Method for transforming roof structure of coal seam bifurcation area of rock burst mine
By transforming the top plate structure in the coal seam bifurcation zone, using directional hydraulic fracturing technology to form a stable continuous medium, the structural instability caused by weak geological surfaces is solved, the risk of impact ground pressure is reduced, and the safe and efficient production of the mine is ensured. .
Patent Information
- Application Number
- CN202410999357.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-24
- Publication Date
- 2024-11-08
AI Technical Summary
The weak geological surface of the coal seam bifurcation area can easily lead to structural instability, increase the risk of impact ground pressure, and affect the safe and efficient production of mines.
By analyzing the impact risks of the coal seam bifurcation area, determining the roof structure transformation area, conducting directional hydraulic fracturing, forming a continuous medium, filling the cracks to stabilize the roof structure, and reducing the slippage and shear activation of the weak geological surface.
It effectively reduces the impact risk during the working face mining, improves the stability of the top slab layer, and ensures safe and efficient production during mining.
Smart Images

Figure CN118911681A_ABST
Abstract
Description
Technical Field
[0001] The present invention belongs to the technical field of safe mining methods for coal mines, and in particular relates to a method for reconstructing the roof structure of a coal seam bifurcation zone in a rock burst mine. Background Art
[0002] As coal mining continues to expand at greater depths, rock bursts have become one of the major hazards hindering high-yield and efficient production in medium- and deep-level mines. Similarly, the geological characteristics of coal seams have a crucial impact on mine operations and safety. Coal seam bifurcation is a common and particularly significant geological phenomenon. Coal seam bifurcation occurs when a single coal seam begins to split into multiple branches within a specific area. This phenomenon has complex geological causes, potentially linked to various factors such as tectonic movements and changes in the sedimentary environment. During mining, the junctions and transition zones between bifurcated coal seams are prone to forming dominant failure surfaces of the coal and rock mass—geologically weak surfaces. These surfaces provide sliding paths for the activation of triangular wedging between the upper and lower bifurcated coal seams. This results in a rapid decrease in the step-over distance of the lower direct roof during mining of the bifurcated area, creating strain space for the hard rock strata at the working face's base roof and the upper direct roof. This gradually increases the exposed area, intensifying the compression and clamping of the coal mass ahead of the working face and increasing the risk of rock bursts at the working face. At the same time, there are fault structures near the bifurcation line of the coal seam, which makes the geological weak surface prone to slip and dislocation under the influence of mining disturbance, causing relative tension and shear activation of the rock masses on both sides of the structural surface, which can easily induce structural instability-type impact ground pressure.
[0003] To better reduce the potential disaster risk caused by geological weak surfaces near coal seam bifurcation areas, geological exploration and analysis are used to accurately understand the morphology, distribution, and characteristics of coal seam bifurcations, and to strengthen roof monitoring and support in these areas. Using underground roof directional hydraulic fracturing technology for abnormally monitored coal seam bifurcation areas, a method for modifying the roof structure in coal seam bifurcation areas in rock burst mines has been proposed. This method can not only reduce the risk of rock bursts during working face mining, but also artificially modify the roof lithology to avoid structural instability caused by geological weak surfaces, which is of great significance to the safe and efficient production of the working face. Summary of the Invention
[0004] The purpose of the present invention is to provide a method for reconstructing the roof structure of a coal seam bifurcation zone in a rock burst mine, thereby solving the problem of structural instability caused by a geological weak surface.
[0005] The technical solution adopted by the present invention is: a method for reconstructing the roof structure of a coal seam bifurcation area in a rock burst mine, comprising the following steps:
[0006] Step 1: Analyze the impact risk of the coal seam bifurcation area, and proceed to step 2 if it is uncontrollable;
[0007] Step 2, determine the dominant failure surface of the coal rock mass;
[0008] Step 3: Based on the impact risk of the coal seam bifurcation zone, the influence range LP of the coal-rock mass dominant failure surface is obtained, and then the length L of the roof structure transformation area is determined, L = LP + 2X, where X is the transition range;
[0009] Step 4: Estimate the height H1 of the roof collapse zone of the working face, and then determine the height H=H2-H1 of the roof structure transformation area based on the maximum height H2 of the dominant failure surface of the coal and rock mass in the roof structure transformation area;
[0010] Step 5, testing the fracturing radius R of the roof hydraulic fracturing drilling hole;
[0011] Step 6: Determine the pressure P of the roof directional hydraulic fracturing to ensure that the height of the roof structural transformation area H=2R;
[0012] Step 7, determine the layout of the directional fracturing drilling site tunnel;
[0013] Step 8: Fracturing the rock formation in the roof structure transformation area into a continuous medium, and filling the pre-cracks and primary cracks with grouting.
