each air rib 1. When the air rib 1 is inflated until its top is flush with the top of the counterweight 2, the inflation is stopped and the connecting piece 3 is connected between each counterweight 2 and the air rib 1.

[0078] Step S4: Continue to inflate each air rib 1 until the air rib 1 is distributed in an arch shape above the waste trench.

[0079] The method for installing a gas tent device for nuclear facility decommissioning construction provided in this embodiment applies the above-mentioned gas tent device for nuclear facility decommissioning construction. Therefore, the method for installing a gas tent device for nuclear facility decommissioning construction and the above-mentioned gas tent device for nuclear facility decommissioning construction can solve the same technical problems and achieve the same technical effects, which will not be repeated here.

[0080] It should be noted that when the nuclear facility decommissioning construction gas tent device also includes a fan 5, in order to facilitate the connection between the fan 5 and the gas ribs 1, in step S1, the centers of the laid multiple gas ribs 1 can be aligned and located on the marked installation center line.

[0081] After the air ribs 1 are installed in place, the multiple air ribs 1 are connected in sequence through quick connectors 3 such as air ducts and joints.

[0082] Then, step S2 can be performed. In step S2, when the counterweight 2 is a sandbag, sand can be filled into the bag using construction machinery such as an excavator on both sides of the waste ditch to form a sandbag, and then the sandbags are placed one by one on one side of each end of the air rib 1.

[0083] After completing step S2, proceed to step S3. Since in step S3, inflation is suspended when the top of the air rib 1 is flush with the top of the counterweight 2, and the connecting member 3 is installed at this time, the installation process of the connecting member 3 is easier to implement, and in the inflation process in the subsequent step S4, it is convenient to use the connected connecting member 3 to support the air rib 1, thereby effectively ensuring the stability of the air rib 1 during the inflation process.

[0084] After the installation of the air rib 1 is completed, the air tent film 6 needs to be installed to complete the installation process of the entire air tent. Figure 4 As shown, the method for installing an air tent device for nuclear facility decommissioning construction provided in this embodiment also includes a step S30 before step S4: covering and connecting an air tent membrane 6 outside the plurality of air ribs 1; and a step S40 after step S4: installing a fixing cable on the air tent membrane 6, and fixing the two ends of the fixing cable to the counterweights 2 or ground anchors on both sides of the waste trench, respectively.

[0085] The step S30 is used to realize the laying process of the air tent film 6 on the air rib 1 , and the step S40 is used to realize the connection process between the air tent film 6 and the ground, thereby effectively preventing the air tent film 6 from sliding off the air rib 1 .

[0086] In step S40, a fixing cable such as a steel cable can be inserted into the pre-set inner channel of the air tent membrane 6 to realize the installation process of the fixing cable, and then the two ends of the fixing cable extending outside the inner channel are respectively connected and fixed to the weighted sandbags or anchor steel dowels on both sides of the waste ditch.

[0087] In order to further improve the installation stability of the air tent membrane 6, in step S30, the inner wall of the air tent membrane 6 and the air rib 1 may be connected by a connecting belt such as a tie.

[0088] After the decommissioning nuclear facility dismantling and cleaning process is completed in the gas tent, the gas tent device used for decommissioning nuclear facility construction needs to be dismantled for recycling or the next decommissioning nuclear facility dismantling and cleaning process. Based on this, when dismantling the gas tent device used for decommissioning nuclear facility construction, the fixing rope can be separated from the counterweight 2 or the anchor, and then the connecting belt between the gas tent membrane 6 and the gas rib 1 can be removed, and then the gas tent membrane 6 can be removed from the gas rib 1 and folded and recycled. Then the gas rib 1 is deflated, and after the deflation is completed, the connecting piece 3 between the gas rib 1 and the counterweight 2 is removed, and finally the gas rib 1 is folded and recycled, and the counterweight 2 is unloaded and recycled. At this point, the dismantling process of the gas tent device used for decommissioning nuclear facility construction can be completed.

[0089] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit it. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or replace some or all of the technical features therein with equivalents. However, these modifications or replacements do not cause the essence of the corresponding technical solutions to deviate from the scope of the technical solutions of the embodiments of the present invention.

