Air conditioner exhaust waste heat recovery device for automobile coating process
By designing multiple heating pipes and spiral heat exchange pipes in the exhaust waste heat recovery device of the air conditioner process, efficient contact between air and water and secondary recycling are achieved, and the problem of low recycling efficiency in the prior art is solved. Significantly reduces energy consumption and costs.
Patent Information
- Application Number
- CN202411291272.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-14
- Publication Date
- 2024-11-08
AI Technical Summary
The recycling efficiency of the air-conditioning exhaust waste heat recovery device in the existing automotive coating process is low, resulting in increased heat loss and energy consumption, and the air contact area with the heat exchange pipe is small and the heat utilization rate is low.
An air conditioning body including a preheating pipe, a first heating chamber, a second heating chamber, a heat exchange pipe and a heating pipe is designed, and the contact area between air and water is increased through a splitter plate and a plurality of heating pipes, and the contact area between air and water is increased at the second heating pipe. The silo is equipped with spiral heat exchange tubes and copper-aluminum composite materials to achieve secondary air recovery and efficient heat absorption.
It improves heat absorption and recycling efficiency, reduces the cost of air conditioning, and significantly saves energy consumption through secondary recycling.
Smart Images

Figure CN118912680A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of waste heat recovery, and in particular to a waste heat recovery device for exhaust of air conditioner in automobile painting process. Background Art
[0002] Automobile painting workshops are usually required to maintain constant temperature and humidity all year round. Since the internal temperature of most automobile painting workshops is about 26°C, the exhaust temperature in winter is about 18°C, and the air intake temperature of the workshop is relatively low, which leads to a large power consumption of the air conditioning system and the inability to recover the waste heat in the exhaust air. After searching, a Chinese patent authorization number CN109900147A discloses an automobile painting process air conditioning exhaust waste heat recovery device, including a painting workshop air conditioning body, a waste heat recovery device, an induced draft fan, an air conditioning exhaust duct, a waste heat recovery device exhaust duct, a fresh air inlet duct, a fresh air outlet duct, an air supply duct, an air inlet, and an exhaust duct. The painting workshop air conditioning body is connected to the waste heat recovery device through the air conditioning exhaust duct, and the waste heat recovery device is connected to the waste heat recovery device through the waste heat recovery device exhaust duct. Exhaust port, the waste heat recovery device is connected to the air inlet through the fresh air inlet duct, the waste heat recovery device is connected to the induced draft fan through the fresh air outlet duct, and the induced draft fan is connected to the paint shop air conditioner body through the air supply duct. Although the device is aimed at the recovery of air conditioning exhaust heat energy in the northeast region in winter, so as to increase the temperature of the inlet air to save the energy consumption of the air conditioner during heating, so as to achieve the purpose of energy saving in the automobile painting process air conditioning, but the waste heat recovery system has a low efficiency of only one recovery, which leads to a small amount of waste heat in the discharged air that cannot be fully recovered, resulting in heat loss and increased cost of air conditioning use. In addition, the contact area between the discharged air and the heat exchange pipe is small, which leads to the inability of the air to fully contact the heat exchange pipe, so that the heat of the discharged air cannot be fully exchanged with the water in the pipe, and the heat utilization rate is low. Summary of the invention
[0003] In view of the deficiencies in the prior art, the present invention provides an exhaust waste heat recovery device for air conditioning in an automobile painting process, which solves the problems raised in the background technology.
[0004] To achieve the above objectives, the present invention is implemented through the following technical solutions: A waste heat recovery device for exhausting air from an air conditioner in an automobile painting process, comprising an air conditioner main body, the air conditioner main body comprising a preheating pipe, a first heating bin, a second heating bin, an upper baffle, a heat exchange pipe and a heating pipe, a preheating pipe is installed on one side of the air conditioner main body, one end of the preheating pipe is connected to the interior of the air conditioner main body, the preheating pipe is respectively connected to the first circulation pipe and the second circulation pipe, the second circulation pipe is connected to one end of a first circulation pump, the other end of the first circulation pump is connected to one end of a third circulation pipe, the other end of the third circulation pipe is connected to the interior of a first steam bin, the bottom of the first steam bin is connected to the interior of the first heating bin, an exhaust device is installed at one end of the first heating bin, a first flange is provided at the other end of the first heating bin, the first flange is connected to the second flange by connecting bolts, the second flange is arranged at one end of the second heating bin, a water bin is installed on the top of the second heating bin, the top of the water bin is connected to the bottom of the second steam bin, one end of the second steam bin is connected to one end of a fourth circulation pipe, the other end of the fourth circulation pipe is connected to the top of the first steam bin, and a heat preservation cover is installed on the outside of the fourth circulation pipe.