[0014] The present invention is also characterized in that:
[0015] Step 2 is specifically as follows: the roof core sampling holes are designed in the rock burst working face according to the exposure of the coal seam bifurcation, the morphology of the coal seam bifurcation area is determined by combining the comprehensive columnar data of the mine drilling, the distribution of the activated structural rock layers between the upper and lower bifurcated coal seams is determined, and the dominant destruction surface of the coal rock mass is determined.
[0016] In step 3, the length L of the roof structure modification area is the length along the direction of the working face. If the bifurcation line is parallel to the inclination of the working face, the roof structure modification area is horizontally rectangular; if the bifurcation line is oblique to the inclination of the working face, the roof structure modification area is horizontally parallelogram.
[0017] In step 4, based on the roof rock structure, according to the working face mining height M and the coal seam roof as the reference point, the height H1 of the working face roof collapse zone is estimated, H1 = f(M).
[0018] Step 5 specifically includes: performing a roof rock stratum fracturing test to test the roof hydraulic fracturing drilling radius R=f(P).
[0019] Step 7 is specifically as follows: the roof directional hydraulic fracturing fracturing section is arranged parallel to the bifurcation line, the horizontal drilling capacity LA of the directional hydraulic fracturing is compared with the bifurcation line length LF, and the directional fracturing drilling site is determined to be arranged in the Nth working face solid coal roadway, N = INT (LA / LF).
[0020] The beneficial effects of the present invention are: the method for reconstructing the roof structure in the bifurcation area of the coal seam in a rock burst mine of the present invention adjusts the prevention and control ideas in special areas, and the bifurcation line area is in a stable low-stress state during the mining of the working face, especially during the mining period, which is more conducive to controlling the pressure situation of the working face and ensuring the personal safety of personnel during mining. It can not only reduce the impact risk caused by the roof rock layer, but also form a continuous medium with a certain strength, which is of great significance to the safe and efficient production of the working face. BRIEF DESCRIPTION OF THE DRAWINGS
[0021] Figure 1 It is a schematic flow chart of the method for reforming the roof structure of a coal seam bifurcation area in a rock burst mine according to the present invention;
[0022] Figure 2 This is the design of the roof coring hole and the morphology of the coal seam bifurcation area of the present invention;
[0023] Figure 3 It is a cross-sectional layout diagram of the top plate structure modification area of the present invention;
[0024] Figure 4 It is a plan layout of the roof structure modification area of the present invention;
[0025] Figure 5 1 is an example plan layout diagram of directional drilling of the present invention.
[0026] In the figure, 1. lower bifurcation coal seam, 2. upper bifurcation coal seam, 3. combined coal seam, 4. roof, 5. floor, 6. dominant failure surface of coal rock mass, 7. roof core sampling hole, 8. roof structure transformation area, 9. roof transformation working face, 10. subsequent roof transformation working face, 11. return air lane (air-facing lane) of roof transformation working face, 12. rubber roadway (physical coal lane) of roof transformation working face, 13. return air lane (air-facing lane) of subsequent roof transformation working face, 14. rubber roadway (physical coal lane) of subsequent roof transformation working face, 15. bifurcation line, 16. drilling site, 17. directional hydraulic fracturing drilling trajectory, 18. directional hydraulic fracturing fracturing section. DETAILED DESCRIPTION
[0027] The present invention will be described in detail below with reference to the accompanying drawings and specific embodiments.
[0028] Example 1
[0029] The present invention provides a method for modifying the roof structure of a coal seam bifurcation area in a rock burst mine, comprising the following steps:
[0030] Step 1: For rock burst mines with coal seam bifurcation, the rock burst risk in the coal seam bifurcation area is assessed by combining existing mines in the surrounding area or real-time monitoring data. If it is uncontrollable, proceed to step 2.