Claims

1. A gas tent device for nuclear facility decommissioning construction, characterized in that: It comprises a gas rib (1), a counterweight (2) and a connecting piece (3); The two ends of the air rib (1) are respectively used to abut against the ground, and the counterweight (2) is used to be placed on the ground. The counterweight (2) is respectively provided on one side of the two ends of the air rib (1); Each of the counterweights (2) is connected to the air rib (1) via the connecting piece (3), and one end of the connecting piece (3) is connected to the counterweight (2), and the other end is connected to a position of the air rib (1) close to its end.

2. The air tent device for nuclear facility decommissioning construction according to claim 1, characterized in that: The counterweight (2) is arranged on a side of the end of the air rib (1) away from the center of the air rib (1).

3. The air tent device for nuclear facility decommissioning construction according to claim 1, characterized in that: The counterweight (2) is a sandbag.

4. The air tent device for nuclear facility decommissioning construction according to claim 1, characterized in that: The connecting member (3) is a tightening belt, and the connecting member (3) is obliquely stretched between the counterweight member (2) and the air rib (1).

5. The air tent device for nuclear facility decommissioning construction according to claim 4, characterized in that: There are two connecting members (3) between each of the counterweight members (2) and the air rib (1), and the two connecting members (3) are arranged between the counterweight member (2) and the air rib (1) at an angle.

6. The air tent device for nuclear facility decommissioning construction according to claim 1, characterized in that: It also comprises a cushion layer (4), the cushion layer (4) being fixed on the ground, and the end of the air rib (1) being in contact with the cushion layer (4).

7. The air tent device for nuclear facility decommissioning construction according to any one of claims 1 to 6, characterized in that: The number of the air ribs (1) is n, where n is an integer multiple of three and n is greater than three; the n air ribs (1) are distributed in sequence, and three adjacent air ribs (1) form an air rib group; The air tent device for nuclear facility decommissioning construction further comprises fans (5), the number of the fans (5) is equal to the number of the air rib groups, and the air rib groups are connected to the fans (5) in a one-to-one correspondence.

8. The air tent device for nuclear facility decommissioning construction according to claim 7, characterized in that: It also includes an air tent membrane (6), a connecting belt and a fixing rope; The air tent membrane (6) covers the outside of the n air ribs (1), and the inner wall of the air tent membrane (6) is connected to the air ribs (1) via the connecting belt; The fixing rope is installed on the air tent membrane (6), and the end of the fixing rope is connected to the counterweight (2) or a ground anchor on the ground.

9. A method for installing a gas tent device for nuclear facility decommissioning construction, using the gas tent device for nuclear facility decommissioning construction as claimed in any one of claims 1 to 8, characterized in that: include: At a waste trench at a nuclear facility decommissioning construction site, a plurality of gas ribs (1) are sequentially laid along the length direction of the waste trench, and two ends of each gas rib (1) are respectively located on two sides of the waste trench; A plurality of the counterweights (2) are respectively placed on both sides of the waste ditch, and one side of the end of each of the air ribs (1) is provided with the counterweight (2); Inflate each of the air ribs (1), and when the air ribs (1) are inflated until the top thereof is flush with the top of the counterweight (2), stop inflating and connect the connecting piece (3) between each of the counterweight (2) and the air ribs (1); Continue to inflate each of the air ribs (1) until the air ribs (1) are distributed in an arch shape above the waste trench.

10. The method for installing an air tent device for nuclear facility decommissioning construction according to claim 9, characterized in that: Before the step of continuing to inflate each of the air ribs (1) until the air ribs (1) are distributed in an arched shape above the waste trench, the method further comprises: An air tent membrane (6) is covered and connected outside the plurality of air ribs (1); After the step of continuing to inflate each of the air ribs (1) until the air ribs (1) are distributed in an arch shape above the waste trench, the method further comprises: A fixing rope is installed on the air tent membrane (6), and the two ends of the fixing rope are respectively fixedly connected to the counterweights (2) or ground anchors on both sides of the waste trench.