[0005] Preferably, both ends of the heat exchange tube are connected to both ends of the water bin respectively, and a lifting pump is installed at one end of the heat exchange tube, and the top of the water bin is connected to the bottom of the second steam bin.
[0006] Preferably, guide plates are provided at both ends of the first heating bin and both ends of the preheating tube, and heating tubes are provided inside the first heating bin and the preheating tube, and the heating tubes are connected to the holes and grooves on the surfaces of the guide plates.
[0007] Preferably, the heating tubes are distributed at equal intervals from each other, the number of the heating tubes corresponds to the number of holes on the surface of the guide plate, and there are gaps between adjacent heating tubes. The heating tubes are made of a copper-aluminum composite material.
[0008] Preferably, the two ends inside the second heating chamber are welded to the two ends of the connecting rod, the connecting rod is arranged in a ring shape with equal intervals inside the second heating chamber, and the surface of the connecting rod is welded to the upper baffle and the lower baffle respectively.
[0009] Preferably, the upper baffle plate and the lower baffle plate are arranged in a semicircular shape, the upper baffle plate and the lower baffle plate are distributed in an up-and-down staggered shape, and the distances between adjacent upper baffle plates are equal.
[0010] Preferably, the preheating tube and the outer wall of the second heating chamber are both provided with an insulation layer, a heat exchange tube is provided inside the second heating chamber, the heat exchange tube is spirally arranged, the surface of the heat exchange tube is welded to the inner wall of the second heating chamber, and the heat exchange tube is made of copper-aluminum composite material.
[0011] The present invention provides a waste heat recovery device for air conditioning exhaust in automobile painting process. It has the following beneficial effects: The automobile painting process air conditioning exhaust waste heat recovery device, through the mutual combination of various components, can divert the air at the exhaust port through the diverter plate when the device is in use, and fully and evenly enter the heating pipe. By arranging a plurality of heating pipes, the contact area between the heating pipe and the water inside the first heating chamber is increased, which is beneficial to improve the heat absorption rate. The exhaust heat can be recovered through the heat exchange pipe inside the second heating chamber, which is beneficial to enable the device to perform secondary recovery of the exhaust waste heat, which is beneficial to improve the efficiency of heat absorption, thereby reducing the cost of using the air conditioner. BRIEF DESCRIPTION OF THE DRAWINGS
[0012] Figure 1 It is a schematic diagram of the overall structure of the present invention; Figure 2 It is a schematic diagram of the internal structure of the water tank and the second steam tank of the present invention; Figure 3 This is a schematic diagram of the heat exchange tube structure of the present invention; Figure 4 This is a schematic diagram of the structure of the upper baffle and the lower baffle of the present invention; Figure 5 This is a schematic diagram of the guide plate structure of the present invention; Figure 6 It is a schematic diagram of the heating tube structure of the present invention.