[0031] Step 2: Design the roof core holes in the rock burst working face according to the exposure of the coal seam bifurcation, and determine the morphology of the coal seam bifurcation area by combining the comprehensive columnar data of the mine drilling, analyze the distribution of the activated structural rock layer between the upper and lower bifurcated coal seams, and determine the dominant failure surface of the coal rock mass, mainly for the upper layer that cannot be mined and the upper layer that is the dominant failure surface of the coal rock mass during the mining of the lower layer.
[0032] Step 3: According to the impact risk of the coal seam bifurcation zone, the influence range LP of the dominant failure surface of the coal and rock mass is obtained, and then the length L of the roof structure modification area is determined, L = LP + 2X, where X is the transition range; the length L of the roof structure modification area is the length along the strike direction of the working face. If the strike of the bifurcation line is parallel to the inclination of the working face, the roof structure modification area is horizontally rectangular; if the strike of the bifurcation line is oblique to the inclination of the working face, the roof structure modification area is horizontally parallelogram.
[0033] Step 4: Based on the roof rock structure, according to the working face mining height M and with the coal seam roof as the reference point, estimate the height H1 of the working face roof collapse zone, H1 = f(M), and then determine the height of the roof structure transformation area H = H2-H1 based on the maximum height H2 of the dominant coal rock failure surface in the roof structure transformation area.
[0034] Step 5: Conduct a roof rock fracturing test to test the roof hydraulic fracturing drilling radius R=f(P).
[0035] Step 6: Determine the pressure P of the roof directional hydraulic fracturing to ensure that the height of the roof structure transformation area H=2R. The range of directional hydraulic fracturing must be at least above the height H1 of the roof collapse zone of the working face.
[0036] Step 7: The roof directional hydraulic fracturing sections are arranged parallel to the bifurcation line. The horizontal drilling capacity LA of the directional hydraulic fracturing is compared with the bifurcation line length LF. The directional fracturing drilling site is determined to be arranged in the solid coal roadway of the Nth working face, where N = INT(LA / LF). As the horizontal drilling capacity LA of the directional hydraulic fracturing increases, regional roof structure reconstruction can be carried out at a distance at the adjacent Nth working face.
[0037] In step 8, the rock formation in the roof structure modification area is fractured into a stable continuous medium by means of roof directional hydraulic fracturing, and then grouting is performed to fill the pre-cracks and primary cracks, thereby modifying the rock formation into a relatively stable artificial buffer layer with similar properties.
[0038] Example 2
[0039] The present invention provides a method for modifying the roof structure of a coal seam bifurcation zone in a rock burst mine. Figure 1 As shown, the following steps are included:
[0040] Step 1: For rockburst mines with coal seam bifurcation, the rockburst risk in the coal seam bifurcation area is assessed by combining existing data from surrounding mines or real-time monitoring data. If the rockburst risk is controllable, mining proceeds normally. If the rockburst risk is uncontrollable, proceed to Step 2.
[0041] Step 2, such as Figure 2 As shown, the rock burst working face is designed with a roof core hole 7 in the roof 4 according to the exposure of the coal seam bifurcation above the bottom plate 5. Combined with the comprehensive columnarity of the mine drilling, the morphology of the coal seam bifurcation area is comprehensively determined, and the distribution of the activated structural rock layer between the upper bifurcation coal seam 2 and the lower bifurcation coal seam 1 on one side of the combined coal seam 3 is determined, and the dominant destruction surface 6 of the coal and rock mass is determined.
[0042] Step 3, such as Figure 3 As shown in the figure, combined with the impact risk of the coal seam bifurcation area, the influence range LP of the dominant failure surface 6 of the coal rock mass is obtained. From the side of the layered layer to the side of the combined coal seam 3, the length L of the roof structure transformation area 8 is determined, where L=LP+2X, and X is the transition range.
[0043] Step 4, such as Figure 3 As shown, combined with the roof rock structure, according to the working face mining height M, with the coal seam roof as the reference point, the height H1 of the working face roof collapse zone is estimated, H1 = f(M); the maximum height H2 of the coal rock dominant failure surface 6 in the roof structure transformation area 8 is determined, and the height H of the roof structure transformation area 8 is determined.