[0013] In the figure, 1, air conditioner body; 2, preheating pipe; 3, first circulation pipe; 4, second circulation pipe; 5, first circulation pump; 6, third circulation pipe; 7, first steam bin; 8, first heating bin; 9, exhaust device; 10, first flange; 11, connecting bolt; 12, second flange; 13, second heating bin; 14, water bin; 15, second steam bin; 16, insulation cover; 17, fourth circulation pipe; 18, lifting pump; 19, upper baffle; 20, lower baffle; 21, connecting rod; 22, heat exchange pipe; 23, guide plate; 24, heating pipe. DETAILED DESCRIPTION
[0014] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0015] See also Figure 1-6, an embodiment of the present invention provides a technical solution: a waste heat recovery device for exhaust air of an automobile painting process air conditioner, comprising an air conditioner main body 1, the air conditioner main body 1 comprising a preheating pipe 2, a first heating bin 8, a second heating bin 13, an upper baffle 19, a heat exchange pipe 22 and a heating pipe 24, a preheating pipe 2 is installed on one side of the air conditioner main body 1, one end of the preheating pipe 2 is connected to the interior of the air conditioner main body 1, the preheating pipe 2 is connected to the first circulation pipe 3 and the second circulation pipe 4 respectively, the second circulation pipe 4 is connected to one end of a first circulation pump 5, the other end of the first circulation pump 5 is connected to one end of a third circulation pipe 6, the other end of the third circulation pipe 6 is connected to the interior of a first steam bin 7, the bottom of the first steam bin 7 is connected to the interior of the first heating bin 8, and the first heating bin 8 is connected to the first heating bin 8. An exhaust device 9 is installed at the end, and a first flange edge 10 is provided at the other end of the first heating bin 8. The first flange edge 10 is connected to the second flange edge 12 by a connecting bolt 11. The second flange edge 12 is arranged at one end of the second heating bin 13. A water bin 14 is installed on the top of the second heating bin 13. The top of the water bin 14 is connected to the bottom of the second steam bin 15. One end of the second steam bin 15 is connected to one end of the fourth circulation pipe 17. The other end of the fourth circulation pipe 17 is connected to the top of the first steam bin 7. An insulation cover 16 is installed on the outside of the fourth circulation pipe 17. When the device is in use, the air inside the workshop will enter the second heating bin 13 when it is discharged, and the air with residual heat can be connected to the lower baffle 19 in the second heating bin 13 through the upper baffle 19. The baffle 20 moves up and down in a circuitous manner, which is conducive to extending the airflow formed inside the second heating chamber 13, so that the air with residual heat can fully contact the heat exchange tube 22, thereby heating the soft water inside the heat exchange tube 22. Under the action of the lifting pump 18, the soft water heated inside the heat exchange tube 22 can circulate to the inside of the water chamber 14, and then the evaporated water vapor rises to the second steam chamber 15 with the heat. The airflow passing through the second heating chamber 13 carries the residual heat through the guide plate 23 at one end of the first heating chamber 8 for diversion, which is conducive to making the air with residual heat evenly dispersed to enter the interior of multiple heating tubes 24, so that the residual heat in the air can heat the heating tube 24, and then the heating tube 24 can heat the first heating chamber 8. The soft water inside is heated, and the water vapor evaporated by the heating of the soft water in the first heating chamber 8 rises to the first steam chamber 7 with the heat, and then enters the second steam chamber 15 through the fourth circulation pipe 17 for collection, and the steam with heat in the second steam chamber 15 enters the preheating tube 2 through the first circulation pipe 3, and then the water vapor with heat can heat the heating tube 24 inside the preheating tube 2, so that the outdoor air can be preheated when entering the heating tube 24 through the guide plate 23 at one end of the preheating tube 2, thereby increasing the temperature of the outdoor air entering the room, and then the preheated air will be discharged through the other end of the preheating tube 2 into the air conditioner body 1, thereby achieving the purpose of increasing the temperature of the incoming air, saving the energy consumption of the air conditioner during heating, and through secondary recovery,This will help improve the efficiency of heat absorption and reduce the cost of air conditioning.
[0016] The two ends of the heat exchange tube 22 are respectively connected to the two ends of the water tank 14, and a lifting pump 18 is installed at one end of the heat exchange tube 22. The top of the water tank 14 is connected to the bottom of the second steam tank 15, which is conducive to the water inside the heat exchange tube 22 circulating in the water tank 14 and the heat exchange tube 22 under the action of the lifting pump 18.
[0017] Guide plates 23 are provided at both ends of the first heating bin 8 and the preheating tube 2, and heating tubes 24 are provided inside the first heating bin 8 and the preheating tube 2. The heating tubes 24 are connected to the holes and grooves on the surface of the guide plates 23. The multiple holes and grooves provided on the surface of the guide plates 23 are conducive to diverting the air and then dispersing the air, thereby improving the heat exchange efficiency.
[0018] The heating tubes 24 are distributed at equal intervals with each other. The number of the heating tubes 24 corresponds to the number of holes on the surface of the guide plate 23, and there are gaps between adjacent heating tubes 24. The heating tubes 24 are made of a copper-aluminum composite material. The gaps between the heating tubes 24 are conducive to the circulation of soft water, and the copper-aluminum composite material is conducive to improving heat exchange efficiency.
[0019] The two ends inside the second heating chamber 13 are welded to the two ends of the connecting rod 21. The connecting rod 21 is arranged in a ring shape with equal intervals inside the second heating chamber 13. The surface of the connecting rod 21 is welded to the upper baffle 19 and the lower baffle 20 respectively. The upper baffle 19 and the lower baffle 20 are arranged in a semicircular shape. The upper baffle 19 and the lower baffle 20 are staggered up and down, and the distance between adjacent upper baffles 19 is equal, which is conducive to allowing the air to move up and down inside the second heating chamber 13, thereby helping to increase the flow range of the airflow.
[0020] The outer walls of the preheating tube 2 and the second heating chamber 13 are both provided with an insulation layer. A heat exchange tube 22 is provided inside the second heating chamber 13. The heat exchange tube 22 is spirally arranged. The surface of the heat exchange tube 22 is welded to the inner wall of the second heating chamber 13. The heat exchange tube 22 is made of a copper-aluminum composite material. The insulation layer is provided to help reduce heat loss. The spirally arranged heat exchange tube 22 is helpful to increase the area in contact with the airflow with waste heat.
[0021] Working principle: When the device is in use, the air inside the workshop will enter the second heating chamber 13 when it is discharged, and the air with waste heat can move up and down through the upper baffle 19 and the lower baffle 20 inside the second heating chamber 13, which is conducive to extending the airflow formed inside the second heating chamber 13, so that the air with waste heat can fully contact the heat exchange tube 22, thereby heating the soft water inside the heat exchange tube 22. Under the action of the lifting pump 18, the heated soft water inside the heat exchange tube 22 can circulate to the water chamber 14, and then the evaporated water vapor rises to the second steam chamber 15 with heat. The airflow passing through the second heating chamber 13 carries the residual heat through the guide plate 23 at one end of the first heating chamber 8 for diversion, which is conducive to allowing the air with waste heat to enter the multiple heating tubes 24 evenly and dispersedly, so that the waste heat in the air can heat the heating tubes 24, and then the heating tubes 24 can heat the first heating chamber 8 is heated, and the water vapor evaporated by the heating of the soft water in the first heating chamber 8 rises to the first steam chamber 7 with heat, and the air after the heat is fully recovered is discharged through the exhaust device 9, and at the same time, the water vapor with heat in the first steam chamber 7 enters the second steam chamber 15 through the fourth circulation pipe 17 for collection, and the steam with heat in the second steam chamber 15 enters the preheating pipe 2 through the first circulation pipe 3, and then the water vapor with heat can heat the heating pipe 24 in the preheating pipe 2, so that the outdoor air can be preheated when entering the heating pipe 24 through the guide plate 23 at one end of the preheating pipe 2, thereby increasing the temperature of the outdoor air entering the room, and then the preheated air will be discharged through the other end of the preheating pipe 2 into the air conditioner body 1, so as to increase the temperature of the inlet air, save the energy consumption of the air conditioner during heating, and through secondary recovery, it is beneficial to improve the efficiency of heat absorption, thereby reducing the cost of using the air conditioner.
[0022] The components of the present invention are 1. air-conditioning main body; 2. preheating pipe; 3. first circulation pipe; 4. second circulation pipe; 5. first circulation pump; 6. third circulation pipe; 7. first steam bin; 8. first heating bin; 9. exhaust device; 10. first flange; 11. connecting bolts; 12. second flange; 13. second heating bin; 14. water bin; 15. second steam bin; 16. insulation cover; 17. fourth circulation pipe; 18. lifting pump; 19. upper baffle; 20. lower baffle; 21. connecting rod; 22. heat exchange pipe; 23. guide plate; 24. heating pipe, all of which are universal standard parts or parts known to those skilled in the art, and their structures and principles can be known to those skilled in the art through technical manuals or conventional experimental methods.