[0044] Step 5, such as Figure 3 As shown, a top plate 4 rock layer fracturing test is performed to test the top plate hydraulic fracturing drilling fracturing radius R=f(P).
[0045] Step 6, such as Figure 3 As shown, the pressure P of the roof directional hydraulic fracturing is determined to ensure that the height H of the roof structural transformation area 8 is 2R.
[0046] Step 7, such as Figure 4 and Figure 5 As shown, the roof directional hydraulic fracturing stage 18 is arranged parallel to the bifurcation line 15. The directional hydraulic fracturing horizontal drilling capacity LA of the roof reconstruction working face 9 and the subsequent roof reconstruction working face 10 are compared with the bifurcation line length LF to determine the placement of the directional fracturing drilling site 16 in the Nth working face solid coal roadway, where N = INT(LA / LF). The roof reconstruction working face 9 is flanked by a roof reconstruction working face return air roadway (air-facing roadway) 11 and a roof reconstruction working face rubber roadway (solid coal roadway) 12, respectively. The subsequent roof reconstruction working face 10 is flanked by a subsequent roof reconstruction working face return air roadway (air-facing roadway) 13 and a subsequent roof reconstruction working face rubber roadway (solid coal roadway) 14, respectively.
[0047] Step 8, such as Figure 5As shown, a directional hydraulic fracturing drilling trajectory 17 is formed by directional hydraulic fracturing of the roof, and the rock formation in the roof structure modification area 8 is fractured into a stable continuous medium; then grouting is performed to fill the pre-cracks and primary cracks, and the rock formation is modified into an artificial buffer layer with similar properties and relatively stable.
[0048] Example 3
[0049] Taking the conditions of a mine in the Inner Mongolia-Shaanxi region as an example, the bifurcation line layout of the working face in the panel area is approximately as follows: Figure 4 As shown, the working face adopts a small coal pillar excavation process to connect in sequence. The bifurcation line of two adjacent working faces is approximately parallel to the working face inclination. The working face is 300m long, the strike length is 3120m, the width of the two tunnels is 5.6m, and the width of the small coal pillar is designed to be 6m. The upper bifurcation coal seam in this panel area does not have mining conditions, and the main mining methods are the lower bifurcation coal seam and the combined coal seam. Combined with the existing roof directional hydraulic fracturing survey in the area, it can be seen that the drilling capacity of the drilling rig can reach 800-1000m. When the drilling depth exceeds 500-600m, the drilling difficulty gradually increases, and it is difficult to drill and discharge slag in the horizontal section. Based on this, the present invention provides a method for transforming the roof structure of the coal seam bifurcation area in a rock burst mine. The specific operating steps are as follows:
[0050] Step 1: For rockburst mines with coal seam bifurcation, the rockburst risk in the coal seam bifurcation area is assessed by combining existing data from surrounding mines or real-time monitoring data. If the rockburst risk is controllable, mining proceeds normally. If the rockburst risk is uncontrollable, proceed to Step 2.
[0051] Step 2: According to the exposure of coal seam bifurcation, roof core sampling holes are designed at intervals of 100 to 150 meters in the direction of the bifurcation line in the rock burst working face. Combined with the comprehensive columnarity of the mine drilling, the morphology of the coal seam bifurcation area is comprehensively determined, the distribution of the activated structural rock layer between the upper and lower bifurcated coal seams is determined, and the dominant destruction surface of the coal rock mass is determined.
[0052] Step 3: Combined with the impact risk of the coal seam bifurcation area, the influence range of the dominant failure surface of the coal and rock mass, LP, is obtained as 100 m on the bifurcation line on the layer side to 50 m on the combined layer side. The length L of the roof structure transformation area is determined, X is taken as 30 m, and L = LP + 2X = 210 m.
[0053] Step 4: Based on the roof rock structure, with the working face mining height M as 4m and the coal seam roof as the reference point, the estimated height H1 of the working face roof collapse zone is 10m; the maximum height H2 of the dominant coal rock failure surface in the roof structure transformation area is 40m, and the height H of the roof structure transformation area is determined to be 30m.