[0023] The above shows and describes the basic principles and main features of the present invention and the advantages of the present invention. It is obvious to those skilled in the art that the present invention is not limited to the details of the above exemplary embodiments, and the present invention can be implemented in other specific forms without departing from the spirit or basic features of the present invention. Therefore, no matter from which point of view, the embodiments should be regarded as exemplary and non-restrictive. The scope of the present invention is defined by the attached claims rather than the above description, and it is intended that all changes falling within the meaning and scope of the equivalent elements of the claims are included in the present invention. Any figure mark in the claims should not be regarded as limiting the claims involved. In addition, it should be understood that although the present specification is described according to implementation modes, not every implementation mode contains only one independent technical solution. This description of the specification is only for the sake of clarity. Those skilled in the art should regard the specification as a whole. The technical solutions in each embodiment may also be appropriately combined to form other implementation modes that can be understood by those skilled in the art.
Claims
1. An exhaust waste heat recovery device for an air conditioner in an automobile painting process, comprising an air conditioner main body (1), characterized in that: The air conditioner main body (1) comprises a preheating pipe (2), a first heating chamber (8), a second heating chamber (13), an upper baffle (19), a heat exchange pipe (22) and a heating pipe (24). The preheating pipe (2) is installed on one side of the air conditioner main body (1). One end of the preheating pipe (2) is connected to the interior of the air conditioner main body (1). The preheating pipe (2) is connected to the first circulation pipe (3) and the second circulation pipe (4) respectively. The second circulation pipe (4) is connected to one end of a first circulation pump (5). The other end of the first circulation pump (5) is connected to one end of a third circulation pipe (6). The other end of the third circulation pipe (6) is connected to the interior of a first steam chamber (7). The bottom of the first steam chamber (7) is connected to the interior of the first heating chamber (8). The first heating bin (8) is connected to the second steam bin (15), one end of which is provided with an exhaust device (9), the other end of which is provided with a first flange (10), the first flange (10) being connected to the second flange (12) by a connecting bolt (11), the second flange (12) being arranged at one end of the second heating bin (13), the top of which is provided with a water bin (14), the top of which is connected to the bottom of the second steam bin (15), one end of which is connected to one end of a fourth circulation pipe (17), the other end of which is connected to the top of the first steam bin (7), and the outside of which is provided with a heat preservation cover (16).
2. According to claim 1, the exhaust waste heat recovery device of the air conditioner in the automobile painting process is characterized by: Both ends of the heat exchange pipe (22) are respectively connected to both ends of the water bin (14), and a lift pump (18) is installed at one end of the heat exchange pipe (22). The top of the water bin (14) is connected to the bottom of the second steam bin (15).
3. According to claim 1, the exhaust waste heat recovery device of the air conditioner in the automobile painting process is characterized by: Both ends of the first heating chamber (8) and both ends of the preheating tube (2) are provided with guide plates (23), and both the first heating chamber (8) and the preheating tube (2) are provided with heating tubes (24) inside, and the heating tubes (24) are connected to the holes and grooves on the surfaces of the guide plates (23).
4. According to claim 1, the exhaust waste heat recovery device of the air conditioner in the automobile painting process is characterized by: The heating tubes (24) are distributed at equal intervals from each other, the number of the heating tubes (24) corresponds to the number of holes on the surface of the guide plate (23), and there are gaps between adjacent heating tubes (24), and the heating tubes (24) are made of a copper-aluminum composite material.
5. According to claim 1, the exhaust waste heat recovery device of the air conditioner in the automobile painting process is characterized by: The two ends of the second heating chamber (13) are welded to the two ends of the connecting rod (21); the connecting rod (21) is arranged in a ring shape at equal intervals inside the second heating chamber (13); and the surface of the connecting rod (21) is respectively welded to the upper baffle plate (19) and the lower baffle plate (20).
6. According to claim 1, the exhaust waste heat recovery device of the air conditioner in the automobile painting process is characterized by: The upper baffle plate (19) and the lower baffle plate (20) are arranged in a semicircular shape, the upper baffle plate (19) and the lower baffle plate (20) are distributed in an up-and-down staggered manner, and the distances between adjacent upper baffle plates (19) are equal.
7. According to claim 1, the exhaust waste heat recovery device of the air conditioner in the automobile painting process is characterized by: The outer walls of the preheating tube (2) and the second heating chamber (13) are both provided with a heat insulation layer, and a heat exchange tube (22) is provided inside the second heating chamber (13). The heat exchange tube (22) is arranged in a spiral shape, and the surface of the heat exchange tube (22) is welded to the inner wall of the second heating chamber (13). The heat exchange tube (22) is made of a copper-aluminum composite material.