[0054] Step 5: Conduct a roof rock fracturing test to test the roof hydraulic fracturing drilling radius R=f(P).
[0055] Step 6: Based on the mine's existing hydraulic fracturing experience, preliminarily determine that the pressure P for directional hydraulic fracturing of the roof is between 10 and 15 MPa. The specific pressure P is adjusted based on the roof rock fracturing test in step 5 to ensure that the height of the roof structure transformation area H = 2R = 30 m.
[0056] Step 7: Arrange the roof directional hydraulic fracturing section parallel to the bifurcation line; compare the horizontal drilling capacity LA of the directional hydraulic fracturing with the bifurcation line length LF, and determine that the directional fracturing drilling site is arranged in the solid coal roadway of the second working face.
[0057] Step 8: Fracture the rock formation in the roof structural modification area into a stable continuous medium through directional hydraulic fracturing of the roof; then fill the pre-cracks and original cracks by cement grouting or other methods to modify the rock formation into a relatively stable artificial buffer layer with similar properties.
Claims
1. Method for structural reconstruction of roof in bifurcation area of coal seam in rock burst mine, It is characterized in that The following steps are involved: Step 1: determine the impact risk of the coal seam bifurcation area, and proceed to step 2 if it is uncontrollable; Step 2, determining the dominant failure surface of the coal rock mass; Step 3: According to the impact risk of the coal seam bifurcation zone, the influence range LP of the dominant failure surface of the coal and rock mass is obtained, and then the length L of the roof structure transformation area is determined, L = LP + 2X, where X is the transition range; Step 4, estimate the height H1 of the roof collapse zone of the working face, and then determine the height H=H2-H1 of the roof structure transformation area according to the maximum height H2 of the dominant failure surface of the coal and rock mass in the roof structure transformation area; Step 5, testing the fracturing radius R of the top plate hydraulic fracturing drilling hole; Step 6, determine the pressure P of the roof directional hydraulic fracturing to ensure that the height of the roof structure transformation area H = 2R; Step 7, determine the layout of the tunnels for the directional fracturing drilling site; Step 8, fracturing the rock formation in the roof structure transformation area into a continuous medium, and filling the pre-cracks and primary cracks with grouting.
2. The method for modifying the roof structure of the coal seam bifurcation area in a rock burst mine as claimed in claim 1, It is characterized in that The step 2 is specifically as follows: the roof coring holes are designed in the rock burst working face according to the exposure of coal seam bifurcation, the morphology of the coal seam bifurcation area is determined by combining the comprehensive columnar data of the mine drilling, the distribution of activated structural rock strata between the upper and lower bifurcated coal seams is determined, and the dominant destruction surface of the coal and rock mass is determined.
3. The method for modifying the roof structure of the coal seam bifurcation area in a rock burst mine as claimed in claim 1, It is characterized in that In step 3, the length L of the top plate structure modification area is the length along the direction of the working surface. If the bifurcation line is parallel to the inclination of the working surface, the top plate structure modification area is horizontally rectangular; if the bifurcation line is oblique to the inclination of the working surface, the top plate structure modification area is horizontally parallelogram.
4. The method for modifying the roof structure of the coal seam bifurcation area in a rock burst mine according to claim 1, It is characterized in that In step 4, the roof rock structure is combined with the mining height M of the working face and the coal seam roof is used as the reference point to estimate the height H1 of the roof collapse zone of the working face, H1=f(M).
5. The method for modifying the roof structure of the coal seam bifurcation area in a rock burst mine as claimed in claim 1, It is characterized in that The step 5 specifically includes: performing a roof rock stratum fracturing test to test the roof hydraulic fracturing drilling radius R=f(P).
6. The method for modifying the roof structure of the coal seam bifurcation area in a rock burst mine as claimed in claim 1, It is characterized in that The step 7 is specifically as follows: the roof directional hydraulic fracturing fracturing section is arranged parallel to the bifurcation line, the directional hydraulic fracturing horizontal drilling capacity LA is compared with the bifurcation line length LF, and the directional fracturing drilling site is determined to be arranged in the Nth working face solid coal roadway, N = INT (LA / LF).